PROTECTION & REVITALISATION OF KINGSCLIFF FORESHORE PROJECT. July Prepared for: Tweed Shire Council. Prepared by: Business Sense

PROTECTION & REVITALISATION OF KINGSCLIFF FORESHORE PROJECT July 2016 Prepared for: Tweed Shire Council Prepared by: Business Sense THE REGION Nort...
Author: May Terry
0 downloads 1 Views 3MB Size
PROTECTION & REVITALISATION OF KINGSCLIFF FORESHORE PROJECT July 2016 Prepared for: Tweed Shire Council Prepared by: Business Sense

THE REGION

Northern Rivers | Tweed

Tweed Shire is located in the northeast corner of New South Wales, about 860 kilometres north of the Sydney CBD and around 100 kilometres south of the Brisbane CBD. Tweed Shire covers 1303 square kilometres and adjoins the NSW shires of Byron, Lismore and Kyogle, with the NSW/Queensland border to its north where it divides the twin towns of Tweed Heads and Coolangatta. Tweed is the largest local government area in the Northern Rivers region. The Northern Rivers is forecast to be the fastest growing region in NSW during the next twenty years, with population forecast to grow at 1.2% per annum (0.4% above the state average). According to the Australian Government Department of Health and Aging, the Northern Rivers region is projected to grow from 283,615 in 2007 to 359,720 in 2027. This population growth is driving high investment and employment growth, bringing demand for infrastructure e.g. houses, roads, and shopping centres; and demand for retail and financial products, health and education services, and other community services. For the past previous 3 years, Tweed itself has had one of the fastest and largest population growths in NSW, growing by over 2000 people per year and reaching over 91,210 residents in 2014 (ERP ABS 2015). The population is estimated to reach more than 126,000 by 2036. The diverse population is geographically spread between urban communities, coastal and rural towns and more than fifteen villages. For more than a decade the Kingscliff area has seen exponential growth elevating it from a coastal village to a key subregional centre servicing the Tweeds network of coastal villages. With new residential releases to meet increased demand from people migrating to the area from predominantly Sydney, Kingscliff will soon surpass the population threshold of a small coastal city with a population of over 20,000 residents. The Kingscliff coastline features numerous world-class surf beaches cradled between headlands. The potential for sustainable economic growth based on developing tourism in the area is significant. However, the area adjacent to Marine Parade (the main street) is subject to immediate risk from coastal erosion, which threatens public and private infrastructure, and ultimately businesses and dwellings, and severely limits the economic growth potential of the immediate area.

2 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

TABLE OF CONTENTS 1. EXECUTIVE SUMMARY 1.1 1.2 1.3 1.4 1.5

Background Purpose Economic Benefits Social Benefits Environmental Benefits

9 10 11 12 12

8

2. Methodology 14 2.1 Potential Limitations

16

17

3. REGIONAL PROFILE 4. SCOPE & BACKGROUND 4.1 4.2 4.3 4.4 4.5 4.6

Planned Outcomes Timeframes & Milestones Seawall Beach Access Central Park Kingscliff Beach Holiday Park

5. Do Nothing Approach 6. Economic benefits 6.1 6.2 6.3 6.4 6.5 6.6

Cost Benefit Analysis Economic Impact Assessment Loss of Economic Benefits Improved Amenity & Land Values Improved Health Increases in Revenue

22 23 25 29 29 31

40 42 42 43 44 45

7. Social benefits 7.1 7.2 7.3 7.4

Sustainable Procurement Climate Change Stormwater Management Education

8. Environmental benefits 8.1 8.2 8.3 8.4

Educational Benefits Community Cohesion Cohesion & Climate Change Socio-Cultural Development

49 49 50 51

59 59 59 59

Funding Arrangement Asset Management Project Management Risk Management

60 63 63 64 66 67

11. Strategic Alignment 11.1 RDA Northern Rivers 11.2 Northern Rivers Social Plan 11.3 NSW 2021 11.4 Visitor Economy Action Plan 11.5 Tweed Community Strategic Plan 11.6 North Coast Destination M’mt Plan 11.7 Tweed Economic Dev’mt Plan 11.8 Kingscliff & Cudgen Locality Plan 11.9 Tweed Sports Field Strategy 11.10 Northern Rivers Catchment Action Plan

53

62

10. PROJECT DELIVERY 10.1 10.2 10.3 10.4

35 39

47

9. Community Education 9.1 Project Delivery

20

69 70 71 71 72 72 73 73 74 75 75

12. REFERENCES 76 13. ANNEXURES 79

©Copyright Tweed Shire Council This work is copyright. Except as permitted under the Copyright Act 1968 (Cwlth), no part of this publication may be reproduced by any process, electronic or otherwise, without the specific written permission of the copyright owners. Information may not be stored electronically in any form whatsoever without such permission. Disclaimer The authors do not warrant that the information in this document is free from errors or omissions. The authors do not accept any form of liability, be it contractual, tortious, or otherwise, for the contents of this document or for any consequences arising from its use or any reliance placed upon it. The information, opinions and advice contained in this document may not relate, or be relevant, to a particular reader’s circumstance. Opinions expressed by the authors are the individual opinions expressed by those persons and are not necessarily those of the publisher, research provider or Tweed Shire Council.

REGIONAL CONTEXT Tweed

Northern Rivers

4 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

6,679 REGISTERED BUSINESSES 2014

91,210 POPULATION ABS ERP 2015

$2.816B

TWEED REGION

GROSS REGIONAL PRODUCT (NIEIR 2014)

28,780 LOCAL JOBS

125,953 2036 POPULATION

Health care &social Assistance LARGEST INDUSTRY

TOTAL PROJECT COST

TOTAL FUNDS REQUESTED

$9.8M

$21.21M

46%

CONFIRMED PARTNER FUNDING

$11.4M 54%

KINGSCLIFF FORESHORE PROTECTION & REVITALISATION

PROJECT ACTIVITIES

Foreshore Protection

$8,818,100



Rock seawall protection of the Kingscliff Beach Holiday Park



Protection of community and associated infrastructure adjacent to the CBD



Stepped 5m high concrete seawall opposite Kingscliff Central Park



Accessible beach access points connecting beach and community hub to CBD



Stormwater drainage runoff quality and control

Kingscliff Central Park

$4,861,400



Enlarged Cenotaph Area



Recreational activities: skateboard area, half basketball court, fitness equipment



3.5m Board walk/cycleway to link with the Tweed and Gold Coast’s Cycleways



Additional public parking



New park furniture / amenities / viewing platforms/landscaping



Refurbishment of the existing Kingscliff Community Hall



Amphitheatre



Facilities for youth and disadvantaged groups including aged and disabled

Kingscliff Beach Holiday Park Upgrade $7,525,900 •

New amenities block / park buildings



Reduction in area to 60 sites



Improved facilities to provide a high standard park

• New access road and improved landscaping 6 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT 7 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

1. EXECUTIVE Summary The Protection and Revitalisation of Kingscliff Foreshore Project will see the permanent protection of the foreshore, creation of a central park with active and passive space and revitalisation of a key tourism asset, the Kingscliff Beach Holiday Park. The Project will transform Kingscliff and will trigger urban revitalisation that will beautify the foreshore corridor and make it a more attractive place to live, work and visit.

The Protection and Revitalisation of Kingscliff Foreshore Project focuses on the reinvigoration of the Kingscliff foreshore through the creation of a central community hub, redevelopment of community and tourism infrastructure and, importantly, connection of the walking, cycleway and beach to the Main Street and Central Business District. A critical element of this project is the construction of a permanent seawall to protect the public and central business district from coastal erosion and natural events.

8 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

This project will significantly contribute to the economic counterbalance required to meet with the direct impact and cost of coastal erosion on Kingscliff, an impact that has left the majority of the foreshore and adjacent CBD uneconomical to develop. The completion of the Project will act as a catalyst for further public infrastructure and attract private sector development due to minimising risk of damage from erosion and natural events caused by climate change. Presently, development of both public and private infrastructure is inhibited due to the lack of a permanent solution for foreshore protection adjacent to the central business district.

In addition, the Project elements will provide a stronger relationship between the park, the beach and the central business district of Kingscliff. The Project objectives will be realised by upgrading the existing Holiday Park and reducing its area, to allow for the creation of a community park opposite the Kingscliff central business district. The proposed features for the park include recreational facilities for the aged, disabled and youth, improved beach access, enlarged Cenotaph area, new amenities block, boardwalk with viewing platforms, barbeques, picnic shelters and landscaping. The improved community hall will create a central community hub for festivals and events. Kingscliff’s revitalisation will draw on its unique identity, provide facilities for the increasing population, employment opportunities and create a contemporary and vibrant beach destination. It will also enhance Kingscliff Beach’s role as a meeting place, providing a welcoming space for families, recreation, leisure, sporting and community groups. The Project will ensure, through significant infrastructure enhancements, value for money and a return on investment for the Tweed Region and the Commonwealth Government.

1.1 Background Tweed Shire Council undertook an extensive process to develop a Coastline Management Plan for the 37 kilometres of coastline under its management. The only section of public (or private) land that was identified as having significant assets within the ‘Immediate Hazard Zone’ was a section of coastline at Kingscliff.

9 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

This section of the coastline is located directly adjacent to the central business district of Kingscliff, the Kingscliff Beach Bowling Club, The Kingscliff Beach Holiday Park and Cudgen Headland Surf Life Saving Club. The coastline headland has been severely damaged by coastal erosion and has had significant environmental, economic and social impacts on the Tweed Community. Estimates of the loss of income due to erosion were provided by representatives from the Kingscliff Beach Holiday Park (KBHP), Cudgen Headland Surf Lifesaving Club (CHSLC) and by Marine Parade business owners, and are in the order of 30-40%. The community of Tweed has invested over $1.98 million over the last 5 years alone for temporary fixes and access ways to maintain the beach foreshore. Due to the erosion and lack of permanent protection, the public and private assets located adjacent to the foreshore, have become run down and degraded. The current park is small, cluttered and unsightly; the community hall degraded and there is no access for the public from the beach to the main street. No major redevelopment of the Kingscliff Beach Holiday Park can occur without first ensuring the protection of the Park from coastal erosion and recession. The approved final design for revitalisation of the Park considers the requirements that would arise from the design and implementation of protection works. The ongoing upgrade and continued profitability of Tweed Coast Holiday Parks is important to Tweed Shire as the profit from these parks, on reserved Crown Land, assists with the maintenance of the other hundreds of hectares of coastal Crown Lands that are under the care and control of Council.

The Kingscliff Foreshore Masterplan was completed in early 2007 and this Business Case forms the second part of the project to support funding applications to enable the implementation of the Plan. The Masterplan was prepared to guide planning and decision making in order to improve the amenity and attractiveness of both the foreshore and Kingscliff. Analysis of the economic, social and environmental aspects of the options then provides a robust and rigorous basis for decision-making.

This project will result in a myriad of benefits. It provides security for the Kingscliff foreshore; it provides new open community space; it enhances and sustains the profitability of the holiday park; it protects the main commercial precinct and the many shops fronting the foreshore; and it will assist in maintaining the beach and foreshore, which are a major economic driver and tourism attraction of the area. It also creates a more functional community centre in the middle of town and creates additional parking capacity to support local businesses and the foreshore park.

10 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

1.2 Purpose Kingscliff has reached a point where the need for a permanent infrastructure solution is critical to preserving the Kingscliff foreshore from severe erosion therefore protecting public and private infrastructure. The Project is driven by the community of Kingscliff and broader Tweed Region, which has been severely affected over the past ten years by the continual erosion of the beach. Key issues and opportunities for the foreshore were sought through extensive consultation with both the local community and other stakeholders, in order to develop a strategic direction that is reflective of the local community’s wants and needs. The Kingscliff Foreshore Masterplan is a direct result of extensive consultation with the community, business owners and government stakeholders. Council is seeking to facilitate sustainable and site responsive development and the Project, being the implementation of the Kingscliff Foreshore Masterplan, is essential to help achieve this. The Masterplan provides the objectives and principles that have been defined through consultation to improve both the quality of life experienced by local residents and visitors, as well as assist and enhance the economic performance of the town. The Project builds on previous work undertaken by the Council that assists with the protection and reinvigoration of the foreshore and Main Street to both attract visitors and show confidence to the community in facing the severe impacts of continual beach erosion.

1.3

ECONOMIC BENEFITS

The Project’s completion will have significant economic benefits, both direct and indirect. Direct benefits include employment during and post construction and contribution to the economy through the purchase of materials. The project will generate indirect benefits in multiple ways. Improved amenity in a key area of the CBD leading to increased value of properties and a flow on for commercial return from investment, improved health of the community with resultant cost savings for the government, greater opportunity for tourism and other special events are a few of these benefits that will be realised. Tweed Shire Council commissioned an independent cost-benefit analysis to identify, quantify and compare the costs and benefits of the Project. The benefits and costs were compared against a baseline, which was the equivalent of maintaining the status quo, in this case not undertaking the Foreshore Protection works, upgrading the Kingscliff Beach Holiday Park or providing upgrades to other facilities. The cost-benefit analysis was based on the assumption that the various components of the Project are interlinked but are predicated on protection of the foreshore.

Continued coastal erosion of the Kingscliff foreshore will have a detrimental impact on tourism locally, a significant contributor to the area’s economy. Using tourism data for visitation to Kingscliff, the analysis determined an estimate of the size of the tourism impact. With the central discount rate of 7 per cent, the Project has a benefit cost ratio of 2.72 and a Net Present Value of $35 million.

11 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

As the benefit cost ratio is greater than 1 and the net present value is positive, the Project can be deemed an efficient use of funds. Based on the information provided by Tweed Shire Council, the estimated economic impact of the construction phase on Tweed LGA is: Year 1: $6.1 million in GRP | 48 FTE Year 2: $5.3 million in GRP | 44 FTE Year 3: $8.0 million in GRP | 69 FTE It should be noted that the above estimates of the economic impact are not cumulative but reflect the impact, including flow-on effects, in the year in which the expenditure was made. The cost-benefit analysis identified a range of other negative economic outcomes if the Project does not proceed:



Loss of personal income tax revenue if individuals employed in tourism-related businesses should lose their job as a result of decreased tourist visitation locally;



Increased welfare payments if individuals employed in tourism-related businesses should lose their job as a result of decreased tourist visitation locally and consequently seek to access Centrelink or other benefits;



Decreased payroll tax revenue, reducing accruals to the State government; and



Increase in unemployment levels locally, with the associated negative impacts on health, crime statistics and other social implications.

1.4

Social Benefits

The Protection and Revitalisation of Kingscliff Foreshore Project will deliver many social benefits for the community of Kingscliff and wider region including building community pride, education benefits for children, encouraging social connectivity, providing access and linkages and reducing crime in the Region. Evidence also suggests that public spaces such as Central Park can offer opportunities for people who may not normally interact to come together, and help develop social ties and community cohesion. This is particularly useful for groups in the Kingscliff Region community who are more vulnerable to social exclusion, such as older and younger people, and ethnic minorities. These benefits are significant due to the disruption and negative social effects on the Kingscliff community of severe erosion events impacting the foreshore over the past ten years. Through the completion of the project, the community will regain confidence and sense of identity in the face of change.

1.5

Environmental Benefits

There are many benefits to the environment through the construction of the seawall and creation of the Central park with open and active spaces. Protection of the foreshore and removal of Holiday Park infrastructure will allow native planting to be undertaken. This will provide habitat for native species allowing an increase in ecological significance for the Central Park area. Stormwater runoff from Marine Parade will be treated using biofiltration,

12 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

This process will remove pollution such as hydrocarbons, nitrogen and phosphorus from stormwater runoff. The biofiltration process will allow ‘clean’ water to infiltrate to the groundwater and minimise the erosive effects of stormwater on the beach. Strengthening the coastal footpath and cycleway will ensure active transport opportunities continue to provide an attractive alternative to road based transport, reducing greenhouse gas emissions and improving health outcomes. The current temporary solution of sand bagging has not only become unsightly but provides a risk to public safety. The installation of the seawall will ensure the safety of all users by replacing the degraded sandbags and provide permanent stability of the foreshore. As sand dunes are rebuilt through the natural and artificial nourishment, these dunes will be stabilised through the re-establishment of native vegetations. This improves the habitat for coastal flora and fauna and improves the resilience of the beach to erosion. There is the opportunity to provide educational and interpretive signage as part of the development of the project to increase awareness about the environmental values of the area. The Project builds on previous work undertaken by the Council to assist to protect and reinvigorate the foreshore and Main Street to both attract visitors and show confidence to the community facing the severe impacts of continual beach erosion.

Table 1: Summary of Project Benefits (2006) Climate change (driver)

Principal direct physical and ecosystem effects

Sustain and increase Tourism to Tweed. Economic Health

Potential secondary and indirect impacts • • • • • • • • • • •

Physical

Private and public assets

• •

• •

Social

Increased Tourism through adding to destination appeal. Hosting of Events and Festivals

• • • • • • •

Environmental

• • •

Creation of direct and indirect employment Hosting of events may generate internal surpluses Visitor expenditure and associated multiplier effects increased demand for goods and services Extension of tourist season - smooth out cyclical demand Improved health through physical activity will have cost savings for all levels of Government Increased generation of funds through Holiday Park development going into foreshore management Relatively low capital cost now and future compared with defensive works and Annual maintenance costs to ratepayers Regeneration and beautification of run down areas Stimulation of beautification of commercial buildings in CBD Reduces coastal hazard risks to foreshore land and provides a level of security to built assets for the life of the seawall (~50 years) Visual amenity - the view from the beach towards land, the view from the land out to sea Keeping the Kingscliff Beach Holiday Park, Kingscliff Beach Bowls Club & Cudgen Headland Surf Lifesaving Club where they are Entertainment and social opportunities for local residents through increased events/festivals Increase in the level of local interest in the activity associated with the event Opportunity for inter-cultural contact through tourism visitation and hosting of events and festivals Bring a sense of belonging and sharing to the community Increased regional profile Increased local pride Greater cultural diversity Increased community cohesion High value natural foreshore and beach system will develop and remain over time Natural beach and foreshore is a high value asset with minimal maintenance input Natural erosion buffer provided by beach sand reserves. A ‘natural’ beach will exist

13 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

2. METHODOLOGY

14 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

2. METHODOLOGY Tweed Shire Council has engaged Business Sense to prepare a business case for the Protection and Revitalisation of Kingscliff Foreshore Project. The business case has three primary objectives:







Due to the long history of the Project and scope, detail clearly the Project scope and rationale behind the Project. To present decision-makers with key information on the Project in a consistent, balanced format that facilitates the evaluation, comparison and prioritisation of competing initiatives. To ensure that resources are allocated based on a sound business rationale and consistent with the priorities of the Federal Government Policies.

A comprehensive review of the literature was carried out to locate all relevant studies from Australia and internationally. Economics and ‘grey literature’ databases were searched using relevant search terms tailored to each research question including variants on the search terms. A review of Tweed Shire Council’s existing strategies relating to the Project was undertaken including but not limited to:



Kingscliff Foreshore Masterplan



Tweed Shire Council Community Strategic Plan



Sports Fields and Reserves Policy



Tweed Economic Development Strategy



Youth Strategy and Action Plan



Access and Inclusion Plan



Kingscliff Context Issues & Opportunities Paper



Various Foreshore Planning Documents including but not limited to the Tweed Coastline Management Study, Tweed Coastline Management Plan Report, and Tweed Coastline Hazard Definition Study Report.

In light of the limitations discussed in the next section, this report draws on national and international literature to support the Project and have been threaded through the report to help illustrate certain points. Wherever possible, examples have been chosen that have been evaluated and are considered to have a reasonable evidence base. These include:



Various climate change and erosion reports



External reports citing Kingscliff



Australian Parliamentary reports and citations including but not limited to House debates (Justine Elliot) Thursday, 23 October 2014.

15 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

2.1

Potential Limitations



In addition to the direct economic impacts, it is important to recognise the contribution made by the social and environmental impacts of the public realm.



Economic activity (consumer spend, new investment and development activity).

The following limitations have been identified when undertaking the cost benefit analysis:



The quality of the foreshore public domain is often influenced by interrelated processes, making it difficult to isolate the impact of different variables.



The economic impacts of investment in the public realm are often long term (and beyond the timescale of the evaluation).



The confidential nature of the retail business involved in sourcing financial data for the future impacts.

16 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

3. REGIONAL PROFILE

17 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

3. THE TWEED REGION Tweed Shire is located in the northeast corner of New South Wales, about 860 kilometres north of the Sydney CBD and around 100 kilometres south of the Brisbane CBD. Tweed Shire covers 1,303 square kilometres and adjoins the NSW shires of Byron, Lismore and Kyogle, with the NSW/Queensland border to its north where it divides the twin towns of Tweed Heads and Coolangatta. Tweed is one of the fastest growing Regions in NSW, with a current population of 89,642, and is forecast to grow to 125,953 by 2036. Increasing population puts pressures on existing services and physical infrastructure. In line with this population growth, the number of dwellings in the Tweed is forecast to grow from 40,452 in 2011 to 48,427 in 2026, with the average household size rising from 2.38 to 2.39 by 2026. Between 2011 and 2026, the age structure forecasts for Tweed Shire indicate a 28.3% increase in population under working age, a 27.3% increase in population of retirement age, and a 15.5% increase in population of working age. Tweed Shire has long been acknowledged as a retirement destination, the age profile of the Shire reflects an ageing population, particularly in the urban areas around Tweed Heads. The population aged 55 and over comprises 38% of the population in urban areas; in rural areas, the same age group represents 30% of the population. There is obvious pressure on living standards. Most residents (69%) work outside the Tweed in a reasonably

18 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

diverse set of industries. The median household income in the Tweed is 50% less than the State average. More than 60% of these households earn less than $1,000 per week, ranking the Tweed as ‘disadvantaged’ on a socioeconomic index.

Tweed Shire has had strong population growth over the past 10 years at around 1.6% per annum, significantly higher than the Northern Rivers Region average. The population is forecast to grow, with Tweed Coast to capture the majority of this growth in the Northern Rivers Region. An increasing population places pressures on existing services and physical infrastructure. ABS Census data shows that the urban and rural residential population are increasingly attaining tertiary-level qualifications.

In particular, postgraduate degree holders more than doubled in rural Tweed Shire between 2001 and 2011; in urban Tweed Shire, this segment tripled over the same period. Certificate level and Bachelor degree-holders continue to compose the largest proportion of education-attainment in both rural and urban Tweed Shire. Both qualification levels saw substantial growth in the past decade. According to the Australian SocioEconomic Index, Tweed Shire is a relatively disadvantaged area, with the most significant disadvantage experienced in Kingscliff. In 2011, the unemployment rate of the 15 to 24 years was 16.1% in Tweed compared to 12.9% in Regional NSW demonstrating the need for the provision of low or unskilled labour in the Region. In the March quarter 2015, Tweed LGA reported an unemployment rate of 8.5%, significantly higher than either New South Wales (5.9%) or Australia (6.1%). The coastline makes an important economic contribution to the Tweed Region. Coastal and beach amenities are clearly a component of the lifestyle, and the surf break is recognised as sufficiently desirable to attract outof-town visitors. Data published by Destination NSW and sourced from Tourism Research Australia indicates that the LGA of Tweed attracted approximately 534,000 overnight visitors in 2014 (measured as a four year annual average), generating a total of 2,054,000 visitor nights. Domestic travel contributed the majority of visitors (96%) with 512,000 overnight visitors and 1,807,000 visitor nights, reflecting an average length of stay of 3.5 nights.

19 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

International travellers made up 22,000 visitors and 247,000 visitor nights (12% of total visitor nights) with an average length of stay of 11.4 nights. Total visitor expenditure in Tweed Shire derived from overnight visitors was estimated to be $257 million with $243 million or almost 95% derived from domestic overnight visitors. Data published by the Australian Bureau of Statistics (ABS) relating to nights spent in tourist accommodation indicates that, in 2013-14, guest nights spent in tourist accommodation in the Kingscliff – Fingal Head area approximated 42.9% of all guest nights spent in Tweed Shire, therefore injecting over $77m into the local economy. Tweed beach destinations are prominent attractions for visitors with over 44% noting beaches as most popular attraction in the Region (source: Destination NSW 2013).

Tourism has been a key economic driver for the region; however there has been a significant decline in respect to the total number of visitors with a 7.5% annual decrease and visitor expenditure (0.8% decrease) in 2012.

4. PROJECT SCOPE & BACKGROUND

20 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

4. PROJECT SCOPE & BACKGROUND The Protection and Revitalisation of Kingscliff Foreshore will see the creation of a central community hub (Central Park), redevelopment of community and tourism infrastructure and importantly connecting the shared pathway and beach to the central business district. A critical element of this project is the construction of a permanent seawall to protect the public and private infrastructure from coastal erosion and natural events. The Tweed’s ocean beaches contribute significantly to the regional economy and have earned the Region an enviable reputation as a premier tourist destination and the best place to live. The ongoing health of the Kingscliff Beach foreshore is vitally important to the Tweed economy into the future. The various components of the Project are inter-linked but are predicated on protection of the foreshore. Continued coastal erosion of the Kingscliff foreshore will have a detrimental impact on tourism locally, a significant contributor to the area’s economy. The Project aims to provide the critical infrastructure to protect and improve the Kingscliff foreshore for the benefit of locals, businesses and visitors to the area. The completion of the Project will act as a catalyst for further public infrastructure and will attract private sector development as a result of minimising the risk of damage from erosion and natural events. Currently, public and private development is inhibited due to the lack of a permanent solution for foreshore protection adjacent to the central business district. Feedback from the community vision survey and the community workshop undertaken for the Kingscliff Context, Issues and Opportunities paper,

identified a number of issues, which relate directly to the Kingscliff retail and town centre experience. These issues are intrinsically linked to the Project. These issues include:



The experiential qualities of the town centre are now car dominated and there is a lack of well-located and accessible car parking.



There is currently no recognisable town centre or town heart which defines the retail centre. It is currently dispersed between the lineal Marine Parade shopping strip and the internalised Kingscliff Village Shopping centre.



Marine Parade shopping precinct (main street) is generally looking tired and run down, with many buildings in need of maintenance and improvements.



There is a general lack of legibility and connectivity especially for pedestrians and a lack of unifying public domain elements.

The construction of a permanent seawall at Kingscliff will see the creation and renewal of community infrastructure so that the beachfront and surrounding public domain is modernised and more functional. The current foreshore is aesthetically poor with low amenity value due to erosion and temporary emergency foreshore protection measures.

of the region as well maintaining employment in the critical tourism sector. The key impediment to meeting these needs as well as the attraction of new development and business is the continual erosion of the foreshore, which requires a permanent solution to mitigate the risk.

Additionally, beach access is continually changing or unavailable as erosion makes its way along the beach.

4.1 Planned Outcomes

The proposed upgrade will deliver foreshore protection, updated urban design to facilities, rationalise car parking, increased shade, provide modern furniture and improve vista and access to Kingscliff Beach. Upon completion, the Project will make the area more attractive for visitors, residents and commercial operators as well as being more pedestrian friendly.

The Kingscliff foreshore area is a major tourism and recreational resource, however coastal erosion has resulted in environmental degradation, loss of natural and cultural values and declining community benefit. The Kingscliff Beach Holiday Park is of a poor standard, as uncertainty around foreshore protection has not allowed upgrades of park infrastructure in order to bring it up to contemporary standards. Overall, the Project is driven from the need to provide appropriate community infrastructure to meet the increased needs associated with the growth

1. Foreshore Protection



Rock seawall - protection of the Kingscliff Beach Holiday Park and public and private infrastructure adjacent to the CBD



Stepped concrete seawall protection of Kingscliff Central Park



Accessible beach access points connecting beach and community hub to CBD



Stormwater drainage runoff quality and control

2. Kingscliff Central Park



Enlarged Cenotaph Area



Recreational activities: Skateboard area, half basketball court, fitness equipment



3.5m wide Board walk/cycleway to link with the Tweed and Gold Coast’s Cycleways



Additional public parking



New park furniture / amenities / viewing platforms/landscaping



Refurbishment of the existing Kingscliff Community Hall to allow it to be more accessible and to better facilitate community uses



Amphitheatre



Facilities for disadvantaged groups, aged, disabled and youth

22 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

3. Redevelopment of Kingscliff Beach Holiday Park



Be used as a baseline for reporting;



New amenities block





New office and managers residence

Assist with delegation and managing of team workloads;



New camp kitchen



15 ensuite sites



20 Cabins







Assist in determining how long the project will take, including in analysing the effect on the overall timeframe of activities going overtime;

Reduction in area to 60 sites creating space for Kingscliff Central Park



Assist with identification of project risks by showing areas of uncertainty;

New access road and improved landscaping



Assist with the management of risk by showing the effect on the project timeline of a risk occurring; and

4.2 Proposed Timeframes and Milestones



Confirm a common understanding of the project timeline among all key stakeholders.

Tweed Shire Council has developed a comprehensive Project Management Plan for the Project, which identifies the project milestones. These are significant events that act as ‘progress markers’ for the project with their achievement being monitored and reported. These timeframes and milestones are flexible if external grant funding is received through the Commonwealth Government. A Gannt chart for the Project has been completed and included in the Project Management Plan to assist in determining how long activities and tasks will take and will:



Assist in determining the relationship between items;



Identify the critical path (the shortest possible path from the first activity to the last);

Table 2: Summary of Project Benefits (2006)

Key Milestones

Key Dates

Announcement

May 2015

Closing NSRF Round 2

July 2015

Planning and Approvals for Seawalls Commence Seawall Construction Complete Seawalls Construction

December 2015 June 2016 March 2017

Start Construction Kingscliff Beach Holiday Park, Central Park and Community Building

May 2017

Complete Project

June 2018

NSRF Project Completion Requirement

23 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

31 December 2019

FACTORS IMPACTING KINGSCLIFF FORESHORE CHANGING CLIMATE The average sea level within Tweed has already risen over 17cm during the 20th Century with a rise of no less than 100cm predicted by 2100*. Storm surges and the resulting coastal erosion are also expected to increase the risk of flooding to several parts of the highly valued foreshore. Development approvals along the foreshore are increasingly being tested against sea level rise modelling and are required to demonstrate ‘coastal dependency’. Source: www.environment.nsw.gov.au/ climateChange/sealevel.htm & http://www. tweed.nsw.gov.au/Item/1350

DEMANDS FOR COMMUNITY SPACE The park and community hall require major capital investment to support the growing community.

AGEING INFRASTRUCTURE The current infrastructure at the existing Cenotaph area & Kingscliff Beach Holiday Park including paths, lights, and other assets are ageing at an accelerated rate. The maintenance and replacement costs are significantly higher along the foreshore compared to other parts of the Region due to the salty seaside conditions and increasing usage.

DECLINING VEGETATION The coastal vegetation, dunes and reserves are feeling the effects of erosion and extreme weather conditions from climate change, increasing population and usage pressures.

DEMANDS FOR ADDITIONAL FACILITIES Population growth and increasing usage along the foreshore is resulting in rising demands for new facilities such as more toilets and beach showers.

24 HOUR CULTURE OVER SUMMER The competing demands for improved residential amenity, passive recreation and more active recreational opportunities continue to grow. The expectation for improved swimming safety and long-term education programs is also rising in the Tweed and Kingscliff areas.

24 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

The Kingscliff foreshore and associated assets located adjacent to the seawall are intrinsically linked. The following section provides a background and rationale to each of the Projects main elements.

long term erosion, shoreline recession, oceanic inundation and coastal entrance instability. Importantly the study identified various public and community assets that were at risk from coastal erosion hazards.

4.3 Seawall

On a short-term basis these assets included:

The Kingscliff foreshore has a history of severe coastal erosion events and active shoreline management. Tweed Shire Council has been actively working to understand and manage the impacts of coastal hazards within its local government area for at least the last fifteen years. There has been extensive consultation with the community and business sector of the Region with regards to options for the foreshore. To effectively manage the Kingscliff coastline the community has invested over $2.5 million in temporary seawalls to protect the public and private assets located on the foreshore (Table 3). In addition, there has been numerous ongoing studies and plans to guide the management of the Kingscliff coastline. Specifically, a Coastal Hazard Definition Study (CHDS) was completed in 2001 (WBM Oceanics, 2001), a Coastline Management Study (CMS) was completed in 2003 (Umwelt, 2003), Coastline Management Plan (CMP) was developed in 2005 (Umwelt, 2005) and Tweed Shire Coastal Hazards Assessment in 2013 (BMT WBM, 2013) and Kingscliff Coastal Risk Management Study 2015 (BMT WBM, 2015). In 1999, Tweed Shire Council completed an extensive Coastline Management Plan in accordance with the NSW Government Coastline Management Manual (1990). The Tweed Coastline Hazard Definition Study was adopted in 2001 and identified the individual coastline hazards including short and



The Cudgen Headland Surf Life Saving Club;



Kingscliff Community Hall; and



Kingscliff Beach Holiday Park.

Tweed Shire Council then completed the Tweed Shire Coastline Management Plan (2005), which outlined a protection strategy in the form of a 500m long rock seawall combined with beach nourishment. Community consultation and feedback confirmed this option with the strong value put on maintaining beach amenity. In 2010, in accordance with the adopted Coastal Management Plan, Council completed a concrete seawall to protect the Cudgen Headland Surf Life Saving Club at a cost of $430,000. However, during 2009-2012 a number of severe erosion events were experienced at Kingscliff Beach resulting in the significant loss of foreshore land which impacted on public assets and infrastructure. Assets that were destroyed or had to be relocated included:



Faulks Park access road and carpark;



Cabins and amenities block at Kingscliff Beach Holiday Park; and



Beach Access Infrastructure.

25 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

Council then undertook emergency foreshore works including constructing a low rock revetment along Faulks Park and constructing a 4m high geotextile sandwall along the Kingscliff Beach Holiday Park and beach nourishment at the southern end of Kingscliff Beach using sand from Cudgen Creek. Over a two year period from 2010 to the end of 2011 Tweed Shire Council and the Tweed Coast Holiday Parks Reserve Trust have spent approximately $2 million on unplanned and emergency coastal erosion protection measures to protect their assets. While these works provide a varying degree of erosion protection, they have impacted on beach amenity and some of the works present a potential risk to public safety. For example the potential for collapse of the steep geotextile bag seawall and the potential for injury to beach users accessing the beach over the rock revetments.

Marine Parade to its south.



By 2100, the erosion hazard extends to Marine Parade along the entire area south from approximately the intersection of Marine Parade and Kingscliff Street.



The Kingscliff Beach Holiday Park and Faulks Park are vulnerable to potential wave inundation due to overtopping during major storm events, extending further landward with shoreline recession and sea level rise.



Inundation by storm tide penetration may affect the eastern fringe of properties along the western shoreline of Cudgen Creek, the extent increasing with sea level rise.

The Tweed Shire Coastal Hazards Assessment (November 2013) identifies the likely extent of coastal risks that may affect the Tweed coastline now and in the future (including sea level rise) and provides the technical basis for the Tweed Shire Coastal Zone Management Plan (CZMP) which is the framework for managing the risks from coastal hazards. The hazard analysis indicates:



Immediate storm erosion would extend into the seaward parts of the presently protected Bowls Club, Kingscliff Beach Holiday Park, Surf Club and adjacent park areas.



The 2050 erosion hazard extent includes a large part of the Bowls Club, essentially all of the Kingscliff Beach Holiday Park and all areas seaward of

26 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

LIST OF PLANNING DOCUMENTS Water Research Laboratory 2010 - 2011 “Review of Tweed Shire Coastline Hazard Lines” Kellogg Brown & Root Pty Ltd “Environmental Assessment and Preliminary Operation Design for Sand Nourishment at Kingscliff Beach” 2011-2012 University of NSW 2011-2012 “Options and Design Report for Foreshore Protection works at Kingscliff Beach” BMT WBM 2012-2013 “Tweed Shire Coastal Hazards Assessment 2012” Griffith University 2013-2014 “Kingscliff Foreshore Management Options - Cost Benefit Analysis” University of NSW 2014-2015 “Foreshore Protection Works Kingscliff Beach. Detailed Concept Terminal Seawall Design” BMT WBM 2014-2015 “Kingscliff Dreamtime Beach Coastal Zone Management Plan” Cardno Constructions 2014-2015 “Geotechnical Investigation. Terminal Seawall Kingscliff” UNSW WRC 2014/2015 “Preliminary Draft Details Concept Terminal Seawall Protection”

27 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

Table 3: Financial Expenditure on the Kingscliff Foreshore 2010-2015 FINANCIAL EXPENDITURE PAST FIVE YEARS TEMPORARY SEAWALLS

FUNDED

AMOUNT

Kingscliff Beach Holiday Park (KBHP) Pump Station to Kingscliff Beach Bowling Club

50%Tweed Shire Council/ 50% KBHP

$470,000

KBHP pump station

50% Tweed Shire Council/50% KBHP

$150,000

CHSLSC to pump station -

Tweed Shire Council

$712,000

Cudgen Creek to CHSLSC

State Government

$342,200

CHSLSC South flank

Tweed Shire Council

$70,000

CHSLSC - (These works were destroyed in 2011)

Tweed Shire Council

$152,000

State Government

$245,400

Car Park and sand nourishment Total

$2,141,600

PERMANENT SEAWALLS CHSLSC - (permanent concrete wall)

Funded

Amount

Tweed Shire Council ($200,000 - State Govt funded)

$430,000

TOTAL

BEACH ACCESS

$430,000

FUNDED

AMOUNT

KBBC timber stairs (destroyed in 2014)

KBHP

$12,000

KBHP timber stairs (rebuild)

KBHP

$12,000

KBBC Aluminium Stairs (Access to bowling club)

KBHP

$16,000

($8,000 TCHP, $8,000 CHSLSC)

$16,000

CHSLSC concrete ramp

Tweed Shire Council

$30,000

Beach Access maintenance

Tweed Shire Council

$50,000 ($10k pa)

CHSLSC Aluminium Stairs (beach to surf club)

TOTAL

PLANS (From 2010 Onwards)

FUNDED

AMOUNT

TOTAL

$10,000

Kellogg Brown & Root Pty Ltd Environmental Assessment and Preliminary Operation Design for Sand Nourishment at Kingscliff Beach"

$225,400

University of NSW 2011-2012 "Options and Design Report for Foreshore Protection works at Kingscliff Beach"

Griffith University 2013-2014 "Kingscliff Foreshore Management Options - Cost Benefit Analysis"

TOTAL

$136,000

Water Research Laboratory 2010 - 2011 "Review of Tweed Shire Coastline Hazard Lines"

BMT WBM 2012-2013 "Tweed Shire Coastal Hazards Assessment 2012"

TOTAL

$89,300 All Funded by Tweed Shire Council & 50% State Government

$55,000 $33,500

University of NSW 2014-2015 "Foreshore Protection Works Kingscliff Beach. Detailed Concept Terminal Seawall Design"

$8,200

BMT WBM 2014-2015 "Kingscliff Dreamtime Beach Coastal Zone Management Plan"

$92,090

Cardno Constructions 2014-2015 "Geotechnical Investigation. Terminal Seawall Kingscliff"

$25,000

TOTAL 28 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

$538,490

4.4

Beach Access

There is currently limited access to the central business district from the central area of Kinsgcliff Beach including an 800 metre stretch. Council and Tweed Coast Holiday Parks has funded the installation of access directly to the Kingscliff Beach Holiday Park and Cudgen Headland Surf Living Club to ensure their viability as key tourism and valued community assets. However, there is currently no access directly to the main street (Marine Parade) from the beach. The Project will see the installation of three access points to allow direct pedestrian access to the main street and the newly created Central Park. The access immediately north of Cudgen Headland Surf Life Saving Club (SLSC) is also designed to provide wheelchair and disability access to the beach as well as enabling vehicular access from the SLSC so that vital life saving equipment can be transported to the beach from the club building. This will also create synergies with the connection of shared pathway linking the Kingscliff Beach to the central business district is viewed as an integral part of the project to drive expenditure to the retail heart of Kingscliff.

4.5

Central Park

There is currently very limited open space adjacent to the main street. The current Central Park space is located directly adjacent to the midcentre of the central business district, an area of only 500 square metres and features the Cenotaph and Kingscliff community hall. The Park is unsightly and congested and does not meet the needs of the Kingscliff community. Council has been unable to respond to community requests for the upgrade of the Park due to the risk and exposure of erosion events on the foreshore.

The reduction in the footprint of the Kingscliff Beach Holiday Park will allow for the creation of a large community space in the centre of the Kingscliff central business district. Kingscliff Central Park, located to the north of Cudgen Headland Surf Life Saving Club, will be a centrepiece of the Kingscliff foreshore and a community hub for the town. A report released in 2011 indicated that “the economic values of parks are not well understood in the wider community. Their importance in the provision of a range of ecosystem services, providing employment, enhancing property values, reducing population health costs, supporting the recreation industry, and in particular underpinning the tourism industry, cannot be overstated”. The redevelopment of the Kingscliff Beach Holiday Park will vacate 12,000 square metres of land for the park. Central Park is designed to be a large community space at the heart of the Kingscliff central business district - a destination for residents and visitors to relax and enjoy the breathtaking scenery, engage with family and friends at an open air barbecue or take a leisurely walk along the foreshore pathway. It will serve as a venue for festivals and performances and a gathering place for locals and visitors to Marine Parade’s shops and cafés. The design will utilise existing stands of coastal trees and includes the planting of many additional trees. This will provide natural shade and retain the Park’s natural feel. A new amenities building with accessible public toilets and showers will be accompanied by seating, picnic settings, shelters and other furniture throughout the Park, as well as drinking fountains and bins.

29 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

A large open lawn area will sit at the heart of the design, to host events and serve as an active space. Strong visual and physical connections tie Central Park and the business district together, guiding the eye through the park and out towards the ocean. Pathways will connect Marine Parade to an enlarged cenotaph area to accommodate growing crowds - and out towards the foreshore. The Park’s design aims to bring different groups of the community together. A large play space will accommodate a wide range of age groups, with a youth recreational space for young children learning to ride a bike or skateboard.

Importantly the park’s design provides a continuous accessible path of travel, with a step free route linking key elements that can be safely negotiated by everyone, including people using a range of mobility aids. Park furniture will be included as part of the design and is similar to those used for park upgrades at Jack Bayliss Park North Kingscliff, Faulks Park Kingscliff, Cabarita Streetscaping, Ambrose Brown Park upgrade Pottsville and Old Boat Harbour Upgrade at Fingal.

30 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

central park

31 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

4.6 Kingscliff Beach Holiday Park The Kingscliff Beach Holiday Park is located on the beachfront in central Kingscliff and directly opposite the Kingscliff commercial area. The Park is on Reserve lands with an area of 3.31 hectares and has 176 tourist sites, of which are 77 are long term casuals. The Kingscliff Beach Holiday Park is an important component of the local tourism sector providing accommodation for the many visitors to the beach. The tourism sector contributes a substantial proportion of local business activity generating visitation to and business activity in Kingscliff and broader Tweed Region. The Holiday Park also provides local employment via 4 full-time positions and 1 casual position and contributes to the local economy through their dealings with local contractors and suppliers injecting over $1.92million into the local economy in 2014.

Importantly the Park makes a substantial contribution to the local economy, in addition to the non-financial contribution they make through the provision of service such as tourist information. Recent research compiled by BDO found that for each $ spent in a caravan park $1.38 was spent by park customers in the adjacent area. Kingscliff South income last year was $1.4m, therefore economic benefit to local business was approximately $1.92m.

Prior to the severe erosion of Kingscliff beach in 2009, the Kingscliff Beach Holiday Park made approximately $500,000 profit per annum. Approximately 50% of this profit was held by the Holiday Park Trust for reinvestment in the Holiday Park’s businesses. The other 50% is distributed to Council to maintain and upgrade Crown Reserve Land along the Tweed Coast. Since the erosion, which required the closing down and removal of six cabins, two villas and 18 sites, profits from the Kingscliff Beach Holiday Park has dropped to around $250,000 per annum. This decline in profits contributes to a corresponding drop in funding to support the maintenance and upgrade of the Crown Reserve along the foreshore. Despite temporary stabilisation works being funded and carried out by Council and Tweed Coast Holiday Parks Reserve Trust, this drop in profits is set to continue as the cabins, villas and sites cannot be replaced until a long term solution to beach erosion is implemented. The proposed upgrade of the Kingscliff Beach Holiday Park will allow expansion of the profitable aspects of operations returning profit margins to pre erosion levels. The Kingscliff Beach Holiday Park management team completed an extensive Business Plan which demonstrated the need to provide facilities that reflect the quality of the location, land management priorities, facilitate equity of access and meet current industry and market benchmarks. The Park is currently rated 2 star, however, the upgrades will bring an expected 4 star rating which will meet the expectation of visitors to the area.

32 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

The proposed revitalisation of the Holiday Park has been assessed against the potential to enhance the ongoing management efficiency and effectiveness of the Trust, to ensure future financial outcomes for the Holiday Park, to make an appropriate contribution to the community and to the management of reserved Crown Land.



Business Management: To maintain a management and operational structure which ensures commercial viability, promotes timely and responsible decision-making and is responsive to the local economic framework and environmental, legal, social and technological imperatives.

The opportunities offered through the improvement of the Holiday Park have the potential to grow the business by providing a greater range of site and accommodation options. In formulating a practical improvement program for the Holiday Park, a number of factors have been considered including:



Environmental Management: To ensure vegetation and the natural environmental features of the Holiday Park and the reserve are managed in accordance with sound ecological principles and for the enjoyment of guests and visitors.



Sustainability: To ensure principles of ecological and environmental sustainability are incorporated into the design and management of the accommodation, facilities and infrastructure within the Park with the ultimate goal that resources are used efficiently throughout their lifecycle and to meet the needs of the community.



Facilities for Management and Guests: To optimise the recreational and tourism potential of the Holiday Park consistent with the principles of ecological sustainability while improving park presentation and providing a range of recreation and communal facilities for guests and their visitors.



Accessibility: To design and develop facilities and accommodation that enable people with disabilities and others with restricted mobility to access and enjoy the full range of holiday and recreation



The principles and parameters established in relevant legislation and policies of the New South Wales government, the Trust and Council;



Potential to achieve environmental objectives;



Safety, security and regulatory compliance;



Potential to improve visitor amenity and maintain income and profit; and



Cost and financial contribution to the local economy.

The vision for the Kingscliff Beach Holiday Park will be implemented in conformity with the following specific objectives:





Regulatory Compliance: To ensure the Holiday Park complies with all applicable statutory requirements. Health Safety and Risk: Management to provide and maintain facilities, in a manner, which minimises risk to Holiday Park guests and staff and promotes a healthy lifestyle.

33 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

opportunities provided in the Holiday Park.



Tourist Sites and Accommodation: To optimise income to the Holiday Park by providing a range of quality tourist accommodation including opportunities for family and traditional camping within the bounds of ecologically sustainable development.



Integrated Land Management: To promote and facilitate integrated management of the range of planning and regulatory issues associated with the use of Holiday Park and adjoining Central Park.

34 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

2001 HISTORIC TIMELINE MAJOR EVENTS

Council adopts Tweed Coastline Hazard Definition Study, which identifies coastline erosion hazard lines. It shows Cudgen Headland Surf Life Saving Club, Kingscliff Beach Holiday Park and Kingscliff Community Hall are at risk.

2005 Council adopts Tweed Shire Coastline Management Plan, outlining coastal management strategies for each coastal village. Environmental Impact Statement commissioned for Kingscliff foreshore protection.

2006

Coastal Management Strategy for Kingscliff refined to include: • A piled seawall in front of Cudgen Headland Surf Life Saving Club. • Initial and ongoing sand nourishment of Kingscliff beach to provide protection against beach erosion.

2007 Kingscliff Foreshore Master Plan endorsed by Council.

2009

Jack Bayliss Park upgraded.

2010 Sea wall in front of Cudgen Headland SLSC completed. Council given license by NSW Department of Land and Property Management to examine source of sand downstream of Barneys Point Bridge, to provide sand nourishment at Kingscliff Beach.

2015

Adoption of the Kingscliff Foreshore Hazard Assessment

35 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

5. DO NOTHING APPROACH MAIN PAGE

36 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

5. DO NOTHING APPROACH A myriad of planning studies on the Kingscliff foreshore highlight the severe negative impacts of not protecting the foreshore. These include the negative effects on the economy, community, environment and physical assets. The positive effects of the ‘Do Nothing’ approach are the short term cost savings in not funding the Project.



Damage during 10 year ARI event would be classified as severe failure.

However a range of negative impacts have been identified that will have negative effects on public safety, private and public infrastructure, scenic, environmental and cultural values, beach amenity, tourism and community perception should the Project not proceed.



50 x 2.3 t rocks over a length of 300m would be displaced into the Holiday Park.



200 x 2.3 t rock over a length of 300m would be displaced into the Holiday Park during a 100 year event.

Extensive coastal studies and the adopted coastal erosion lines demonstrate that erosion would eventually (within 100 years) reach Marine Parade, the main shopping street in Kingscliff.



Pedestrians from the general public would not be able to tolerate a 10 year overtopping.

Essentially with no protection the foreshore and public assets would require relocation in the event of a large storm.

In addition the Tweed Coastal Hazard Study (2013) identifies the hazard lines of potential damage from storms and coastal erosion. It identifies:



Immediate storm erosion would extend into the seaward parts of the presently protected Bowls Club, Kingscliff Beach Holiday Park, Surf Club and adjacent park areas.



The 2050 erosion hazard extent includes a large part of the Bowls Club, essentially all of the Kingscliff Beach Holiday Park and all areas seaward of Marine Parade to its south.



By 2100, the erosion hazard extends to Marine Parade

The WLR Technical Report (2014) completed on the potential storm impacts on the existing temporary seawall indicates severe damage to both physical assets and public safety. The physical modelling tests indicate:



The existing seawall resulted in extensive damage under all tests.



Damage during a 1 year ARI event would result in moderate damage.

37 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

along the entire area south from approximately the intersection of Marine Parade and Kingscliff Street.





The Kingscliff Beach Holiday Park and Faulks Park are vulnerable to potential wave inundation due to overtopping during major storm events, extending further landward with shoreline recession and sea level rise. Inundation by storm tide penetration may affect the eastern fringe of properties along the western shoreline of Cudgen Creek, the extent increasing with sea level rise.

In the meantime the predicted erosion lines would retard development and investment in Marine Parade as there would be no protection for private and public assets from coastal erosion.

38 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

Potentially no financial institutions would provide investment funding for Marine Parade businesses without foreshore protection measures in place and insurance premiums would increase as the threat from coastal erosion grows. The beach is a key tourism asset, which has seen a decline in visitation over the past 5 years. Continued coastal erosion of the Kingscliff foreshore will have a detrimental impact on tourism locally, a significant contributor to the area’s economy. Due to their exposed locations, both the Cudgen Headland Surf Life Saving Club and the Kingscliff Beach Bowling Club, will have to be provided with seawalls on their northern and southern sides to prevent outflanking of their existing erosion protection walls.

Costs Over a two-year period from 2010 to the end of 2011 Tweed Shire Council and the Tweed Coast Holiday Parks Reserve Trust have spent approximately $1,980,000 on unplanned and emergency coastal erosion protection measures to protect their assets. Without foreshore protection, Council and the Tweed Coast Holiday Parks is budgeting $160,000 per annum to undertake repairs to the seawall based on a 1 in 1 year event as set out in the WRL report. This in addition to the $250,000 profit per annum that the Holiday Park is foregoing due to the loss of 8 cabins in 2011. For storm events significantly larger than a 1:1 event and based on the WRL modelling it is unlikely that the Holiday Park would remain open or reopen due to the extensive damage that the interim seawall and Holiday Park infrastructure would sustain. In this event the substantial contribution from the Holiday Park to Council for foreshore maintenance would be lost.

39 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

The works that are proposed in the Project aim to prevent further damage to community assets and infrastructure from wave erosion. Funding by the Commonwealth Government for the Protection and Revitalisation of Kingscliff Foreshore Project is an investment that will reduce the demand for future disaster recovery funding. In other words, not completing the proposed foreshore protection works now would only defer the problem to a future time.

THE EFFECTS OF THE DO NOTHING APPROACH Public safety No beach access causes people to make informal and potentially unsafe paths over rocks and sandbags to the beach Aged and out-dated community infrastructure Risks following storm events including rocks and bags distributed over the beach pose a public safety concern Private infrastructure and assets Structural damage to privately owned dwellings or businesses is costly and can have detrimental impacts on livelihoods Reduction in property value can occur as the loss of land migrates hazards closer to existing development Marine Pde and businesses come under threat in longer-term ( ~50 yrs) Public infrastructure Damage or destruction to critical infrastructure such as water, sewerage and communications and transport infrastructure such as roads and power lines is extremely costly to repair Existing facilities ‘managed to fail’ with removal once impacted and no replacement in the future Significant costs involved in removal of damaged infrastructure or relocation Significant costs involved in the construction and maintenance of protection structures (failing rock walls, damaged sandbags) Continuation of temporary solutions for the management of the shoreline and opportunity costs involved Public assets Foreshore parkland and public access to the foreshore is often the first to be lost in long term recession and erosion events Scenic value Loss of amenity value impacting coastal recreation, tourism attractions and accommodation Environmental and cultural values

Loss of habitat and vegetation Reduction in areas of ecological significance Loss of beach and dunes Loss of foreshore land asset Coastal land use/Beach Amenity Impacts for current and future use of coastal areas Current coastal land uses may need to change due to the risk. i.e. recreational uses Certain uses may be restricted by hazards Loss of funds to manage coastline due to decreased profit from the holiday park Progressive deterioration of temporary rock and geo-textile bags have detrimental effects on beach amenity: • strewn rock and geo-textile on beach; • irregular and unpredictable foreshore land erosion impacts. Localised erosion may be exacerbated; • degraded beach access amenity; • high risk to beach and foreshore users; • continuing accelerated loss of sand from upper beach. Tourism Decline in visitation levels, therefore loss of tourism expenditure in the Region resulting in the decline of tourism jobs Loss of economic activity from inability to host major Surf Carnival events and festivals on the foreshore Community Perception Likely to be perceived by community as abandonment of foreshore land especially following previous installation of temporary seawalls Loss of Community pride and sense of place Visual concerns regarding existing ad-hoc structures

40 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

6. ECONOMIC BENEFITS 41 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

6. ECONOMIC BENEFITS The Protection and Revitalisation of Kingscliff Foreshore Project will ensure the economic growth in the Region by mitigating the effects of a declining tourism industry, provide employment during the construction phase and facilitate and enable investment and development into the future. The Project will drive significant economic activity for Kingscliff, broader Tweed Region, NSW and Australia during the development, construction and ongoing life of the project. During construction, the Project will generate 48 full time jobs in year one, 44 in year two and 69 in the third year. Improved amenity, safety, increased land values, improved health outcomes combined with additional economic benefits, add up to significant positive impacts for Kingscliff and the State economy. Despite being buffered by a strong local economy, Kingscliff faces significant infrastructure challenges to offer public domain enhancement expected in a modern subregional centre catering for a significant population. This is due to the hazards poised through lack of protection on the foreshore. Council and Tweed Coast Holiday Parks Reserve Trust has attributed over $2.0million in ‘temporary fixes’ to mitigate the effects of coastal erosion which has essentially ceased the development of essential community assets such as the Central Park element of the project. The impacts of the lack of a permanent solution are having detrimental effects on the economy through a declining tourism industry, lack of social community

infrastructure and inability to attract significant development to the Kingscliff main street. In order to sustain economic growth, a strong, diversified and resilient economic base must be maintained. If the region is to attain its potential and continue to be an economic driver, greater social infrastructure to maintain the region’s enviable lifestyle and ensure social well-being for the Tweeds communities, is critical.

6.1

Cost-benefit Analysis

Tweed Shire Council commissioned an independent cost-benefit analysis, which was undertaken by RedeConsult, to identify, quantify and compare the costs and benefits of the Project. The full report including the methodology and assumptions is attached as annexure 1. The benefits and costs were compared against a baseline, which was the equivalent of maintaining the status quo, in this case not undertaking the Foreshore Protection works, upgrading the Kingscliff Beach Holiday Park or providing upgrades to other facilities. The cost-benefit analysis was based on the assumption that the various components of the Project are interlinked but are predicated on protection of the Foreshore. Without that protection, the viability of the other components is questionable.

42 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

176

JOBS POST CONSTRUCTION

48 y1 44 y2 69 y3 FTE CREATED DURING CONSTRUCTION

$35m

$6.1m Y1 $5.6m Y2 $8.7m Y3 GROSS REGIONAL PRODUCT

NET PRESENT VALUE

2.79

COST BENEFIT RATIO

gross regional product.

Continued coastal erosion of the Kingscliff foreshore will have a detrimental impact on tourism locally, a significant contributor to the area’s economy. The key benefit assumes that without the infrastructure development proposed, there is a strong likelihood that coastal erosion will result in the loss of beach-related tourism locally. Therefore, the analysis estimated what the impact to the local economy would be if the beach related tourism is impacted. This would include the loss of employment which would have a significant impact on the regional workforce. Using tourism data for visitation to Kingscliff, the analysis determined an estimate of the size of the tourism impact. With the central discount rate of 7 per cent, the Project has a benefit cost ratio of 2.79. As the benefit cost ratio is greater than 1 and the net present value is positive, the Project can be deemed an efficient use of funds.

The Project has a cost benefit ratio of 2.79 and net present value of $35 million.

6.2 Economic Impact assessment The economic impact of the proposed infrastructure has been assessed in terms of the impact of the construction of the infrastructure. The economic impact has been prepared from the perspective of the impact on Tweed Shire as direct and flow-on impacts will affect the local community in terms of employment, household income and

The economic impact analysis was undertaken utilising an input-output (IO) model developed for Tweed Local Government Area. IO analysis provides a detailed picture of the structure of a regional economy at a point in time and can be used to estimate the contribution or impact of a particular sector of the economy including flowon or multiplier effects.

The estimated economic impact of the construction phase on Tweed LGA is: Year 1: $6.1m in GRP & 48 FTE Year 2: $5.6m in GRP & 44 FTE Year 3: $8.7m in GRP & 69 FTE ReddeConsult

It should be noted that the above estimates of the economic impact are not cumulative but reflect the impact, including flow-on effects, in the year in which the expenditure was made. Overall, it is estimated that beachrelated visitor expenditure in the Kingscliff – Fingal Head area supports the direct employment of almost 150 people, or 108 full-time equivalent jobs (adopting the ABS convention that 1 full-time employee is equivalent to 0.5 part-time employee). Based on flowon multipliers calculated for the entire Tweed Shire, this would equate to total FTE employment in the Kingscliff – Fingal Head area supported by beachrelated visitor expenditure of 176 jobs post construction.

44 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

6.3 Loss of Economic Benefits to Government The Project will slow the continual erosion of the Foreshore which is impacting on the viability of the local tourism and retails sectors. Continued loss of employment in these sectors will result in declining economic benefits to the different levels of government including: Personal income tax revenue. If individuals employed in tourismrelated businesses should lose their job as a result of decreased tourist visitation locally. The Government will forego any revenue generated from income tax. Data published by the ABS estimates the value and contribution of tourism to the national economy including estimating employment and tourism consumption by tourismrelated product. Applying that data to estimated tourist expenditure by category suggests that visitor expenditure in the Kingscliff – Fingal Head area supports the following levels of direct employment, defined by traditional industry category.



Using data from the Australian Taxation Office regarding personal withholding tax contributions also provides an indication of the withholding tax revenue accrued to the Federal Government by each full-time equivalent employee directly supported by tourist expenditure in the Kingscliff – Fingal Head area. When applied to the total estimated direct fulltime equivalent employment, the estimated withholding tax return to the Federal Government is approximately $1.0 million per annum. This does not include the impact of flow-on employment and the associated withholding tax revenue.

Increased welfare payments if individuals employed in tourismrelated businesses should lose their job as a result of decreased tourist visitation locally and consequently seek to access Centrelink or other benefits. Decreased payroll tax revenue, reducing accruals to the State government.



Overall, it is estimated that beachrelated visitor expenditure in the Kingscliff – Fingal Head area supports the direct employment of almost 150 people, or 108 fulltime equivalent jobs (adopting the ABS convention that 1 full-time employee is equivalent to 0.5 parttime employee).

Increase in unemployment levels locally, with the associated negative impacts on health, crime statistics and other social implications. Currently (March quarter 2015), Tweed LGA has an estimated unemployment rate of 8.5%, significantly higher than either the New South Wales average (5.9%) or nationally (6.1%).



Based on data from the ABS regarding average weekly earnings by industry, adjusted to reflect overall average weekly earnings in New South Wales and further adapted to reflect average income by industry for Tweed Shire by place of employment in comparison with New South Wales (derived from 2011 Census), results in an estimate of average weekly income per full-time employee (ordinary time earnings).

Tourism has been a key economic driver for this region; however there has been a significant decline in respect to the total number of visitors with a 7.5% annual decrease and visitor expenditure (0.8% decrease) in 2012.

45 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

6.4 Improved Amenity and Land Values The Protection and Revitalisation of Kingscliff Foreshore Project will improve liveability in the Tweed Region and assist in improving the rateable value of property within the Kingscliff central business district and residential area. Improving the value of properties in Kingscliff and surrounds will play a significant role in countering the costs of beach erosion many commercial properties, currently uneconomical for redevelopment. Spanning the central part of the beautiful central Kingscliff coastline, the Project will improve the amenity of the region including attractive views, creation of open space and convenient recreation opportunities. People value this amenity which is often reflected in increased real property values and increased marketability for property located near open space. Developers also recognise these values and incorporate open space into planning, design, and marketing new and redeveloped properties. The effect on property values of a location near a park has been the subject of several studies that have revealed increases in property values in instances where the property is located near or adjacent to high amenity open spaces and coastlines. Coastal property prices in Australia demonstrate a strong desire for coastal proximity. Studies in Sydney (Anning, 2012) and in Adelaide (Burgan, 2003) report that beach frontage in Australian property markets commands an environmental premium of around 40% on adjacent, non-beachfront properties. An increase in property values will result in increased property tax revenues for local and state governments. The investment will ultimately pay for

itself over a short period of time due in part to increased property stamp duty revenues from higher values of property. Research indicates that the demand is expected to continue in the coming decade as demographic changes and consumer preferences shift toward denser, more compact residential environments. Additional factors that could support the market for walkable urban places, include: urban job growth, tight urban housing markets, preferences for urban amenities and support for public policies and investments that favour revitalisation, alternative transportation modes, historic preservation and urban parks and open space.

Open space enhances the value of nearby development lands, allowing compact development to command a premium in the residential real estate market.

6.5 Improved Health through Physical activity There are also economic benefits for the Federal Government as a result of improved health from people utilising the Park, in particular the shared pathway and recreational facilities. The Park itself will provide a means to increase daily physical activity, which can help individuals to maintain better health. The Project will see a 800 metre long and 3.5 metre wide shared pathway suitable for all ages including the disabled, aged and physically impaired. This pathway will connect to the Tweed and QLD Cycleway’s providing the essential connection for users to continue their route along the coast.

46 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

Physical inactivity is a leading contributor to the burden of chronic disease in Australia, with an estimated total cost to the health budget of $1.5 billion.

Recent research by the National Heart Foundation ranked the Richmond-Tweed region sixth in New South Wales in the national obesity and inactivity ranking. The research indicated 27% of people in the Tweed region were obese and 70.5% were insufficiently active to maintain good health. A study commissioned by the Queensland Government in 2011 found that, for a typical off-road path in an inner urban area, the economic benefits per kilometre walked or cycled are: decongestion (20.7 cents per kilometre walked or cycled), health (up to 168.0 cents per kilometre), vehicle operating costs (35.0 cents per kilometre), infrastructure savings (6.8 cents per kilometre) and environment (5.9 cents per kilometre). When this data is aggregated the result is that:



1000 pedestrians per day will generate discounted benefits of around $7 million per kilometre over a 30-year appraisal period ($2.12 per kilometre walked, per person)



1000 bicycle riders per day will generate discounted benefits of around $15 million per kilometre over a 30-year

appraisal period ($1.43 per kilometre cycled, per person). Recent counts on existing shared pathways in the Tweed show 1300 wheeled vehicles per week and in excess of 5000 per week. Based on these estimates and a conservative figure of 7000 users per week for the Kingscliff shared pathway, it is estimated that over 365,750 people will use the pathway on an annual basis. As such, the annual economic benefits from the Project’s shared pathway element will have the following cost benefits. This has been calculated based on a conservative user figure of 365,750 users per year:



Environment: $21,580



Infrastructure savings: $24,871



Health: $614,460



De-congestion: $75,710



Vehicle Operating Costs: $128,012

6.6 Increase in Revenue for local business The Project will ensure the ongoing viability of the Kingscliff Beach Holiday Park (KBHP), Cudgen Headland Surf Lifesaving Club (CHSLC) and Marine Parade business owners. The Tweed Coastal Hazard Assessment indicates that by 2100, the severe coastal erosion will extend to Marine Parade forcing the relocation of the main street and subsequent closure of many shops.

47 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

The Project will ensure the permanent protection and viability of the foreshore’s public and private assets.  Associated with this, the Project will result in mitigating the effects of loss of revenue for businesses located in the central business district adjacent to the Project (Marine Parade,) in part due to the decline of tourists to the area. Estimates of the loss of income due to erosion events in 2010 were provided by representative Kingscliff Beach Holiday Park (KBHP), Cudgen Headland Surf Lifesaving Club (CHSLC) and by Marine Parade business owners, and are in the order of 30-40%.

48 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

MAIN PAGE SOCIAL

7. SOCIAL BENEFITS 49 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

7. SOCIAL BENEFITS The Kingscliff Regional Coastal Revitalisation Project will result in many social benefits to the community of Kingscliff and wider Tweed region. The eroding coastline has concerned the community for decades due to loss of beach amenity, rapidly receding sand dunes and opportunity costs in providing temporary measures to mitigate the effects of climate change.

The Protection and Revitalisation of Kingscliff Foreshore Project will result in many social benefits to the community of Kingscliff and wider Tweed region. The Project will boost the community’s confidence and pride, improve health through social participation and physical activity, deliver educational benefits for children, and create community cohesion. The permanent solution to the foreshore, the creation of a central park with recreational & community facilities, provision of linkages to the Tweed and Gold Coast cyclepaths and improvements to the community hall, will create an integrated space for the residents and visitors to the Tweed Region.

50 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

The foreshore is a vital asset for the visitors and residents of Kingscliff and wider Tweed region. This has been demonstrated by the input and feedback into the various strategies and management plans developed over the past ten years regarding the foreshore. Consultation undertaken for the development of the Draft Kingscliff Locality Plan found that the community valued the beach, creek and natural areas. The research indicated that 70% of respondents frequent the beach and creek areas either daily or weekly. Additionally, almost 70% also stated that they utilise the walking / bike trails on a regular basis (38.9% daily, 29% weekly, 10% monthly).

The existing cycleway network is well utilised however there is an identified need to improve the amenity of the network through wider paths, more shade, more seating, water bubblers and lighting. The viability of the Surf Club will be secured through the protection of the foreshore. Individual benefits that are gained by participating in activities carried out through the Surf Club, such as volunteer surf lifesaving include improved personal health, social participation, education and personal satisfaction. The Protection and Revitalisation of Kingscliff Foreshore Project will also expand opportunities for hosting sporting events such as triathlons, surf carnivals, lifesaving carnivals with the provision of beach access and improvements to the area surrounding the existing surf club. The Central Park area will provide a space for many community inspired events such as markets.

7.1

Boost Community Confidence and Pride

The community of Kingscliff’s confidence has been eroded by the continual effects of severe beach erosion. Over the past ten years the community has seen the valued beach amenity damaged and the degradation of key infrastructure along the foreshore with Council unable to deliver upgrades due to the risk of damage to new infrastructure. This loss of community confidence was demonstrated during the engagement period of the development of the Tweed Community Strategic Plan (2011-2031) where residents and business of the Tweed Region strongly expressed their desire for the need for the Central Park, beach access and

51 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

most importantly permanent solution to the protect the foreshore from further erosion.

“The Tweed coastline is one of the defining characteristics of the Region, widely recognised as an integral component of our cultural identity” Tweed Community Strategic Plan 2011-2031

Future economic growth in the Tweed will require balancing development with the sustainable management of natural resources. The Projects completion will give the businesses and the community increased confidence about what the future holds. The Project will help restore confidence, trust and integrity in both local and federal governments. The Park will provide a sense of belonging through greater opportunity to participate in the local community and with it the Oark will increase the character of Kingscliff and the morale this engenders.

7.2

Improved health through social participation & physical activity

The Protection and Revitalisation of Kingscliff Foreshore Project will provide modern recreational infrastructure suitable for all ages that encourages new users to partake in physical activity including the aged, disabled and physically impaired. The creation of an open active and passive space in central Kingscliff and significant improvements to the community hall will provide active

and passive areas for residents and visitors and contribute to the overall health and wellbeing of residents and visitors. Over the next 20 years, there will be significant growth in population along the Tweed Coast, including an increase in the number of young people and increase in the ageing population. The timely provision of the Central Park with a range of activities (multi-purpose court, skate elements, playground, bike/walking tracks, tiered seating) will be important to keep young people safe, active and healthy. The upgraded and integrated community hall will provide multi-purpose facilities for the delivery of youth programs and services for young people to meet and get connected with their community. For some, these places also provide a place away from home to get some help, be listened to, cared for, and to stay out of trouble. Research reports that people who participate in physical activity enjoy better mental health, are more alert, and more resilient against the stresses of modern living. Beyond Blue released a report in 2012 examining the health benefits associated with green spaces and found that “the range of psychological benefits for people who visit green, open spaces is vast and includes improved mood, lower levels of anxiety, lower stress levels, lower levels of depression and increased physical activity”. The Australian Bureau of Statistics (2006) noted that “participation in recreational groups and socially-supported physical activity reduces stress, anxiety and depression and the symptoms of Alzheimer’s disease.” This is further supported by a Deakin University study which examined the linkage between nature and health and wellbeing and concluded “contrary to popular thinking, humans may be dependent on nature for psychological,

52 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

emotional, and spiritual needs that are difficult to satisfy by other means”9. The report goes on to suggest that parks provide one of the only ways in which residents in highly urbanised environments can access nature. Lautenslager (2008), conducting research for the WA Centre for Health and Ageing, found just 20 minutes of moderate exercise a day can protect the brain from memory loss and potentially delay dementia. If an additional 40 per cent of the Australian population engaged in regular, moderate and effective exercise, an estimated net benefit of $6.5 million per day would result from reduced costs associated with heart disease, back pain, absenteeism and low workplace productivity. “In a country where health costs are expected to rise from 3.8 per cent of gross domestic product this year to more than five per cent within two decades, we must ensure a healthier, more active Australia” (Brandis, 2007).

7.3 Education Benefits for Children Currently, approximately 14 per cent of the Tweed population is made up of the 12-24 age group and the Region has begun to show growth in young families, attracted to the region for its lifestyle attributes. The population is forecast to grow to 125,953 by 2036, a increase of over 40% which will place pressure on existing services and physical infrastructure. The Park will provide a range of infrastructure for children and youth of the Region, which will encourage physical activity in a safe environment with modern infrastructure, which is currently lacking in Kingscliff.

A study completed by the Australian National University found that there is a strong relationship between primary school students who exercise regularly and higher NAPLAN scores. Additionally, a study undertaken by California Department of Education found that fit kids “scored twice as well on academic tests as those that were unfit”. A study commissioned by Play England provided a comprehensive assessment of economic benefits of playgrounds on the educational outcomes of children. The study indicated that there is a direct increase in educational achievement in early education associated with physical activity. Further, it shows that early academic achievement is the key predicator for later achievement and this is directly linked to higher monetary earnings as an adult. In addition, the Project will ensure the strength of the tourism sector which provides critical employment opportunities for many youth in the Region. Employment in the tourism sector enables young people to develop leadership and problem solving skills, and build attributes including a sense of identity, sense of purpose, resilience and independence. Other skills include basic finances, communication, teamwork and customer service. This will address the outward migration of young people in the areas as identified in Tweed Shire Council’s Youth Strategy and Action Plan.

7.4 Increased Community Cohesion and Social Participation There is an absence of facilities for community interaction in Kingscliff. The creation of Central Park, facilitated by the permanent seawall, will provide a ‘neutral space’ which people can gather from different backgrounds and interact socially. While personal goals are pursued, community building and increased social capital will emerge. Central park, which will create an active and passive green space, will bring people together, creating community cohesion. People from different social groupings will engage with each other for a variety of reasons: to relax, find inspiration, exercise and gather with friends and family. The Park will create a sense of connectedness in the people that use the area and foster a greater sense of trust and cooperation among individuals. These social dynamics will promote community wellness and social cohesion for the Kingscliff community and wider Tweed region.

Community cohesion is demonstrated by the existence of, and participation in, social and community facilities, organisations, and structures, which bring people and groups together. The Park design incorporates opportunities that are not currently available to recognise/promote the heritage values of the foreshore including aboriginal heritage values. There is a high proportion of Aboriginal community in Kingscliff and the young make up 25% of the aboriginal population in the Tweed.

53 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

7.5

Community Cohesion and 7.6 Contribution to Climate Change. sustainable socio- cultural development There are some tentative links between the potential community and through increased social value of community cohesion and climate change. These links lie in tourism the fact that stronger more cohesive communities are likely to be more resistant to change and the adaptations required to address climate change (Donoghue and Sturtevant, 2007: 907).

Furthermore, the Project will enable visitors and guests to spend more time in nature and develop attachments to green space. This in turn may promote environmental awareness and encourage more environmentally minded actions and a greater sense of responsibility and stewardship, which could in turn contribute to tackling climate change (O’Brien et al., 2008). The creation of the central space in Kingscliff will enable social participation and subsequent social support which has been shown to increase participation in physical activity and engagement in physical activity is strongly associated with sound mental health (Baum, et al., 2000; Savage et al., 2003; McAuley et al., 2005).

54 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

The Tweed Region has experienced a decline in tourism over the past seven years. Securing the Kingscliff foreshore and the beautification of the precinct through the Central Park will increase tourism visitation to the area. The Project will also provide a much needed community space for the hosting of events and festivals. This increase in tourism will contribute to sustainable socio-cultural development through direct and indirect interaction with visitors to the Kingscliff foreshore. Events and festivals held at Central Park will provide an opportunity for inter-cultural contact.

8. ENVIRONMENTAL BENEFITS

55 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

8. ENVIRONMENTAL BENEFITS The Project will result in numerous environmental benefits through mitigating and adaptation to the effects of climate change. These include reduced greenhouse gas emissions from an increase in cycling and walking, improved flora and fauna habitat and the environmental benefits associated with the creation of a ‘green’ space in Central Park. Kingscliff has experienced a long history of storm damage and coastal erosion and is recognised as an area high immediate risk in the Northern Rivers region. Hazards affecting the beach include beach erosion, climate change and coastal inundation. It is likely that Kingscliff Beach has been impacted by the effects of climate change (greenhouse effect) and has the potential to increase the frequency and intensity as storms cause further coastal recession and erosion of Kingscliff Beach. The specific coastal hazard risks considered most critical for the region are shoreline recession and coastal erosion, which is likely to lead to the loss of beaches and damage to nearby public and private assets. Climate change is expected to increase the rate of erosion at Kingscliff Beach in a number of ways. Increased storm activity associated with climate change also means increased pounding wave action along the coast and further erosion. Rising sea level exposes new areas of coast to wave action. Given beaches exist at the interface between terrestrial, marine and atmospheric systems, they have the potential to be influenced by a suite of processes in response to climate change. In Australia, these changes are

56 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

likely to include increased variability of rainfall, an overall reduction in rainfall, increased air and water temperatures, changes in ocean circulation and wave direction patterns, and increased storminess (Aboudha & Woodroffe, 2006; CSIRO, 2002; Ranasinghe, McLoughlin, Short, & Symonds, 2004.).

“The Kingscliff coastline is affected by a range of coastal hazards that will become potentially more acute or extensive in the future with climate change induced sea rise” Kingscliff Coastal Risk Management Study

The Kingscliff Beach Nourishment And Dune Restoration Works Flora And Fauna Assessment was prepared on behalf of Tweed Shire Council to accompany the development application and environmental impact statement for beach protection works along Kingscliff Beach. This assessment concluded that the proposal was unlikely to have a significant effect on threatened species, populations, ecological communities or their habitats due to the nature of flora and fauna habitats affected.

The survey focused on the vegetation along the Kingscliff foreshore dune and beach and the potential habitat values of the site to terrestrial fauna, including shorebirds and turtles. One vulnerable bird, the osprey, was recorded during the flora survey. The osprey roosts and nests at the Kingscliff estuary mouth and forages for fish in the estuary and a short distance offshore. This project, through the improvement of the Kingscliff foreshore will aim to ensure that the environment including beach, parks or gardens, heritage and streetscapes is preserved and responsibly enhanced. The removal of existing Holiday Park infrastructure from the Central Park area will enable the re-establishment of coastal vegetation within the Park. This will provide habitat opportunities for native species allowing an increase in ecological significance of the Central Park area. The creation of Central Park will provide the opportunity to enhance local habitat values and increase resident and visitor exposure to nature-based education and information. With increased awareness comes greater ownership and care for our environment. This project will ultimately include effective visitor information services including interpretative signing on the historic events of the foreshore to raise the profile of natural assets and issues surrounding them. Tweed Shire Council and the local community are proud of the environment of Tweed and the environs surrounding the Kingscliff foreshore and through this project they will undertake improvements, which care for the area and make it more sustainable. This project aims to achieve the objectives of the Federal Governments National Climate Change Adaptation Framework and

57 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

the Environmental Goals of the Tweed Community Strategic plan. “The 2011/2021 Tweed Community Strategic Plan acknowledges that the management, protection, conservation and restoration of the shire’s environmental assets are vitally important, because it is environment that ultimately supports society and the economy. Without a healthy environment, local food and water supply is jeopardised, our highly regarded quality of life declines, tourism and associated business suffer and the shire becomes a less attractive place to live, work and visit.” The Tweed Community Strategic Plan environmental goal is to ensure the principles of sustainable development underpin Councils land uses & the design of our buildings and facilities. In support of this goal Council has developed its sustainability theme which aims to bring together all of its projects across the Council that relate to environmental management and sustainability technologies. At the same time the foreshore contains distinctive and important habitats and these support a diverse range of species, which we need to protect and conserve. Integrating socioeconomic and environmental/ ecological factors is crucial to the long-term sustainability and already features in several sectoral strategies of relevance to the coast and Federal Government and local policies on environmental sustainability. Environmental sustainability underpins every aspect of this project from design, decision-making, construction through to long-term management. Using a sustainability approach the project aligns with the Federal Governments National Climate Change Adaptation Framework, a myriad of regional strategies and Council policies.

Prior to sand mining (which commenced in the 1930s and was discontinued in the 1990s), the hind dunes at Kingscliff Beach would have supported a strip of littoral rainforest. The sand mining process involved clearing, stockpiling and burning dune vegetation (rainforest is intolerant to fire) and then levelling the dunes, hence the native seed bank is essentially depleted and the potential for natural regeneration is low. Rehabilitation of mined areas included re-contouring and revegetation with a limited range of hardy species, most of which are now classed as weeds.

8.1 Sustainable Procurement Tweed Shire Council’s procurement processes favour local procurement opportunities, incorporating recycled materials in public open space equipment, and installing energy efficient public lighting and renewable energy options (e.g. solar powered bbqs). The actions in Council’s Environmental Sustainability Prioritisation Strategy embed assessment processes and environmental improvements in capital works.

Table 4: Direct and indirect climate change impacts on beaches (Adapted from Aboudha (2006).

Climate change (driver)

Principal direct physical and ecosystem effects

Potential secondary and indirect impacts

Increased inundation of coastal zone disruption of coastal economy, tourism impacts

Disruption of coastal economy, tourism impacts

Increased coastal erosion Sea-level rise

Increased risk of flooding and storm damage Saline intrusion into surface and ground water

Displacement of residents in impacted areas Increased risk of flooding and storm damage to coastal infrastructure, restricted access and enhanced risk when using beaches

Increased wave run-up Altered wave climate

Storm frequency and intensity changes

Ocean acidification

Altered erosion and accretion balance

Increased wave heights, run-up and storm surge

Enhanced erosion

Increased storm damage

Southward shift in cyclone zones Impacts on reef-building corals

58 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

Reduced storm protection function, less resilient and functional reefs, dissolution of calcareous beach sand content

8.2 Climate Change Strengthening the coastal footpath and cycleway will ensure active transport opportunities continue to provide an attractive alternative to road based transport, reducing greenhouse gas emissions and improving public health outcomes.

8.3 Stormwater Management Overland flow discharging from Marine Parade through the Kingscliff Beach Holiday Park has historically caused erosion of the adjacent dune system and Kingscliff Beach. Whilst this is not the only factor contributing to the erosion of this beach, it is recognised that if this is not addressed, stormwater induced erosion may compromise the proposed beach stabilisation works. Bio-retention swales have been incorporated into both the Central Park and the upgraded Kingscliff beach Holiday Park. Hydrologic and hydraulic modelling indicates that the proposed measures would eliminate overland flows during regular storms (up to a 1 in 2 year storm event) and during larger storm events, modelling indicates the resulting overland flows would give significantly reduced peak flows and flow durations. This will significantly reduce erosion of Kingscliff Beach and the adjacent dune system by stormwater runoff.

Water quality modelling was undertaken with model results indicating that the proposed stormwater control measures would exceed the treatment objectives recommended in Australian Runoff Quality (ARQ) and current Best Management Practice (BMP) guidelines. The biofiltration process will remove pollutants from stormwater runoff including nitrogen, phosphorous, suspended solids and hydrocarbons. Additionally, the increased infiltration area would enhance the design life of the infiltration systems, resulting in lower maintenance costs.

8.4 Education The Central Park will include educational and interpretive signage as part of the development of the project. This signage will be used to increase awareness about the environmental values of the area.

59 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

9. COMMUNITY EDUCATION & CONSULTATION

60 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

9. COMMUNITY EDUCATION & CONSULTATION Tweed Shire Council has worked closely with a range of stakeholders over the last fifteen years on the issues and impacts of coastal erosion at Kingscliff. The Project is a direct result of working with the community during the development of the Kingscliff Foreshore Masterplan. Tweed and Kingscliff caters for a range of recreational activities including walking, swimming, surfing, and simply relaxing and enjoying the scenery. In addition, the beaches provide a venue for social gatherings and functions, sporting clubs and events, and environmental care and education. Tweed Shire Council acknowledges that the problems of coastal erosion concern the whole community, residents, visitors and government agencies, and aims to foster constructive working relationships between all parties and to participate in developing and implementing longterm solutions with our community. Council recognises that by working together as a community we can go a long way to resolving all our coastal management problems.

The community has the right to not only be informed about issues facing the beaches and their possible solutions, but also to be involved in decisions about how the beach is managed. Community members often bring valuable experience, knowledge and skills to coastal management activities.

A number of public meetings have taken place since the 1997 to inform local residents and community groups, businesses to understand the community views on beach management options. These consultations have helped inform the erosion management, hazard reports and various other studies that have been undertaken. Council undertook an extensive consultation process during the development of the Kingscliff Foreshore Masterplan (2007) and Kingscliff Locality Plan, both key defining documents for the community, Council and Government Departments on the future of Kingscliff. The Kingscliff Central Park Concept Design was on public exhibition from 7 March until 12 April 2011. During this period, Council conducted a number of activities to inform the community about the proposed Central Park and to encourage public input to the final design. These activities included:



A dedicated website www. k i n g s c l i f fc e n t r a l p a r k . c o m . au featuring: – an online community forum – all relevant documents, including maps of the beach sand nourishment, Holiday Park redevelopment and Central Park layout – a video ‘fly-over’ of the proposed Central Park design.

61 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT



A community information stall at the NSW Surf Life Saving Championships, at the Cudgen Headland Surf Life Saving Club on Saturday, 19 March 2011.



Printed documents were available at Council’s Murwillumbah and Tweed offices and its libraries at Kingscliff, Murwillumbah and Tweed Heads.



Fly-over videos on display at the Cudgen Headland Surf Life Saving Club and Kingscliff Beach Club. The information session provided an opportunity to talk one-on-one with Council representatives about Kingscliff Central Park and the Foreshore Master Plan.

9.1 Project Delivery Mitigating and minimising disruption to business during the construction phase is deemed a key process and outcome of this project. A full program of engagement and communication with local business owners will be ongoing during all phases of the project. This feedback will inform the implementation processes to ensure project delivery fits best around business operations. Stakeholder engagement and communication is a critical success factor of this project. The efficiency of the project delivery will provide savings to Council and businesses and will contribute to the overall success of the project

62 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

10. PROJECT DELIVERY

63 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

10. PROJECT DELIVERY Tweed Shire Council will oversee the project management and manage any funding secured for the Protection and Revitalisation of Kingscliff Foreshore Project. The Council and Tweed Coast Holiday Parks Reserve Trust have allocated substantial funding for the Project as it is viewed as a strategic priority not only in terms of valued community amenity but also to act as a catalyst to secure the future viability of the Region by attracting and boosting investor confidence in the Region. This is supported by the significant investment from the Tweed Coast Holiday Parks Reserve Trust in funding the revitalisation of the Holiday Park element of the Project. The Project is investment ready with all works proposed, design plans and Masterplan being completed. Extensive community consultation has been taking place with the community regarding the Masterplan, Project elements and protection of the Foreshore. The Project has strong community support. All approvals are in progress and due for completion by December 2015. In addition, the various formal documents, which oversee the community assets have been formally adopted by Council and supported through the Long Term Financial and Strategic Planning process.

64 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

10.1 Funding Arrangements It is envisaged the Project will have three core funding streams, Tweed Holiday Parks and Reserves Trust (Funding the upgrade of the Holiday Park), Tweed Shire Council (Seawalls and Central Park) and the Commonwealth Government (Seawalls and Central Park). Council will manage any funding secured for the Project and manage the construction of the Seawalls, Central Park and the Kingscliff Beach Holiday Park. Tweed Shire Council and the Tweed Coast Holiday Parks Reserve Trust have committed the funding required to complete the Project. The project has been analysed with regard to Tweed Shire Council’s future cash flows and is within the capacity of the Council’s and Tweed Coast Holiday Parks Reserve Trust financial positions to fund ongoing support expenditure including maintenance. The ongoing funding to maintain the seawall and Central Park will be covered by the current allocations for the ongoing maintenance of the temporary seawall itself. Tweed Shire Council has the capabilities and experience to manage the funding arrangement of the Project. The Council is experienced in managing and acquitting State and Federal Government Grants with the Council successfully acquitting over $130 million of grant funding over the past six years.

The Council has a fully staffed financial services unit with 27 people employed across Council’s Financial Services including the roles of Management, Financial/Asset/ Management Accounting, Corporate Reporting, Taxation, Treasury, Payroll, Accounts Payable and Revenue. The section includes 2 qualified Chartered Professional Accountants and the remaining staff have minimum Tertiary qualifications in Commerce, Business or Accounting and post graduate qualifications. This Unit is responsible for the financial administration of financial activities in preparation of forward planning for the sustainable financial future of Council and residents of Tweed. The Unit currently manages a $194 million operating budget, which incorporates grant funding of approximately $21.6 million per annum.

Tweed Shire Council has the capabilities and experience to manage the funding arrangement of the Project. The Tweed Shire Council budget is allocated into various cost centres. Each project is designated its own cost centre and budget. These costs centres are framed in the context of Council’s four year delivery plan and annual operational budget. Council produces a quarterly report that is publicly available, which details all incumbent expenditure for all cost centres, and is subject to year end audit to ensure that the accounts reflect an accurate and transparent view. These procedures ensure the financial accountability of public monies are executed and managed in accordance with the relevant Acts that the Tweed Shire Council operates under.

65 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

10.2 Ongoing Asset Management To enable the community to access and enjoy all the services and facilities that Tweed has to offer, the Tweed Shire Council owns and maintains a large portfolio of assets. With an infrastructure asset replacement value of over $2.6 billion, the efficient management of these assets is vital in maintaining safe, reliable and efficient services that help achieve the strategic priorities and goals of Council. The various assets created as a result of the Project will be managed in accordance with best practice asset management. Council has a detailed Asset Management Plan, which includes facilities located along the Foreshore and Coastline. The assets created as a result of the completion of the Project would be maintained in accordance with the Plan and any planned maintenance and capital funding reviewed and allocated annually. Council recognises that failure to adequately plan for the renewal of assets and the development of new assets will result in the needs of the community, now and into the future, not being met. As such Council has developed an Asset Management Strategy, Council’s Asset Management Policy as part of Council’s goal to adopt contemporary best practice in Asset Management. The Asset Management Strategy provides clear courses of action for managing Asset Management at Council and supports the Tweed Shire’s Community Strategic Plan and Asset Management Policy. The Asset Management Strategy is also the basis for outlining and monitoring Key Performance Indicators and provides Council with the ability to monitor, measure and report on asset management plans and processes.

These key documents allow Council the:



Ability to provide better outputs with fewer resources by better aligning Council resources and needs.



Ability to understand what condition the assets are in and by monitoring the effect actions are having on them. Having a key set of actions that will allow Council to manage the provision of these assets into the future at lowest longterm cost.



Ability to assign appropriate levels of funding for each asset class in line with the respective service level targets. Being able to clearly define what service levels Council can deliver to customers, the rate-payers and users.

10.3 Project Management The Protection and Revitalisation of Kingscliff Foreshore Project Management Plan has been formulated specifically for the implementation of the Projects three core activities:



Foreshore Seawall



Central Park and



Kingscliff Beach Holiday Park revitalisation.

The Project will be managed in accordance with Tweed Shire Council’s Project Management Procedure, which documents the overarching project controls that will be followed for the life of the project.

66 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

The Project Management Plan has been developed for the Project to provide:



A comprehensive overview of the project outputs and describes the roles and responsibilities of each of the parties;



Key stakeholders (Government, funding parties, project staff) with a documented framework to ensure the delivery of defined project outcomes and to effectively monitor the project from start to finish; and



A formalised agreement between the governing body and the Project Manager regarding the project structure, scope and key components.

Detailed cost estimates for each element of the project are provided in the Project Management Plan. These estimates have been developed by Tweed Shire Council’s Engineering Division. Although not independently verified Tweed’s Engineering division has used its recent experience to develop and maintain unit rates for cost estimation purposes. This experience includes:



Construction of over 700m of rock walls at Kingscliff in the last five years.



Construction of 70m of reinforced concrete piled seawall in front of the Cudgen Headland Surf Lifesaving Club.



Construction of the following Parks: Jack Evan Boat Harbour, Arkinstall Regional Sports Facility, Faulks Park, Jack Bayliss Park, Fingal Boat Harbour and Hastings Point Park.



Construction of North Holiday Park

Kingscliff



Construction of 70m of 4m high sandbag seawall

These works have been constructed using both Council’s day labour and contractors. They have allowed Council’s Engineering Division to gather considerable data for cost estimating directly relevant to the Protection and Revitalisation of Kingscliff Foreshore Project.

10.4 Risk Management Tweed Shire Council recognises that managing risks in infrastructure projects is a very important management process in order to achieve the Project objectives in terms of time, cost, quality, safety and environmental sustainability. As such to identify and appropriately treat risks affecting the project, Council’s Risk Management Team have developed a comprehensive Risk Management Plan, including Risk Management Matrix for the Protection and Revitalisation of Kingscliff Foreshore Project. The objective of the Project Risk Management Plan is to manage the actions to identify, assess and treat risks to the project objectives and its delivered system to create, maintain, action and report upon the risk register. The Plan is a living document that is completed and updated throughout the life of the project. Risks identified in the plan are general and relate to the whole of the project. These risks are further described in detail in the MDP5 Kingscliff Foreshore Masterplan workspace in Council’s project management system. The high level Risk Analysis includes identified risk, estimate and schedule items, new risks, secondary risks, scope changes, change orders and actual costs, so as

67 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

to provide a graphic depiction of the changing nature of project risk over time. Due to the nature of risks involved in the implementation of the Protection and Revitalisation of Kingscliff Foreshore Project Council recognises that the Risk Management Plan will require regular review. The responsibility of maintaining the Plan and the associated registers up to date will be the responsibility of the Project Manager. The National standard AS/NZS ISO 31000:2009 Risk Management – Principles and Guidelines provides the generic framework for risk management strategies for this project. Internal and external policies adopted to guide the risk management procedures in the Project include:



Tweed Shire Councils Risk Management policies;



TPP 09-05 : Internal Audit and Risk Management Policy for the NSW public sector by New South Wales Treasury;



HB 327:201 Communicating and Consulting about Risk;



IEC/ISO 31010:2009 Risk Management – Risk Assessment Techniques; ISO Guide 73: 2009 Risk Management – Vocabulary; and



HB 436:2004 Risk Management Guidelines Companion to AS/NZS 4360:20

Tweed Shire Council believes that good risk management involves the entire project team including design, engineering, business, contracts, finance, purchasing, estimating and project controls.

The process is ongoing, a never ending cycle and iterative process of identification, quantification, modelling, management and monitoring. As such senior management will promulgate organisational risk management policy, and actively support the risk management actions required for the project and ensure that all project stakeholders and participants support these actions.

68 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

The Project Manager will lead the project team and is assigned the authority and responsibility for meeting the project objectives including the overall management of the risks identified within the project.

11. STRATEGIC ALIGNMENT

69 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

11. STRATEGIC ALIGNMENT The Protection and Revitalisation of Kingscliff Foreshore Project directly aligns with the multiple policies, strategies and actions of the Federal Government, NSW Government, regional strategies and The Tweed Shire Community Strategic Plans. Strategic Plans for the Tweed Shire, both over time and geographically, reinforce the role of Kingscliff as a key hub of the Richmond Tweed Region and the critical role the beach and foreshore play in destination appeal and liveability of Region. This role is supported by a series of strategic plans which are currently in place and being implemented.

11.1 Regional Development Australia Northern Rivers The Project aligns with the Regional Development Australia – Northern Rivers (RDANR) strategic plan. Written support has been received for the Project, which notes:

“This infrastructure program is vitally important to the Tweed Valley and has strong support from the community. Tweed Shire Council has allocated over $10million for the project as it is a priority project for the region.” The Project aligns with the following key aspects of the RDA Northern Rivers Regional Plan as follows: -

Priority 3. Natural infrastructure: 3.1 Support measures to maintain and improve the region’s irreplaceable natural infrastructure, in particular the key strategies and actions identified in the Northern Rivers Catchment Action Plan. Priority 4: Sustainable industry 4.7: Attract investment to the region to complement and grow established and merging new industries Priority 6: Regional identity 6.2: Grow and develop the Northern Rivers’ visitor economy consistent with the region’s identity 6.3: Promote the region’s rich natural asset pose and high quality and clean, green image as a means of communicating competitive advantage and accessing international, national and regional markets. Priority 7: A collaborative region 7.7 Coordinate the region’s economic development planning, promotion, facilitation and development activities using cluster and/or placebased approaches

Priority 1: Connected communities 7.3: support initiatives to use existing or ageing infrastructure to meet future needs

70 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

“This critical infrastructure development will be a significant enabler of economic benefit to the Tweed and the Northern Rivers region as a whole. Regional Development Australia Northern Rivers is pleased to support this significant regional infrastructure enhancement.” (John Walker, Chairperson RDA Northern Rivers)”

11.2 Northern Rivers Regional Social Plan 2013-2018 The Project aligns with the Northern Rivers Regional Social Plan 2013-2018, which was developed in conjunction with the Regional Development Australia – Northern Rivers. The Plan includes the voices of the community, identifies regional community development priorities and initiates key actions to address identified social priorities across the seven local government areas of Clarence Valley, Richmond Valley, Kyogle, Lismore, Byron Bay, Ballina and Tweed. The Project will directly assist in achieving the following outcomes of the plan: 1. A region where our children and young people reach their potential 2. A region where people with disabilities reach their fullest potential 3. A region that closes the gap between Aboriginal and nonAboriginal people 4. A region where people are healthy 5. A region where people participate

in meaningful education

employment

and

7. A region of people who value and enjoy our unique natural, arts and cultural assets 9. A region with sustainable, viable, community assets 10. A vibrant, innovative regional economy The Project through the creation of open space and recreational infrastructure will deliver many social benefits for the region including building community pride, strengthening the Tweed community, encouraging social connectivity, providing access and reduction in crime.

11.3

NSW 2021

The Plan aligns with a number of objectives in the State Governments strategic plan, NSW 2021. NSW 2021 is the 10-year plan to rebuild the economy, provide quality services, renovate infrastructure, restore government accountability and strengthen our local environment and communities. Tourism was identified amongst the priorities for action in NSW 2021, with a high potential for growth and a key goal ‘to increase tourism in NSW with double the overnight visitor expenditure by 2020’. The program is critically aligned to NSW 2021 Goals and will assist in meeting many of the goals of NSW 2021. These include: Goal 1 Improve the performance of the NSW economy; Goal 3 Drive economic growth in regional NSW; Goal 11 Keep people healthy and out of hospital;

71 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

Goal 14 Increase opportunities for people with a disability; Goal 19 Invest in critical infrastructure; Goal 24 make it easier for people to be involved in their communities; and

11.5 Tweed Shire Council Community Strategic Plan 2013-23

Goal 27 Enhance cultural, creative, sporting and recreation opportunities.

The Protection and Revitalisation of Kingscliff Foreshore Project is directly aligned with the objectives and priorities of Tweed Shire Council Community Strategic Plan 2013/23, specifically:

11.4 The Visitor Economy Action Plan

Objective 1.1 Ensure actions taken and decisions reached are based on the principles of sustainability.

The Visitor Economy Action Plan outlines a number of key priority actions to enable the achievement of the NSW Governments goal ‘to increase tourism in NSW with double the overnight visitor expenditure by 2020’. A number of immediate actions outlined in the plan are pertinent to the supply of tourist accommodation and other visitor economy related facilities on Crown land such as the Kingscliff Beach Holiday Park. These include improving planning processes to encourage quality and appropriate accommodation on Crown land in locations of high natural amenity (Action 35D) and identifying and releasing land for visitor economy purposes (Action 6C).

Objective 1.2 Improve decision making by engaging stakeholders and taking into account community input.

The Plan also advocates implementation of Destination Management Planning to enable a coordinated approach to addressing demand and supply, policy and planning issues including infrastructure requirements and the role of Crown land within the identified zones (Action 18A). In this context the Reserve Trust has a responsibility to respond to tourism demand and to be aware of the dynamic character of the tourist marketplace in the State and in the region.

Objective 2.5 Provide vibrant and accessible town, community and business centres. Objective 3.1 Expand employment, tourism and education opportunities Objective 3.3 Maintain and enhance the Tweed lifestyle and environmental qualities as an attraction to business and tourism Objective 3.3.2 Facilitate governmentfunded infrastructure. Objective 3.4.2 Ensure sustainable provision of infrastructure (utilities, services and transport) is available to support economic development. Objective 4.1 Protect the environment and natural beauty of the Tweed. Objective 4.4 Manage the Tweed coastline to ensure a balance between utilisation and conservation. Objective 4.4.3 Provide for appropriate public access and use.

72 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

11.6 North Coast of NSW Tourism Destination Management Plan 2013 The North Coast of NSW Destination Management Plan is the creation of a united Regional Tourism Network. In partnership with Destination NSW, 14 Local Government Areas, 14 Local Tourism Associations (or association equivalent of) and over 3,500 combined industry operators, community groups and agencies, and cross regional border partners, will provide the roadmap to achieve doubling overnight visitor expenditure by 2020. The Project aligns with the objectives of the Plan through sustaining and increasing tourism in the Region by protecting the foreshore and creating an attractive area, which will encourage visitors to stay longer and add to destination appeal.

11.7 Tweed Shire Economic Development Strategy The Tweed Shire Economic Development Strategy is a joint project between Tweed Shire Council and Destination Tweed. Both organisations play a key role in the economic development and promotion of Tweed Shire. The aim of the Economic Development Strategy is to identify practical actions for the enhancement of the Tweed Shire economy, responding to the opportunities and constraints to economic and business growth in Tweed Shire and the values of the Tweed Shire community. Tweed Shire Council’s role in economic development is to facilitate business

investment implement policy and create an environment conducive to appropriate industry. The Project directly aligns with achieving many of the outcomes:



Maintain a diverse industry and business base;



Provide investment certainty;



Support existing businesses;



Increase job participation and inclusion;



Grow jobs in Tweed Shire;



Promote and develop business sustainability (economic, environmental, and social);



Grow and develop an economy which does not negatively affect the natural environment and landscape values of Tweed Shire.

ECONOMIC DEVELOPMENT VISION Tweed Shire will continue to develop as a dynamic place for business and investment, led by growth in health, retail, tourism and knowledge industries. The various components of the Project are inter-linked but are predicated on protection of the foreshore. The protection of the foreshore and creation of a vibrant community space for use by residents and visitors will enhance the destination appeal of the region and assist with increasing length of stay and therefore visitor expenditure into the local economy.

73 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

In addition, the Project will also assist with the provision of employment opportunities through the creation of jobs in the construction and tourism sectors helping to strengthen the diversity of industry sectors.

11.8 Kingscliff and Cudgen Locality Plan Themes and issues relating to Kingscliff open space and recreation featured consistently throughout the community feedback obtained whilst developing the Report. Specifically, the community values the beach, creek and natural areas, with survey results identifying 70% frequent the beach and creek areas either daily or weekly, with almost 70% of respondents also stated that they utilise the walking / bike trails on a regular basis (38.9% daily, 29% weekly, 10% monthly). The existing cycleway network is well utilised however initial feedback suggests there is opportunity to improve the amenity of the network through wider paths, more shade, more seating, water bubblers and lighting. The core of the open space related issues include:



The need for more youth focused open spaces including a skate area and basketball court.



More open space for community based activities including concerts, music, food and wine festivals (such as Miami mini marketta) and farmers markets in addition to the regular markets.



More planting, shade and general improvement of amenities (including shade, seating, bbqs and lighting) required.



More trees and landscaping along the coastal reserve.



Improve the coastal foreshore area with a strong greening buffer extending north to south with more shade, trees and green spaces within the coastal reserve.



Need to improve access to the beach and creek areas including disabled access and provide more showers.



Access cycleways walkways.



Need to extend the existing cycleway and improve the overall amenity (shade, seating, water, bike stands, wider paths, lighting).

In light of the strength of the community’s feedback, Council through the completion of the Project acknowledges the communities embedded value of retaining and enhancing these spaces. The Projects appropriate upgrades and design solutions are increasingly critical as Kingscliff’s population increases and ages to ensure the retention of character and maintaining usability.

11.9

Tweed Sports Field Strategy (TSFS)

Prepared in 2014, this Shirewide strategy provides a framework for the provision of additional sports fields and improvement of existing facilities for future need based on population projections. The strategy identifies the existing sports field facilities (along with their age and quality) and details the likely demand for new sports facilities given the anticipated population growth for the area.

74 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

The project considers sport provision trends and issues, as well as community based ideas and aspirations. The TSFS is broken down into different precincts with Kingscliff falling under the Mid-Coast Precinct. The TSFS finds that based on the existing and immediate projected population the there is a need for open (with active and passive) space within the Kingscliff Foreshore. The Project will directly facilitate this need for open space on the Kingscliff foreshore.

about to commence as part of the Access and Inclusion Plan



Improving access in open spaces and parks is another imperative in the Plan with Kingscliff not only a destination for residents of the Tweed but also the region and tourists from further afield.



There are accessible toilet facilities.



There is a significantly high population of older residents in the Kingscliff locality with connections to walking paths and exercise equipment along the foreshore an important factor for this development



The café and retail strip will benefit from creating better access to the open space across the road and improvements to the accessibility of the Kingscliff Hall for community events



The Access and Inclusion Policy also commits Council to providing universal access and social inclusion wherever possible.

11.10 Northern Rivers Catchment Action Plan 2013-2023 The Northern Rivers Catchment Action Plan prepared by Northern Rivers CMA, working with the DoP and local government provides a co-ordinated approach for all natural resource work within the region through partnerships and collaborations with community groups, individuals, industry and government. The project is consistent with this plan through ensuring that the economic potential of the region is realised while maintaining or improving the quality of the natural environment for visitors and the local community.

11.11 ACCESS AND INCLUSION PLAN There are many actions in the Access and Inclusion Plan that apply to this Project. These include:



Improving access to the foreshores for a range of activities including viewing, swimming, fishing, surfing etc. There is a beach wheelchair stored at the Kingscliff Hall and Disabled Surfers Australia has a major event there at least once  year. A review of access to foreshores and waterways is

11.12 Tweed Shire Environmental Sustainability Prioritisation Strategy (ESPS) Council’s Environmental Sustainability Prioritisation Strategy highlights lead actions to enable Council to improve environmental outcomes in the Tweed Shire. The project will deliver on Council’s focus on embedding assessment processes and environmental improvements in capital works, and implementing controls to protect high value environments and landscapes.

75 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

12. REFERENCES 76 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

12. REFERENCES Anning, D. B. (2012). Estimation of the economic importance of beaches in Sydney, Australia, and implications for management. Doctorate of Philosophy, University of New South Wales, Sydney. Retrieved from http://handle.unsw.edu.au/1959.4/51799 Australian Bureau of Statistics ABS Cat. No. 8635.0 – Tourist Accommodation, NSW, 2013-14 Bureau of Meteorology. 2011. Model Outlooks of ENSO Conditions. http://www.bom.gov. au/climate/ahead/ENSO-summary.shtml. Accessed 5th July 2011. Goodwin, I.D. 2005. A mid-shelf, mean wave direction climatology for southeastern Australia, and its relationship to El Nino – Southern Oscillation since 1878 AD. International Journal of Climatology, 25, 1715-1729. National Oceanic and Atmospheric Administration (NOAA), 2011. Experimental NOAA/ ESRL PSD and CIRES/CDC Forecast of PDO in Pacific Domain http://www.esrl.noaa.gov/ psd/forecasts/sstlim/for1pdo.html. Accessed 5th July. Department of Environment, Climate Change and Water (DECCW), 2010. Draft Guidelines for assessing the impacts of seawalls. NSW Department of Public Works (DPW). 1978. Donoghue, E. M. and Sturtevant, V. E. (2007). Social science constructs in ecosystem assessments: revisiting community capacity and community resilience. Society & Natural Resources 20 (10), 899–912. Byron Bay – Hastings Point Erosion Study. Prepared by NSW Department of Public Works, Report No. PWD 78026. Lofthouse J Britton G, Messiter D Entrenching Climate Change Uncertainty Into Kingscliff Foreshore Protection Works (no date) NSW Department of Public Works (DPW). 1980. Dreamtime Beach Coastal Engineering Advice. Prepared by NSW Department of Public Works, Report No 80006. O’Brien, L. Townsend, M. and Ebden, M. (2008). Environmental volunteering: motivations, barriers and benefits. http://www.forestresearch.gov.uk/pdf/Env_Volunteering_Full_ Report.pdf/$FILE/Env_Volunteering_Full_Report.pdf accessed 19/02/10 Patterson, D. 2010.Notes of recent erosion at Kingscliff. http://www.tweed.nsw.gov.au. Accessed 5th July. Patterson, D. 2011. Tweed River Entrance Sand Bypassing Long Term Average Sand Transport rate. 20th NSW Coastal Conference, Tweed. Proudfoot, M and Peterson, L.S. 2011 Positive SOI, negative PDO and spring tides as simple indicators of the potential for extreme coastal erosion in northern NSW. Australian Journal of Environmental Management, 18(3), 170-181. Roy P.S. 1975.Coastal Geology of the Cudgen Area, North Coast of NSW.Dept Mineral Resources and Development, Geological Survey Report No GS1973/286. Short, A.D., Cowell, P.J., Cadee, M., Hall, W., van Dijke, B. 1995.Beach rotation and possible relation to the Southern Oscillation. In Proceedings of the 27th International Coastal Engineering Conference. ASCE: Sydney; 2439 – 2452.

77 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

Short, A D. 1999, Embayed and structurally controlled beaches. In Short, A.D (ed) Handbook of Beach and Shoreface Morphodynamics. John Wiley and Sons, Chichester, 230-250. Umwelt 2003. Tweed Coastline Management Study. Available at http://www.tweed.nsw.gov. au/Waterways/TheTweedCoastHome.aspx Umwelt, 2005.Tweed Coastline Management Plan. Report 1656/R03/V4. Available at http:// www.tweed.nsw.gov.au/Waterways/TheTweedCoastHome.aspx WBM Oceanics, 2001. Tweed Coastline Hazard Definition Study. Report B12876.002.03.doc available at http://www.tweed.nsw.gov.au/Waterways/TheTweedCoastHome.aspx

78 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

13. ANNEXURES 1. Project Plans 2. Cost Benefit Analysis (2015) RedeConsult 3. Kingscliff Foreshore Masterplan

79 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

80 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

81 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

82 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

83 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

84 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

85 | Business Case - PROTECTION & REVITALISATION of KINGSCLIFF FORESHORE PROJECT

     

PROTECTION  AND  REVITALISATION  OF  KINGSCLIFF  FORESHORE  PROJECT   ECONOMIC  ASSESSMENT   PREPARED  FOR  THE  TWEED  SHIRE  COUNCIL   21ST  JULY  2015  

                     

Tweed  Shire  Council    

 

                      Kathy  Sloan:     [email protected]   Lesley  Arthur:     [email protected]    

  2  

Protection  and  Revitalisation  of  Kingscliff  Foreshore  Project    

   

Table  of  Contents     Executive  Summary  

4  

Background  

6  

Protection  and  Revitalisation  of  Kingscliff  Foreshore  Project  

Cost-­‐benefit  analysis  

6  

8  

Costs  

8  

Benefits  

9  

Results  

11  

Other  benefits  

12  

Economic  Impact  Analysis  

13  

Construction  impacts  

13  

Conclusion  

15  

Appendix  A  –  Modelling  Methodology  

16  

   

 

  3  

Tweed  Shire  Council    

 

Executive  Summary   Background   The  National  Stronger  Regions  Fund  (NSRF)  is  an  Australian  Government   programme  to  promote  economic  development  in  Australia’s  regions.  The  Fund   will  provided  $1  billion  over  five  years  to  fund  priority  infrastructure  in  local   communities.   Applications  to  this  Fund  will  be  assessed  via  four  criteria.  This  report  provides  an   economic  assessment  of  the  Protection  and  Revitalisation  of  Kingscliff  Foreshore   Project  supporting  Criterion  1  -­‐  The  extent  to  which  the  project  contributes  to   economic  growth  in  the  region.  

Protection  and  Revitalisation  of  Kingscliff  Foreshore  Project   The  Kingscliff  Regional  Coastal  Revitalisation  Project  will  revitalise  the  Kingscliff   foreshore,  in  the  Tweed  Local  Government  Area  (LGA),  through  the  creation  of  a   central  community  hub,  redevelopment  of  tourism  infrastructure  and  connecting   the  walking  and  cycleway  and  beach  to  the  Main  Street  and  Central  Business   District.  A  vital  element  of  this  project  is  the  construction  of  a  permanent  seawall   to  protect  the  public  and  central  business  district  infrastructure  from  coastal   erosion  and  natural  events.   The  Project  will  involve  three  main  elements:   §

Foreshore  Protection;  

§

Kingscliff  Central  Park  and  Lions  Park;  and  

§

Redevelopment  of  Kingscliff  Beach  Holiday  Park.    

    4  

Cost-­‐benefit  analysis   Cost-­‐benefit  analysis  is  a  process  of  identifying,  quantifying  and  comparing  the   costs  and  benefits  of  a  project  in  current  prices.  The  benefits  and  costs  should  be   compared  against  a  baseline  which  is  the  equivalent  of  maintaining  the  status   quo,  in  this  case  not  undertaking  the  Foreshore  Protection  works,  upgrading  the   Kingscliff  Beach  Holiday  Park  or  providing  upgrades  to  other  facilities.   Using  a  discount  rate  of  7  per  cent,  the  Project  is  estimated  to  generate  a  net   present  value  of  the  net  cash  flow  of  approximately  $35  million  with  a  benefit   cost  ratio  of  2.79.  As  the  benefit  cost  ratio  is  greater  than  1  and  the  net  present   value  is  positive,  the  Project  can  be  deemed  an  efficient  use  of  funds.  

Other  benefits   There  is  a  range  of  other  economic  benefits  associated  with  the  Project  which   will  be  lost  to  the  different  levels  of  government  including:   §

Loss  of  personal  income  tax  revenue  if  individuals  employed  in  tourism-­‐ related  businesses  should  lose  their  job  as  a  result  of  decreased  tourist   visitation  locally;    

§

Increased  welfare  payments  if  individuals  employed  in  tourism-­‐related   businesses  should  lose  their  job  as  a  result  of  decreased  tourist  visitation   locally  and  consequently  seek  to  access  Centrelink  or  other  benefits;  

§

Decreased  payroll  tax  revenue,  reducing  accruals  to  the  State   government;  and  

§

Increase  in  unemployment  levels  locally,  with  the  associated  negative   impacts  on  health,  crime  statistics  and  other  social  implications.  

 

Protection  and  Revitalisation  of  Kingscliff  Foreshore  Project    

 

Economic  impact   The  economic  impact  of  the  proposed  infrastructure  has  been  assessed  in  terms   of  the  impact  of  the  construction  of  the  infrastructure.  The  economic  impact  has   been  prepared  from  the  perspective  of  the  impact  on  Tweed  Shire  as  direct  and   flow-­‐on  impacts  will  affect  the  local  community  in  terms  of  employment,   household  income  and  gross  regional  product.       Based  on  the  information  provided  by  Tweed  Shire  Council,  the  estimated   economic  impact  of  the  construction  phase  on  Tweed  LGA  is:   §

$6.1  million  in  GRP  and  48  FTE  in  Year  1;    

§

$5.6  million  in  GRP  and  44  FTE  in  Year  2;  and  

§

$8.7  million  in  GRP  and  69  FTE  in  Year  3.  

The  above  calculations  suggest  an  average  FTE  employment  per  annum  across   the  construction  period  of  54  positions.        

 

  5  

Tweed  Shire  Council    

 

Background  

§

Assessment  Criterion  2:  The  extent  to  which  the  project  supports  or   addresses  disadvantage  in  the  region;  

The  National  Stronger  Regions  Fund  (NSRF)  is  an  Australian  Government   programme  to  promote  economic  development  in  Australia’s  regions.  The  Fund   will  provided  $1  billion  over  five  years  to  fund  priority  infrastructure  in  local   communities.1  

§

Assessment  Criterion  3:  The  extent  to  which  the  project  increases   investment  and  builds  partnerships  in  the  region;  and    

§

Assessment  Criterion  4:  The  extent  to  which  the  project  and  proponent   are  viable  and  sustainable.    

The  objective  of  the  NSRF  is  “to  fund  investment  ready  projects  which  support   economic  growth  and  sustainability  of  regions  across  Australia,  particularly   disadvantaged  regions,  by  supporting  investment  in  priority  infrastructure”.  2  The   programme  aims  to:       improve  level  of  economic  activity  in  regions;  

§

increase  productivity  in  the  regions;    

Protection  and  Revitalisation  of  Kingscliff  Foreshore  Project  

§

increase  employment  and  a  more  skilled  workforce  in  regions;    

§

increase  capacity  and  improved  capability  of  regions  to  deliver  major   projects,  and  to  secure  and  manage  investment  funding;    

§

improve  partnerships  between  local,  state  and  territory  governments,   the  private  sector  and  community  groups;  and    

§

enable  more  stable  and  viable  communities,  where  people  choose  to  live.  

The  Kingscliff  Regional  Foreshore  Protection  and  Revitalisation  Project  will   revitalise  the  Kingscliff  foreshore,  within  the  Tweed  Local  Government  Area   (LGA),  through  the  creation  of  a  central  community  hub,  redevelopment  of   tourism  infrastructure  and  connecting  the  walking  and  cycleway  and  beach  to   the  Main  Street  and  Central  Business  District.  A  vital  element  of  this  project  is  the   construction  of  a  permanent  seawall  to  protect  the  public  and  central  business   district  infrastructure  from  coastal  erosion  and  natural  events.  

§

Assessment  Criterion  1:  The  extent  to  which  the  project  contributes  to   economic  growth  in  the  region;    

                                                                                                                                         Australian  Government,  Department  of  Infrastructure  and  Regional  Development.  National  Stronger  Regions    Australian  Government,  Department  of  Infrastructure  and  Regional  Development.  National  Stronger  Regions  

2

Fund.   investment.infrastructure.gov.au/publications/administration/pdf/NSRF_Guidelines_13May_2015_FINAL.pdf     6  

 

§

Applications  will  be  assessed  via  four  criteria  which  are  shown  below.      

1

This  report  provides  an  economic  assessment  of  the  Protection  and   Revitalisation  of  Kingscliff  Foreshore  Project  supporting  Criterion  1  -­‐  The  extent   to  which  the  project  contributes  to  economic  growth  in  the  region.  

For  more  than  a  decade  the  Kingscliff  area  has  seen  exponential  growth   elevating  it  from  a  coastal  village  to  a  key  sub-­‐regional  Centre  servicing  the   Tweed  region’s  network  of  coastal  villages.  With  new  residential  releases  to  meet   increased  demand  from  people  migrating  to  the  area  from  predominantly   Sydney,  Kingscliff  will  soon  surpass  the  population  threshold  of  a  small  coastal   city,  namely  greater  than  20,000  people.    

Protection  and  Revitalisation  of  Kingscliff  Foreshore  Project    

 

Coupled  with  population  growth,  Kingscliff  is  a  key  tourism  destination,  with  the   Tweed  Shire  attracting  over  1.4  million  visitors  per  annum3  injecting  over  $278   million  into  the  Tweed  economy  (2013)  and  employing  over  1,900  people4.    

2. Kingscliff  Central  Park  and  Lions  Park    

To  meet  growing  demand  and  ensure  the  provision  and  protection  of  vital   community  infrastructure,  the  Council  and  community  of  Tweed  have  identified   the  Protection  and  Revitalisation  of  Kingscliff  Foreshore  Project  as  a  priority  for   the  Region.   The  Project  will  involve  three  main  elements  which  are  outlined  below.  

1. Foreshore  Protection     §

Rock  seawall  to  protect  upgraded  Kingscliff  Beach  Holiday  Park.  

§

Stepped  concrete  seawall  to  provide  protection  for  the  community  and   associated  infrastructure  adjacent  to  the  CBD  opposite  the  proposed   Kingscliff  Central  Park.    

§

Accessible  beach  access  points  connecting  beach  and  community  hub  to   CBD.  

§

Stormwater  drainage  runoff  quality  and  control.    

§

Enlarged  Cenotaph  Area.    

§

Recreational  activities:  Skateboard  area,  half  basketball  court,  fitness   equipment.  

§

Board  walk/cycleway  to  link  with  Gold  Coast  Cycleway.    

§

Additional  public  parking.    

§

New  park  furniture  /  amenities  /  viewing  platforms/landscaping.    

§

Refurbishment  of  the  existing  Kingscliff  Community  Hall  to  allow  it  to  be   more  accessible  and  to  better  facilitate  community  uses.    

§

Amphitheatre.    

§

Facilities  for  disadvantaged  groups,  aged,  disabled  and  youth  

 

3. Redevelopment  of  Kingscliff  Beach  Holiday  Park     §

New  amenities  block    

§

New  office  and  managers  residence  

 

§

New  camp  kitchen  

 

§

15  ensuite  sites  

 

§

20  cabins  

§

Reduction  in  area  to  60  sites    

§

Improved  facilities  to  provide  a  high  standard  park    

§

New  access  road  and  improved  landscaping    

                                                                                                                                       

3 4

 Destination  NSW  http://www.destinationnsw.com.au/wp-­‐content/uploads/2015/06/Tweed-­‐LGA-­‐profile-­‐1.pdf    Economy.id  http://economy.id.com.au/tweed/tourism-­‐value?sEndYear=2013&BMID=50  

 

  7  

Tweed  Shire  Council    

 

Cost-­‐benefit  analysis   Cost-­‐benefit  analysis  is  a  process  of  identifying,  quantifying  and  comparing  the   costs  and  benefits  of  a  project  in  current  prices.  The  benefits  and  costs  should  be   compared  against  a  baseline  which  is  the  equivalent  of  maintaining  the  status   quo,  in  this  case  not  undertaking  the  Foreshore  Protection  works,  upgrading  the   Kingscliff  Beach  Holiday  Park  or  providing  the  Central  Park  and  upgrades  to   other  facilities.   The  cost-­‐benefit  analysis  of  the  key  infrastructure  has  been  prepared  using  a  real   discount  rate  of  7  per  cent,  with  sensitivity  analysis  conducted  using  real  discount   rates  of  3  per  cent  and  10  per  cent  in  accordance  with  Federal  Government   recommendations5.  The  key  assumptions  adopted  in  preparing  the  cost-­‐benefit   analysis  are  summarised  below.    

Costs   The  capital  costs  associated  with  construction  of  the  proposed  project  have  been   provided  by  Tweed  Shire  Council  and  are  summarised  below.   §

Foreshore  Protection  -­‐     $8,818,100  

§

Kingscliff    Beach  Holiday  Park  upgrade    -­‐  $7,525,900  

§

Kingscliff  Central  Park  -­‐  $4,150,700  

§

Cycle-­‐way  connections  to  Kingscliff  Central  Park    -­‐  $204,300  

§

Car  parking  -­‐  $203,900  

                                                                                                                                       

5

 http://www.finance.gov.au/obpr/proposal/handbook/appendix-­‐E-­‐cost-­‐benefit-­‐analysis.html  

  8  

§

Community  Hall  upgrade  -­‐  $212,500  

§

Lions  Park  Furniture  upgrade  -­‐  $93,000  

§

Total  -­‐  $21,208,400  

The  funding  sought  by  Tweed  Shire  Council  under  this  grant  application  to  the   National  Stronger  Regions  Fund  amounts  to  $9,816,600  or  approximately  46%  of   the  total  estimated  Project  cost.  The  distribution  of  funding  sources  per  Project   component  is  as  follows:   Project  Component  

Total  Cost   Tweed  Shire  Council   contribution  

National  Stronger   Regions  Fund   contribution  

Foreshore  Protection  

$8,818,100  

$2,240,200  (25.4%)  

$6,577,900  (74.6%)  

Kingscliff    Beach  Holiday  Park   upgrade  

$7,525,900   $7,525,900  (100.0%)  

$0  (0.0%)  

Kingscliff  Central  Park  

$4,150,700  

$1,000,000  (24.1%)  

$3,150,700  (75.9%)  

Cycle-­‐way  connections  

$204,300  

$204,300  (100.0%)  

$0  (0.0%)  

Car  parking  

$203,900  

$203,900  (100.0%)  

$0  (0.0%)  

Community  Hall  upgrade  

$212,500  

$124,500  (58.6%)  

$88,000  (41.4%)  

$93,000  

$93,000  (100.0%)  

$0  (0.0%)  

Lions  Park  Furniture  upgrade   Total  

$21,208,400   $11,391,800  (53.7%)   $9,816,600  (46.3%)  

The  various  components  of  the  Project  are  inter-­‐linked  but  are  predicated  on   protection  of  the  foreshore.  Without  that  protection,  the  other  components   cannot  proceed.  Continued  coastal  erosion  of  the  Kingscliff  foreshore  will  have  a   detrimental  impact  on  tourism  locally,  a  significant  contributor  to  the  area’s   economy.  This  is  addressed  further  in  the  benefits  section  of  this  report.    

Protection  and  Revitalisation  of  Kingscliff  Foreshore  Project     Assuming  that  the  Foreshore  Protection  component  is  undertaken,  adopting  the   construction  of  a  5  metre  high  concrete  and  boulder  seawall,  the  remaining   components  will  improve  linkages  between  the  central  business  district  of   Kingscliff  and  the  beach  benefiting  local  residents,  local  businesses  and  visitors   alike.  Upgrading  the  Kingscliff  Beach  Holiday  Park  will  provide  improved   accommodation  facilities  for  visitors  and  the  projected  operating  surplus  from   this  will  contribute  to  the  ongoing  maintenance  costs  of  the  proposed  Foreshore   Protection  component.  The  other  components  of  the  Project  are  expected  to   contribute  to  amenity  for  local  residents  and,  potentially,  increase  tourist   visitation  to  the  area.   The  timing  of  the  disbursement  of  the  Project  development  costs  has  been   distributed  over  a  four  year  period  between  2015  and  2018  as  advised  by  Tweed   Shire  Council.  In  the  first  phase,  it  is  proposed  that  the  seawall  construction  takes   place,  with  completion  anticipated  in  2017.  In  the  same  year,  construction  of  the   other  phases  of  the  Project  will  commence.    

Benefits   The  key  benefits  addressed  in  the  cost-­‐benefit  analysis  are  the  impact  on   producer  surplus  locally  resulting  from  retention  of  existing  visitor  expenditure  in   the  Kingscliff  area.  These  benefits  can  be  directly  attributed  to  the  Project  as,   without  the  infrastructure  development  proposed,  there  is  a  strong  likelihood   that  coastal  erosion  will  result  in  the  loss  of  beach-­‐related  tourism  locally.   The  key  assumptions  relating  to  visitor  expenditure  and  the  resultant  impact  on   the  local  economy  are  outlined  below.    

 

Overnight  visitors  to  the  Kingscliff  –  Fingal  Head  area   Data  published  by  Destination  NSW  and  sourced  from  Tourism  Research   Australia  indicates  that  the  LGA  of  Tweed  attracted  approximately  534,000   overnight  visitors  in  2014  (measured  as  a  four  year  annual  average),  generating  a   total  of  2,054,000  visitor  nights.  Domestic  travel  contributed  the  majority  of   visitors  (96%)  with  512,000  overnight  visitors  and  1,807,000  visitor  nights,   reflecting  an  average  length  of  stay  of  3.5  nights.  International  travellers  made  up   22,000  visitors  and  247,000  visitor  nights  (12%  of  total  visitor  nights)  with  an   average  length  of  stay  of  11.4  nights.  Total  visitor  expenditure  in  Tweed  Shire   derived  from  overnight  visitors  was  estimated  to  be  $257  million  with  $243   million  or  almost  95%  derived  from  domestic  overnight  visitors.   The  Protection  and  Revitalisation  of  Kingscliff  Foreshore  Project  is  however  likely   to  impact  on  tourist  visitor  numbers  and  associated  expenditure  in  the   immediate  locality  rather  than  the  wider  LGA.  There  is  no  data  available  on  the   total  number  of  visitors  to  the  Statistical  Area  Level  2  (SA2)  of  Kingscliff  –  Fingal   Head.     However,  data  published  by  the  Australian  Bureau  of  Statistics  (ABS)  relating  to   nights  spent  in  tourist  accommodation6  indicates  that,  in  2013-­‐14,  guest  nights   spent  in  tourist  accommodation  in  the  Kingscliff  –  Fingal  Head  area   approximated  42.9%  of  all  guest  nights  spent  in  Tweed  Shire.  It  has  been   assumed  that  that  proportion  applies  to  all  overnight  visitors  estimated  for   Tweed  in  total,  excluding  those  visiting  friends  and  relatives.  It  is  worth  noting   that  more  than  half  of  domestic  overnight  visitor  nights  in  Tweed  cited  holiday  as   the  main  purpose  of  visit  with  a  further  37%  noting  visiting  friends  and  relatives   as  the  primary  reason  for  visit.                                                                                                                                            

6

 ABS  Cat.  No.  8635.0  –  Tourist  Accommodation,  NSW,  2013-­‐14  

  9  

Tweed  Shire  Council     With  regard  to  the  proportion  of  overnight  visitors  staying  with  friends  and   relatives,  the  calculation  has  been  based  on  the  estimated  resident  population7   whereby  just  over  13%  of  the  estimated  resident  population  of  the  LGA  resides  in   the  Kingscliff  –  Fingal  Head  area.  Accordingly,  that  proportion  has  also  been   applied  to  the  overnight  visitor  market  staying  with  friends  and  relatives  in  the   Kingscliff  –  Fingal  Head  area.   Based  on  the  above  assumptions  it  has  been  estimated  that  in  the  year  ending   September  2014,  approximately  647,000  visitor  nights  were  spent  in  the   Kingscliff  –  Fingal  Head  area,  representing  approximately  31%  of  the  total  visitor   nights  spent  in  Tweed  Shire.     Adopting  the  average  expenditure  per  visitor  night  estimated  for  Tweed  Shire  of   $134  per  domestic  visitor  night  and  $58  per  international  visitor  night  would   suggest  that  total  expenditure  locally  derived  from  overnight  visitors  would   approximate  $77  million.  Whilst  it  is  likely  that  some  of  the  expenditure  by  these   overnight  visitors  would  be  made  in  other  parts  of  the  LGA,  it  can  reasonably  be   expected  that  this  would  be  offset  by  expenditure  made  in  the  Kingscliff  –  Fingal   Head  area  by  visitors  staying  overnight  elsewhere  in  the  LGA.     Data  from  Tourism  Research  Australia8  indicates  the  following  distribution  of   expenditure  for  overnight  visitors  to  Northern  Rivers  Tropical  New  South  Wales.   However,  not  all  of  this  expenditure  will  be  retained  locally.  Accordingly,   estimates  have  been  prepared  regarding  direct  expenditure  which  will  be   retained  in  the  region  and  accordingly  have  a  direct  economic  impact.   Table  1:  Distribution  of  overnight  visitor  expenditure,  Northern  Rivers  Tropical  NSW   2012-­‐13  

                                                                                                                                        7

 ABS  Cat.  No.  3218.0  –  Regional  Population  Growth,  Australia,  2013-­‐14    Tourism  Research  Australia  –  Regional  Tourism  Profiles  2012-­‐13  

8

  10  

  Proportion  of  total   expenditure  

Proportion  retained  locally  

Accommodation  

33.0%  

90.0%  

Food  and  drink  

29.2%  

90.0%  

Airfares  

8.0%  

20.0%  

Other  transport  fares  

3.0%  

50.0%  

14.8%  

15.0%  

Shopping  

8.5%  

40.0%  

Entertainment  

2.6%  

90.0%  

Other  

0.8%  

90.0%  

Packages    

0.2%  

20.0%  

100.0%  

67.7%  

Expenditure  type  

Fuel  

Total  expenditure   Source:  Tourism  Research  Australia,  RedeConsult  estimates  

Adopting  these  estimates  of  expenditure  retained  locally,  and  therefore   impacting  on  the  immediate  economy  in  terms  of  employment,  household   income  and  gross  regional  product,  suggests  total  expenditure  retained  in  the   region  of  approximately  $51  million  in  2013-­‐14.  

     

 

Protection  and  Revitalisation  of  Kingscliff  Foreshore  Project    

 

Daytrip  visitors  to  the  Kingscliff  –  Fingal  Head  area   The  four  year  annual  average  data  for  daytrip  visitation  to  the  Tweed  Shire   estimates  that  approximately  910,000  daytrip  visits  were  made.  In  assessing  the   number  of  daytrip  visitors  travelling  to  the  Kingscliff  –  Fingal  Head  area,  it  has   been  assumed  that  the  proportion  of  total  visitors  to  the  region  compared  with   the  total  LGA  is  similar  to  the  proportion  of  total  overnight  visits  i.e.  31%.  This   implies  that  the  locality  attracts  approximately  287,000  daytrip  visitors  per   annum.     Expenditure  data  from  Tourism  Research  Australia  for  daytrip  visitors  and  its   associated  distribution  by  sector  has  been  applied,  with  the  proportion  retained   in  the  region  being  equivalent  to  that  adopted  for  overnight  visitor  expenditure.   This  provides  an  estimate  of  daytrip  expenditure  retained  locally  in  the  Kingscliff   –  Fingal  Head  area  of  $17.5  million.  

Beach-­‐related  tourism  and  associated  expenditure  in  the  Kingscliff  –   Fingal  Head  area   The  Project,  however,  has  been  conservatively  assumed  to  impact  only  on  those   individuals  who  go  to  the  beach.  Data  published  by  Destination  NSW9,  has   estimated  that  44%  of  domestic  overnight  visitors  to  Tweed  Shire  nominated  “go   to  the  beach  (including  swimming)”  as  one  of  the  top  five  activities  during  their   visit.  Applying  the  impact  of  expenditure  by  these  visitors  only,  would  provide  an   estimate  of  total  retained  spending  of  $22.4  million  in  the  Kingscliff  –  Fingal   Head  area.   Similarly  with  daytrip  visitors,  only  that  proportion  attributed  to  visitors  who  go   to  the  beach  has  been  assumed  to  be  affected  by  the  Project.  Data  published  by   Destination  NSW,  has  estimated  that  23%  of  daytrip  visitors  to  Tweed  Shire                                                                                                                                           9

 http://www.destinationnsw.com.au/wp-­‐content/uploads/2015/06/Tweed-­‐LGA-­‐profile-­‐1.pdf

nominated  “go  to  the  beach  (including  swimming)”  as  one  of  the  top  five  activities   during  their  visit.  This  results  in  an  estimate  of  total  retained  spending  by  daytrip   visitors  in  the  Kingscliff  –  Fingal  Head  area  of  approximately  $4  million  per   annum.  

Loss  of  tourist  expenditure   Reduction  in  beach  width,  as  a  result  of  coastal  erosion,  is  expected  to  have  a   detrimental  effect  on  beach  related  tourism.  A  study  commissioned  by  Tweed   Shire  Council  from  Griffith  University10  indicates  that  the  chances  of  experiencing   an  event  which  would  result  in  zero  beach  width  in  a  single  year  are  18%,  but  that   the  chance  of  the  same  event  over  a  37  year  period  is  100%.  Accordingly,  it  has   been  assumed  that  18%  of  beach-­‐related  tourism  expenditure  is  retained  as  a   result  of  the  Project  for  the  first  five  years  after  completion  of  the  Foreshore   Protection  component  (i.e.  82%  of  the  existing  beach-­‐related  tourism   expenditure  is  assumed  to  remain  and  not  be  impacted  by  the  Project).     Subsequently,  it  has  been  assumed  that  36%  of  beach-­‐related  tourism   expenditure  is  retained  as  a  result  of  the  Project.  These  assumptions  have  been   applied  to  individual  years  (in  2013-­‐14  $  values)  and  are  not  cumulative.  Without   the  Foreshore  Protection,  however,  it  is  likely  that  complete  beach  erosion  would   occur,  potentially  reducing  beach-­‐related  tourism  to  zero  for  a  period  of  at  least   six  years.  That  impact  has  not  been  included  in  the  analysis.      

Results                                                                                                                                           10

 

 Griffith  University,  Centre  for  Coastal  Management  –  Kingscliff  Foreshore  Management  Options  Cost  Benefit   Analysis,  August  2013  

  11  

Tweed  Shire  Council    

 

The  results  of  the  cost-­‐benefit  analysis  are  summarised  in  Table  2  below.  The   analysis  does  not  incorporate  any  benefits  derived  from  construction  of  the   infrastructure  project  or  the  impact  of  resident  recreational  value.   Table  2:  Cost-­‐benefit  analysis  of  the  Project  –  2015  -­‐  2050   Discount  Rate  

NPV  of    net  cash  flow     ($  million)  

NPV    of  Costs     ($  million)  

NPV    of  Benefits     ($  million)  

Benefit  Cost     ratio  

3%  

$78.43  

$22.62  

$98.86  

4.37  

7%  

$34.68  

$18.83  

$52.53  

2.79  

10%  

$19.17  

$16.88  

$35.48  

2.10  

Personal  income  tax  revenue,  if  individuals  employed  in  tourism-­‐related   businesses  should  lose  their  job  as  a  result  of  decreased  tourist  visitation  locally.   Data  published  by  the  ABS  estimates  the  value  and  contribution  of  tourism  to  the   national  economy11  including  estimating  employment  and  tourism  consumption   by  tourism-­‐related  product.  Applying  that  data  to  estimated  tourist  expenditure   by  category  suggests  that  visitor  expenditure  in  the  Kingscliff  –  Fingal  Head  area   supports  the  following  levels  of  direct  employment,  defined  by  traditional   industry  category.   Table   3:   Direct   employment   supported   by   beach-­‐related   tourist   expenditure,   Kingscliff  –  Fingal  Head,  2013-­‐14    

Using  the  central  discount  rate  of  7  per  cent,  the  Project  is  estimated  to  generate   a  net  present  value  of  the  net  cash  flow  of  approximately  $35  million  with  a   benefit  cost  ratio  of  2.79.  As  the  benefit  cost  ratio  is  greater  than  1  and  the  net   present  value  is  positive,  the  Project  can  be  deemed  an  efficient  use  of  funds.      

Part-­‐time  

Full-­‐time  

Total  

FTE  

Accommodation  

15.1  

19.7  

34.8  

27.2  

Food  &  beverage  services  

53.1  

34.9  

88.0  

61.4  

Transport  

0.7  

2.6  

3.3  

2.9  

Administrative  services  

0.0  

0.1  

0.1  

0.1  

Arts  &  recreation  services  

3.0  

3.2  

6.2  

4.7  

Retail  trade  

4.4  

4.6  

9.0  

6.8  

Other  industries  

1.3  

4.1  

5.4  

4.8  

77.6  

69.1  

146.8  

107.9  

Total  

 

Source:  ABS  Cat.  No.  5249.0,  Tourism  Research  Australia,  RedeConsult  estimates  

 

Overall,  it  is  estimated  that  beach-­‐related  visitor  expenditure  in  the  Kingscliff  –   Fingal  Head  area  supports  the  direct  employment  of  almost  150  people,  or  108   full-­‐time  equivalent  jobs  (adopting  the  ABS  convention  that  1  full-­‐time  employee   is  equivalent  to  0.5  part-­‐time  employee).  Based  on  flow-­‐on  multipliers  calculated   for  the  entire  Tweed  Shire,  this  would  equate  to  total  FTE  employment  in  the  

Other  benefits   There  is  a  range  of  other  economic  benefits  associated  with  the  Project  which   will  be  lost  to  the  different  levels  of  government  including:  

                                                                                                                                        11

  12  

 ABS  Cat.  No.  5249.0  –  Australian  National  Accounts:  Tourism  Satellite  Account,  2013-­‐14  

Protection  and  Revitalisation  of  Kingscliff  Foreshore  Project    

 

Kingscliff  –  Fingal  Head  area  supported  by  beach-­‐related  visitor  expenditure  of   176  jobs.  

Economic  Impact  Analysis  

Based  on  data  from  the  ABS  regarding  average  weekly  earnings12  by  industry,   adjusted  to  reflect  overall  average  weekly  earnings  in  New  South  Wales  and   further  adapted  to  reflect  average  income  by  industry  for  Tweed  Shire  by  place   of  employment  in  comparison  with  New  South  Wales  (derived  from  2011   Census),  results  in  an  estimate  of  average  weekly  income  per  full-­‐time  employee   (ordinary  time  earnings).    

Construction  impacts  

Using  data  from  the  Australian  Taxation  Office  regarding  personal  withholding   tax  contributions  also  provides  an  indication  of  the  withholding  tax  revenue   accrued  to  the  Federal  Government  by  each  full-­‐time  equivalent  employee   directly  supported  by  tourist  expenditure  in  the  Kingscliff  –  Fingal  Head  area.   When  applied  to  the  total  estimated  direct  full-­‐time  equivalent  employment,  the   estimated  withholding  tax  return  to  the  Federal  Government  is  approximately   $1.0  million  per  annum.  This  does  not  include  the  impact  of  flow-­‐on  employment   and  the  associated  withholding  tax  revenue.   Increased  welfare  payments  if  individuals  employed  in  tourism-­‐related   businesses  should  lose  their  job  as  a  result  of  decreased  tourist  visitation  locally   and  consequently  seek  to  access  Centrelink  or  other  benefits.   Decreased  payroll  tax  revenue,  reducing  accruals  to  the  State  government.   Increase  in  unemployment  levels  locally,  with  the  associated  negative  impacts   on  health,  crime  statistics  and  other  social  implications.  Currently  (March  quarter   2015),  Tweed  LGA  has  an  estimated  unemployment  rate13  of  8.5%,  significantly   higher  than  either  the  New  South  Wales  average  (5.9%)  or  nationally  (6.1%).                                                                                                                                          

The  economic  impact  of  the  proposed  infrastructure  has  been  assessed  in  terms   of  the  impact  of  the  construction  of  the  infrastructure.  The  economic  impact  has   been  prepared  from  the  perspective  of  the  impact  on  Tweed  Shire  as  direct  and   flow-­‐on  impacts  will  affect  the  local  community  in  terms  of  employment,   household  income  and  gross  regional  product.       The  economic  impact  analysis  was  undertaken  utilising  an  input-­‐output  (IO)   model  developed  for  Tweed  Local  Government  Area.  IO  analysis  provides  a   detailed  picture  of  the  structure  of  a  regional  economy  at  a  point  in  time  and  can   be  used  to  estimate  the  contribution  or  impact  of  a  particular  sector  of  the   economy  including  flow-­‐on  or  multiplier  effects.     Marginal,  rather  than  average,  income  and  expenditure  relationships  for  the   household  sector  were  incorporated  in  the  analysis.  As  has  been  well   documented,  the  household  sector  is  the  dominant  component  of  multiplier   effects  in  an  IO  model,  as  consumer  driven  consumption  and  income  tends  to   dominate  local  economic  activity.     Capturing  marginal  income  and  expenditure  relationships  for  the  household   sector  can  provide  a  more  realistic  representation  of  the  economic  system  and   remove  the  strict  linearity  assumption  implicit  in  conventional  IO  modelling.   Further  details  relating  to  the  IO  modelling  are  provided  at  Appendix  A.  

     

12

                                                                                                                                                                                                                                                                                                                                                     

13

 

 ABS  Cat.  No.  6302.0  –  Average  Weekly  Earnings,  Australia    https://docs.employment.gov.au/node/34693  

  13  

Tweed  Shire  Council    

 

  Economic  impact  of  construction  in  Tweed  LGA   Based  on  the  information  provided  by  Tweed  Shire  Council,  the  estimated   economic  impact  of  the  construction  phases  on  Tweed  LGA  is  shown  in  Table  4.   All  monetary  values  are  expressed  in  2013-­‐14  terms.   Table  4:  Economic  impact  of  construction  expenditure  in  Tweed  LGA,  including  flow-­‐on  effects   Value  Added  

Income  

Employment  

$m  

$m  

FTE  

Total  Impact  Year  1  

6.1  

2.8  

48  

Total  Impact  Year  2  

5.6  

2.6  

44  

Total  Impact  Year  3  

8.7  

4.0  

69  

   

It  should  be  noted  that  the  above  estimates  of  the  economic  impact  are  not   cumulative  but  reflect  the  impact,  including  flow-­‐on  effects,  in  the  year  in  which   the  expenditure  was  made.     The  above  calculations  suggest  an  average  FTE  employment  per  annum  across   the  construction  period  of  54  positions.           14  

 

Protection  and  Revitalisation  of  Kingscliff  Foreshore  Project    

 

Conclusion   Tweed  Shire  Council  is  seeking  funding  from  the  Australian  Government  under   the  National  Stronger  Regions  Fund  to  complete  the  Protection  and   Revitalisation  of  Kingscliff  Foreshore  Project.    The  economic  value  of  this  project   has  been  assessed  with  the  key  results  shown  below.  

Economic  impact   Based  on  the  information  provided  by  Tweed  Shire  Council,  the  estimated   economic  impact  of  the  construction  phase  on  Tweed  LGA  is:  

Cost  benefit  analysis   Using  a  discount  rate  of  7  per  cent,  the  Project  is  estimated  to  generate  a  net   present  value  of  the  net  cash  flow  of  approximately  $35  million  with  a  benefit   cost  ratio  of  2.79.  As  the  benefit  cost  ratio  is  greater  than  1  and  the  net  present   value  is  positive,  the  Project  can  be  deemed  an  efficient  use  of  funds.  

§

$6.1  million  in  GRP  and  48  FTE  in  Year  1;    

§

$5.6  million  in  GRP  and  44  FTE  in  Year  2;  and  

§

$8.7  million  in  GRP  and  69  FTE  in  Year  3.  

The  above  calculations  suggest  an  average  FTE  employment  per  annum  across   the  construction  period  of  54  positions.    

Other  benefits   There  is  a  range  of  other  economic  benefits  associated  with  the  Project  which   will  be  lost  to  the  different  levels  of  government  including:   §

Loss  of  personal  income  tax  revenue  if  individuals  employed  in  tourism-­‐ related  businesses  should  lose  their  job  as  a  result  of  decreased  tourist   visitation  locally;    

§

Increased  welfare  payments  if  individuals  employed  in  tourism-­‐related   businesses  should  lose  their  job  as  a  result  of  decreased  tourist  visitation   locally  and  consequently  seek  to  access  Centrelink  or  other  benefits;  

§

Decreased  payroll  tax  revenue,  reducing  accruals  to  the  State   government;  and  

§

Increase  in  unemployment  levels  locally,  with  the  associated  negative   impacts  on  health,  crime  statistics  and  other  social  implications.  

    15  

Tweed  Shire  Council    

 

Appendix  A  –  Modelling   Methodology   The  latest  national  input  output  table  (2012-­‐13)  published  by  the  Australian   Bureau  of  Statistics  (ABS)  (ABS  Cat.  No.  5209.0.55.001)  was  utilised  as  the  base   table.  The  steps  involved  in  updating  that  table  to  reflect  the  financial  year  of   2013-­‐14  included:   §

§

§

  16  

Data  from  the  2011  Census  relating  to  employment  by  industry  sector   were  analysed,  in  conjunction  with  data  from  the  Labour  Force  Survey   (ABS  Cat.  No.  6291.0.55.003),  to  determine  the  number  of  full  time   equivalent  employees  by  industry  sector  in  2013-­‐14.  In  converting  to  full   time  equivalent  jobs,  the  ABS  convention  of  assuming  1  part  time   employee  is  equivalent  to  0.5  full  time  employees  was  adopted.  The   above  data  were  used  to  calculate  output  by  industry  sector,  in  2012-­‐13   dollar  values.   Data  from  the  Australian  System  of  National  Accounts  (ABS  Cat.  No.   5204.0)  for  2013-­‐14  were  extracted  and  information  on  Compensation  of   Employees  and  Gross  Operating  Surplus  by  industry  sector  was  used  to   adjust  the  previously  derived  results  in  the  relevant  rows  in  the  input   output  table.  Similarly,  data  from  the  same  publications  relating  to  final   demand  were  used  to  adjust  the  relevant  columns  in  the  input  output   table.   The  table  was  balanced  and  checked  for  accuracy  against  data  from  the   Australian  System  of  National  Accounts  including  comparisons  of  the   derived  Gross  Domestic  Product  and  its  components  and  Gross  Industry   Value  Added.  

Creating  an  input  output  table  for  New  South  Wales   The  national  input  output  table  derived  for  2013-­‐14  was  used  to  generate  an   input  output  table  for  the  same  year  for  New  South  Wales.  The  steps  involved  in   developing  the  State  table  included:   §

Data  from  the  2011  Census  regarding  employment  by  industry  sector  by   place  of  employment  were  analysed,  in  conjunction  with  data  from  the   Labour  Force  Survey,  to  estimate  the  number  of  full  time  equivalent   employees  by  industry  sector  working  in  each  New  South  Wales  in  2013-­‐ 14.  This  was  used  to  apportion  output  by  industry  sector.  

§

Data  from  the  Australian  National  Accounts:  State  Accounts  (ABS  Cat.   No.  5220.0)  for  2013-­‐14  were  extracted  and  information  on   Compensation  of  Employees,  Gross  Operating  Surplus  and  the  various   final  demand  sectors  extracted.  

§

The  above  data  were  entered  into  the  Generation  of  Regional  Input   Output  Tables  (GRIT)  file  incorporated  in  the  IO9  software  used  in  this   analysis.  The  GRIT  technique,  developed  by  Professors  West  and  Jensen   of  the  University  of  Queensland,  uses  allocation  methods  and  location   quotients  as  well  as  superior  data.  It  is  the  most  widely  used  method  of   constructing  input  output  tables  in  Australia.  It  is  also  commonly   employed  in  Europe  and  America.  

§

The  resultant  tables  were  balanced  using  the  RAS  methodology.  The   RAS  technique  is  a  bi-­‐proportional  iterative  adjustment  method  designed   to  modify  a  base  input  output  matrix  to  fit  new  row  and  column  totals.   The  rows  and  columns  are  adjusted  proportionally  to  the  new  row  and   column  totals  in  turn,  and  the  cycle  repeated  until  the  actual  row  and   column  totals  converge  to  the  specified  values.  This  may  require  some  

Protection  and  Revitalisation  of  Kingscliff  Foreshore  Project    

  adjustment  to  the  tolerances  of  individual  sectors  to  enable  the  table  to   converge.     §

The  balanced  tables  were  then  checked  for  accuracy  against  data  from   the  Australian  National  Accounts:  State  Accounts  including  comparisons   of  the  derived  Gross  State  Product  and  its  components  and  Gross   Industry  Value  Added.  

§

The  above  data  were  incorporated  into  the  GRIT  file,  along  with  data  for   the  relevant  university  campus  as  outlined  below,  and  the  resultant   tables  balanced  using  the  RAS  methodology.  The  balanced  tables  were   checked  for  reasonableness  by  comparing  Gross  Regional  Product  per   capita  and  per  full  time  equivalent  employee  with  the  State  average.  

Creating  the  regional  input  output  table   The  input  output  table  developed  for  2013-­‐14  for  New  South  Wales  was  used  to   create  the  relevant  regional  table  for  Tweed  LGA.  This  incorporated  the   following  steps:   §

Data  from  the  2011  Census  regarding  employment  by  industry  sector  by   place  of  employment  were  analysed,  in  conjunction  with  Census  data   relating  to  full  time  and  part  time  employment  by  industry  sector  and   data  from  the  Labour  Force  Survey,  to  estimate  the  number  of  full  time   equivalent  employees  by  industry  sector  working  in  each  area  in  2013-­‐14.   This  was  used  to  estimate  output  by  industry  sector.  

§

Data  from  the  2011  Census  relating  to  weekly  income  by  industry  sector   were  extracted  and  compared  with  the  average  weekly  income  by   industry  sector  for  New  South  Wales.  The  resultant  ratio  was  used  to   adjust  State  level  Compensation  of  Employees  by  full  time  equivalent  by   industry  sector  to  a  regional  level.  

§

Average  weekly  income  per  capita  for  persons  residing  in  each  area  was   calculated  from  data  from  the  2011  Census  and  compared  with  the  State   average.  The  resultant  ratio  was  used  to  adjust  State  level  Household   Final  Consumption  Expenditure  and  Ownership  of  Dwellings  per  capita  to   a  regional  level.  

  17  

Tweed Shire Council

Kingscliff Foreshore Master Plan Kingscliff Central Park

Tweed Shire Council is planning a new Kingscliff Central Park, to provide a vibrant public open space which links the beach with the town’s central business district.

Concept plans Council is exhibiting concept plans for the Central Park, which include a boardwalk, landscaping, picnic shelters, play equipment and a larger ANZAC memorial space. The Central Park is a major feature of the Kingscliff Foreshore Master Plan adopted by Council in July 2007, to establish a vision for future foreshore upgrades.

The vibrant cafe belt of Kingscliff

Council has already implemented sections of the master plan, including: • Construction of an underground pile wall in front of the Cudgen Headland Surf Life Saving Club. • An upgrade of Jack Bayliss Park at North Kingscliff The Central Park is part of the master plan’s next stage, a three-step process for the foreshore between Cudgen Headland Surf Life Saving Club and the Kingscliff Beach (Bowling) Club.

Kingscliff Central Park, located to the north of Cudgen Headland Surf Life Saving Club, will be a centrepiece of the Kingscliff foreshore and a community hub for the town. It will serve as a venue for festivals and performances and a gathering place for locals and visitors to Marine Parade’s shops and cafes.

Be

ac

Kin

hn

ou

ris

hm

en

t

gs

cli ff

Be

ac

hH

oli

da

yP ar

k

Three-step plan Step 1 – Restore the adjacent stretch of beach by sand nourishment. Step 2 - Redevelop the Kingscliff Beach Holiday Park and reduce its size. Step 3 - Create the Kingscliff Central Park on the land vacated by the reduced Kingscliff Beach Holiday Park.

Step 1 - Sand nourishment Council plans to place 250,000 cubic metres of sand from the Tweed River, downstream of Barney’s Point Bridge, to the southern section of Kingscliff Beach. Sand nourishment will restore the eroded Kingscliff Beach to its pre 2009 condition and provide additional protection to the Kingscliff Beach Holiday Park and the Kingscliff Community Hall, which are within the immediate coastal erosion hazard zone.

The beach nourishment program will create a dune with a crest level five metres above mean sea level and widen the existing beach. This will move the coastal hazard line – an indicator of erosion risk seaward. Ongoing nourishment and dune management will shift the hazard line seaward of the redeveloped holiday park and the new Kingscliff Central Park.

Footprint of redeveloped Kingscliff Beach Holiday Park

Vacated area of Kingscliff Beach Holiday Park for Kingscliff Central Park

Step 2 - Redevelop Kingscliff Beach Holiday Park Once the beach nourishment is completed, the Kingscliff Beach Holiday Park can be redeveloped and reduced in size. The reduced size will create space for the Kingscliff Central Park, while enabling the creation of a public foreshore cycleway, boardwalk and beach access points.

The redevelopment will include: • Construction of new amenities blocks, recreational elements and improved facilities to provide a high standard park. • Reducing the sites to around 60, with a mix of cabins, ensuite sites and camp sites. • Reduce the park’s area to create space for the new Kingscliff Central Park. • Landscaping which incorporates foreshore works. • New management facilities.

Redeveloped Kingscliff Beach Holiday Park

Kingscliff Central Park

Step 3 - Kingscliff Central Park Beach nourishment will protect the proposed Kingscliff Central Park and the Holiday Park redevelopment will vacate 12,000 square metres of land for the park. Central Park is designed to be a large community space at the heart of the Kingscliff central business district - a destination for residents and visitors to relax and enjoy the breathtaking scenery, engage with family and friends at an open air barbecue or take a leisurely walk along the foreshore pathway. The design will utilise existing stands of coastal trees and many additional trees will be planted to provide natural shade and retain the park’s natural feel. A new amenities building with toilets and showers will be accompanied by seating, picnic settings, shelters and other furniture throughout the park, as well as drinking fountains and bins. A large open lawn area will sit at the heart of the design, to host events and serve as an active space. Strong visual and physical connections tie Central Park and the business district together, guiding the eye through the park and out towards the ocean. Pathways connect Marine Parade to an

enlarged cenotaph area - to accommodate growing crowds - and out towards the foreshore. The park design aims to bring different groups of the community together. A large play space will accommodate a wide range of age groups, with a halfcourt basketball court and space for young children learning to ride a bike or skateboard.

The Central Park will be framed by a 3.5m-wide boardwalk which will run the length of the beach protection area, from north of the Kingscliff Beach Club to south of the Cudgen Headland Surf Life Saving Club. The boardwalk will be accessible by wheelchair and bicycle and will provide accesses to the beach. It will be a link in the cycleway - walkway spanning the entire Tweed coastline.

y Park

olida each H

liff B Kingsc

8

Kingscliff Beach

8 9

6

9

5

4

Mari

1

ne Pa

rade

2

Legend

Notation

Turf Garden Bed Dune Vegetation Pavement Type 1 Pavement Type 2 Pavement Type 3 Pavement Type 4 Decking Boardwalk

1 Cenotaph 2 Community Centre 3 Cudgen Headland Surf Club 4 Existing parking 5 Amenities block 6 Half size basketball court 7 Additional parking 8 Beach Access 9 Barbecue 10 Playground

Shade Sail structure

9

10 3

7 7

Picnic Shelter

History September 2001: Council adopts Tweed Coastline Hazard Definition Study, which identifies coastline erosion hazard lines. It shows Cudgen Headland Surf Life Saving Club, Kingscliff Beach Holiday Park and Kingscliff Community Hall are at risk.

November 2010: Council given licence by NSW Department of Land and Property Management to examine source of sand downstream of Barneys Point Bridge, to provide sand nourishment at Kingscliff Beach.

Project time frame*

July 2005: Council adopts Tweed Shire Coastline Management Plan, outlining coastal management strategies for each coastal village.

*Subject to gaining finance and planning approvals

April 2006: Environmental Impact Statement commissioned for Kingscliff foreshore protection.

May 2011: Council approval of concept.

December 2006: Coastal Management Strategy for Kingscliff refined to include: • A piled seawall in front of Cudgen Headland Surf Life Saving Club. • Initial and ongoing sand nourishment of Kingscliff beach to provide protection against beach erosion. July 2007: Kingscliff Foreshore Master Plan endorsed by Council. December 2009: Jack Bayliss Park upgraded. September 2010: Sea wall in front of Cudgen Headland SLSC completed.

March 2011: Concept design of Central Park on public exhibition. May 2011: Council appoints consultants to undertake all environmental impact studies required to gain extraction approval for sand from Tweed River. May 2011 - May 2012: Detailed design of Central Park including community updates. May 2012: EIS completed and submitted to relevant government departments for approval. August 2012: Tender documents for Central Park completed. August 2012: Planning Approvals received.

Start of Construction (Sand nourishment, holiday park redevelopment, Central Park): Subject to obtaining government funding.

Want to find out more about the Kingscliff Foreshore Master Plan and how you can have your say? The Kingscliff Foreshore Master Plan is on public exhibition from 7 March until 12 April 2011. During this period, Council will conduct a number of activities to inform the community about the proposed Central Park and to encourage public input to the final design. These activities include: • A dedicated website www.kingscliffcentralpark.com.au featuring: – an online community forum – all relevant documents, including maps of the beach sand nourishment, Holiday Park redevelopment and Central Park layout – a video ‘fly-over’ of the proposed Central Park design • A community information stall at the NSW Surf Life Saving Championships, at the Cudgen Headland Surf Life Saving Club on Saturday, 19 March from 10am to 2pm.

• Printed documents available at Council’s Murwillumbah and Tweed offices and its libraries at Kingscliff, Murwillumbah and Tweed Heads. • Fly-over videos on display at the Cudgen Headland Surf Life Saving Club and Kingscliff Beach Club. The information session is an opportunity to talk one-on-one with Council representatives about Kingscliff Central Park and the Foreshore Master Plan. For all information and updates about the Kingscliff Central Park community engagement program, please visit www.yoursaytweed.com.au/kingscliffpark from 14 March to 12 April 2011.