Project Management Life Cycle (PMLC)

Project Management Life Cycle (PMLC) Section 2 Office of the Senior Associate Vice President for Finance Outline Project Management Life Cycle PM...
Author: Wilfrid Paul
27 downloads 0 Views 2MB Size
Project Management Life Cycle (PMLC) Section 2

Office of the Senior Associate Vice President for Finance

Outline Project Management Life Cycle

PMLC Review Phases In Depth Monitoring & Controlling

 Planning  Analysis, Design & Development  Testing & Readiness  Post Go Live  Closing

Wrap Up Office of the Senior Associate Vice President for Finance

Page 2

Process Comparison Project Management Life Cycle

Initiating

Planning

Executing

Closing

GO LIVE!

Idea

Proposal

Request

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing

Chartered Project

Monitoring & Controlling

Office of the Senior Associate Vice President for Finance

Page 3

Planning Project Management Life Cycle Planning

Planning

• Develop schedule, plans and requirements for implementation

Office of the Senior Associate Vice President for Finance

• Acquire resources and engage the project team Page 4

Monitoring & Controlling Project Management Life Cycle Monitoring & Controlling

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

• Schedule / Resource Management

• Risk Management

• Change Management

• Stakeholder Management

Closing

Office of the Senior Associate Vice President for Finance

Page 5

Executing Project Management Life Cycle Executing

Analysis, Design & Development

Testing & Readiness

• Transform business requirements into actionable items

• Validate the solution against the business requirements

• Design and develop the planned solution

• Verify deployment readiness

Post Go Live

• Verify solution deployment per plan • Prepare to transition project to operational organization

Office of the Senior Associate Vice President for Finance

Page 6

Closing Project Management Life Cycle Closing

Closing

• Receive approval to close the project • Transition project items to the operational owner Office of the Senior Associate Vice President for Finance

• Perform Lessons Learned

Page 7

Planning Phase - Process Project Management Life Cycle

Input Activities Gate Review

 Baseline Business Requirements  Acquire Project Team  Create Project Definition Document

Authorize to begin Development?

Yes

 Develop WBS - Schedule  Develop Communications Plan

No

 Obtain Signed Contract(s)

Close or delay the project, Complete open planning items

Project Manager Receives Charter

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Plan Gate

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 8

Planning Phase - Activities Project Management Life Cycle

Activities  Baseline Business Requirements  Acquire Project Team  Create Project Definition Document  Develop WBS - Schedule  Develop Communications Plan

 Document the “what” of the idea at an actionable level

 Obtain Signed Contract(s)

 If not baselined by Proposal Gate, must be by Planning Gate Review. Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 9

Planning Phase - Activities Project Management Life Cycle  Contact managers of resources committed by charter Activities

 Establish expectations of resource usage

 Baseline Business Requirements  Acquire Project Team

 Conduct a kickoff meeting

 Create Project Definition Document

 Present the project, including timelines

 Develop WBS - Schedule

 Introduce members, roles & expectations

 Develop Communications Plan

 Establish meeting frequency

 Obtain Signed Contract(s)

 Begin communications planning  Receive feedback on project

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 10

Planning Phase - Activities Project Management Life Cycle Scope Management Time Management

Activities  Baseline Business Requirements

Cost Management Quality Management

 Acquire Project Team  Create Project Definition Document

HR Management

 Develop WBS - Schedule

Communications Mgt

 Develop Communications Plan

Risk Management

 Obtain Signed Contract(s)

Procurement Mgt Project Integration

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 11

Planning Phase - Activities Project Management Life Cycle

Activities  Baseline Business Requirements  Acquire Project Team  Create Project Definition Document  Develop WBS - Schedule  Develop Communications Plan  Obtain Signed Contract(s)

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 12

RASI Matrix Project Management Life Cycle

Activities  Baseline Business Requirements  Acquire Project Team  Create Project Definition Document  Develop WBS - Schedule  Develop Communications Plan  Obtain Signed Contract(s)

Office of the Senior Associate Vice President for Finance

Page 13

Planning Phase - Activities Project Management Life Cycle Work Breakdown Structure (WBS) Activities

“Software Implementation Project”

 Baseline Business Requirements  Acquire Project Team

Stakeholder Communications WBS1

 Create Project Definition Document

Website Development WBS2

 Develop WBS - Schedule  Develop Communications Plan  Obtain Signed Contract(s)

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Postcards / Mailings WBS 1.2

Email WBS1.3

Meetings / Seminars WBS 1.4

Initial announcement email WBS 1.3.1

First reminder email WBS1.3.2

Last reminder email WBS 1.3.3

Analysis, Design & Development

Testing & Readiness

Post Go Live

Graphics Design WBS2.1

Closing Page 14

Planning Phase - Activities Project Management Life Cycle

Activities  Baseline Business Requirements  Acquire Project Team  Create Project Definition Document  Develop WBS - Schedule  Develop Communications Plan  Obtain Signed Contract(s)

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 15

Communications Planning Project Management Life Cycle

Activities  Baseline Business Requirements

The written strategy for getting the right information to the right project stakeholders at the right time.

 Acquire Project Team  Create Project Definition Document

OR

 Develop WBS - Schedule  Develop Communications Plan  Obtain Signed Contract(s)

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Who needs to know what, when and how at what level of detail and informed by whom.

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 16

Communications Planning Project Management Life Cycle  Develop plan to actively communicate with stakeholders  “Internal” to the project  Project team meetings  Project team status reports & meeting minutes  Action Item registers

 “External” to the project  Letters to stakeholders  Blast emails & news  Formal and informal stakeholder meetings

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 17

Communications Planning Project Management Life Cycle  Vertical & Horizontal  Top-down & Bottom-up  Targeted & Tailored  Written & Oral  Concise  Timely With Reminders  Proper Perspective & Tone Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 18

Communications Planning Project Management Life Cycle  Matrix to organize and track progress  Deliverable/Communication  Description  Audience  Delivery Method  Delivery Date/Timing/Deadline  Frequency  Approval/Reviewer  Responsible Party/Owner

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 19

Planning Phase - Activities Project Management Life Cycle

Activities  Baseline Business Requirements  Acquire Project Team  Create Project Definition Document  Develop WBS - Schedule  Develop Communications Plan  Obtain Signed Contract(s)

 Engage OGC in contracts approval process  Monitor to ensure GW Executive signature  Confirm all necessary parties have signed

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 20

Planning Phase – Gate Review Project Management Life Cycle If Planning Approved:  Decision to proceed to the Analysis, Design & Development Phase Activities  Baseline Business Requirements  Acquire Project Team  Create Project Definition Document

 Resources can begin the planned work  Determination of artifacts required, participants required and/or action items for next phase  Meeting minutes with decisions made  Gate Review Approval Document

 Develop WBS - Schedule  Develop Communications Plan  Obtain Signed Contract(s)

If Planning Rejected:  If project cancelled, proceed to Closing Phase  Address planning issues and re-review  Meeting minutes with decisions made Plan Gate

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 21

Project Monitoring & Controlling Project Management Life Cycle Schedule / Resource Management

Change Management

• Monitoring activities & variation from dates

• Documenting & facilitating change requests

• Adding and updating action items • Document Management

• Guarding scope through disciplined change management

Stakeholder Management

Risk Management

• Status Reporting

• Risk register

• Communications

Triple Constraints

• Status reporting

Monitoring & Controlling

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 22

Change Management FAQs Project Management Life Cycle What change requests will go through process? - Schedule - Anything impacting committed deliverable dates.

Triple Constraints

- Costs - Anything increasing resources required. - Scope/Quality - Any requested change in the requirements.

Who approves changes? - The project owner can approve a change, if impact not significant. - The Change Review Board has ultimate authority. - In PMLC, the Gate Reviewers could be the Change Reviewers.

Where is this documented? - The plan, including the Change Reviewers, can be documented in PDD or separate Change Management Plan. - Change requests should be documented in a running log. Monitoring & Controlling

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 23

Analysis, Design & Development Phase - Process Project Management Life Cycle

Input Activities Gate Review

 Create Test Plan & Procedures  Create Deployment Plan  Complete System and / or Process Development  Complete Requirements Traceability Matrix

Authorize to begin Testing?

 Develop Service Level Agreement

Yes

No

 Update Project Schedule

Close or delay the project, Complete open development items

Project Manager Dev Gate

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 24

Analysis, Design & Development Phase - Activities Project Management Life Cycle

 Test Plan - Describes methodology and coordination of testing

Activities  Create Test Plan & Procedures  Create Deployment Plan  Complete System and / or Process Development

 Test Procedures - Describe the test scenarios and test cases to be executed as part of testing

 Complete Requirements Traceability Matrix  Develop Service Level Agreement  Update Project Schedule

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 25

Analysis, Design & Development Phase - Activities Project Management Life Cycle Test Plan Activities

 System / Process Testing Methodology

 Create Test Plan & Procedures

-

Test the integration of the development

-

Ensure development against Functional Specifications

 Create Deployment Plan  Complete System and / or Process Development

 User Acceptance Testing Methodology

 Complete Requirements Traceability Matrix  Develop Service Level Agreement  Update Project Schedule

Office of the Senior Associate Vice President for Finance

Idea

Proposal

-

Engages the users in testing the solution

-

Ensure development against Business Requirements

 Regression Testing Methodology

Planning

-

Re-tests the solution after fixing

-

Ensure nothing else was broken through fixing Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 26

Analysis, Design & Development Phase - Activities Project Management Life Cycle Test Procedures / Cases

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 27

Analysis, Design & Development Phase - Activities Project Management Life Cycle

Overall plan to deliver solution Activities  Create Test Plan & Procedures

 Cutover plan

 Create Deployment Plan

 Back out plan

 Complete System and / or Process Development

 Site preparation

 Complete Requirements Traceability Matrix

Office of the Senior Associate Vice President for Finance

 Develop Service Level Agreement

 Transition support

 Update Project Schedule

 Training

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 28

Analysis, Design & Development Phase - Activities Project Management Life Cycle

Activities  Create Test Plan & Procedures  Create Deployment Plan  Complete System and / or Process Development  Complete Requirements Traceability Matrix  Develop Service Level Agreement  Update Project Schedule

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 29

Analysis, Design & Development Phase - Activities Project Management Life Cycle

Activities  Create Test Plan & Procedures  Create Deployment Plan  Complete System and / or Process Development  Complete Requirements Traceability Matrix  Develop Service Level Agreement  Update Project Schedule

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 30

Analysis, Design & Development Phase - Activities Project Management Life Cycle Business Requirements

Functional Specification

Test Cases

BR3.1 – Adjustable slots capable of toasting both bread and bagels

Activities  Create Test Plan & Procedures

TO

 Create Deployment Plan

FS98.1.2 – Toaster slots expand between 1” and 2”

 Complete System and / or Process Development  Complete Requirements Traceability Matrix

FS98.2.5 – Tension mechanism will hold toaster slots together in order to secure contents during toasting

 Develop Service Level Agreement

TO

 Update Project Schedule

TC131.9 - Placing toast & bagel into toaster slots. Verify slot size & tension

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 31

Analysis, Design & Development Phase - Activities Project Management Life Cycle

Office of the Senior Associate Vice President for Finance

Idea

Proposal

1 Business Requirement Becomes 2 Functional Requirements Becomes Analysis, 5 Test CasesTesting & Planning Design & Development

Readiness

Post Go Live

Closing Page 32

Analysis, Design & Development Phase - Activities Project Management Life Cycle

Describes agreements between “customer” and “provider”

Activities  Create Test Plan & Procedures  Create Deployment Plan

 General support agreement

 Complete System and / or Process Development

 Hardware support agreements

 Complete Requirements Traceability Matrix

 Hardware performance agreement

 Develop Service Level Agreement  Update Project Schedule

Office of the Senior Associate Vice President for Finance

Idea

Proposal

 Disaster recovery agreement

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 33

Analysis, Design & Development Phase – Gate Review Project Management Life Cycle If Development Approved: Activities

 Decision to proceed to the Testing & Readiness Phase

 Create Test Plan & Procedures

 Determination of artifacts required, participants required and/or action items for next phase

 Create Deployment Plan

 Meeting minutes with decisions made

 Complete System and / or Process Development

 Gate Review Approval Document

 Complete Requirements Traceability Matrix  Develop Service Level Agreement  Update Project Schedule

If Development Rejected:  If project cancelled, proceed to Closing Phase  Address development issues and re-review  Meeting minutes with decisions made Dev Gate

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 34

PMLC “Lite” Project Management Life Cycle

PMLC “Lite”

Idea

Proposal

Planning

Analysis, Design , Development, Testing & Readiness

Post Go Live

Closing

Can be iterative development & test

Office of the Senior Associate Vice President for Finance

~With Executive Sponsor Approval~ Page 35

Testing & Readiness Phase - Process Project Management Life Cycle

Input Gate Review

Activities  Execute Test Plan & Procedures

GO LIVE?

 Compile Test Results  Track Issues to Resolution

Yes

 Begin Execution of Deployment Plan  Update Project Schedule

No

Project Manager GO LIVE

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Close or delay the project, Complete open issues Post Go Live

Closing Page 36

Testing & Readiness Phase - Process Project Management Life Cycle

Activities

 Ensuring System Ready for Test

 Execute Test Plan & Procedures

 UAT Coordination

 Compile Test Results

 Facilitation / Monitoring of Testing Efforts

 Track Issues to Resolution  Begin Execution of Deployment Plan  Update Project Schedule

 Gathering of Testing Results

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 37

Testing & Readiness Phase - Process Project Management Life Cycle

Activities  Execute Test Plan & Procedures  Compile Test Results  Track Issues to Resolution  Begin Execution of Deployment Plan  Update Project Schedule

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 38

Testing & Readiness Phase - Process Project Management Life Cycle

Activities  Execute Test Plan & Procedures  Compile Test Results  Track Issues to Resolution  Begin Execution of Deployment Plan  Update Project Schedule

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 39

Testing & Readiness Phase - Process Project Management Life Cycle

Activities  Execute Test Plan & Procedures  Compile Test Results  Track Issues to Resolution  Begin Execution of Deployment Plan  Update Project Schedule

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 40

Testing & Readiness Phase - Process Project Management Life Cycle  Have essential support and user personnel been trained? Activities  Execute Test Plan & Procedures

 Is site / hardware / software ready for Go Live?

 Compile Test Results  Track Issues to Resolution  Begin Execution of Deployment Plan  Update Project Schedule

 Have we communicated the pending changes to stakeholders?  Do we have a cutover and back out plan?

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 41

Testing & Readiness Phase - Process Project Management Life Cycle

Activities  Execute Test Plan & Procedures  Compile Test Results  Track Issues to Resolution  Begin Execution of Deployment Plan  Update Project Schedule

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 42

Testing & Readiness Phase – Gate Review Project Management Life Cycle If Testing & Readiness Approved:  Decision to GO LIVE with solution. Activities

 Determination of artifacts required, participants required and/or action items for next phase

 Execute Test Plan & Procedures

 Meeting minutes with decisions made

 Compile Test Results

 Gate Review Approval Document

 Track Issues to Resolution  Begin Execution of Deployment Plan

If Testing & Readiness Rejected:

 Update Project Schedule

 If project cancelled, proceed to Closing Phase  Address open issues and re-review  Meeting minutes with decisions made GO LIVE

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 43

Post Go Live Phase - Process Project Management Life Cycle

Input Gate Review

Activities  Monitor Post Go Live Activity

Move to Close Project?

 Complete Deployment Actions

Yes

 Prepare Transition Plan No

Resolve open Issues

Project Manager

Post Gate

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 44

Post Go Live Phase - Process Project Management Life Cycle  Provide support after system / process changes deployed Activities  Monitor Post Go Live Activity

 Document, track and monitor issues and resolutions  Escalate as necessary

 Complete Deployment Actions  Prepare Transition Plan

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 45

Post Go Live Phase - Process Project Management Life Cycle

 Complete user and administrator training Activities  Monitor Post Go Live Activity  Complete Deployment Actions



 Ensure all user and administrator documentation is complete and accessible

 Prepare Transition Plan

 Close any issues remaining from Go Live

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 46

Post Go Live Phase - Process Project Management Life Cycle

Activities  Monitor Post Go Live Activity  Complete Deployment Actions  Prepare Transition Plan

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 47

Post Go Live Phase – Gate Review Project Management Life Cycle

If Decision to Move to Closing Approved:  Project Transition Plan approved, project moves to closing phase Activities  Monitor Post Go Live Activity  Complete Deployment Actions

 Determination of artifacts required, participants required and/or action items for next phase  Meeting minutes with decisions made

 Prepare Transition Plan

If Decision to Move to Closing Rejected:  Address deployment issues and re-review  Meeting minutes with decisions made Post Gate

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 48

PMLC “Lite” Project Management Life Cycle

PMLC “Lite”

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live & Closing

Move to closing after Go Live.

Office of the Senior Associate Vice President for Finance

~With Executive Sponsor Approval~ Page 49

Closing Phase - Process Project Management Life Cycle

Input Gate Review

Activities  System/Process Support Handed to Operations

Yes

Close Project?

 Project Lessons Learned  Project Financial Review  Archive Project Artifacts

No

Resolve open Issues Project Manager Close Gate

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 50

Closing Phase - Process Project Management Life Cycle  Transition process / system support to operation group  Hand off open project issues

Activities  System/Process Support Handed to Operations

 Notify stakeholders of the transition

 Project Lessons Learned  Project Financial Review  Archive Project Artifacts

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 51

Closing Phase - Process Project Management Life Cycle

Activities  System/Process Support Handed to Operations  Project Lessons Learned  Project Financial Review

 Facilitate Project Team & Stakeholder Meeting

 Archive Project Artifacts

 Document lessons learned by project phase Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 52

Closing Phase - Process Project Management Life Cycle

$

Activities  System/Process Support Handed to Operations  Project Lessons Learned  Project Financial Review

 Compare initial project budget with actual expenditures

 Archive Project Artifacts

 Assess benefits achieved Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 53

Closing Phase - Process Project Management Life Cycle  Organize and file all project artifacts  Communicate archiving location to stakeholders

Activities  System/Process Support Handed to Operations  Project Lessons Learned  Project Financial Review  Archive Project Artifacts

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 54

Closing Phase - Process Project Management Life Cycle

If Decision to Close Project Approved: Activities  System/Process Support Handed to Operations

 Close the project  Meeting minutes with decisions made

 Project Lessons Learned  Project Financial Review

If Decision to Close Project Rejected:

 Archive Project Artifacts

 Address open issues and re-review  Meeting minutes with decisions made

Close Gate

Office of the Senior Associate Vice President for Finance

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing Page 55

Project Closed Project Management Life Cycle

Idea

Proposal

Planning

Analysis, Design & Development

Testing & Readiness

Post Go Live

Closing

Office of the Senior Associate Vice President for Finance

Page 56