NEW YORK. State: MUD Density. County: Field: Location: Well: Company:

Company: SANDIA TECHNOLOGIES, LLC Company: Field: WILDCAT Location: LAT: 41.1039 Well: NYSTA TANDEM LOT 1 Well: Field: County: ROCKLAND LOCATI...
Author: Todd Rich
0 downloads 4 Views 599KB Size
Company: SANDIA TECHNOLOGIES, LLC

Company:

Field:

WILDCAT Location:

LAT: 41.1039 Well:

NYSTA TANDEM LOT 1

Well: Field: County:

ROCKLAND

LOCATION

SANDIA TECHNOLOGIES, LLC NYSTA TANDEM LOT 1 WILDCAT

KELLY BUSHING

GROUND LEVEL 16.00 ft

Elev.:

Elev.:

Permanent Datum: KELLY BUSHING

G.L.

K.B.

402.00 ft

386.00 ft

402.00 ft

@ @ @

@

@

QUAD

above Perm. Datum

386.00 ft

D.F.

ROCKLAND State: NEW YORK POWERED POSITIONING CALIPER − PPC 4 ARM CALIPER LOG LAT: 41.1039

Log Measured From:

LONG: −74.027

Drilling Measured From:

API Serial No. Section Township 31−087−27016−00−00 CLARKSTOWN Logging Date 31−Aug−2011 Run Number 1 Depth Driller 1528 ft Schlumberger Depth 1500 ft Bottom Log Interval 1482 ft Top Log Interval 602 ft Casing Driller Size @ Depth 13.375 in @ 603 ft Casing Schlumberger 602 ft Bit Size 12.250 in Type Fluid In Hole FRESH WATER BASED MUD Density Viscosity 9.3 lbm/gal Fluid Loss PH Source Of Sample MEASURED RM @ Measured Temperature 6.690 ohm.m @ 77 degF RMF @ Measured Temperature 5.017 ohm.m @ 77 degF RMC @ Measured Temperature 10.035 ohm.m @ 77 degF Source RMF RMC CALCULATED CALCULATED RM @ MRT RMF @ MRT 7.490 @ 68 5.617 @ 68 @ Maximum Recorded Temperatures 68 degF Circulation Stopped Time Logger On Bottom Time 31−Aug−2011 17:00 Unit Number Location 3039 BRADFORD Recorded By TIM ZOTARA Witnessed By DAN COLLINS

County: MUD

MUD

Logging Date Run Number Depth Driller Schlumberger Depth Bottom Log Interval Top Log Interval Casing Driller Size @ Depth Casing Schlumberger Bit Size Type Fluid In Hole Density Viscosity Fluid Loss PH Source Of Sample RM @ Measured Temperature RMF @ Measured Temperature RMC @ Measured Temperature Source RMF RMC RM @ MRT RMF @ MRT Maximum Recorded Temperatures Circulation Stopped Time Logger On Bottom Time Unit Number Location Recorded By Witnessed By

Run 1

@

@

@ @ @

Run 2

@

Run

n3

@ @

@ @ @

Run 4

@

DEPTH SUMMARY LISTING Date Created: 31−AUG−2011 1:45:23

Depth System Equipment Depth Measuring Device Type: Serial Number: Calibration Date: Calibrator Serial Number: Calibration Cable Type: Wheel Correction 1: Wheel Correction 2:

IDW−B 2828 1−JAN−2011 33 7−39P LXS −5 −4

Tension Device Type: Serial Number: Calibration Date: Calibrator Serial Number: Number of Calibration Points: Calibration RMS: Calibration Peak Error:

Logging Cable CMTD−B/A 2929 2−AUG−2011 1095 10 45 71

Type: Serial Number: Length:

7−39P LXS 3039 13300 FT

Conveyance Method: Wireline Rig Type: LAND

Depth Control Parameters Log Sequence:

First Log In the Well

Rig Up Length At Surface: Rig Up Length At Bottom: Rig Up Length Correction: Stretch Correction: Tool Zero Check At Surface:

0.50 FT

Depth Control Remarks 1. ALL SCHLUMBERGER DEPTH CONTROL POLICIES FOLLOWED 2. IDW USED AS PRIMARY DEPTH DEVICE 3. Z−CHART USED AS SECONDARY DEPTH DEVICE 4. 5. 6.

DISCLAIMER THE USE OF AND RELIANCE UPON THIS RECORDED−DATA BY THE HEREIN NAMED COMPANY (AND ANY OF ITS AFFILIATES, PARTNERS, REPRESENTATIVES, AGENTS, CONSULTANTS AND EMPLOYEES) IS SUBJECT TO THE TERMS AND CONDITIONS AGREED UPON BETWEEN SCHLUMBERGER AND THE COMPANY, INCLUDING: (a) RESTRICTIONS ON USE OF THE RECORDED−DATA; (b) DISCLAIMERS AND WAIVERS OF WARRANTIES AND REPRESENTATIONS REGARDING COMPANY’S USE OF AND RELIANCE UPON THE RECORDED−DATA; AND (c) CUSTOMER’S FULL AND SOLE RESPONSIBILITY FOR ANY INFERENCE DRAWN OR DECISION MADE IN CONNECTION WITH THE USE OF THIS RECORDED−DATA. OTHER SERVICES1 OS1: PEX−AIT OS2: CMR−ECS−HNGS OS3: PPC−SSCAN−FMI OS4: MDT−MSCT OS5: CBL/VDL−USIT REMARKS: RUN NUMBER 1 THANK YOU FOR CHOOSING SCHLUMBERGER

OTHER SERVICES2 OS1: OS2: OS3: OS4: OS5: REMARKS: RUN NUMBER 2

TOOLS RUN AS PER TOOL SKETCH, W/BOWSPRING & STANDOFFS ON AIT ALL WELLSITE DATA, PERMIT, MUD REPORT, SOP PROVIDED BY CLIENT RUN1: PEX−AIT RUN2: CMR−ECS−HNGS RUN3: PPC−SSCAN−FMI

RUN4: MSCT RUN5: MDT RUN6: CBL/VDL−USIT GEO REQUESTED MATR = SANDSTONE / MDEN = 2.65 G/CC 3 MAX TEMP THERMOMETERS RUN IN HEAD, PER RUN, MAX TEMP FROM HTEM. RUN1 LOGGED AT: REPEAT & MAIN @ 1600’/HR CMR TUNED @ 1184’

SLB CREW: THIMLAR / CANNON RUN 1 SERVICE ORDER #: PROGRAM VERSION: FLUID LEVEL: LOGGED INTERVAL

RUN 2

START

AXPS−00185 19C0−187 0 ft STOP

SERVICE ORDER #: PROGRAM VERSION: FLUID LEVEL: LOGGED INTERVAL

START

EQUIPMENT DESCRIPTION RUN 1 SURFACE EQUIPMENT

RUN 2

WITM (EDTS)−A

DOWNHOLE EQUIPMENT

LEH−QT LEH−QT

EDTC−B EDTH−B EDTC−B EDTG−A/B

PPC2

88.1 MDSB_EDTC Mud Tempe CTEM Gamma Ray EFTB DIAG TelStatus EDTCB Ele

85.2 81.7 79.8

85.2

78.7

Calipers

77.6

PPC_Cartr

72.2

78.7

PPC2−B PPC_CAL_STD

MAPC−B

72.2

MAPC−BA ECH−SF MAMS−BA 8235

MAMS−PS

MAXS−B MASS−BA MAXS−BA

56.8

51.2

STOP

MAXS−PS

30.9

Calipers

29.8

PPC_Cartr

24.4

PPC1

30.9

PPC1−B PPC_CAL_STD

FBST−B

24.4

ECH−MRA FBCC−A AH−185 FBSH−A GPIC−F FBSC−B FBSS−B

PADS FBCC FBSC HV DF ACCZ Tension DHRU

1.3 0.0 TOOL ZERO

MAXIMUM STRING DIAMETER 5.00 IN MEASUREMENTS RELATIVE TO TOOL ZERO ALL LENGTHS IN FEET

Company: SANDIA TECHNOLOGIES, LLC

Well: NYSTA TANDEM LOT 1

Input DLIS Files DEFAULT

FMI_CAL_MAXS_MAPC_074PUP

FN:110

PRODUCER

31−Aug−2011 20:42 1500.0 FT

82.5 FT

Output DLIS Files DEFAULT

FMI_CAL_MAXS_MAPC_084PUP

FN:127

PRODUCER

31−Aug−2011 22:40 1500.0 FT

82.5 FT

RTB

FMI_CAL_MAXS_MAPC_084PUP

FN:128

PRODUCER

31−Aug−2011 22:40 1500.0 FT

82.5 FT

Integrated Hole/Cement Volume Summary Hole Volume = 106.68 F3 Cement Volume = 46.04 F3 (assuming 9.63 IN casing O.D.) Computed from 1500.0 FT to 1380.5 FT using data channel(s) CRD1_PPC1 CRD2_PPC1 CRD3_PPC1 CRD4_PPC1

OP System Version: 19C0−187 FBST−B MAXS−B PPC2

19C0−187 19C0−187 19C0−187

PPC1 MAPC−B EDTC−B

19C0−187 19C0−187 19C0−187

PIP SUMMARY Integrated Hole Volume Minor Pip Every 10 F3 Integrated Hole Volume Major Pip Every 100 F3 Integrated Cement Volume Minor Pip Every 10 F3 Integrated Cement Volume Major Pip Every 100 F3 Time Mark Every 60 S 2

10000

Tension (TENS) (LBF)

Tool/Tot. Drag 0 From D3T 2 to STIA

PPC1 Radius 4 (CRD4_PPC1) (IN)

12 6

PPC1 Hole Diameter 2 (HD2_PPC1) (IN) 16

PPC1 Radius 3 (CRD3_PPC1) (IN)

12 6

PPC1 Hole Diameter 1 (HD1_PPC1) (IN) 16

Cable PPC1 Relative Bearing (RB_PPC1) Drag 0 (DEG) 360 From STIA 2 to STIT

PPC1 Radius 2 (CRD2_PPC1) (IN)

PPC1 Ellipse Hole Diameter 2 (EHD2_ PPC1) 12 6 (IN) 16

Stuck Stretch (STIT) 16 2 0 (F) 50

PPC1 Radius 1 (CRD1_PPC1) (IN)

PPC1 Ellipse Hole Diameter 1 (EHD1_ PPC1) 12 6 (IN) 16

6

Bit Size (BS) (IN)

PPC1 100

200

300

400

500

600

700

800

900

1000

1100

1200

1300

1400

1500 Stuck Stretch (STIT) 16 2 0 (F) 50

PPC1 Radius 1 (CRD1_PPC1) (IN)

PPC1 Ellipse Hole Diameter 1 (EHD1_ PPC1) 12 6 (IN) 16

Cable PPC1 Relative Bearing (RB_PPC1) Drag 0 (DEG) 360 From STIA 2 to STIT

PPC1 Radius 2 (CRD2_PPC1) (IN)

PPC1 Ellipse Hole Diameter 2 (EHD2_ PPC1) 12 6 (IN) 16

Tool/Tot. Drag 0 From D3T 2 to STIA

PPC1 Radius 3 (CRD3_PPC1) (IN)

12 6

PPC1 Hole Diameter 1 (HD1_PPC1) (IN) 16

PPC1 Radius 4 (CRD4_PPC1) (IN)

12 6

PPC1 Hole Diameter 2 (HD2_PPC1) (IN) 16

Bit Size (BS) (IN)

6

10000

Tension (TENS) (LBF)

2

PIP SUMMARY Integrated Hole Volume Minor Pip Every 10 F3 Integrated Hole Volume Major Pip Every 100 F3 Integrated Cement Volume Minor Pip Every 10 F3 Integrated Cement Volume Major Pip Every 100 F3 Time Mark Every 60 S

Parameters DLIS Name

Description

Value

PPC1: Powered Positioning Device/Caliper 1 PPC1 Caliper Type CLBD_PPC PPC Calibration data selection MAPC−B: Multimode Array Sonic Power Cartridge BS Bit Size PPC2: Powered Positioning Device/Caliper 2 PPC2 Caliper Type CLBD_PPC PPC Calibration data selection DIP: Dip Computation DIP Tool DIR: Directional Survey Computation SPVD TVD of Starting Point TIMD Along−hole depth of Tie−in Point TIVD TVD of Tie−in Point STI: Stuck Tool Indicator LBFR Trigger for MAXIS First Reading Label STKT STI Stuck Threshold TDD Total Depth − Driller TDL Total Depth − Logger HOLEV: Integrated Hole/Cement Volume FCD Future Casing (Outer) Diameter HVCS Integrated Hole Volume Caliper Selection System and Miscellaneous DO Depth Offset for Playback PP Playback Processing TD Total Depth Format: PPC1_Logging Vertical Scale: 5" per 100’

CAL_STD ROM 12.250

IN

CAL_STD ROM FBST 1499.87 650 650

FT FT FT

TDL 2.5 1528.00 1500.00

FT FT FT

9.625 AUTOMATIC

IN

0.0 FT OFF 1500 FT Graphics File Created: 31−Aug−2011 22:40

OP System Version: 19C0−187 FBST−B MAXS−B PPC2

19C0−187 19C0−187 19C0−187

PPC1 MAPC−B EDTC−B

19C0−187 19C0−187 19C0−187

Input DLIS Files DEFAULT

FMI_CAL_MAXS_MAPC_074PUP

FN:110

PRODUCER

31−Aug−2011 20:42 1500.0 FT

82.5 FT

Output DLIS Files DEFAULT

FMI_CAL_MAXS_MAPC_084PUP

FN:127

PRODUCER

31−Aug−2011 22:40

RTB

FMI_CAL_MAXS_MAPC_084PUP

FN:128

PRODUCER

31−Aug−2011 22:40

Company: SANDIA TECHNOLOGIES, LLC

Well: NYSTA TANDEM LOT 1

Input DLIS Files DEFAULT

FMI_CAL_MAXS_MAPC_074PUP

FN:110

PRODUCER

31−Aug−2011 20:42 1500.0 FT

82.5 FT

Output DLIS Files DEFAULT

FMI_CAL_MAXS_MAPC_081PUP

FN:123

PRODUCER

31−Aug−2011 22:21 1500.0 FT

82.5 FT

RTB

FMI_CAL_MAXS_MAPC_081PUP

FN:124

PRODUCER

31−Aug−2011 22:21 1500.0 FT

82.5 FT

Integrated Hole/Cement Volume Summary Hole Volume = 106.68 F3 Cement Volume = 46.04 F3 (assuming 9.63 IN casing O.D.) Computed from 1500.0 FT to 1380.5 FT using data channel(s) CRD1_PPC1 CRD2_PPC1 CRD3_PPC1 CRD4_PPC1

OP System Version: 19C0−187 FBST−B MAXS−B PPC2

19C0−187 19C0−187 19C0−187

PPC1 MAPC−B EDTC−B PIP SUMMARY

Integrated Hole Volume Minor Pip Every 10 F3 Integrated Hole Volume Major Pip Every 100 F3

19C0−187 19C0−187 19C0−187

Integrated Cement Volume Minor Pip Every 10 F3 Integrated Cement Volume Major Pip Every 100 F3 Integrated Transit Time Minor Pip Every 1 MS Integrated Transit Time Major Pip Every 10 MS Time Mark Every 60 S

10000

Tension (TENS) (LBF)

HD difference From EHD1_PPC1 to HD1_ PPC1

HD difference From HD2_PPC1 to EHD2_ PPC1

Formation From F2 to EHD1_PPC1

Formation From EHD2_PPC1 to F3

0

Tool/Tot. PPC1 Relative Bearing (RB_ PPC1 Hole Diameter 1 (HD1_ PPC1 Hole Diameter 2 (HD2_ Drag PPC1) PPC1) PPC1) From D4T 0 (DEG) 360 24 (IN) 44 (IN) 24 to STIA Cable PPC1 Tool Center 2 (ETC2_ PPC1 Ellipse Hole Diameter 1 PPC1 Ellipse Hole Diameter 2 Drag PPC1) (EHD1_PPC1) (EHD2_PPC1) From D4T −10 (IN) 10 24 (IN) 44 (IN) 24 to STIT Stuck PPC1 Tool Center 1 (ETC1_ Stretch PPC1) (STIT) 24 −10 (IN) 10 0 (F) 50

Bit Size (BS) (IN)

PPC 1 100

200

44

Bit Size (BS) (IN)

24 24

Bit Size (BS) (IN)

4

300

400

500

600

700

800

900

1000

1100

1200

1300

1400

1500 Stuck PPC1 Tool Center 1 (ETC1_ Stretch PPC1) (STIT) 24 −10 (IN) 10 0 (F) 50

Bit Size (BS) (IN)

44

Bit Size (BS) (IN)

24 24

Cable PPC1 Tool Center 2 (ETC2_ PPC1 Ellipse Hole Diameter 1 PPC1 Ellipse Hole Diameter 2 Drag PPC1) (EHD1_PPC1) (EHD2_PPC1) From D4T −10 (IN) 10 24 (IN) 44 (IN) 24 to STIT Tool/Tot. Drag

PPC1 Relative Bearing (RB_ PPC1 Hole Diameter 1 (HD1_ PPC1 Hole Diameter 2 (HD2_

Bit Size (BS) (IN)

4

PPC1) (DEG)

360 24

PPC1) (IN)

Tension (TENS) (LBF)

0

Formation From F2 to EHD1_PPC1

Formation From EHD2_PPC1 to F3

HD difference From EHD1_PPC1 to HD1_ PPC1

HD difference From HD2_PPC1 to EHD2_ PPC1

From D4T 0 to STIA

10000

PPC1) (IN)

44

24

PIP SUMMARY Integrated Hole Volume Minor Pip Every 10 F3 Integrated Hole Volume Major Pip Every 100 F3 Integrated Cement Volume Minor Pip Every 10 F3 Integrated Cement Volume Major Pip Every 100 F3 Integrated Transit Time Minor Pip Every 1 MS Integrated Transit Time Major Pip Every 10 MS Time Mark Every 60 S

Parameters DLIS Name

Description

Value

PPC1: Powered Positioning Device/Caliper 1 PPC1 Caliper Type CLBD_PPC PPC Calibration data selection MAPC−B: Multimode Array Sonic Power Cartridge BS Bit Size ITTS Integrated Transit Time Source PPC2: Powered Positioning Device/Caliper 2 PPC2 Caliper Type CLBD_PPC PPC Calibration data selection DIP: Dip Computation DIP Tool DIR: Directional Survey Computation SPVD TVD of Starting Point TIMD Along−hole depth of Tie−in Point TIVD TVD of Tie−in Point STI: Stuck Tool Indicator LBFR Trigger for MAXIS First Reading Label STKT STI Stuck Threshold TDD Total Depth − Driller TDL Total Depth − Logger HOLEV: Integrated Hole/Cement Volume FCD Future Casing (Outer) Diameter HVCS Integrated Hole Volume Caliper Selection System and Miscellaneous DO Depth Offset for Playback PP Playback Processing TD Total Depth Format: PPC1_HoleDiameter Vertical Scale: 5" per 100’

CAL_STD ROM 12.250 DTCO

IN

CAL_STD ROM FBST 1499.87 650 650

FT FT FT

TDL 2.5 1528.00 1500.00

FT FT FT

9.625 AUTOMATIC

IN

0.0 FT OFF 1500 FT Graphics File Created: 31−Aug−2011 22:21

OP System Version: 19C0−187 FBST−B MAXS−B PPC2

19C0−187 19C0−187 19C0−187

PPC1 MAPC−B EDTC−B

19C0−187 19C0−187 19C0−187

Input DLIS Files DEFAULT

FMI_CAL_MAXS_MAPC_074PUP

FN:110

PRODUCER

31−Aug−2011 20:42 1500.0 FT

82.5 FT

Output DLIS Files DEFAULT

FMI_CAL_MAXS_MAPC_081PUP

FN:123

PRODUCER

31−Aug−2011 22:21

RTB

FMI_CAL_MAXS_MAPC_081PUP

FN:124

PRODUCER

31−Aug−2011 22:21

Company: SANDIA TECHNOLOGIES, LLC

Well: NYSTA TANDEM LOT 1

Input DLIS Files DEFAULT

FMI_CAL_MAXS_MAPC_074PUP

FN:110

PRODUCER

31−Aug−2011 20:42 1500.0 FT

82.5 FT

Output DLIS Files DEFAULT

FMI_CAL_MAXS_MAPC_084PUP

FN:127

PRODUCER

31−Aug−2011 22:40 1500.0 FT

82.5 FT

RTB

FMI_CAL_MAXS_MAPC_084PUP

FN:128

PRODUCER

31−Aug−2011 22:40 1500.0 FT

82.5 FT

Integrated Hole/Cement Volume Summary Hole Volume = 106.68 F3 Cement Volume = 46.04 F3 (assuming 9.63 IN casing O.D.) Computed from 1500.0 FT to 1380.5 FT using data channel(s) CRD1_PPC1 CRD2_PPC1 CRD3_PPC1 CRD4_PPC1

OP System Version: 19C0−187 FBST−B MAXS−B PPC2

19C0−187 19C0−187 19C0−187

PPC1 MAPC−B EDTC−B

19C0−187 19C0−187 19C0−187

PIP SUMMARY Integrated Hole Volume Minor Pip Every 10 F3 Integrated Hole Volume Major Pip Every 100 F3 Integrated Cement Volume Minor Pip Every 10 F3 Integrated Cement Volume Major Pip Every 100 F3 Time Mark Every 60 S PPC2 Radius 4 (CRD4_PPC2) (IN)

12 6

PPC2 Hole Diameter 2 (HD2_PPC2) (IN) 16

Tool/Tot. Drag 0 From D3T 2 to STIA

PPC2 Radius 3 (CRD3_PPC2) (IN)

12 6

PPC2 Hole Diameter 1 (HD1_PPC2) (IN) 16

Cable PPC2 Relative Bearing (RB_PPC2) Drag 0 (DEG) 360 From STIA 2 to STIT

PPC2 Radius 2 (CRD2_PPC2) (IN)

PPC2 Ellipse Hole Diameter 2 (EHD2_ PPC2) 12 6 (IN) 16

Stuck Stretch (STIT) 16 2 0 (F) 50

PPC2 Radius 1 (CRD1_PPC2) (IN)

PPC2 Ellipse Hole Diameter 1 (EHD1_ PPC2) 12 6 (IN) 16

2

10000

6

Tension (TENS) (LBF)

Bit Size (BS) (IN)

PPC2 100

200

300

400

500

600

700

800

900

1000

1100

1200

1300

1400

1500 Stuck Stretch (STIT) 16 2 0 (F) 50

PPC2 Radius 1 (CRD1_PPC2) (IN)

PPC2 Ellipse Hole Diameter 1 (EHD1_ PPC2) 12 6 (IN) 16

Cable PPC2 Relative Bearing (RB_PPC2) Drag 0 (DEG) 360 From STIA 2 to STIT

PPC2 Radius 2 (CRD2_PPC2) (IN)

PPC2 Ellipse Hole Diameter 2 (EHD2_ PPC2) 12 6 (IN) 16

Tool/Tot. Drag 0 From D3T 2 to STIA

PPC2 Radius 3 (CRD3_PPC2) (IN)

12 6

PPC2 Hole Diameter 1 (HD1_PPC2) (IN) 16

PPC2 Radius 4 (CRD4_PPC2) (IN)

12 6

PPC2 Hole Diameter 2 (HD2_PPC2) (IN) 16

Bit Size (BS) (IN)

6

10000

Tension (TENS) (LBF)

2

PIP SUMMARY Integrated Hole Volume Minor Pip Every 10 F3 Integrated Hole Volume Major Pip Every 100 F3 Integrated Cement Volume Minor Pip Every 10 F3 Integrated Cement Volume Major Pip Every 100 F3 Time Mark Every 60 S

Parameters DLIS Name

Description

Value

PPC1: Powered Positioning Device/Caliper 1 PPC1 Caliper Type CLBD_PPC PPC Calibration data selection MAPC−B: Multimode Array Sonic Power Cartridge BS Bit Size PPC2: Powered Positioning Device/Caliper 2 PPC2 Caliper Type CLBD_PPC PPC Calibration data selection DIP: Dip Computation DIP Tool DIR: Directional Survey Computation SPVD TVD of Starting Point TIMD Along−hole depth of Tie−in Point TIVD TVD of Tie−in Point STI: Stuck Tool Indicator LBFR Trigger for MAXIS First Reading Label STKT STI Stuck Threshold TDD Total Depth − Driller TDL Total Depth − Logger HOLEV: Integrated Hole/Cement Volume FCD Future Casing (Outer) Diameter HVCS Integrated Hole Volume Caliper Selection System and Miscellaneous DO Depth Offset for Playback PP Playback Processing TD Total Depth Format: PPC2_Logging Vertical Scale: 5" per 100’

CAL_STD ROM 12.250

IN

CAL_STD ROM FBST 1499.87 650 650

FT FT FT

TDL 2.5 1528.00 1500.00

FT FT FT

9.625 AUTOMATIC

IN

0.0 FT OFF 1500 FT Graphics File Created: 31−Aug−2011 22:40

OP System Version: 19C0−187 FBST−B MAXS−B PPC2

19C0−187 19C0−187 19C0−187

PPC1 MAPC−B EDTC−B

19C0−187 19C0−187 19C0−187

Input DLIS Files DEFAULT

FMI_CAL_MAXS_MAPC_074PUP

FN:110

PRODUCER

31−Aug−2011 20:42 1500.0 FT

82.5 FT

Output DLIS Files DEFAULT

FMI_CAL_MAXS_MAPC_084PUP

FN:127

PRODUCER

31−Aug−2011 22:40

RTB

FMI_CAL_MAXS_MAPC_084PUP

FN:128

PRODUCER

31−Aug−2011 22:40

Company: SANDIA TECHNOLOGIES, LLC

Well: NYSTA TANDEM LOT 1

Input DLIS Files DEFAULT

FMI_CAL_MAXS_MAPC_074PUP

FN:110

PRODUCER

31−Aug−2011 20:42 1500.0 FT

82.5 FT

Output DLIS Files DEFAULT

FMI_CAL_MAXS_MAPC_081PUP

FN:123

PRODUCER

31−Aug−2011 22:21 1500.0 FT

82.5 FT

RTB

FMI_CAL_MAXS_MAPC_081PUP

FN:124

PRODUCER

31−Aug−2011 22:21 1500.0 FT

82.5 FT

Integrated Hole/Cement Volume Summary Hole Volume = 106.68 F3 Cement Volume = 46.04 F3 (assuming 9.63 IN casing O.D.) Computed from 1500.0 FT to 1380.5 FT using data channel(s) CRD1_PPC1 CRD2_PPC1 CRD3_PPC1 CRD4_PPC1

OP System Version: 19C0−187 FBST−B MAXS−B PPC2

19C0−187 19C0−187 19C0−187

PPC1 MAPC−B EDTC−B

19C0−187 19C0−187 19C0−187

PIP SUMMARY Integrated Hole Volume Minor Pip Every 10 F3 Integrated Hole Volume Major Pip Every 100 F3 Integrated Cement Volume Minor Pip Every 10 F3 Integrated Cement Volume Major Pip Every 100 F3 Integrated Transit Time Minor Pip Every 1 MS Integrated Transit Time Major Pip Every 10 MS Time Mark Every 60 S

10000

Tension (TENS) (LBF)

HD difference From EHD1_PPC2 to HD1_ PPC2

HD difference From HD2_PPC2 to EHD2_ PPC2

Formation From F2 to EHD1_PPC2

Formation From EHD2_PPC2 to F3

0

Tool/Tot. PPC2 Relative Bearing (RB_ PPC2 Hole Diameter 1 (HD1_ PPC2 Hole Diameter 2 (HD2_ Drag PPC2) PPC2) PPC2) From D4T 0 (DEG) 360 24 (IN) 44 (IN) 24 to STIA Cable PPC2 Tool Center 2 (ETC2_ PPC2 Ellipse Hole Diameter 1 PPC2 Ellipse Hole Diameter 2 Drag PPC2) (EHD1_PPC2) (EHD2_PPC2) From D4T −10 (IN) 10 24 (IN) 44 (IN) 24 to STIT Stuck PPC2 Tool Center 1 (ETC1_ Stretch PPC2) (STIT) 24 −10 (IN) 10 0 (F) 50

Bit Size (BS) (IN)

PPC 2 100

44

Bit Size (BS) (IN)

24 24

Bit Size (BS) (IN)

4

200

300

400

500

600

700

800

900

1000

1100

1200

1300

1400

1500 Stuck PPC2 Tool Center 1 (ETC1_ Stretch PPC2) (STIT) 24 −10 (IN) 10 0 (F) 50

Bit Size (BS) (IN)

Bit Size (BS) (IN)

44

24 24

Bit Size (BS) (IN)

Cable PPC2 Tool Center 2 (ETC2_ PPC2 Ellipse Hole Diameter 1 PPC2 Ellipse Hole Diameter 2 Drag PPC2) (EHD1_PPC2) (EHD2_PPC2) From D4T −10 (IN) 10 24 (IN) 44 (IN) 24 to STIT Tool/Tot. PPC2 Relative Bearing (RB_ PPC2 Hole Diameter 1 (HD1_ PPC2 Hole Diameter 2 (HD2_ Drag PPC2) PPC2) PPC2) From D4T 0 (DEG) 360 24 (IN) 44 (IN) 24 to STIA

10000

Tension (TENS) (LBF)

0

Formation From F2 to EHD1_PPC2

Formation From EHD2_PPC2 to F3

HD difference From EHD1_PPC2 to HD1_ PPC2

HD difference From HD2_PPC2 to EHD2_ PPC2

PIP SUMMARY Integrated Hole Volume Minor Pip Every 10 F3 Integrated Hole Volume Major Pip Every 100 F3 Integrated Cement Volume Minor Pip Every 10 F3 Integrated Cement Volume Major Pip Every 100 F3 Integrated Transit Time Minor Pip Every 1 MS Integrated Transit Time Major Pip Every 10 MS Time Mark Every 60 S

Parameters DLIS Name

Description

PPC1: Powered Positioning Device/Caliper 1 PPC1 Caliper Type CLBD_PPC PPC Calibration data selection MAPC−B: Multimode Array Sonic Power Cartridge BS Bit Size ITTS Integrated Transit Time Source PPC2: Powered Positioning Device/Caliper 2 PPC2 Caliper Type CLBD_PPC PPC Calibration data selection DIP: Dip Computation DIP Tool DIR: Directional Survey Computation SPVD TVD of Starting Point TIMD Along−hole depth of Tie−in Point

Value CAL_STD ROM 12.250 DTCO

IN

CAL_STD ROM FBST 1499.87 650

FT FT

4

TIVD

TVD of Tie−in Point STI: Stuck Tool Indicator LBFR Trigger for MAXIS First Reading Label STKT STI Stuck Threshold TDD Total Depth − Driller TDL Total Depth − Logger HOLEV: Integrated Hole/Cement Volume FCD Future Casing (Outer) Diameter HVCS Integrated Hole Volume Caliper Selection System and Miscellaneous DO Depth Offset for Playback PP Playback Processing TD Total Depth Format: PPC2_HoleDiameter Vertical Scale: 5" per 100’

650

FT

TDL 2.5 1528.00 1500.00

FT FT FT

9.625 AUTOMATIC

IN

0.0 FT OFF 1500 FT Graphics File Created: 31−Aug−2011 22:21

OP System Version: 19C0−187 FBST−B MAXS−B PPC2

19C0−187 19C0−187 19C0−187

PPC1 MAPC−B EDTC−B

19C0−187 19C0−187 19C0−187

Input DLIS Files DEFAULT

FMI_CAL_MAXS_MAPC_074PUP

FN:110

PRODUCER

31−Aug−2011 20:42 1500.0 FT

Output DLIS Files DEFAULT

FMI_CAL_MAXS_MAPC_081PUP

FN:123

PRODUCER

31−Aug−2011 22:21

RTB

FMI_CAL_MAXS_MAPC_081PUP

FN:124

PRODUCER

31−Aug−2011 22:21

Company:

SANDIA TECHNOLOGIES, LLC

Well: Field: County: State:

NYSTA TANDEM LOT 1 WILDCAT ROCKLAND NEW YORK POWERED POSITIONING CALIPER − PPC 4 ARM CALIPER LOG

82.5 FT