MEGACOIL-SOLAR. Air Source Heat Pump Domestic Hot Water Cylinders

Installer manual TITANIUM MEGACOIL/MEGACOIL-SOLAR Air Source Heat Pump Domestic Hot Water Cylinders Table of Contents 1 Important information Safety...
Author: Jody Dean
2 downloads 0 Views 7MB Size
Installer manual TITANIUM MEGACOIL/MEGACOIL-SOLAR Air Source Heat Pump Domestic Hot Water Cylinders

Table of Contents 1 Important information Safety information

4 4

2 Delivery and handling

6

Transport Assembly Supplied components

6 6 6

3 The water heater design

7

4 Pipe connections

9

General Dimensions and pipe connections Overall dimensions T&P valve Heat pump Sun Cold and hot water

9 10 11 12 12 12 13

Docking Docking

13

5 Electrical installation

15

Sensors Temperature limiter

15 16

6 Commissioning and adjusting

17

Filling and venting Start-up and inspection

17 18

7 Service and maintenance

19

Maintenance Service actions

19 19

8 Technical Technica Technica

20 Titanium Megacoil Titanium Megacoil

Item register

20 21

22

Table of Contents |

3

Serial number The serial number can be found on the rating plate below Caution the front cover. Always give the product's serial number when reporting a fault. Caution

Always give the product's serial number when reporting a fault.

Country

c information

Installer manual

This installer manual must be left with the customer. Country c information Installer manual Great Britain

This installer manual must be left with the customer. This installation is subject to building regulation approval, notifyBritain the local Authority of intention to install. Great Use only manufacturer’s recommended replacement This parts.installation is subject to building regulation approval, notify the local Authority of intention to install. Use only manufacturer’s recommended replacement parts. 4

Chapter 1 | Important information

5

The product has only been used for the storage of wholesome water (max.250mg/l chloride at 65o C).

The installer has fully completed the Benchmark Checklist at the end of the Installation Manual supplied with the product. The product is serviced annually by a competent person and the relevant Service Record on the Benchmark Checklist completed after each service. The completed Benchmark Checklist & Service Record may be required in the event of a warranty claim and as supporting documentation invoices relating to servicing may also be required. The unit is registered within 28 days of commissioning via the guarantee form on the NIBE website www.nibe.co.uk or by completing the enclosed warranty card supplied with the product. Failure to do so may result in a reduced or invalid warranty period. No factory fitted parts have been removed for unauthorised repair or replacement. The unit has not been damaged by frost and/or freezing pipe work connected to the unit. This guarantee does not confer any rights other than those expressly set out above and does not cover any claims for consequential loss or damage. This guarantee is offered as an extra benefit and does not affect your statutory rights as a consumer.

NOTE

Any disinfection of the cylinder has been carried out in accordance with BS6700.

This symbol indicates danger to machine or person.

NIBE water heaters are manufactured in Sweden to the very highest standard so we are pleased to r our customers a comprehensive guarantee.

Thank you for installing a new NIBE water heater in your home.

The NIBE Megacoil has been correctly installed in accordance with our printed installation manual by a competent person and all relevant Codes, Best Practice and Regulations in existence at the time of installation have been adhered to.

Symbols

The serial number can be found next to the front cover.

The warranty is valid provided that:

©NIBE 2012.

This symbol indicates tips on how to facilitate Serial number using the product.

This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety.

This symbol indicates danger to water heater Caution or person. This symbol indicates important information about what you should observe when maintainCaution ing your installation. This symbol indicates important information about what you should observe when maintainTIP your installation. ing This symbol indicates tips on how to facilitate using the product. TIP

This manual describes installation and service procedures for implementation by specialists.

This symbol indicates danger to water heater or person. NOTE

Thank you for installing a new NIBE Megacoil. NIBE Megacoils are manufactured to the highest standard so NIBE are pleased to offer a comprehensive guarantee. The product is guaranteed for 24 months for parts and labour from the date of commissioning. The inner stainless steel vessel is guaranteed against material defect or manufacturing faults for a period of 25 years. The installer must complete and return the guarantee registration card, or completes the guarantee form on the NIBE website www. nibe.co.uk within 28 days from commissioning to activate this warranty.

Safety information

NOTE

Symbols

Warranty and insurance information

Warranty

s are

Symbols

©NIBE 2012.

Rights to make any design or technical reserved.

s are

1 Important information

©NIBE to 2012. Rights make any design or technical reserved.

Children should be supervised to ensure that they do not play with the appliance.

ted before it is commissioned. The inspection must be This manual appliance is not intended for use persons (includThis describes installation and by service procedures ing children) with reduced physical, sensory or mental for implementation by specialists. capabilities, or lack of experienceDate and knowledge, unless Signature This not intended for use by personsconcern(includthey appliance have beenisgiven supervision or instruction ing children) with reduced physical, sensory or mental ing use of the appliance by a person responsible for their capabilities, or lack of experience and knowledge, unless safety. they have been given supervision or instruction concernChildren be supervised to ensure that theyfor dotheir not ing use ofshould the appliance by a person responsible play with the appliance. safety. are Rights toshould make any design or technical Children be supervised to ensure that they dos not reserved. play with the appliance.

Installers are required to carry out the installation, commissioning and servicing work in accordance with the Benchmark Code of practice which is available from the Heating and Hotwater Industry Council who manage and promote the Scheme. Visit www.centralheating.co.uk for information.

This manual describes installation and service procedures

for implementation by specialists. Safety information

Benchmark places responsibilities on both manufacturers and installers. the purpose is to ensure that customers are provided with the correct equipment for their needs, Benchmark places commissioned responsibilities and on both manufacturers that it is installed, serviced in accordand installers. the purpose is to ensure that ance with the manufacturers instructions bycustomers competent are provided withitthe correct equipment foroftheir needs, persons and that meets the requirements the approthat it is installed, commissioned and serviced in accordpriate Building Regulations. The Benchmark Checklist can ance with manufacturers instructions by competent be used tothe demonstrate compliance with Building Regupersons and that it meets the requirements of the lations and should be provided to the customer forapprofuture priate Building Regulations. The Benchmark Checklist can reference. be used to demonstrate compliance with Building ReguInstallers are required to carry out thecustomer installation, comlations and should be provided to the for future missioning and servicing work in accordance with the reference. Benchmark Code of practice which is available from the Installers areHotwater required Industry to carry out the installation, Heating and Council who managecomand missioning and servicing work in accordance with the promote the Scheme. Visit www.centralheating.co.uk for Benchmark information.Code of practice which is available from the Heating and Hotwater Industry Council who manage and promote the Scheme. Visit www.centralheating.co.uk for information.

Benchmark places responsibilities on both manufacturers and installers. the purpose is to ensure that customers are provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with the manufacturers instructions by competent persons and that it meets the requirements of the appropriate Building Regulations. The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be provided to the customer for future reference.

1 Important information Safety informationinformation 1 Important

Where this condition is not met, any chargeable spare parts or components issued within the applicable guaranCountry c information t from a 12 month warranty from tee period still Installer manual the date o ssue by the manufacturer. This installer manual must be left with the customer. We recommend the installer completes and returns as GreatasBritain soon possible, your guarantee registration card or completes the guarantee on theregulation NIBE website This installation is subjectform to building approval, www.nibe.co.uk. notify the local Authority of intention to install. Use only manufacturer’ s recommended replacement Please ensure that the installer has fully completed the parts. Benchmark Checklist in the end of the Installation Instruc-

ate

below

o ts operation. Therequire installer is legally required to com- to be inspected before it is commissioned. The inspection must be Current regulations the heating installation The Benchmark Checklist may be required in the event plete a commissioning checklist as a means of complying d person. carried out by a suitably of any warranty work and as supporting documentation with the appropriate Building Regulations (England and Wales). Description Notes All installations must be

relating to home improvements in the optional documents Signature Date section of the Home Information Pack.

d to Local Area Building

HotControl watereither (pagedirectly 14) or through a Competent Persons

Current regulations require the heating installation to be inspected before it is commissioned. The inspection must be Description Non-return valve

Mixing Hot watervalve (page 14) Safety valvevalves Shut Tundish Expansion vessel ElectricityT&P (page 16) valve Hot Tundish water sensor Temperature limiter Cold water (page 13 and 14)

Signature

Date

Miscellaneous Benchmark checklist

Chapter 1 | Important information

Caution

Temperature limiter

This symbol indicates danger to machine or person.

Hot water sensor

NOTE

Electricity (page 16)

Symbols

Tundish

©NIBE 2012.

Safety valve

s are

Mixing valve

Rights to make any design or technical reserved.

Benchmark checklist Non-return valve

Children should be supervised to ensure that they do not play with the appliance.

valves

This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety.

Miscellaneous Shut

Notes

Warranty and insurance information

of any warranty work and as supporting documentation d person. carried byimprovements a suitably in the optional valves Shuttoout relating home documents section of the Home Information Pack.

The product is guaranteed for 24 months for parts and labour from the date of installation or 33 months from the date of manufacture, whichever is the shorter.

Cold (pageChecklist 13 and 14) Thewater Benchmark may be required in the event

NIBE water heaters are manufactured in Sweden to the very highest standard so we are pleased to r our customers a comprehensive guarantee.

ThisT&P product valveshould be serviced regularly to optimise its safety, y and performance. The service engineer should complete the relevant Service Record on the Tundish Benchmark Checklist after each service. Inspection of the installation

Thank you for installing a new NIBE water heater in your home.

Scheme. Chapter A Building Regulations Compliance 1 | Important information willShut then be valves issued to the customer who should, on ren Number on the Benchmark ceipt, write the Expansion vessel Checklist.

Installers are required to carry out the installation, commissioning and servicing work in accordance with the Benchmark Code of practice which is available from the Heating and Hotwater Industry Council who manage and promote the Scheme. Visit www.centralheating.co.uk for information.

4

This manual describes installation and service procedures for implementation by specialists.

nt

tions supplied with the product and that you have signed Inspection of the installation to say that you have received a full and clear explanation

Safety information

proval,

This product should be serviced regularly to optimise its safety, y and performance. The service engineer should complete the relevant Service Record on the Benchmark Checklist after each service.

Benchmark places responsibilities on both manufacturers and installers. the purpose is to ensure that customers are provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with the manufacturers instructions by competent persons and that it meets the requirements of the appropriate Building Regulations. The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be provided to the customer for future reference.

er.

All installations must be d to Local Area Building Control either directly or through a Competent Persons Scheme. A Building Regulations Compliance will then be issued to the customer who should, on ren Number on the Benchmark ceipt, write the Checklist.

1 Important information

hen

with the appropriate Building Regulations (England and Wales).

5

2 Delivery and handling Transport

Supplied components

The Titanium Megacoil/Megacoil-Solar should be transported and stored vertically in a dry place.

Titanium Megacoil/Megacoil-Solar Mega Coil/Mega Coil-Solar

0 R

R

0

Elbow and drain cock - cold inlet

Tundish

Armoured hose (expansion vessel)

Expansion vessel with holder

The water heater is only designed for upright installation.

Motorized valve (solar coil only)

Position the water heater on a m base that can bear r or foundaits weight, preferably on a concrete tion. Use the water heater’s adjustable feet to obtain a horizontal and stable set-up. Pipes must be routed from the safety valve to a suitable drain. The water heater’s installation area should always have a temperature of at least 10 °C and max 30 °C. Remember to rotate the cylinder in a direction that allows easy access to the immersion heater and the electrical box.

LEK

Cold water inlet combination Solenoid valve (Megacoil Only)

Pressure reduction valve, check valve and expansion relief valve

GUARANTEE REGISTRATION CARD IMPORTANT - Register your Guarantee now

NO.

In order to register your guarantee, it is important that all details on this card are completed before it is returned.

Installer manual

The completion of a Benchmark Checklist is a condition of warranty but does not affect your statutory rights.

Please complete in block capitals.

TITANIUM MEGACOIL/MEGACOIL-SOLAR MEGA COIL/MEGA COIL-SOLAR CUSTOMER

HOT WATER HEATER Hot Cylinders Air to Water Heat Pump Domestic

CUSTOMER'S NAME

NAME OF NIBE PRODUCT INSTALLED

INSTALLATION ADDRESS

SERIAL NUMBER

ADDRESS

YEAR OF MANUFACTURE

POSTCODE

INSTALLATION DATE

TELEPHONE

EMAIL

INSTALLER INSTALLER NIBE REGISTERED NUMBER:

COMPLETE THIS PAGE AND RETURN TO NIBE

Assembly

INSTALLER'S COMPANY NAME

ADDRESS

ADDRESS

POSTCODE

INSTALLERS NAME (PLEASE PRINT)

EMAIL

INSTALLERS SIGNATURE

For full terms and conditions, please see our website www.nibe.co.uk.

Installer manual

GBV UK Warranty Card 0948-1 art.nr 711318

TELEPHONE

Warranty Card

Location The kit of supplied items is supplied in a separate box.

6

Chapter 2 | Delivery and handling

3 The water heater design (See page 8 for explanations) TITANIUM MEGACOIL 160,L.200 & 300 L. MEGA COIL 160, 200 & 300

TITANIUM 200L.& 300 L. MEGAMEGACOIL-SOLAR COIL - SOLAR 200 & 300

Chapter 3 | The water heater design

7

Pipe connections

Electrical components

XL3

Connection, cold water, Ø 22 mm / 3/4”

XL4

Connection, hot water, Ø 22 mm

XL5

Connection, hot water circulation, Ø 1/2”

FD1 FD2 TS1 TS2 FD3

Temperature limiter immersion heater Temperature limiter motorized valve Working thermostat immersion heater Optional working thermostat Temperature limiter motorized valve (solar)

(Not Megacoil 160 L. and Megacoil - Solar) XL8

Docking connection, Ø 22 mm

w line (from heat pump*),

XL9

Docking connection, return line (to heat pump*, Ø 22 mm

XL13

Connection, w line (from solar heating system) Ø 22 mm (Only Titanium Megacoil - Solar)

XL14

Connection, return line (to solar heating system) Ø 22 mm (Only Titanium Megacoil - Solar)

XL29

Connection, T&P valve, ø 15 mm

Miscellaneous PF 3

Serial number plate

UL

Adjustable feet

Designations in component locations according to standard IEC 81346-1 and 81346-2.

HVAC components FL5

T&P valve Ø 15 mm

QM22

Venting, charge coil

UA1

Submerged tube for hot water sensor (display)

UA2

Submerged tube for hot water sensor (control)

UA3

Submerged tube for solar sensor (control) (only Titanium Megacoil - Solar)

Cleaning the climate system d with water, Titanium Megacoil/ When the water heater and the climate system have been Titanium Megacoil-Solar must operate at maximum normal temperature for at least one hour. Thereafter the system must be drained of water

*or another external heat source

8

Chapter 3 | The water heater design

4 Pipe connections General Pipe installation must be carried out in accordance with current norms and directives. d when a plastic Internal support bushes should be pipe or annealed copper pipe is used. The water heater must be d with the requisite valves, such as a safety valve, valve, non-return valve, and vacuum valve. An w pipe must be routed from the safety valve w pipe must be to a suitable drain. The size of the the same as on the safety valve. Route the w pipe from the safety valve enclosed along its entire length and ensure that it is frost proof. The outlet of the pipe should be visible and clearly away from any electrical components.

Discharge pipes from tundishes shall have av vertical section of pipe at least 300 mm long, before any elbows or bends in the pipework (see following picture). Metal discharge pipe from temperature relief valve to tundish. Safety device (e.g. temperature relief valve).

w water from the safety valves goes via nonpressurised collecting pipes to a drain so that hot water splashes cannot cause injury. These non-pressurised collecting pipes shall not be used for anything else. A discharge pipe from the tundish connected to the expansion relief valve (safety valve) shall also be connected to a drain in the same way. Please note that the connection of the T&P-valve should not be used for any other purpose. Valves may not be positioned between the expansion valve and the vessel.

600 mm maximum Tundish 300 mm minimum

Discharge below Metal discharge pipe from tundish, with continous fall. Fixed grating

Trapped gulley Possible wall

NOTE

The expansion vessel accomodates expansion that results from heating the water inside the unit. The expansion vessel must be connected between the expansion valve and the cylinder. The location of the expansion vessel should allow access to recharge the pressure as and when necessary.

Valve outlet size

Minimum size of discharge pipe

Minimum size of discharge pipe from tundish

Maximum resistance allowed, expressed as a lenght of straight pipe (i.e. no elbows or bends)

Resistance created by each elbow or bend

G1/2

15 mm

22 mm

up to 9 m

0.8 mm

G1/2

15 mm

28 mm

up to 18 m

1.0 mm

G1/2

15 mm

35 mm

up to 27 m

1.4 mm

G3/4

22 mm

28 mm

up to 9 m

1.0 mm

G3/4

22 mm

35 mm

up to 18 m

1.4 mm

G3/4

22 mm

42 mm

up to 27 m

1.7 mm

G1

28 mm

35 mm

up to 9 m

1.4 mm

G1

28 mm

42 mm

up to 18 m

1.7 mm

G1

28 mm

54 mm

up to 27 m

2.3 mm

Hard water areas Usually, there should not be a problem in installing Titanium Megacoil/Megacoil - Solar Coil in areas of hard water as the operating temperature is 50-60 °C. Emptying the system by r valve and external drain valve. 1. Open external 2. Flush the system for some minute. Watch out for water splashes from the safety valve. 3. Close the valves and check the stainer. Chapter 4 | Pipe connections

9

Dimensions and pipe connections Dimensions, pipe connections and setting-out coordinates Titanium Megacoil 160, 200 & 300 MEGACOIL 160,&200 & 300 MEGA COIL 200 300

Titanium 200 SOLARMegacoil-Solar COIL 200 & 300 MEGACOIL - SOLAR 200 & 300& 300

Connection XL3 Cold water Ø

3/4” F with elbow

mm

22

XL4 Hot water Ø

mm

22

XL5 Hot water circulation Ø

mm

15 F 1/2”

mm

22

XL9 Docking connection, return line Ø

mm

22

XL13 Solar

mm

22

XL14 Solar return line Ø

mm

22

XL29 T&P valve Ø

mm

15 F 1/2”

XL8 Docking connection,

10

w line Ø

Chapter 4 | Pipe connections

w line Ø

Dimensions and pipe connections 8

7

6

Titanium Megacoil-Solar Megacoil-Solar 4

971 (160L) 1129 (200L) 1608 (300L)

414 (200L) 424 (300L)

140 5

519 (160L) 540 (200L) 731 (300L)

15 14

Primary flow. Solar.(Red) Ø22mm

137,5

Primary return. Heat Pump.(Blue) Ø22mm

3 2 1 Pos.

97,2

Temp. sensor BT 7 1/2" F

A

Dato

1/2" F. T&P Valve Temp. sensor BT 7 1/2" F

97,2 97,2

Secondary return. 6

8

PG-Nippel ø13, M20x1,5mm M/mut 3/4" F. Cold inlet. Lokk, NIBE, lysgrå, med hull. Ventil P&T 1/2" 15mm Skumpakning ø20/ø80 O ring 29,2x3mm Rør Nippel Overgang G1" ø22mm RØRNIPPEL OVERG. 1"Ø22 MS Skumspakning el-lokk 85 5 Thermodisc (300075)(4011) O-Ring, 38x3,2mm Element 1.1/4 " 3 kW 230V, SMO. Ytterplate Megacoil UK 300L Stanse Hvit 1 Plastbunn, ø580 Lys. m/ben 1 Plasttopp ø580 lys grå med 7 stk. hu Primary return. Solar.(Blue) 1 300L, Megacoil. Ø22mm Beskrivelse Ant. Stykkliste 1/2" F. T&P Valve

09.05.2011

97,2Kontroll 7

6

137,5

Primary flow. Heat Pump.(Red) Ø22mm

Termostat boks, Mega coil. Sealing 3/4" Light grey Sealing 1/2" Light grey Dekkskive blå ø21-ø66 Dekkskive rød ø21-ø66 PG-Nippel Ø10/M16x1,5mm M/mutte

14 1 13 A 1 12 1 11 10 137,510.2 137,5 1 10.1 1 10 1 9 1 7 1 6 1 5 1 4 1

Primary return. Heat Pump.(Blue) Ø22mm

Temperatur limiter motorized valve.

1 1 1 1 1 1

121

274 (200L) 398 (300L)

35 19 18 17 16 15

3/4" F. Cold inlet.

137,5 137,5 B

Hot outlet Ø22mm

155

122

180

B

137,5

13

Solar sensor 1/2" F

C

VPB/VPBS UK

High temp limiter motorized valve al thermostat optiond

18

410 (200L) 750 (300L)

1

High temp limiter motorized valve solar.

Temp. sensor BT 6 1/2" F

Thermostat and temp limiter immersion heater.

Immersion heater.

7

1/2" F 12

Thermostat and high temp limiter for immersed heat.

Temp. sensor BT 6 1/2" F

6

16

A

Ø22mm(4x)

11

D

2

Ø585

B

E

3

1135 (200L) 1609 (300L)

A-A ( 1:8 )

5

424 (200L) 1019 (300L

Temperatur limiter motorized valve.

F Ø585

97,2

.1

6

1606

Titanium MegacoilMegacoil 7

5

Konstr./ Tegnet

Gen tol:

Kontrollert

Godkjent

R-E N

Målestokk:

NS-ISO 2768 (Middels)

1:8

5 Titanium Megacoil UK.

45°

Ersta

12

Tegn

300L,30m spiral bereder, Varenummer:

5

4

3

3333003000

Chapter 4 | Pipe connections

Filen

N:\Ut

2

11

T&P valve Install the pipe for the T&P valve as illustrated on page 9.

Solar connections Connecting to solar power and heat pump

T&P valve

The solar heating system's supply and return are connected to the Titanium Megacoil- Solar Coil. Install the pipe for the T&P valve as illustrated on page 9.

Solar connections Connecting to solar power and heat pump The solar heating system's supply and return are connected to the Titanium Megacoil- Solar Coil.

Heat pump connections Connecting to heat pump The heat pump supply and return are connected to Titanium Megacoil.

Heat pump connections Connecting to heat pump The heat pump supply and return are connected to Titanium Megacoil.

1/2” F 12

12

Chapter 4 | Pipe connections

Chapter 4 | Pipe connections

Cold and hot water

Docking

Connecting cold and hot water

Titanium MegaCoil 200 & 300 can be connected in several different ways, one of which is shown here.

There must be a mixing valve if the temperature can exceed 60 °C. The e hose to the expansion vessel can be installed in the plugged connection on the safety valve.

Further option information is available at www.nibe.co.uk and in the respective assembly instructions for the heat pumps used.

Symbol key

Symbol

Meaning Venting valve valve Non-return valve Mixing valve Safety valve T&P valve Tundish Temperature sensor Circulation pump Particle Pressure reduction valve Motorized valve 3/4”x22 Elbow and drain cock (see p. 6)

Cold water inlet combination valve

Pressure reduction valve, check valve and expansion relief valve (see p. 6) Connecting hot water circulation Titanium MegaCoil 200 & 300 have a connection that allows

hot water circulation. To reduce the risk of bacterial growth in systems with hot water circulation, the temperature of the circulating water should not fall below 50 °C. There should not be any non-circulatory hot water pipes. Adjust the hot water system so that the temperature does not fall below 50°C at the ends of the system.

Chapter 4 | Pipe connections

13

To gas boiler Titanium Megacoil/ Megacoil - Solar can be docked with another heat source, To solar heating for example a gas boiler. Megacoil - Solar can be docked to a solar heating system To solar heating in addition to the F2040 air source heat pump. Mega Coil - Solar can be docked to a solar heating system in addition to the F2040 heat pump.

P

P

-AA25

-EB1

-BT1

To solar heating

Titanium Megacoil/ Megacoil - Solar can be -BT12 system. docked to solar heating -BT3 P

P

To air sorce heat pump Mega Coil / Mega Coil - Solar can be docked with an air to water heat pump example NIBE 2040

To air sorce heat pump

To air Coil source heatCoil pump Mega / Mega - Solar can be docked with an air to Megacoil/Megacoil - Solar NIBE can be docked with F2040 air water heat pump example 2040 source heat pump. P

-AA25 P

To air/water heat pump -AA25

Titanium Megacoil/Megacoil-Solar can be docked with -EB1 heat pump, for example NIBE air/water heat pump.

-BT1

-BT12

-BT3

-BT1

-BT12

14

Chapter 4 | Pipe connections -BT3

-EB1

5 Electrical installation NOTE

Electrical installation and service must be carried out under the supervision of a qualified electrician. Electrical installation and wiring must be carried out in accordance with the stipulations in force.

Sensors (See page 10) The Titanium Megacoil can accommodate up to two hot water sensors, one for SMO Controller display and one to control start and stop of heat pump. The display sensor is positioned in the submerged tube for the display sensor (UA1) and the control sensor in the submerged tube for control sensor (UA2). In cases where it is only possible to connect one sensor, use the submerged tube for control sensor (UA2). Titanium Megacoil/Megacoil-Solar can also be supplemented with a solar sensor. This is placed in the submerged tube for solar sensor (UA3). Use the sensors provided with the heat pump/control module. When no heat sensors have been provided, these must be ordered from the manufacturer of the heatpump/ control module.

Thermostats and temperature limiter (Factory fitted) TITANIUM MEGACOIL-SOLAR 200 & 300 L.

TITANIUM MEGACOIL MEGA COIL 160, 200 & 160, 300 200 & 300 L.

Chapter 5 | Electrical installation

15

Temperature limiters Power supply to temperature limiter (FD1) is 230 V. Connect temperature limiter (FD2 and FD3) electrically to the motorized valves one to each heat source

Megacoil Solar Models

Temperature limiter wiring diagram

Megacoil Models

Immersion heater wiring diagram 16

Chapter 5 | Electrical installation

6 Commissioning and adjusting NOTE

Filling and venting the charge coil

At the time of commissioning, complete all relevant sections of the Benchmark Checklist located at the back of this document.

Filling and venting

Completion of the Benchmark Checklist is a condition of warranty. For full terms and conditions of warranty, please see our website www.nibe.co.uk.

Filling and venting

1.

Open the g valve (external, not included with the product). Fill the coil in the hot water heater and the rest of the climate system with water.

2.

Vent the coil and the rest of the climate system via the relevant venting valves.

3.

Keep topping up and venting until all air has been removed and the pressure is correct.

Filling the hot water heater 1. 2.

Open a hot water tap in the house. (XL4)

3.

When the water that comes out of the hot water tap is no longer mixed with air, the water heater is full. Flush the system for several minutes and the tap can be closed.

Fill the hot water heater through the cold water connection (XL3).

Cold inlet

The

e shows Mega Coil 160, 200 and 300

Chapter 6 | Commissioning and adjusting

17

Start-up and inspection Pressure drop diagram, solar coil

Docking connection, w line (XL8) and docking connection, return line (XL9).

Connection, w line solar heating system (XL13) and connection, return line solar heating system (XL14).

Titanium Megacoil 160

Titanium Megacoil - Solar 200

Pressure drop

Pressure drop diagram, charge coil

Flow Megacoil

Titanium Megacoil 200

Pressure drop

Pressure drop

Titanium Megacoil - Solar 300

Flow

Flow HP coil

Pressure drop

Pressure drop

Titanium Megacoil 300

Pressure drop

Flow

18

Flow

Pressure drop

Flow

Chapter 6 | Commissioning and adjusting

Flow

7 Service and maintenance NOTE

NOTE

After servicing, complete the relevant Service Interval Record section of the Benchmark Checklist located at the back of this document.

If this pressurised water heater develops a fault, e.g. a flow of hot water from the overflow pipe, turn the heat pump offand contact your installer.

Completion of the Service Interval Record is a condition of warranty. For full terms and conditions of warranty, please see our website www.nibe.co.uk.

Cleaning Inspect and clean the water heater by using a suitable instrument such as an endoscope. The hot water connection (XL4) must be removed to facilitate access.

NOTE

Any servicing must be carried out by a competent person.

Emptying The water heater is emptied through the drain cock (with hose connection) in the cold water connection (XL3).

Maintenance

Drain the charge coil through the siphon (with hose) on the docking connection, return to heat pump (XL9).

General inspection

Drain the solar coil through the siphon (with hose) on the connection, return to solar heating system (XL14).

Check the following:

1. Condition of casing. 2. Electrical connections. 3. Pipe connections. Correct any fault before continuing.

Hot water heater Check the following: Expansion relief valve. T&P valve. Discharge pipe. Expansion vessel.

Service actions Safety valves The function of the safety valves must be checked regularly. Perform checks as follows:

Mega Coil 160, 200 & 300

1. Open the valve by turning the knob anti-clockwise carefully.

2. Check that water flows through the valve. 3. Close the valve by releasing it. Ifi t does not close automatically when released, turn it anti-clockwise slightly.

TITANIUM MEGACOIL - SOLAR 200 & 300

Correct any fault before continuing.

TITANIUM MEGACOIL 160, 200 & 300

1. 2. 3. 4.

NOTE

Do not remove or adjust any components that are part of this pressurised water heater. Contact your installer!

Mega Coil - Solar Coil 200 & 300

Chapter 7 | Service and maintenance

19

8 Technical Titanium Megacoil

300 (281,7) litre

litre

148,5

179

271

Volume, charge coil

litre

8,1

8,5

10,6

Titanium Net weight Megacoil

kg

160 (156) 42 litre

Volume (net) Gross weight

litre kg

148,5 190,5

179 224

Volume, coil Drawn offcharge capacity

litre litre/%

8,1 126,9/85,5

8,5 150/83,9

Net weight Heat content at 50°C*

kg kWh

42 6,89

45 8,16

59 12,58

Gross weight Equivalent amount of hot water (40°C)*

kg litre

190,5 198

224 234

330 361

Drawn off capacity Re-heat performance

litre/% kW

Heat content at to 50°C* Re-heating time 60°C, 70% of the total volume

kWh min.

6,89 46

8,16 50

12,58 91

litre °C

198 85

234 85

361 85

126,9/85,5 6,2

200 (187,6) litre 45

150/83,9 7,3

300 (281,7) 59 litre 271 330 10,6 214/79

214/79 7,3

Re-heat performance Max pressure, primary side

kW bar/MPa

6,2 3/0.3

7,3 3/0.3

7,3 3/0.3

Re-heating time to 60°C, Max pressure, water heater70% of the total volume

min. bar/MPa

46 5,5/0,55

50 5,5/0,55

91 5,5/0,55

Maxwater operating temperature Max supply pressure

°C bar/MPa

85 16/1.6

85 16/1.6

85 16/1.6

Maxvessel, pressure, side pressure Exp. tapprimary water, charge

bar/MPa bar/MPa

3/0.3 3.0/0.3

3/0.3 3.0/0.3

3/0.3 3.0/0.3

Max pressure, Expansion reliefwater valve,heater setting

bar/MPa bar/MPa

5,5/0,55 6/0.6

5,5/0,55 6/0.6

5,5/0,55 6/0.6

Maxoperating water supply pressure Max pressure, T&P-valve

bar/MPa bar/MPa

16/1.6 7/0.7

16/1.6 7/0.7

16/1.6 7/0.7

bar/MPa °C

3.0/0.3 95

3.0/0.3 95

3.0/0.3 95

Expansion Heat loss ∆t relief 45°C valve, setting

bar/MPa kW/24 hrs

6/0.6 1,72

6/0.6 1,85

6/0.6 2,59

Max operating pressure, T&P-valve Set pressure reducing valve

bar/MPa bar/MPa

7/0.7 3

7/0.7 3

7/0.7 3

°C °C

95 75

95 75

Exp.operating vessel, taptemperature, water, charge pressure Max T&P-valve

Max operating temperature, T&P-valve Max temperature heat pump Heat loss ∆t 45°C Max recommended heat pump size Set pressure reducing valve Volume expansion vessel Max temperature heat pump Part No. Max recommended heat pump size * Cold water temperature Volume expansion vessel = 10°C Part No. * Cold water temperature = 10°C

20

200 (187,6) litre

(net) 8Volume Technical

Equivalent amount of hot water (40°C)* Max operating temperature

20

160 (156) litre

Chapter 8 | Technical data

Chapter 8 | Technical data

kW/24 hrs kW

kW

1,72 12 3 18 75 081005 12

litre

18

bar/MPa litre °C

081005

1,85 12

95 75 2,59 12

3 18 75 081007 12

3 24 75 081008 12

18

24

081007

081008

Titanium Megacoil-Solar Titanium Megacoil - Solar

200 (187,6) litre

300 (281,7) litre

Volume/dedicated solar storage

litre

174,5/79,5

267,4/92,5

Volume, HP coil

litre

8,5

8,8

Volume, solar coil

litre

4,6

5,5

Volume, expansion vessel

litre

18

24

Net weight

kg

49

61

Gross weight

kg

225

329

Heat transfer (60/50 °C at 50 °C hot water temperature)*

kW

8,1

8,5

litre

165,5

262,5

Solar heat transfer (at 50 °C hot water temperature)**

kW

2,2

3,1

Heat content at 50°C

kWh

8,1

12,4

Equivalent amount of hot water (40°C)

litre

232

356

Re-heat time HP

min.

36

64

Re-heat time Solar

min.

175

264

1,85

2,59

Volume of water drawn

, above 40 °C

Heat loss ∆t 45°C

kW/24Hrs

Max operating temperature

°C

75

75

Max pressure, primary side

bar/MPa

3/0.3

3/0.3

Max pressure, water heater

bar/MPa

5,5/0,55

5,5/0,55

Maximum pressure, solar coil

bar/MPa

3/0.3

3/0.3

Max water supply pressure

bar/MPa

16/1.6

16/1.6

Max design pressure

bar/MPa

6,0/0.6

6,0/0.6

Exp. vessel, tap water, charge pressure

bar/MPa

3.0/0.3

3.0/0.3

Expansion relief valve, setting

bar/MPa

6/0.6

6/0.6

Max operating pressure, T&P-valve

bar/MPa

7/0.7

7/0.7

Max operating temperature, T&P-valve

°C

95

95

Max recommended heat pump size

kW

12

12

081009

081010

Part No.

*Primary **Solar

w to achieve the maximum capacity (12 kW): 1025 l/h w (3.3 kW): 300 l/h 70 °C

Tested according to standard EN 12897:2006.

Chapter 8 | Technical data

21

9 Item register Item register A Assembly, 6 C Cold and hot water, 13 Commissioning and adjusting, 17 Filling and venting, 17 Pressure drop diagram, solar coil, 18 Start-up and inspection, 19 Connecting cold and hot water, 13 Connecting hot water circulation, 13 Connecting to heat pump, 12 Connecting to solar power, 12 D Delivery and handling, 6 Assembly, 6 Supplied components, 6 Transport, 6 Dimensions and pipe connections, 10 Dimensions and setting-out coordinates, 10 E Electrical installation, 15 Sensors, 15 Temperature limiter, 16 Emptying, 19 F Filling and venting, 17 Filling and venting the charge coil, 17 Filling the hot water heater, 17 G General inspection, 19 H Heat pump, 12 Connecting hot water circulation, 13 Connecting to heat pump, 12 I Important information, 4 Safety information, 4 Inspection of the installation, 5 Installation alternative, 13 To ground source heat pump, 14 M Maintenance, 19 General inspection, 19

22

Chapter 9 | Item register

P Pipe connections, 9 Cleaning the climate system, 8 Cold and hot water, 13 Connecting cold and hot water, 13 Dimensions and pipe connections, 10 General, 9 Hard water areas, 9 Heat pump, 12 Installation alternative, 13 Sun, 12 Symbol key, 13 Pressure drop diagram, charge coil, 18 Pressure drop diagram, solar coil, 18 S Safety information, 4 Inspection of the installation, 5 Serial number, 4 Symbols, 4 Warranty information, 4 Safety valves, 19 Sensors, 15 Serial number, 4 Service actions, 19 Emptying, 19 Safety valves, 19 Service and maintenance, 19 Maintenance, 19 Service actions, 19 Start-up and inspection, 19 Pressure drop diagram, charge coil, 18 Sun, 12 Connecting to solar power, 12 Supplied components, 6 Symbol key, 13 Symbols, 4

T Technical data, 20-21 Dimensions and setting-out coordinates, 10 Temperature limiter, 16 The water heater design, 7 List of components, 8 Transport, 6 W Warranty information, 4

MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST This Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights. Customer Name

Telephone Number

Address Cylinder Make and Model Cylinder Serial Number Commissioned by (print name)

R e gis te re d O pe ra tive ID N umbe r

Company Name

Telephone Number

Company Address Commissioning Date To be completed by the customer on receipt of a Building Regulations Compliance Certificate Building Regulations Notification Number

*:

(if applicable)

ALL SYSTEMS PRIMARY SETTINGS

(indirect heating only)

Is the primary circuit a sealed or open vented system?

Sealed

Open

What is the maximum primary flow temperature?

°C

ALL SYSTEMS What is the incoming static cold water pressure at the inlet to the system?

bar

Has a strainer been cleaned of installation debris (if fitted)?

Yes

No

Is the installation in a hard water area (above 200ppm)?

Yes

No

If yes, has a water scale reducer been fitted?

Yes

No

What type of scale reducer has been fitted? What is the hot water thermostat set temperature?

°C l/min

What is the maximum hot water flow rate at set thermostat temperature (measured at high flow outlet)? T ime a nd te mpe ra ture c ontrols ha ve be e n fitte d in c omplia nc e with P a rt L of the B uilding R e gula tions ?

Ye s

Type of control system (if applicable)

Y Plan

Is the cylinder solar (or other renewable) compatible?

S Plan

Other

Yes

No

What is the hot water temperature at the nearest outlet?

°C

A ll a ppropria te pipe s ha ve be e n ins ula te d up to 1 me tre or the point whe re the y be c ome c onc e a le d

Ye s

UNVENTED SYSTEMS ONLY Where is the pressure reducing valve situated (if fitted)? What is the pressure reducing valve setting?

bar

H a s a c ombine d te mpe ra ture a nd pre s s ure re lie f va lve a nd e x pa ns ion va lve be e n fitte d a nd dis c ha rge te s te d?

Ye s

T he tundis h a nd dis c ha rge pipe work ha ve be e n c onne c te d a nd te rmina te d to P a rt G of the B uilding R e gula tions

No Ye s

Are all energy sources fitted with a cut out device?

Yes

No

Has the expansion vessel or internal air space been checked?

Yes

No

THERMAL STORES ONLY What store temperature is achievable?

°C

What is the maximum hot water temperature?

°C

ALL INSTALLATIONS The hot water system complies with the appropriate Building Regulations

Yes

T he s ys te m ha s be e n ins ta lle d a nd c ommis s ione d in a c c orda nc e with the ma nufa c ture r’s ins truc tions

Ye s

The system controls have been demonstrated to and understood by the customer

Yes

The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer

Yes

Commissioning Engineer’s Signature Customer’s Signature (To confirm satisfactory demonstration and receipt of manufacturer’s literature)

*All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a Co A Building Regulations Compliance Certificate will then be issued to the customer.

© H e a ting a nd H otwa te r Indus try C ounc il (H H IC )

mpetent Persons Scheme.

www. c e ntra lhe a ting. c o. uk

SERVICE RECORD It is recommended that your hot water system is serviced regularly and that the appropriate Service Record is completed.

Service Provider

Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions.

SERVICE 1

Date

SERVICE 2

Date

Engineer Name

Engineer Name

Company Name

Company Name

Telephone Number

Telephone Number

Comments

Comments

Signature

Signature

SERVICE 3

Date

SERVICE 4

Date

Engineer Name

Engineer Name

Company Name

Company Name

Telephone Number

Telephone Number

Comments

Comments

Signature

Signature

SERVICE 5

Date

SERVICE 6

Date

Engineer Name

Engineer Name

Company Name

Company Name

Telephone Number

Telephone Number

Comments

Comments

Signature

Signature

SERVICE 7

Date

SERVICE 8

Date

Engineer Name

Engineer Name

Company Name

Company Name

Telephone Number

Telephone Number

Comments

Comments

Signature

Signature

SERVICE 9

Date

SERVICE 10

Date

Engineer Name

Engineer Name

Company Name

Company Name

Telephone Number

Telephone Number

Comments

Comments

Signature

Signature

aller manual

COIL/SOLAR COIL HOT WATER HEATER

NIBE Energy Systems Ltd 3C Broom Business Park Bridge Way Chesterfield S41 9QG Phone 0845 095 1200 Fax 0845 095 1201 [email protected] www.nibe.co.uk