PROGRAM QUALITY PLAN

DOCUMENT NO. PQP – NUCLEAR Revision 3

NUCLEAR SERVICES

Prepared by Southwest Research Institute® Institute Quality Systems

April 2010

®

Southwest Research Institute 6220 Culebra Road P. O. Drawer 28510 San Antonio, TX 78228-0510

PROGRAM QUALITY PLAN DOCUMENT NO. PQP

-

NUCLEAR

Revision 3

NUCLEAR SERVICES

Revision 3: QSM references updated in line with ISO 9001:2008 and SwRI QSM Revision 3.

Prepared by:

Date: ~ 22,

Reviewed by:

Date:

_____________

Date:

__________

Approved by:

/1

U:\CC3O\QDOC\QSMDOC\NUCLEAR\MASTER\pQP NUCEAR.DOCX

~

Southwest Research Institute® Program Quality Plan

PQP – Nuclear Revision 3 Page ii

TABLE OF CONTENTS

1.0

INTRODUCTION .............................................................................................................1

2.0

SCOPE............................................................................................................................1

3.0

APPLICABLE SECTIONS OF THE QSM ........................................................................1

4.0

SUPPLEMENTAL REQUIREMENTS ..............................................................................1

4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18

Indoctrination and Training ........................................................................ 1 Qualification of Personnel .......................................................................... 2 Design Control ........................................................................................... 3 Right of Access .......................................................................................... 4 Control of Supplier–Generated Documents ............................................... 4 Acceptance of Services Only ..................................................................... 4 Commercial Grade Items ........................................................................... 5 Identification and Control of Items ............................................................. 6 Control of Special Processes ..................................................................... 7 Inspection .................................................................................................. 7 Inspection and Testing ............................................................................... 7 Control of Measuring and Test Equipment................................................. 7 Handling, Storage, Packaging, Preservation, and Delivery........................ 8 Inspection,Test, and Operating Status ....................................................... 8 Control of Nonconforming Items ................................................................ 8 Quality Assurance Records .......................................................................... 8 Audits ....................................................................................................... 10 10CFR, Part 21 ........................................................................................ 11

Appendix A 10CFR50B/NQA-1 to QSM Correspondence Table .............................. A1

Southwest Research Institute® Program Quality Plan

1.0

PQP – Nuclear Revision 3 Page 1 of 11

INTRODUCTION This program quality plan (PQP) defines the Quality Assurance (QA) program requirements for personnel providing engineering, analytical, testing, or other services to the nuclear and radiation related industries. The QA requirements shall be implemented through the use of this plan in conjunction with the Southwest Research Institute® (SwRI®) Quality System Manual (QSM). Project activities controlled by this program shall be accomplished through the application of the appropriate operating procedures and work instructions found within each of the divisions/departments/sections conducting work in support of the nuclear industry. Upon notification of the initiation of project activities, Institute Quality Systems (IQS) or the appropriate management representative shall determine if this PQP shall be applied. If, due to complexity, duration, or other factors, it is determined that a unique, project-specific project quality plan is required, a plan shall be generated in accordance with the applicable document control procedures.

2.0

SCOPE Unless otherwise determined or specified, this PQP shall be applied to any services performed by SwRI where required by contract to meet 10CFR50 Appendix B, ASME NQA-1, or other related quality standard(s). This document supplements the requirements of the SwRI QSM written to the requirements of ISO 9001. SwRI maintains a quality management system meeting the requirements of ISO 9001 and supplements additional requirements through the use of program- or project-specific quality plans. Other standards related to the nuclear or radiation industries may also be addressed by incorporating the applicable requirements within a project-specific quality plan.

3.0

APPLICABLE SECTIONS OF THE QSM The QSM contains elements or clauses that correspond to the 18-point criteria of 10CFR50 Appendix B and NQA-1 as shown in Appendix A. In general, the elements of ISO 9001, apply to this system as supplemented in this quality plan.

4.0

SUPPLEMENTAL REQUIREMENTS The following requirements are in addition to those of the SwRI QSM. In the event of a conflict between these requirements and those of the QSM, these requirements supersede those of the QSM. References to NQA-1 requirements apply to the 1997 edition. 4.1

Indoctrination and Training (Ref. NQA-1, Requirement 2) Personnel performing or managing activities affecting quality shall receive indoctrination in their job responsibilities and authority. The indoctrination and

Southwest Research Institute® Program Quality Plan

PQP – Nuclear Revision 3 Page 2 of 11

training shall be commensurate with scope, complexity, importance of the activities, and the education, experience, and proficiency of the person. 4.1.1 Indoctrination Personnel performing or managing activities affecting quality shall receive indoctrination in their job responsibilities and authority; general criteria, including applicable codes and standards; regulatory commitments; company procedures; and QA program requirements. 4.1.2 Training The need for a formal training program for personnel performing or managing activities affecting quality shall be determined. Training shall be provided, if needed, to achieve initial proficiency, maintain proficiency, and adapt to changes in technology, methods, or job responsibilities. 4.2

Qualification of Personnel (Ref. NQA-1, Requirement 2) 4.2.1 Inspection and Test Personnel When inspection and/or test personnel are required to be formally qualified and certified, they shall be qualified and certified in accordance with the division or department procedures which shall address, as a minimum: 1) qualification requirements; 2) personnel selection and experience; 3) training requirements; 4) determination of initial capability; 5) evaluation of performance; 6) physical requirements; and 7) certification record. The initial capabilities of a candidate shall be determined by an evaluation of the candidate’s education, experience, training, and either test results or capability demonstration. The job performance of inspection and test personnel shall be re-evaluated at periodic intervals not to exceed three years. Re-evaluation shall be by evidence of continued satisfactory performance or re-determination of capability in accordance with the requirements in Paragraph 4.1 of this document. If, during this evaluation

Southwest Research Institute® Program Quality Plan

PQP – Nuclear Revision 3 Page 3 of 11

or at any other time, it is determined by the responsible organization that the capabilities of an individual are not in accordance with the qualification requirements specified for the job, that person would be removed from that activity until such time as the required capability has been demonstrated. Any person who has not performed inspection or testing activities in the qualified area for a period of one year shall be reevaluated. 4.2.2 Quality Assurance Audit Personnel The qualification of QA audit personnel shall be accomplished in accordance with written procedures. This procedure shall establish the personnel qualifications for the certification of QA auditors and lead auditors, and the requirements for use of technical personnel to accomplish the internal or external auditing of the SwRI nuclear QA program. 4.2.3 Records Records of the implementation of indoctrination and training may take the form of attendance sheets, training logs, or personnel training records. Records of qualification, including re-qualification, for auditors and lead auditors, and for inspection and test personnel shall be established and maintained by IQS for indoctrination and training. 4.3

Design Control (Ref. NQA-1, Requirement 3) Design adequacy shall be verified by individuals other than those who designed the item. 4.3.1 Change Control a) Changes to design inputs, final designs, field changes, and temporary and permanent modifications shall be justified and subject to design control measures commensurate with those applied to the original design. These measures shall include evaluation of effects of those changes on the overall design and on any analyses upon which the design is based. The evaluation shall include facility configurations that occur during operation, maintenance, test, surveillance, and inspection activities. The design organization approving the change shall have demonstrated competence in the specific design area of interest, and have an adequate understanding of the requirements and intent of the original design. b) When a design change is approved other than by revision to the affected design documents, measures shall be established to incorporate the change into these documents, where such incorporation is approprpiate.

Southwest Research Institute® Program Quality Plan

c)

PQP – Nuclear Revision 3 Page 4 of 11

Where a significant design change is necessary because of an incorrect design, the design process and verification procedure shall be reviewed and modified as necessary.

4.3.2 Control of Software Software design controls (NQA-1, Requirement 3, Paragraph 800) are not implemented in this program. SwRI does not design software for its nuclear industry customers. Software controls are implemented by SwRI, but are limited to the software used for testing purposes as described in the QSM, Section 7.6, and the applicable division procedures. 4.4

Right of Access (Ref. NQA-1, Requirement 4) The procurement documents shall provide for access to the suppliers’ and subtier suppliers’ facilities and records for surveillance, inspection, or audit by SwRI, its designated representative, and others authorized by SwRI.

4.5

Control of Supplier–Generated Documents (Ref. NQA-1, Requirement 7) Controls shall be implemented to assure that the submittal and evaluation of supplier-generated documents are accomplished in accordance with the procurement document requirements. These controls shall provide for the acquisition, processing, and recorded evaluation of the quality assurance, technical, inspection, and test documentation or data against acceptance criteria.

4.6

Acceptance of Services Only (Ref. NQA-1, Requirement 7) In cases involving procurement of services only, such as third-party inspection; engineering and consulting services; auditing; and installation, repair, overhaul, or maintenance work, the purchaser shall accept the service by any or all of the following methods: a) technical verification of data produced; b) surveillance and/or audit of activity; or c) review of objective evidence for conformance to the procurement document requirements. 4.6.1 Certificate of Conformance When a Certificate of Conformance is used, the following shall apply:

Southwest Research Institute® Program Quality Plan

PQP – Nuclear Revision 3 Page 5 of 11

a) The certificate shall identify the purchased materials or equipment, such as by the purchase order number. b) The certificate shall identify the specific procurement requirements met by the purchased material or equipment, such as codes, standards, and other specifications. This may be accomplished by including a list of the specific requirements or by providing, on-site, a copy of the purchase order and the procurement specifications or drawings, together with a suitable certificate. The procurement requirements identified shall include any approved changes, waivers, or deviations applicable to the material or equipment. c) The certificate shall identify any procurement requirements that have not been met together with an explanation and the means for resolving the nonconformances. d) The certificate shall be signed or otherwise authenticated by a person who is responsible for this quality assurance function and whose function and position are described in the Purchaser’s or Supplier’s quality assurance program. e) The certification system, including the procedures to be followed in filling out a certificate and the administrative procedures for review and approval of the certificates, shall be described in the Purchaser’s or Supplier’s quality assurance program. f) Means shall be provided to verify the validity of supplier certificates and the effectiveness of the certification system, such as during the performance of audits of the supplier or independent inspection or test of the items. Such verification shall be conducted by the Purchaser at intervals commensurate with the Supplier’s past quality performance. 4.7

Commercial Grade Items (Ref. NQA-1, Requirement 7) An item shall be considered “commercial grade” where it is to be incorporated into a deliverable to a customer and that item is: 1) not subject to design or specification requirements that are unique to nuclear facilities; 2) used in applications other than nuclear facilities; and 3) to be ordered from the manufacturer/supplier on the basis or specifications set forth in the manufacturers’ published product and description.

Southwest Research Institute® Program Quality Plan

PQP – Nuclear Revision 3 Page 6 of 11

The following requirements may be used as an acceptable alternative for procuring and accepting commercial grade items: a) The commercial grade item is identified in an approved design output document. An alternate commercial grade item may be applied, provided the cognizant design organization provides verification that the alternate commercial grade item will perform the intended function and will meet design requirements applicable to both the replaced item and its application. b) Source evaluation and selection, where determined necessary by SwRI based on complexity and importance to safety, shall be in accordance with Section 200 of NQA-1, Requirement 7. c) Commercial grade items shall be identified in the purchase order by the manufacturer’s published product description (for example, catalog number.) d) One, or a combination, of the following methods shall be utilized to provide reasonable assurance that the item meets the acceptance criteria for the characteristics identified to be verified for acceptance: 1) special test(s) or inspection(s), or both; 2) commercial grade survey of the supplier; 3) source verification; and/or 4) acceptable supplier/item performance records. e) Prior to acceptance of a commercial grade item, the purchaser shall determine that: 1) damage was not sustained during shipment; 2) the item has satisfied the specified acceptance criteria; and 3) specified documentation, as applicable to the item, was received and is acceptable. 4.8

Identification and Control of Items (Ref. NQA-1, Requirement 8) Items having limited calendar or operating lifecycles shall be identified and controlled to preclude use of items whose shelf life or operating life has expired.

Southwest Research Institute® Program Quality Plan

4.9

PQP – Nuclear Revision 3 Page 7 of 11

Control of Special Processes (Ref. NQA-1, Requirement 9) For special processes not covered by existing codes and standards or where quality requirements specified exceed those of existing codes or standards, the necessary requirements for qualification of personnel, procedures, or equipment shall be specified or referenced in procedures or instructions.

4.10

Inspection (Ref. NQA-1, Requirement 10) Inspection for acceptance shall be performed by qualified persons other than those who performed or directly supervised the work being inspected. Final inspections shall include a records review of the results and resolution of nonconformances identified by prior inspections. Sampling procedures, when used, shall be based upon valid statistical methods.

4.11

Inspection and Testing (Ref. NQA-1, Requirement 11) Required tests shall be conducted under appropriate environmental conditions using the tools and equipment necessary to conduct the test in a manner to fulfill test requirements and acceptance criteria. If temporary changes to the approved configuration of a facility are required for testing purposes, approval by the design authority is required prior to performing the test. Test procedures shall include or reference: 1)

Configuration and objectives;

2)

Prerequisites and environmental conditions; and

3)

Adequate and calibrated instrumentation, equipment, and monitoring and data acquisition devices.

As an alternative to the test procedures specified above, appropriate sections of related documents, such as ASTM methods, supplier manuals, equipment maintenance instructions, or approved drawings for travelers with acceptance criteria, can be used. 4.12

Control of Measuring and Test Equipment (Ref. NQA-1, Requirement 12) Measuring and test equipment shall be properly handled and stored to maintain accuracy. Calibration and control measures are not required for commercial equipment such as rulers, tape measures, levels, etc., if such equipment provides the required accuracy.

Southwest Research Institute® Program Quality Plan

4.13

PQP – Nuclear Revision 3 Page 8 of 11

Handling, Storage, Packaging, Preservation, and Delivery (Ref. NQA-1, Requirement 13) Where appropriate to the item or material, controls shall be included for cleaning and any special protective environments. Special handling tools and equipment shall be utilized and controlled where necessary. Operators of special handling and lifting equipment shall be experienced or trained in the use of the equipment.

4.14

Inspection, Test, and Operating Status (Ref. NQA-1, Requirement 14) The authority for application and removal of tags, markings, labels, and stamps shall be specified.

4.15

Control of Nonconforming Items (Ref. NQA-1, Requirement 15) Personnel performing evaluations to determine a disposition shall have demonstrated competence in the specific area they are evaluating, shall have an adequate understanding of the requirements, and shall have access to pertinent background information. A disposition, such as use-as-is, reject, repair, or rework of nonconforming items shall be made and documented. Technical justification for the acceptance of a nonconforming item dispositioned repair or use-as-is shall be documented.

4.16

Quality Assurance Records (Ref. NQA-1, Requirement 17) Quality Assurance records shall furnish documentary evidence that items or activities meet specified quality requirements. QA records shall be identified, generated, authenticated, and maintained, and their final disposition specified. Requirements and responsibilities for these activities shall be documented. The term records used throughout this section is to be interpreted as quality assurance records. 4.16.1

Generation of Records Records shall be traceable to associated items and activities and accurately reflect the work accomplished or information required.

4.16.2

Authentication of Records Documents shall be considered valid records only if stamped, initialed, or signed and dated by authorized personnel or otherwise authenticated.

Southwest Research Institute® Program Quality Plan

4.16.3

PQP – Nuclear Revision 3 Page 9 of 11

Classification Records shall be classified as lifetime or nonpermanent by the owner, or his agent when authorized, in accordance with the criteria given in the paragraphs below. Lifetime Records Lifetime records are those that meet one or more of the following criteria: a) those that would be of significant value in demonstrating capability for safe operation; b) those that would be of significant value in maintaining, reworking, repairing, replacing, or modifying an item; c)

those that would be of significant value in determining the cause of an accident or malfunction of an item; and/or

d) those that provide required baseline data for in-service inspections Lifetime records are required to be maintained by or for the plant owner for the life of the particular item while it is installed in the plant or stored for future use. Nonpermanent Records Nonpermanent records are those required to show evidence that an activity was performed in accordance with the applicable requirements, but need not be retained for the life of the item because they do not meet the criteria for lifetime records. 4.16.4

Receipt of Control and Retention of Records Records shall be retained in accordance with the above classifications. The retention period for nonpermanent records shall be established in writing. Each organization responsible for the receipt of records shall designate a person or organization responsible for receiving the records. The designee shall be responsible for organizing and implementing a system of receipt control of records for permanent and temporary storage.

4.16.5

Storage Records shall be stored in facilities, containers, or a combination thereof, constructed and maintained in a manner that minimizes the risk of damage or destruction from the following:

Southwest Research Institute® Program Quality Plan

PQP – Nuclear Revision 3 Page 10 of 11

1) natural disasters such as winds, floods, or fires; 2) environmental conditions such as high and low temperatures and humidity; and 3) infestation of insects, mold, or rodents. Dual facilities, containers, or combination thereof, shall be provided for records storage if a single facility, container, or combination thereof, is not capable of providing adequate protection. 4.16.6

Disposition 1) Custodian shall inventory submittals, acknowledge receipts, and process the records. 2) Records retention periods shall be documented. 3) Records shall be maintained for their retention periods.

4.16.7

Maintenance of Records The methods for record changes shall be documented. Provisions shall be made for specially processed records (such as radiographs, photographs, negatives, microform, and magnetic and optical media) to prevent damage from excessive light, stacking, electromagnetic fields, temperature, and humidity.

4.17

Audits (Ref. NQA-1, Requirement 18) The contents of the audit report shall: 1)

Describe the audit scope;

2)

Identify auditors and persons contacted;

3)

Summarize audit results, including a statement on the effectiveness of the elements audited; and

4)

Describe each reported adverse audit finding.

Southwest Research Institute® Program Quality Plan

4.18

PQP – Nuclear Revision 3 Page 11 of 11

10CFR, Part 21 4.18.1 Reporting of Defects and Noncompliance SwRI procurement documents shall include SwRI requirements for reporting and approving disposition of supplier nonconformances and, when required, compliance to 10CFR, Part 21. The manager of Institute QA or director of IQS shall determine if a nonconforming condition is reportable under 10CFR, Part 21, and shall initiate reporting and condition in accordance with SwRI Operating Policies and Procedures, OPP 9.1.5. Safety hazards or defects that could create a substantial safety hazard shall be reported. Substantial safety hazard means a loss of safety function to the extent that there is a major reduction in the degree of protection provided to public health and safety.

Southwest Research Institute® Program Quality Plan

PQP-Nuclear Revision 3 Page A1 of A2

Appendix A 10CFR50B/NQA-1 to SwRI QSM Correspondence Table 18-Point Criteria 1

Title Organization

Subject Area(s) or Quality Element Responsibility for QA program Senior management responsibility Responsibility for ensuring quality Verification of quality Delegation Interface control

2

Quality Assurance Program

3

Design Control

4

Procurement Document Control

5 6 7

Instructions, Procedures, and Drawings Document Control Control of Purchased Items and Services

8

Identification and Control of Items

9

Control of Special Processes

QA Program planning, implementation and maintenance Detection and correction of quality problems Management Review Indoctrination, Training and Qualification Competence, training and awareness Job performance Qualification requirements Design control Design inputs Design changes Design process Design analysis Design verification Design change control Interface control Design documentation and records Procurement document requirements Procurement document review Instructions, Procedures, and Drawings Preparation, issue and change of documents Supplier evaluation Bid evaluation Supplier generated documents Methods of acceptance Certificate of conformance Source verification Receiving inspection Post-installation testing Acceptance of items or services Nonconformance control Commercial grade items Establishing and maintaining identification Item identification Physical identification Identification and traceability of items Limited life items Maintaining identification of stored items Personnel qualification Process control Responsibility Records

Corresponding QSM Section 5.5 5.1 5.3 5.5 5.5 5.3, 4.1, Appendix A PQP-N, 4.1, 5.3, 5.4.2, 8.1 8.2 5.6 PQP-N, 6.2, 5.3 PQP-N PQP-N PQP-N, 6.2 PQP-N, 7.3 7.3 7.3 7.3 7.3 7.3 PQP-N, 7.3 7.3 7.5.3, 4.2.4 PQP-N, 7.4.2 7.4.2 4.2.3 4.2.3 7.4 7.4 PQP-N 7.4 PQP-N 7.4 7.4 7.4 PQP-N 8.3 PQP-N 7.5.3 7.5.3 7.5.3 7.5.3 PQP-N 7.5.3 7.5.3 PQP-N, 7.5.3 7.5.3 4.2.4

Southwest Research Institute® Program Quality Plan

18-Point Criteria 10

Title Inspection

11

Test Control

12

Control of Measuring and Test Equipment

13

Handling, Storage, and Shipping

14

Inspection, Test, and Operation Status

15

Control of Nonconforming Items

16 17

Corrective Action Quality Assurance Records

18

Audits

PQP-Nuclear Revision 3 Page A2 of A2

Subject Area(s) or Quality Element Requirements Inspection hold points Planning Sampling In-process inspection Final inspection, nonconformance resolution, modifications, repairs, or replacements Inspection records Test requirements Test procedures Computer program test procedures Test records Control Selection Calibration Corrective action Handling and storage Status indication Commercial devices Records Procedures Special requirements Handling and lifting equipment Marking or labeling Inspection and test status Operating status Nonconforming item control Identification Segregation Disposition control Disposition responsibility and authority Disposition Reexamination Corrective action Quality assurance records Record authentication Classification of records Record retention Record storage Audit program Schedule Audit plan Audit team Audit performance Audit reporting Audit response Audit follow-up

Corresponding QSM Section PQP-N, 7.1, 7.4.3, 8.2.4 7.1 7.1 PQP-N 8.2.4 PQP-N, 8.2.4 8.2.4 PQP-N, 7.0 PQP-N PQP-N 7.2, 4.2.4 7.6 7.6 7.6 8.5.2 PQP-N 7.6 PQP-N 7.6 7.5.5 7.5.5 PQP-N, 7.5.5 7.5.5 PQP-N, 7.5.3, 8.3 Not applicable 8.3 8.3 8.3 8.3 PQP-N, 8.3 PQP-N, 8.3 8.3 8.5.2 PQP-N, 4.2.4 PQP-N PQP-N PQP-N PQP-N, 4.2.4 8.2.2 8.2.2 8.2.2 8.2.2 8.2.2 PQP-N, 8.2.2 8.2.2 8.2.2