Energy efficiency project: Biomass boilers & district heating and efficient lighting

ORGANIZATION CHART FOR THE PROJECT CONSEJERÍA DE MEDIO AMBIENTE (JUNTA DE CASTILLA Y LEÓN)

SOCIEDAD PÚBLICA DE MEDIO AMBIENTE DE CASTILLA Y LEÓN, S.A.

CONSEJO DE ADMINISTRACIÓN

CONSEJERO DELEGADO

AREA DE VERIFICACIÓN Y CONTROL

DIRECCIÓN DE

DIRECCIÓN DE INFRAESTRUCTURAS

ÁREA DE OBRAS

ÁREA DE CONTRATACIÓN

OFICINA TÉCNICA

ÁREA DE CONTABILIDAD

EFICIENCIA ENERGÉTICA

DIRECCIÓN DE GESTIÓN

ADMINISTRACIÓN Y

DE RECURSOS

FINANZAS

AMBIENTALES

EXPLOTACIONES FORESTALES

INFRAESTRUCTURAS AMBIENTALES

TASKS TASKS: BIOMASS BOILERS AND DISTRICT HEATING

BUDGETED PROJECTS. BIOMASS BOILERS & DISTRICT HEATING

NUMBER OF PROJECTS BUDGET ESTIMATED PROJECT DURATION BIOMASS SUPPLY NEEDS ESTIMATED SAVES OF CONVENTIONAL ENERGY ESTIMATED JOBS IN CONSTRUCTION AND EQUIPMENT ESTIMATED JOBS IN O&M (20 YEARS) CO2 EMISSIONS AVOIDED ENERGY CONSUMPTION kWh/YEAR PUBLIC BUILDINGS IN JCYL REGIONAL AGRICULTURE MINISTRY REGIONAL HEALTH MINISTRY REGIONAL EDUCATION MINISTRY REGIONAL SOCIAL SERVICES MINISTRY

85 149 385 03 85.149.385,03 4 PROJECTS

PRIVATE COMPANIES

TOTAL BUDGETED BIOMASS PROJECTS

PLANNED BUDGET (€)

16 427 240 80 16.427.240,80

36 012 461 21 36.012.461,21

900.000,00

1.500.000,00

36 PROJECTS

12.843.512,94

2.342.052,36

4.292.219,61

32.447.874,99

5.916.965,44

17.276.480,61

24 PROJECTS

39.857.997,10

7.268.223,00

9 PROJECTS

PUBLIC BUILDINGS IN COUNCILS SEVERAL COUNCILS COLLABORATIONS AGREEMENTS WITH PRIVATE COMPANIES

ANUAL CONSUMPTION OF BIOMASS (Kg)

109 PROJECTS

DH CONVENIADAS UNIVERSITIES OF CYL

-

231 58.002.796 € 4 yr 35.327 t 10.000.000 €/yr 800 jobs 200 jobs 700.000 t/yr /

12.943.760,98

-

11.690.335,62

-

11.690.335,62

-

8.750.000,00 18.900.000,00

50 PROJECTS -

8.750.000,00 1.550.000,00

2 PROJECTS

1.550.000,00

85.149.385,03

35.327.240,80

58.002.796,83

PLANNED SCHEDULE ENERGY EFFCIENCY PLANNED PROJECTS YEAR 2013 2013-2016 2016

YEAR 2013 INICI Dura O FIN ción ene feb mar abr may jun (meses)

BIOMASS BOILERS IN PUBLIC BUILDINGS IN CyL PROVINCE OFSEGOVIA PREVIOUS STUDIES BASIC PROJECT CONTRACT TRAMITACION WITH CLIENTS EXECUTION PROJECTS INVITATIONS TO TENDER & CONTRACT AWARDS EXECUTION & START UP

feb-13

ago-14

19

1

2

3

2

8

8

PROVINCE OF LEON

abr-13

oct-14

19

PROVINCE OF BURGOS

abr-13

oct-14

19

PROVINCE OF VALLADOLID

jun-13

ago-15

27

PROVINCE OF SALAMANCA

oct-13

sep-15

24

PROVINCE OF AVILA

feb-14

jun-16

29

PROVINCE OF SORIA

may-14

sep-16

29

PROVINCE OF ZAMORA

ago-14

dic-16

29

may-14

12

DISTRICT HEATING NETWORKS DH CENTRAL SERVICES BUILDINGS OF JCyL PREVIOUS STUDIES BASIC PROJECT CONTRACT TRAMITACION WITH CLIENTS EXECUTION PROJECTS INVITATIONS TO TENDER & CONTRACT AWARDS OTHERS DH NETWORKS PREVIOUS STUDIES BASIC PROJECT CONTRACT TRAMITACION WITH CLIENTS EXECUTION PROJECTS INVITATIONS TO TENDER & CONTRACT AWARDS COLLABORATIONS AGREEMENTS WITH PRIVATE COMPANIES PROYECTOS DE ALUMBRADO PUBLICO Ponferrada León Otros ( Barrio del Cristo-Palencia y Cuellar )

may-13

1

2

3

4

12

mar-14

feb-17

35

4

8

10

11

19

feb-14

mar-16

26

mar-13

mar-14

12

ene-14

jun-15

18

ene-15

ene-16

12

YEAR 2014

YEAR 2015

YEAR 2016

YEAR 2017

no jul ago sep oct nov dic ene feb mar abr may jun jul ago sep oct nov dic ene feb mar abr may jun jul ago sep oct nov dic ene feb mar abr may jun jul ago sep oct v dic ene feb

PHASES OF THE PROJECTS

PUBLIC CLIENTS

COMMITMENTS

BUILDINGS

NO

NO

POTENTIAL  BUILDINGS

PREVIOUS STUDIES & AUDITS BASIC PROJECT

STRATEGIC OR DEMOSTRATION  PROJECTS CONFIDENTIALITY  AGREEMENT

PROJECT AUDIT & FEASIBILITIY  STUDY AUDIT OF THE PROJECT  PARTNERS PARTN RS INFORM TO THE  BROAD OF  DIRECTORS

ENERGY CONTRACTS ENERGY CONTRACTS EXECUTION PROJECTS DECISION  TO  PARTICIPATE

INVITATIONS TO TENDER FOR  CONSTRUCTION AND O&M CONSTRUCTION, START UP &  LEGALITATION OPERATION

PURCHASE OF STOCKS AS  MINORITARY PARTNER (5%)

NO

SELECTION PROCESS: COMMITMENTS

PHASE 1: SELECTION OF PUBLIC ORGANITATIONS

• REGIONAL MINISTRY OF SOCIAL SERVICES REGIONAL MINISTRY OF SOCIAL SERVICES • REGINAL MINISTRY OF EDUCATION OF JUNTA DE CASTILLA Y LEON • REGIONAL MINISTRY OF HEALTH OF JUNTA DE CASTILLA Y LEON REGIONAL MINISTRY OF TREASURY OF JUNTA DE CASTILLA Y LEON Y LEON • REGIONAL MINISTRY OF TREASURY OF JUNTA DE CASTILLA • REGIONAL MINISTRY OF AGRICULTURE OF JUNTA DE CASTILLA Y LEON • UNIVERSITY OF VALLADOLID AND UNIVERSITY OF LEON. • AGRICULTURAL TECNOLOGIC AGRICULTURAL TECNOLOGIC INSTITUTE OF CASTILLA INSTITUTE OF CASTILLA Y LEON Y LEON

COMMITMENTS TO SOMACYL FOR  STUDY AND EXECUTION OF  PROJECTS OF ENERGY EFFICIENCY  FOCUSED IN THE USE OF BIOMASS  FOR THERMAL USES

CHARACTERISTICS OF BUILDINGS BELONGING TO THESE AGENCIES

1. HIGH‐MEDIUM ENERGETIC CONSUMPTION 2. HIGH QUANTITY OF BUILDINGS WITH EQUIPS WITH OVER 10 YRS. OLD amortized obsolete facilities and often with low performances in power  amortized obsolete facilities and often with low performances in power generation (NEED FOR RENEWAL OF EQUIPMENT) 3. CURRENT ENERGY DIESEL & PROPANE DIESEL & PROPANE (REDUCTION OF CO2 EMISSIONS & SAVING COSTS) 4. USE & OCCUPATION Occupation and operation hours medium‐high Occupation and operation hours medium high (ECONOMIC FEASIBILITY) 5. LOCATION & PROXIMITY TO OTHER BUILDINGS To project district heating and mini‐district heating p j g g (TECHNICAL‐ECONOMICAL FEASIBILITY) 6. OWNERSHIP Public ownership (not rented) and not planned to be sold or closed at least for  the period of operation of the new facilities of each project.

SELECTION OF BUILDINGS PHASES 2 Y 3: Data acquisition and pre‐selection of potential buildings

EXAMPLE (REGIONAL MINISTRY OF EDUCATION)

Selection criteria:

• Boilers with fossil fuels over 15 y years. •

Low stationary performances.

• Planned important changes p g in boilers and facilities in general in the next 5 years.

ENERGY AUDITS AND BASIC PROJECTS

Phase 4: Energy audits

Fase 5: Basic projects

OBJECTIVES

OBJECTIVES

• Measure of the thermal demand of the building and its distribution throughout the year. • Measure current emission levels.

performances

and

• Configuration and location of current facilities. • Analyze were to install the new boilers. • Estimate energy savings with the new boilers.

• Analyze different alternatives of the new installation: location, technical characteristics, type of biomass, etc. • Detailed description of the technical solution: boiler, hot water accumulation volume,, silo volume. • Budget of the new installation and • Draws D d process diagrams di

COMMITMENT OF ENERGY SERVICE COMPANY Phase 6: Commitment of energy service company •Commitment regulates the provision of the services that SOMACYL gives to the REGIONAL MINISTRY who is the owner of the buildingg ((CENTER). ) • What services gives SOMACYL to the CENTER: ‐Replacement the boilers with fossil fuels with boilers of biomass. ‐Maintenance M i t off the th new facilities f iliti ‐Fuel supply •

Length of the commitment: 10‐15 years.

• A minimum consumption of annual thermal energy will be fixed. The follows: ‐ Up to achieve the minimum consumption:

fee to be paid for the CENTRE is as

current price of net thermal kWh with a

discount of 10% (aprox. It depends of each project) ‐ If the consumption exceed the minimum:

current price of net thermal kWh with a

d discount off 30% (aprox. ( It depends d d off each h project)) • Upgrade rate: CPI + 1 % (Aprox.) • Each month one twelfth of the minimum consumption will be billed to the CENTER. If at the end of the year the minimum consumption is exceeded, exceeded the difference shall be governed by the last year bill. bill

CURRENT PROJECTS

Installation, start up, operation and maintenance of heating system Biomass Network for various buildings of the University of Valladolid

Awarded. Start construction in November 2013 Instaled power: 12 MWt. 24 Buildings. Budget: 5.000.000 € O&M period: 10 years

CURRENT PROJECTS

Installation, start up and maintenance of a district heating system Biomass in Complex Zamadueñas CyL Agricultural Technological Institute.

District heating for buildings of the Ministry of  Agriculture consists of a biomass boiler 1 Mw Budget: 540.000 € O&M period: 15 years

CURRENT PROJECTS

Installation, start up and maintenance of heating system Biomass College CEIP Pedro I in Tordesillas (Valladolid)

Mini district heating. Boiller with pellets of 840 Kw Budget: 205.000 € O&M period: 15 years

CURRENT PROJECTS

Installation, start up and maintenance of heating system Biomass Institute ES ROA Duero

Boiler with pellets of 400 Kw Budget: 157.000 € O&M period: 12 years

CURRENT PROJECTS

SITUACIÓN DE LA OBRA

DESCRIPCIÓN

INVERSIÓN PREVISTA (Sin IVA)

LE

Sustitución del alumbrado público para mejora del ahorro energético del municipio de Ponferrada y prestación de servicio de mantenimiento integral del alumbrado.

Ejecutada

Inversión de sustitución elementos de alumbrado Público en Ponferrada con ahorro del 40% en consumos. Reducción de potencia, regulación de la iluminación y colocación de equipos más eficientes. T bié mantenimiento También t i i t integral i t l de d las l instalaciones i t l i por 12 años

2.051.316,00 €

VA

Instalación, puesta en marcha y mantenimiento de un sistema de calefacción de distrito con Biomasa en el Complejo Zamadueñas del Instituto Tecnológico Agrario CyL.

Ejecutada

Red de calor para edificios de la Consejería de Agricultura compuesta por una caldera de biomasa de 1 Mw

540.000,00 €

BU

Instalación, puesta en marcha y mantenimiento de los sistema de calefacción con Biomasa del Instituto E.S. ROA de DUERO

Ejecutada

Caldera de Pellets de 400 Kw

156 554 00 € 156.554,00

VA

Instalación, puesta en marcha y mantenimiento de los sistema de calefacción con Biomasa del Colegio CEIP Pedro I en Tordesillas

Ejecutada

Caldera de Pellets de 840 Kw

205.135,00 €

VA

Instalación, puesta en marcha y mantenimiento de los sistema de calefacción con Biomasa del Centro de Salud de Medina de Rioseco

Ejecutada

Caldera de Pellets de 200 Kw

122.170,00 €

BU

Instalación, puesta en marcha y mantenimiento de los sistema de calefacción con Biomasa de la Residencia Fuentes Blancas en Burgos

Pendiente de licitación la fase de construcción. Adjudicado el suministro de equipos de biomasa.

Caldera de Pellets de 800 Kw

286.334,00 €

VA

Instalación, puesta en marcha y mantenimiento de los sistema de Red de Red de calor para edificios de la UVA y edificios del Adjudicada. Inicio de obra Noviembre calefacción con Biomasa para diversos Edificios de la Universidad de Ayto VA, compuesta por una central de biomasa de 14 2013 Valladolid Mw y red de distribución ida y vuelta de 8 km

5.000.000,00 €

PA

Instalación, puesta en marcha y mantenimiento de los sistema de calefacción con Biomasa en 10 centros dependientes del Ayuntamiento de Palencia

SG

Realización de mejoras en la red de calor con biomasa existente dependiente del Ayuntamiento de Cuellar

LE

Instalación, puesta en marcha y mantenimiento de los sistema de calefacción con biomasa para el complejo CHF y para la residencia Virgen del Camino dependientes del Ayuntamiento de León

AV

Instalación, puesta en marcha y mantenimiento de un sistema de calefacción con biomasa para el C.E.I.P. Juan Arrabal y polideportivo d dependientes di t d dell A Ayuntamiento t i t d de B Barco d de áávila il

ACTUACIÓN

Pendiente de licitación

Calderas de Pellets para 9 colegios y para el parque de bomberos

1.300.000,00 €

En ejecución desde Septiembre 2013

Instalación de mejoras en la red de calor con biomasa del municipio de Cuellar. Instalación de telecontrol, Mejoras en red, Mejoras eléctricas y Reparación de calderas. calderas

210.000,00 €

Red de calor para tres edificios del complejo CHF con Adjudicada. Inicio de obra Noviembre caldera de Astillas de 1200kW. Caldera de pellet de 500 2013 kW para la residencia Virgen del camino Pendiente licitación. Previsión N Noviembre 2013

Caldera Pellets de 400 kW para suministro térmico a dos edificios: C Colegio g y Polideportivo p

768.169,00 €

150.000,00 €

TASKS: ENERGY EFFICIENCY IN LIGTHING

ENERGY EFFICIENCY IN PUBLIC LIGHTING

METHODOLOGY: ENERGY AUDIT FEASIBILITY STUDIES SELECTION OF LIGHTING EQUIPMENTS POWER OPTIMISATION OFFER TO THE COUNCIL ECONOMIC & TECHNICAL SHEETS AND INVITATIONS TO TENDER MONITORING AND CONTROL WORKS

ENERGY EFFICIENCY IN PUBLIC LIGHTING

METHODOLOGY: ENERGY AUDIT FEASIBILITY STUDIES SELECTION OF LIGHTING EQUIPMENTS 19:12

POWER OPTIMISATION

14:24 9:36

OFFER TO THE COUNCIL

4:48

ECONOMIC & TECHNICAL SHEETS AND INVITATIONS TO TENDER ECONOMIC & TECHNICAL SHEETS AND INVITATIONS TO TENDER

0:00 01 ene 01‐ene

MONITORING AND CONTROL WORKS

Horas … 11 abr 11‐abr

20 jul 20‐jul

28 oct 28‐oct

TIPO

Horas Equivalentes

Reducción

A

2702h

32.45%

B

2678h

33.04%

ENERGY EFFICIENCY IN PUBLIC LIGHTING

FIELD MEASUREMENTS

METHODOLOGY: ENERGY AUDIT FEASIBILITY STUDIES SELECTION OF LIGHTING EQUIPMENTS POWER OPTIMISATION OFFER TO THE COUNCIL ECONOMIC & TECHNICAL SHEETS AND INVITATIONS TO TENDER ECONOMIC & TECHNICAL SHEETS AND INVITATIONS TO TENDER MONITORING AND CONTROL WORKS

NUMERIC SIMULATION

ENERGY EFFICIENCY IN PUBLIC LIGHTING

METHODOLOGY: ENERGY AUDIT FEASIBILITY STUDIES SELECTION OF LIGHTING EQUIPMENTS POWER OPTIMISATION OFFER TO THE COUNCIL ECONOMIC & TECHNICAL SHEETS AND INVITATIONS TO TENDER ECONOMIC & TECHNICAL SHEETS AND INVITATIONS TO TENDER MONITORING AND CONTROL WORKS

ENERGY EFFICIENCY IN PUBLIC LIGHTING

REMOTE MANAGEMENT AND MAINTENANCE: REMOTE MANAGEMENT AND MAINTENANCE: INVENTORY

CONTROL IMPROVE LOAD BALANCING ESTABLISH THEORETICAL CONSUMPTION

REAL TIME MONITORING OF CONSUMPTION ALARMS DETECTION OF UNAUTHORIZED CONNECTIONS CURRENT LEAK DETECTION IMPROVING EFFICIENCY MAINTENANCE

ENERGY EFFICIENCY IN PUBLIC LIGHTING

EXAMPLE: PUBLIC LIGHTING IN PONFERRADA, LEON

Budget: 2.051.359 € Contract (inc. O&M): 5.1M € Contract length : 12 yrs. g y

Ligth points ‐ 12.441 ud Lamps – 14.600 ud Obsolete electrical enclosures – 25 ud Obsolete lamps – 147 ud Mercury vapor (MV) ‐> Sodium vapor high pressure  (SVHP)– 209 ud

EXPECTED RESULTS EXPECTED RESULTS: Instaled power Consumption Emisions Population  Installed power per capita   Energy consumption per capita

KW KWh/año Kg CO2 / año Kg CO2 / año inhabitant Kw/inhabitant kwh/inhabitant year

Electricity consumption / Installed power Electricity consumption / Installed power

kWh/kW kWh/kW 

ACTUAL PREDICTED AUDIT EXPECTED IMPROVEMENT 2.955,61 1.866,00 36,87% 1.866,00 36,87% 11.547.370,00 6.928.422,00 40,00% 5.230.398,00 54,70% 5 196 316 50 3.117.789,90 5.196.316,50 3 117 789 90 40 00% 2.353.679,10 40,00% 2 353 679 10 54 70% 54,70% 68.767 68.767,00 68.767,00 42,98 27,14 27,14 167,9 100,75 76,06 3.906,94

3.712,98

2.803,00