MAINTENANCE SHED HEATING PROJECT NO CONTRACT NO

PORT COMMISSIONERS: CONSTANCE T. BACON DON MEYER DONALD C. JOHNSON RICHARD P. MARZANO CLARE PETRICH DRAWING LIST PORT STAFF: SHEET # SHEET TITLE ...
Author: Guest
7 downloads 0 Views 2MB Size
PORT COMMISSIONERS: CONSTANCE T. BACON DON MEYER DONALD C. JOHNSON RICHARD P. MARZANO CLARE PETRICH

DRAWING LIST

PORT STAFF:

SHEET #

SHEET TITLE

1

COVER SHEET

A1.1

2

SHED FLOOR PLAN

A1.2

3

SHED ELEVATION

M1.3

4

MECHANICAL SHED PLAN

EO.2

5

E4.1

6

ELECTRICAL LEGEND AND POWER RISER DIAGRAM SHED ELECTRICAL PLAN

JOHN WOLFE Chief Executive Officer DAKOTA CHAMBERLAIN Director of Facilities Development

SPECIAL INSPECTION 2215 North 30th Street,

Tacoma, WA 98403

SEATTLE 801SECONDAVENUES , TE700S , EATTLEW , A99104 TEL(2 :06)269-0104 wwwc.ardnoc.om

253.383.2422 TEL 253.383.2572 FAX

OF 6

Suite 300,

SH 1

STANLEY RYTER, PE Project Manager

CONSULTANTS:

G1.1

JANE VANDENBERG, PE Director of Engineering

REVISION

COVER SHEET

SHEET DESIGNATION G1.1

MAINTENANCE SHED HEATING

PROJECT LOCATION

6582

PORT OF TACOMA FILE: C:\Users\vecto\OneDrive\Vector\Clients\04-Cardno\Maintenance Mezzanine\CAD\Sheet Files\MID 101140.01 COVER_SHED

PROJECT NO. 101140.01 CONTRACT NO. 070735

THIS DRAWING IS THE PROPERTY OF THE PORT OF TACOMA AND SHALL NOT BE USED ON OTHER WORK, DISCLOSED, COPIED, IN WHOLE OR IN PART, WITHOUT WRITTEN PERMISSION

P.O. BOX 1837 TACOMA, WA 98401 (253)383-5841

BINDING EDGE

MAINTENANCE SHED HEATING

SH 2

OF 6

A1.1

6582

BINDING EDGE

P.O. BOX 1837 TACOMA, WA 98401 (253)383-5841

THIS DRAWING IS THE PROPERTY OF THE PORT OF TACOMA AND SHALL NOT BE USED ON OTHER WORK, DISCLOSED, COPIED, IN WHOLE OR IN PART, WITHOUT WRITTEN PERMISSION

SHED FLOOR PLAN

MAINTENANCE SHED HEATING

PORT OF TACOMA FILE: C:\Users\vecto\OneDrive\Vector\Clients\04-Cardno\Maintenance Mezzanine\CAD\Sheet Files\MID 101140.01 A1.1-A1.2_SHED

SH 3

OF 6

A1.2

6582

BINDING EDGE

P.O. BOX 1837 TACOMA, WA 98401 (253)383-5841

THIS DRAWING IS THE PROPERTY OF THE PORT OF TACOMA AND SHALL NOT BE USED ON OTHER WORK, DISCLOSED, COPIED, IN WHOLE OR IN PART, WITHOUT WRITTEN PERMISSION

SHED ELEVATION

MAINTENANCE SHED HEATING

PORT OF TACOMA FILE: C:\Users\vecto\OneDrive\Vector\Clients\04-Cardno\Maintenance Mezzanine\CAD\Sheet Files\MID 101140.01 A1.1-A1.2_SHED

P.O. BOX 1837 TACOMA, WA 98401 (253)383-5841

BINDING EDGE

CONSTRUCTION NOTES

UH 2

INSTALL UNIT HEATER PER MANUFACTURER RECOMMENDATIONS. INSTALL 8' ABOVE FINISHED FLOOR WHILE MAINTAINING REQUIRED CLEARANCES. SEE INSTALLATION DETAIL 2 ON THIS SHEET.

1

ELECTRIC UNIT HEATER SCHEDULE ELECTRICAL WATTS VOLTS Ø

UNIT NO

MANUFACTURER

MODEL

UH-1

INDEECO

UHIR

SHED

T'STAT

7500

480

UH-2

INDEECO

UHIR

SHED

T'STAT

7500

480

LOCATION INTERLOCK

STARTER FURN. BY

DISCONNECT FURN. BY

3

MFR

EC

1

2

3

4

3

MFR

EC

1

2

3

4

REMARKS

NOTES FOR UNIT HEATER SCHEDULE: 1 UNIT TO BE CONTROLLED WITH INTEGRAL 2-STAGE FACTORY-INSTALLED THERMOSTAT. SET POINT TO BE 55°F. 2 INSTALL PER MANUFACTURER INSTALLATION INSTRUCTIONS. PROVIDE WITH FACTORY DIRECTIONAL DIFFUSERS.

2017

3 INSTALL WITH ENGRAVED PLASTIC LAMINATE IDENTIFICATION NAMEPLATE PER 23 05 53.

WALL BRACKET

12/19/17

PROVIDE BASIS OF DESIGN MODEL OR APPROVED EQUAL. 12/19/17

4

12/15/

ONE SITCUM PLAZA TACOMA, WA 98401-1837

CC

DS

HEATER BRACKET

MOUNTING LOCATION TO BE COORDINATED WITH G.C.

2 M1.3

SCALE : NOT TO SCALE

3E 34 MLLW 19.18' @ Tide 22 1933 AS NOTED

MECHANICAL SHED PLAN SCALE : 1/8" = 1'-0"

0'

4'

8'

16'

32'

OF 6 SH # 4

SCALE: 1/8" = 1'-0"

M1.3

1 M1.3

ELECTRIC HEATER INSTALLATION DETAIL

21N WA83-SF 27

1

MECHANICAL SHED PLAN

UH 1

6582

PORT OF TACOMA FILE: R:\dwgs\217\217-054\_Drawings\Mechanical\217054_M1-3

MOUNTING HEIGHT 8' AFF TO BOTTOM OF UNIT

MAINTENANCE SHED HEATING

UNIT HEATER

THIS DRAWING IS THE PROPERTY OF THE PORT OF TACOMA AND SHALL NOT BE USED ON OTHER WORK, DISCLOSED, COPIED, IN WHOLE OR IN PART, WITHOUT WRITTEN PERMISSION

1

DEMAND CALCULATION EXISTING FUSED SWITCHBOARD #5 NEC 220-87 AND WAC 296-46B-010(16)(J) Phase to Phase Voltage(volts): Phases(1 = Single Phase, 3 = Three Phase):

480 3

Peak Demand 30-Day Meter Reading

=

Demand Adjustment Factor Per NEC 220-87(2)

x

Adjusted Peak Demand Added New Load Added load from the Bridge Crane Project New Added load from Shed Heater

220.78 kW 1.25

(

275.98 kVA 332.10 A)

+ +

30.75 kVA 15.00 kVA

Calculated Demand Load Calculated Demand Current Existing Switchboard Size

321.73 kVA 387 Amps 800 Amps

DEMAND CALCULATION EXISTING PANEL "A" NEC 220-87 AND WAC 296-46B-010(16)(J) 480 Phase to Phase Voltage(volts): 3 Phases(1 = Single Phase, 3 = Three Phase): = 91.88 kW Peak Demand 30-Day Meter Reading Demand Adjustment Factor Per NEC 220-87(2)

x (

1.25 114.85 kVA 138.21 A)

+ +

30.75 kVA 15.00 kVA

Adjusted Peak Demand Added New Load Added load from the Bridge Crane Project New Added load from Shed Heater

Calculated Demand Load Calculated Demand Current Existing Switchboard Size

160.60 kVA 193 Amps 400 Amps