SANDIA TECHNOLOGIES, LLC NYSTA TANDEM LOT 1 WILDCAT
KELLY BUSHING
GROUND LEVEL 16.00 ft
Elev.:
Elev.:
Permanent Datum: KELLY BUSHING
G.L.
K.B.
402.00 ft
386.00 ft
402.00 ft
@ @ @
@
@
QUAD
above Perm. Datum
386.00 ft
D.F.
ROCKLAND State: NEW YORK POWERED POSITIONING CALIPER − PPC 4 ARM CALIPER LOG LAT: 41.1039
Log Measured From:
LONG: −74.027
Drilling Measured From:
API Serial No. Section Township 31−087−27016−00−00 CLARKSTOWN Logging Date 31−Aug−2011 Run Number 1 Depth Driller 1528 ft Schlumberger Depth 1500 ft Bottom Log Interval 1482 ft Top Log Interval 602 ft Casing Driller Size @ Depth 13.375 in @ 603 ft Casing Schlumberger 602 ft Bit Size 12.250 in Type Fluid In Hole FRESH WATER BASED MUD Density Viscosity 9.3 lbm/gal Fluid Loss PH Source Of Sample MEASURED RM @ Measured Temperature 6.690 ohm.m @ 77 degF RMF @ Measured Temperature 5.017 ohm.m @ 77 degF RMC @ Measured Temperature 10.035 ohm.m @ 77 degF Source RMF RMC CALCULATED CALCULATED RM @ MRT RMF @ MRT 7.490 @ 68 5.617 @ 68 @ Maximum Recorded Temperatures 68 degF Circulation Stopped Time Logger On Bottom Time 31−Aug−2011 17:00 Unit Number Location 3039 BRADFORD Recorded By TIM ZOTARA Witnessed By DAN COLLINS
County: MUD
MUD
Logging Date Run Number Depth Driller Schlumberger Depth Bottom Log Interval Top Log Interval Casing Driller Size @ Depth Casing Schlumberger Bit Size Type Fluid In Hole Density Viscosity Fluid Loss PH Source Of Sample RM @ Measured Temperature RMF @ Measured Temperature RMC @ Measured Temperature Source RMF RMC RM @ MRT RMF @ MRT Maximum Recorded Temperatures Circulation Stopped Time Logger On Bottom Time Unit Number Location Recorded By Witnessed By
Run 1
@
@
@ @ @
Run 2
@
Run
n3
@ @
@ @ @
Run 4
@
DEPTH SUMMARY LISTING Date Created: 31−AUG−2011 1:45:23
Depth System Equipment Depth Measuring Device Type: Serial Number: Calibration Date: Calibrator Serial Number: Calibration Cable Type: Wheel Correction 1: Wheel Correction 2:
IDW−B 2828 1−JAN−2011 33 7−39P LXS −5 −4
Tension Device Type: Serial Number: Calibration Date: Calibrator Serial Number: Number of Calibration Points: Calibration RMS: Calibration Peak Error:
Rig Up Length At Surface: Rig Up Length At Bottom: Rig Up Length Correction: Stretch Correction: Tool Zero Check At Surface:
0.50 FT
Depth Control Remarks 1. ALL SCHLUMBERGER DEPTH CONTROL POLICIES FOLLOWED 2. IDW USED AS PRIMARY DEPTH DEVICE 3. Z−CHART USED AS SECONDARY DEPTH DEVICE 4. 5. 6.
DISCLAIMER THE USE OF AND RELIANCE UPON THIS RECORDED−DATA BY THE HEREIN NAMED COMPANY (AND ANY OF ITS AFFILIATES, PARTNERS, REPRESENTATIVES, AGENTS, CONSULTANTS AND EMPLOYEES) IS SUBJECT TO THE TERMS AND CONDITIONS AGREED UPON BETWEEN SCHLUMBERGER AND THE COMPANY, INCLUDING: (a) RESTRICTIONS ON USE OF THE RECORDED−DATA; (b) DISCLAIMERS AND WAIVERS OF WARRANTIES AND REPRESENTATIONS REGARDING COMPANY’S USE OF AND RELIANCE UPON THE RECORDED−DATA; AND (c) CUSTOMER’S FULL AND SOLE RESPONSIBILITY FOR ANY INFERENCE DRAWN OR DECISION MADE IN CONNECTION WITH THE USE OF THIS RECORDED−DATA. OTHER SERVICES1 OS1: PEX−AIT OS2: CMR−ECS−HNGS OS3: PPC−SSCAN−FMI OS4: MDT−MSCT OS5: CBL/VDL−USIT REMARKS: RUN NUMBER 1 THANK YOU FOR CHOOSING SCHLUMBERGER
OTHER SERVICES2 OS1: OS2: OS3: OS4: OS5: REMARKS: RUN NUMBER 2
TOOLS RUN AS PER TOOL SKETCH, W/BOWSPRING & STANDOFFS ON AIT ALL WELLSITE DATA, PERMIT, MUD REPORT, SOP PROVIDED BY CLIENT RUN1: PEX−AIT RUN2: CMR−ECS−HNGS RUN3: PPC−SSCAN−FMI
RUN4: MSCT RUN5: MDT RUN6: CBL/VDL−USIT GEO REQUESTED MATR = SANDSTONE / MDEN = 2.65 G/CC 3 MAX TEMP THERMOMETERS RUN IN HEAD, PER RUN, MAX TEMP FROM HTEM. RUN1 LOGGED AT: REPEAT & MAIN @ 1600’/HR CMR TUNED @ 1184’
SLB CREW: THIMLAR / CANNON RUN 1 SERVICE ORDER #: PROGRAM VERSION: FLUID LEVEL: LOGGED INTERVAL
RUN 2
START
AXPS−00185 19C0−187 0 ft STOP
SERVICE ORDER #: PROGRAM VERSION: FLUID LEVEL: LOGGED INTERVAL
START
EQUIPMENT DESCRIPTION RUN 1 SURFACE EQUIPMENT
RUN 2
WITM (EDTS)−A
DOWNHOLE EQUIPMENT
LEH−QT LEH−QT
EDTC−B EDTH−B EDTC−B EDTG−A/B
PPC2
88.1 MDSB_EDTC Mud Tempe CTEM Gamma Ray EFTB DIAG TelStatus EDTCB Ele
85.2 81.7 79.8
85.2
78.7
Calipers
77.6
PPC_Cartr
72.2
78.7
PPC2−B PPC_CAL_STD
MAPC−B
72.2
MAPC−BA ECH−SF MAMS−BA 8235
MAMS−PS
MAXS−B MASS−BA MAXS−BA
56.8
51.2
STOP
MAXS−PS
30.9
Calipers
29.8
PPC_Cartr
24.4
PPC1
30.9
PPC1−B PPC_CAL_STD
FBST−B
24.4
ECH−MRA FBCC−A AH−185 FBSH−A GPIC−F FBSC−B FBSS−B
PADS FBCC FBSC HV DF ACCZ Tension DHRU
1.3 0.0 TOOL ZERO
MAXIMUM STRING DIAMETER 5.00 IN MEASUREMENTS RELATIVE TO TOOL ZERO ALL LENGTHS IN FEET
Company: SANDIA TECHNOLOGIES, LLC
Well: NYSTA TANDEM LOT 1
Input DLIS Files DEFAULT
FMI_CAL_MAXS_MAPC_074PUP
FN:110
PRODUCER
31−Aug−2011 20:42 1500.0 FT
82.5 FT
Output DLIS Files DEFAULT
FMI_CAL_MAXS_MAPC_084PUP
FN:127
PRODUCER
31−Aug−2011 22:40 1500.0 FT
82.5 FT
RTB
FMI_CAL_MAXS_MAPC_084PUP
FN:128
PRODUCER
31−Aug−2011 22:40 1500.0 FT
82.5 FT
Integrated Hole/Cement Volume Summary Hole Volume = 106.68 F3 Cement Volume = 46.04 F3 (assuming 9.63 IN casing O.D.) Computed from 1500.0 FT to 1380.5 FT using data channel(s) CRD1_PPC1 CRD2_PPC1 CRD3_PPC1 CRD4_PPC1
OP System Version: 19C0−187 FBST−B MAXS−B PPC2
19C0−187 19C0−187 19C0−187
PPC1 MAPC−B EDTC−B
19C0−187 19C0−187 19C0−187
PIP SUMMARY Integrated Hole Volume Minor Pip Every 10 F3 Integrated Hole Volume Major Pip Every 100 F3 Integrated Cement Volume Minor Pip Every 10 F3 Integrated Cement Volume Major Pip Every 100 F3 Time Mark Every 60 S 2
10000
Tension (TENS) (LBF)
Tool/Tot. Drag 0 From D3T 2 to STIA
PPC1 Radius 4 (CRD4_PPC1) (IN)
12 6
PPC1 Hole Diameter 2 (HD2_PPC1) (IN) 16
PPC1 Radius 3 (CRD3_PPC1) (IN)
12 6
PPC1 Hole Diameter 1 (HD1_PPC1) (IN) 16
Cable PPC1 Relative Bearing (RB_PPC1) Drag 0 (DEG) 360 From STIA 2 to STIT
PIP SUMMARY Integrated Hole Volume Minor Pip Every 10 F3 Integrated Hole Volume Major Pip Every 100 F3 Integrated Cement Volume Minor Pip Every 10 F3 Integrated Cement Volume Major Pip Every 100 F3 Time Mark Every 60 S
Parameters DLIS Name
Description
Value
PPC1: Powered Positioning Device/Caliper 1 PPC1 Caliper Type CLBD_PPC PPC Calibration data selection MAPC−B: Multimode Array Sonic Power Cartridge BS Bit Size PPC2: Powered Positioning Device/Caliper 2 PPC2 Caliper Type CLBD_PPC PPC Calibration data selection DIP: Dip Computation DIP Tool DIR: Directional Survey Computation SPVD TVD of Starting Point TIMD Along−hole depth of Tie−in Point TIVD TVD of Tie−in Point STI: Stuck Tool Indicator LBFR Trigger for MAXIS First Reading Label STKT STI Stuck Threshold TDD Total Depth − Driller TDL Total Depth − Logger HOLEV: Integrated Hole/Cement Volume FCD Future Casing (Outer) Diameter HVCS Integrated Hole Volume Caliper Selection System and Miscellaneous DO Depth Offset for Playback PP Playback Processing TD Total Depth Format: PPC1_Logging Vertical Scale: 5" per 100’
CAL_STD ROM 12.250
IN
CAL_STD ROM FBST 1499.87 650 650
FT FT FT
TDL 2.5 1528.00 1500.00
FT FT FT
9.625 AUTOMATIC
IN
0.0 FT OFF 1500 FT Graphics File Created: 31−Aug−2011 22:40
OP System Version: 19C0−187 FBST−B MAXS−B PPC2
19C0−187 19C0−187 19C0−187
PPC1 MAPC−B EDTC−B
19C0−187 19C0−187 19C0−187
Input DLIS Files DEFAULT
FMI_CAL_MAXS_MAPC_074PUP
FN:110
PRODUCER
31−Aug−2011 20:42 1500.0 FT
82.5 FT
Output DLIS Files DEFAULT
FMI_CAL_MAXS_MAPC_084PUP
FN:127
PRODUCER
31−Aug−2011 22:40
RTB
FMI_CAL_MAXS_MAPC_084PUP
FN:128
PRODUCER
31−Aug−2011 22:40
Company: SANDIA TECHNOLOGIES, LLC
Well: NYSTA TANDEM LOT 1
Input DLIS Files DEFAULT
FMI_CAL_MAXS_MAPC_074PUP
FN:110
PRODUCER
31−Aug−2011 20:42 1500.0 FT
82.5 FT
Output DLIS Files DEFAULT
FMI_CAL_MAXS_MAPC_081PUP
FN:123
PRODUCER
31−Aug−2011 22:21 1500.0 FT
82.5 FT
RTB
FMI_CAL_MAXS_MAPC_081PUP
FN:124
PRODUCER
31−Aug−2011 22:21 1500.0 FT
82.5 FT
Integrated Hole/Cement Volume Summary Hole Volume = 106.68 F3 Cement Volume = 46.04 F3 (assuming 9.63 IN casing O.D.) Computed from 1500.0 FT to 1380.5 FT using data channel(s) CRD1_PPC1 CRD2_PPC1 CRD3_PPC1 CRD4_PPC1
OP System Version: 19C0−187 FBST−B MAXS−B PPC2
19C0−187 19C0−187 19C0−187
PPC1 MAPC−B EDTC−B PIP SUMMARY
Integrated Hole Volume Minor Pip Every 10 F3 Integrated Hole Volume Major Pip Every 100 F3
19C0−187 19C0−187 19C0−187
Integrated Cement Volume Minor Pip Every 10 F3 Integrated Cement Volume Major Pip Every 100 F3 Integrated Transit Time Minor Pip Every 1 MS Integrated Transit Time Major Pip Every 10 MS Time Mark Every 60 S
PIP SUMMARY Integrated Hole Volume Minor Pip Every 10 F3 Integrated Hole Volume Major Pip Every 100 F3 Integrated Cement Volume Minor Pip Every 10 F3 Integrated Cement Volume Major Pip Every 100 F3 Integrated Transit Time Minor Pip Every 1 MS Integrated Transit Time Major Pip Every 10 MS Time Mark Every 60 S
Parameters DLIS Name
Description
Value
PPC1: Powered Positioning Device/Caliper 1 PPC1 Caliper Type CLBD_PPC PPC Calibration data selection MAPC−B: Multimode Array Sonic Power Cartridge BS Bit Size ITTS Integrated Transit Time Source PPC2: Powered Positioning Device/Caliper 2 PPC2 Caliper Type CLBD_PPC PPC Calibration data selection DIP: Dip Computation DIP Tool DIR: Directional Survey Computation SPVD TVD of Starting Point TIMD Along−hole depth of Tie−in Point TIVD TVD of Tie−in Point STI: Stuck Tool Indicator LBFR Trigger for MAXIS First Reading Label STKT STI Stuck Threshold TDD Total Depth − Driller TDL Total Depth − Logger HOLEV: Integrated Hole/Cement Volume FCD Future Casing (Outer) Diameter HVCS Integrated Hole Volume Caliper Selection System and Miscellaneous DO Depth Offset for Playback PP Playback Processing TD Total Depth Format: PPC1_HoleDiameter Vertical Scale: 5" per 100’
CAL_STD ROM 12.250 DTCO
IN
CAL_STD ROM FBST 1499.87 650 650
FT FT FT
TDL 2.5 1528.00 1500.00
FT FT FT
9.625 AUTOMATIC
IN
0.0 FT OFF 1500 FT Graphics File Created: 31−Aug−2011 22:21
OP System Version: 19C0−187 FBST−B MAXS−B PPC2
19C0−187 19C0−187 19C0−187
PPC1 MAPC−B EDTC−B
19C0−187 19C0−187 19C0−187
Input DLIS Files DEFAULT
FMI_CAL_MAXS_MAPC_074PUP
FN:110
PRODUCER
31−Aug−2011 20:42 1500.0 FT
82.5 FT
Output DLIS Files DEFAULT
FMI_CAL_MAXS_MAPC_081PUP
FN:123
PRODUCER
31−Aug−2011 22:21
RTB
FMI_CAL_MAXS_MAPC_081PUP
FN:124
PRODUCER
31−Aug−2011 22:21
Company: SANDIA TECHNOLOGIES, LLC
Well: NYSTA TANDEM LOT 1
Input DLIS Files DEFAULT
FMI_CAL_MAXS_MAPC_074PUP
FN:110
PRODUCER
31−Aug−2011 20:42 1500.0 FT
82.5 FT
Output DLIS Files DEFAULT
FMI_CAL_MAXS_MAPC_084PUP
FN:127
PRODUCER
31−Aug−2011 22:40 1500.0 FT
82.5 FT
RTB
FMI_CAL_MAXS_MAPC_084PUP
FN:128
PRODUCER
31−Aug−2011 22:40 1500.0 FT
82.5 FT
Integrated Hole/Cement Volume Summary Hole Volume = 106.68 F3 Cement Volume = 46.04 F3 (assuming 9.63 IN casing O.D.) Computed from 1500.0 FT to 1380.5 FT using data channel(s) CRD1_PPC1 CRD2_PPC1 CRD3_PPC1 CRD4_PPC1
OP System Version: 19C0−187 FBST−B MAXS−B PPC2
19C0−187 19C0−187 19C0−187
PPC1 MAPC−B EDTC−B
19C0−187 19C0−187 19C0−187
PIP SUMMARY Integrated Hole Volume Minor Pip Every 10 F3 Integrated Hole Volume Major Pip Every 100 F3 Integrated Cement Volume Minor Pip Every 10 F3 Integrated Cement Volume Major Pip Every 100 F3 Time Mark Every 60 S PPC2 Radius 4 (CRD4_PPC2) (IN)
12 6
PPC2 Hole Diameter 2 (HD2_PPC2) (IN) 16
Tool/Tot. Drag 0 From D3T 2 to STIA
PPC2 Radius 3 (CRD3_PPC2) (IN)
12 6
PPC2 Hole Diameter 1 (HD1_PPC2) (IN) 16
Cable PPC2 Relative Bearing (RB_PPC2) Drag 0 (DEG) 360 From STIA 2 to STIT
PIP SUMMARY Integrated Hole Volume Minor Pip Every 10 F3 Integrated Hole Volume Major Pip Every 100 F3 Integrated Cement Volume Minor Pip Every 10 F3 Integrated Cement Volume Major Pip Every 100 F3 Time Mark Every 60 S
Parameters DLIS Name
Description
Value
PPC1: Powered Positioning Device/Caliper 1 PPC1 Caliper Type CLBD_PPC PPC Calibration data selection MAPC−B: Multimode Array Sonic Power Cartridge BS Bit Size PPC2: Powered Positioning Device/Caliper 2 PPC2 Caliper Type CLBD_PPC PPC Calibration data selection DIP: Dip Computation DIP Tool DIR: Directional Survey Computation SPVD TVD of Starting Point TIMD Along−hole depth of Tie−in Point TIVD TVD of Tie−in Point STI: Stuck Tool Indicator LBFR Trigger for MAXIS First Reading Label STKT STI Stuck Threshold TDD Total Depth − Driller TDL Total Depth − Logger HOLEV: Integrated Hole/Cement Volume FCD Future Casing (Outer) Diameter HVCS Integrated Hole Volume Caliper Selection System and Miscellaneous DO Depth Offset for Playback PP Playback Processing TD Total Depth Format: PPC2_Logging Vertical Scale: 5" per 100’
CAL_STD ROM 12.250
IN
CAL_STD ROM FBST 1499.87 650 650
FT FT FT
TDL 2.5 1528.00 1500.00
FT FT FT
9.625 AUTOMATIC
IN
0.0 FT OFF 1500 FT Graphics File Created: 31−Aug−2011 22:40
OP System Version: 19C0−187 FBST−B MAXS−B PPC2
19C0−187 19C0−187 19C0−187
PPC1 MAPC−B EDTC−B
19C0−187 19C0−187 19C0−187
Input DLIS Files DEFAULT
FMI_CAL_MAXS_MAPC_074PUP
FN:110
PRODUCER
31−Aug−2011 20:42 1500.0 FT
82.5 FT
Output DLIS Files DEFAULT
FMI_CAL_MAXS_MAPC_084PUP
FN:127
PRODUCER
31−Aug−2011 22:40
RTB
FMI_CAL_MAXS_MAPC_084PUP
FN:128
PRODUCER
31−Aug−2011 22:40
Company: SANDIA TECHNOLOGIES, LLC
Well: NYSTA TANDEM LOT 1
Input DLIS Files DEFAULT
FMI_CAL_MAXS_MAPC_074PUP
FN:110
PRODUCER
31−Aug−2011 20:42 1500.0 FT
82.5 FT
Output DLIS Files DEFAULT
FMI_CAL_MAXS_MAPC_081PUP
FN:123
PRODUCER
31−Aug−2011 22:21 1500.0 FT
82.5 FT
RTB
FMI_CAL_MAXS_MAPC_081PUP
FN:124
PRODUCER
31−Aug−2011 22:21 1500.0 FT
82.5 FT
Integrated Hole/Cement Volume Summary Hole Volume = 106.68 F3 Cement Volume = 46.04 F3 (assuming 9.63 IN casing O.D.) Computed from 1500.0 FT to 1380.5 FT using data channel(s) CRD1_PPC1 CRD2_PPC1 CRD3_PPC1 CRD4_PPC1
OP System Version: 19C0−187 FBST−B MAXS−B PPC2
19C0−187 19C0−187 19C0−187
PPC1 MAPC−B EDTC−B
19C0−187 19C0−187 19C0−187
PIP SUMMARY Integrated Hole Volume Minor Pip Every 10 F3 Integrated Hole Volume Major Pip Every 100 F3 Integrated Cement Volume Minor Pip Every 10 F3 Integrated Cement Volume Major Pip Every 100 F3 Integrated Transit Time Minor Pip Every 1 MS Integrated Transit Time Major Pip Every 10 MS Time Mark Every 60 S
PIP SUMMARY Integrated Hole Volume Minor Pip Every 10 F3 Integrated Hole Volume Major Pip Every 100 F3 Integrated Cement Volume Minor Pip Every 10 F3 Integrated Cement Volume Major Pip Every 100 F3 Integrated Transit Time Minor Pip Every 1 MS Integrated Transit Time Major Pip Every 10 MS Time Mark Every 60 S
Parameters DLIS Name
Description
PPC1: Powered Positioning Device/Caliper 1 PPC1 Caliper Type CLBD_PPC PPC Calibration data selection MAPC−B: Multimode Array Sonic Power Cartridge BS Bit Size ITTS Integrated Transit Time Source PPC2: Powered Positioning Device/Caliper 2 PPC2 Caliper Type CLBD_PPC PPC Calibration data selection DIP: Dip Computation DIP Tool DIR: Directional Survey Computation SPVD TVD of Starting Point TIMD Along−hole depth of Tie−in Point
Value CAL_STD ROM 12.250 DTCO
IN
CAL_STD ROM FBST 1499.87 650
FT FT
4
TIVD
TVD of Tie−in Point STI: Stuck Tool Indicator LBFR Trigger for MAXIS First Reading Label STKT STI Stuck Threshold TDD Total Depth − Driller TDL Total Depth − Logger HOLEV: Integrated Hole/Cement Volume FCD Future Casing (Outer) Diameter HVCS Integrated Hole Volume Caliper Selection System and Miscellaneous DO Depth Offset for Playback PP Playback Processing TD Total Depth Format: PPC2_HoleDiameter Vertical Scale: 5" per 100’
650
FT
TDL 2.5 1528.00 1500.00
FT FT FT
9.625 AUTOMATIC
IN
0.0 FT OFF 1500 FT Graphics File Created: 31−Aug−2011 22:21
OP System Version: 19C0−187 FBST−B MAXS−B PPC2
19C0−187 19C0−187 19C0−187
PPC1 MAPC−B EDTC−B
19C0−187 19C0−187 19C0−187
Input DLIS Files DEFAULT
FMI_CAL_MAXS_MAPC_074PUP
FN:110
PRODUCER
31−Aug−2011 20:42 1500.0 FT
Output DLIS Files DEFAULT
FMI_CAL_MAXS_MAPC_081PUP
FN:123
PRODUCER
31−Aug−2011 22:21
RTB
FMI_CAL_MAXS_MAPC_081PUP
FN:124
PRODUCER
31−Aug−2011 22:21
Company:
SANDIA TECHNOLOGIES, LLC
Well: Field: County: State:
NYSTA TANDEM LOT 1 WILDCAT ROCKLAND NEW YORK POWERED POSITIONING CALIPER − PPC 4 ARM CALIPER LOG