Projects History List OVERVIEW For over 40 years, Donkersloot & Sons Marine Development Co. has been the "go to" organization for complex construction projects in a marine environment both as a general contractor and a valued subcontractor. Started in the 1960's by Arie Donkersloot, Sr. who brought his Dutch experience including acknowledge of harsh with him when he emigrated to the U.S. from his native Holland in the 1950's. The company began with Arie's technical training and practical experience in mechanical systems and construction techniques. Equally important, he brought with him his positive "can do" attitude combined with his unique creative abilities. His sons joined their father in the 1970's to form the family construction company. In 1989 the company incorporated in Michigan as Donkersloot & Sons Marine Development Co. with Arie Donkersloot, Jr. being named President and Ronald Donkersloot, Sr. named Vice President. Together the second and third generation continue the tradition of innovation and quality workmanship on all their projects. Donkersloot & Sons has completed projects both on and off shore in at least five states (MI, IN, WI, IL, and FL) and is a listed marine contractor with the US Army Corps of Engineers. This extensive work utilizes many innovative designs and construction concepts and techniques. The company continues to expand their capabilities in the marine construction industry. In 1989 they added a custom built, innovative 120 foot work vessel, the M/V Miss Jamie Lynn, to support their activities. Donkersloot & Sons has received several awards in recognition of their outstanding work product. (see samples attached). A partial list of project references demonstrates the diverse capabilities of the company. In 2009 sons Arie Donkersloot, Jr & Ronald Donkersloot, Sr. bought out their father's interest shares of Donkersloot & Sons Marine Development, Co. Reference Projects: CURRENT ON GOING PROJECT 155 Warwick Shores Condominium Association C/O Your Property Management 500 W Buffalo Street, Ste 220 New Buffalo, MI. 49117

Steve Paukowits 269-469-3536 Start Date 6/26/2015 Completion Date 11/19/2015 Contractor's Work Force 100% Contract Amount $ 1,403,768.00

Engineer/Architect: Edgewater Resources 518 Broad Street, Suite 200 St. Joseph, MI. 49085

Mike Morphey

269-983-4502

Revetment Restoration 1100 feet Provide Labor, Material & Equipment to Deconstruct an existing armor stone wall (approx. 5000 tons) ; Re build new single layer armor stone wall on a 2 on 1 slope; Provide 12"ounce filter clothe on new sand slope; 12" layer of mattress lime stone (4 to 6" diameter) with 1 layer on lime stone armor stone range 2000# to 4500# with larger stones used as the toe stones (Added 5500 Tons new Armor Stone) CURRENT ON GOING PROJECT 154 Bob & Donna Salerno 18200 Fern Glenn New Buffalo, MI. 49117

Bob & Donna Salerno Start Date Completion Date Percentage Completed Page 1 of 29

269-469-9405 7/23/2015 100%

Contractor's Work Force Contract Amount $

Stone Revetment Repair

100% 192,292.00

Provide Labor, Material & Equipment to Repair / Add / Placement of Armor Stone rip rap above the existing wall 275' long by 12' to increase the height of the existing wall. Consisting of 12 ounce Geotextile clothe; 12" layer of 4"x 6" mattress stone' 1 ton size Armor Stone. Deconstruct 40' long section of existing wall and rebuild on a 2/1 slope 12 ounce Geotxtile clothe; 12" layer of 4"x 6" mattress stone 1 to 2 ton size Armor Stone. Carl Dissette 630-247-2395 Start Date 6/13/2015 Completion Date 6/18/2015 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 36,556.60

153 Carl Dissette 333 Canal Street, Unit 2202 Chicago, IL. 60606

EZ Dock Floating Dock System Peninsula Lot 10, New Buffalo, Michigan

Provide Labor, Material & Equipment to Install EZ Dock Floating Dock System 50" wide x 70' long with (2) 12-step aluminum adjustable staircase and custom aluminum gangway landing 4'w x 4'l with thru flow decking and railing all powder coated tan. (6) Aluminum Post 3"x3"x59" w/Ace Dock Cushions and Solar Light. (2) EZ Port Max PWC floating dock lifts. Anchored to the existing seawall with (4) 3.5" OD x sch 40 galvanize pipe x 14' long and custom seawall mounting brackets James LeFresne jlefresne*trilliumcdi.c Start Date 6/9/2015 Estimate Completion Date 6/15/2015 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 31,525.88

152 Peter Liguori 123 south Green Street, # 1003B Chicago, IL. 60607 Lot #3 Foundation Support Piles Unit # 30 Peninsula Drive, New Buffalo, Michigan James LeFresne - Trillium Capital Development 42163 Sutters Lane Northville, MI. 48168

James LeFresne

734-673-0743

Provide Labor, Material and Equipment to Install Four (4) 9.625" diameter x 120' long steel support foundation piles for the residence: Install 3/4" - 9.25" diameter pile cap plates on the (4) 9.625" dia piles Mike G'Agostina - Manager 269-469-8100 Start Date 4/18/2015 Completion Date 6/24/2015 Contractor's Work Force 100% Contract Amount $ 370,698.42

151 Dunewood Condominium Association PO Box 536 New Buffalo, MI. 49117 Engineer / Architect: Shabica & Associates, Inc. 550 Frontage Road, Suite 3735 Northfield. IL. 60093

Stefanie Nagelbach, CPESC

847-446-1436

Revetment Restoration 295 feet Provide Labor, Material & Equipment to Deconstruct an existing armor stone wall (approx. 1200 tons) ; Re build new double layer armor stone wall on a 2 on 1 slope; Provide 12"ounce filter clothe on new sand slope; 12" layer of mattress lime stone (4 to 6" diameter) with 2 layer on lime stone armor stone range 1500# to 4500# with larger stones used as the toe stones (Added 2323.0 Tons new Armor Stone) Karl Samuel 219-391-8482 Start Date 4/7/2015 Completion Date 4/14/2015 Contractor's Work Force 100% Contract Amount $ 92,630.00

150 East Chicago Marina 3301 Aldis St East Chicago, IN 46312 Pier & Pile Repair Spring 2015

Page 2 of 29

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to replace/repair missing and damaged corner bracket pipe guides, realign pier spud piles, drive down raised pier spud piles, realign pier gangway ramps on Pier E & F Pier from winter ice damage. Also remove & replace treated 2x6 fire damage decks board on an area 100' long x 8' wide main floating dock walkway Doreen Kral 269-231-5450 Estimated Start Date 3/24/2015 Estimate Completion Date 3/26/2015 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 12,310.00

149 South Cove Association PO Box 192 New Buffalo, MI. 49117

Dock & Pile Repair Spring 2015

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to repair dock and piles from winter ice. Remove and install new steel formed dock saddle; level dock and weld saddles to steel support pile. Cut off raised piles and reset dock on support pile level. Repair & Replace broken mooring pile PVC sleeves and caps Jan Ferrell 269-469-5790 Estimated Start Date 3/23/2015 Estimate Completion Date 3/30/2015 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 30,285.00

149 Moorings Association 310 Oselka Drive, Ste 256 New Buffalo, MI. 49117

Dock Repair Spring 2015

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to repair dock and piles from winter ice. Remove and install new steel formed dock saddle; level dock and weld saddles to steel support pile Arie Donkersloot, Jar 269-469-3000 Start Date 1/12/2015 Completion Date 1/21/2015 Contractor's Work Force 100% Contract Amount $ 27,675.86

148 Onex Properties, LLC PO Box 190 New Buffalo, MI 49117 Quality Boatlifts 27,000# 4 Post Alum-A-Vator II

Provide Labor, Material & Equipment to Install Quality Boatlifts 27,000# 4 Post Alum-A-Vator II w/ auto stop and remote; Install Two (2) 9.625 Dia. x 50' long, Two (2) 8.625" Dia.x 50' Support Piles in Pleasure Isle Marina Slip # 28, New Buffalo Michigan

147 David Cooney 3842 N. Janssen Avenue Chicago, IL. 60613-2822 Residence 47009 Lakeview Avenue, Grand Beach, Michigan 49117 Dunescape Construction Services, Inc. PO Box 573 New Buffalo, MI. 49117

David Cooney Start Date Completion Date Percentage Completed Contractor's Work Force Contract Amount $

10/24/2014 2/26/2015 100% 100% 99,751.52

Bill McLinden 708-822-4204 1210brassie*comcast.net

Provide Labor, Material & Equipment to Install 94' lineal feet section of Z-55 grade 55 Steel Sheet Wall by 25' long panels retaining wall along the north property line to protect the neighbors property / residential for the basement excavation installation. Excavate foundation & Backfill, Placement of drain tile around foundation. Install Styrofoam block behind lakefront retaining with filter cloth and drain tile, then backfill with clean sand. Steve Paukowits 269-469-3536 Start Date 12/4/2015 Completion Date 12/17/2015 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 26,963.00

146 Warwick Shores Condominium Association C/O Your Property Management 500 W Buffalo Street, Ste 220 New Buffalo, MI. 49117 Rip Rap Revetment Repair 60'

Page 3 of 29

Provide Labor, Material & Equipment to Repair / add additional Armor Stone to the top washed out area above the existing Stone Revetment wall along lake front from the northeast property line back approximately 60' to consist of: (approximately 700 sqft) Greg McAvoy 800-968-2299 Start Date 10/22/2014 Completion Date 10/24/2014 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 9,980.00

145 Lake Michigan Products 5846 S. Straits Hwy. Indian River, MI. 49746

EZ Dock Floating Dock System / Kayak Launch

Provide Labor Only to Assemble and Install EZ Dock Floating Dock / Canoe / Kayak Launch System at the West Boardman Lake Trail in Traverse City, Michigan; Units consisting of (6) 80" x 10' dock sections, EZ Launch Components, 5' wide x 30' long Heavy Duty Gangway with Thru -Flow Decking, Bench Kit, Swim Ladder and (6) 3.5" OD x .250 wall galvanized spud pipe x 18' long Steve & Wendy Smith mrsgrinddoc*gmail.com Start Date 10/8/2014 Estimate Completion Date 10/20/2014 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 34,580.00

144 Steve & Wendy Smith 246 Fairs Court Addison, IL. 60101 Lot #8 Foundation Support Piles Unit # 80 Peninsula Drive, New Buffalo, Michigan Bouwkamp Builders, Inc. - General Contractor PO Box 8006 Holland, MI. 49422-8009

Randy Bouwkamp

616-339-6888

Provide Labor, Material and Equipment to install Four (4) 9.625" diameter x 120' long steel support foundation piles for the residence: Install attach Six(6) HP12x53# I-beam to existing seawall H-piles for concrete grade beam support: Install 3/4" 16"x16' pile cap plates on the (4) 9.625" dia piles and the existing (6) seawall HP12x53# h-piles Tim Frame 219-872-1712 Start Date 9/8/2014 Completion Date 10/2/2014 Contractor's Work Force 100% Contract Amount $ 90,180.00

143 Michigan City Port Authority 200 Heisman Harbor Drive Michigan City, IN 46360 Engineer/Architect: Edgewater Resources 518 Broad Street, Suite 200 St. Joseph, MI. 49085

Mike Morphey

269-983-4502

Washington Park Marina Spot Dredging Project Provide Labor, Material & Equipment to Mechanically Excavate Dredge 1500 CY of material from 2 slips and approximately 350' along an interior wall. Work to perform by the M/V Miss Jamie Lynn Crane Barge (120' long x 34' wide 6' Height), Barge Steve Paukowits 269-469-3536 Start Date 8/13/2014 Completion Date 8/11/2014 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 12,503.75

142 Warwick Shores Condominium Association C/O Your Property Management 500 W Buffalo Street, Ste 220 New Buffalo, MI. 49117 Treated 6x6 Landscape Retaining Wall Replacement

Provide Labor, Material & Equipment to remove 231 SF (72' long x various elevations) of existing rail road tie landscape retaining wall and replace with in ground treated 6x6 timber landscape retaining wall Tim Frame 219-872-1712 Start Date 8/5/2014 Completion Date 8/11/2014 Contractor's Work Force 100% Contract Amount $ 7,930.00

141 Michigan City Port Authority 200 Heisman Harbor Drive Michigan City, IN 46360 Barge Service Page 4 of 29

Supply M/V Miss Jamie Lynn Crane Barge (120' long x 34' wide 6' Height), to act as barrier protection from wave action in channel during the Michigan City, Indiana IN Water Boat Show Carl Dissette 630-247-2395 Start Date 7/7/2014 Estimate Completion Date 7/15/2014 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 33,857.50

140 Carl Dissette 333 Canal Street, Unit 2202 Chicago, IL. 60606 Lot #1 Foundation Support Piles 10 Peninsula Drive, New Buffalo, Michigan

Provide Labor, Material and Equipment to install Four (4) 9.625" diameter x 120' long steel support foundation piles for the residence: Install attach Six(6) W24x84# I-beam to existing seawall H-piles for concrete grade beam support

Karl Samuel 219-391-8482 Start Date 5/8/2014 Completion Date 7/7/2014 Contractor's Work Force 100% Contract Amount $ 256,870.00

139 East Chicago Marina 3301 Aldis St East Chicago, IN 46312 Pile Repair Summer 2014

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to repair mooring piles from winter ice heaving by adding 30' pipe extensions and driving down to the required elevation, replace broken PVC covers, replace/repair missing and damaged corner bracket pipe guides, realign pier spud piles, drive down raised pier spud piles, realign pier gangway ramps on Pier A, B, C, D, E, F, G, SE & SW Pier. 138 Lori Beebe Weiss & Carol McMurray 8521 Bucki Lane Western Springs, IL. 60480

EZ Dock Floating Dock System South Cove LHP Cabana Unit # 13, New Buffalo, Michigan

Lori Beebe Weiss 630-278-5202 Carol McMurray 708-567-8189 Start Date 5/30/2014 Completion Date 7/11/2014 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 11,543.00

Provide Labor, Material & Equipment to Install EZ Dock Floating Dock System 40" wide x 50' long with 10-step aluminum adjustable staircase Anchored to the existing fix dock with Three(3) 3" OD x sch 40 galvanize pipe x 24' long and custom mounting brackets Brent Stettler 574-536-0594 Start Date 4/30/2014 Completion Date 6/6/2014 Contractor's Work Force 100% Contract Amount $ 28,849.16

137 Brent Stettler 51264 North Shore Drive Elkhart, IN. 46514-6362 Quality Boatlifts 27,000# 4 Post Alum-A-Vator II

Provide Labor, Material & Equipment to Install Quality Boatlifts 27,000# 4 Post Alum-A-Vator II w/ auto stop and remote; C Keel Spreader, (1) 10x6x.410 w/carpet / wood std length, C Sailboat Support Stanchions w/carpet / wood pads, set of 4, Install Two (2) 9.625 Dia.x 46' long, Two (2) 8.625" Dia.x 46' Support Piles in South Cove Association LHP Unit # 13, New Buffalo Michigan David Schau 219-221-3837 Start Date 4/21/2014 Completion Date 4/28/2014 Contractor's Work Force 100% Contract Amount $ 23,362.00

136 David Schau 11 Grand Beach Road Michigan City, IN. 46360 Quality Boatlifts 16,000# 4 Post Alum-A-Vator II

Provide Labor, Material & Equipment to Install Quality Boatlifts 27,000# 4 Post Alum-A-Vator II w/ auto stop and remote; C Keel Spreader, (1) 10x6x.410 w/carpet / wood std length, C Sailboat Support Stanchions w/carpet / wood pads, set of 4, Install Four (4) 7" OD Dia.x 45' long Support Piles in LMYC Slip # 34, New Buffalo Michigan Arie Donkersloot, Jr

135 Onex Properties, LLC Page 5 of 29

269-469-3000

Start Date Completion Date Contractor's Work Force Contract Amount $

PO Box 190 New Buffalo, MI 49117 Quality Boatlifts 27,000# 4 Post Alum-A-Vator II

4/16/2014 4/22/2014 100% 28,816.26

Provide Labor, Material & Equipment to Install Quality Boatlifts 27,000# 4 Post Alum-A-Vator II w/ auto stop and remote; Install Two (2) 9.625 Dia. x 50' long, Two (2) 8.625" Dia.x 50' Support Piles in Pleasure Isle Marina Slip # 27, New Buffalo Michigan Sue Boers 630-234-2912 Start Date 4/9/2014 Completion Date 4/16/2014 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 22,248.20

134 Lou & Sue Boers 912 Rob Roy Place Downers Grove, Il. 60516

EZ Dock Floating Dock System Peninsula Lot 50, New Buffalo, Michigan

Provide Labor, Material & Equipment to Install EZ Dock Floating Dock System 40" wide x 60' long with 12-step aluminum adjustable staircase and custom aluminum gangway landing 3'w x 3'l with thru flow decking and railing all powder coated tan. (6) Aluminum Post 3"x3"x59" w/Ace Dock Cushions and Solar Light. (1) EZ Port Max PWC floating dock lifts. Anchored to the existing seawall with 3" OD x sch 40 galvanize pipe x10' long and custom seawall mounting brackets Jan Ferrell 269-469-5790 Estimated Start Date 4/8/2014 Estimate Completion Date 4/16/2014 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 15,260.00

133 Moorings Association 310 Oselka Drive, Ste 256 New Buffalo, MI. 49117

Steel Sheet Wall Deadman Rods

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to repair dock and piles from winter ice heaving by driving down raised piles to the required elevation and add additional lengths to sunken piles. Rob Harte 312-953-9683 Start Date 1/3/2014 Estimate Completion Date 4/11/2014 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 68,611.15

132 CIP II/UDG Peninsula, LLC 11008 US 41 North Palmetto, FL 34221

Pool House Foundation

Provide Labor, Material and Equipment to install Two (2) 9.625" diameter x 125' long steel support foundation piles. Install 180' lineal feet of various dimensional structural concrete grade beams with associated reinforce rods. Install 412 square feet of 7" thick concrete slab on grade. Ted Reese 219-878-1200 Start Date 9/9/2013 Completion Date 12/30/2013 Percentage Completed 100% Contractor's Work Force 95% Contract Amount $ 356,597.83

131 Ted Reese 2306 Lakeshore Drive Long Beach, IN. 46361

Engineer/Architect: Wightman & Associates 2303 Pipestone Road Benton Harbor, MI. 49022

Suzannah M. Deneau

877-927-0109

Ted Reese Residence 2306 Lake Shore Drive, long Beach, Indiana Provide Labor, Material & Equipment to Install 362' lineal feet of section Z-75 grade 55 Steel Sheet Wall by 20' long panels seawall along the Beach Lakefront. Install a concrete bulkhead cap wall 17" wide x 6' tall with top cap 22" wide with 10" face with associated reinforce rods. Placement of Thorocoat DOT texture coating on concrete outside face. Install 362' feet of 6" drain tile system with 4" PVC drain outlet sleeved through concrete cap spaced at 20' OC outlet. Contour grade behind wall level Page 6 of 29

130 The Drake Group 1967 Johns Drive Glenview, IL. 60025

Stephens Residence1410 Lake Shore Drive, Michigan City, Indiana

Tom Drake 773-406-5799 Start Date 8/30/2013 Completion Date 9/6/2013 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 22,430.00

Provide Labor, Material & Equipment to Install 50' lineal feet section of Z-55 grade 55 Steel Sheet Wall by 15' long panels retaining wall along the north property line to protect the neighbors concrete retaining wall for residential basement excavation & poured installation Tim Frame 219-872-1712 Start Date 8/20/2013 Completion Date 8/26/2013 Contractor's Work Force 100% Contract Amount $ 7,930.00

129 Michigan City Port Authority 200 Heisman Harbor Drive Michigan City, IN 46360 Barge Service

Supply M/V Miss Jamie Lynn Crane Barge (120' long x 34' wide 6' Height), to act as barrier protection from wave action in channel during the Michigan City, Indiana Water Boat Show George Ward 630-742-4637 Start Date 8/26/2013 Completion Date 8/29/2013 Contractor's Work Force 100% Contract Amount $ 26,980.39

128 George & Jennifer Ward 15W175 60th Street Burr Ridge, IL. 60527 Quality Boatlifts 27,000# 4 Post Alum-A-Vator II

Provide Labor, Material & Equipment to Install Quality Boatlifts 27,000# 4 Post Alum-A-Vator II w/ auto stop and remote; Install Four (4) 7" Dia. x 40' long support Piles in Dunewood Association Slip #13, New Buffalo Michigan Karl Samuel 219-391-8482 Start Date 7/10/2013 Completion Date 8/20/2013 Contractor's Work Force 100% Contract Amount $ 96,035.00

127 East Chicago Marina 3301 Aldis St East Chicago, IN 46312 Pile Repair Summer 2013

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to repair mooring piles and pier spud pipes from winter ice heaving by driving down to the required elevation, replace broken PVC covers, realign pier gangway ramps; replace/repair missing and damaged corner bracket pipe guides; Repair/replace damage EZ Dock Floating Dock Sections on Pier A, B, C, D, E, F, G, Southeast and Southwest Pier, EZ Dock Pier 630' & EZ Dock 234' Police Boat Dock. Bob Lang 219-362-8236 Start Date 7/2/2013 Completion Date 7/11/2013 Contractor's Work Force 100% Contract Amount $ 28,596.96

126 Bob Lang 409 Lake Drive, Unit # 14 New Buffalo, MI. 49117 Quality Boatlifts 27,000# 4 Post Alum-A-Vator II

Provide Labor, Material & Equipment to Install Quality Boatlifts 27,000# 4 Post Alum-A-Vator II w/ auto stop and remote; Install Four (4) 7" Dia. x 40' long support Piles in Dunewood Association Slip #24, New Buffalo Michigan Ryan Fellows 269-469-1500 Start Date 4/24/2013 Completion Date 7/25/2013 Percentage Completed 100% Contractor's Work Force 90% Contract Amount $ 382,481.58

125 City of New Buffalo 224 W. Buffalo Street New Buffalo, MI. 49117

Engineer/Architect: Wightman & Associates 2303 Pipestone Road Benton Harbor, MI. 49022

Oscar Loveless, P.E.

Page 7 of 29

877-927-0109

City of New Buffalo 2013 Dredging From Bridge To Launch Project Provide Labor, Material & Equipment to Mechanically Excavate Dredge 14998 CY of material from the Galien River and Harbor Pointe shores Slips in the New Buffalo Harbor, Michigan in an area measuring 1000 feet long by 100' wide; Barge material to an off load area at City of New Buffalo Launch Ramp Facility; Deposit dredge spoils into dump trucks and truck off to the designated Upland Disposal Site in New Buffalo, Michigan Rick Moore - Manager 269-983-6333 Start Date 4/15/2013 Completion Date 4/29/2013 Contractor's Work Force 100% Contract Amount $ 61,923.50

124 LaFarge Corporation 200 N. Upton Drive Sat, Joseph, MI. 49085 Mechanically Dredge Facility Dock

Provide Labor, Material & Equipment to Mechanically Excavate/Dredge 2361 CY of material from along the Dock Facility in the St Joseph River in the St Joseph Harbor, Michigan, in an area measuring 575' long by 125' wide; Barge material to an off load area at Dock 63; The dredged spoils to be off load by Dock 63 Hitachi ZX600 hydraulic clam shell a clam shell and stock piled at no charge to D&S Tighe Curran 269-983-3333 Start Date 4/1/2013 Completion Date 4/3/2013 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 13,960.00

123 Pier 33 250 Anchors Way St. Joseph, MI. 49085

Spring 2013 Lower Adjustable Docks

Provide Labor, Material & Equipment to Lower Adjustable Docks to their summer Position Mike Heston 630-408-8578 Start Date 2/25/2013 Completion Date 3/28/2013 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 26,471.22

122 Sergei Antipov 50 Baybrook Lane Oak Brook, Il. 60523

EZ Dock Floating Dock System Peninsula Lot 50, New Buffalo, Michigan

Provide Labor, Material & Equipment to Install EZ Dock Floating Dock System 40" wide x 60' long with 12-step aluminum adjustable staircase and custom aluminum gangway landing 3'w x 3'l with thru flow decking and railing all powder coated tan. (6) Aluminum Post 3"x3"x59" w/Ace Dock Cushions and Solar Light. (2) EZ Port Max PWC floating dock lifts. Anchored to the existing seawall with 3" OD x sch 40 galvanize pipe x10' long and custom seawall mounting brackets Ed Grywacz 708-790-8836 Start Date 2/20/2013 Completion Date 3/5/2013 Contractor's Work Force 100% Contract Amount $ 20,000.00

121 Ed Grywacz 14010 Farmoy Avenue Orland Park, Il. 60467 Quality Boatlifts 16,000# 4 Post Alum-A-Vator II

Provide Labor, Material & Equipment to Install Quality Boatlifts 16,000# 4 Post Alum-A-Vator II w/ auto stop and remote; Install Four (4) 7" Dia. x 40' long support Piles in Dunewood Association Slip #10, New Buffalo Michigan Rob Harte 312-953-9683 Start Date 12/7/2012 Estimate Completion Date 12/13/2012 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 31,829.00

120 CIP II/UDG Peninsula, LLC 11008 US 41 North Palmetto, FL 34221

Lot #70 Foundation Support Piles

Provide Labor, Material and Equipment to install Four (4) 9.625" diameter x 120' long steel support foundation piles for each residence Tom Drake

119 The Drake Group Page 8 of 29

773-406-5799

1967 Johns Drive Glenview, IL. 60025

Start Date Completion Date Percentage Completed Contractor's Work Force Contract Amount $

Engineer/Architect: Burns & Beyerl Architects 1010 South Wabash Ave. Chicago, IL. 60605

Edward Twohey, AIA

10/17/2012 8/16/2013 100% 95% 274,733.04

312-212-4830

Smith Residence 2050 Lake Shore Drive, long Beach, Indiana Provide Labor, Material & Equipment to Install 100' lineal feet section of Z55 grade 55 Steel Sheet Wall by 30' long panels seawall along the Beach Lakefront. Encapsulate the top 8' portion of wall with concrete facing with poured in place board form concrete; boards to be rough cut cedar face varying height 4" to 10". Install 4" drain tile system with 2" PVC drain outlet sleeved through concrete and shoring spaced at 8' OC daylight outlet. Install 120' lineal feet section of Z55 grade 55 Steel Sheet Wall by 20' long panels retaining wall along perimeter of south and east property line. Excavate building site of approximately 2456 cubic yards of debris and truck off; excavate & backfill foundation footings. Deliver and placement of 378 cubic yards of clean sand fill around perimeter of poured walls Rich Lenardson 269-605-9036 Start Date 10/29/2012 Completion Date 11/14/2012 Contractor's Work Force 65% Contract Amount $ 24,491.44

118 Great Lakes Towing 4308 Willow, PO Box 632 Bridgeman, MI. 49016 Salvage 57' Carver Voyager Vessel

Supply M/V Miss Jamie Lynn crane barge (120" long x 34" wide x 6' high) with crew to assist Great Lakes Towing personnel in salvaging 57' Carver Voyager Vessel from New Buffalo Harbor Rip Rap Breakwall, Michigan Tim Frame 219-872-1712 Start Date 8/20/2012 Completion Date 8/27/2012 Contractor's Work Force 100% Contract Amount $ 7,930.00

117 Michigan City Port Authority 200 Heisman Harbor Drive Michigan City, IN 46360 Barge Service

Supply M/V Miss Jamie Lynn Crane Barge (120' long x 34' wide 6' Height), to act as barrier protection from wave action in channel during the Michigan City, Indiana Water Boat Show Steve Jotzat 269-465-9910 Start Date 6/25/2012 Completion Date 6/26/2012 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 4,560.00

116 Lost Dunes Golf Club 8910 Red Arrow Hwy Bridgeman, MI. 49106 Steve Jotzat - Superintendent Clay Dike

Provide Labor, Material & Equipment to Install Clay Dike to Dam off Lake to Consist 60 yard brown clay compacted. Dike dimensions 45' long by 5' tall by 8' wide bottom taper to 5' wide top. Sand bag and plywood off drain pipe end 3/4 coverage allowing 1/4 over flow drainage Tighe Curran 269-983-3333 Start Date 5/3/2012 Completion Date 6/4/2012 Percentage Completed 100% Contractor's Work Force 95% Contract Amount $ 186,816.65

115 Pier 33 250 Anchors Way St. Joseph, MI. 49085

2012 Morrison Channel Dredging Project Provide Labor, Material & Equipment to Hydraulically Dredge 8960 CY of material from the Morrison Channel in the St. Joseph, Michigan, in an area measuring 950 feet long by 80' to 120' wide; Pump dredge spoils into a confined disposal facility (CDF). Control Manage Turbidity outflow, facility integrity and spoil material build up in cell. Cyndi Deadman

114 Moorings Association Page 9 of 29

269-469-5790

Estimated Start Date Estimate Completion Date Percentage Completed Contractor's Work Force Contract Amount $

310 Oselka Drive, Ste 256 New Buffalo, MI. 49117

Steel Sheet Wall Deadman Rods

3/14/2012 6/15/2012 100% 100% 23,415.00

Provide Labor, Material and Equipment to install deadman rod through peninsula to stabilize 107.5 feet of the steel sheet seawall Ryan Fellows 269-469-1500 Start Date 4/12/2012 Completion Date 5/2/2012 Percentage Completed Contractor's Work Force 95% Contract Amount $ 164,510.56

113 City of New Buffalo 224 W. Buffalo Street New Buffalo, MI. 49117

Engineer/Architect: Wightman & Associates 2303 Pipestone Road Benton Harbor, MI. 49022

Oscar Loveless, P.E.

877-927-0109

City of New Buffalo 2012 Federal Channel Dredging Project Provide Labor, Material & Equipment to Hydraulically Dredge 6248 CY of material from the Federal Channel of the Galien River in the New Buffalo Harbor, in an area measuring 2000 feet long by 80 ' wide; Pump dredge spoils to the beach nourishment zone along the Lake Michigan shoreline Bob & Donna Salerno 269-469-9405 Start Date 3/26/2012 Completion Date 4/4/2012 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 29,292.00

112 Bob & Donna Salerno 18200 Fern Glenn New Buffalo, MI. 49117

Stone Revetment Repair

Provide Labor, Material & Equipment to Repair/rebuild the existing Stone Revetment wall 25' wide on a 2'/3' on 1' slope by 75' long Cate Parthun 269-231-5174 Start Date 3/12/2012 Completion Date 4/6/2012 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 45,147.50

111 Cate Parthun 1450 Shore Drive New Buffalo, MI. 49117

Stone Revetment Repair

Provide Labor, Material & Equipment to Repair an existing Stone Revetment wall wash out in an area approximately 25' wide on a 2'/3' on 1' slope by 90' long Rob Harte 312-953-9683 Start Date 2/18/2012 Estimate Completion Date 2/25/2012 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 58,632.50

110 CIP II/UDG Peninsula, LLC 11008 US 41 North Palmetto, FL 34221

Lot #50 & 60 Foundation Support Piles

Provide Labor, Material and Equipment to install Four (4) 9.625" diameter x 120' long steel support foundation piles for each residence

Barry Bensz 219-879-8301 Start Date 1/26/2012 Completion Date 2/2/2012 Contractor's Work Force 100% Contract Amount $ 22,942.00

109 B & E Marine, Inc. Washington Park Michigan City, IN 46360 Mooring Pile Repair Page 10 of 29

Provide Labor, Material & Equipment To Removal and Disposal of (9) existing 12" diameter wood mooring post. Replace Install with (8) 9.625" OD x .352 wall steel piles x 40' long with 10" dia. x 10' long PVC cover and cap Agent - Steven Mermlestein 215-349-3631 Start Date 12/21/2012 Completion Date 3/8/2012 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 380,626.00

108 National Railroad Passenger Corporation 30th Street Station, mail Box 3 12 2955 Market Street, 5th Floor South Philadelphia, PA 19104 Project Agent - Steve Mermlestein Trail Creek Bridge Fender System Repair 502 Center Street Michigan City, IN 46360

Engineer- Kristin Leese

215-307-0041

Trail Creek Bridge Fender System Repair Provide Labor, Material & Equipment To Remove, Disposal & Install Approximately 880 LF of 12x12 Creosote Heavy Timber; Removal of (6) existing wood deteriorate 12" support piles and replace with Hollow Fiberglass Reinforce Plastic Piles (FRPP); All in accordance to the contract specifications Mohammed Anjum 630-654-1989 Start Date 11/14/2011 Completion Date 12/27/2011 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 159,200.00

107 Mohammed Anjum 3333 Chicago Drive Stevensville, Mi. 49127 Engineer/Architect: Fishbeck, Thompson, Carr & Huber 5913 Executive Drive, Suite 100 Lansing, Michigan 48911

Thomas Bennet

517-887-4022

Shoreline Protection Provide Labor, Material & Equipment to Install Approximately 129 LF of shoreline protection using 324 CY #1500-#2500 quarried limestone; 2 temporary access ramps (161 CY clean fill): 2000 CY clean fill behind seawall; remove and dispose of 30 LF failed seawall. Adhere to all requirements set forth in MDEQ, Berrien County SESC and Vegetative Assurance Permits Tighe Curran 269-983-3333 Start Date 11/8/2011 Completion Date 11/10/2011 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 5,425.00

106 Pier 33 250 Anchors Way St. Joseph, MI. 49085

Fall 2011 Raise Adjustable docks

Provide Labor, Material & Equipment to Raise Adjustable Docks to their Winter Position Marcia Blackman 269-432-3889 Start Date 10/25/2011 Completion Date 11/10/2011 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 45,230.00

105 Village of Colon PO Box 50 110 N. Blackstone Ave. Colon, MI. 49040 Engineer/Architect: P.M. Blough, Inc 1640 Gladys Ave Grand Haven, MI. 49417

Pam Blough

616-847-2010

Provide & Install Raised Walkway System Provide Labor, Material & Equipment to Install EZ Trail Dock System 60" wide x 100' long Raised Walkway over Wetland Area Virginia Orlowski

104 Ted & Virginia Orlowski Page 11 of 29

847-358-0077

Start Date Completion Date Percentage Completed Contractor's Work Force Contract Amount $

545 Windsor Road Inverness, IL. 60067

Stone Revetment Repair

10/25/2011 11/3/2011 100% 100% 13,000.00

Provide Labor, Material & Equipment to Repair/add additional Stone to the existing Stone Revetment wall along lakefront Steve Paukowits 269-469-3536 Start Date 10/1/2011 Completion Date 10/30/2011 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 74,650.00

103 Warwick Shores Condominium Association C/O Your Property Management 500 W Buffalo Street, Ste 220 New Buffalo, MI. 49117 Stone Revetment Repair

Provide Labor, Material & Equipment to Rebuild the existing Stone Revetment wall 25' wide on a 2' on 1' slope 200' along the lakefront shoreline; Consisting of #1500-#2500 quarried limestone Jessica Minton 312-542-3219 Start Date 6/6/2011 Completion Date 6/28/2011 Contractor's Work Force 100% Contract Amount $ 12,061.20

102 Kenneth Brody 1444 W. Henderson Street Chicago, IL. 60657 EZ Dock Floating Dock System

Provide Labor, Material & Equipment to Install EZ Dock Floating Dock System (80" wide x 30'Long w/6' wide x 10' long ramp; Four Aluminum Post 3"x3"x59" w/Ace Dock Cushions, Solar Light; Modify existing wood boardwalk in the Galien River, New Buffalo, Michigan at 505 Marquette Drive Ryan Fellows 269-469-1500 Start Date 4/14/2011 Completion Date 5/2/2011 Contractor's Work Force 95% Contract Amount $ 102,250.60

101 City of New Buffalo 224 W. Buffalo Street New Buffalo, MI. 49117 Engineer / Architect: Wightman & Associates 2303 Pipestone Road Benton Harbor, MI. 49022

Oscar Loveless, P.E.

877-927-0109

City of New Buffalo 2011 Federal Channel Dredging Project Provide Labor, Material & Equipment to Hydraulically Dredge 3746 CY of material from the Federal Channel of the Galien River in the New Buffalo Harbor, in an area measuring 2000 feet long by 80 ' wide; Pump dredge spoils to the beach nourishment zone along the Lake Michigan shoreline Mike D'Agostino - Manager 269-469-8100 Start Date 3/29/2011 Completion Date 3/30/2011 Contractor's Work Force 100% Contract Amount $ 7,510.00

100 Lake Michigan Yacht Club PO Box 358 New Buffalo, MI. 49117 Additional 7" dia x 40" long Mooring Post

Provide Labor, Material & Equipment to Install Three Additional 7" dia x 40' long Mooring pile align with the end dock post; install 8" dia x 20' long PVC sleeve with cap over mooring pile; Located in LMYC slip #1, 2/3 & 4/5 New Buffalo, Michigan 99

George Miz 304 East Randolph Street, Chicago, Il. 60601

George Miz 312-265-1124 Estimated Start Date 3/14/2011 Estimate Completion Date 3/16/2011 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 7,611.00

Apt 2001

Stone Revetment Repair

Page 12 of 29

Provide Labor, Material & Equipment to Repair/rebuild the existing Stone Revetment wall 20' wide on a 2'/3' on 1' slope by 8' long with a 20' return wall on the north end; Consist of#1500-#2500 quarried limestone; Project located at 48017 Ridge Road Grand Beach, Michigan 98

Bill Kavouriaris 708-799-0525 Start Date 1/17/2011 Completion Date 2/25/2011 Contractor's Work Force 100% Contract Amount $ 22,364.62

Bill Kavouriaris 4857 W 171st street Country Club Hills, IL. 60478 Quality Boatlifts 27,000# 4 Post Alum-A-Vator II

Provide Labor, Material & Equipment to Install Quality Boatlifts 27,000# 4 Post Alum-A-Vator II w/ auto stop and remote; Install Four (4) 10.75" Dia. x 40' long support Piles in MPW Slip #13, Michigan City, Indiana 97

John Wieclowski 630-858-1387 Start Date 1/4/2011 Completion Date 1/28/2011 Contractor's Work Force 100% Contract Amount $ 22,500.00

John Wieclowski 1 Marine Drive, Unit #1 Michigan City, In. 46360 Quality Boatlifts 27,000# 4 Post Alum-A-Vator II

Provide Labor, Material & Equipment to Install Quality Boatlifts 27,000# 4 Post Alum-A-Vator II w/ auto stop and remote; Install Four (4) 7" Dia. x 40' long support Piles in MPW Slip #10, Michigan City, Indiana 96

East Chicago Marina 3301 Aldis Street East Chicago, IN. 46312 EZ Dock Floating Dock System - 234 Feet Long Dock

Karl Samuel-Harbor Master 219-391-8418 Start Date 10/6/2010 Completion Date 3/4/2011 Contractor's Work Force 100% Contract Amount $ 80,802.47

Provide Labor, Material & Equipment to Install EZ Dock Floating Dock System (80" wide x 234' Long w/3' wide x 25' long ramp; Thirty Seven Aluminum Post 3"x3"x71" w/Ace Dock Cushions, Solar Light; Modify existing boardwalk in the East Chicago Marina, East Chicago, Indiana 95

Marina Park South Condominium Association, Inc. 15 Marine Drive Michigan City, IN. 46360 Paint Docks (2) 40', (14) 50', (4) 55' & (200 Staircases, Slips #1-40

Mike Wattman/Jim Arendas 708-824-0670 Start Date 11/1/2010 Completion Date 2/26/2011 Contractor's Work Force 100% Contract Amount $ 110,081.33

Provide Labor, Material & Equipment to Remove, Transport, Sandblast, Minor Repairs, Upgrade Wiring, Paint and Re install (2) 40' Re install (2) 40'Docks, (14) 50' docks & (4) 55' Docks for Marina Park South in the Trail Creek, Michigan City, Indiana 94

Ed Burke 630-505-8282 Estimated Start Date 9/27/2010 Estimate Completion Date 10/7/2010 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 39,940.50

Ed Burke PO Box 947 New buffalo, MI. 49117

Stone Revetment

Provide Labor, Material & Equipment to Install Stone Revetment wall 25' wide on a 2'/3' on 1' slope by 65' long and 15' wide x 35' long wing wall; Consist of#1500-#2500 quarried limestone; Project located at 51017 Lake Park Drive Grand Beach, Michigan 93

Kerry & Paddy 773-276-2646 Estimated Start Date 8/3/2010 Estimate Completion Date 9/3/2010 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 42,000.00

Joe & Beth Grayson 165 Church Road Winnetka, IL. 60093

Stone Revetment

Page 13 of 29

Provide Labor, Material & Equipment to Install Stone Revetment wall 25' wide on a 2'/3' on 1' slope by 100' long wall; Consist of#1500-#2500 quarried limestone; Project located at 10975 Marquette Drive New Buffalo, Michigan 92

Kerry & Paddy 773-276-2646 Estimated Start Date 8/3/2010 Estimate Completion Date 9/7/2010 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 42,000.00

Shintani (Kerry) & Paddy Lauber 2256 N. Kedzie Blvd. Chicago, IL. 60647

Stone Revetment

Provide Labor, Material & Equipment to Install Stone Revetment wall 25' wide on a 2'/3' on 1' slope by 100' long wall; Consist of#1500-#2500 quarried limestone; Project located at 10963 Marquette Drive New Buffalo, Michigan 91

Jim Gray 312-362-4211 Estimated Start Date 7/12/2010 Estimate Completion Date 8/3/2010 Percentage Completed 100% Contractor's Work Force 100% Contract Amount $ 64,080.60

Jim Gray 440 LaSalle Street, Ste 650 Chicago, Il. 60605

Stone Revetment

Provide Labor, Material & Equipment to Install Stone Revetment wall 25' wide on a 2'/3' on 1' slope by 140' long wall; Consist of#1500-#2500 quarried limestone; Project located at 10945 Marquette Drive New Buffalo, Michigan 90

Mike D'Agostino - Manager 269-469-8100 Start Date 4/9/2010 Completion Date 4/27/2010 Contractor's Work Force 90% Contract Amount $ 61,645.90

Harbor Landing Condominium Association PO Box 328 New Buffalo, MI. 49117 Harbor Landing Facility Channel & Slip Dredging

Provide Labor, Material & Equipment to Mechanically Excavate/Dredge 970 CY of material from the Facility Channel Entrance off of the Galien River in the New Buffalo Harbor, in an area measuring 150' long by 140' wide; Barge material to an off load area; deposit dredge spoils into dump trucks and truck off to an off site disposal yard 89

Roxanne Martino 312-762-6797 Start Date 3/18/2010 Completion Date 4/1/2010 Contractor's Work Force 100% Contract Amount $ 25,986.18

Roxanne Martino 1468 Garywood Drive Burr Ridge, IL. 60527 Quality Boatlifts 16,000# 4 Post Alum-A-Vator II

Provide Labor, Material & Equipment to Install Quality Boatlifts 16,000# 4 Post Alum-A-Vator II w/ auto stop and GEM remote; Install Four (4) 7" Dia. x 40' long support Piles in South Cove Association HID Cabana Unit Slip #4, New Buffalo, Michigan 88

Lake Michigan Yacht Club PO Box 358 New Buffalo, MI. 49117 Add Additional 15' length To Existing Docks #1/2, 3/4 & 5/6

Mike D'Agostino - Manager 269-469-8100 Start Date 3/15/2010 Completion Date 4/7/2010 Contractor's Work Force 100% Contract Amount $ 16,950.00

Provide Labor, Material & Equipment to Add an additional 15' length of dock section to the existing dock; Fabricate A-36 steel formed section by 15' long in length to match the same material gauge; Add Two(2) additional 72" long by 4" square 7 gauge steel tube bumper posts; All new steel sandblast, epoxy base primer and one coat finish with a non slip walking surface; Placement of a camber in the dock and attaching a 1/4"-2.5"x 2.5" angle iron; Install junction box, splice additional length of wiring to Powerheads, nose cone, light, Telephone and water line. 87

Hillary Bubb 269-469-2569 Start Date 10/7/2009 Completion Date 2/19/2010 Contractor's Work Force 100% Contract Amount $ 21,628.00

Hillary Bubb 1221 Shore Drive New Buffalo, MI. 49117 City of New Buffalo Larry Bubb Memorial

Page 14 of 29

Provide Labor, Material & Equipment to Fabricate and install Stainless Steel Memorial Structure to consist of: Artist Paul Fujawa drawing of a 4" sq Tubing x 1/4" - 4"sq 304 Stainless Steel Tubing 180 Grit x 40' long; Polished 86

Cyndi Deadman 269-469-5790 Start Date 11/27/2009 Completion Date 12/5/2009 Contractor's Work Force 100% Contract Amount $ 24,865.00

Moorings Association 310 Oselka Drive, Ste 256 New Buffalo, MI. 49117 Fasten Angle Iron Whaler

Provide Labor, Material and Equipment to Fasten the Angle Iron Whaler to the Steel Sheet Seawall; Peninsula B - 687 Feet & Peninsula C - 1261 Feet; Align angle iron whaler to steel sheet seawall; Attach fasten angle iron cap whaler to steel sheet with 3/4" bolts spaced approximately 3' apart; Weld/Splice angle iron butt joints as needed. 85

Mike D'Agostino - Manager 269-469-8100 Start Date 12/22/2009 Completion Date 4/10/2010 Contractor's Work Force 100% Contract Amount $ 145,811.10

Lake Michigan Yacht Club PO Box 358 New Buffalo, MI. 49117 Seawall Repair

Provide Labor, Material & Equipment to remove and replace 56 lineal feet of concrete seawall panels, bulkhead and patio/walkway; Remove/disconnect and re install Two(2) docks. (To be stored on site). Remove and reinstall Two(2) light fixtures, Six(6) seawall cleats, One(2) seawall ladder, slip electrical & water for slips 1, 2, 3, 4, 5,& 6. Removal and discard of 56' x 14' wide existing concrete walkway and 56' x 12' long seawall panels Installation of Six (6) HP12 x 53# seawall support piles x 50 feet long on 10' spacing; Fabrication of H-pile to conform to corner at slip #6 to connect into existing seawall panel; Fabricate 6 panels 9'8" wide by 6" thick by 20' long with #6 grade 60 steel reinforcing bars on 12" spacing; 6" c-channel frame around perimeter panel with 4000 psi concrete compressive strength; Placement of Thorocoat DOT texture coating on seawall face from the water line up to under the seawall bulkheads to match existing new seawall section along slip #1, 2 and Federal channel. Installation of 100' of Z55 grade 50 by 15' and 25' length deadman steel sheet wall; Installation of #9 Dywidag Rods 20 feet long from H-pile lugs to steel sheet wall. Placement of clean sand fill compacted to grade; Placement of a 14"t x 18" wide seawall cap bulkhead with 12'6" wide x 5" thick x 56' patio/walkway; Placement of 86 lineal feet of 4" to 6" limestone rip rap 2' deep taper out 4' wide at the seawall panel 84

Cyndi Deadman 269-469-5790 Start Date 11/25/2009 Completion Date 12/22/2009 Contractor's Work Force 100% Contract Amount $ 24,785.00

Moorings Association 310 Oselka Drive, Ste 256 New Buffalo, MI. 49117 Steel Sheet Wall Deadman Rods

Provide Labor, Material and Equipment to install deadman rod through peninsula to stabilize 80 feet of the steel sheet seawall; Install 80' of 6" C-channel whaler on face of steel sheet wall on each side of peninsula; Install Thirteen (13) Dywidag deadman rod through peninsula to fasten steel sheet walls together; Attach fasten 80' of angle iron cap whaler to steel sheet with 3/4" bolts spaced approximately 3' apart; Re attach fasten 80' of existing I-beam whaler to steel sheet; Excavate fill behind wall for deadman installation and straighten wall within reason; Mooring Peninsula C Slips # 117-127

83

Berrien County Community Development Department 701 Main Street St. Joseph, Michigan 49085 Engineer/Architect: ECT Environmental Consulting & Technology, Inc. 115A W. Main Street Benton Harbor, MI. 49022

Dan Fette - Director 269-983-7111 Start Date 9/30/2009 Completion Date 11/14/2009 Contractor's Work Force 100% Contract Amount $ 235,560.40

rc Florian, CPG, RG, CUSTP

FY2009 Recreational Waterway Maintenance Dredging; Bid No.: 0609010

Page 15 of 29

269-927-3366

Provide Labor, Material & Equipment to Mechanically Excavate/Dredge 4788 CY of material from the St. Joseph River Channel in the City of St Joseph, Michigan, in an area measuring 460' long by 50' wide; Barge work vessel, M/V Miss Jamie Lynn, is a 120’ x 34’ x 6’ self propelled vessel with four hydraulic spuds to stabilize and lock down from movement. Aboard the M/V Miss Jamie Lynn will be a containment cell 26’ x 26’ to contain the dredge spoils An excavator will be placed on the M/V Miss Jamie Lynn deck to remove the shoal and place the material in the containment cell on the deck. The work vessel will dredge the full width of the channel as it advances. Once the cell is filled the M/V Miss Jamie Lynn will transport to the Whirlpool disposal site where the excavator will unload the spoils. A loader will be utilized to relocate and stock pile the dredge spoils to its designated destination on site. Dredging will begin at the downstream side of the dredge area and advance upstream.

82

Neal Shevin 269-469-1818 Start Date 7/8/2009 Completion Date 7/31/2009 Contractor's Work Force 100% Contract Amount $ 25,370.74

Neal Shevin 16500 Timber Lane New Buffalo, MI. 49117 Quality Boatlifts 16,000# 4 Post Alum-A-Vator II

Provide Labor, Material & Equipment to Install Quality Boatlifts 16,000# 4 Post Alum-A-Vator II w/ auto stop and GEM remote; Install Four (4) 7" Dia. x 40' long support Piles in Harbor Landing Slip #1, New Buffalo, Michigan 81

Bill D McLinden 708-822-4204 Start Date 9/5/2007 Completion Date 5/31/2009 Contractor's Work Force 100% Contract Amount $ 3,879,794.01

Peninsula Drive, LLC PO Box 573 105 N. Thompson St New Buffalo, MI 49117 Engineer/Architect: Wightman & Associates 2303 Pipestone Rd Benton Harbor, MI 49022

Oscar Loveless, P.E.

877-927-0109

Peninsula Club Phase I & II Fabrication and installation of 2,100' precast concrete seawall panels 10' wide x 25' long and 6" thick. Each panel inserted between W12 x 53# H-piles driven to 40 ton bearing load which consisted of each H-pile length of 120' long. Hydraulically dredge 17,760 cubic yards of sand material through a 10" pipeline approximately 4,000' long onto the beach nourishment area. 80

Ryan Fellows 269-469-1500 Start Date 4/29/2009 Completion Date 5/9/2009 Contractor's Work Force 100% Contract Amount $ 83,421.80

City of New Buffalo 224 W. Buffalo Street New Buffalo, MI. 49117 Engineer/Architect: Wightman & Associates 2303 Pipestone Road Benton Harbor, MI. 49022

Oscar Loveless, P.E.

877-927-0109

City of New Buffalo 2011 Federal Channel Dredging Project Provide Labor, Material & Equipment to Hydraulically Dredge 5274 CY of material from the Federal Channel of the Galien River in the New Buffalo Harbor, in an area measuring 600 feet long by 80 ' wide; Pump dredge spoils to the beach nourishment zone along the Lake Michigan shoreline 79

Cyndi Deadman 269-469-5790 Start Date 1/24/2009 Completion Date 1/31/2009 Contractor's Work Force 100% Contract Amount $ 35,100.00

The Moorings Association 310 Oselka Dr Suite 256 New Buffalo, MI 49117 Level Docks Peninsula D &E

Provide Labor, Material & Equipment to Remove section of the Dock support pile to level dock with the seawall bulkhead; Peninsula "D" Dock 228-299 (37) and Peninsula "E" Dock 300-369 (35)

Page 16 of 29

78

Chuck Dobbins 269-469-1500 Start Date 1/22/2009 Completion Date 2/18/2009 Contractor's Work Force 100% Contract Amount $ 19,320.00

City of New Buffalo 224 W. Buffalo St. New Buffalo, MI 49117 Rehab Launch Ramp Skid Piers

Remove, transport, sandblast, minor repairs, paint, replace 2 x 6 treated decking and 6 x 6 timber posts, Install Ace dock cushions and deliver back to site. 77

Cyndi Deadman 269-469-5790 Start Date 10/14/2008 Completion Date 12/26/2008 Contractor's Work Force 100% Contract Amount $ 27,205.67

The Moorings Association 310 Oselka Dr Suite 256 New Buffalo, MI 49117 Seawall Repair Slip # B-47

Excavate and pull back steel sheet wall to correct position and install Dywidag Deadman rods and additional sea channel Whaler to secure wall in position. 76

Richard Novak 219-391-8482 Start Date 10/28/2008 Completion Date 11/17/2008 Contractor's Work Force 100% Contract Amount $ 249,772.25

East Chicago Marina 3301 Aldis St East Chicago, IN 46312 EZ Dock Floating System Phase I, II, III

Installation of EZ Dock floating dock system consisting of 80" wide dock sections x 10' long for a total length of approximately 630' long with 3 access aluminum gangway 5' wide x 25' long and associated dock edging and cleats in the East Chicago Marina Facility. 75

Mike Trapp 269-408-1725 Start Date 10/26/2008 Completion Date 11/2/2008 Contractor's Work Force 100% Contract Amount $ 23,121.25

Sea Brex Marine, Inc. 3121 Oak Lane Stevensville, MI 49127 Salvage Vessel

Supply M/V Miss Jamie Lynn crane barge (120" long x 34" wide x 6' high) with crew to assist Sea Brex Marine personnel in salvaging 19' x 24' barge off the Burns Ditch Indiana breakwall. 74

Richard Novak 219-391-8482 Start Date 7/18/2008 Completion Date 8/8/2008 Contractor's Work Force 100% Contract Amount $ 90,900.00

East Chicago Marina 3301 Aldis St East Chicago, IN 46312 Pile Repair Spring 2008

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to repair mooring piles from winter ice heaving by adding 30' pipe extensions and driving down to the required elevation, replace broken 8" PVC covers, replace/repair missing and damaged corner bracket pipe guides on Pier A, B, C, D, E, F, G, Southeast and Southwest Pier. 73

Joe Francaviglia 630-587-2448 Start Date 4/21/2008 Completion Date 5/20/2008 Contractor's Work Force 100% Contract Amount $ 19,965.05

Joe Francaviglia 1227 Quarterhouse St. Charles, IL 60174 Quality Boat Lifts 13,000lbs 4 Posts Alum-A-Vator II

Installation of Quality Boat Lifts 13,000lbs post Alum-A-Vator II with Gem remote controls on four 7" x .312 wall x 40' long steel support piles with 8" schedule forty PVC pipe sleeve covers by 20' long. Installed in Dunewood Harbor Side slip 22, New Buffalo, MI. 72

Cyndi Deadman Start Date Completion Date

The Moorings Association 310 Oselka Dr Suite 256 Page 17 of 29

269-469-5790 12/14/2007 5/15/2008

Contractor's Work Force Contract Amount $

New Buffalo, MI 49117

100% 394,423.00

46 Dock Replacement Phase II Remove and discard existing steel/wood deteriorated docks. Fabrication and installation of Donkersloot & Sons patent steel design 13 - 30' docks and 33 - 35' docks, and associated accessories including four-step adjustable stairs, poly bumper guards, 10" aluminum "S" style cleats and mounting provisions, steel beam dock lights, and 10.75" OD x 3.365 wall x 40' steel dock support piles. 71

Michael O'Malley 269-983-1240 Start Date 8/8/2007 Completion Date 8/9/2007 Contractor's Work Force 100% Contract Amount $ 4,975.00

City of St. Joseph Water Plant 700 Broad St St. Joseph, MI 49085 Retrieve Water Intake Riser Extensions

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to assist Sea Brex Marine in salvaging of a steel intake riser (6' dia. x 4' tall) at the City of St. Joseph water intake in approximately 27' water depth. 70

Richard Novak 219-391-8482 Start Date 7/24/2007 Completion Date 7/31/2007 Contractor's Work Force 100% Contract Amount $ 7,265.00

East Chicago Marina 3301 Aldis St East Chicago, IN 46312 Gas Dock 2 x 6 Decking Replacement Removal and replacement of approximately 100 treated 2 x 6 decking boards.

69

Richard Novak 219-391-8482 Start Date 7/13/2007 Completion Date 7/28/2007 Contractor's Work Force 100% Contract Amount $ 29,885.00

East Chicago Marina 3301 Aldis St East Chicago, IN 46312 Gas Dock, Slip # 33 and 34 Bumper Post

Removal of existing upright 6 x 6 post and horizontal guard rail post above water line on the 96 lineal feet of gas docks and installation of new 6 x 6 timber posts with replacement dock cushions. 68

Keith Carey 219-659-7678 Start Date 6/26/2007 Completion Date 6/26/2007 Contractor's Work Force 100% Contract Amount $ 2,695.00

Hammond Marina 701 Casino Center Drive Hammond, IN 46320 Install Swim Buoys

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to set 3 marker buoys along the outside perimeter of the harbor breakwall. 67

Steve Paukowits 269-469-3536 Start Date 4/30/2007 Completion Date 6/11/2007 Contractor's Work Force 100% Contract Amount $ 35,985.00

Eagle Pointe Condominiums C/O First American Management Co, Inc. 139 N. Whittaker St. New Buffalo, MI 49117 Dock Replacement, St. Joseph, MI

Removal of existing fiberglass docks and fabrication and installation of 4 Donkersloot & Sons patented steel design 35' docks with associated accessories including four-step adjustable stairs, poly bumper guards, 10" aluminum "S" type cleats and mounting provisions. 66

Richard Novak 219-391-8482 Start Date 5/4/2007 Completion Date 5/25/2007 Contractor's Work Force 100% Contract Amount $ 16,760.00

East Chicago Marina 3301 Aldis St East Chicago, IN 46312 Southeast Star Dock Pier Spud Pile Replacement

Page 18 of 29

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to remove 4 existing spud piles and replace with 4 - 9.625" OD x 75' long spud piles with spud guides and 10" dia. x 20' long PVC cover and cap. 65

George Miz 312-265-1124 Start Date 1/4/2007 Completion Date 5/25/2007 Contractor's Work Force 100% Contract Amount $ 58,616.00

George Miz 48017 Ridge Road Grand Beach, MI 49117 Lake Front Stone Revetment

Placement of a stone revetment wall 21' wide on a 1' slope x 100' long, consisting of 8" to 12" mattress stone with 12oz filter fabric and 1,000 - 2,000lb armor stone. 64

Dave Arney 269-426-4043 Start Date 4/26/2007 Completion Date 5/24/2007 Contractor's Work Force 100% Contract Amount $ 28,041.40

Harbor Landing Association PO Box 328 New Buffalo, MI 49117 Concrete Seawall Bulkhead Replacement

Labor, material and equipment to remove and replace 104 lineal feet of concrete bulk head and walkway at the Harbor Landing Association Slips 6-11. 63

Cyndi Deadman 269-469-5790 Start Date 1/1/2007 Completion Date 4/30/2007 Contractor's Work Force 100% Contract Amount $ 297,543.20

The Moorings Association 310 Oselka Dr Suite 256 New Buffalo, MI 49117 28 Dock Replacement Phase I

Remove and discard existing steel/wood deteriorated docks. Fabrication and installation of Donkersloot & Sons patent design 7 - 30' docks, 7 - 35' docks, and 14 - 40' docks with associated accessories including four-step adjustable stairs, poly bumper guards, 10" aluminum "S" type cleats and mounting provisions, steel beam dock lights, and 10.75" OD 3.365 wall x 40' steel dock support piles. 62

Richard Novak 219-391-8482 Start Date 4/24/2007 Completion Date 4/20/2007 Contractor's Work Force 100% Contract Amount $ 55,855.00

East Chicago Marina 3301 Aldis St East Chicago, IN 46312 Pile Repair Spring 2007

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to lower mooring piles from winter ice heaving down to required elevation, replace broken 8" PVC covers, replace/repair missing and damaged corner bracket pipe guides on Pier A, B, C, D, E, F, G, and Southeast Star Dock. 61

David Gibbons 317-815-8064 Start Date 9/26/2006 Completion Date 1/4/2007 Contractor's Work Force 100% Contract Amount $ 134,042.50

Dunewood Condominium Association PO Box 536 New Buffalo, MI 49117 Paint Docks

Disconnect and transport 2 - 35' docks, 15 - 50' docks, 5 - 55' docks to our shop facility. Remove all fixtures and repair minor dents and damages. Sandblast complete dock and install one coat of epoxy primer and one coat of gloss enamel finish. Install anti-slip to the walk way and reassemble all fixtures. Reinstall steel docks. 60

Richard Novak 219-391-8482 Start Date 11/16/2006 Completion Date 12/19/2006 Contractor's Work Force 100% Contract Amount $ 49,716.60

East Chicago Marina 3301 Aldis St East Chicago, IN 46312 Pier C Spud Pile Replacement

Page 19 of 29

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to realign Pier B and remove the existing 35 - 4.5" piles and replace with 9 - 10.75" OD x 43' long and 1 - 7" OD x 40' long spud piles with spud guides and 12" dia. x 15' long and 8" dia. x 50' long PVC cover and cap. 59

Richard Novak 219-391-8482 Start Date 7/28/2006 Completion Date 8/17/2006 Contractor's Work Force 100% Contract Amount $ 43,739.80

East Chicago Marina 3301 Aldis St East Chicago, IN 46312 Pier B Spud Pile Replacement

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to realign Pier B and remove the existing 35 - 4.5" piles and replace with 12 - 10.75" OD x 43' long spud piles with spud guides and 12" dia. x 15' long PVC cover and cap. 58

Richard Novak 219-391-8482 Start Date 7/10/2006 Completion Date 7/27/2006 Contractor's Work Force 100% Contract Amount $ 38,840.00

East Chicago Marina 3301 Aldis St East Chicago, IN 46312 Southeast Star Dock Pier Ramp Replacement

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to remove existing gangway ramps and replace with 5' wide x 25' long aluminum gangway with railings. Also installed 2 - 7" OD x 3.17 wall steel spud pile by 40' long with 8" x 10' long PVC cover with spud guide along each side of the pier entrances. 57

Rich Corbett 888-624-9618 Start Date 7/6/2006 Completion Date 7/19/2006 Contractor's Work Force 100% Contract Amount $ 71,635.00

Blue Chip Casino 2 Easy St Michigan City, IN 46360 Steel Dock and Mooring Piling Removal

Supply M/V Miss Jamie Lynn (120' long x 34' wide x 6' high) with crew to remove and dispose of 28 - 10" steel piles, 54 - 7" steel piles, and 4 - 40' fiberglass docks from Trail Creek, Michigan City, IN. 56

Tom Kulesia 574-848-5195 Start Date 5/20/2006 Completion Date 6/1/2006 Contractor's Work Force 100% Contract Amount $ 29,520.15

Tom Kulesia 802 W. Vistula St Bristol, IN 46507 Quality Boat Lifts 27,000lbs 4 Posts Alum-A-Vator

Installation of Quality Boat Lifts 27,000lbs post Alum-A-Vator (motors up) with Gem remote controls on four 7" x .322 wall x 60' long steel support piles with 10" schedule forty PVC pipe sleeve covers by 10' long. Installed in Waterfront Association #14, St. Joseph, MI. 55

Pier 33 250 Anchors Way St. Joseph, MI 49085 40', 45', and 50' Dock Replacement with 37.5' Adjustable System Phase II

Tighe Curran 269-983-3333 Start Date 10/21/2005 Completion Date 4/27/2006 Contractor's Work Force 100% Contract Amount $ 483,866.00

Remove and discard existing fiberglass deteriorated docks. Fabrication and installation of Donkersloot & Sons Patent steel design 17 - 40', 15 - 45', and 7 - 50' docks with associated accessories including 37.5" adjustable system, five-step adjustable stairs, poly bumper guards, 10" aluminum "S" type cleats and mounting provisions, steel beam dock lights, and 10.75" OD x 3.365 wall x 40' steel dock support piles. 54

Richard Novak 219-391-8482 Start Date 4/18/2006 Completion Date 4/26/2006 Contractor's Work Force 100% Contract Amount $ 16,760.00

East Chicago Marina 3301 Aldis East Chicago, IN 46312 Pile Repair Spring 2006

Page 20 of 29

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to repair mooring piles from winter ice heaving by adding 30' pipe extensions and driving down to the required elevation, replace broken 8" PVC covers, replace/repair missing and damaged corner bracket pipe guides on Pier B, D, E, and G. 53

Richard Novak 219-391-8482 Start Date 2/2/2006 Completion Date 4/26/2006 Contractor's Work Force 100% Contract Amount $ 69,905.00

East Chicago Marina 3301 Aldis St East Chicago, IN 46312 Pier F Spud Pile Replacement

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to realign Pier B and remove the existing 50 - 4.5" piles and replace with 12 - 9.625" OD x 75" long spud piles with spud guides and 10" dia.x 20' long PVC cover and cap. 52

Dave Arney 269-426-4043 Start Date 3/28/2006 Completion Date 4/10/2006 Contractor's Work Force 100% Contract Amount $ 29,950.00

Harbor Landing Association PO Box 328 New Buffalo, MI 49117 Mooring Pile Repair

Supply M/V Miss Jamie Lynn crane barge (120' long x 34' wide x 6' high) with crew to repair mooring piles from winter ice heaving by adding 20' pipe extensions and driving down to the required elevation. 51

Steve Lempera 708-479-6900 Start Date 1/3/2006 Completion Date 3/18/2006 Contractor's Work Force 100% Contract Amount $ 23,905.43

Steve Lempera 19701 S. 97th Ave Mokena, IL 60448 Quality Boat Lifts 27,000lbs 4 Posts Alum-A-Vator

Installation of Quality Boat Lifts 27,000lbs 4 Posts Alum-A-Vator (motors up) with Gem remote controls on four 8.625" x .322 wall x 60' long steel support piles with 10" schedule forty PVC pipe sleeve covers by 10' long. Installed in Dunewood Harbor Side slip 21, New Buffalo, MI. 50

Mike Oros 269-556-2576 Start Date 10/10/2005 Completion Date 3/3/2006 Contractor's Work Force 100% Contract Amount $ 157,460.00

Riverside Pointe Condo Association C/O Countrywide Property Management, Inc. 609 Market St. St. Joseph, MI 49085 35' Dock Replacement, St. Joseph, MI

Removal of existing fiberglass docks and fabrication and installation of 20 Donkersloot & Sons patent steel design 35' docks with four-step adjustable stairs, poly bumper guards, 10" aluminum "S" type cleats and mounting provisions. 49

Cyndi Deadman 269-469-5790 Start Date 10/24/2005 Completion Date 11/10/2005 Contractor's Work Force 100% Contract Amount $ 10,374.45

The Moorings Association 310 Oselka Dr Suite 256 New Buffalo, MI 49117 Seawall Whaler Repair

Repair I-beam Whaler splice joints by welding and bolting steel stiffener plates at each joint. 48

Bob Simenas 708-567-7000 Start Date 12/15/2004 Completion Date 10/5/2005 Contractor's Work Force 100% Contract Amount $ 57,471.40

Bob Simenas 5612 West 79th St Burbank, IL 60459 Excavate Channel and Install Dock System

Mechanically excavate area 60' wide x 130' long to 6' depth and removal of dredge material off site. Installation of an EZ Dock floating dock system with 60" walkways and 2 slips - 35' long with cleats, lights, and electric.

Page 21 of 29

47

Bill Kay 630-561-9095 Start Date 4/13/2005 Completion Date 5/28/2005 Contractor's Work Force 100% Contract Amount $ 25,863.72

Bill Kay 832 Woodland Ave Naperville, IL 60540 Quality Boat Lifts 27,000lbs 4 Posts Alum-A-Vator

Installation of Quality Boat Lifts 27,000lbs posts Alum-A-Vator with Gem remote controls on four 8.625" x .322 wall x 60' long steel support piles with 10" schedule forty PVC pipe sleeve covers by 20' long. Installed in South Cove Harbor Isle Drive boathouse unit 46, New Buffalo, MI. 46

Thomas Danielson 630-986-5302 Start Date 5/2/2005 Completion Date 5/28/2005 Contractor's Work Force 100% Contract Amount $ 19,118.26

Thomas Danielson 110 Surray Lane Burr Ridge, IL 60527 Quality Boat Lifts 13,000lbs 4 Posts Alum-A-Vator

Installation of Quality Boat Lifts 13,000lbs post Alum-A-Vator with Gem remote controls on four 7" x .312 wall x 40' long steel support piles with 8" schedule forty PVC pipe sleeve covers by 20' long. Installed in South Cove Harbor Isle Drive cabana unit 36, New Buffalo, MI. 45

Tighe Curran 269-983-3333 Start Date 2/22/2005 Completion Date 5/24/2005 Contractor's Work Force 100% Contract Amount $ 496,471.00

Pier 33 250 Anchors Way St. Joseph, MI 49085 30' and 35' Dock Replacement with 37.5" Adjustable System Phase I

Remove and discard existing fiberglass deteriorated docks. Fabrication and installation of Donkersloot & Sons patent steel design 29 - 30' docks, 18 - 35' docks with associated accessories including 37.5" adjustable system, five-step adjustable stairs, poly bumper guards, 10" aluminum "S" type cleats and mounting provisions, steel beam dock lights, and 10.75" OD x 3.365 wall x 40' steel dock support piles. 44

Arie Donkersloot 269-469-3000 Start Date 4/3/2002 Completion Date 5/27/2005 Contractor's Work Force 100% Contract Amount $ 1,278,157.12

Pleasure Isle Marina 512 Lake Drive New Buffalo, MI 49117 Pleasure Isle Marina Phase I & II

Develop a twenty-six slip marina facility consisting of 720' of concrete seawall, thirteen 42' slips, thirteen 30' boat-lift slips, and a 2,880 square foot bathhouse, office and condo rental building. 43

Andy Vozar 219-391-8482 Start Date 6/3/2003 Completion Date Contractor's Work Force 100% Contract Amount $ 103,802.00

Robert A. Pastrick Marina 3301 Aldis St East Chicago, IN 46312 Pile Repairs & Concrete Debris Removal

Repaired slip mooring piles, pier spud piles and guides from winter ice damage. Removal of 270 tons of concrete debris between Pier A & B fairways. Excavator with thumb grab material in fairways placed in containers on barge, transport to unloading area and loaded into semi trucks. 42

Chuck Dobbins 269-469-1500 Start Date 4/1/2003 Completion Date Contractor's Work Force 100% Contract Amount $ 30,162.50

City of New Buffalo 224 W. Buffalo St New Buffalo, MI 49117 Removal of 312 Wooden Piles

Removal of 312 wooden pilings 12" diameter x 26' long from the Harbor Entrance Cove area. Extract with barge crane, transport to unloading area, load onto semi trailer and haul off site. 41

Jeff Price

Coastline Builders, Inc. Page 22 of 29

312-925-1072

Start Date Completion Date Contractor's Work Force Contract Amount $

3230 Yankee Road Niles, MI 49120 Support Piles & Concrete Grade Beams

3/1/2003 100% 179,251.00

Installation of 19 8.625" OD support steel piles driven to 15-50 ton load with an average length of 120' long. Placement of 555' of heavy reinforcement concrete grade beam 12" thick by 3' and 6' tall. The purpose is to support a million plus home in a wet land environment. 40

Scott Westphal 219-872-1712 Start Date 7/1/2002 Completion Date Contractor's Work Force 100% Contract Amount $ 51,842.80

Michigan City Port Authority 200 Heisman Harbor Drive Michigan City, IN 46360 Trail Creek Outer Harbor Shoal Removal 2002

Mechanically dredge 6,326 cubic yards of shoal sediment from the harbor entrance, load onto barge, transport 1 mile west and unload in 6' deep water at the disposal area. 39

Marina Park East, South & West Condo Slip Association Pioneer Lumber Slip Facility 320 E. 2nd Street Michigan City, IN 46360

Dan Radtke 219-874-7290 Start Date 3/1/2002 Completion Date Contractor's Work Force 100% Contract Amount $ 398,270.00

Dredge Slips Trail Creek Michigan City, IN Mechanically dredge slips to a depth of 6.5'. Place material in storage cell on barge, transport to dock, and unload into semi trucks and deliver to the Deercroft Landfill Michigan City, IN. 38

Chuck Dobbins 269-469-1500 Start Date 3/1/2002 Completion Date Contractor's Work Force 100% Contract Amount $ 33,748.00

City of New Buffalo 224 W Buffalo St New Buffalo, MI 49117 Harbor Channel Entrance Shoal Dredging 2002

Hydraulically dredge 5,240 cubic yards of shoal sediment in the federal channel and place material on the beach nourishment area. 37

Chuck Dobbins 269-469-1500 Start Date 10/1/2001 Completion Date Contractor's Work Force 100% Contract Amount $ 21,780.00

City of New Buffalo 224 W Buffalo St New Buffalo, MI 49117 Rehabilitation of 11 Steel Finger Piers Lower docks 14" and extend ramps 28".

36

Elmar Johsen 269-469-3404 Start Date 9/1/2001 Completion Date Contractor's Work Force 100% Contract Amount $ 5,500.00

Mr. Elmar Johsen 27 Pokagon New Buffalo, MI 49117 265 Sea Ray Flybridge "Ship Happens"

Raise sunken vessel in marina Park South Slip # 2 and transport to B & E Marina Travel Lift Facility. 35

Jeff Price 312-925-1072 Start Date 9/1/2001 Completion Date Contractor's Work Force 100% Contract Amount $ 69,137.94

Coastline Builders, Inc. 3230 Yankee Road Niles, MI 49120 Installation of Private Slip Facility

Installation 85' of 5' W x 14' L precast tongue and groove seawall panels with 14" bulkhead and 10' wide walkway, fabricate & install 1 - 45' telescopic steel dock, piles, electrical and plumbing. Page 23 of 29

34

Jack Manley 312-243-2229 Start Date 8/1/2001 Completion Date Contractor's Work Force 100% Contract Amount $ 11,000.00

Chicago Marine Salvage & Towing 6348 N. Milwaukee Avenue Suite 389 Chicago, IL 60646 32' Bayliner Sailboat Recovery "Sun Maid"

M/V Miss Jamie Lynn crane barge removed sailboat off racks and wood piles along shoreline 3 miles south of St. Joseph, MI. Set vessel on deck, transported to New Buffalo Harbor and unloaded onto Dockside Nautical Marine Service hydraulic boat trailer. 33

Karen Pietroski 269-469-5790 Start Date 4/12/2001 Completion Date 7/1/2001 Contractor's Work Force 100% Contract Amount $ 342,140.95

Moorings Condominium/Dock Association 310 Oselka Drive Suite 256 New Buffalo, MI Emergency Dredging

Hydraulic dredge 4 fairways approximately 650' long each, 75 - 30'/35' long slips and 75 40'/45' long slips consisting of 14,973 cubic yards into beach dewatering facility, truck silty material off and contour grade sandy material on beach. 32

Philip Donahue 708-524-4831 Start Date 1/27/2001 Completion Date 6/17/2001 Contractor's Work Force 100% Contract Amount $ 52,309.00

Philip Donahue 11900 Marquette Dr New Buffalo, MI 49117 Dredge Private Channel

Mechanically dredge private channel 30' wide x 300' long to a depth of 5' deep and removal of dredge material off site. Placement of 80' small rip rap along shoreline and construct a 12' wide x 42' long wood treated dock. 31

Edward Burke 630-505-8282 Start Date 10/1/2000 Completion Date Contractor's Work Force 100% Contract Amount $ 62,275.00

Edward Burke 2580 Hanford Lane Aurora, IL 60504 Stone Revetment

Placement of 1,630 cubic yards of clay to rebuild bluff and install 160' of armor stone revetment on a 2:1 slope 30' wide. 30

Jerry Looney 219-876-5480 Start Date 7/1/2000 Completion Date Contractor's Work Force 100% Contract Amount $ 53,620.00

Lake Michigan Yacht Club PO Box 358 New Buffalo, MI 49117 Seawall Repair Slips #1 & 2

Replace seawall with 40' of 10' W x 22' L precast concrete panels, install 28" adjustable steel dock, pile, electrical, and plumbing 29

Karen Pietroski 269-469-5790 Start Date 6/1/2000 Completion Date Contractor's Work Force 100% Contract Amount $ 41,377.04

Moorings Condominium/Dock Association 310 Oselka Dr Suite 256 New Buffalo, MI 49117 Channel A & B Dredging

Hydraulic dredge 2,795 cubic yards onto beach nourishment site and 2,080 cubic yards into a dewatering facility. 28

Chuck Dobbins Start Date Completion Date Contractor's Work Force

City of New Buffalo 224 W. Buffalo St New Buffalo, MI 49117

Page 24 of 29

269-469-1500 5/1/2000 100%

Contract Amount $

Timber Pile Removal

41,360.00

Removal of 170 wooden pilings with diving crew in Channels A & B entrance and along the New Buffalo Transient Marine pump out dock. Extract with barge crane, transport to unloading area, load onto semi trailer and haul off site. 27

Andy Vozar 219-391-8482 Start Date 4/1/2000 Completion Date Contractor's Work Force 100% Contract Amount $ 52,435.00

Robert A. Pastrick Marina 3301 Aldis St East Chicago, IN 46312 Pier G Spud Pile Replacement

M/V Miss Jamie Lynn crane barge removed existing spud pile system and install twelve 9.625" OD piles by 75' long. 26

Chuck Dobbins 269-469-1500 Start Date 3/1/2000 Completion Date Contractor's Work Force 100% Contract Amount $ 31,890.45

City of New Buffalo 224 W. Buffalo St New Buffalo, MI 49117 Federal Channel Shoal Dredging

Hydraulic dredge 6,131 cubic yards of shoal sediment I, II, III in the federal channel and city marina shoal and place material on the beach nourishment area. 25

Jerry Looney 219-876-5480 Start Date 10/2/1999 Completion Date 1/30/2001 Contractor's Work Force 100% Contract Amount $ 303,886.00

Lake Michigan Yacht Club PO Box 358 New Buffalo, MI 49117 Shore Stabilization & Beautification

Installation of steel I-beams, 185' of 10'W x 22'L precast concrete seawall panels, 445' of 5'W x 12'6"L precast tongue and groove seawall panels with 14" bulkhead and 5' and 14' wide walkway, lights, and railing. 24

Mary Jo Blythe 630-215-7415 Start Date 8/1/1999 Completion Date Contractor's Work Force 100% Contract Amount $ 4,000.00

Masterplan, Inc. 125 W. 55th St Suite 200 Clarendon Hills, IL 60514 Fastball Band Concert - Absdut Mandrin

Provided M/V Miss Jamie Lynn barge for entertainment crew, company set up band on bow of barge. Barge transported band and crew to Stop #2 Sheridan Beach Michigan City, IN. Barge spud down off beach in 6' of water for a 2.5 hour private concert party. 23

Thomas Boyd Start Date Completion Date Contractor's Work Force Contract Amount $

Timber Lane Homeowners Association 16599 West Way New Buffalo, MI 49117 Stone Revetment

8/1/1998 100% 173,755.00

Placement of clay as needed to rebuild bluff and install 631' of armor stone revetment on a 2:1 slope 25' wide for individual home owners. Hydro seed crown vetch on upper remaining portion of bluff. 22

Jack Manley 312-243-2229 Start Date 5/1/1998 Completion Date Contractor's Work Force 100% Contract Amount $ 12,625.00

Chicago Marine Salvage & Towing 6348 N. Milwaukee Ave Suite 389 Chicago, IL 60646 49' Grand Banks Alaskan "Cloud Vision"

M/V Miss Jamie Lynn crane barge raised vessel off the shore line of Mount Baldy, Indiana. Transported to Oselka's Marina in New Buffalo Harbor to hoist out with travel lift.

Page 25 of 29

21

Ronald Farina 269-469-2222 Start Date 5/1/1998 Completion Date Contractor's Work Force 100% Contract Amount $ 48,760.00

Ronald Farina 10925 Marquette Dr New Buffalo, MI 49117 Stone Revetment

Placement of 2,000 cubic yards of clay to rebuild bluff and install 130' of large armor stone revetment on a 2:1 slope 35' wide. Hydro seed crown vetch on upper remaining portion of bluff. 20

Bill Deputy 269-46-4860 Start Date 10/1/1997 Completion Date Contractor's Work Force 100% Contract Amount $ 115,057.86

Bill Deputy 606 Lake Drive New Buffalo, MI 49117 Sunset Shores Beach Revetment Project

Placed 782' of armor stone revetment wall along dune bluff on a 2:1 slope 20' wide for individual home owners. 19

Scott Westphal 219-872-1712 Start Date 6/1/1997 Completion Date Contractor's Work Force 100% Contract Amount $ 1,581,832.16

Michigan City Port Authority 200 Heisman Harbor Drive Michigan City, IN 46360 700/800 Dock Replacement - Expansion

Removal of floating docks and wooden spud and mooring piles, construct 1,180' pier on piles with a 12' and 14' wide concrete deck, fabricate and install 76- 35' and 40' telescopic docks, piles, electrical, and plumbing. 18

Windham Bremer 219-778-4790 Start Date 11/1/1996 Completion Date Contractor's Work Force 100% Contract Amount $ 116,565.00

Windham Bremer 1353 East 1000 North LaPorte, IN 46350 Boat Slip - Taylor St. Michigan City, IN

Demolish building, excavation of private boat well, design & install precast tongue & groove seawall panels with 14" bulkhead and 10' wide walkway, steel dock, boat house roof with steel piles, I-beams, & corrugated steel roof. 17

Barry Bensz 219-879-8301 Start Date 8/1/1996 Completion Date Contractor's Work Force 100% Contract Amount $ 190,829.55

B & E Marine, Inc. Washington Park Michigan City, IN 46360 Launch Ramp Rehabilitation

Removal of existing launch ramp & steel sheet wall, design & install 400' of 5'W x 12'6" L precast tongue and groove seawall panels with 14" bulkhead and 10' wide walkway, install new launch ramp & boat well, steel railing, & block retaining wall. 16

Ron Hosek 219-924-5231 Start Date 12/1/1995 Completion Date Contractor's Work Force 100% Contract Amount $ 25,635.00

K & S Testing & Engineering, Inc. 9718 Kennedy Ave Highland, IN 46322 Sediment Samples from Michigan City Harbor

Set up K & S Engineering drill rig on M/V Miss Jamie Lynn work barge. Assisted K & S to perform sediment sample drilling of lake bottom on the Trail Creek River mouth. 15

Karen Pietroski 269-469-5790 Start Date 5/1/1995 Completion Date Contractor's Work Force 100% Contract Amount $ 310,000.00

Moorings Condominium/Dock Association 310 Oselka Drive Suite 256 New Buffalo, MI 49117 Peninsula A Rehab & A/B Headwall Rehab

Page 26 of 29

Remove docks and steel sheet wall, design and install 600' of 5'W x 12'6"L precast tongue and groove seawall panels with 14" bulkhead and 10' wide walkway, fabricate and install 16 - 40' steel docks and piles, electrical, and plumbing. 14

Arvind Modi 312-747-1524 Start Date 5/1/1995 Completion Date Contractor's Work Force 100% Contract Amount $ 199,997.00

Chicago Park District 425 East McFetridge Drive Chicago, IL 60605

Dredging at Jackson Park Outer Harbor & Lincoln Park Wilson Ave Launch Ramp Hydraulically dredge 25,330 cubic yards of sediment in harbor channels and placement of material on nearby beaches. 13

Scott Westphal 219-872-1712 Start Date 4/1/1995 Completion Date Contractor's Work Force 100% Contract Amount $ 156,314.60

Michigan City Port Authority 200 Heisman Harbor Drive Michigan City, IN 46360 Bulkhead Improvements

Removal of steel sheet wall and install 185' of 5'W x 12'6"L precast tongue & groove seawall panels with 14" bulkhead and 10' wide walkway. 12

Scott Westphal 219-872-1712 Start Date 6/1/1994 Completion Date Contractor's Work Force 100% Contract Amount $ 519,524.00

Michigan City Port Authority 200 Heisman Harbor Drive Michigan City, IN 46360 800 Dock Additions

Design & construct 460' pier on piles with 14' wide concrete deck, fabricate & install 28 - 35' and 40' telescopic docks, piles, electrical, and plumbing 11

Thomas A. Deja, P.E. 219-923-1763 Start Date 5/1/1994 Completion Date Contractor's Work Force 100% Contract Amount $ 286,059.16

US Army Corps of Engineers Calumet Area Office 906 Griffith Blvd Griffith, IN 46319 M/D Trail Creek, Michigan City, IN

Hydraulic dredge 32,500 cubic yards into a dewatering facility, truck spoils off site 3 miles to contract berm. 10

David Kadinger, Sr. 414-383-2040 Start Date 11/1/1993 Completion Date Contractor's Work Force 100% Contract Amount $ 12,228.56

Kadinger Marine Service, Inc. 401 E. Greenfield Ave Milwaukee, WI 53204 Michigan City, IN Zebra Mussel Project

Utilized our Toyo Pump to remove large amounts of zebra mussels and sand from crib intake as pigs pushed out. 9

Thomas A. Deja, P.E. 219-923-1763 Start Date 6/1/1993 Completion Date Contractor's Work Force 100% Contract Amount $ 3,800.00

US Army Corps of Engineers Calumet Area Office 906 Griffith Blvd Griffith, IN 46319 Sediment Sample Collection Burns Harbor Lake Michigan, Burns Harbor, IN

USACOE personal and equipment set up on barge and took sediment samples of harbor bottom. 8

Arvind Modi 312-747-1524 Start Date 6/1/1993 Completion Date Contractor's Work Force 100% Contract Amount $ 218,742.32

Chicago Park District 425 East McFetridge Drive Chicago, IL 60605

Page 27 of 29

Dredging Harbors in Various Parks and at Wilson Ave Boat Launching Ramp Hydraulically dredge channels at various harbors and placement of material on nearby beaches. 7

Thomas A. Deja, P.E. 219-923-1763 Start Date 5/1/1993 Completion Date Contractor's Work Force 100% Contract Amount $ 1,084,592.36

US Army Corps of Engineers Calumet Area Office 906 Griffith Blvd Griffith, IN 46319 East Pier Resurfacing, Michigan City, IN

Scale loose concrete surface off the 1,100' east pier breakwall, design & install steel ice plates, pour new concrete surface on entire breakwall. 6

Barry Bensz 219-879-8301 Start Date 4/1/1993 Completion Date Contractor's Work Force 100% Contract Amount $ 60,000.00

B & E Marine, Inc. Washington Park Michigan City, IN 46360 Construct Gas Dock & Concrete Seawall

Removal of existing gas dock, design & install 90' of 5'W x 12'6"L precast tongue and groove seawall panels with 14" bulkhead and 10' wide walkway, design and construct pier with concrete deck for gas dock, fabricate & install one 45' steel dock & piles, and electrical. 5

Scott Westphal 219-872-1712 Start Date 8/1/1992 Completion Date Contractor's Work Force 100% Contract Amount $ 142,410.00

Michigan City Port Authority 200 Heisman Harbor Drive Michigan City, IN 46360 Southeast Seawall Construction Project

Removal of concrete rip rap, install 380' of 5'W x 12'6"L precast tongue and groove seawall panels with 14" bulkhead and 10' wide walkway, sidewalk/curve, lighting, benches, landscaping, and fishing pier. 4

Chuck Dobbins 269-469-1500 Start Date 3/1/1992 Completion Date Contractor's Work Force 100% Contract Amount $ 14,050.00

City of New Buffalo 224 W. Buffalo St New Buffalo, MI 49117 Harbor Channel Dredging

Hydraulic dredge 1,400 cubic yards of shoal sediment in the federal channel and place material on the beach nourishment area. 3

Ronald I. Bobbitt, C.O.R. 313-266-3825 Start Date 8/1/1991 Completion Date Contractor's Work Force 100% Contract Amount $ 193,407.09

US Army Corps of Engineers Detroit Area Office PO Box 09258 Detroit, MI 48209-0258 M/D Bolles Harbor, Michigan

Hydraulic dredge 37,331 cubic yards of sediment into a confined dewatering facility located on site. 2

Thomas A. Deja, P.E. 219-923-1763 Start Date 4/1/1990 Completion Date Contractor's Work Force 100% Contract Amount $ 22,500.00

US Army Corps of Engineers Calumet Area Office 906 Griffith Blvd Griffith, IN 46319 Michigan City Outer Harbor Emergency Dredging

Hydraulic dredge 2,500 cubic yards of shoal sediment in the federal channel and place material within 1000' to the east on the beach nourishment area.

Page 28 of 29

1

Ted Schafer 815-464-9467 Start Date 8/1/1989 Completion Date Contractor's Work Force 100% Contract Amount $ 1,226,885.00

Harbor Landing Condominium Association PO Box 328 New Buffalo, MI 49117 Harbor Landing Seawall, Pier, & Docks

Design & install 1,030' of 5'W x 14'L precast tongue and groove seawall panels with 14" bulkhead and 10' wide walkway, construct pier 550' long on piles with a treated wood deck mount to a 14" steel frame, fabricate & install 49 - 35', 40', 45' steel docks, piles, electrical, and plumbing.