Northern Territory Road Infrastructure Planning

Northern Territory Road Infrastructure Planning A long term plan for the delivery of transport infrastructure. Clare Gardiner-Barnes Chief Executive ...
5 downloads 0 Views 1MB Size
Northern Territory Road Infrastructure Planning A long term plan for the delivery of transport infrastructure.

Clare Gardiner-Barnes Chief Executive

18 February 2014

Where do we need to invest for the future?

Plan well into the future

Prioritise

Coordinate

needs

across agencies

Evidence Based Decisions

Consult with stakeholders

2030 Vision for Developing Northern Australia

The Roadmap Darwin Regional Transport Plan

Maritime Industry Review

Motor Vehicle Registry Reform

Freight & Logistics Industry Strategy

Northern Territory Integrated Transport Planning and Investment Roadmap

Taxi Industry Reform Strategy

Road & Bridge Strategy

Aviation Industry & Services Strategy

Public Transport Strategy

Darwin Regional Transport Plan http://www.planningcommission.nt.gov.au/

Darwin Regional Transport Plan

Department of Transport Strategic Plan 2014 to 2018 Framing the Future: Northern Territory Government’s objectives for a Prosperous Economy, Strong Society, Confident Culture and Balanced Environment.

Department of Transport Strategic Plan: Key priorities and actions against which the Department’s performance and outcomes is measured.

Divisional Operational Plans and Individual Officer Plans: Key priorities and actions against which the Executive Director and Individiual Staff Members’ performance and outcomes is measured.

4 February 2014

Road and Bridge Strategy

CHALLENGES AND $s Challenges and $s LARGE AREA 1.3 Million Km2

LARGE NETWORK 36,000 KM Majority of Roads Unsealed (76%)

POPULATION 230,000

Aging Network 50% of Land Mass is Aboriginal Land Increasing User I Expectations Climactic conditions - Tropical North (Cyclones) - Arid Centre (Droughts)

Transport task is growing Traffic Mix Poor Road Safety Statistics High Construction Costs

Challenges – Flooding & Accessibility Challenges – Flooding and Accessibility Road Closures & Impassable @ 10 February 2014

Click to edit Master title style (30 pts)

NT Regional Infrastructure Strategy NT Regional Infrastructure Strategy Scope Detail •

The Study will develop a thirty year Regional Infrastructure Plan



Identify and analyse drivers of the NT economy



Regional Infrastructure Audit and ‘gap analysis’



Prioritise regional infrastructure projects based on greatest economic, social and environmental benefit (value for money)



Prepare Regional Infrastructure Project Plans suitable as application to funding programs



Study will commence February 2014



Completion is expected in October 2014

Click to edit Master title style (30 pts)

Strategic Resource areas

Stuart Park Transport Stuart Park Transport StrategyStudy • Joint Study between the Department of Transport and the Department ClickoftoLands editPlanning Master title and the Environment. • Planning for future transport capacity through Stuart Park and entry to the Darwin CBD. • The Study area includes the Stuart Highway from Bagot Road to McMinn Street. • Consultants Parsons Brinckerhoff are undertaking the Study.

style (30 pts)

Central Arnhem Road - New Bridges at Goyder River & Donydji Creek

Goyder River

Donydji Creek

Arnhem Highway Upgrades ($20M)

• • • •

$10 million Strengthening and Widening Contract was awarded to Ostojic Group on 20 November 2014. Works commenced in late November 2013 Completion August 2014 (weather permitting) Contract to complete additional two sections currently out to tender – closing on 5 March 2014.

• • •

$6 million Overtaking Lanes Contract awarded to Ostojic Group on 24 September 2013 Four overtaking lanes Completion June 2014 (weather permitting)

Infrastructure Investment Program 2014-15 to 2018-19 Carry Over into New Program • Alice Springs Rail Overpass • Katherine Heavy Vehicle Diversion – Stage 1 • Flood Immunity Projects on Victoria Highway New Projects • Tiger Brennan Drive Duplication from CBD to Berrimah Road Regional Roads Productivity Program

Infrastructure Investment Program Northern Territory Submission – On-Network Project

Funding Requested

Approved

Berrimah Road Duplication from Export Drive to the Port

$60M

NIL

Strengthening and Widening – National Highways

$125M

NIL

Stuart Highway - Complete overtaking lanes between Darwin and Katherine

$7M

NIL

Safety and Fatigue Management – National Highways

$70M

NIL

Victoria Highway – Little Horse and Big Horse Creek Bridges

$40M

NIL

Flood Immunity Upgrades – National Highways

$40M

NIL

Repairs and Maintenance – National Highways

$180M

$88M

Tiger Brennan Drive Duplication INTRODUCTION

Click to edit Master title style (30 pts)

Outback Way

Tanami Road

Alice Springs Remote Transport Forum

Map from Desert Knowledge Australia’s 2012 Report entitled “Fixing the Hole in Australia’s Heartland”.

Questions and Feedback