MUNICIPAL SERVICES PROJECT-MESKI PROCUREMENT PLAN (13th Revision, September 14, 2012) / BELEDİYE HİZMETLERİ PROJESİ MESKI SATINALMA PLANI (13. Revizyon - 14 Eylül 2012) 1

2

2

Ref. No. Description

3

4

6

7

Type

No. of packages

Proc. Method

Review by Bank Prior/Post

8

9 Expected Bid-Open. Preperation BD/RFP date Date/Proposal Submission Date

10

11

Conctract signed date

Contract completion date*

WORKS (INCLUDING SUPPLY & INSTALLATION)

İNŞAAT İŞLERİ (TEMİN VE MONTAJ DAHİL)

1

Construction of Reservoirs and Pumping Stations (Pack. 1)

Depo ve Terfi Merkezleri İnşaatı

(1.paket)

W

1

NCB

sonra - post

Kasım 07 / Nov 07

Ocak 08 / Jan 08

Şubat 08 / Feb 08

Ocak / January 2010

2

Construction of Reservoirs and Pumping Stations (Pack. 2)

Depo ve Terfi Merkezleri İnşaatı

(2.paket)

W

1

NCB

sonra - post

Ocak 08 / Jan 08

Şubat 08 / Feb 08

Nisan 08 / April 08

Eylül / September 2009

3

MERGED INTO W2

SÖZLEŞME NO.W2'YE DAHİL EDİLDİ

W

1

4

Renovation of Water Network and Customer Connections - I

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi - I

W

1

NCB

sonra - post

Haz. 08 / June 08

Temmuz 08 / July 08

Ocak 09 / Jan 09

Mayıs / May 2010

5

Renovation of Water Network and Customer Connections - II

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi - II

W

1

NCB

sonra - post

Aralık 08 / Dec 08

Ocak 2009 / Jan. 2009

Ağustos 09/August 09

Temmuz 2010 / July 2010

6

MERGED INTO W5

SÖZLEŞME NO.W5'E DAHİL EDİLDİ

W

1

7

MERGED INTO G2

SÖZLEŞME NO.G2'YE DAHİL EDİLDİ

W

1

8

Establishing SCADA System and District Metering Areas

SCADA Sisteminin Kurulması ve Bölgesel Ölçüm Alanlarının Oluşturulması

W(S&I)

1

ICB

önce - prior

Ekim/October 2010

Haziran/June 2011

Ekim / October 2011

Mart /March 2013*

Construction of Reservoir, Pumping Station and Renovation of Water Network and Customer Connections Renovation of Water Network and Customer Connections

Depo, Pompa İstasyonu ile İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi

W

1

NCB

sonra - post

Mart 09 / March 09

Nisan/April 2009

Temmuz / July 2010

Nisan/April 2011

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi

W

1

Works Sub-Total

İnşaat İşleri Alt-Toplam

GOODS

MALZEME VE EKİPMAN TEMİN VE MONTAJI

1

Procurement of Leak Detection Equipment (Procurement of Equipment for 19 Municipal Operation Unit and ufw)

Kaçak Tespiti için Ekipman Alımı (19 belediye için yeni işletme biriminin kurulması ve Kaçak Tesbiti için Ekipman temini)

1

NCB

önce - prior

Temmuz 08 / July 08

Kasım 08 / November 08

Mart 09 / March 09

Haziran 09 / June 09

2

MERGED INTO W8

Sözleşme NO. W8'e dahil edildi.

3

Procurement of software

Yazılım temini

Goods

1

NCB

sonra-post

February/Şubat 2012

April/Nisan 2012

September / Eylül 2012

Mart /March 2013*

4

Procurement of hardware

Donanım temini

Goods

1

NCB

sonra-post

July /Temmuz 2012

October /Ekim 2012

November/Kasım 2012

December / Aralık 2012*

5

Procurement of vacuum trucks, sewer line cleaning equipment

Vidanjör, kanal temizleme cihazı temini

Goods

Multiple

NCB

sonra - post

April/Nisan 2012

May/Mayıs 2012

August / Ağustos 2012

November/Kasım 2012

6

Procurement of excavators and loaders

Kazıcı ve yükleyici temini

Goods

Multiple

NCB

sonra - post

March/Mart 2012

April/Nisan 2012

June/Haziran 2012

July/Temmuz 2012

7

Procurement of maintenance vehicles

Arıza onarım aracı temini

Goods

1

NCB

sonra - post

May/Mayıs 2012

July/Temmuz 2012

September/Eylül 2012

December/Aralık2012*

8

Procurement of beackhoe loader

Kazıcı yükleyici temini

Goods

1

NCB

sonra - post

September/Eylül 2012

October/Ekim 2012

November/Kasım 2012

December/Aralık2012*

9

Procurement of computer

Bilgisayar Temini

Shopping

1

Shopping

sonra - post

September/Eylül 2012

November/Kasım 2012

November/Kasım 2012

December/Aralık2012*

Goods Sub-Total

Mal Alımı Alt-Toplam

CONSULTANT'S SERVICES AND TRAINING

DANIŞMANLIK HİZMETLERİ VE EĞİTİM

1

Preparation of EMP

ÇYP'nin Hazırlanması

C

1

Individual

sonra - post

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Mayıs 07 / May 07

2

Review of the Final Design(s) for Reservoirs, Connection among the reservoirs, and Pumping Stations, Preparation of Bidding Documents and Construction Supervision for W1 Contract

Depolar, Depolar arası bağlantı hatları, terfi merkezleri kesin projelerinin incelenmesi, ihale dökümanlarının hazırlanması ve inşaat konrollüğü (MES-W1)

C

1

QCBS

önce - prior

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Nisan/April 2010

3

Preparation of Bidding Documents for Water Network, Construction Supervision and Technical Assistance to MESKI

İçmesuyu İhale Dokümanlarının Hazırlanması, İnşaat Kontroluğu ve MESKİ'ye Teknik Destek Sağlanması Müşavirlik Hizmetleri

C

1

QCBS

önce - prior

Ekim 06 / October 06

Aralık 06 / December 06

Mayıs 07 / May 07

Mart /March 2013*

4

CANCELLED

İPTAL EDİLDİ

C

1

5

Institutional Strengtening (Training of 19 Municipality Operation and ufw Staff)

Kurumsal Güçlendirme(19 belediye işletme birimi ve kaçak tesbit birimi personel eğitimi)

C

1

QCBS

önce - prior

Ocak 08 / January 08

Mart 08 / March 08

Nisan 09 / April 09

Mayıs /May 2010

6

CANCELLED

İPTAL EDİLDİ

C

1

7

CANCELLED

İPTAL EDİLDİ

C

1

8

Up-date of Consumer's Address Information and Establishing GIS and MIS

Abone Adres Bilgilerinin Güncellenmesi ve Coğrafi Bilgi Sistemi ve Yönetim Bilgi Sisteminin Kurulması

C

1

QCBS

önce - prior

Ağustos/August 2010

Aralık/December 2010

June/Haziran 2011

Mart /March 2013*

Consultant Sub-Total

Müşavirlik Alt-Toplam

9 10

Goods

Physical and Price Contingencies /Beklenmeyen Giderler TOTAL

GENEL TOPLAM WORKS : Insaat isleri GOODS: Malzeme ve ekipman temin ve montaji CONSULTANTS :Danismanlik Hizmetleri

services-works were completed/hizmetler-işler tamamlandı services-works are going on /hizmetler-işler devam ediyor to be tendered /ihale edilecek VAT TO BE COVERED FROM THE SUB-LOAN

* In accordance with the Bank's general policy on financing from the loan account with reference to the loan closing date please be advised that the Bank will finance eligible expenditures that are payable only for such goods, works and services that are included in the project and delivered, performed and completed on or before the closing date of the loan, and in accordance with the provisions of respective contract. Consequently, the Bank's no-objection for the above procurement plan is subject to the above financing policy and Ilbank/MESKI's insuring, availability of funds from Ilbank/MESKI's own or other resources as may be required for goods, works and services to be delivered, performed and completed after the loan closing date of the project. a) All ICB contracts for works and goods and all direct contracting will be subject to prior review by the Bank. b) The works contracts to cost less than Euro 7,5 million each may be procured through NCB. Bank’s sample NCB documents for ECA Region for Works will be used. The conditions for using NCB are listed in Schedule 4 to the Loan Agreement. c) Consultancy services by firms estimated to cost Euro 200,000 or more per contract, individual consultant contracts estimated to cost Euro 50,000 or more and single source selection of consultants will be subject to prior review by the Bank. d) Short lists composed entirely of national consultants: Short lists of consultants for services estimated to cost less than Euro 200,000 equivalent per contract may be composed entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

Not : WORKS ( İnşaat İşleri ) ve GOODS ( Malzeme ve Ekipman Temin ve Montajı ) için %10 İşveren Payına ek olarak %18 KDV MESKİ tarafından MES-W8, ayrıcaMES-W9, ödenmektedir. MES-G3, MES-G4, MES-G5, MES-G6 ve MES-G7 Sözleşmeleri için İşveren sadece %10 iç katkı payı sağlayacaktır. CONSULTANTS ( Danışmanlık Hizmetleri ) için ise sadece %18 KDV MESKİ tarafından karşılanmaktadır.

MUNICIPAL SERVICES PROJECT-MESKI PROCUREMENT PLAN (12th Revision, January 25 , 2012) / BELEDİYE HİZMETLERİ PROJESİ MESKI SATINALMA PLANI (12. Revizyon - 25 Ocak 2012) 1

2

2

Ref. No. Description

3

4

6

7

8

Type

No. of packages

Proc. Method

Review by Bank Prior/Post

Preperation BD/RFP date

9 Expected Bid-Open. Date/Proposal Submission Date

10

11

Conctract signed date

Contract completion date*

WORKS (INCLUDING SUPPLY & INSTALLATION) İNŞAAT İŞLERİ (TEMİN VE MONTAJ DAHİL)

1

Construction of Reservoirs and Pumping Stations (Pack. 1)

Depo ve Terfi Merkezleri İnşaatı

(1.paket)

W

1

NCB

sonra - post

Kasım 07 / Nov 07

Ocak 08 / Jan 08

Şubat 08 / Feb 08

Ocak / January 2010

2

Construction of Reservoirs and Pumping Stations (Pack. 2)

Depo ve Terfi Merkezleri İnşaatı

(2.paket)

W

1

NCB

sonra - post

Ocak 08 / Jan 08

Şubat 08 / Feb 08

Nisan 08 / April 08

Eylül / September 2009

3

MERGED INTO W2

SÖZLEŞME NO.W2'YE DAHİL EDİLDİ

W

1

4

Renovation of Water Network and Customer Connections - I

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi - I

W

1

NCB

sonra - post

Haz. 08 / June 08

Temmuz 08 / July 08

Ocak 09 / Jan 09

Mayıs / May 2010

5

Renovation of Water Network and Customer Connections - II

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi II

W

1

NCB

sonra - post

Aralık 08 / Dec 08

Ocak 2009 / Jan. 2009

Ağustos 09/August 09

Temmuz 2010 / July 2010

6

MERGED INTO W5

SÖZLEŞME NO.W5'E DAHİL EDİLDİ

W

1

7

MERGED INTO G2

SÖZLEŞME NO.G2'YE DAHİL EDİLDİ

W

1

8

Establishing SCADA System and District Metering Areas

SCADA Sisteminin Kurulması ve Bölgesel Ölçüm Alanlarının Oluşturulması

W(S&I)

1

ICB

önce - prior

Ekim/October 2010

Haziran/June 2011

Ekim / October 2011

August / Agustos 2012

Construction of Reservoir, Pumping Station and Renovation of Water Network and Customer Connections Renovation of Water Network and Customer Connections

Depo, Pompa İstasyonu ile İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi

W

1

NCB

sonra - post

Mart 09 / March 09

Nisan/April 2009

Temmuz / July 2010

Nisan/April 2011

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi

W

1

Works Sub-Total

İnşaat İşleri Alt-Toplam

GOODS

MALZEME VE EKİPMAN TEMİN VE MONTAJI

1

Procurement of Leak Detection Equipment (Procurement of Equipment for 19 Municipal Operation Unit and ufw)

Kaçak Tespiti için Ekipman Alımı (19 belediye için yeni işletme biriminin kurulması ve Kaçak Tesbiti için Ekipman temini)

1

NCB

önce - prior

Temmuz 08 / July 08

Kasım 08 / November 08

Mart 09 / March 09

Haziran 09 / June 09

2

MERGED INTO W8

Sözleşme NO. W8'e dahil edildi.

3

Procurement of software

Yazılım temini

Goods

1

NCB

sonra-post

February/Şubat 2012

March/Mart 2012

May / Mayıs 2012

December / Aralık 2012

4

Procurement of hardware

Donanım temini

Goods

1

NCB

sonra-post

May/Mayıs 2012

July /Temmuz 2012

August/Ağustos 2012

November / Kasım 2012

5

Procurement of vacuum trucks, sewer line cleaning equipment

Vidanjör, kanal temizleme cihazı temini

Goods

Multiple

NCB

sonra - post

February/Şubat 2012

April/Nisan 2012

July/Temmuz 2012

September/Eylül 2012

6

Procurement of excavators and loaders

Kazıcı ve yükleyici temini

Goods

Multiple

NCB

sonra - post

February/Şubat 2012

April/Nisan 2012

July/Temmuz 2012

September/Eylül 2012

7

Procurement of pick-up, trucks and forklift and maintenance vehicles

Pikap, kamyon, forklift ve arıza onarım aracı temini

Goods

Multiple

NCB

sonra - post

February/Şubat 2012

April/Nisan 2012

July/Temmuz 2012

September/Eylül 2012

Goods Sub-Total

Mal Alımı Alt-Toplam

CONSULTANT'S SERVICES AND TRAINING

DANIŞMANLIK HİZMETLERİ VE EĞİTİM

Preparation of EMP

ÇYP'nin Hazırlanması

C

1

Individual

sonra - post

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Mayıs 07 / May 07

Review of the Final Design(s) for Reservoirs, Connection among the reservoirs, and Pumping Stations, Preparation of Bidding Documents and Construction Supervision for W1 Contract Preparation of Bidding Documents for Water Network, Construction Supervision and Technical Assistance to MESKI

Depolar, Depolar arası bağlantı hatları, terfi merkezleri kesin projelerinin incelenmesi, ihale dökümanlarının hazırlanması ve inşaat konrollüğü (MES-W1)

C

1

QCBS

önce - prior

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Nisan/April 2010

İçmesuyu İhale Dokümanlarının Hazırlanması, İnşaat Kontroluğu ve MESKİ'ye Teknik Destek Sağlanması Müşavirlik Hizmetleri

C

1

QCBS

önce - prior

Ekim 06 / October 06

Aralık 06 / December 06

Mayıs 07 / May 07

August/Agustos 2012

4

CANCELLED

İPTAL EDİLDİ

C

1

5

Institutional Strengtening (Training of 19 Municipality Kurumsal Güçlendirme(19 belediye işletme birimi ve kaçak Operation and ufw Staff) tesbit birimi personel eğitimi)

C

1

QCBS

önce - prior

Ocak 08 / January 08

Mart 08 / March 08

Nisan 09 / April 09

Mayıs /May 2010

6

CANCELLED

İPTAL EDİLDİ

C

1

7

CANCELLED

İPTAL EDİLDİ

C

1

8

Up-date of Consumer's Address Information and Establishing GIS and MIS

Abone Adres Bilgilerinin Güncellenmesi ve Coğrafi Bilgi Sistemi ve Yönetim Bilgi Sisteminin Kurulması

C

1

QCBS

önce - prior

Ağustos/August 2010

Aralık/December 2010

June/Haziran 2011

June/Haziran 2012

Consultant Sub-Total

Müşavirlik Alt-Toplam

9 10

1

2

3

Goods

Physical and Price Contingencies /Beklenmeyen Giderler TOTAL

GENEL TOPLAM WORKS : Insaat isleri GOODS: Malzeme ve ekipman temin ve montaji CONSULTANTS :Danismanlik Hizmetleri

Not : WORKS ( İnşaat İşleri ) ve GOODS ( Malzeme ve Ekipman Temin ve Montajı ) içinMES-W8, %10 İşveren MES-W9, Payına MES-G3, ek olarak MES-G4, %18 KDV MES-G5 MESKİ ve tarafından MES-G6 Sözleşmeleri ayrıca ödenmektedir. için İşveren sadece %10 iç katkı payı sağlayacaktır. CONSULTANTS ( Danışmanlık Hizmetleri ) için ise sadece %18 MES-C8 KDV MESKİ Sözleşmesinde tarafından tüm karşılanmaktadır. giderler Alt Krediden karşılanacaktır.

services-works were completed/hizmetlerişler tamamlandı services-works are going on /hizmetlerişler devam ediyor to be tendered /ihale edilecek

VAT TO BE COVERED FROM THE SUB-LOAN

MUNICIPAL SERVICES PROJECT-MESKI PROCUREMENT PLAN (11th Revision, June 17 , 2011) / BELEDİYE HİZMETLERİ PROJESİ MESKI SATINALMA PLANI (11. Revizyon - 17 Haziran 2011) 1

2

2

Ref. No.

Description

3

4

6

7

Type

No. of packages

Proc. Method

Review by Bank Prior/Post

8

9

Expected Bid-Open. Preperation BD/RFP date Date/Proposal Submission Date

10

11

Conctract signed date

Contract completion date*

WORKS (INCLUDING SUPPLY & INSTALLATION)

İNŞAAT İŞLERİ (TEMİN VE MONTAJ DAHİL)

1

Construction of Reservoirs and Pumping Stations (Pack. 1)

Depo ve Terfi Merkezleri İnşaatı

(1.paket)

W

1

NCB

sonra - post

Kasım 07 / Nov 07

Ocak 08 / Jan 08

Şubat 08 / Feb 08

Ocak / January 2010

2

Construction of Reservoirs and Pumping Stations (Pack. 2)

Depo ve Terfi Merkezleri İnşaatı

(2.paket)

W

1

NCB

sonra - post

Ocak 08 / Jan 08

Şubat 08 / Feb 08

Nisan 08 / April 08

Eylül / September 2009

3

MERGED INTO W2

SÖZLEŞME NO.W2'YE DAHİL EDİLDİ

W

1

4

Renovation of Water Network and Customer Connections - I

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi I

W

1

NCB

sonra - post

Haz. 08 / June 08

Temmuz 08 / July 08

Ocak 09 / Jan 09

Mayıs / May 2010

5

Renovation of Water Network and Customer Connections - II

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi II

W

1

NCB

sonra - post

Aralık 08 / Dec 08

Ocak 2009 / Jan. 2009

Ağustos 09/August 09

Temmuz 2010 / July 2010

6

MERGED INTO W5

SÖZLEŞME NO.W5'E DAHİL EDİLDİ

W

1

7

MERGED INTO G2

SÖZLEŞME NO.G2'YE DAHİL EDİLDİ

W

1

8

Establishing SCADA System and District Metering Areas

SCADA Sisteminin Kurulması ve Bölgesel Ölçüm Alanlarının Oluşturulması

W(S&I)

1

ICB

önce - prior

Ekim/October 2010

Haziran/June 2011

Ağustos/August 2011

Haziran/June 2012

9

Construction of Reservoir, Pumping Station and Renovation of Water Network and Customer Connections

Depo, Pompa İstasyonu ile İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi

W

1

NCB

sonra - post

Mart 09 / March 09

Nisan/April 2009

Temmuz / July 2010

Nisan/April 2011

10

Renovation of Water Network and Customer Connections

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi

W

1

NCB

sonra - post

Mayıs 2011/May 2011

Temmuz/july 2011

Temmuz / July 2011

Aralık/December 2011

Goods

1

NCB

önce - prior

Temmuz 08 / July 08

Kasım 08 / November 08

Mart 09 / March 09

Haziran 09 / June 09

Goods

1

NCB

önce-prior

Ekim/October 2011

Aralık/December 2011

Ocak/January 2012

Haziran/June 2012

Works Sub-Total İnşaat İşleri Alt-Toplam MALZEME VE EKİPMAN TEMİN VE MONTAJI

GOODS

1

Procurement of Leak Detection Equipment Kaçak Tespiti için Ekipman Alımı (19 belediye için yeni (Procurement of Equipment for 19 Municipal Operation işletme biriminin kurulması ve Kaçak Tesbiti için Ekipman Unit and ufw) temini)

2

MERGED INTO W8

Sözleşme NO. W8'e dahil edildi.

3

Procurement of MIS and GIS softwares and required hardwares

YBS ve CBS yazılımları ile gerekli donanımın temin edilmesi

Goods Sub-Total Mal Alımı Alt-Toplam CONSULTANT'S SERVICES AND TRAINING

DANIŞMANLIK HİZMETLERİ VE EĞİTİM

1

Preparation of EMP

ÇYP'nin Hazırlanması

C

1

Individual

sonra - post

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Mayıs 07 / May 07

2

Review of the Final Design(s) for Reservoirs, Connection among the reservoirs, and Pumping Stations, Preparation of Bidding Documents and Construction Supervision for W1 Contract

Depolar, Depolar arası bağlantı hatları, terfi merkezleri kesin projelerinin incelenmesi, ihale dökümanlarının hazırlanması ve inşaat konrollüğü (MES-W1)

C

1

QCBS

önce - prior

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Nisan/April 2010

3

Preparation of Bidding Documents for Water Network, Construction Supervision and Technical Assistance to MESKI

İçmesuyu İhale Dokümanlarının Hazırlanması, İnşaat Kontroluğu ve MESKİ'ye Teknik Destek Sağlanması Müşavirlik Hizmetleri

C

1

QCBS

önce - prior

Ekim 06 / October 06

Aralık 06 / December 06

Mayıs 07 / May 07

Haziran/June 2011

4

CANCELLED

İPTAL EDİLDİ

C

1

5

Institutional Strengtening (Training of 19 Municipality Operation and ufw Staff)

Kurumsal Güçlendirme(19 belediye işletme birimi ve kaçak tesbit birimi personel eğitimi)

C

1

QCBS

önce - prior

Ocak 08 / January 08

Mart 08 / March 08

Nisan 09 / April 09

Mayıs /May 2010

6

CANCELLED

İPTAL EDİLDİ

C

1

7

CANCELLED

İPTAL EDİLDİ

C

1

8

Up-date of Consumer's Address Information and Establishing GIS and MIS

Abone Adres Bilgilerinin Güncellenmesi ve Coğrafi Bilgi Sistemi ve Yönetim Bilgi Sisteminin Kurulması

C

1

QCBS

önce - prior

Ağustos/August 2010

Aralık/December 2010

June/Haziran 2011

June/Haziran 2012

Consultant Sub-Total

Müşavirlik Alt-Toplam

TOTAL

Physical and Price Contingencies /Beklenmeyen Giderler GENEL TOPLAM WORKS : Insaat isleri GOODS: Malzeme ve ekipman temin ve montaji CONSULTANTS :Danismanlik Hizmetleri

Not : WORKS ( İnşaat İşleri ) ve GOODS ( Malzeme ve Ekipman Temin ve Montajı ) için %10MES-W8 İşveren ve Payına MES-W9 ek olarak Sözleşmeleri %18 KDViçin MESKİ İşveren tarafından sadece ayrıca %10 içödenmektedir. katkı payı sağlayacaktır. CONSULTANTS ( Danışmanlık Hizmetleri ) için ise sadece %18 KDV MES-C8 MESKİ Sözleşmesinde tarafından karşılanmaktadır. tüm giderler Alt Krediden karşılanacaktır.

services-works were completed/hizmetler-işler tamamlandı services-works are going on /hizmetler-işler devam ediyor to be tendered /ihale edilecek

VAT TO BE COVERED FROM THE SUB-LOAN

MUNICIPAL SERVICES PROJECT-MESKI PROCUREMENT PLAN (10th Revision, August 20 , 2010) / BELEDİYE HİZMETLERİ PROJESİ MESKI SATINALMA PLANI (10. Revizyon - 20 Ağustos 2010) 1

2

2

Ref. No.

Description

3

4

6

7

Type

No. of packages

Proc. Method

Review by Bank Prior/Post

8

9

Expected Bid-Open. Preperation BD/RFP date Date/Proposal Submission Date

10

11

Conctract signed date

Contract completion date*

WORKS (INCLUDING SUPPLY & INSTALLATION)

İNŞAAT İŞLERİ (TEMİN VE MONTAJ DAHİL)

1

Construction of Reservoirs and Pumping Stations (Pack. 1)

Depo ve Terfi Merkezleri İnşaatı

(1.paket)

W

1

NCB

sonra - post

Kasım 07 / Nov 07

Ocak 08 / Jan 08

Şubat 08 / Feb 08

Ocak / January 2010

2

Construction of Reservoirs and Pumping Stations (Pack. 2)

Depo ve Terfi Merkezleri İnşaatı

(2.paket)

W

1

NCB

sonra - post

Ocak 08 / Jan 08

Şubat 08 / Feb 08

Nisan 08 / April 08

Eylül / September 2009

3

MERGED INTO W2

SÖZLEŞME NO.W2'YE DAHİL EDİLDİ

W

1

4

Renovation of Water Network and Customer Connections - I

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi I

W

1

NCB

sonra - post

Haz. 08 / June 08

Temmuz 08 / July 08

Ocak 09 / Jan 09

Mayıs / May 2010

5

Renovation of Water Network and Customer Connections - II

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi II

W

1

NCB

sonra - post

Aralık 08 / Dec 08

Ocak 2009 / Jan. 2009

Ağustos 09/August 09

Temmuz 2010 / July 2010

6

MERGED INTO W5

SÖZLEŞME NO.W5'E DAHİL EDİLDİ

W

1

7

MERGED INTO G2

SÖZLEŞME NO.G2'YE DAHİL EDİLDİ

W

1

8

Establishing SCADA System and District Metering Areas

SCADA Sisteminin Kurulması ve Bölgesel Ölçüm Alanlarının Oluşturulması

W(S&I)

1

ICB

önce - prior

Ağustos/august 2010

Kasım/November 2010

Aralık/December 2010

Aralık/December 2011

9

Construction of Reservoir, Pumping Station and Renovation of Water Network and Customer Connections

Depo, Pompa İstasyonu ile İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi

W

1

NCB

sonra - post

Mart 09 / March 09

Nisan/April 2009

Temmuz / July 2010

Şubat/February 2011

Goods

1

NCB

önce - prior

Temmuz 08 / July 08

Kasım 08 / November 08

Mart 09 / March 09

Haziran 09 / June 09

Goods

1

NCB

sonra-post

Mart/March 2011

Nisan/April2011

Mayıs/May 2011

Eylül/September 2011

Works Sub-Total İnşaat İşleri Alt-Toplam MALZEME VE EKİPMAN TEMİN VE MONTAJI

GOODS

1

Procurement of Leak Detection Equipment Kaçak Tespiti için Ekipman Alımı (19 belediye için yeni (Procurement of Equipment for 19 Municipal Operation işletme biriminin kurulması ve Kaçak Tesbiti için Ekipman Unit and ufw) temini)

2

MERGED INTO W8

Sözleşme NO. W8'e dahil edildi.

3

Procurement of MIS and GIS softwares and required hardwares

YBS ve CBS yazılımları ile gerekli donanımın temin edilmesi

Goods Sub-Total Mal Alımı Alt-Toplam CONSULTANT'S SERVICES AND TRAINING

DANIŞMANLIK HİZMETLERİ VE EĞİTİM

1

Preparation of EMP

ÇYP'nin Hazırlanması

C

1

Individual

sonra - post

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Mayıs 07 / May 07

2

Review of the Final Design(s) for Reservoirs, Connection among the reservoirs, and Pumping Stations, Preparation of Bidding Documents and Construction Supervision for W1 Contract

Depolar, Depolar arası bağlantı hatları, terfi merkezleri kesin projelerinin incelenmesi, ihale dökümanlarının hazırlanması ve inşaat konrollüğü (MES-W1)

C

1

QCBS

önce - prior

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Nisan/April 2010

3

Preparation of Bidding Documents for Water Network, Construction Supervision and Technical Assistance to MESKI

İçmesuyu İhale Dokümanlarının Hazırlanması, İnşaat Kontroluğu ve MESKİ'ye Teknik Destek Sağlanması Müşavirlik Hizmetleri

C

1

QCBS

önce - prior

Ekim 06 / October 06

Aralık 06 / December 06

Mayıs 07 / May 07

Haziran/June 2011

4

CANCELLED

İPTAL EDİLDİ

C

1

5

Institutional Strengtening (Training of 19 Municipality Operation and ufw Staff)

Kurumsal Güçlendirme(19 belediye işletme birimi ve kaçak tesbit birimi personel eğitimi)

C

1

QCBS

önce - prior

Ocak 08 / January 08

Mart 08 / March 08

Nisan 09 / April 09

Mayıs /May 2010

6

CANCELLED

İPTAL EDİLDİ

C

1

7

CANCELLED

İPTAL EDİLDİ

C

1

8

Up-date of Consumer's Address Information and Establishing GIS and MIS

Abone Adres Bilgilerinin Güncellenmesi ve Coğrafi Bilgi Sistemi ve Yönetim Bilgi Sisteminin Kurulması

C

1

QCBS

önce - prior

Ağustos/August 2010

Kasım/November 2010

Aralık/December 2010

November/Kasım 2011

Consultant Sub-Total

Müşavirlik Alt-Toplam

Physical and Price Contingencies

Beklenmeyen Giderler

TOTAL

GENEL TOPLAM WORKS : Insaat isleri GOODS: Malzeme ve ekipman temin ve montaji CONSULTANTS :Danismanlik Hizmetleri

Not : WORKS ( İnşaat İşleri ) ve GOODS ( Malzeme ve Ekipman Temin ve Montajı ) için %10 İşveren Payına ek olarak %18 KDV MESKİ tarafından ayrıca ödenmektedir. CONSULTANTS ( Danışmanlık Hizmetleri ) için ise sadece %18 KDV MESKİ tarafından karşılanmaktadır.

a) All ICB contracts for works and goods and all direct contracting will be subject to prior review by the Bank. The works contracts to cost less than Euro 7,5 million each may be procured through NCB. b)

services-works were completed/hizmetler-işler tamamlandı

Bank’s sample NCB documents for ECA Region for Works will be used. The conditions for using NCB are listed in Schedule 4 to the Loan Agreement. Consultancy services by firms estimated to cost Euro 200,000 or more per contract, individual consultant contracts estimated to cost Euro 50,000 or more c)

services-works are going on /hizmetler-işler devam ediyor

and single source selection of consultants will be subject to prior review by the Bank. d)

Short lists composed entirely of national consultants: Short lists of consultants for services estimated to cost less than Euro 200,000 equivalent per contract may be composed

to be tendered /ihale edilecek

entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. *

Kusur sorumluluk periyodu hariç-exc. Defects liability period

VAT TO BE COVERED FROM THE SUB-LOAN

MUNICIPAL SERVICES PROJECT-MESKI PROCUREMENT PLAN (9th Revision, MARCH 8 , 2010) / BELEDİYE HİZMETLERİ PROJESİ MESKI SATINALMA PLANI (9. Revizyon - 8 mart 2010) 1

2

2

Ref. No.

Description

3

4

6

7

Type

No. of packages

Proc. Method

Review by Bank Prior/Post

8

9

Expected Bid-Open. Preperation BD/RFP date Date/Proposal Submission Date

10

11

Conctract signed date

Contract completion date*

WORKS (INCLUDING SUPPLY & INSTALLATION)

İNŞAAT İŞLERİ (TEMİN VE MONTAJ DAHİL)

1

Construction of Reservoirs and Pumping Stations (Pack. 1)

Depo ve Terfi Merkezleri İnşaatı

(1.paket)

W

1

NCB

sonra - post

Kasım 07 / Nov 07

Ocak 08 / Jan 08

Şubat 08 / Feb 08

Ocak/January 2010

2

Construction of Reservoirs and Pumping Stations (Pack. 2)

Depo ve Terfi Merkezleri İnşaatı

(2.paket)

W

1

NCB

sonra - post

Ocak 08 / Jan 08

Şubat 08 / Feb 08

Nisan 08 / April 08

Eylül/September 2009

3

MERGED INTO W2

SÖZLEŞME NO.W2'YE DAHİL EDİLDİ

W

1

4

Renovation of Water Network and Customer Connections - I

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi I

W

1

NCB

sonra - post

Haz. 08 / June 08

Temmuz 08 / July 08

Ocak 09 / Jan 09

Nisan/April 2010

5

Renovation of Water Network and Customer Connections - II

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi II

W

1

NCB

sonra - post

Aralık 08 / Dec 08

Ocak 2009/Jan. 2009

Ağustos 09/August 09

Temmuz 2010/July 2010

6

MERGED INTO W5

SÖZLEŞME NO.W5'E DAHİL EDİLDİ

W

1

7

MERGED INTO G2

SÖZLEŞME NO.G2'YE DAHİL EDİLDİ

W

1

8

Establishing SCADA System and District Metering Areas

SCADA Sisteminin Kurulması ve Bölgesel Ölçüm Alanlarının Oluşturulması

W(S&I)

1

ICB

önce - prior

Aralık 09 / December 09

May/Mayıs 2010

Ağustos/August 2010

Ağustos/August 2011

9

Construction of Reservoir, Pumping Station and Renovation of Water Network and Customer Connections

Depo, Pompa İstasyonu ile İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi

W

1

NCB

sonra - post

Mart 09 / March 09

Nisan/April 2009

Mayıs/May 2010

Aralık/December 2010

1

NCB

önce - prior

Temmuz 08 / July 08

Kasım 08 / November 08

Mart 09 / March 09

Haziran 09 / June 09

Works Sub-Total İnşaat İşleri Alt-Toplam MALZEME VE EKİPMAN TEMİN VE MONTAJI

GOODS

1

Procurement of Leak Detection Equipment Kaçak Tespiti için Ekipman Alımı (19 belediye için yeni (Procurement of Equipment for 19 Municipal Operation işletme biriminin kurulması ve Kaçak Tesbiti için Ekipman Unit and ufw) temini)

2

MERGED INTO W8

Goods

Sözleşme NO. W8'e dahil edildi. Goods Sub-Total Mal Alımı Alt-Toplam

CONSULTANT'S SERVICES AND TRAINING

DANIŞMANLIK HİZMETLERİ VE EĞİTİM

1

Preparation of EMP

ÇYP'nin Hazırlanması

C

1

Individual

sonra - post

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Mayıs 07 / May 07

2

Review of the Final Design(s) for Reservoirs, Connection among the reservoirs, and Pumping Stations, Preparation of Bidding Documents and Construction Supervision for W1 Contract

Depolar, Depolar arası bağlantı hatları, terfi merkezleri kesin projelerinin incelenmesi, ihale dökümanlarının hazırlanması ve inşaat konrollüğü (MES-W1)

C

1

QCBS

önce - prior

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Nisan/April 2010

3

Preparation of Bidding Documents for Water Network, Construction Supervision and Technical Assistance to MESKI

İçmesuyu İhale Dokümanlarının Hazırlanması, İnşaat Kontroluğu ve MESKİ'ye Teknik Destek Sağlanması Müşavirlik Hizmetleri

C

1

QCBS

önce - prior

Ekim 06 / October 06

Aralık 06 / December 06

Mayıs 07 / May 07

Haziran/June 2010

4

CANCELLED

İPTAL EDİLDİ

C

1

5

Institutional Strengtening (Training of 19 Municipality Operation and ufw Staff)

Kurumsal Güçlendirme(19 belediye işletme birimi ve kaçak tesbit birimi personel eğitimi)

C

1

QCBS

önce - prior

Ocak 08 / January 08

Mart 08 / March 08

Nisan 09 / April 09

Mayıs /May 2010

6

CANCELLED

İPTAL EDİLDİ

C

1

7

CANCELLED

İPTAL EDİLDİ

C

1

8

Up-date of Consumer's Address Information and Establishing GIS

Abone Adres Bilgilerinin Güncellenmesi ve Coğrafi Bilgi Sisteminin Kurulması

C

1

QCBS

önce - prior

Mart/March 2010

Temmuz/July 2010

Ağustos/August 2010

Ağustos/August 2011

Consultant Sub-Total

Müşavirlik Alt-Toplam

TOTAL

Physical and Price Contingencies /Beklenmeyen Giderler GENEL TOPLAM WORKS : Insaat isleri GOODS: Malzeme ve ekipman temin ve montaji CONSULTANTS :Danismanlik Hizmetleri

Not : WORKS ( İnşaat İşleri ) ve GOODS ( Malzeme ve Ekipman Temin ve Montajı ) için %10 İşveren Payına ek olarak %18 KDV MESKİ tarafından ayrıca ödenmektedir. CONSULTANTS ( Danışmanlık Hizmetleri ) için ise sadece %18 KDV MESKİ tarafından karşılanmaktadır.

a) All ICB contracts for works and goods and all direct contracting will be subject to prior review by the Bank. The works contracts to cost less than Euro 7,5 million each may be procured through NCB. b)

services-works were completed/hizmetler-işler tamamlandı

Bank’s sample NCB documents for ECA Region for Works will be used. The conditions for using NCB are listed in Schedule 4 to the Loan Agreement. Consultancy services by firms estimated to cost Euro 200,000 or more per contract, individual consultant contracts estimated to cost Euro 50,000 or more c)

services-works are going on /hizmetler-işler devam ediyor

and single source selection of consultants will be subject to prior review by the Bank. d)

Short lists composed entirely of national consultants: Short lists of consultants for services estimated to cost less than Euro 200,000 equivalent per contract may be composed

to be tendered /ihale edilecek

entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. *

Kusur sorumluluk periyodu hariç-exc. Defects liability period

VAT TO BE COVERED FROM THE SUB-LOAN

MUNICIPAL SERVICES PROJECT-MESKI PROCUREMENT PLAN (8th Revision, SEP. 24 , 2009) / BELEDİYE HİZMETLERİ PROJESİ MESKI SATINALMA PLANI (8. Revizyon - 24 Eylül 2009) 1

2

2

Ref. No.

Description

3

4

6

7

Type

No. of packages

Proc. Method

Review by Bank Prior/Post

8

9

Expected Bid-Open. Preperation BD/RFP date Date/Proposal Submission Date

10

11

Conctract signed date

Contract completion date*

WORKS (INCLUDING SUPPLY & INSTALLATION)

İNŞAAT İŞLERİ (TEMİN VE MONTAJ DAHİL)

1

Construction of Reservoirs and Pumping Stations (Pack. 1)

Depo ve Terfi Merkezleri İnşaatı

(1.paket)

W

1

NCB

sonra - post

Kasım 07 / Nov 07

Ocak 08 / Jan 08

Şubat 08 / Feb 08

Ekim 09 / October 09

2

Construction of Reservoirs and Pumping Stations (Pack. 2)

Depo ve Terfi Merkezleri İnşaatı

(2.paket)

W

1

NCB

sonra - post

Ocak 08 / Jan 08

Şubat 08 / Feb 08

Nisan 08 / April 08

Ekim 09 / October 09

3

MERGED INTO W2

SÖZLEŞME NO.W2'YE DAHİL EDİLDİ

W

1

4

Renovation of Water Network and Customer Connections - I

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi I

W

1

NCB

sonra - post

Haz. 08 / June 08

Temmuz 08 / July 08

Ocak 09 / Jan 09

Aralık 09 / December 09

5

Renovation of Water Network and Customer Connections - II

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi II

W

1

NCB

sonra - post

Aralık 08 / Dec 08

Ocak 2009/Jan. 2009

Ağustos 09/August 09

Temmuz 2010/July 2010

6

MERGED INTO W5

SÖZLEŞME NO.W5'E DAHİL EDİLDİ

W

1

7

MERGED INTO G2

SÖZLEŞME NO.G2'YE DAHİL EDİLDİ

W

1

8

Establishing SCADA System and District Metering Areas

SCADA Sisteminin Kurulması ve Bölgesel Ölçüm Alanlarının Oluşturulması

W(S&I)

1

ICB

önce - prior

Aralık 09 / December 09

Şubat 10 / February 10

Mart 10 / March 10

Haziran/June 2010

9

Construction of Reservoir, Pumping Station and Renovation of Water Network and Customer Connections

Depo, Pompa İstasyonu ile İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi

W

1

NCB

sonra - post

Mart 09 / March 09

Mayis 2009/May 2009

November 2009/ Kasım 2009

Haziran/June 2010

1

NCB

önce - prior

Temmuz 08 / July 08

Kasım 08 / November 08

Mart 09 / March 09

Haziran 09 / June 09

Works Sub-Total İnşaat İşleri Alt-Toplam MALZEME VE EKİPMAN TEMİN VE MONTAJI

GOODS

1

Procurement of Leak Detection Equipment Kaçak Tespiti için Ekipman Alımı (19 belediye için yeni (Procurement of Equipment for 19 Municipal Operation işletme biriminin kurulması ve Kaçak Tesbiti için Ekipman Unit and ufw) temini)

2

MERGED INTO W8

Goods

Sözleşme NO. W8'e dahil edildi. Goods Sub-Total Mal Alımı Alt-Toplam

CONSULTANT'S SERVICES AND TRAINING

DANIŞMANLIK HİZMETLERİ VE EĞİTİM

1

Preparation of EMP

ÇYP'nin Hazırlanması

C

1

Individual

sonra - post

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Mayıs 07 / May 07

2

Review of the Final Design(s) for Reservoirs, Connection among the reservoirs, and Pumping Stations, Preparation of Bidding Documents and Construction Supervision for W1 Contract

Depolar, Depolar arası bağlantı hatları, terfi merkezleri kesin projelerinin incelenmesi, ihale dökümanlarının hazırlanması ve inşaat konrollüğü (MES-W1)

C

1

QCBS

önce - prior

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Ekim 09 / October 09

3

Preparation of Bidding Documents for Water Network, Construction Supervision and Technical Assistance to MESKI

İçmesuyu İhale Dokümanlarının Hazırlanması, İnşaat Kontroluğu ve MESKİ'ye Teknik Destek Sağlanması Müşavirlik Hizmetleri

C

1

QCBS

önce - prior

Ekim 06 / October 06

Aralık 06 / December 06

Mayıs 07 / May 07

Haziran 10 / June 10

4

CANCELLED

İPTAL EDİLDİ

C

1

5

Institutional Strengtening (Training of 19 Municipality Operation and ufw Staff)

Kurumsal Güçlendirme(19 belediye işletme birimi ve kaçak tesbit birimi personel eğitimi)

C

1

QCBS

önce - prior

Ocak 08 / January 08

Mart 08 / March 08

Nisan 09 / April 09

Mayıs 10 / May 10

6

CANCELLED

İPTAL EDİLDİ

C

1

7

CANCELLED

İPTAL EDİLDİ

C

1

8

Up-date of Consumer's Address Information and Establishing GIS

Abone Adres Bilgilerinin Güncellenmesi ve Coğrafi Bilgi Sisteminin Kurulması

C

1

QCBS

önce - prior

Kasım / November 2009

Aralık / December 2009

Ocak / January 2010

Haziran 10 / June 10

Müşavirlik Alt-Toplam

Consultant Sub-Total

Physical and Price Contingencies TOTAL

GENEL TOPLAM WORKS : Insaat isleri GOODS: Malzeme ve ekipman temin ve montaji CONSULTANTS :Danismanlik Hizmetleri

Not : WORKS ( İnşaat İşleri ) ve GOODS ( Malzeme ve Ekipman Temin ve Montajı ) için %10 İşveren Payına ek olarak %18 KDV MESKİ tarafından ayrıca ödenmektedir. CONSULTANTS ( Danışmanlık Hizmetleri ) için ise sadece %18 KDV MESKİ tarafından karşılanmaktadır.

a) All ICB contracts for works and goods and all direct contracting will be subject to prior review by the Bank. The works contracts to cost less than Euro 7,5 million each may be procured through NCB. b)

services-works were completed/hizmetler-işler tamamlandı

Bank’s sample NCB documents for ECA Region for Works will be used. The conditions for using NCB are listed in Schedule 4 to the Loan Agreement. Consultancy services by firms estimated to cost Euro 200,000 or more per contract, individual consultant contracts estimated to cost Euro 50,000 or more c)

services-works are going on /hizmetler-işler devam ediyor

and single source selection of consultants will be subject to prior review by the Bank. d)

Short lists composed entirely of national consultants: Short lists of consultants for services estimated to cost less than Euro 200,000 equivalent per contract may be composed entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

*

Kusur sorumluluk periyodu hariç-exc. Defects liability period

to be tendered/ihale edilecek

MUNICIPAL SERVICES PROJECT-MESKI PROCUREMENT PLAN (Seventh Revision, May 26 , 2008) / BELEDİYE HİZMETLERİ PROJESİ MESKI SATINALMA PLANI ( 7. Revizyon - 26 Mayıs 2008) 1

2

2

Ref. No.

Description

3

4

6

7

8

Type

No. of packages

Proc. Method

Review by Bank Prior/Post

Preperation BD/RFP date

W

1

NCB

sonra - post

Kasım 07 / Nov 07

W

1

NCB

sonra - post

9 Expected Bid-Open. Date/Proposal Submission Date

10

11

Conctract signed date

Contract completion date

Ocak 08 / Jan 07

Şubat 08 / Feb 08

Şubat 09 / Feb 09

Ocak 08 / Jan 08

Şubat 08 / Feb 08

Nisan 08 / April 08

Nisan 09 / April 09

WORKS (INCLUDING SUPPLY & INSTALLATION) İNŞAAT İŞLERİ (TEMİN VE MONTAJ DAHİL)

1

Construction of Reservoirs and Pumping Depo ve Stations (Pack. 1) (1.paket)

Terfi

Merkezleri

İnşaatı

2

Construction of Reservoirs and Pumping Depo ve Stations (Pack. 2) (2.paket)

Terfi

Merkezleri

İnşaatı

3

MERGED INTO W2

SÖZLEŞME NO.W2'YE DAHİL EDİLDİ

W

1

4

Renovation of Water Network and Customer Connections - I

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi - I

W

1

NCB

sonra - post

Haz. 08 / June 08

Temmuz 08 / July 08

Eylül 08 / September 08

Ağustos 09 / August 09

5

Renovation of Water Network and Customer Connections - II

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi - II

W

1

NCB

sonra - post

Temmuz 08 / July 08

Ağustos 08 / August 08

Ekim 08 / October 08

Ağustos 09 / August 09

6

MERGED INTO W5

SÖZLEŞME NO.W5'E DAHİL EDİLDİ

W

1

7

MERGED INTO G2

SÖZLEŞME NO.G2'YE DAHİL EDİLDİ

W

1

Multiple

ICB / NCB / Shopping

önce/sonra - prior/post

Şubat 08 / February 08

Nisan 08 / April 08

Haziran 08 / June 08

Nisan 09 / April 09

Goods

1

ICB

önce - prior

Şubat 08 / February 08

Nisan 08 / April 08

Haziran 08 / June 08

Mayıs 09 / May 09

Works Sub-Total İnşaat İşleri Alt-Toplam

GOODS

MALZEME VE EKİPMAN TEMİN VE MONTAJI

1

Procurement of Equipment for 19 Municipal Operation Unit and ufw

19 belediye için yeni işletme biriminin kurulması ve Kaçak Tesbiti için Ekipman temini

2

Establishing SCADA System and District SCADA Sisteminin Kurulması ve Bölgesel Metering Areas Ölçüm Alanlarının Oluşturulması

Goods

Goods Sub-Total Mal Alımı Alt-Toplam CONSULTANT'S TRAINING

SERVICES

AND

DANIŞMANLIK HİZMETLERİ VE EĞİTİM

1

Preparation of EMP

ÇYP'nin Hazırlanması

C

1

Individual

sonra - post

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Mayıs 07 / May 07

2

Review of the Final Design(s) for Reservoirs, Connection among the reservoirs, and Pumping Stations, Preparation of Bidding Documents and Construction Supervision for W1 Contract

Depolar, Depolar arası bağlantı hatları, terfi merkezleri kesin projelerinin incelenmesi, ihale dökümanlarının hazırlanması ve inşaat konrollüğü (MESW1)

C

1

QCBS

önce - prior

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Temmuz 08 / July 08

3

İçmesuyu İhale Dokümanlarının Preparation of Bidding Documents for Hazırlanması, İnşaat Kontroluğu ve Water Network, Construction Supervision MESKİ'ye Teknik Destek Sağlanması and Technical Assistance to MESKI Müşavirlik Hizmetleri

C

1

QCBS

önce - prior

Ekim 06 / October 06

Aralık 06 / December 06

Mayıs 07 / May 07

Haziran 09 / June 09

4

CANCELLED

İPTAL EDİLDİ

C

1

5

Institutional Strengtening (Training of 19 Municipality Operation and ufw Staff)

Kurumsal Güçlendirme(19 belediye işletme birimi ve kaçak tesbit birimi personel eğitimi)

C

1

QCBS

önce - prior

Ocak 08 / January 08

Mart 08 / March 08

Haziran 08 / June 08

Mayıs 09 / May 09

6

CANCELLED

İPTAL EDİLDİ

C

1

7

CANCELLED

İPTAL EDİLDİ

C

1

Consultant Sub-Total

Müşavirlik Alt-Toplam

TOTAL

GENEL TOPLAM WORKS : Insaat isleri GOODS: Malzeme ve ekipman temin ve montaji CONSULTANTS :Danismanlik Hizmetleri

Not : WORKS ( İnşaat İşleri ) ve GOODS ( Malzeme ve Ekipman Temin ve Montajı ) için %10 İşveren Payına ek olarak %18 KDV MESKİ tarafından ayrıca ödenmektedir. CONSULTANTS ( Danışmanlık Hizmetleri ) için ise sadece %18 KDV MESKİ tarafından karşılanmaktadır.

a) All ICB contracts for works and goods and all direct contracting will be subject to prior review by the Bank. b) The works contracts to cost less than Euro 7,5 million each may be procured through NCB. Bank’s sample NCB documents for ECA Region for Works will be used. The conditions for using NCB are listed in Schedule 4 to the Loan Agreement. c) Consultancy services by firms estimated to cost Euro 200,000 or more per contract, individual consultant contracts estimated to cost Euro 50,000 or more and single source selection of consultants will be subject to prior review by the Bank. d) Short lists composed entirely of national consultants: Short lists of consultants for services estimated to cost less than Euro 200,000 equivalent per contract may be composed entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

MUNICIPAL SERVICES PROJECT-MESKI PROCUREMENT PLAN (Sixth Revision, Nov. 05, 2007) / BELEDİYE HİZMETLERİ PROJESİ MESKI SATINALMA PLANI ( 6. Revizyon - 05 Kasım 2007) 1

2

2

Ref. No.

Description

3

4

6

7

8

9 Expected Bid-Open. Preperation BD/RFP date Date/Proposal Submission Date

10

11

Type

No. of packages

Proc. Method

Review by Bank Prior/Post

Conctract signed date

Contract completion date

W

1

NCB

sonra - post

Kasım 07 / Nov 07

Ocak 08 / Jan 08

Şubat 08 / Feb 08

Şubat 09 / Feb 09

W

1

NCB

sonra - post

Ocak 08 / Jan 08

Şubat 08 / Feb 08

Nisan 08 / April 08

Nisan 09 / April 09

WORKS (INCLUDING SUPPLY & INSTALLATION) İNŞAAT İŞLERİ (TEMİN VE MONTAJ DAHİL)

1

Construction of Reservoirs and Pumping Stations (Pack. 1)

Depo ve (1.paket)

Terfi

Merkezleri

İnşaatı

2

Construction of Reservoirs and Pumping Stations (Pack. 2)

Depo ve (2.paket)

Terfi

Merkezleri

İnşaatı

3

MERGED INTO W2

SÖZLEŞME NO.W2'YE DAHİL EDİLDİ

W

1

4

Renovation of Water Network and Customer Connections - I

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi - I

W

1

NCB

sonra - post

Ocak 08 / Jan 08

Şubat 08 / Feb 08

Nisan 08 / April 08

Mart 09 / March 09

5

Renovation of Water Network and Customer Connections - II

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi - II

W

1

NCB

sonra - post

Ocak 08 / Jan 08

Mart 08 / March 08

Mayıs 08 / May 08

Mart 09 / March 09

6

MERGED INTO W5

SÖZLEŞME NO.W5'E DAHİL EDİLDİ

W

1

7

MERGED INTO G2

SÖZLEŞME NO.G2'YE DAHİL EDİLDİ

W

1

Multiple

ICB / NCB / Shopping

önce/sonra - prior/post

Şubat 08 / February 08

Nisan 08 / April 08

Haziran 08 / June 08

Nisan 09 / April 09

Goods

1

ICB

önce - prior

Şubat 08 / February 08

Nisan 08 / April 08

Haziran 08 / June 08

Mayıs 09 / May 09

Works Sub-Total İnşaat İşleri Alt-Toplam

GOODS

MALZEME VE EKİPMAN TEMİN VE MONTAJI

1

Procurement of Equipment for 19 Municipal Operation Unit and ufw

19 belediye için yeni işletme biriminin kurulması ve Kaçak Tesbiti için Ekipman temini

2

Establishing SCADA System and District SCADA Sisteminin Kurulması ve Bölgesel Metering Areas Ölçüm Alanlarının Oluşturulması

Goods

Goods Sub-Total Mal Alımı Alt-Toplam CONSULTANT'S TRAINING

SERVICES

AND

DANIŞMANLIK HİZMETLERİ VE EĞİTİM

1

Preparation of EMP

ÇYP'nin Hazırlanması

C

1

Individual

sonra - post

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Mayıs 07 / May 07

2

Review of the Final Design(s) for Reservoirs, Connection among the reservoirs, and Pumping Stations, Preparation of Bidding Documents and Construction Supervision for W1 Contract

Depolar, Depolar arası bağlantı hatları, terfi merkezleri kesin projelerinin incelenmesi, ihale dökümanlarının hazırlanması ve inşaat konrollüğü (MES-W1)

C

1

QCBS

önce - prior

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Temmuz 08 / July 08

3

İçmesuyu İhale Dokümanlarının Preparation of Bidding Documents for Hazırlanması, İnşaat Kontroluğu ve Water Network, Construction Supervision MESKİ'ye Teknik Destek Sağlanması and Technical Assistance to MESKI Müşavirlik Hizmetleri

C

1

QCBS

önce - prior

Ekim 06 / October 06

Aralık 06 / December 06

Mayıs 07 / May 07

Haziran 09 / June 09

4

CANCELLED

İPTAL EDİLDİ

C

1

5

Institutional Strengtening (Training of 19 Municipality Operation and ufw Staff)

Kurumsal Güçlendirme(19 belediye işletme birimi ve kaçak tesbit birimi personel eğitimi)

C

1

QCBS

önce - prior

Ocak 08 / January 08

Mart 08 / March 08

Haziran 08 / June 08

Mayıs 09 / May 09

6

CANCELLED

İPTAL EDİLDİ

C

1

7

CANCELLED

İPTAL EDİLDİ

C

1

Consultant Sub-Total

Müşavirlik Alt-Toplam

TOTAL

GENEL TOPLAM WORKS : Insaat isleri GOODS: Malzeme ve ekipman temin ve montaji CONSULTANTS :Danismanlik Hizmetleri

a) All ICB contracts for works and goods and all direct contracting will be subject to prior review by the Bank. b) The works contracts to cost less than Euro 7,5 million each may be procured through NCB. Bank’s sample NCB documents for ECA Region for Works will be used. The conditions for using NCB are listed in Schedule 4 to the Loan Agreement. c) Consultancy services by firms estimated to cost Euro 200,000 or more per contract, individual consultant contracts estimated to cost Euro 50,000 or more and single source selection of consultants will be subject to prior review by the Bank. d) Short lists composed entirely of national consultants: Short lists of consultants for services estimated to cost less than Euro 200,000 equivalent per contract may be composed entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

MUNICIPAL SERVICES PROJECT-MESKI PROCUREMENT PLAN (Fifth Revision, July 17, 2007) / BELEDİYE HİZMETLERİ PROJESİ MESKI SATINALMA PLANI ( 5. Revizyon - 17 Temmuz 2007) 1

2

2

Ref. No.

Description

3

4

6

7

8

Type

No. of packages

Proc. Method

Review by Bank Prior/Post

Preperation BD/RFP date

W

1

NCB

sonra - post

Mayıs 07 / May 07

W

1

NCB

sonra - post

9 Expected Bid-Open. Date/Proposal Submission Date

10

11

Conctract signed date

Contract completion date

Temmuz 07 / July 07

Eylül 07 / September 07

Ağustos 08 / August 08

Haziran 07 / June 07

Ağustos 07 / August 07

Ekim 07 / October 07

Mayıs 08 / May 08

WORKS (INCLUDING SUPPLY & INSTALLATION) İNŞAAT İŞLERİ (TEMİN VE MONTAJ DAHİL)

1

Construction of Reservoirs and Pumping Stations (Pack. 1)

Depo ve (1.paket)

Terfi

Merkezleri

İnşaatı

2

Construction of Reservoirs and Pumping Stations (Pack. 2)

Depo ve (2.paket)

Terfi

Merkezleri

İnşaatı

3

MERGED INTO W2

SÖZLEŞME NO.W2'YE DAHİL EDİLDİ

W

1

4

Renovation of Water Network and Customer Connections - I

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi - I

W

1

NCB

sonra - post

Kasım 07 / November07

Ocak 08 / January 08

Mart 08 / March 08

Mart 09 / March 09

5

Renovation of Water Network and Customer Connections - II

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi - II

W

1

NCB

sonra - post

Aralık 07 / December07

Şubat 08 / February 08

Nisan 08 / April 08

Mart 09 / March 09

6

MERGED INTO W5

SÖZLEŞME NO.W5'E DAHİL EDİLDİ

W

1

7

MERGED INTO G2

SÖZLEŞME NO.G2'YE DAHİL EDİLDİ

W

1

Multiple

ICB / NCB / Shopping

önce/sonra - prior/post

Şubat 08 / February 08

Nisan 08 / April 08

Haziran 08 / June 08

Nisan 09 / April 09

Goods

1

ICB

önce - prior

Şubat 08 / February 08

Nisan 08 / April 08

Haziran 08 / June 08

Mayıs 09 / May 09

Works Sub-Total İnşaat İşleri Alt-Toplam MALZEME VE EKİPMAN TEMİN VE MONTAJI

GOODS

1

Procurement of Equipment for 19 Municipal Operation Unit and ufw

2

Establishing SCADA System and District Metering Areas

19 belediye için yeni işletme biriminin kurulması ve Kaçak Tesbiti için Ekipman temini SCADA Sisteminin Kurulması ve Bölgesel Ölçüm Alanlarının Oluşturulması

Goods

Goods Sub-Total Mal Alımı Alt-Toplam CONSULTANT'S TRAINING

SERVICES

AND

DANIŞMANLIK HİZMETLERİ VE EĞİTİM

Preparation of EMP

ÇYP'nin Hazırlanması

C

1

Individual

sonra - post

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Mayıs 07 / May 07

Review of the Final Design(s) for Reservoirs, Connection among the reservoirs, and Pumping Stations, Preparation of Bidding Documents and Construction Supervision for W1 Contract Preparation of Bidding Documents for Water Network, Construction Supervision and Technical Assistance to MESKI

Depolar, Depolar arası bağlantı hatları, terfi merkezleri kesin projelerinin incelenmesi, ihale dökümanlarının hazırlanması ve inşaat konrollüğü (MESW1)

C

1

QCBS

önce - prior

Mart 06 / March 06

Nisan 06 / April 06

Şubat 07 / February 07

Temmuz 08 / July 08

İçmesuyu İhale Dokümanlarının Hazırlanması, İnşaat Kontroluğu ve MESKİ'ye Teknik Destek Sağlanması Müşavirlik Hizmetleri

C

1

QCBS

önce - prior

Ekim 06 / October 06

Aralık 06 / December 06

Mayıs 07 / May 07

Haziran 09 / June 09

4

CANCELLED

İPTAL EDİLDİ

C

1

5

Kurumsal Güçlendirme(19 belediye Institutional Strengtening (Training of işletme birimi ve kaçak tesbit birimi 19 Municipality Operation and ufw Staff) personel eğitimi)

C

1

QCBS

önce - prior

Ocak 08 / January 08

Mart 08 / March 08

Haziran 08 / June 08

Mayıs 09 / May 09

6

CANCELLED

İPTAL EDİLDİ

C

1

7

CANCELLED

İPTAL EDİLDİ

C

1

1

2

3

Consultant Sub-Total

Müşavirlik Alt-Toplam

TOTAL

GENEL TOPLAM WORKS : Insaat isleri GOODS: Malzeme ve ekipman temin ve montaji CONSULTANTS :Danismanlik Hizmetleri

a) All ICB contracts for works and goods and all direct contracting will be subject to prior review by the Bank. b) The works contracts to cost less than Euro 7,5 million each may be procured through NCB. Bank’s sample NCB documents for ECA Region for Works will be used. The conditions for using NCB are listed in Schedule 4 to the Loan Agreement. c) Consultancy services by firms estimated to cost Euro 200,000 or more per contract, individual consultant contracts estimated to cost Euro 50,000 or more and single source selection of consultants will be subject to prior review by the Bank. d) Short lists composed entirely of national consultants: Short lists of consultants for services estimated to cost less than Euro 200,000 equivalent per contract may be composed entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

MUNICIPAL SERVICES PROJECT - MESKI PROCUREMENT PLAN (Third Revision, May 8, 2006) 1

2

3

4

6

Ref. No.

Description

Type

No. of packages

Proc. Method

7 Review by Bank Prior/Post

8 Preperation BD/RFP date

9 Expected Bid-Open. Date/Proposal Submission Date

10

11

Conctract signed date

Contract completion date

WORKS WORKS (INCLUDING SUPPLY & INSTALLATION) 1

Construction of Reservoir and Pumping Station (Pack. 1)

W

1

NCB

PRIOR

June 2006

August 2006

November 2006

November 2007

2

Construction of Reservoir and Pumping Station (Pack. 2)

W

1

NCB

POST

August 2006

October 2006

January 2007

January 2008

3

Construction of Reservoir and Pumping Station (Pack. 3)

W

1

NCB

POST

October 2006

December 2006

March 2007

March 2008

4

Renovation of water network and customer connections - I

W

1

NCB

PRIOR

March 2007

May 2007

August 2007

August 2008

5

Renovation of water network and customer connections - II

W

1

NCB

POST

April 2007

June 2007

September 2007

September 2008

6

Renovation of water network and customer connections - III

W

1

NCB

POST

May 2007

July 2007

October 2007

October 2008

7

Establishing District Metering Areas

W

1

NCB

POST

July 2007

September 2007

November 2007

November 2008

Multiple

Shopping

POST

September 2007

November 2007

January 2008

August 2008

1

ICB

PRIOR

August 2007

October 2007

January 2007

December 2008

Works Sub-Total GOODS

1

Procurement of Equipment for 19 Municipal Operation Unit and ufw

2

Establishment of SCADA

Goods

Goods

Goods Sub-Total CONS

CONSULTANT'S SERVICES AND TRAINING

1

Preparation of EMP

C

1

Individual

POST

March 2006

April 2006

May 2006

September 2006

2

Review of the Final Design(s) for Reservoirs, Connection among the reservoirs, and Pumping Stations, Preparation of Bidding Documents and Construction Supervision for W1 Contract

C

1

QCBS

PRIOR

March 2006

April 2006

May 2006

December 2007

3

Review of the Final Design(s) for Water Distribution System, Preparation of Replacement Program and Bidding Documents

C

1

QCBS

PRIOR

March 2006

May 2006

August 2006

March 2009

4

Establishments of GIS and Calibrated Hydraulic Model

C

1

CQ

POST

March 2008

May 2008

July 2008

December 2008

5

Institutional Strengtening (Training of 19 Municipality Operation and ufw Staff)

C

1

CQ

POST

April 2007

June 2007

August 2007

August 2008

6

Preparation of ToR and Bidding Documents for SCADA System

C

1

CQ

POST

May 2007

June 2007

July 2007

February 2008

7

Consultancy Services for Project Implementation Management and Training

C

1

Individual

POST

March 2006

December 2008

Consultant Sub-Total TOTAL

BELEDİYE HİZMETLERİ PROJESİ MESKI SATINALMA PLANI ( 2. revizyon 01 Mart 2006) Sıra No

Tanım

Tür

Paket sayisi

Satınalma Yöntemi

DB tarafından İnceleme Önce/Sonra

İhale Dok. / Teklif İsteme Dok. Hazırlanma Tarihi

Tahmini Teklif Açılış / Teklif Sunma Tarihi

Sözleşme İmza Sözleşme Tarihi Tamamlanma Tarihi

MESKİ İDARESİ WORKS İNŞAAT İŞLERİ (TEMİN VE MONTAJ DAHİL) 1

Depo ve Terfi Merkezleri İnşaatı (1.paket)

W

1

NCB

PRIOR

Jun-06

Aug-06

Nov-06

Nov-07

2

Depo ve Terfi Merkezleri İnşaatı (2.paket)

W

1

NCB

POST

Aug-06

Oct-06

Jan-07

Jan-08

3

Depo ve Terfi Merkezleri İnşaatı (3.paket)

W

1

NCB

POST

Oct-06

Dec-06

Mar-07

Mar-08

4

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi - I

W

1

NCB

PRIOR

Mar-07

Mayıs 2007

Aug-07

Aug-08

5

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi - II

W

1

NCB

POST

Apr-07

Jun/2007

Sep-07

Sep-08

6

İçmesuyu Şebekesi ve Abone Bağlantılarının Yenilenmesi - III

W

1

NCB

POST

May 2007

Jul-07

Oct-07

Oct-08

7

Bölgesel Ölçüm Alanlarının Oluşturulması

W

1

NCB

POST

Jul-07

Sep-07

Nov-07

Nov-08

Shopping

POST

Sep-07

Nov-07

Jan-08

Aug-08

1

ICB

PRIOR

Aug-07

Oct-07

Jan-07

Dec-08

İnşaat İşleri Alt-Toplam

GOODS

MALZEME VE EKİPMAN TEMİN VE MONTAJI

1

19 belediye için yeni işletme biriminin kurulması ve Kaçak Tesbiti için Goods Ekipman temini

8

SCADA Sisteminin Kurulması

CONS

Goods

Multiple

DANIŞMANLIK HİZMETLERİ VE EĞİTİM

1

ÇYP'nin Hazırlanması

C

1

Individual

POST

Mar-06

Apr/2006

May-06

Sep-06

2

Depolar, Depolar arası bağlantı hatları, terfi merkezleri uygulama projelerinin incelenmesi, ihale dökümanlarının hazırlanması ve inşaat konrollüğü(MES-W1)

C

1

CQ

POST

Mar-06

Apr/2006

May-06

Dec-07

3

İçmeyu Dağıtım Şebekesi Uygulama Projeleri,Yenileme Programı ve İhale Dokümanlarının Hazırlanması,İnşaat Kontroluğu ve Müşavirlik Hizmetleri

C

1

QCBS

PRIOR

Mar-06

May 2006

Aug-06

Mar-09

4

Kalibre Hidrolik Model Kurulması

C

1

CQ

POST

Mar-08

May-08

Jul-08

Dec-08

5

Kurumsal Güçlendirme(19 belediye işletme birimi ve kaçak tesbit birimi personel eğitimi)

C

1

CQ

POST

Apr-07

Jun-07

Aug-07

Aug-08

6

SCADA sistemi ihale dök.haz.

C

1

CQ

POST

May-07

Jun-07

Jul-07

Feb-08

7

Proje Uygulama Yönetimi Müşavirlik Hizmetleri

C

1

Individual

POST

Mar-06

Dec-08

Müşavirlik Alt-Toplam GENEL TOPLAM