BID TABULATION M-59 WATER MAIN CROSSING HIGHLAND TOWNSHIP OAKLAND COUNTY, MICHIGAN Bids Due: Wednesday, September 28, 2016 HRC Job # 20130529 Joe Ra...
2 downloads 0 Views 219KB Size
BID TABULATION M-59 WATER MAIN CROSSING HIGHLAND TOWNSHIP OAKLAND COUNTY, MICHIGAN

Bids Due: Wednesday, September 28, 2016 HRC Job # 20130529

Joe Raica Excavating 3640 Nicholson Road Fowlervillve, MI | (517) 521-4393

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27.

Item Pavt, Rem Sidewalk, Rem Curb and Gutter, Rem Water Main, HDPE, DR 11, 16 inch, HDD Water Main, DI, Cl 54, 8 inch, Tr Det A Water Main, DI, Cl 54, 8 inch, Tr Det B Water Main, DI, Cl 54, 16 inch, Tr Det A Gate Valve & Well, 8 inch Gate Valve & Well, 16 inch Water Main Connection, 16 inch Fire Hydrant Water Service, Copper, Type K, 1 inch Curb Stop and Box, 1 inch HDPE to DI Transition Anchor Aggregate Base, 22A Aggregate Base, 21AA Limestone HMA, 36A, Mod HMA, 2C HMA, 3C HMA, 4C, Mod Curb and Gutter, Conc, Det F4 Sidewalk, Conc, 4 inch Sidewalk Ramp, Conc, 6 inch ADA Tile, 24 inch Conc, Low Temp Protection Seed, Blanket, Topsoil, 3 inch Erosion Control, Silt Fence

Quantity 710 2070 60 346 230 350 500 8 4 1 4 105 3 4 260 270 100 30 15 15 60 1950 120 12 26 3800 300

\\VMENG\Projdocs\201305\20130529\04_Design\Final\Bidding\20160929_BidTab.xls

syd sft ft ft ft ft ft ea ea ea ea ft ea ea ton ton ton ton ton ton ft sft sft ft cyd syd ft

Unit Price $10.00 $1.25 $6.00 $150.00 $80.00 $75.00 $110.00 $5,000.00 $9,000.00 $10,500.00 $5,000.00 $100.00 $250.00 $2,000.00 $28.00 $35.00 $190.00 $250.00 $350.00 $350.00 $40.00 $4.00 $6.00 $62.00 $12.00 $3.50 $2.50

Page 1

Total Cost $7,100.00 $2,587.50 $360.00 $51,900.00 $18,400.00 $26,250.00 $55,000.00 $40,000.00 $36,000.00 $10,500.00 $20,000.00 $10,500.00 $750.00 $8,000.00 $7,280.00 $9,450.00 $19,000.00 $7,500.00 $5,250.00 $5,250.00 $2,400.00 $7,800.00 $720.00 $744.00 $312.00 $13,300.00 $750.00

Bricco Excavating 21201 Meyers Road Oak Park, MI | (248) 547-6963 Unit Price $4.50 $0.50 $8.00 $200.00 $100.00 $90.00 $140.00 $4,000.00 $7,600.00 $5,000.00 $6,000.00 $35.00 $550.00 $2,000.00 $20.00 $25.00 $100.00 $100.00 $100.00 $100.00 $18.00 $4.00 $5.00 $35.00 $30.00 $4.00 $2.00

Total Cost $3,195.00 $1,035.00 $480.00 $69,200.00 $23,000.00 $31,500.00 $70,000.00 $32,000.00 $30,400.00 $5,000.00 $24,000.00 $3,675.00 $1,650.00 $8,000.00 $5,200.00 $6,750.00 $10,000.00 $3,000.00 $1,500.00 $1,500.00 $1,080.00 $7,800.00 $600.00 $420.00 $780.00 $15,200.00 $600.00

Giannetti Building 1850 Oak Trail Oxford, MI | (248) 628-2594 Unit Price $16.00 $2.50 $6.00 $160.00 $102.00 $84.00 $154.00 $3,420.00 $7,900.00 $8,435.00 $5,948.00 $60.00 $550.00 $4,400.00 $29.00 $29.00 $176.00 $176.00 $176.00 $176.00 $27.00 $10.00 $12.00 $28.00 $35.00 $5.20 $4.50

Total Cost $11,360.00 $5,175.00 $360.00 $55,360.00 $23,460.00 $29,400.00 $77,000.00 $27,360.00 $31,600.00 $8,435.00 $23,792.00 $6,300.00 $1,650.00 $17,600.00 $7,540.00 $7,830.00 $17,600.00 $5,280.00 $2,640.00 $2,640.00 $1,620.00 $19,500.00 $1,440.00 $336.00 $910.00 $19,760.00 $1,350.00

BID TABULATION M-59 WATER MAIN CROSSING HIGHLAND TOWNSHIP OAKLAND COUNTY, MICHIGAN

Bids Due: Wednesday, September 28, 2016 HRC Job # 20130529

Joe Raica Excavating 3640 Nicholson Road Fowlervillve, MI | (517) 521-4393

28. 29. 30. 31. 32. 33. 34. 35.

Item Erosion Control, Inlet Filter Mailbox, Relocate Tree, Rem SESC Permit Allowance RCOC Permit Allowance Traffic Control Audio Video Route Survey Mobilization

Quantity 5 1 4 8000 15000 1 1 1

ea ea wa dlr dlr LS LS LS

Unit Price $125.00 $50.00 $1,200.00 $1.00 $1.00 $6,000.00 $2,000.00 $15,000.00

Total Amount of Bid Additional Bidders: Verdeterre Contracting, Inc. E.T. MacKenzie Company Fonson Company, Inc. Lawrence M. Clarke, Inc.

Total Cost $625.00 $50.00 $4,800.00 $8,000.00 $15,000.00 $6,000.00 $2,000.00 $15,000.00 $418,578.50

$480,048.75 $481,667.50 $499,158.00 $505,890.00

* corrected by engineer ENGINEER: Hubbell, Roth & Clark, Inc. 105 W. Grand River Ave. Howell, MI 48843

\\VMENG\Projdocs\201305\20130529\04_Design\Final\Bidding\20160929_BidTab.xls

Page 2

Bricco Excavating 21201 Meyers Road Oak Park, MI | (248) 547-6963 Unit Price $150.00 $130.00 $550.00 $1.00 $1.00 $9,000.00 $15,000.00 $21,000.00

Total Cost $750.00 $130.00 $2,200.00 $8,000.00 $15,000.00 $9,000.00 $15,000.00 $21,000.00 $428,645.00

Giannetti Building 1850 Oak Trail Oxford, MI | (248) 628-2594 Unit Price $74.00 $50.00 $245.00 $1.00 $1.00 $5,920.00 $1,200.00 $17,000.00

Total Cost $370.00 $50.00 $980.00 $8,000.00 $15,000.00 $5,920.00 $1,200.00 $17,000.00 $455,818.00

BID TABULATION M-59 WATER MAIN CROSSING HIGHLAND TOWNSHIP OAKLAND COUNTY, MICHIGAN Verdeterre Contracting, Inc. 2618 Hannan Road Canton, MI | (734) 697-4166

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27.

Item Pavt, Rem Sidewalk, Rem Curb and Gutter, Rem Water Main, HDPE, DR 11, 16 inch, HDD Water Main, DI, Cl 54, 8 inch, Tr Det A Water Main, DI, Cl 54, 8 inch, Tr Det B Water Main, DI, Cl 54, 16 inch, Tr Det A Gate Valve & Well, 8 inch Gate Valve & Well, 16 inch Water Main Connection, 16 inch Fire Hydrant Water Service, Copper, Type K, 1 inch Curb Stop and Box, 1 inch HDPE to DI Transition Anchor Aggregate Base, 22A Aggregate Base, 21AA Limestone HMA, 36A, Mod HMA, 2C HMA, 3C HMA, 4C, Mod Curb and Gutter, Conc, Det F4 Sidewalk, Conc, 4 inch Sidewalk Ramp, Conc, 6 inch ADA Tile, 24 inch Conc, Low Temp Protection Seed, Blanket, Topsoil, 3 inch Erosion Control, Silt Fence

\\VMENG\Projdocs\201305\20130529\04_Design\Final\Bidding\20160929_BidTab.xls

Quantity 710 2070 60 346 230 350 500 8 4 1 4 105 3 4 260 270 100 30 15 15 60 1950 120 12 26 3800 300

syd sft ft ft ft ft ft ea ea ea ea ft ea ea ton ton ton ton ton ton ft sft sft ft cyd syd ft

Unit Price $13.20 $1.25 $8.50 $260.00 $71.00 $71.00 $145.00 $4,585.00 $10,750.00 $8,050.00 $5,500.00 $34.85 $450.00 $1,900.00 $31.60 $34.05 $172.50 $184.00 $184.00 $184.00 $46.00 $5.20 $6.30 $46.00 $86.25 $5.75 $2.65

Page 3

Total Cost $9,372.00 $2,587.50 $510.00 $89,960.00 $16,330.00 $24,850.00 $72,500.00 $36,680.00 $43,000.00 $8,050.00 $22,000.00 $3,659.25 $1,350.00 $7,600.00 $8,216.00 $9,193.50 $17,250.00 $5,520.00 $2,760.00 $2,760.00 $2,760.00 $10,140.00 $756.00 $552.00 $2,242.50 $21,850.00 $795.00

E.T. MacKenzie Company 4248 W Saginaw Hwy Grand Ledge, MI | (517) 627-8408 Unit Price $3.50 $1.00 $6.50 $220.00 $100.00 $68.00 $198.00 $4,400.00 $10,950.00 $9,700.00 $4,175.00 $17.50 $575.00 $2,050.00 $23.75 $35.00 $155.00 $210.00 $260.00 $260.00 $41.00 $6.30 $7.50 $47.00 $21.00 $5.30 $3.80

Total Cost $2,485.00 * $2,070.00 $390.00 $76,120.00 $23,000.00 $23,800.00 $99,000.00 $35,200.00 $43,800.00 $9,700.00 $16,700.00 $1,837.50 $1,725.00 $8,200.00 $6,175.00 $9,450.00 $15,500.00 $6,300.00 $3,900.00 $3,900.00 $2,460.00 $12,285.00 $900.00 $564.00 * $546.00 $20,140.00 $1,140.00

BID TABULATION M-59 WATER MAIN CROSSING HIGHLAND TOWNSHIP OAKLAND COUNTY, MICHIGAN Verdeterre Contracting, Inc. 2618 Hannan Road Canton, MI | (734) 697-4166

28. 29. 30. 31. 32. 33. 34. 35.

Item Erosion Control, Inlet Filter Mailbox, Relocate Tree, Rem SESC Permit Allowance RCOC Permit Allowance Traffic Control Audio Video Route Survey Mobilization

Quantity 5 1 4 8000 15000 1 1 1

ea ea wa dlr dlr LS LS LS

Unit Price $140.00 $150.00 $725.00 $1.00 $1.00 $8,000.00 $2,160.00 $19,895.00

Total Amount of Bid

$480,048.75

Additional Bidders: Verdeterre Contracting, Inc. E.T. MacKenzie Company Fonson Company, Inc. Lawrence M. Clarke, Inc. * corrected by engineer ENGINEER: Hubbell, Roth & Clark, Inc. 105 W. Grand River Ave. Howell, MI 48843

\\VMENG\Projdocs\201305\20130529\04_Design\Final\Bidding\20160929_BidTab.xls

Total Cost $700.00 $150.00 $2,900.00 $8,000.00 $15,000.00 $8,000.00 $2,160.00 $19,895.00

Page 4

E.T. MacKenzie Company 4248 W Saginaw Hwy Grand Ledge, MI | (517) 627-8408 Unit Price $105.00 $55.00 $350.00 $1.00 $1.00 $13,000.00 $1,900.00 $14,500.00

Total Cost $525.00 $55.00 $1,400.00 $8,000.00 $15,000.00 $13,000.00 $1,900.00 $14,500.00 $481,667.50

BID TABULATION M-59 WATER MAIN CROSSING HIGHLAND TOWNSHIP OAKLAND COUNTY, MICHIGAN

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27.

Item Pavt, Rem Sidewalk, Rem Curb and Gutter, Rem Water Main, HDPE, DR 11, 16 inch, HDD Water Main, DI, Cl 54, 8 inch, Tr Det A Water Main, DI, Cl 54, 8 inch, Tr Det B Water Main, DI, Cl 54, 16 inch, Tr Det A Gate Valve & Well, 8 inch Gate Valve & Well, 16 inch Water Main Connection, 16 inch Fire Hydrant Water Service, Copper, Type K, 1 inch Curb Stop and Box, 1 inch HDPE to DI Transition Anchor Aggregate Base, 22A Aggregate Base, 21AA Limestone HMA, 36A, Mod HMA, 2C HMA, 3C HMA, 4C, Mod Curb and Gutter, Conc, Det F4 Sidewalk, Conc, 4 inch Sidewalk Ramp, Conc, 6 inch ADA Tile, 24 inch Conc, Low Temp Protection Seed, Blanket, Topsoil, 3 inch Erosion Control, Silt Fence

\\VMENG\Projdocs\201305\20130529\04_Design\Final\Bidding\20160929_BidTab.xls

Quantity 710 2070 60 346 230 350 500 8 4 1 4 105 3 4 260 270 100 30 15 15 60 1950 120 12 26 3800 300

syd sft ft ft ft ft ft ea ea ea ea ft ea ea ton ton ton ton ton ton ft sft sft ft cyd syd ft

Fonson Company, Inc. 7644 Whitmore Lake Road Brighton, MI | (810) 231-5188

Lawrence M. Clarke, Inc. 50850 Bemis Belleville, MI | (734) 481-1565

Unit Price $4.50 $1.50 $12.25 $268.00 $64.00 $60.00 $145.00 $4,400.00 $11,500.00 $9,800.00 $6,500.00 $40.00 $400.00 $3,100.00 $33.00 $42.00 $150.00 $250.00 $250.00 $300.00 $40.00 $6.50 $10.25 $40.00 $75.00 $8.50 $3.25

Unit Price $12.00 $1.00 $15.00 $175.00 $180.00 $110.00 $150.00 $5,000.00 $10,000.00 $3,500.00 $5,000.00 $30.00 $400.00 $6,000.00 $25.00 $25.00 $200.00 $200.00 $200.00 $200.00 $50.00 $7.00 $8.00 $50.00 $75.00 $4.00 $6.00

Page 5

Total Cost $3,195.00 $3,105.00 $735.00 $92,728.00 $14,720.00 $21,000.00 $72,500.00 $35,200.00 $46,000.00 $9,800.00 $26,000.00 $4,200.00 $1,200.00 $12,400.00 $8,580.00 $11,340.00 $15,000.00 $7,500.00 $3,750.00 $4,500.00 $2,400.00 $12,675.00 $1,230.00 $480.00 $1,950.00 $32,300.00 $975.00

Total Cost $8,520.00 $2,070.00 $900.00 $60,550.00 $41,400.00 $38,500.00 $75,000.00 $40,000.00 $40,000.00 $3,500.00 $20,000.00 $3,150.00 $1,200.00 $24,000.00 $6,500.00 $6,750.00 $20,000.00 $6,000.00 $3,000.00 $3,000.00 $3,000.00 $13,650.00 $960.00 $600.00 $1,950.00 $15,200.00 $1,800.00

BID TABULATION M-59 WATER MAIN CROSSING HIGHLAND TOWNSHIP OAKLAND COUNTY, MICHIGAN

28. 29. 30. 31. 32. 33. 34. 35.

Item Erosion Control, Inlet Filter Mailbox, Relocate Tree, Rem SESC Permit Allowance RCOC Permit Allowance Traffic Control Audio Video Route Survey Mobilization

Quantity 5 1 4 8000 15000 1 1 1

ea ea wa dlr dlr LS LS LS

Fonson Company, Inc. 7644 Whitmore Lake Road Brighton, MI | (810) 231-5188

Lawrence M. Clarke, Inc. 50850 Bemis Belleville, MI | (734) 481-1565

Unit Price $150.00 $320.00 $650.00 $1.00 $1.00 $7,400.00 $825.00 $18,800.00

Unit Price $200.00 $100.00 $1,000.00 $1.00 $1.00 $7,500.00 $5,000.00 $24,090.00

Total Amount of Bid

$499,158.00

Additional Bidders: Verdeterre Contracting, Inc. E.T. MacKenzie Company Fonson Company, Inc. Lawrence M. Clarke, Inc. * corrected by engineer ENGINEER: Hubbell, Roth & Clark, Inc. 105 W. Grand River Ave. Howell, MI 48843

\\VMENG\Projdocs\201305\20130529\04_Design\Final\Bidding\20160929_BidTab.xls

Total Cost $750.00 $320.00 $2,600.00 $8,000.00 $15,000.00 $7,400.00 $825.00 $18,800.00

Page 6

Total Cost $1,000.00 $100.00 $4,000.00 $8,000.00 $15,000.00 $7,500.00 $5,000.00 $24,090.00 $505,890.00