nuclear news

World List of Nuclear Power Plants Operable, Under Construction, or on Order (30 MWe and Over) as of December 31,1987

Reactor Supplier

Generator Supplier

Architect Engineer

Constructor

PHWR PHWR CANDU

Siemens KWU

KWU KWU

AECL

Italimpianti

Siemens CNEA/KWU AECL/ Italimpianti

Siemens/Imp. CNEA/KWU AECL/ Italimpianti

400

PWR

ACECOWEN

400

PWR

ACECOWEN

COP/TOSI/ ACEC COP/TOSI/ ACEC

900

PWR

FRAMACECO

1010

PWR

ACECOWEN

Net MWe

Type

335 692 600

Indivision Doel DoeM (Doel, East Flanders) Doel 2 (Doel, East Flanders)

Construction stage (%)

Commercial Operation orig. actual sched- or exulet pected

Argentina

Comision National de Energia Atomica (CNEA) Atuchal (Lima, Buenos Aires) Atucha2 (Lima, Buenos Aires) Embalse (RioTercero, Cordoba)

100 50 100

6/72 6/74 6/87 6/92 1/80 11/83

TE

100

6/73

TE

100

3/75 11/75

2/80 10/82

Belgium

Soci6t6s RSunies d'Energie du Bassin del'Escaut(EBES) Doel 3 (Doel, East Flanders) Doel 4 (Doel, East Flanders)

AlsthomAtlantique/ACEC Alsthom-

2/75

TE

TE

100

TE

TE

100

12/82

7/85

Atlantique/ACEC

Soci6te Belgo-Francaise d'Energie Nucl6aire Mosane (SEMO) Tihange 1 (Huy, Liege)

870

PWR

ACLF

Alsthom/Rateau/ La Meuse/ ACEC-JS

EdF/ Electrobel

CFE-Blaton/ADF SPIE-SNTP/C-B

100

12/74

9/75

Soci6t6 Intercommunale Beige de Gaz etd'Electriciti (INTERCOM) Tihange 2 (Huy, Liege)

900

PWR

FRAMACECO

Electrobel

CTAFMC

100

4/80

6/83

1020

PWR

ACECOWEN

Alsthom/Rateau/ La Meuse/ACEC Brown Boveri/ Alsthom/ACEC

Electrobel

CTAFMC

100

4/82

9/85

Tihange 3 (Huy, Liege)

CONTINUED

Units in commercial operation

t Estimated date, announced at time reactor was ordered

Twice each year Nuclear News sends a questionnaire to each utility or agency on this list, asking for corrections or additions to the information listed. In cases where a response is not received, we do follow up by phone, though such follow-up is not always possible for plants outside the United States. The criterion for listing a unit is that either an order or a letter of intent has been signed for the reactor. In cases where the definition of "letter of intent" may be ambiguous, or where a special situation may exist, the judgment of the utility is followed as to whether a plant should be included in the list. NUCLEAR NEWS / FEBRUARY 1988

63

World List of Nuclear Power Plants, cont'd

Reactor Supplier

Generator Supplier

Architect Engineer

Constructor

W

W

KWU KWU

KWU KWU

6&H/PE Nuclen Nuclen

W Nucon Nucon

Con- Commercial struc- Operation tion orlg. actual stage sched- or ex(%) ulet pected

Net MWe

Type

626 1229 1229

PWR PWR PWR

440 440 440 440 953 953 953 953

PWR PWR PWR PWR PWR PWR PWR PWR

AEE AEE AEE AEE AEE AEE AEE AEE

640

PHWR

AECL

H-P

AECL/CTL/Utility

Utility

100

10/79

515 515 515 515 516 516 516 516 759* 769* 759* 769* 835 837 837 837 881 881 881 881

PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR

AECL AECL AECL AECL AECL AECL AECL AECL AECL AECL AECL AECL AECL AECL AECL AECL AECL AECL AECL AECL

H-P H-P H-P H-P H-P H-P H-P H-P H-P H-P H-P H-P CGE CGE CGE CGE BBC BBC BBC BBC

OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL

OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 75 90 30 20

11/70 7/71 10/71 12/71 10/72 6/72 10/73 6/73 4/80 5/83 1/81 2/84 10/81 1/85 7/82 2/86 6/77 9/77 9/76 9/77 6/78 2/78 6/79 1/79 7/84 3/85 10/83 9/84 4/85 4/86 1/86 5/87 8/86 8/89 1/85 3/89 5/87 5/91 2/88 2/92

638

PHWR

AECL

GE

AECL/CTL/HQ

HQ

100

11/79

300

PWR

MNI

MNI

MNI

MNI

35

900 900

PWR PWR

Fra Fra

GEC GEC

GNPJVC GNPJVC

HCCM HCCM

Brazil Furnas Angral (Itaorna, Rio de Janeiro) Angra 2 (Itaorna, Rio de Janeiro) Angra 3 (Itaorna, Rio de Janeiro)

Bulgaria

Kozloduyl (Kozloduy, Vratsa) Kozloduy 2 (Kozloduy, Vratsa) Kozloduy 3 (Kozloduy, Vratsa) Kozloduy 4 (Kozloduy, Vratsa) Kozloduy 5 (Kozloduy, Vratsa) Kozloduy 6 (Kozloduy, Vratsa) Belene 1 (Belene, Pleven) Belene 2 (Belene, Pleven)

100 30 0

3/77 12/84 12/87 8/92 12/88 12/95

100 100 100 100 100

12/74 12/75 /78 12/80 /79 8/82

11/87 /89 /90 /92

Canada

New Brunswick Electric Power Commission Point Lepreau (Bay of Fundy,N.B.) Ontario Hydro Pickering1(Pickering,Ont.) Pickering 2 (Pickering, Ont.) Pickering 3 (Pickering, Ont.) Pickering 4 (Pickering, Ont.) Pickering 5 (Pickering, Ont.) Pickering 6 (Pickering, Ont.) Pickering 7 (Pickering, Ont.) Pickering 8 (Pickering, Ont.) Brucel (Tiverton, Ont.) Bruce 2 (Tiverton, Ont.) Bruce 3 (Tiverton, Ont.) Bruce 4 (Tiverton, Ont.) Bruce 5 (Tiverton, Ont.) Bruce 6 (Tiverton, Ont.) Bruce 7 (Tiverton, Ont.) Bruce 8 (Tiverton, Ont.) Darlington 1 (Newcastle Twp., Ont.) Darlington 2 (Newcastle Twp., Ont.) Darlington 3 (Newcastle Twp., Ont.) Darlington 4 (Newcastle Twp., Ont.) Hydro Quebec Gentilly2(B6cancour,Qu6.)

1/83

9/83

China (People's Republic of) Ministry of Nuclear Industry Qinshan(Qinshan,Zhejiang) Guangdong Nuclear Power Joint Venture Company, Ltd. Guangdong 1 (Daya Bay, Guangdong) Guangdong 2 (Daya Bay, Guangdong)

12/87 12/90 /92 /93

* Bruce 1, 2, 3, and 4 have additional capacity for process steam, bringing their net power ratings to 848 MWe equivalent each. NOTES ON THIS LIST: All units in Italy, whether licensed, under construction, or planned, are being retained on this list. The Italian government voted on December 17 in favor of a number of actions, including closure of the Latina unit and indefinite deferral of the two Piemonte Trino units, but at this writing no firm action had been taken to define clearly what the Italian nuclear scene will eventually look like.

64

The PNPP-1 unit in the Philippines is also still retained; the government continues to express its intent to cancel the plant, but at this writing had not taken formal action. Notes on the United States portion of the list are given separately on the pages under the U.S. heading.

NUCLEAR NEWS / FEBRUARY 1988

Cuba

Juragual (Cienfuegos, Cienfuegos) Juragua 2 (Cienfuegos, Cienfuegos)

Architect Engineer

Generator Supplier

Construction stage (%)

Commercial Operation orig. actual sched- orexulet pected

Net MWe

_Type_

Reactor Supplier

440 440

PWR PWR

AEE AEE

400 400 400 400 390 390 390 390 390 390 390 390 890 890 890 890

PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR

AEE AEE

Skoda Skoda Skoda Skoda Skoda Skoda Skoda Skoda Skoda Skoda AEE/Skoda AEE/Skoda AEE/Skoda AEE/Skoda

Skoda Skoda Skoda Skoda Skoda Skoda Skoda Skoda Skoda Skoda AEE/Skoda AEE/Skoda AEE/Skoda AEE/Skoda

465 465

PWR PWR

AEE AEE

AEE AEE

IVO IVO

IVO IVO

100 100

6/76 4/78

710 710

BWR BWR

ASEA-Atom ASEA-Atom

Stal-Laval Stal-Laval

ASEA-Atom ASEA-Atom

ASEA-Atom Jukola

100 100

8/78 10/79 8/80 7/82

233

LMFBR

CEA/EdF/ Novatome

CEM

CEA/Novatome EdF

SGE

100

12/73

Ansaldo

Nersa

Fou/CdA/PH

100

Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Rateau/JS Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom

EdF/CEA EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF

GTM GTM GTM GTM GTM GTM GTM GTM GTM

100 100

Constructor

789 /91

Czechoslovakia

Czechoslavakia Power Works • Bohunicel (Jaslovske" Bohunice) • Bohunice 2 (Jaslovske" Bohunice) • Bohunice 3 (Jaslovske" Bohunice) • Bohunice 4 (Jaslovske'Bohunice) • Dukovanyl (Dukovany) • Dukovany 2 (Dukovany) • Dukovany 3 (Dukovany) • Dukovany 4 (Dukovany) Mochovce 1 (Mochovce) Mochovce 2 (Mochovce) Mochovce 3 (Mochovce) Mochovce 4 (Mochovce) Temelin 1 (Temelin) Temelin 2 (Temelin) Temelin 3 (Temelin) Temelin 4 (Temelin)

AEE

100 100 100 100 100 100 100 100

AEE

12/78 179 3/80 /82 8/84 /83 8/85 /82 3/85 /83 3/86 /83 12/86 /87 /84 /89 /90

/91

/92 /92 /93 /96

Finland ImatranVoimaOy(IVO) • Loviisal (Loviisa, Uusimaa) • Loviisa 2 (Loviisa, Uusimaa) Teollisuuden Voima Osakeyhtio (TVO) • TVO-1 (Olkiluoto, Turku Pori) • TVO-2 (Olkiluoto, Turku Pori)

5/77 1/81

France

Commissariat a I'Energie Atomique • Phenix(Gard) Centrale Nucl6aire Europ6ene a Neutrons Rapides S.A. (Nersa) Creys-Malville (Isere) Electricity de France (EdF) • ChinonA3(lndre-et-Loire) • ChinonBI (Indre-et-Loire) • ChinonB2 (Indre-et-Loire) • ChinonB3 (Indre-et-Loire) • ChinonB4 (Indre-et-Loire) • Saint-Laurent-des-Eaux1 (Loir-et-Cher) • Saint-Laurent-des-Eaux 2 (Loir-et-Cher) • Saint-Laurent-des-Eaux B1 (Loir-et-Cher) • Saint-Laurent-des-Eaux B2 (Loir-et-Cher) • Bugeyl (Ain) • Bugey2(Ain) • Bugey3(Ain) • Bugey4(Ain) • Bugey5(Ain) • Fessenheim 1 (Haut-Rhin) • Fessenheim 2 (Haut-Rhin)

Units in commercial operation

1200 400 870 870 870 870 460 515 880 880 540 920 920 900 900 880 880

LMFBR Novatome/NIRA GCR PWR PWR PWR PWR GCR GCR PWR PWR GCR PWR PWR PWR PWR PWR PWR

various Fra Fra Fra Fra various various Fra Fra various Fra Fra Fra Fra Fra Fra

Dumez Bouygues Bouygues Bouygues Bouygues C-B C-B

100 100 100 100 100 100 100 100 100 100 100 100 100 100

2/83

/88*

8/67 2/82 2/84 6/82 8/84 5/86 3/87 1/87 12/87 3/69 8/71 1/81 8/83 6/81 8/83 4/72 12/76 2/79 8/77 2/79 6/78 6/79 11/78 1/80 10/75 12/77 7/76 3/78 CONTINUED

t Estimated date, announced at time reactor was ordered

* Creys-Malville has generated power, but full-scale operation has been postponed pending completion of studies on the safety of operation without the avail­ ability of the fuel storage vessel, which has been found to leak liquid sodium. NUCLEAR NEWS / FEBRUARY 1988

65

World List of Nuclear Power Plants, cont'd

Net MWe

Type

Reactor Supplier

Generator Supplier

Architect Engineer

FRANCE, cont'd EdF, cont'd • Dampierrel(Loiret)

890

PWR

Fra

Alsthom

EdF

• Dampierre 2 (Loiret)

890

PWR

Fra

Alsthom

EdF

• Dampierre 3 (Loiret)

890

PWR

Fra

Alsthom

EdF

• Dampierre 4 (Loiret)

890

PWR

Fra

Alsthom

EdF

GravelinesBI (Nord) Gravelines 62 (Nord) Gravelines B3 (Nord) Gravelines B4 (Nord) Gravelines C5 (Nord) Gravelines C6 (Nord) Tricastin 1 (Drome) Tricastin 2 (Drome) Tricastin 3 (Drome) Tricastin 4 (Drome) Blayais 1 (Gironde) Blayais 2 (Gironde) Blayais 3 (Gironde) Blayais 4 (Gironde) Paluel 1 (Seine-Maritime)

910 910 910 910 910 910 915 915 915 915 910 910 910 910 1290

PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR

Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra

Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom

EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF

Paluel 2 (Seine-Maritime)

1290

PWR

Fra

Alsthom

EdF

Paluel 3 (Seine-Maritime)

1290

PWR

Fra

Alsthom

EdF

Paluel 4 (Seine-Maritime)

1290

PWR

Fra

Alsthom

EdF

880 880 880 880 1300 1300 1290 1290 1265 1265 1265 1265 1275 1275 1275 1275 1290 1290 1275 1275 1390 1390

PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR

Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra Fra

Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom Alsthom

EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF EdF

310

PWR

ACECOWEN/Fra

Rateau/C-L

G&H/SPIE

70 408 408 408 408 408 408 408 408 900 900

PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR

AEE AEE AEE AEE AEE

Cruas 1 (Ardeche) Cruas 2 (Ardeche) Cruas 3 (Ardeche) Cruas 4 (Ardeche) Saint-Alban 1 (Isere) Saint-Alban 2 (Isere) Flamanville 1 (Manche) Flamanville2(Manche) Cattenom 1 (Moselle) Cattenom 2 (Moselle) Cattenom 3 (Moselle) Cattenom 4 (Moselle) Belleville 1 (Cher) Belleville 2 (Cher) Nogents/Seine1(Aube) Nogents/Seine2(Aube) Penly 1 (Seine-Maritime) Penly 2 (Seine-Maritime) Golfechl (Tarn et Garonne) Golfech 2 (Tarn et Garonne) Chooz B1 (Ardennes) ChoozB2 (Ardennes) Socifite D'friergie Nucl6aire Franco-Beige des Ardennes • Chooz A (Ardennes)

Germany (Democratic Republic) Rheinsberg 1 (Rheinsberg, Granesee region) Nord 1 (Lubmin, Greifswald region) Nord 2 (Lubmin, Greifswald region) Nord 3 (Lubmin, Greifswald region) Nord 4 (Lubmin, Greifswald region) Nord 5 (Lubmin, Greifswald region) Nord 6 (Lubmin, Greifswald region) Nord 7 (Lubmin, Greifswald region) Nord 8 (Lubmin, Greifswald region) Stendal 1 (Stendal, Magdeburg region) Stendal 2 (Stendal, Magdeburg region)

66

Skoda Skoda Skoda Skoda AEE AEE

Constructor CM/SeB/ Ballot CM/SeB/ Ballot CM/SeB/ Ballot CM/SeB/ Ballot SGE SGE SGE SGE SGE SGE C-B-C C-B-C C-B-C C-B-C SB/Dumez SB/Dumez SB/Dumez SB/Dumez CM/Ballot/ Chag CM/Ballot/ Chag CM/Ballot/ Chag CM/Ballot/ Chag C-B-C C-B-C C-B-C C-B-C Bouygues Bouygues SGE/SCREG SGE/SCREG SB/Dumez SB/Dumez SB/Dumez SB/Dumez GTM GTM CB

Construction stage (%)

Commercial Operation orig. actual sched- or exulet pected

100

7/79

9/80

100

1/80

2/81

100

7/80

5/81

100

4/81 11/81

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

4/79 10/79 5/80 2/81 11/84 8/85 2/79 8/79 3/80 9/80 2/81 9/81 9/82 2/83 2/83

11/80 12/80 6/81 10/81 1/85 11/85 12/80 12/80 5/81 11/81 12/81 2/83 11/83 10/83 12/85

100

5/83 12/85

100

6/84

2/86

100

9/85

6/86

Fougerolle Fougerolle Bouygues Bouygues

100 100 100 100 100 100 100 100 100 100 80 55 100 95 100 85 70 45 70 40 50 25

5/83 8/83 2/84 8/84 11/84 10/85 1/85 12/85 8/85 5/86 7/88 7/90 10/86 8/87 5/87 3/88 10/89 6/91 1/90 5/92 5/91 10/93

4/84 4/85 9/84 2/85 5/86 3/87 12/86 3/87 4/87 12/87 8/89 6/91 2/88 8/88 2/88 2/89 4/90 3/92 6/90 5/93 10/91 10/93

SGE/CITRA

100

4/67

100 100 100

/60 5/66 12/74 12/73

CB CM CM

100 100

/75 /77

2/75 6/78

/78 11/79 /88 /89 /90

/91 /91

/93 NUCLEAR NEWS / FEBRUARY 1988

Commercial Operation orig. actual sched- or exulet pected

JTyp_e_

Reactor Supplier

Generator Supplier

Architect Engineer

Constructor

Construction stage (%)

1235

PWR

KWU

KWU

KWU

KWU

100

795 1225

PWR PWR

KWU KWU

KWU KWU

KWU KWU

KWU KWU

100 79

2/76 12/76 5/89 5/89

1260

BWR

AEG

KWU

KWU

Hoch/ Hammers/ Heitkamp/ Holzmann

100

9/77

3/84

1242

PWR

KWU

KWU

KWU

KWU

99

2/89

8/88

296

HTR

HRB

BBC

BBC/HRB

KTHTR

100

3/77

6/87

1307

PWR

KWU

KWU

KWU

KWU

100

9/77 12/86

771

BWR

AEG

KWU

KWU

KWU

100

4/74

2/77

907 1285

BWR PWR

KWU KWU

KWU KWU

KWU KWU

KWU KWU

100 100

11/76 7/88

3/79 5/88

340

PWR

Siemens

Siemens

Siemens

Siemens

100

3/69

3/69

864 1268

BWR PWR

KWU KWU

KWU KWU

KWU KWU

KWU KWU

100 100

/74 11/82

2/80 4/85

1244 1244

BWR BWR

KWU KWU

KWU KWU

KWU/Hoch KWU/Hoch

KWU/Hoch KWU/Hoch

100 100

6/79 6/80

7/84 1/85

630

PWR

Siemens

Siemens

Siemens

Siemens

100

4/72

5/72

1284

PWR

KWU

KWU

KWU

KWU

640

BWR

AEG

AEG/KWU

AEG/KWU

Hochtief

100

2/72

1230

PWR

KWU

KWU

KWU

Arge/KKU

100

1/76 10/79

1300

PWR

KWU

KWU

KWU

Arge/KWG

100

8/79

2/85

1146

1240 1237 1227 1258

PWR PWR PWR PWR PWR

Siemens Siemens KWU BBR

KWU KWU KWU BBC/BBR KWU

Hochtief Hochtief Hochtief Hochtief

100 100 0 100 0

6/74 8/76

3/75 1/77

KWU

KWU KWU KWU BBC KWU

295

LMFBR

Int/BN/Nera

KWU

INB

INB/Hoch

100

1/80

/88

410 410 410 410

AEE/Skoda AEE/Skoda AEE/Skoda AEE/Skoda AEE

AEE/GVM AEE/GVM AEE/GVM AEE/GVM

EROTERV EROTERV EROTERV EROTERV

100 100 100 100 0 0

/SO 8/83 6/82 9/84 6/87 12/86 6/85 10/87

1000

PWR PWR PWR PWR PWR PWR

160 160

BWR BWR

GE GE

GE GE

Bechtel Bechtel

100 100

2/69 10/69 2/69 10/69

Net MWe

Germany (Federal Republic)

BayernwerkAG • Grafenrheinfeld KKG (Grafenrheinfeld) Gemeinschaftskernkraftwerk Neckar (GKN) • GKN 1 (Neckarwestheim) GKN 2 (Neckarwestheim) Kernkraftwerk Kruemmel GmbH (KKK) • Kruemmel KKK (Geesthacht-Kruemmel/ Elbe) Kernkraftwerk Lippe-EMS GmbH (KLE) Emsland (Lingen) Hochtemperatur-Kernkraftwerk GmbH (HKG) • THTR300(Hamm-Uentrop) Kernkraftwerk Brokdorf GmbH KBR (Brokdorf)

Kernkraftwerk Brunsbuettel GmbH (KKB) • Brunsbuettel (Brunsbuettel/Elbe) Kernkraftwerk Isar(KKI) • KK11 (Essenbach) KKI2(Essenbach) Kernkraftwerk Obrigheim GmbH (KWO) • Obrigheim KWO (Obrigheim) Kernkraftwerk Philippsburg (KKP) • KKP 1 (Philippsburg) • KKP 2 (Philippsburg) Kernkraftwerk RWE-Bayernwerk GmbH (KRB) • KRB II Block B(Gundremmingen) • KRB II Block C(Gundremmingen) Kernkraftwerk Stade GmbH (KKS) • Stade KKS (Stade) Kernkraftwerk Sud GmbH (KWS) KWS(Wyhl/Rhein) PreussenElektraAG • KWW (Wuergassen) Kernkraftwerk Unterweser GmbH (KKU) • KKU (Esensham) Gemeinschaftskernkraftwerk Grohnde GmbH (KWG) • KWG (Grohnde) Rhelnlsch-Westfalisches Elektrlzltatswerk AG (RWE) • BiblisA(Worms/Rhein) • BiblisB(Worms/Rhein) Biblis C (Worms/Rhein) • Mulheim-Kaerlich (Mulheim-Kaerlich) Pfaffenhofen A (Pfaffenhofen ad Zusam) Schnell-Bruter-Kernkraftwerksgesellschaft (SBK) KalkarSNR-SOO(Kalkar)

0

11/78

6/82

/79 indef. 3/72

/81 indef. 5/78 10/87 /90 indef.

Hungary

Hungarian Electrical Works • Paks1(Paks,Tolna) • Paks2(Paks,Tolna) • Paks3(Paks,Tolna) • Paks4(Paks,Tolna) Paks 5 (Paks, Tolna) Paks6(Paks,Tolna)

1000

AEE

/94 indef. /96 indef.

India

Atomic Energy Commission, Department of Atomic Energy • Tarapur1(Tarapur, Maharashtra) • Tarapur2 (Tarapur, Maharashtra)

• Units in commercial operation NUCLEAR NEWS / FEBRUARY 1988

Bechtel Bechtel

CONTINUED

t Estimated date, announced at time reactor was ordered 67

World List of Nuclear Power Plants, cont'd

Reactor Supplier

Generator Supplier

Architect Engineer

Constructor

Con­ struc­ tion stage (%)

CGE L&T

EEC EEC

AECL/MECO AECL/MECO

HCC HCC

100 100

L&T L&T WIL R&C L&T/WIL L&T/WIL

BHEL BHEL BHEL BHEL BHEL BHEL

DAE DAE DAE DAE DAE DAE

ECC ECC HCC HCC HCC HCC

100 100 85 80 22 17

6CR

TNPG

Parsons/AMN

TNPG/Agip

100

5/63

PWR

W

Franco Tosi/ Marelli undecided undecided

G&H

Torno/ McAlp Recchi

100

10/64

ENEL ENEL NIRA/ENEL G&H ENEL/ G&H/AMN ENEL/ G&H/AMN

undecided undecided Torno SOGENE CCN

0 0 91 100 67

5/94 indef. 5/95 indef. 4/75 12/81 11/83 3/91

CCN

42

3/83 11/91

Takenaka/ Kajima Takenaka/ Kajima Takenaka/ Kajima

100

Net MWe

Type

202 202 220 220 220 220 220 220 220 220 220 220

PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR

Ente Nazionale per I'Energia Elettrica (ENEL) • Latina(BorgoSabotino,Latina)

153

• TrinoVercellesel (Trino, Vercelli)

260

PiemonteTrinol (Trjno, Vercelli) Piemonte Trino 2 (Trino, Vercelli) Cirene(Latina, Latjna) • Caorso (Caorso, Piacenza) Montaltodi Castro 1 (Montalto di Castro, Viterbo) Montaltodi Castro 2 Montaltodi Castro, Viterbo)

950 950 53 860 982

INDIA, cont'd AEC, DEA, cont'd • RAPP1(Kota,Rajasthan) • RAPP2(Kota,Rajasthan) RAPP3(Kota,Rajasthan) RAPP4(Kota,Rajasthan) • MAPP1 (Kalpakkam, Tamil Nadu) • MAPP 2 (Kalpakkam, Tamil Nadu) NAPP1(Narora,UttarPradesh) NAPP2(Narora,UttarPradesh) KAPP1 (Kakrapar, Gujarat) KAPP2(Kakrapar,Gujarat) Kaiga 1 (Kaiga, Karnataka) Kaiga2 (Kaiga, Karnataka)

Commercial Operation orig. actual sched- or exulet pected 12/69 12/73 12/73 4/81 /94 /95 6/76 1/84 6/77 10/85 3/81 5/88 3/82 2/89 2/91 2/91 2/92 2/92 /94 /95

Italy

AMN PWR AMN PWR NIRA LWCHW BWR AMN/GETSCO BWR AMN/GETSCO

AMN AMN/ASGEN AMN/ASGEN

m

/88

982

BWR

AMN/GETSCO

AMN/ASGEN

ChuDu Electric Power Co. • Hamaoka 1 (Hamaoka-cho, Shizuoka)

516

BWR

Toshiba

Hitachi

Chubu/Toshiba

• Hamaoka 2 (Hamaoka-cho, Shizuoka)

814

BWR

Toshiba

Hitachi

• Hamaoka 3 (Hamaoka-cho, Shizuoka)

1066

BWR

Toshiba

Hitachi

Chubu/Toshiba/ Hitachi Chubu/Toshiba Hitachi

Chugoku Electric Power Co., Inc. • Shimane 1 (Kashima-cho, Shjmane) Shimane 2 (Kashima-cho, Shimane)

439 791

BWR BWR

Hitachi Hitachi

Hitachi Hitachi

Hitachi Hitachi/ Kajima

Kajima Kajima/ Shimizu/ Okumura

Hokkaido Electric Power Co. Tomari-1 (Tomari-mura, Hokkaido)

550

PWR

MHI

MHI/MEL

MAPI

Tomari-2 (Tomari-mura, Hokkaido)

550

PWR

MHI

MHI/MEL

MAPI

Taisei/Obay Shimizu Taisei/Obay Shimizu

Japan Atomic Power Co. Ltd. (JAPC) • Tokai 1 (Tokaj Mura, Ibaraki) • Tokai 2 (Tokai Mura, Ibaraki) • Tsurugal (Tsuruga, Fukui) • Tsuruga 2 (Tsuruga, Fukui)

159 1056 340 1115

GCR BWR BWR PWR

GEC GE GE MHI

GEC GE GE MHI/MEL

GEC Ebasco Ebasco

MH I/MAPI

Shimizu Shimizu Takenaka Obay/ Takenaka/ Shimizu/Kum

100 100 100 100

7/66 8/77 11/78 3/70 6/87 2/87

Kansai Electric Power Co., Inc. • Mihamal (Mihama-cho, Fukui)

320

PWR

W

MHI/MEL

KEPCO/Gilbert

100

11/70

• Mihama 2 (Mihama-cho, Fukui)

470

PWR

MHI

MHI/MEL

KEPCO/MAPI

100

7/72

• Mihama 3 (Mihama-cho, Fukui)

780

PWR

MHI

MHI/MEL

KEPCO/MAPI

100

7/76 12/76

• Takahama 1 (Takahama-cho, Fukui)

780

PWR

W

MHI/MEL

KEPCO/Gilbert

100

8/74 11/74

• Takahama 2 (Takahama-cho, Fukui)

780

PWR

MHI

MHI/MEL

KEPCO/MAPI

100

7/75 11/75

• Takahama 3 (Takahama-cho, Fukui)

830

PWR

MHI

MHI/MEL

KEPCO/MAPI

Maeda/ Kum/Obay Maeda/ Kum/Obay Haz/ Takenaka Maeda/ Haz/Taisei Maeda/ Haz/Taisei Maeda, Haz, Kum/ Takenaka, Obay, Taisei, Haz

100

2/85

Japan

11/74

3/76

100

3/78 11/78

100

8/87

100 11/73 90.9 9/88

3/74 2/89

83.9

6/89

6/89

51.7

/90

6/91

1/85

CONTINUED 68

NUCLEAR NEWS / FEBRUARY 1988

Net MWe

Type

Reactor Supplier

Generator Supplier

Architect Engineer

830

PWR

MHI

MHI/MEL

KEPCO/MAPI

• Ohi1 (Ohi-cho, Fukui) • Ohi 2 (Ohi-cho, Fukui) Ohi 3 (Ohi-cho, Fukui)

1120 1120 1127

PWR PWR PWR

W W MHI

MHI/MEL MHI/MEL MHI/MEL

KEPCO/Gilbert KEPCO/Gilbert KEPCO/MAPI

Ohi 4 (Ohi-cho, Fukui)

1127

PWR

MHI

MHI/MEL

KEPCO/MAPI

529 529 1127

PWR PWR PWR

MHI MHI MHI

MHI/MEL MHI/MEL MHI/MEL

MAPI MAPI MAPI

1127

PWR

MHI

MHI/MEL

MAPI

846 846

PWR PWR

MHI MHI

MHI/MEL MHI/MEL

MAPI MAPI

148

HWLWR

Toshiba

PNC/EPDC

Toshiba

PNC/ FBEC

JAPAN, cont'd Kansai Electric, cont'd • Takahama4(Takahama-cho,Fukui)

Kyushu Electric Power Co., Inc. • Genkai 1 (Genkai, Saga) • Genkai 2 (Genkai, Saga) Genkai 3 (Genkai, Saga) Genkai 4 (Genkai, Saga) • Sendai 1 (Sendai, Kagoshima) • Sendai 2 (Sendai, Kagoshima) Power Reactor & Nuclear Fuel Development Corp. (PNC) • Fugen, ATR (Tsuruga, Fukui)

Hitachi/MHI/ SHI/Fuji LMFBR Toshiba/Hitachi/ MHI/Fuji

Monju (Tsuruga, Fukui)

250

Shlkoku Electric Power Co. • Ikatal (Ikata-cho, Ehime) • Ikata 2 (Ikata-cho, Ehime) Ikata 3 (Ikata-cho, Ehime)

538 538 846

PWR PWR PWR

MHI MHI

MHI/MEL MHI/MEL

MAPI MAPI

Constructor

Con­ struc­ tion stage (%)

100 Maeda, Haz, Kum/ Takenaka, Obay Taisei, Haz 100 Kum/Obay 100 Kum/Obay 12 Kum/Kajima/ NKK/Maeda/Haz/ Takenaka/Taisei 1 Kum/Kajima/ NKK/Maeda/Haz/ Takenaka/Taisei

Obay Obay Obay/Shimizu/ Takenaka Obay/Shimizu/ Takenaka Taisei Taisei

100 100 23

Maeda/ Kajima Obayashi/ Taisei/Kajima

100

Commercial Operation orig. actual sched- or exulet peeled 8/85

7/76 3/79 1/77 12/79 8/91 10/91 6/92

8/92

7/75 10/75 3/81 3/81 7/93

1.5 100 100

6/85

7/95 7/84 7/84 3/86 11/85 12/76

3/79

40.4 10/92

/93

100 MHI/Taisei 100 MHI/Taisei 8 Kajima/Okumura/ Kokudo/Toa/Aoki Taisei/Goyo/ Wakatiku

4/77 10/81 3/92

9/77 3/82 3/92

12/75 7/95 /97

6/84 7/95 /97

8/76 12/75 10/76 5/82 8/83 6/85 12/85

3/71 7/74 3/76 10/78 4/78 10/79 4/82 2/84 6/85 8/87

Tohoku Electric Power Co., Inc. • Onagawa 1 (Onagawa, Miyagi) Onagawa 2 (Onagawa, Miyagi) Maki 1 (Maki, Niigata) Tokyo Electric Power Co. • Fukushima Daiichi 1 (Fukushima) • Fukushima Daiichi 2 (Fukushima) • Fukushima Daiichi 3 (Fukushima) • Fukushima Daiichi 4 (Fukushima) • Fukushima Daiichi 5 (Fukushima) • Fukushima Daiichi 6 (Fukushima) • Fukushima DainM (Fukushima) • Fukushima Daini 2 (Fukushima) • Fukushima Daini 3 (Fukushima) • Fukushima Daini 4 (Fukushima)

497 825 825

BWR BWR BWR

Toshiba

Toshiba

Toshiba

Kajima

100 0 0

439 760 760 760 760 1067 1067 1067 1067 1067

BWR BWR BWR BWR BWR BWR BWR BWR BWR BWR

GE GE Toshiba Hitachi Toshiba GE Toshiba Hitachi Toshiba Hitachi

GE GE Toshiba Hitachi Toshiba GE Toshiba Hitachi Toshiba Hitachi

Ebasco Ebasco Toshiba Hitachi Toshiba Ebasco Toshiba Hitachi Toshiba Hitachi

100 100 100 100 100 100 100 100 100 100

• Kashiwazaki Kariwa 1 (Niigata) Kashiwazaki Kariwa 2 (Niigata) Kashiwazaki Kariwa 3 (Niigata) Kashiwazaki Kariwa 4 (Niigata) Kashiwazaki Kariwa 5 (Niigata)

1067 1067 1100 1100 1067

BWR BWR BWR BWR BWR

Toshiba Toshiba Toshiba Hitachi Hitachi

Toshiba Toshiba Toshiba Hitachi Hitachi

Toshiba Toshiba

Kajima Kajima Kajima Kajima Kajima Kajima Kajima Kajima Kajima Takenaka/ Shimizu Kajima Kajima

Hitachi

Takenaka/ Shimizu

556 605 895 895 629 900 900

PWR PWR PWR PWR PHWR PWR PWR

W W W W AECL W W

GEC GEC GEC GEC NEI/ParsonsLtd. W W

Gilbert Gilbert Bechtel Bechtel Canatom/AECL Bechtel Bechtel

W W Hyundai Hyundai AECL Hyundai Hyundai

100 12/84 9/85 59.5 10/90 10/90 4.2 7/93 7/93 0 7/93 7/93 71.6 4/90 4/90

Korea

Korea Electric Power Corporation • Ko-Ri 1 (Ko-Ri, South Kyongsang) • Ko-Ri 2 (Ko-Ri, South Kyongsang) • Ko-Ri 3 (Ko-Ri, South Kyongsang) • Ko-Ri 4 (Ko-Ri, South Kyongsang) • Wolsung (Kampo, North Kyongsang) • Yongkwangl (Yongkwang, South Cholla) • Yongkwang 2 (Yongkwang, South Cholla) • Units in commercial operation NUCLEAR NEWS / FEBRUARY 1988

100 100 100 100 100 100 100

12/75 4/78 2/83 7/83 9/84 9/85 9/85 4/86 1/82 4/83 3/86 8/86 3/87 6/87 CONTINUED

t Estimated date, announced at time reactor was ordered 69

World List of Nuclear Power Plants, cont'd

Net MWe

Type

Reactor Supplier

Generator Supplier

Architect Engineer

1000 1000 943

PWR PWR PWR

C-E/KHIC C-E/KHIC Fra

GE GE Alsthom

S&L S&L Fra/Alsthom

943

PWR

Fra

Alsthom

Fra/Alsthom

654 654

BWR BWR

GE GE

Mitsubishi Mitsubishi

Ebasco Ebasco

CFE/Ebasco CFE/Ebasco

55

BWR

RDM

Stork

GKN

BAM

452

PWR

KWU/RDM

KWU/Stork

KWU

125

PHWR

CGE

Hitachi

620

PWR

W

Zarnowiec 1 (Zarnowiec, Gdansk)

434

PWR

Zarnowiec 2 (Zarnowiec, Gdansk)

434

Zarnowiec 3 (Zarnowiec, Gdansk) Zarnowiec 4 (Zarnowiec, Gdansk)

KOREA, cont'd Korea Electric, cont'd Yongkwang 3 (Yongkwang, South Cholla) Yongkwang 4 (Yongkwang, South Cholla) Uljin 1 (Uljin, North Kyongsang) Uljin 2 (Uljin, North Kyongsang)

Constructor Hyundai Hyundai Dong Ah/ KHIC Dong Ah/ KHIC

Construction stage (%)

Commercial Operation orig. actual sched- or exulet pected

0 /95 0 /96 90.6 12/87

/95 /96 9/88

79

12/88

9/89

6/77 6/78

6/88 6/92

100

1/69

1/69

KWU/ Bredero

100

7/73 10/73

CGE

CGE

100

6/71 12/72

W

B&R

W

Skoda

Zamech

Megadex

20

/85

/91

PWR

Skoda

Zamech

Megadex

20

/86

/92

434

PWR

Skoda

Zamech

434

PWR

Skoda

Zamech

Loatep/Energo Project Loatep/Energo Project Loatep/Energo Project Loatep/Energo Project

1000 1000

PWR PWR

440 620 620 620 620 620

PWR CANDU CANDU CANDU CANDU CANDU

Mexico

Comision Federal de Electricidad (CFE) Laguna Verde 1 (Laguna Verde, Veracruz) Laguna Verde 2 (Laguna Verde, Veracruz)

99.0 48.4

Netherlands

GemeenschappelijkeKernenergiecentrale NederlandNV(GKN) • Dodewaard (Dodewaard, Gelderland) NV Provinciale Zeeuwse Energle Maatschappij(PZEM) • Borssele (Borssele, Zeeland)

Pakistan

Pakistan Atomic Energy Commission • Kanupp (Karachi, Sind)

Philippines

Philippine National Power Corp. PNPP1 (Morong, Luzon)

Poland

Kujawy 1 Kujawy 2

Rumania

oit

Cernavoda 1 (Cernavoda, Constanta) Cernavoda 2 (Cernavoda, Constanta) Cernavoda 3 (Cernavoda, Constanta) Cernavoda 4 (Cernavoda, Constanta) Cernavoda 5 (Cernavoda, Constanta) 70

AEE AECL AECL AECL AECL AECL

AMN/GE AMN/GE

AECL/GE/AMN AECL/GE/AMN

98.5 12/82 indef.

Megadex

/94

Megadex

/95 /96 /98

/80 indef. /90 /86 /92 /87 Romenergo /94 Romenergo /95 Romenergo /96 CONTINUED ON PAGE 75 Romenergo Romenergo

0

50 30 15 10 5

NUCLEAR NEWS / FEBRUARY 1988

Commercial Operation orig. actual sched- orexulet pected

Constructor

Construction stage (%)

SB

100

12/82

SB

100

12/83 11/85

Bechtel/lnitec/lyP Bechtel/lnitec/lyP

several several

100 100

7/77 12/84 12/77 6/85

Alsthom/J-S

SOCIA

GC

100

9/72

7/72

W

W/ENB

Initec/Bechtel

VANEA

100

12/81

/88

PWR

KWU/ENSA

KWU/ENB

EA

EA/ EyT/others

100

6/82

8/88

997

PWR

KWU/ENSA

440

BWR

GE

GE

Ebasco

GE

100

930 930

PWR PWR

W W

W W

EA/G&HE EA/G&HE

EyT

EyT

100 100

11/76 8/81 12/77 12/83

975 975

BWR BWR

GE GE

GE GE

EA EA

AETEA/others AETEA/others

71 58

/81 indef. /82 indef.

975

BWR-6

GE

GE/GEE

EA/SEN/G&H

EyT/others

100

900

PWR

W

W

Iber

97

12/76 indef.

900

PWR

W

W

Iber

57

7/78 indef.

1075

PWR

W

W

Iber/Bech/ SEN/I nitec Iber/Bech/ SEN/I nitec Iber/Bech/ SEN/I nitec

Iber

0

6/81 indef.

153

PWR

W

W

EyT

100

1000

PWR

KWU

KWU

OKGAktiebolag • Oskarshamn 1 (Oskarshamn)

440

BWR

ASEA-Atom

• Oskarshamn 2 (Oskarshamn)

595

BWR

ASEA-Atom

• Oskarshamn 3 (Oskarshamn)

1060

BWR

ASEA-Atom

Stal-Laval ASEA/ BBC/Stal-Laval ASEA/Stal-Laval

750 800 915 915 970 970 1050

BWR PWR PWR PWR BWR BWR BWR

ASEA-Atom W W W ASEA-Atom ASEA-Atom ASEA-Atom

EE Stal-Laval Stal-Laval Stal-Laval Stal-Laval Stal-Laval Stal-Laval

ASEA-Atom/SSPB SSPB/G&H/S-L VBB-TE/S-L VBB-TE/S-L A-A/SSPB/S-L A-A/SSPB/S-L A-A/SSPB/S-L

600 585

BWR BWR

ASEA-Atom ASEA-Atom

Stal-Laval Stal-Laval

A-A/S-L/SK/VBB A-A/S-L/SK/VBB

Net MWe

Type

Reactor Supplier

Generator Supplier

Architect Engineer

ESCOM • Koeberg 1 (Melkbosstrand, Cape)

920

PWR

Fra

Alsthom

• Koeberg 2 (Melkbosstrand, Cape)

920

PWR

Fra

Alsthom

Fra/Alsthom/ Framateg Fra/Alsthom/ Framateg

880 880

PWR PWR

W W

W/ENB W/ENB

480

GCR

SFAC

982

PWR

997

South Africa 7/84

Spain

Asociacion Nuclear Asco • Asco 1 (Asco, Tarragona) • Asco 2 (Asco, Tarragona) Hispano-Francesa de Energia Nuclear, SA • Vandellos 1 (Vandellos, Tarragona) Asociacion Nuclear Vandellos Vandellos 2 (Vandellos, Tarragona) Central de Trillo Trlllo 1 (Trillo, Guadalajara) Trillo 2 (Trillo, Guadalajara) Centrales Nucleares del Norte, SA • Santa Maria deGarona (Santa Maria de Garona, Burgos) Central Nuclear de Almaraz • Almaraz 1 (Almaraz, Caceres) • Almaraz 2 (Almaraz, Caceres) Central Nuclear de Valdecaballeros Valdecaballeros 1 (Valdecaballeros, Badajoz) Valdecaballeros 2 (Valdecaballeros, Badajoz) Hidroelectrica Espanola SA • Cof rentes (Cof rentes, Valencia) IberdueroSA Lemoniz 1 (Lemoniz, Vizcaya) Lemoniz 2 (Lemoniz, Vizcaya) Sayago (Sayago, Zamora) Union Electrica, SA, & Fenosa • JoseCabrera (Almonacid de Zorita, Guadalajara) Regodola (Jove, Lugo)

G&H

indef.

0 2/70

7/78

7/68

3/71

3/85

8/69

0

indef.

100

2/72

100

8/74 12/74

Sweden

Statens Vartenfallsverk (SSPB) • Ringhals 1 (Varberg) • Ringhals 2 (Varberg) • Ringhals 3 (Varberg) • Ringhals 4 (Varberg) • Forsmarkl (Uppsala) • Forsmark 2 (Uppsala) • Forsmark 3 (Uppsala) SydkraftA.B. • Barsebackl (Malmo) • Barseback2(Malmo)

• Units in commercial operation NUCLEAR NEWS / FEBRUARY 1988

ASEA/

ArmeradBetong ArmeradOKG/AA/BBC/ Betong SL/VBB AA/SL/OKG/VBB ABV/Skanska/ Boliden-WPContech ASEA-Atom

100

12/83

SSPB SSPB SSPB

SSPB SSPB SSPB SSPB

100 100 100 100 100 100 100

6/73 2/76 7/74 5/75 12/77 4/81 7/79 11/83 7/78 12/80 7/80 7/81 /82 8/85

SCG SCG

100 100

7/75 7/75 7/77 7/77 CONTINUED

8/85

t Estimated date, announced at time reactor was ordered 75

World List of Nuclear Power Plants, cont'd

Construction stage (%)

Commercial Operation orig. actual sched- or exulet pected

Net MWe

Type

Reactor Supplier

Generator Supplier

Architect Engineer

Constructor

Bernische Kraftwerke AG (BKW) • Muhleberg (Muhleberg, Bern)

320

BWR

GETSCO

BBC

BBC/E&B/ GETSCO

BBC/ GETSCO

100

10/72

Kernkrattwerk Leibstadt AG • Leibstadt (Leibstadt, Aargau)

990

BWR

GETSCO

BBC

BBC/GETSCO/ EWI

BBC/ GETSCO

100

10/78 12/84

350 350

PWR PWR

W W

BBC BBC

G&H/BBC G&H/BBC

Zschokke Zschokke

100 100

12/69 12/69 3/72 3/72

920

PWR

KWU

KWU

KWU

KWU

100

11/77 11/79

604 604 948 948 890 890

BWR BWR BWR BWR PWR PWR

GE GE GE GE W W

W W W W GE GE

Ebasco Ebasco Bechtel Bechtel Bechtel Bechtel

TPC TPC TPC TPC TPC TPC

100 100 100 100 100 100

3/75 12/78 3/76 7/79 4/80 12/81 4/81 3/83 5/84 7/84 5/85 5/85

138 138 150 150 250 250 275 275 600 600 290 290 1175 250 250 625 625 300 300 590 590 625 625 625 625 660 660

GCR GCR GCR GCR GCR GCR GCR GCR AGR AGR GCR GCR PWR GCR GCR AGR AGR GCR GCR GCR GCR AGR AGR AGR AGR AGR AGR

TNPG TNPG TNPG TNPG APC APC TNPG TNPG APC APC EE/BW/TW EE/BW/TW PPP EE/BW/TW EE/BW/TW NPC NPC TNPG TNPG EE/B&W/TW EE/B&W/TW NNC NNC NNC NNC NNC NNC

AEI AEI Par(UK) Par(UK) RW RW Par(UK)/AEI Par(UK)/AEI Par(UK) Par(UK) EE EE GEC EE EE AEI/GEC AEI/GEC AEI/Par(UK) AEI/Par(UK) EE EE GEC GEC GEC GEC NEI NEI

TNPG TNPG TNPG

JL-Bal

TNPG APC APC TNPG TNPG APC APC EE/BPL/TW EE/BPL/TW NNC EE/BPL/TW EE/BPL/TW NPC NPC TNPG TNPG EE/BPL/TW EE/BPL/TW NNC NNC NNC NNC CEGB CEGB

100 100 100 100

6/62 10/62 6/62 11/62 2/65 3/65 9/65 12/65 3/85 1/86 1/66 3/66 /94 5/65 5/65 6/76 1/77 1/68 1/68 11/71 1/72 5/84 1/85 4/84 11/84 7/88 11/88

160 160 625 625 700 700

GCR GCR AGR AGR AGR AGR

GEC GEC TNPG TNPG NNC NNC

GEC GEC Par (UK) Par (UK) GEC GEC

50 50 50 50

GCR GCR GCR GCR

UKAEA UKAEA UKAEA UKAEA

Par (UK) Par (UK) Par (UK) Par (UK)

Switzerland

Nordostschweizerische Kraftwerke AG (NOK) • Beznau 1 (Doettingen, Aargau) • Beznau 2 (Doettingen, Aargau) Kernkrattwerk Gosgen-Oaniken AG • Gosgen (Daniken, Solothurn)

Taiwan

Taiwan Power Co. Chinshanl (Chinshanjaipei) Chinshan 2 (Chinshan, Taipei) Kuosheng 1 (Kuosheng, Wang-Li, Taipei) Kuosheng 2 (Kuosheng, Wang-Li, Taipei) Maanshan 1 (Herng Chuen) Maanshan 2 (Herng Chuen)

United Kingdom

Central Electricity Generating Board (CEGB) • Berkeley 1 (Gloucestershire) • Berkeley 2 (Gloucestershire) • Bradwell 1 (Essex) • Bradwell 2 (Essex) • Trawsfynydd 1 (Gwynedd, Wales) • Trawsfynydd 2 (Gwynedd, Wales) • DungenessAI (Kent) • DungenessA2(Kent) • DungenessBI (Kent) • DungenessB2(Kent) • SizewellAI (Suffolk) • SizewellA2 (Suffolk) SizewellB (Suffolk) • Hinkley Point A1 (Somerset) • Hinkley Point A2 (Somerset) • Hinkley Point B1 (Somerset) • Hinkley Point B2 (Somerset) • Oldbury 1 (Gloucestershire) • Oldbury 2 (Gloucestershire) • Wylfal (Anglesey, Wales) • Wylfa 2 (Anglesey, Wales) • Hartlepool R1 (Cleveland) • Hartlepool R2 (Cleveland) • Heysham 1 R1 (Lancashire) • Heysham 1 R2 (Lancashire) Heysham 2 R1 (Lancashire) Heysham 2 R2 (Lancashire) South of Scotland Electricity Board • HunterstonAI (Ayrshire) • Hunterston A2 (Ayrshire) • Hunterston B1 (Ayrshire) • Hunterston B2 (Ayrshire) Torness Point 1 (Dunbar, East Lothian) Torness Point 2 (Dunbar, East Lothian) British Nuclear Fuels Ltd. • Calder Hall 1 (Cumbria) • Calder Hall 2 (Cumbria) • Calder Hall 3 (Cumbria) • Calder Hall 4 (Cumbria) • Units in commercial operation 76

JL-Bal McAlpine McAlpine NCC NCC McAlpine McAlpine APC APC TW TW JL

McAlpine McAlpine TW TW NNC NNC NNC NNC various various

100 100 100 100 100 100 100 100 0 100 100 100 100 100 100 100 100 100 100 100 100 100 100

GEC GEC TNPG TNPG NNC NNC

Mowlem Mowlem TNPG TNPG various various

100 100 100 100 100 100

5/64 9/64 3/73 6/76 9/73 5/77 8/88 10/88

UKAEA UKAEA UKAEA UKAEA

TW TW TW TW

100 100 100 100

9/56 9/56 9/56 9/56

TW TW NPC NPC

1/70 1/71 /94 12/72 12/73

1/74 1/74 1/75 1/75 1/87 /88

t Estimated date, announced at time reactor was ordered NUCLEAR NEWS / FEBRUARY 1988

UNITED KINGDOM, cont'd British Nuclear Fuels Ltd., cont'd • Chapel Cross 1 (Dumfriesshire) • Chapel Cross 2 (Dumfriesshire) • Chapel Cross 3 (Dumfriesshire) • Chapel Cross 4 (Dumfriesshire) United Kingdom Atomic Energy Authority (UKAEA) • WinfrithSGHWR (Dorset) • DounreayPFR (Highland)

Net MWe

Type

Reactor Supplier

Generator Supplier

Architect Engineer

Constructor

Con­ struc­ tion stage (%)

50 50 50 50

GCR GCR GCR GCR

UKAEA UKAEA UKAEA UKAEA

Par (UK) Par (UK) Par (UK) Par (UK)

UKAEA UKAEA UKAEA UKAEA

TW TW TW TW

100 100 100 100

AEI/RPL EE

UKAEA UKAEA

Turriff NPC

100 100

10/73

2/68 8/76

1/73 1/74

5/75 4/77

92 250

UKAEA HWLWR LMFBR UKAEA/TNPG

Commercial Operation orig. actual sched- or exulet pected 11/58 11/58 11/58 11/58

United States

NORTHEAST

Baltimore Gas & Electric Co. • Calvert Cliffs 1 (Lusby, Md.) • Calvert Cliffs 2 (Lusby, Md.) Boston Edison Co. • Pilgrim 1 (Plymouth, Mass.) Connecticut Yankee Atomic Power Co. • Haddam Neck (Haddam Neck, Conn.) Consolidated Edison Co. • Indian Point 2 (Indian Point, N.Y.) Duquasne Light Co. • Beaver Valley 1 (Shippingport, Pa.) • Beaver Valley 2 (Shippingport, Pa.) GPU Nuclear Corporation • Oyster Creek 1 (Forked River, N.J.) • Three Mite Island 1 (Londonderry Twp., Pa.) Long Island Lighting Co. Shoreham (Brookhaven, N.Y.) Maine Yankee Atomic Power Co. • Maine Yankee (Wiscasset, Me.) New Hampshire Yankee Seabrookl (Seabrook, N.H.) New York Power Authority • Indian Point 3 (Indian Point, N.Y.) • JamesA.FitzPatrick(Scriba, N.Y.) Niagara Mohawk Power Corp. • Nine Mile Point 1 (Scriba, N.Y.) Nine Mile Point 2 (Scriba, N.Y.) Northeast Utilities Millstone 1 (Waterford, Conn.) Millstone 2 (Waterford, Conn.) Millstone 3 (Waterford, Conn.) Pemuytvania Power ft Light Co.

Susquenannal (Berwick, Pa.) Susquehanna 2 (Berwick, Pa.) Philadelphia Electric Co. Peach Bottom 2 (Peach Bottom, Pa.) Peach Bottom 3 (Peach Bottom, Pa.) Limerick 1 (Pottstown, Pa.) Limerick 2 (Pottstown, Pa.) Public Service Electric & Gas Co.

• Salem 1 (Salem, N.J.) • Salem 2 (Salem, N.J.) • Hope Creek 1 (Salem, N.J.) Rochester Gas & Electric Corp. • Robert E.Ginna (Ontario, N.Y.) Vermont Yankee Nuclear Power Corp. • Vermont Yankee (Vernon.Vt.) Yankee Atomic Electric Co.

• Yankee (Rowe, Mass.)

850 850

PWR PWR

C-E C-E

GE W

Bechtel Bechtel

Bechtel Bechtel

100 100

670

BWR

GE

GE

Bechtel

Bechtel

100

10/71 12/72

582

PWR

W

W

S&W

S&W

100

11/67

1/68

873

PWR

W

W

UE&C

Wedco

100

6/69

7/74

833 833

PWR PWR

W W

W W

S&W S&W

S&W/DLC DLC

100 100

6/73 4/77 10/78 11/87

620 792

BWR PWR

GE B&W

GE GE

B&R/GE Gilbert

B&R UE&C

100 100

2/68 12/69 9/71 9/74

809

BWR

GE

GE

S&W

Utility

100

/75 note1

825

PWR

C-E

W

S&W

S&W

100

12/72

1150

PWR

W

GE

UE&C

UE&C

100

11/79

note2

965 821

PWR BWR

W GE

W GE

UE&C S&W

Wedco S&W

100 100

7/71 1/73

8/76 7/75

610 1080

BWR BWR

GE GE

GE GE

Utility S&W

S&W S&W

100 100

11/68 12/69 7/78 3/88

660 870 1150

BWR PWR PWR

GE C-E W

GE GE GE

Ebasco Bechtel S&W

Ebasco Bechtel S&W

100 100 100

6/69 12/70 4/74 12/75 3/78 4/86

1050 1050

BWR BWR

GE GE

GE GE

Bechtel Bechtel

Bechtel Bechtel

100 100

5/79 5/81

1065 1065 1055 1055

BWR BWR BWR BWR

GE GE GE GE

GE GE GE GE

Bechtel Bechtel Bechtel Bechtel

Bechtel Bechtel Bechtel Bechtel

100 100 100 74.5

/71 7/74 /73 12/74 8/78 2/86 1/80 2/90

1106 1106 1067

PWR PWR BWR

W W GE

W GE GE

Utility Utility Bechtel

UE&C UE&C Bechtel

100 100 100

/71 6/77 /73 10/81 3/75 2/87

490

PWR

W

W

Gilbert

Bechtel

100

11/69

514

BWR

GE

GE

Ebasco

Ebasco

100

10/70 11/72

175

PWR

W

W

S&W

S&W

100

1/61 6/61 CONTINUED

6/83 2/85

3/70

1 Shoreham is complete, but operation above five percent power cannot take place until the Nuclear Regulatory Commission approves an offisite emergency plan for the unit. 2 Seabrook is completed, but — like Shoreham - its operation is being deferred by NRC deliberations on contested emergency planning issues. NUCLEAR NEWS / FEBRUARY 1988

77

World List of Nuclear Power Plants, cont'd UNITED STATES, cont'd MIDWEST The Cleveland Electric Illuminating Co. • Perry 1 (North Perry, Ohio) Perry 2 (North Perry, Ohio) Commonwealth Edison Company • Dresden 2 (Morris, III.) • Dresden 3 (Morris, III.) • LaSalle County 1 (Seneca, III.) • LaSalle County 2 (Seneca, III.) • Zion1(Zion,lll.) • Zion2(Zion,lll.) • Byron 1 (Byron, III.) • Byron 2 (Byron, III.) Braidwoodl (Braidwood, III.) Braidwood 2 (Braidwood, III.) Carroll County 1 (Savanna, III.) Carroll County 2 (Savanna, III.) Commonwealth Edison Co. and Iowa-Illinois Gas & Electric Co. 1 (Cordova, III.) Quad-Cities • (Cordova, III.) 2 Quad-Cities • Co. Power Consumers Mich.) (Charlevoix, Point Rock Big • Mich.) Haven, (South Palisades • Detroit Edison Co. Fermi 2 (Newport, Mich.) Illinois Power Co. Clinton 1 (Clinton, III.) Indiana & Michigan Electric Co. • Donald C. Cook 1 (Bridgman, Mich.) • Donald C. Cook 2 (Bridgman, Mich.) Iowa Electric Light & Power Co. • Duane Arnold (Palo, Iowa)

Commercial Operation orig. actual sched- or exulet pected

Net MWe

Type

Reactor Supplier

Generator Supplier

Architect Engineer

Constructor

Construction stage (%)

1205 1205

BWR BWR

GE GE

GE GE

Gilbert Gilbert

Utility Utility

100 57

794 794 1078

1078 1040 1040 1120 1120 1120 1120 1120 1120

BWR BWR BWR BWR PWR PWR PWR PWR PWR PWR PWR PWR

GE GE GE GE W W W W W W W W

GE GE GE GE W W W W W W W W

S&L S&L S&L S&L S&L S&L S&L S&L S&L S&L S&L S&L

UE&C UE&C Utility Utility Utility Utility Utility Utility Utility Utility

100 100 100 100 100 100 100 100 100 100 0 0

789 789

BWR BWR

GE GE

GE GE

S&L S&L

UE&C UE&C

100 100

3/70 8/72 3/71 10/72

69 777

BWR PWR

GE C-E

GE W

Bechtel Bechtel

Bechtel Bechtel

100 100

12/62 12/62 7/70 12/71

1100

BWR

GE

GEC

Utility

Daniel

100

2/74

985

BWR

GE

GE

S&L

Baldwin

100

6/80 note3

1020

1060

PWR PWR

W W

GE BBC

AEPSC AEPSC

AEPSC AEPSC

100 100

4/72 4/73

8/75 7/78

538

BWR

GE

GE

Bechtel

Bechtel

100

12/73

2/75

7/79 11/87 7/80 indef. 2/69 2/70 2/76 2/77 4/72 5/73 5/79 3/80 10/79 10/80 10/87 10/88

8/70 10/71 10/82 6/84 12/73 9/74 9/85 8/87 3/88 9/88 indef. indef.

1/88

NORTHEAST: Connecticut, Delaware, Maine, Maryland, Massachusetts, New Hampshire, New Jersey, New York, Pennsylvania, Rhode Island, Vermont. SOUTH: Alabama, Arkansas, Florida, Georgia, Kentucky, Louisiana, Missis­ sippi, North Carolina, South Carolina, Tennessee, Virginia, West Virginia. MIDWEST: Illinois, Indiana, Iowa, Kansas, Michigan, Minnesota, Mis­ souri, Nebraska, North Dakota, Ohio, South Dakota, Wisconsin. SOUTHWEST: Arizona, New Mexico, Oklahoma, Texas. WEST AND NORTHWEST: California, Colorado, Idaho, Montana, Nevada, Oregon, Utah, Washington, Wyoming.

3 Clinton began full-service operation on November 24,1987, but its commercial operation criteria had not, at this writing, been established by its rate regulator, the Illinois Commerce Commission. 78

NUCLEAR NEWS / FEBRUARY 1988

U.S. - MIDWEST, cont'd Nebraska Public Power District • Cooper (Brownville, Neb.) Northern States Power Co. • Monticello (Monticello, Minn.) • Prairie Island 1 (Red Wing, Minn.) • Prairie Island 2 (Red Wing, Minn.) Omaha Public Power District • Fort Calhounl (Fort Calhoun, Neb.) Toledo Edison Co. • Davis-Bessel (Oak Harbor, Ohio) Union Electric Co. • Callawayl (Fulton, Mo.) Wisconsin Electric Power Co. • Point Beach 1 (Two Creeks, Wis.) • Point Beach 2 (Two Creeks, Wis.) Wisconsin Public Service Corporation • Kewaunee (Carlton, Wis.) Wolf Creek Nuclear Operating Corporation • Wolf Creek (Burlington, Kans.)

Commercial Operation orlg. actual sched- orexulet pected

Net MWe

Type

Reactor Supplier

Generator Supplier

Architect Engineer

Constructor

Construction stage (%)

778

BWR

GE

W

B&R

B&R

100

4/71

536 520 520

BWR PWR PWR

GE W W

GE W W

Bechtel FEI FEI

Bechtel Utility Utility

100 100 100

5/70 7/71 5/72 12/73 5/74 12/74

486

PWR

C-E

GE

G&H

G&H

100

6/71

866

PWR

B&W

GE

Bechtel

Bechtel

100

12/74 11/77

1150

PWR

W

GE

Bechtel

Daniel

100

10/81

485 485

PWR PWR

W W

W W

Bechtel Bechtel

Bechtel Bechtel

100 100

4/70 12/70 4/71 10/72

535

PWR

W

W

FEI

FEI

100

6/72

6/74

1150

PWR

W

GE

Bech/S&L

Daniel

100

4/81

9/85

829 829

PWR PWR

W W

W W

SCSI/Bechtel SCSI/Bechtel

Daniel Daniel

100 100

4/75 12/77 4/76 7/81

836 858

PWR PWR

B&W C-E

W GE

Bechtel Bechtel

Bechtel Bechtel

100 100

7/72 12/74 12/75 3/80

665 790 790 900

PWR BWR BWR PWR

W GE GE W

W GE GE W

Ebasco UE&C UE&C Ebasco

Ebasco Brown Brown Daniel

100 100 100 100

5/70 3/71 3/75 3/77 3/74 11/75 3/77 5/87

860 860 860 1180 1180 1145 1145

PWR PWR PWR PWR PWR PWR PWR

B&W B&W B&W W W W W

GE GE GE W W GE GE

Utility/Bech Utility/Bech Utility/Bech Utility Utility Utility Utility

Utility Utility Utility Utility Utility Utility Utility

100 100 100 100 100 100

100

5/71 7/73 5/72 9/74 6/73 12/74 3/76 12/81 3/77 3/84 3/79 6/85 3/80 8/86

666 666 827 837

PWR PWR PWR PWR

W W C-E C-E

W W W W

Bechtel Bechtel Ebasco Ebasco

Bechtel Bechtel Ebasco Ebasco

100 100 100 100

8/70 12/72 8/71 9/73 1/73 12/76 9/79 8/83

825

PWR

B&W

W

Gilbert

Jones

100

9/72

810 820 1100 1100

BWR BWR PWR PWR

GE GE W W

GE GE GE GE

SS/Bechtel Bechtel SS/Bechtel SS/Bechtel

Utility Utility Utility Utility

100 100

4/73 12/75 4/76 8/79 2/78 5/87 2/79 6/89

940

BWR

GE

GE

S&W

S&W

100

10/79

6/86

1104

PWR

C-E

W

Ebasco

Ebasco

100

1/77

9/85

900

PWR

W

GE

Gilbert

Daniel

100

10/77

1/84

1250 1250

BWR BWR

GE GE

Allis Allis

Bechtel Bechtel

Bechtel Bechtel

100 33

1067 1067 1067

BWR BWR BWR

GE GE GE

GE GE GE

Utility Utility Utility

Utility Utility Utility

100 100 100

7/74

9/73

4/85

SOUTH

Alabama Power Company • Joseph M.Farley1(Dothan, Ala.) • Joseph M. Farley 2 (Dothan, Ala.) Arkansas Power & Light Co. • Nuclear One 1 (Russellville, Ark.) • Nuclear One 2 (Russellville, Ark.) Carolina Power & Light Co. • Robinson 2 (Hartsville, S.C.) • Brunswick 1 (Southport, N.C.) • Brunswick2(Southport,N.C.) • Shearon Harris (New Hill, N.C.) Duke Power Co. • Oconeel (Seneca, S.C.) • Oconee 2 (Seneca, S.C.) • Oconee 3 (Seneca, S.C.) • McGuirel (Cornelius, N.C.) • McGuire 2 (Cornelius, N.C.) • Catawbal (Clover, S.C.) • Catawba 2 (Clover, S.C.) Florida Power & Light Co. • Turkey Point 3 (Florida City, Fla.) • Turkey Point 4 (Florida City, Fla.) • St. Lucie1(Hutchinson Island, Fla.) • St.Lucie2(Hutchinsonlsland,Fla.) Florida Power Corporation • Crystal River 3 (Red Level, Fla.) Georgia Power Co. • Edwin I. Hatch 1 (Baxley, Ga.) • Edwin I. Hatch 2 (Baxley, Ga.) • Vogtle 1 (Waynesboro, Ga.) Vogtle2(Waynesboro,Ga.) Gulf States Utilities Co. • River Bend 1 (St. Francisville, La.) Louisiana Power & Light Co. • Waterford3(Taft,La.) South Carolina Electric & Gas Co. • Virgil C. Summer 1 (Parr, S.C.) System Energy Resources, Inc. (subsidiary of Middle South Utilities) • Grand Gulf 1 (Port Gibson, Miss.) Grand Gulf 2 (Port Gibson, Miss.) Tennessee Valley Authority • Browns Ferry 1 (Decatur, Ala.) • Browns Ferry 2 (Decatur, Ala.) • Browns Ferry 3 (Decatur, Ala.)

• Units in commercial operation NUCLEAR NEWS / FEBRUARY 1988

100 75

3/77

9/79 7/85 9/81 indef.

10/70 10/71 10/72

8/74 3/75 3/77

CONTINUED

t Estimated date, announced at time reactor was ordered 79

World List of Nuclear Power Plants, cont'd U.S. - SOUTH, cont'd Tennessee Valley Authority, cont'd • Sequoyahl (Soddy-DaisyJenn.) • Sequoyah2(Soddy-Daisy,Tenn.) Watts Bar 1 (Spring City, Tenn.) Watts Bar 2 (Spring City, Tenn.) Bellefonte 1 (Scottsboro, Ala.) Bellefonte 2 (Scottsboro, Ala.) Virginia Power Co. • Surryl (Gravel Neck, Va.) • Surry 2 (Gravel Neck, Va.) • North Anna 1 (Mineral, Va.) • North Anna 2 (Mineral, Va.)

Type

Reactor Supplier

Generator Supplier

Architect Engineer

Constructor

1177 1177 1213 1213

PWR PWR PWR PWR PWR PWR

W W W W B&W B&W

W W W W BBC BBC

Utility Utility Utility Utility Utility Utility

Utility Utility Utility Utility Utility Utility

781 781 893 893

PWR PWR PWR PWR

W W W W

W W W W

S&W S&W S&W S&W

1270

1270 1270

PWR PWR PWR

C-E C-E C-E

GE GE GE

1250 1250

PWR PWR

W W

1150 1150

PWR PWR

1084 1106

Net MWe

Construction stage (%)

Commercial Operation orig. actual sched- orexulet pected 7/81

100

10/73

100 90

10/76 note4 4/77 note4

S&W S&W S&W S&W

100 100 100 100

3/71 12/72 3/72 5/73 3/74 6/78 7/75 12/80

Bechtel Bechtel Bechtel

Bechtel Bechtel Bechtel

100 100 100

5/81 11/82 5/84

1/86 9/86 2/88

W W

Bechtel Bechtel

Ebasco Ebasco

100 83

10/80 3/82

3/88 6/89

W W

Allis Allis

G&H G&H

Brown Brown

99

87

1/80 1/82

9/89 3/90

PWR PWR

W W

W W

Utility Utility

Utility Utility

100 100

5/72 7/74

5/85 3/86

1130

PWR

W

GE

Bechtel

Indep

100

9/74

5/76

330

HTGR

GA

GE

S&L

GA

100

4/72

1/79

913

PWR

B&W

W

Bechtel

Bechtel

100

5/73

4/75

436 1100 1100

PWR PWR PWR

W C-E C-E

W GEC GEC

Bechtel Bechtel Bechtel

Bechtel Bechtel Bechtel

100 100 100

6/75 6/75

1/68 8/83 4/84

860

LGR

GE

GE

B&R

B&R

100

1250 1100 1240 116939

PWR BWR PWR

B&W GE C-E

W W W

UE&C

Bechtel Bechtel Ebasco

100

9/77 12/84

100 100 100 100 100 100

LGR LGR LGR LGR LGR LGR

100 100 100 100 100 100

9/58 12/59 12/60 12/61 12/62 12/63

1148 1148

100

87 57

4/74

6/82

7/77 4/78

/94 /96

SOUTHWEST

Arizona Public Service Co. • Palo Verde 1 (Wintersburg,Ariz) • Palo Verde 2 (Wintersburg,Ariz.) Palo Verde 3 (Wintersburg, Ariz.) Houston Lighting & Power Company South Texas Project 1 (Palacios, Tex.) South Texas Project 2 (Palacios, Tex.) Texas Utilities Electric Company Comanche Peak 1 (Glen Rose, Tex.) Comanche Peak 2 (Glen Rose, Tex.)

WEST AND NORTHWEST

Pacific Gas & Electric Co. • Diablo Canyon 1 (Avila Beach, Calif.) • Diablo Canyon 2 (Avila Beach, Calif.) Portland General Electric Co. • Trojan (Prescott, Ore.) Public Service Company of Colorado • FortSt.Vrain(Platteville,Colo.) Sacramento Municipal Utility District • RanchoSeco (Clay Station, Calif.) Southern California Edison and San Diego Gas & Electric Co. • San Onofre 1 (San Clemente, Calif.) • San Onofre 2 (San Clemente, Calif.) • San Onofre 3 (San Clemente, Calif.) United States Department of Energy" • Hanford-N(Richland,Wash.) Washington Public Power Supply System WNP-1(Richland,Wash.) • WNP-2(Richland,Wash.) WNP-3(Satsop,Wash.) U.S. Total (126 units)

B&R

Ebasco

62.5 75

7/66

9/80 indef.

3/82 indef.

USSR

Ministry of Medium Machine Building • Troitsk A (Troitsk) • Troitsk B (Troitsk) • Troitsk C (Troitsk) • Troitsk D (Troitsk) • Troitsk E (Troitsk) • Troitsk F (Troitsk)

Both Watts Bar units are undergoing inspections connected with problems in construction quality assurance; the TVA will not project operation dates until it can determine whether, and how much, rework is required. aPower is extracted by WPPSS through the Hanford Generating Project; the reactor is owned by the DOE. 80

NUCLEAR NEWS / FEBRUARY 1988

USSR, cont'd Ministry of Nuclear Power • Beloyarskiy 2 (Zarechnyy) • Beloyarskiy 3 (BN-600) (Zarechnyy) Beloyarskiy 4 (BN-800) (Zarechnyy) • Novovoronezhskiy 1 (Novovoronezhskiy) • Novovoronezhskiy 2 (Novovoronezhskiy) • Novovoronezhskiy 3 (Novovoronezhskiy) • Novovoronezhskiy 4 (Novovoronezhskiy) • Novovoronezhskiy 5 (Novovoronezhskiy) • Kolal (PolyarnyyeZori) • Kola 2 (PolyarnyyeZori) • Kola 3 (PolyarnyyeZori) • Kola 4 (PolyarnyyeZori) • Armenia 1 (Metsamor) • Armenia 2 (Metsamor) • Leningrad 1 (Sosnovyy Bor) • Leningrad 2 (Sosnovyy Bor) • Leningrad 3 (Sosnovyy Bor) • Leningrad 4 (Sosnovyy Bor) • Kursk 1 (Kurchatov) • Kursk 2 (Kurchatov) • Kursk 3 (Kurchatov) • Kursk 4 (Kurchatov) • Rovno 1 (Kuznetsovsk) • Rovno 2 (Kuznetsovsk) • Rovno 3 (Kuznetsovsk) Rovno 4 (Kuznetsovsk) • South Ukraine 1 (Konstantinovka) • South Ukraine 2 (Konstantinovka) • South Ukraine 3 (Konstantinovka) South Ukraine 4 (Konstantinovka) • Smolensk 1 (Desnogorsk) • Smolensk 2 (Desnogorsk) • Smolensk 3 (Desnogorsk) Smolensk 4 (Desnogorsk) • Chernobyl 1 (Pripyat) • Chernobyl 2 (Pripyat) • Chernobyl 3 (Pripyat) Chernobyl 5 (Pripyat) Chernobyl 6 (Pripyat) • Kalinin 1 (Udomlya) • Kalinin 2 (Udomlya) • Zaporozhye 1 (Energodar) • Zaporozhye 2 (Energodar) • Zaporozhye 3 (Energodar) • Zaporozhye 4 (Energodar) • Ignalinal (Snieckus) • Ignalina 2 (Snieckus) • Khmel'nitskiyl(Neteshin) Khmel'nitskiy2(Neteshin) Khmel'nitskiy3(Neteshin) Odessa 1 (Teplodar) Odessa 2 (Teplodar) • Balakovo 1 (Balakovo) • Balakovo 2 (Balakovo) Balakovo 3 (Balakovo) Crimea 1 (Shchelkino) Crimea 2 (Shchelkino) Nizhnekamsk 1 Kostroma 1 (Buy) Kostroma 2 (Buy) Bashkir 1 (Agidel) Bashkir 2 (Agidel) Rostov 1 (Volgodonsk) Rostov 2 (Volgodonsk) Rostov 3 (Volgodonsk) Rostov 4 (Volgodonsk) Tatar 1 (Kama) Minsk 1 (Minsk)

• Units in commercial operation NUCLEAR NEWS / FEBRUARY 1988

Net MWe

Type

175 550 800 265 338 410 410 950 440 440 440 440 400 400 1000 1000 1000 1000 950 950 950 950 440 440 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 950 1450 1450 950 950 950 900 900 950 950 950 950 950 950 1450 1450 950 950 950 950 950 950 950 900

LGR LMFBR LMFBR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR LGR LGR LGR LGR LGR LGR LGR LGR PWR PWR PWR PWR PWR PWR PWR PWR LGR LGR LGR LGR LGR LGR LGR LGR LGR PWR PWR PWR PWR PWR PWR LGR LGR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR LGR LGR PWR PWR PWR PWR PWR PWR PWR PWR

Reactor Supplier

Generator Supplier

Architect Engineer

Constructor

Con­ struc­ tion stage (%)

Commercial Operation orig. actual sched- orexulet peeled

100 100

12/67 12/72 10/80

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

12/64 4/70 6/72 4/73 7/81 12/73 /74 12/74 /BO 12/82 /BO 11/84 /75 10/77 /75 5/80 /73 12/74 /75 9/75 6/80 10/81 12/76 12/76 7/77 6/79 12/83 12/85 6/82 /BO 12/82 12/86 /90 /BO 6/84 12/84 /87 /89 177 7/83 /78 5/85 /87 /90 177 5/78 /79 5/79 6/82 /91 /92 /78 12/84 /BO 12/86 /85 11/84 6/85 /87 12/87 12/84 /87 12/87 /88 /89 /88 12/85 /90 12/84 6/86 12/86 10/87 /90 /88 12/85 /88 12/87 /89 /88 12/86 /89 /88 /89 /88 /88 /89 /90 /88 /89 CONTINUED

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

100 100

t Estimated date, announced at time reactor was ordered 81

World List of Nuclear Power Plants, cont'd

Architect Generator Reactor Supplier____Supplier____Engineer

Construction stage (%)

Commercial Operation orig. actual sched- orexulet pected

Net MWe

Type

50

BWR

100

1/66

350

LMFBR

100

7/73

632

PWR

100

12/78 11/82

USSR, cont'd Scientific Research Institute for Atomic Reactors • VK-50(Dimitrovgrad) State Committee on Atomic Energy • BN-350* (Shevchenko)

Constructor

Yugoslavia

Savske Elektrarne Ljubljana (Slovenia) and Elektroprivreda Zagreb (Croatia) • Krsko (Krsko) Non-U.S. Total (438 units) WORLD TOTAL (564 units)

W

W

Gilbert

W/local

320 231 437 170

The BN-350 is a dual-purpose facility; 200 MWe is used to desalinate water, and 150 MWe is used for electricity.

Abbreviations used in this table A-A: ASEA-Atom (Sweden) AC: Acres Canatom (Canada) ACEC: Ateliers de Constructions Electriques de Charleroi S.A. (Belgium) ACEC: ACEC with COP (Belgium) ACECOWEN: ACECO with Westinghouse (Belgium) ACLF group: ACECO/Creusot-Loire/Framatome/Westinghouse Electric Energy Systems Europe (France) ADF: Auxeltra-Delens-Francois AECL: Atomic Energy of Canada Ltd. AEE: Atomenergoexport (USSR) (formerly TPE: Technopromexport) AEG: Allgemeine Elektricitaets-Gesellschaft, Aeg-Tele funken (W. Germany) AEI: Associated Electric Industries Ltd. (U.K.) AEPSC: American Electric Power Service Corp. (U.S.) AETEA: Agroman, EyT, Ea (Spain) AGR: advanced gas-cooled reactor Allis: Allis-Chalmers (U.S.) Alsthom: Ste Generate de Constructions Electriques et Mechaniques (France) AMN: Ansaldo Meccanico Nucleare SpA (Italy) ARC: Atomic Power Construction Ltd. (U.K.) Arge KKU: Dyckerhoff & Widmann AG; Wayss & Freitag AG; Hegdkamp (FGR) ASGEN: Ansaldo San Giorgio Compagnia Generate (Italy) Aux: Auxini Ingenieria Espanola SA (Spain) Bal: Balfour Beatty & Co. (U.K.) BAM: Bataafsche Aanneming Maatschappij NV (The Netherlands) BBC: Brown Boveri et Cie (Switzerland) BBR: Babcock-Brown Boveri Reaktor GmbH (W. Germany) Bech: Bechtel Corporation (U.S.) BHEL: Bharat Heavy Electrical (India) BLWR: same as BWR BNDC: British Nuclear Design & Construction Ltd. (U.K.) BPL: Babcock Power Ltd. (U.K.) B&R: Burns & Roe, Inc. (U.S.) B&V: Black & Veatch (U.S.) B&W: Babcock & Wilcox Co. (U.S.) BRAUN: C. F. Braun & Co. (U.S.) Brown: Brown & Root, Inc. (U.S.) BWR: boiling water reactor C-B: Campenon-Bernard (France) CCN: Consorzio Construttori Central! Nucleari (Italy) CdA: Condotte d'Acqua (Italy) C-E: Combustion Engineering, Inc. (U.S.) CEA: Commissariat a I'Energie Atomique (France) CEM: Compagnie Electro Mechanique (France) CFE: Cie d'Enterprises CFE S.A. (Belgium) CGE: Canadian General Electric Chag: Chagnaud (France) Cie GE: Cie. Generate d'Electricite (France) CITRA: Compagnie Industrielle de Travaux (France) CL: Creusot-Loire (France) CM: Chantiers Modernes (France) CNO: Construtora Noberto Oldebrecht (Brazil) COP/TOSI/ACEC: Cockeril Ougree-Providence/Franco Tosi SpA/ Ateliers de Constructions Electriques de Charleroi SA (Belgium) CTAFMC: CFe, Travaux, Astrobel General Contractors, Francois et Fils, Maurice Delens, Campenon Bernard (Belgium) CTL: Canatom Ltd. (Canada) DAE: Department of Atomic Energy (India) Daniel: Daniel Construction Co. (U.S.) D-L: Delattre-Levivier (France) DOE: Department of Energy (U.S.)

82

EA: Empresarios Agrupados (Spain) E&B: Emch & Berger (Switzerland) Ebasco: Ebasco Services, Inc. (U.S.) ECC: Engineering Construction Corp. (India) EEC: English Electric Co. Ltd. (Canada) EEW: English Electric and G. Wimpey Group (U.K.) El: Elettronucleare Italiana (Italy) Elln: Elin Union AG (W. Germany) ENB: Empresa Nacional Bazan (Spain) ENSA: Equipos Nucleares SA (Spain) EPDC: Electric Power Development Co., Ltd. (Japan) ERBE: Hungarian Company for Power Plant Investment ETOCEA: Entrecanales y Ocisa (Spain) EW: ElectroWatt Ltd. (Switzerland) EyT: Entrecanales y Tavora SA (Spain) FEI: Fluor Engineers Inc. (U.S.) Fou: Fougerolle (France) Fra: Framatome: Societe Franco-Americaine de Constructions Atomiques SA (France) FRAMACECO: Framatome with ACECO (Belgium) Fuji: Fuji Electric Co. Ltd. (Japan) GA: General Atomic Company (U.S.) GAAA: Groupement pour les Activites Atomiques et Avancees (France) GC: Groupement Constructeurs Francais (France) GCHWR: gas-cooled, heavy-water-moderated reactor GCR: gas-cooled reactor GE: General Electric Co. (U.S.) GEC: General Electric Co. Turbine Generated Ltd. (U.K.) GETSCO: General Electric Technical Services Co. G&H: Gibbs & Hill, Inc. (U.S.) G&HE: Gibbs & Hill Espanola SA (Spain) Gilbert: Gilbert Associates, Inc. (U.S.) Gil/Com: Gilbert/Commonwealth (U.S.) GKW: Gemeinschaftkraftwerk Weser GmbH (FRG) GNPJVC: Guangdong Nuclear Power Joint Venture Company, Ltd. (China) GTM: Grands Travaux de Marseille (France) Haz: Hazama Gumi Co. (Japan) HCC: Hindustan Construction Co. (India) HCCM: Huaxing (China), China Construction Engineering Corporation (China), Campenon Bernard (France), Maeda (Japan) Hoch: Hochtief AG (W. Germany) H-P: Howden-Parsons (Canada) HQ: Hydro-Quebec (Canada) HRB: Hochtemperatur-Reaktorbau GmbH (W. Germany) HTGR: high-temperature gas-cooled reactor HTR: high-temperature reactor HWLWR: heavy-water-moderated, boiling light-water-cooled reactor Iber: Iberduero SA (Spain) Imp: Impresit INB: Internationale Natrium Brutreaktorbau GmbH (W. Germany) INITEC: Empresa Nacional de Ingeneria y Tecnologia SA (Spain) Int: Interatom (W. Germany) lyP: Informas y Projectas SA (Spain) JL: John Laing Construction Ltd. (U.K.) Jones: J. A. Jones Construction Co. (U.S.) J-S: Jeumont-Schneider (France) Kaiser: Kaiser Engineers (U.S.) KHIC: Korea Heavy Industries and Construction Company KTHTR: Konsortium THTR—Brown, Boveri & Cie AG, Hochtem­ peratur-Reaktorbau GmbH, Nukem GmbH (W. Germany) Kum: Kumagaya Gumi Co. (Japan) KWU: Kraftwerk Union AG (W. Germany) L&T: Larsen & Toubro (India) t-GR: light-water cooled, graphite-moderated reactor LMFBR: liquid metal fast breeder reactor LWBR: light-water breeder reactor LWCHW: light-water-cooled, heavy-water-moderated reactor

MAPI: Mitsubishi Atomic Power Industries, Inc. (Japan) Maxon: Maxon Construction Company (U.S.) McAlp: Sir Robert McAlpine & Sons Ltd. (U.K.) MCING: Motor-Columbus Consulting Engineers Inc. (Switzerland) MECO: Montreal Engineering Co. (Canada) MEL: Mitsubishi Electric Corporation (Japan) MHI: Mitsubishi Heavy Industries, Ltd. (Japan) MNI: Ministry of Nuclear Industry (PRC) NCC: Nuclear Civil Constructors (U.K.) NEI: Northern Engineering Industries (U.K.) Nera: Neratoom NV (The Netherlands) Nersa: Centrale Nucleaire Europeenne A Neutrons Rapides (France) NIRA: Nucleare Italiana Reattori Avanzati (Italy) NNC: National Nuclear Corporation (U.K.) NPC: Nuclear Power Co. Ltd. (U.K.) Nuclebras: Empresas Nucleares Brasileiras SA Nuclen: Nuclebras Engenaria SA (Brazil) Nuclep: Nuclebras Equipamentos Pesados SA NWK: Nordwestdeutsche Kraftwerke AG (FRG) OBAY: Obayashi Gumi Co. (Japan) OH: Ontario Hydro (Canada) OPS: Offshore Power Systems (U.S.) Par (U.K.): C. A. Parsons and Co. Ltd. (U.K.) Parsons: Ralph M. Parsons Co. (U.S.) PE: Promon Engenharia SA (Brazil) PH: Philip Holzman (W. Germany) PHWR: pressurized heavy-water-moderated and -cooled reactor PPP: PWR Power Projects, a joint venture of W & NNC (U.K.) PWR: pressurized water reactor R 4 C: Richardson & Cruddas (I), (India) Rateau: Rateau, Ste. (France) RDM: Rotterdamse Droogdok Madtdschappij (The Netherlands) RPL: Reyrolle Parsons Ltd. (U.K.) RW: Richardsons Westgarth Ltd. (U.K.) SACM: Societe Alsacienne de Constructions Mechaniques (France) SB: Spie Batignolles SA (France) SCG: Skanska Cementgjuteriet SCSI: Southern Company Services, Inc. SeB: Sainrapt et Brice (France) SEN: Sener, SA (Spain) SGE: Societe Generate d'Enterprises (France) SHI: Sumitomo Heavy Industries Ltd. (Japan) SK: Sydvenska Kraft AB (Sweden) S&L: Sargent & Lundy Engineers (U.S.) S-L: Stal-Laval Turbin AB (Sweden) SNC: Surveyer, Nenniger & Chenevert Inc. (Canada) SO: Siemens Osterreich (Austria) SOCIA: Societe pour 1'lndustrie Atomique (France) SOGENE: Societa Generate per Lavore e Pubbliche Utilita (Italy) SR: Stearns-Roger Corp. (U.S.) SS: Southern Services, Inc. (U.S.) SSPB: Swedish State Power Board Stork: Koninklijke Machinefabriek Stork (The Netherlands) S&W: Stone & Webster Engineering Corp. (U.S.) T4B: Townsend & Bottum, Inc. TE: Traction-Electricite THTR: thorium high-temperature reactor TNPG: The Nuclear Power Group (U.K.) TPC: Taiwan Power Company TR: Tecnicas Reunidas SA (Spain) TW: Taylor Woodrow Construction Ltd. (U.K.) UE4C: United Engineers & Constructors (U.S.) VANEA: Vandellos-Empresarios Agrupados (Spain) VBB: AB Vattenbyggnadsbyran VMF: Verenigde Machinefabrieken NV (The Netherlands) W: Westinghouse Electric Corporation (U.S.) Wedco: a subsidiary of Westingthouse Electric Corporation (U.S.) WIL: Walchandnagar Industries Ltd. (India) Zachry: H. B. Zachry Company (U.S.)

NUCLEAR NEWS / FEBRUARY 1988