Our Mission. quality of our work and services. Constantly striving to exceed each client s expectations

Introduction COMO W.L.L. has been continually building values since its foundation. Quality, Technology and Adaptability have been the foremost value...
Author: Emil Weaver
2 downloads 0 Views 6MB Size
Introduction COMO W.L.L. has been continually building values since its foundation. Quality, Technology and Adaptability have been the foremost values adopted by the company. The concern for quality is nurtured at every level. Being at the technological forefront of our business has further strengthened this commitment to excellence. Our workforce is not only highly qualified but also highly adaptable. The ability to take on challenges has enabled us to successfully execute projects that have been new to our experience. COMO Construction offers a full range of construction services. The project teams maintain a strong foundation of trust and mutual respect generated through positive relationships with clients, architects, engineers, contractors, subcontractors and suppliers. A company-wide policy encouraging shared per formance responsibility ensures the highest degree of professional service and results on all projects undertaken. Since its foundation, the company has been producing outstanding records in a wide range of construction works. From develo pment, the company has a rich experience in these fields. The Company has built a base of loyal clients on the strength of our reputation for service and competitive costing. COMO’s success in the construction sector is due in part to our commitment to teamwork.

Our Mission The mission of COMO is to build on our reputation for integrity, excellence, experience and leadership as one of Qatar’s finest construction organization by:

• • • •

Continuously improving the quality of our work and services. Constantly striving to exceed each client’s expectations. Maintaining our dedication to the highest moral principles. Providing our people with a challenging, secure and safe environment in   which to achieve our objectives.

Construction Services Construction : Civil Architectural

Sectors Oil & Gas Industry Chemical Plants Sewage Treatment Plants Water Pump Stations Sub Station Power Plants Marine Works Industrial Buildings

Certified ISO Company

Certified ISO Company

Facility Management Services Facility Management Waste Management HVAC, MEP Land sccape Management Security STP, O&M

Clients : COMO Construction is building a wide range of projects for a diverse client base. Each project encompasses both the high quality and value that COMO brings to each of its buildings. These projects include Industrial buildings, control buildings, sub stations, pump stations etc..

Client - Qatar Petroleum/Shaqab Abela

(Central Food Processing Unit project)

Central Food Processing Unit is undertaken by Qatar Petroleum. It is a Fully Automatic kitchen which can provide meals for 120,000 people every day.

Client -

Ras Girtas Power Co. (IWPP Project)

Qatar General Electricity and Water Corporation “KAHRAMAA” and its partners have signed, Ras Girtas (previously Ras Laffan “c”) Water and Power Project contracts worth QR 14 billion (approximately $ 3.85 billion) Since inception, Kahramaa has operated as an independent corporation on a commercial basis with a total capital of four billion Qatari Riyals.

Client - Qafco-5 Expansion Project QAFCO-5 is set to bolster QAFCO’s position as world-class producer of fertilizer and the world’s largest single site urea producer. The planned expansion will add 1.1 million MT of ammonia and 1.1 million MT of urea to the Company’s annual production capacity thus boosting ammonia production by 55% to 3.1 million MT per annum and urea production 40% to 4 million MT annually.

Client - Barwa Real Estate

Facility Management Full facilities management Service Contract on Barwa Real Estate Co. with built up area of 584,706 sq. m, of 62 buildings. Each building will house 64 apartments 1984 in total, located in West Saliya of South Doha.

Client - CFE - Mideast Civil Structure Works for 1 Day Emergency Lagoon (Lagoon 1) under the main contract - Doha North Sewerage Treatment and associated works CP682/1. A water treatment tank of total area of 67,500 sq.m. and volume 405,000 m3 that can hold 90,000,000 gallon of water.

Safety Como achieve a milestone on January 2011 with 20,000,000 man hours without a lost time incident. Simply put, COMO applies a “Zero Harm” philosophy to all of our operations. We are committed creating an environment that makes safety our number one priority while conducting our business. This is reflected in our Corporate Values Statement which states the principles under which we operate. Achieving “Zero Harm” is no small undertaking. In an industry that is often driven by deadlines, maintaining the discipline to pre-plan and integrate safety into all activities requires diligence. Our policies and procedures mandate the planning of tasks so that they become

ingrained as habits. Safety is always paramount before executing any activity. We continuously monitor and improve our policies, procedures and behaviors using inspections, self-audits and the impleme ntation of industry best practices. COMO emplo yees from every branch participate in industry organizations with the goal of assisting in the development of new best practices for integration into our operations. Safety training is provided at all levels of the company. Both employees and suppliers can expect an environment that is true to the belief that everyone has the right to return home safely at the end of the workday.

Current Projects

No.

Place of Work

Project Name

Client

Work Trade

Contract value

1

Umm Salal, Qatar

Doha North Sewage Treatment Plant

CFE Middle East

Civil Structural Works (Sub Stations)

10.87 Million

2

Umm Barkah, Qatar

Temporary Package Treatment Plant

PROTEC (Ashghal)

Civil & Structural Work

5 Million

3

Ras Laffan Industrial City

Chlorine Doixide Dosing System

ISIA S.p.A (RGPC)

Civil Construction Work

0.6 Million

4

Doha, Qatar

Facility Management Services

BARWA

Facility Management Services

8.21 Million

5

Doha, Qatar

Facility Management Service

Qatar National Bank

Facility Management Services

12 Million

6

Mesaieed, Qatar

Supply, Installation and Maintenance of Site Facilities work for Doha Port Project

MEDCO

Site Facilities and Accommodation Facilities

45 Million

7

Doha, Qatar

Food Factory

Shaqab Abela Catering Company

Turn-key project

72 Million

Finished Projects No.

Client Name, Name of Project Plant Capacity & Location

Client

Contract Value (QR.)

Construction Period

1

Screed Removal work Hamad Medical City Fit-out Work , Doha, Qatar.

Hyundai E&C

0.8 Million

Jun. 2011 - Oct. 2011

2

Structural & Architectural Work QAFCO -V Urea Ammonia Expansion Project , Mesaieed, Qatar.

Hyundai E&C (QAFCO)

52 Million

Sept. 2008 - Feb. 2011

3

Civil , Strural & Architectural Work IWPP Package A Ras Laffan Industrial City, Ras Laffan, Qatar.

Hyundai E&C (Ras Girtas)

100 Million

Jun. 2008 - Mar. 2011

4

ACTS Laboratory Turn-key project , Ras Laffan, Qatar.

ACTS

0.31 Million

Mar. 2008 - Jul. 2008

5

MEP Works Extension of Audio Visual System , Doha, Qatar.

Techno Q

0.23 Million

Feb. 2010 - Jun. 2010

6

Civil & Structural Construction of Temporary Classrooms in French School , West Bay, Qatar.

Lycee Bonaparte

0.5 Million

Jul. 2009 - Jan. 2010

7

Construction of Ware House , Al Khor, Qatar.

Shaqab Abela Catering Co.

3.23 Million

Jan. 2010 - Dec. 2010

8

Renovations & Alterations of Asian Games Accommodation , Doha, Qatar.

ASHGHAL

26.30 Million

Nov. 2007 - Aug. 2009

9

Drywalls & ceiling installation in Barwa Accommodation , Doha, Qatar.

Seavron

0.79 Million

Feb. 2009 - Dec. 2009

10

Finishing Works Business Management School , Al Khor, Qatar.

Education City

0.273 Million

Jul. 2008 - Aug. 2008

11

Construction & MEP Works Accommodation Block , Al Khor, Qatar.

Strabag

5.56 Million

Apr. 2008 - Aug. 2008

12

Construction & MEP Works Mess Hall 500 sqm, Ras Laffan, Qatar.

Strabag

0.52 Million

Mar. 2008 - Apr. 2009

13

Construction & MEP Works Mess Hall 3,000 sqm , Ras Laffan, Qatar.

Flour Mideast Ltd.

2.80 Million

Feb. 2008 - Mar. 2009

14

Construction & MEP Works Al Huda Bakery , Ras Laffan, Qatar.

Shaqab Abela Catering Co.

1.42 Million

Completed in 2008

15

Warehouse & Cold Storage , Al Khor, Qatar.

Just Organic

1.32 Million

Completed in 2008

16

Design, Delivery & Installation of Kitchen , Ras Laffan, Qatar.

Dodsal AKG

0.795 Million

Completed in 2008

17

Design, MEP & Finishing Recreational Facilities , Al Sailiyah, Qatar.

American Base

1.98 Million

Completed in 2008

18

Supply, Delivery & Commissioning works for Kitchen & Mess Hall , Ras Laffan, Qatar.

Al Jaber & Partners

2.0 Million

Completed in 2007

30

Supply, Delivery & Commissioning works for Mess Hall , RasLaffan, Qatar.

Dodsal AKG

1.12 Million

Completed in 2007

20

Supply, Delivery & Commissioning works for Domestic Kitchen, Mesaieed, Qatar.

Mesaieed Housing

1.12 Million

Completed in 2007

21

Design,Construction & Installation works for Central Food Processing Unit project ,Ras Laffan,Qatar.

Qatar Petroleum

72.00 Million

2006 -2009

22

Doha North Sewage Treatment Plant, Structural Works for Emergency Lagoon (Lagoon 1) ,Umm Salal, Qatar.

CFE Middle East

24.59 Million

Jan. 2010-Sept. 2012

23

Qatar Foundation, Migrant Worker Housing Modular Building Project.

Virgenia Commenwealth University,

2.1 Million

May 2011-June 2012

24

Sea Water Intake Desalination Plant, Civil Works, Umm Baab, Qatar.

PROTEC

3.34 Million

Sept. 2011-Sept. 2012

25

Chlorine Doixide Dosing System, Civil Construction Work, Ras Abu Fontas, Qatar.

ISIA S.p.A (QEWC)

1.12 Million

Feb. 2012-May 2012

26

Chlorine Doixide Dosing System, Civil Construction Work, Ras Laffan Industrial City, Qatar.

ISIA S.p.A (RLPC)

0.35 Million

Jan. 2012-May 2012

como

Commercial Registration

A

B

C

D

como

Commercial Registration

A

B

C

D

como

Signing Authority

A

B

C

D

como Municipality Registration

A

B

C

D

como

Chamber of Commerce Membership

A

B

C

D

imthi….

Site QA/QC

Safety Supervisors

Projects

Safety Officers

QA/QC

HSE Manager

Main Store

Plant & Equipment

Camp Manager

Purchasing & Material Handling

Material Management Manager

Planning & Scheduling

Estimation

Quantity Surveyors

Draughtsman

Land Surveyors

Technical Office

Plumbing & Drainage

Mechanical

Electrical

MEP Service

Administration Manager

Finance

Asst. Accountant

Accountant

Accounts in Charge

Camp 5

Camp 4

Al Khor Camp

COMPANY ORGANIZATION CHART

Tendering

Document Controller

Senior Document Controller

Projects Development Manager

General Manager

Transport

HR Officer

HR & Transport Manager

Projects Manager

Construction Manger

z

Personal Asst. to GM

Company Organization Chart

STAFF LEVELS Trades/Categories SiteEngineering Civil Electrical/MEP ProjectsManagers QA/QC ConstructionManager SubͲtotal Engineeringsupport TechnicalofficeCoordinator Autocaddraftsmen Surveyor SurveyorsAssistant SeniorEstimator/Planner QuantitySurveyor SeniorQA/QC SubͲtotal Constructionsitestaff HSEManager Safetyofficers Nurse Securityofficers Shutteringcarpenters Steelfixers Masons Welder Pipefitters Plumbers Electricians Scaffolders Painters Drivers Plantoperators Riggers Mechanic(heavyplant) Mechanic(vehicles) Mechanic(generators) Storemen Generallabour Sitemaintenancestaff SubͲtotal Officestaff GeneralManager AdminManager AdminOfficer ProjectsDevelopment Manager PRO Documentcontrollers

Persons

1 1 1 3

Senior Engineers

Site Engineers

Site Supervisors

2 1

5 1

3 1

3

6

4

Skilled Workers

0

Labour

Total

0

10 3 1 1 1 16

1 3 2 3 1 3 1 14

1 3 2 3 1 3 1 14

1 4 1 2

1 4 1 2 45 25 57 4 2 6 7 6 6 13 2 1 1 1 1 4 17 4 210

5 3 4

2 1 1

8 1 1 3 1 1 2

1 4 2 23

40 22 53 4 2 6 5 5 5 13 2 1 1 1 1 3 13 2 166

13

1 1 3 1 1 2

STAFF LEVELS Trades/Categories Trainingofficer Humanresources PurchasingCoordinator Purchasingofficer Accounts ITtechnician Sectretaries SubͲtotal FacilityManagement ProjectManagers Siteservicesmanager Operationmanager Maintenancemanager AdminManager Civilengineer Electricalengineer Mechanicalengineer HVACengineer Electricians Plumbers Painters Masons Securityofficers Safetyofficers Labour HouseͲkeeping Officeadministration CallCentrestaff Carpenter Fabricator Steelfixers CadOperator Gardener FacilitiesSupervisor ITtechnician StoreKeeper GeneralTechnician Drivers SubͲtotal

Persons

Senior Engineers

1 1 4 1 3 4 2 1 26

Site Engineers

0

Site Supervisors

0

Skilled Workers

0

Labour

0

0

2 1 1 1 1 1

1 4 5 6

2

10 6 16 6 4 2 2 1 2 3

4

31 29 13 5 6 15 73

4

12

2

9

2

14

60

22 160

7 2 1 1 1 7 2 4 7 38

1

18

Totalmanpower

Total

73

1 1 4 1 3 4 2 1 26 2 1 1 1 1 15 11 21 43 33 15 7 7 17 5 73 16 7 2 11 1 1 1 16 7 2 4 7 22 350 616

Central Food Processing Unit Project a t R a s  L a f f a n  I n d u s t r i a l  C i t y

CENTRAL FOOD PROCESSING UNIT-

RAS LAFFAN (QATAR PETROLEUM) Como has completed all the MEP installation including the design of the substation, t ra n sfo r m e r, a n d l o w voltage panels, domestic and sewage water line, equipment installation etc. according to ES Standards and NFPA.

Central Food Processing Unit Project atRas Laffan Industrial City

Ras Laffan Industrial City

IWPP Project Constructions

Fire Station Building

Fire Station C-IWPP Project - Ras Laffan

Gas Turbine Building Ground Floor Slab. C-IWPP Project Ras Laffan

Gas Turbine Building Ground Floor Slab. C-IWPP Project Ras Laffan

Gas Turbine Building Ground Floor Slab. C-IWPP Project Ras Laffan

Gas Turbine Building Electrical Room. C-IWPPProjectRas Laffan

Gate House. C-IWPP Project - Ras Laffan

Electronics & Electrical Building C-IWPP Project - Ras Laffan

Local Electrical Building. C-IWPP Project - Ras Laffan

Gas Turbine Building. C-IWPP Project - Ras Laffan

Gate House. C-IWPP Project - Ras Laffan

Local Electrical Building. C-IWPP Project - Ras Laffan

Fire Station Building. C-IWPP Project - Ras Laffan

Gas Turbine Building - Electrical Room. C-IWPP Project Ras Laffan

Gas Turbine Building - HVAC Accu. Floor. C-IWPP Project Ras Laffan

Gas Turbine Building - HVAC Accu Floor Pads C-IWPP Project - Ras Laffan

Gas Turbine Building - HVAC Room # 8. C-IWPP Project Ras Laffan

Electronic & Electrical Building. C-IWPP Project - Ras Laffan

Electronic & Electrical Building. C-IWPP Project - Ras Laffan

Fire Station Building. C-IWPP Project - Ras Laffan

Gas Turbine Building- HVAC Room # 2. C-IWPP Project Ras Laffan

Local Electrical Building. C-IWPP Project - Ras Laffan

C-IWPP Project - Ras Laffan

C-IWPP Project - Ras Laffan

C-IWPP Project - Ras Laffan

M e s a i e e d    I n d u s t r i a l   C i t y

QAFCO -5 Projec t

Utility Building. qafco-5 Project - Mesaieed

Utility Building. qafco-5 Project - Mesaieed

Utility Building. qafco-5 Project - Mesaieed

Utility Building. qafco-5 Project - Mesaieed

Utility Building. qafco-5 Project - Mesaieed

Utility Building. qafco-5 Project - Mesaieed

Utility Building. qafco-5 Project - Mesaieed

Cogen-2 Building

qafco-5 Project Mesaieed

Scaffolding & Formwork System in Utility Building qafco-5 Project - Mesaieed

Amonia 5 & Urea 5. qafco-5 Project - Mesaieed

Job Yard. qafco-5 Project - Mesaieed

Job Yard. qafco-5 Project - Mesaieed

Pipe Rack Area. qafco-5 Project - Mesaieed

Pipe Rack Area. qafco-5 Project - Mesaieed

Utility Building. qafco-5 Project - Mesaieed

Form Work System. qafco-5 Project - Mesaieed

Cogen 2 Building. qafco-5 Project - Mesaieed

Cogen 2 Building. qafco-5 Project - Mesaieed

Blast Proof Concrete Wall qafco-5 Project - Mesaieed

Blast Proof Concrete Wall Transformer Area (Cogen-2) qafco-5 Project - Mesaieed

Blast Proof Concrete Wall - CCR-2 qafco-5 Project - Mesaieed

Blast Proof Concrete Wall - CCR-2 qafco-5 Project - Mesaieed

Utility Building qafco-5 Project - Mesaieed

Utility Building qafco-5 Project - Mesaieed

D o h a    N o r t h   S e w e r a g e

Tr e a t m e n t P l a n t

LDP-northeast side Doha North Sewerage Treatment Plant

One day Emergency Lagoon cfe - Doha North Sewerage Treatment Plant

Lagoon cfe - Doha North Sewerage Treatment Plant

Lagoon cfe - Doha North Sewerage Treatment Plant

Lagoon cfe - Doha North Sewerage Treatment Plant

Lagoon cfe - Doha North Sewerage Treatment Plant

Lagoon cfe - Doha North Sewerage Treatment Plant

Lagoon cfe - Doha North Sewerage Treatment Plant

Lagoon cfe - Doha North Sewerage Treatment Plant

Lagoon cfe - Doha North Sewerage Treatment Plant

Lagoon cfe - Doha North Sewerage Treatment Plant

Sub Stations

Odur Control Facility Sub Station

Sub Station - E

Sub Station - G

Substation - E cfe - Doha North Sewerage Treatment Plant

Substation - G cfe - Doha North Sewerage Treatment Plant

Substation - E cfe - Doha North Sewerage Treatment Plant

Substation - E cfe - Doha North Sewerage Treatment Plant

Temporar y pack age Treatment Plant

UMM BARKAH

Reception Facilities - Umm Barkah Temporary Package Treatment Plant

Receiving Tank - Umm Barkah Temporary Package Treatment Plant

Receiving Tank - Umm Barkah Temporary Package Treatment Plant

Platform - Umm Barkah Temporary Package Treatment Plant

Platform - Umm Barkah Temporary Package Treatment Plant

Platform - Umm Barkah Temporary Package Treatment Plant

Receiving Tank - Umm Barkah Temporary Package Treatment Plant

Platform - Umm Barkah Temporary Package Treatment Plant

Platform - Umm Barkah Temporary Package Treatment Plant

Platform - Umm Barkah Temporary Package Treatment Plant

Platform - Umm Barkah Temporary Package Treatment Plant

Reception Facilities - Umm Barkah Temporary Package Treatment Plant

Receiving Tank - Umm Barkah Temporary Package Treatment Plant

Receiving Tank - Umm Barkah Temporary Package Treatment Plant

Reception Facilities - Umm Barkah Temporary Package Treatment Plant

Reception Facilities - Umm Barkah Temporary Package Treatment Plant

Reception Facilities - Umm Barkah Temporary Package Treatment Plant

Receiving Tank - Umm Barkah Temporary Package Treatment Plant

Receiving Tank - Umm Barkah Temporary Package Treatment Plant

Doha New Port Project

MEDCO - Site Office & Camp Facilities

Doha New Port Project

MEDCO - Site Office & Camp Facilities

abm military college

Shahania

Como did the all audio visual and electrical i n sta l l at i o n i n A r my College under the main contractor TECHNO Q and NASPAK. We executed all cable pulling, equipment installation, conduiting, cable tray installation and electrical works.

Como Camps Como has six camps situated in Al-Khor.

Food Caterings We are in partner with one of the market leader for catering service company, Shaqab Abela Catering Services. They have all the edge of technology to produce meals in huge quantities and serve end users such as professional centers, industries, hotels, restaurants, public institutions and labour camps.

Group of Companies

Chapo Trading & Contracting www.chapo-qatar.com

www.qdc.com.sa-qatar.com

www.steelfab-qatar.com

www.qit-qatar.com

www.shaqabcatering.com

Suggest Documents