PARADOX SERIES PDX4 LOW VOLTAGE AND LINE VOLTAGE INSTALLATION INSTRUCTIONS
Installation should be performed by a qualified electrician in accordance with the National Electrical Code and relevant local codes.
FOR INSTALLATION IN CONCRETE: 1. Dig a hole to appropriate depth allowing for rough-in-section to be secured to conduit. PDX4 MR16/MR11 AND LED LINE VOLTAGE
PDX4 MR16/MR11 AND LED LOW VOLTAGE
Door Screws Door Screws Flush Pour Shield/ Temporary Cover Plate Flush Pour Shield/ Temporary Cover Plate
Rough-in-Section (RIS) Rough-in-Section (RIS)
2. Mount rough-in-section (RIS) with top of temporary pour shield at grade level. ENLARGED DETAIL WITH TEMPOARY COVERPLATE/POUR SHIELD
ENLARGED DETAIL WITH DOOR INSTALLED
Pour Screw Door
Flush Pour Shield/ Temp Cover
Finish Grade (Concrete Pour)
Finish Grade (Concrete Pour)
Rough-In Section (RIS) Rough-In Section (RIS)
Finish Grade (Concrete Pour)
Rough-In Section BEFORE Pouring Finish Grade
©2008 Acuity Brands Lighting, Inc. Rev. 7/31/08 INS-PDX4_REV0
Finish Grade (Concrete Pour)
Rough-In Section AFTER Pouring Finish Grade
NOTE: HYDREL RESERVES THE RIGHT TO MODIFY SPECIFICATION WITHOUT NOTICE. Any dimension on this sheet is to be assumed as a reference dimension: "Used for information purposes only. It does not govern manufacturing or inspection requirements." (ANSI Y14.5-1973)
20660 Nordhoff St., Suite B Chatsworth, CA 91311 Phone: 866.533.9901 Fax: 866.533.5291 www.hydrel.com
PARADOX SERIES PDX4 LOW VOLTAGE AND LINE VOLTAGE INSTALLATION INSTRUCTIONS
Installation should be performed by a qualified electrician in accordance with the National Electrical Code and relevant local codes.
FOR INSTALLATION IN EARTH OR SOILS: 1. Dig a hole to appropriate depth allowing for rough-in-section to be secured to conduit or direct burial cable. PDX4 MR16/MR11 AND LED LINE VOLTAGE
PDX4 MR16/MR11 AND LED LOW VOLTAGE
Door Screws
Door Screws Flush Pour Shield/ Temporary Cover Plate
Flush Pour Shield/ Temporary Cover Plate
Rough-in-Section (RIS) Rough-in-Section (RIS)
2. Mount rough-in-section (RIS) with top of temporary pour shield 1/4” to 1/2” above grade level. ENLARGED DETAIL WITH TEMPOARY COVERPLATE/POUR SHIELD
ENLARGED DETAIL WITH DOOR INSTALLED
Pour Screw Flush Pour Shield/ Temp Cover
Door
Finish Grade (Earth)
1/4" - 1/2"
Finish Grade (Earth)
Rough-In Section (RIS)
Rough-In Section (RIS)
Finish Grade (Earth)
Finish Grade (Earth)
Rough-InSection Before Pouring Finish Grade
©2008 Acuity Brands Lighting, Inc. Rev. 7/31/08 INS-PDX4_REV0
Rough-InSection After Pouring Finish Grade
NOTE: HYDREL RESERVES THE RIGHT TO MODIFY SPECIFICATION WITHOUT NOTICE. Any dimension on this sheet is to be assumed as a reference dimension: "Used for information purposes only. It does not govern manufacturing or inspection requirements." (ANSI Y14.5-1973)
20660 Nordhoff St., Suite B Chatsworth, CA 91311 Phone: 866.533.9901 Fax: 866.533.5291 www.hydrel.com
PARADOX SERIES PDX4 LOW VOLTAGE AND LINE VOLTAGE INSTALLATION INSTRUCTIONS LOW VOLTAGE WIRING
Installation should be performed by a qualified electrician in accordance with the National Electrical Code and relevant local codes.
Cable Size Constant Chart* CABLE SIZE CABLE SIZE CONSTANT #18 1380 #16 2200 #14 3500 #12 7500 #10 11,920 #8 18,960 #6 30,150
3. Remove temporary pour shield. 4. Connect 1/2” NPT conduit to RIS (side or bottom entry). Seal conduit using suitable thread sealing compound to ensure conduit is watertight and to prevent moisture penetration from VOLTAGE DROP FORMULA conduit system. Total Watts on Cable 4a. Secure 1/2” NPT cord seal and direct burial cable (by X Length of Run others) to RIS (side or bottom CABLE SIZE CONSTANT* entry). Seal cord seal entry using suitable = VOLTAGE DROP thread sealing compound to ensure conduit is water-tight and to prevent moisture penetration * Refer to Hydrel Transformer Specifications from cable system. 5. Pull electrical supply conductors and make wire splices with lamp housing in accordance with NEC. (IMPORTANT! Use silicon filled wire nuts.) 6. While aligning notches in housing with tabs in RIS, gather spliced wiring below and tighten assemblies together with module screws. 7. Adjust assembly to aim. (MR16/MR11 models only) 7a. For LED aiming, use appropriate tilt insert. Secure to inside of lens with retaining ring. 8. Install door lens assembly ensuring screws are tight. Low Voltage LED Housing
Module Screws
Low Voltage LED Housing
Low Voltage MR16/MR11 Housing
Low Voltage MR16/MR11 Housing
Silicone-filled Wire Nuts (By Hydrel) For Through-Branch Installation
Module Screws
Silicone-Filled Wire Nuts (By Hydrel) For Through-Branch Installation
Conduit (By Others)
LANDSCAPE/EARTH INSTALLATION
Cord Seal (By Others) Direct Burial Cable (By Others)
CONCRETE INSTALLATION
©2008 Acuity Brands Lighting, Inc. Rev. 7/31/08 INS-PDX4_REV0
NOTE: HYDREL RESERVES THE RIGHT TO MODIFY SPECIFICATION WITHOUT NOTICE. Any dimension on this sheet is to be assumed as a reference dimension: "Used for information purposes only. It does not govern manufacturing or inspection requirements." (ANSI Y14.5-1973)
20660 Nordhoff St., Suite B Chatsworth, CA 91311 Phone: 866.533.9901 Fax: 866.533.5291 www.hydrel.com
PARADOX SERIES PDX4 LOW VOLTAGE AND LINE VOLTAGE INSTALLATION INSTRUCTIONS
Installation should be performed by a qualified electrician in accordance with the National Electrical Code and relevant local codes.
Line Voltage LED Housing
Module Screws Line Voltage MR16/MR11 Housing
LINE VOLTAGE WIRING
Silicone-filled Wire Nuts (By Hydrel)
3. Remove temporary pour shield. 4. Connect 1/2” NPT conduit to RIS For (side or bottom entry). Seal conduit Through-Branch using suitable thread sealing comInstallation pound to ensure conduit is watertight and to prevent moisture penetration from conduit system. 5. Pull electrical supply conductors and make wire splices with lamp Conduit housing in accordance with NEC. (By Others) (IMPORTANT! Use silicon filled wire nuts.) 6. While aligning notches in housing with tabs in RIS, gather spliced wiring below and tighten assemblies together with module screws. 7. Adjust assembly to aim. (MR16/MR11 models only) 7a. For LED aiming, use appropriate tilt insert. Secure to inside of lens with retaining ring. 8. Install door lens assembly ensuring screws are tight.
©2008 Acuity Brands Lighting, Inc. Rev. 7/31/08 INS-PDX4_REV0
NOTE: HYDREL RESERVES THE RIGHT TO MODIFY SPECIFICATION WITHOUT NOTICE. Any dimension on this sheet is to be assumed as a reference dimension: "Used for information purposes only. It does not govern manufacturing or inspection requirements." (ANSI Y14.5-1973)
20660 Nordhoff St., Suite B Chatsworth, CA 91311 Phone: 866.533.9901 Fax: 866.533.5291 www.hydrel.com
PARADOX SERIES PDX4 LOW VOLTAGE AND LINE VOLTAGE INSTALLATION INSTRUCTIONS
Installation should be performed by a qualified electrician in accordance with the National Electrical Code and relevant local codes.
MR16/MR11 ADJUSTMENT/RELAMPING 1. Squeeze tabs on retaining clip inward to release from lamp adjustment ring. 2. Pull out lamp and disengage from socket. 3. Replace with new lamp and re-secure with retaining clip. 4. Use philips screwdriver to adjust spring-loaded lamp adjustment ring to preferred angle.
15˚ Tilt Adjustment Screw (3 Places)
Adjust Tilt by Loosening Screws with Screwdriver.
©2008 Acuity Brands Lighting, Inc. Rev. 7/31/08 INS-PDX4_REV0
NOTE: HYDREL RESERVES THE RIGHT TO MODIFY SPECIFICATION WITHOUT NOTICE. Any dimension on this sheet is to be assumed as a reference dimension: "Used for information purposes only. It does not govern manufacturing or inspection requirements." (ANSI Y14.5-1973)
20660 Nordhoff St., Suite B Chatsworth, CA 91311 Phone: 866.533.9901 Fax: 866.533.5291 www.hydrel.com
PARADOX SERIES PDX4 LOW VOLTAGE AND LINE VOLTAGE INSTALLATION INSTRUCTIONS
Installation should be performed by a qualified electrician in accordance with the National Electrical Code and relevant local codes.
LED TILT LENS INSTALLATION Retaining Ring LED Tilt Optic
LED Optic Detail
Arrow Indicates Tilt Direction
LED Optic should be pushed against bottom of lens as shown in detail.
LED TILT-LENS ASSEMBLY AND ADJUSTMENT 1. Attach retaining ring around edge of LED tilt optic (5°, 10°, 15° or axial spread) and press against underside of lens. 2. Adjust tilt by rotating molded arrow detail in optic to preferred direction.
LED Optic Retaining Ring LED Tilt Optic (5˚, 10˚, 15˚, Axial Spread) Door Assembly (Bottom Side Up)
©2008 Acuity Brands Lighting, Inc. Rev. 7/31/08 INS-PDX4_REV0
NOTE: HYDREL RESERVES THE RIGHT TO MODIFY SPECIFICATION WITHOUT NOTICE. Any dimension on this sheet is to be assumed as a reference dimension: "Used for information purposes only. It does not govern manufacturing or inspection requirements." (ANSI Y14.5-1973)
20660 Nordhoff St., Suite B Chatsworth, CA 91311 Phone: 866.533.9901 Fax: 866.533.5291 www.hydrel.com