Predicted uncertainty Tecnomatix Plant Simulation

Ir. Auke Nieuwenhuis/ 26 May 2015

Agenda

• Introduction to Kahoot • Tecnomatix Plant Simulation Introduction

• Plant Simulation Case Studies • Q&A

Restricted © cards PLM Solutions 2015 All rights reserved. Page 2

29-May-15

Go to Kahoot

• • • •

Access WIFI network ‘WLAN-PUB’ Go to www.kahoot.it Enter the game PIN (will follow) And join the quiz

Restricted © cards PLM Solutions 2015 All rights reserved. Page 3

29-May-15

Predicted uncertainty

Tecnomatix Plant Simulation Introduction

Restricted © cards PLM Solutions 2015 All rights reserved. Page 4

29-May-15

Principle Process Simulation WHAT? • Transparent analysis of dynamic and complex systems • Optimization of process, capacity, lay-out, management and control • Intelligent support of investments

• Virtual process model with real process data

Existing or new system

Restricted © cards PLM Solutions 2015 All rights reserved. Page 5

29-May-15

Simulation model

Experiments and results

How to Design a New System? Dimensioning: Buffers, machines, #operators?

Process flow: Order of process steps, decoupling points?

Design goals: •

Predictive behavior, reliability



Maximize system performance



Minimize effort and investment



Documents and communicate

Control: Who produces what, when, which resoures, pull or push? Restricted © cards PLM Solutions 2015 All rights reserved. Page 6

29-May-15

Lay-out: Optimal location for machines, buffers, operators, supply-chain?

In- and Output Simulation Model Input •

Lay-out



Product mix, order pattern



Routings



Timings: set-ups, processing, MTBF, MTTR



Capacities



Planning, planning rules



Failures

Restricted © cards PLM Solutions 2015 All rights reserved. Page 7

29-May-15

Simulation Model Dimensining: Buffers, machines, #operators

Control: Who, what, when, pull or push?

Process flow: Process flow, decoupling points?

Lay-out: optimal location resources?

Output •

Efficiency



Utillization



Waiting times



Throughput times



Costs



Revenue



Visualisation 2D/3D

Typical Users Plant Simulation WHAT? • Manufacturing companies • Logistics service providers (3pl, warehousing, distribution, supply chain management)

• System suppliers and machine builders (material handling, process lines, etc.) • Consultancy and engineering • Retailers

• Healthcare • Shipyards • Airports, mainports & terminals

• Government (rail, water, road traffic) and defense

Restricted © cards PLM Solutions 2015 All rights reserved. Page 8

29-May-15

Typical Users Plant Simulation WHAT? • High level design • Conceptual • Schematic and flow based simulation • Low level of visualization, mainly for simulation purposes • High detail design • PLC • Operational system based simulation • High level of visualization, 3D, visualization also for communication purposes

Restricted © cards PLM Solutions 2015 All rights reserved. Page 9

29-May-15

Advantages of Process Simulation WHAT? • Early detection and elimination of problems • Risk-free experimental environment • Test en compare of alternatives • Minimize investments • Optimize performance • Increase process understanding with visualization • Support on management decisions

Restricted © cards PLM Solutions 2015 All rights reserved. Page 10

29-May-15

Business Issues Plant Simulation WHAT? • Increase volumes and / or efficiency. Can it be done with current process or are investments required? If investment is required, where to invest?

• Where to invest and what improvements can be expected? • Eliminate the effect of the bottleneck within the system • Dynamic modelling with every day uncertainties. Other tools are static and not visual, it is difficult to understand results or to share them with management and operators • What should the factory of the future look like and is the system flexible to cope with demand and product mix of the future? • Daily planning of resources is fuzzy and general

Restricted © cards PLM Solutions 2015 All rights reserved. Page 11

29-May-15

Business Drivers Plant Simulation WHAT? • Savings on investments > 5-15%

• Decrease start up costs > 5-20% • Increase volumes > 15-20% • Decrease stock and throughput times > 20-60%

• Rule of Thump: 1 euro invested in simulation will return 12 euro!

Restricted © cards PLM Solutions 2015 All rights reserved. Page 12

29-May-15

Plant Simulation Software Solution Data fit

2D, 3D, CAD, FactoryCAD

Generic modelling objects

Modeling

Data analyze

Simulation

Visualization

Generic Simulation Tools Statistic Wizard, Bottleneck Analyzer, Sankey chart, Attribute Explorer, Gantt Wizard

Process analyze

Generic Algorithm, Optimization Wizard, Layout Optimizer, Neural Networks, Sequencing Wizard

Optimization

Experiment Manager, Neutral Networks, Factor Analysis, Automatic Experiment Generation

Experiment Draft

PLC Testing, OPC Server

Process Automation

Restricted © cards PLM Solutions 2015 All rights reserved. Page 13

29-May-15

13

Users Plant Simulation WHAT? Automotive OEMs

System Suppliers

Machine Builders

Shipyards

Audi Autovaz BMW DaimlerChrysler Honda Mazda Mitsubishi Nissan PSA Rolls-Royce Suzuki Vauxhall Volkswagen

Bosch EBM Papst Faurecia Hella Magna Modine Recticell SKF St. Gobain ZF

Comau Duerr Eisenmann Hoermann ibk Krones Kuka Nothelfer Thyssen Krupp TMS Voest Alpine

Babkock Chantier de l’Atlantique Fincantieri Flensburger Schiffsbau Gesellschaft Kockums Kvaerner Warnow Werft Meyer Werft Papenburg Thyssen Nordseewerke

Restricted © cards PLM Solutions 2015 All rights reserved. Page 14

29-May-15

Users Plant Simulation WHAT? Engineering

Airports

DRC EDAG Fraunhofer Icarus Industrie Planung Fischer Isilog Life Sciences Logplan Pitotech PPI Protema

Dallas Denver Frankfurt Munich Schipol Aviation Airbus Rolls-Royce MTU BAE Systems Fairchild Dornier

Restricted © cards PLM Solutions 2015 All rights reserved. Page 15

29-May-15

Heavy Industry

Process Industry

Caterpillar Freightline Volvo Trucks MAN Iveco Daimler Chrysler Trucks DAF Trucks Mack Trucks

BASF Bayer Ciba Henkel Proctor & Gamble Ratiopharm Wacker Semiconductor

Logistics SSI Schaefer Duerr Hoermann psb UPS PPI iSILOG Healthcare Erasmus MC LUMC Vreelandgroep AMC UMCG

DAF Trucks Challenges • Simulation of a complex production line • Check the proposed investments • Optimization of the batch sizes and automation rules Approach • Plant Simulation software (realistic and complete model) • Customized training for DAF Trucks personnel • Modelling done by DAF Trucks users Results • Very accurate and realistic models of a complex line • Investment in additional production equipment not necessary (€ 800.000 saving) • Extension of material handling necessary to reduce and relieve manual tasks • Highly improved knowledge of the production process Restricted © cards PLM Solutions 2015 All rights reserved. Page 16

29-May-15

Procter & Gamble - warehousing Challenges • Simulation of several newly build warehouses world wide • Optimization of strategies and early validation • Required capacity definition Approach • Plant Simulation software (realistic and complete model) • Warehousing and Logistics Library • Modelling and simulation done by cards, result analysis by cards and P&G Results • Investment of construction work reduced to minimum • Early identification of bottlenecks and precise elimination if needed • Reduce startup time for new processes Restricted © cards PLM Solutions 2015 All rights reserved. Page 17

29-May-15

Constellation Brands – Corona case 1 Challenges • Simulation of LGV transportation from bottle and can filling lines to the ASRS • Over 100 LGVs work in a tight and limited space • Validation that the proposed system can work Approach • Plant Simulation software (realistic and complete model) • Warehousing and Logistics Library • Modelling and simulation by cards, result analysis by cards en CBi Results • Savings on the number of LGVs needed (over $450.000 savings) • Allocation algorithm of LGV trip improved • In depth knowledge on system behavior during the implementation (predictive) Restricted © cards PLM Solutions 2015 All rights reserved. Page 18

29-May-15

Constellation Brands – Corona case 2 Challenges • Simulation of train movements around brewery • Over 360 train lorry movements per day • Stress test and sensitivity analysis of train movements and connected processes Approach • Plant Simulation software (realistic and complete model) • Modelling and simulation by cards, result analysis by cards and CBi Results • Define the maximum process timing of the sub-processes • Define the daily throughput and relocation of the train lorries • Improve the negotiation position of CBi with the train operator

Restricted © cards PLM Solutions 2015 All rights reserved. Page 19

29-May-15

Nuplex Challenges • Simulation of a continuous flow process • Increase of the capacity of a complete plant • Validate the effect the proposed of investments Approach • Plant Simulation software (realistic and accurate model) • Runtime model and user interface • Modelling done by cards, simulation done by cards and Nuplex Results • Realistic and accurate model of a continuous process • Nuplex gets the maximum benefit of their investments at lowest cost • Strong increase in process knowledge

Restricted © cards PLM Solutions 2015 All rights reserved. Page 20

29-May-15

Marel Challenges • Simulation of two alternative welding robots • Proof the need for the robot cell with the expected growth Approach • On site modelling of the two options with the same input data • Modelling done by cards, simulation done by cards and Marel Results • Models proofs by quantitive and qualitative numbers what cell is preferred with respect of throughput and WIP • Model demonstrates the importance of throughput and WIP

Restricted © cards PLM Solutions 2015 All rights reserved. Page 21

29-May-15

Questions?

Restricted © cards PLM Solutions 2015 All rights reserved. Page 22

29-May-15

International user meeting Upcoming events

Plant Simulation International User Meeting Siemens offices, Stuttgart, Germany June 16 and 17 Complementary

Plant Simulation Warehouse and Logistics training Siemens offices, Stuttgart, Germany June 18 Complementary

Restricted © cards PLM Solutions 2015 All rights reserved. Page 23

29-May-15

Contact Auke Nieuwenhuis Business Development cards PLM Solutions De Maas 22a | 5684PL Best T: +31 499 371990 | F: +31 499 372690 | M: +31 6 224 85984 [email protected] | www.cardsplmsolutions.com

From good to great, from great to Best. Restricted © cards PLM Solutions 2015 All rights reserved. Page 24