Multiconsult in Norway

multiconsult.no Multiconsult in Norway     Founded Number of employees Turnover in 2014 Headquarters 1908 1 650 2,266m NOK Oslo, Norway Subsid...
Author: Joel Day
7 downloads 3 Views 1MB Size
multiconsult.no

Multiconsult in Norway    

Founded Number of employees Turnover in 2014 Headquarters

1908 1 650 2,266m NOK Oslo, Norway

Subsidiaries in:  Poland  Singapore  United Kingdom  Tanzania  Uganda

1

multiconsult.no

Multiconsult Polska    

Founded Number of employees Turnover in 2014 Offices

1992 110 PLN 24.4 m Warsaw, Gliwice Świnoujście …

Warszawa Wrocław Gliwice

2

Oil & gas – Onshore

multiconsult.no

Photo: Polskie LNG S.A.

LNG Terminal

PROJECT LNG Terminal

MULTICONSULT Polska and Atkins Ltd were awarded the contract as Investors Supervisor.

PROJECT TYPE

In this role we were responsible for providing extensive supervision of: design verification • Detailed Works • Construction Installation of equipment • selection • Vendor approval • Document Commissioning • • Start-up

Investors Supervisor for the detailed

design, construction and commissioning CLIENT Polskie LNG S.A. PERIOD 2010 – present

Environmental

multiconsult.no

High Speed Rail

PROJECT High Speed Rail

MULTICONSULT Polska was awarded a contract to prepare an environmental part of the Feasibility Study for the first High Speed Rail in Poland.

PROJECT TYPE Environmental part of a Feasibility Study

In this role we were responsible for:

CLIENT IDOM

• • •

carrying out environmental inventory in four voivodships preparing environmental analysis for three options of railway routing and preparing environmental impact assessment

PERIOD 2010-2012

Transportation & infrastructure – Roads

multiconsult.no

Photo: AWSA webpage

A2 Motorway

PROJECT A2 Motorway

MULTICONSULT Polska was awarded the contract as an Independent Engineer.

PROJECT TYPE Independent Engineer to provide services of construction design and supervision over construction of A2 Motorway, section Nowy Tomyśl – Świecko and Nowy Tomyśl – Konin

In this role we were responsible for providing following services: Management • Contract Review of the design, as produced by the Design • and Build Contractor Engineer based on FIDIC conditions • Independent of contract and Site Supervision works according to Polish Construction Law processing, progress assessment and • Claims preparation of payment certifications • Advisor and Auditor during Operations and Maintenance period

CLIENT Autostrada Wielkopolska SA PERIOD 2002-2012 (O&M period 2012-2037)

Transportation & infrastructure – Airports

Chopin Airport Terminal 2 MULTICONSULT Polska was awarded a role as a Technical Advisor for banks for construction of Warsaw Chopin Airport Terminal 2. In this role Multiconsult Polska was responsible for: obtaining of decisions and permits • monitoring necessary to carry out the investment • project budget and payments review against the project schedule • flagging possible risks to the time schedule

multiconsult.no

PROJECT Construction of Warsaw Chopin Airport Terminal 2 TYPE OF PROJECT Technical Advisor for banks

CLIENT Austria Creditanstalt AG PERIOD 2004 - 2008

Transportation – Container Terminals

DCT2 Deepwater Container Terminal MULTICONSULT Polska was awarded a contract as a Technical Advisor for construction of a DCT2 Deepwater Container Terminal. Our services include: • Review of technical documentation of the project report • Initial • Closing report • Advisory during design and construction

multiconsult.no

PROJECT Construction of DCT2 Deepwater Container Terminal in Gdańsk TYPE OF PROJECT Technical Advisor for financing institutions CLIENT DCT Gdańsk SA PERIOD April 2014 – present

Transport Energy & infrastruktura – koleje

multiconsult.no

B8 Field Platform MULTICONSULT Polska was awarded a contract as a Technical Advisor for modernisation of an offshore Baltic B8 oil and natural gas field platform („banker’s engineer”). As a part of the scope of services for financing institutions, MULTICONSULT Polska prepared the Opening Report for the planned investment at the B8 field.

PROJECT Offshore Baltic B8 Field platform TYPE OF THE PROJECT Modernisation of the Baltic B8 Field platform CLIENT Lotos Petrobaltic SA & Financial Institutions PERIOD October 2014 – present

Transport Energy & & Mining infrastruktura – koleje

multiconsult.no

Assessment of uranium deposits & potential prospective areas MULTICONSULT Polska and the resource experts from Technical University in Wroclaw were awarded a contract as a Reviewer for assessment of all known uranium deposits in Poland. The se deposits were identified in 1935 – 1970 period.

As a part of the scope of services for Government of Poland & NFOŚiGW, MULTICONSULT Polska prepared the Report with the ranking of these deposits and comparison with other uranium projects planned in other countries.

PROJECT Review of uranium deposits and potential new areas for uranium prospecting TYPE OF THE PROJECT Strategic advice to the government CLIENT Government of Poland & NFOŚiGW PERIOD 2009 – 2011

Transport Energy & & Mining infrastruktura – koleje

KWB Konin & KWB Adamów MULTICONSULT Polska was awarded a contract as a Technical & Environmental Advisor for DD of two mining assets in central Poland. Brown coal mines Konin & Adamów were consolidated with ZE PAK power plant. MCP was adviser to Solorz holding and ZE PAK during this transaction. As a part of the scope of services for the Client, MULTICONSULT Polska prepared several reports for the various stages of the privatization process.

multiconsult.no

PROJECT TEDD of KWB Konin and KWB Adamow and the investment projects planned in the next 10 years TYPE OF THE PROJECT Due dilligence of mining assets CLIENT ZE PAK S.A., Rafako and other Clients PERIOD 2011 – 2012