Infrastructure. Infrastructure Project Pipeline P3 opportunities in Latin America. Opportunities in Latin America. April 2015 April 2014

Infrastructure Infrastructure Project Pipeline Opportunities in Latin America P3 opportunities in Latin America April 2015 April 2014 Infrastructu...
13 downloads 1 Views 1MB Size
Infrastructure Infrastructure Project Pipeline Opportunities in Latin America

P3 opportunities in Latin America April 2015

April 2014

Infrastructure Project Pipeline P3 Opportunities in Latin America by country Brazil

4

Chile

7

Colombia

10

Peru

13

Mexico

15

Paraguay

18

P3 Opportunities in Latin America by sector

2

3

19

Airports

20

Energy

21

Healthcare

22

Ports

23

Rail

24

Roads

26

Water

32

Other

33

P3 Opportunities in Latin America by country

3

Brazil Project

Sector

Procurement Transaction State / Stage Value ($m) Department

Description

Lucas do Rio VerdeCampinorte Railroad Concession

Rail

Pre-Launch

3650

Mato 35 year concession. 1920km extension construction to be Grosso,Goiás completed up to the 5th year of the concession term.

Maracaju-Lapa Railroad Concession

Rail

Pre-Launch

3130

Mato Grosso 35 year concession. 989km extension construction to be do Sul completed up to the 5th year of the concession term.

Military College of Manaus

Education

Pre-Launch

N/A

Minas Gerais Aerospace Center

Accommo dation

Pre-Launch

33.3

PR-280 Palmas - Clevelândia

Roads

Pre-Launch

20

Paraná

Praia Mansa cultural complex PPP

Leisure

Pre-Launch

N/A

Fortaleza

Construction of cultural and touristic complex Public hearings were planned to take place during last trimester of 2014. No recent information available.

Rolim de Moura Wastewater PPP

Water

Pre-Launch

36

Rondônia

Concession approved on February 5 2015. Project to be given in a 30 year concession for the provision of water and wastewater services to the city.

4

Amazonas

Military College of Manaus announced partnership for recovery of Epaminondas street in downtown Manaus.

Project structuring proposals were filed in November 2014. 35 Minas Gerais year concession. Bidding process set to be launched by the end of 2015 or first trimester of 2016. Project proposed by the National Transport Infrastructure Department is undergoing feasibility studies. Project extent unknown at the time.

Brazil Project

Sector

Procurement Transaction State / Stage Value ($m) Department

Description

Santo André Wastewater Concession

Water

Pre-Launch

N/A

São Paulo

35 year concession for the construction and operation of a wastewater managing facility through PPP financing. Feasibility studies are being made and by October 2014, the authorities of Sao Andre declared they still have interest in the project.

Sao Paulo desalination PPP

Water

Pre-Launch

538

São Paulo

Very recently launched. The state has requested companies to express their interest in preparing feasibility studies.

Rio Digital - Optic Fiber Connection Project

Other

Pre-Launch

N/A

Brazil

Declared as a priority PPP project by Secretary Julio Bueno In late January 2015. Currently undergoing feasibility studies.

Rio Grande do Sul airport

Airport

Pre-Launch

505

Brazil's civil aviation authority SAC approved the construction of a new airport to serve Rio Grande do Sul state capital Porto Porto Alegre Alegre - 3,200m x 45m runway and an international cargo and passenger terminal.

Uberaba international airport

Airport

Pre-Launch

N/A

Council of public private partnership (PPP), has published a Minas Gerais request for expression of interest (RFEOI) to hire consultants to develop feasibility studies. Project cost to be determined.

Tunnels

Pre-Launch

N/A

Rio de Janeiro

Ongoing planning process of tender for a PPP project for the repair, operation and maintenance of 16 road tunnels.

Pre-Launch

NA

Soracaba

PPP Program Administrator and local agencies are planning public hearings. Project cost to be determined.

Rio de Janeiro Tunnel upgrades

Sorocaba Bus Rapid Transit Transport (BTR) PPP project.

5

Brazil Procurement Transaction State / Stage Value ($m) Department

Project

Sector

Street lighting PPP

Energy

Pre-launch

N/A

Minas Gerais river transposition project

Water

Pre-launch

383

Redirecting water from the Paraopeba river to the Manso river Belo Horizonte (supplies Belo Horizonte). Governor is seeking federal government support. Overall, the railway system will be 431km long and have two routes, the Norte-Sul (north-south) and the Leste-Oeste (eastwest). Phase I, budgeted at 5.5bn reais, involves a publicprivate partnership to build a 135km railway linking the city of Americana to state capital São Paulo.

São Paulo Intercity train network PPP

São Paulo

Description Feasibility studies were under review by local authorities. No updated information has been published. World Bank has stated interest in project.

Light Rail / Transit

Pre-launch

9300

Minas Gerais MG-050 Highway PPP

Roads

Unknown

325

The project includes the recuperation, enlargement and Minas Gerais maintenance of a 372km highway with required investments of around US$207 million.

São Luiz do Tapajós Hydropower Plant Complex

Energy

Planned

9200

São Luiz do 8GW hydro-power plant requiring an estimated investment of US$12.8 billion. Tapajós

Rail

Pre-launch

2000

Blue line PPP of Curitiba metro

Salvador's Bridge - Sistema Viário Oeste, SVO

6

Bridges and Tunnels

Pre-launch

2800

São Paulo

Curitiba

Bahia

Construction and 35 year concession of a new rail lane. PPP project for the construction of a bridge between Salvador de Bahia and Itaparica Island. Includes state and federal contributions and sponsor financing. Tender opening announced for 2015, but schedule has not been released.

Chile Project

Sector

Procurement Stage

Transaction Value ($m)

Pre-tendering

387

Multipurpose reservoir that will be used to irrigate approximately 70,000ha and could generate 94MW.

Description

Embalse Punilla

Other (Energy)

Road connection Melipilla Camino de la Fruta (Ruta G-60)

Roads

Tendering

38

Improvement, restoration and maintenance of 31km highway .

Nuevo Complejo Fronterizo los Libertadores

Other

Tendering

84

The main connection between Chile and Mercosur (highest flow of people and goods). The goal is to build a control and inspection building and a hosting building for officers, among others.

Tender of the Airport Internacional Arturo Merino Benitez

Airports

Tendering

700

Airport improvement, maintenance and operation .

Américo Vespucio Oriente (Tramo Av. Príncipe Gales - los Presidentes)

Roads

Announced

726

Construction and operation of a 5km highway.

Highway Costanera Central

Roads

Announced

1819

Development of a high standard underground roadway.

Road la Madera

Roads

Announced

142

Direct connection to the city of Concepcion and the ports of the area. The project is to improve the design, capacity, speed and security.

Civic center de Valdivia

Other

Announced

25.68

Construction of Valdivia civic neighbourhood to create a government identity.

7

Chile Project

Sector

Procurement Stage

Transaction Value ($m)

Description

Concession Aeródromo de Balmaceda

Other

Announced

31

Enlargement and development of passenger terminal.

Concession road 5, Tramo Caldera – Chañaral

Roads

Announced

250

Private initiative PPP to improve 90km road infrastructure through dual highways towards.

Road concession Metropolitan high way of Puerto Montt

Roads

Announced

140.23

Road concession Longitudinal Chiloé

Roads

Announced

263

Improvement and expansion of a 101km dual highway.

Access road concession to Valdivia

Roads

Announced

209

Improvement and expansion of a dual highway. Extent to be determined by the Chilean Government.

Connection road 78 to 68

Roads

Announced

107.84

Connectivity improvement between the to routes (78 and 68).

Conurbación La Serena Coquimbo

Roads

Announced

133

Improvement of the road infrastructure and the sustainability of developing tourism .

Airport Diego Aracena de Iquique Airports (4th tendering offer)

Announced

N/A

To satisfy the specific demands of an international airport (development and expansion)

Airport El Tepual de Puerto Montt Airports (4th tendering offer)

Announced

N/A

Construction of passenger terminal, road improvements and new parking lots.

8

Improvement of Port Varas - Port Montt 34.3km connection through the El Tepuall Airport.

Chile Project

Sector

Procurement Stage

Transaction Value ($m)

Description

Underground parking Centro Cívico Concepción

Other (Parking)

Announced

12

Construction of underground parking lots with a 431 car capacity.

Improvement of road 68

Roads

Announced

200

Improve the connectivity conditions between two regions (Metropolitana and Valparaiso), increase the design speed and improve the road safety.

Improvement Ruta Nahuelbuta

Roads

Announced

221.21

Tendering offer Airport Carriel South

Airports

Announced

45

Expansion, relocation and improvement of the airfield facilities.

International ground port Antofagasta

Other (Port)

Announced

45

Construction of a new 20 hectares port.

Relicitación Concesión Camino Nogales – Puchuncaví

Roads

Announced

148

Improvement of a 27km highway.

Tender offer of the tunnel "El Melon"

Roads

Announced

120

Construction, maintenance and exploitation and improvement of current service levels.

Road G21, Access to the ski center

Roads

Announced

107

Improvement of a 30km highway.

Road G-66, Camino de La Fruta Roads

Announced

N/A

Improvement and maintenance of a 138km urban road.

Cabel railway Bicentenario

Announced

29.63

9

Other

Enlargement of the 55km road into a double carriageway.

Public transport system (4.5km line) operation.

Colombia Project

Bogota Metro PPP

Sector

Procurement Stage

Transaction Value ($m)

Description Development of an underground transportation system for the city of Bogota. Initial designs include 27km line and 27 stations, fully underground and electrical at an estimated investment cost of about US$7 trillion.

Rail

Announced

N/A

Autopista Mar 1 highway PPP

Roads

Pre-launch

621.7

Tunnel construction (4.7km), double-lane (33km), improvement (34km), bridges (50km).

Villavicencio - Yopal Highway PPP

Roads

Tendering (TdR published 1-2015)

1064

Construction of a double-lane (48km) and rehabilitation (212km).

Autopista Mar 2 highway PPP

Roads

Pre-launch

670

Improvement (118km), tunnels (2.2 km), construction single-lane (15.5km).

Sisga - El Secreto highway PPP

Roads

Tendering (TdR published 2-5-15

395

Rehabilitation (137km).

Stder. Quilichao – Popayán highway PPP

Roads

Tendering (TdR published 1-2015)

680.9

Construcion of a double lane (76km), 36 bridges, 7 bypass.

Puerta de Hierro - Cruz del Viso Palmar de Varela highway PPP

Roads

Tendering (TdR published 1-2015)

510.64

Improvement of 175km.

Neiva – Girardot highway PPP

Roads

Pre-launch

553

Barrancabermeja – Bucaramanga: highway PPP

Roads

Pre-launch

1148.9

10

Construction of a double lane (79km) and improvement (190km). Construction of a double lane (66km), single lane (128km), and improvement (67km).

Colombia Sector

Procurement Stage

Transaction Value ($m)

El Dorado II Airport PPP

Airports

Announced

N/A

Further information has not been given by the Colombian government.

Bogota - Villavicencia Sector 1

Roads

Pre-launch

851

Double-lane, third lane carril and improvement.

Santana - Mocoa – Neiva highway PPP

Roads

Tendering (TdR published 1-2015)

1276.6

Pasto – Popayán highway PPP

Roads

Announced

1236

Double-lane and several bypass. Extent to be defined.

Barbosa – Bucaramanga highway PPP

Roads

Announced

N/A

Double-lane (10km), improvement (179km), bypass (3), rehabilitation (62km) and a Third-lane (17km).

Bucaramanga – Pamplona highway PPP

Roads

Announced

N/A

Construction 22km roadlane, improvement (53km) and rehabilitation (77km).

Pamplona – Cúcuta highway PPP

Roads

Announced

N/A

Rehabilitation (43km) , and construction of second -lane (47km ).

Project

11

Description

Construction double-lane (22km), single-lane (32km) and rehabilitation (422km) of road.

Colombia Sector

Procurement Stage

Transaction Value ($m)

Sogamoso – Aguazul – Maní Highway PPP

Roads

Announced

1254

Bogota - Girardot 3 PPP

Roads

Announced

1021.28

Cartagena Dredging

Ports

Announced

60

Further information has not been given by the Colombian government.

Cucuta-Ocaña highway PPP

Roads

Announced

534

Improvement of 169km, rehabilitation 23km and 2 bypass.

Pamplona - Duitama Highway PPP

Roads

Announced

354

Rehabilitation (213km), improvement (95km) and 3 bypass.

Barbosa - Zipaquira Highway PPP

Roads

Announced

1685

Double lane (76km), improvement (107km), rehabilitation (172km), third lane (14km) and 4km bypass.

Chinchina - Mariquita

Roads

Announced

310.6

Rehabilitation (33km) , improvement (103km), viaduct (1) and bypass (3km).

Project

12

Description

Improvement of 172km and 2 bypass.

Construction of double-lane. Further information has not been given by the Colombian government.

Peru Project

National Fibre Optic Backbone Project

Sector

Telecomm Concessionaire unications

Machu Picchu-Abancay-Cotaruse Power- not Transmission Line PPP generation

LNG Supply System

Lima Metro Line 3

Procurement Stage

Unknown

Other

Announced

Rail

Announced

Transaction Value ($m)

Description

323,00

Connection of 180 municipalities.

90,00

Construction and implementation of a 220kV transmission and 200km power line.

568,00

Concession to design, finance, construction, operation and maintenance of a supply system which will provide a reserve of natural gas liquid produced in the gas liquefaction plant with a capacity of 130,000 m3. Consultant is developing the pre-investment study project level profile. Award provided for III quarter 2016.

5500 Lima Metro Line 4

Preparation of final engineering studies (design), financing, construction, electromechanical equipment, rolling stock acquisition, operation and 30km track maintenance. Scheduled award 2017.

Rail

Announced

Power-not generation

Unknown

146,00

Contract suspended. Government currently evaluating new procurement.

Longitudinal de la sierra 4

Roads

Announced

340,00

Improvement and rehabilitation (117km), initial maintenance (280km); and its subsequent maintenance and operation.

Longitudinal de la sierra 5

Roads

Announced

N/A

Mantaro-Caraveli-Montalvo Transmission Line PPP

13

Initial Periodic maintenance and the consequent operation and maintenance of 422km track.

Peru Sector

Procurement Stage

Transaction Value ($m)

Child and Youth Social Security Institute

Healthcare

Announced

N/A

Design, construction, equipment, operation and maintenance of complementary services to enable the provision of high complexity assistance to 0-17 years old population nationwide.

Chimbote High Complexity Hospital

Healthcare

Announced

N/A

Design, construction, equipment, operation and maintenance of complementary services to enable the provision of high complexity assistance in the Ancash Department.

Piura High Complexity Hospital

Healthcare

Announced

N/A

Design, construction, equipment, operation and maintenance of complementary services to enable the provision of high complexity assistance in the Piura Department.

Arequipa fast monorail

Rail

Announced

N/A

To be defined.

Huancayo - Huancavelica railway

Rail

Announced

N/A

Rehabilitation works (128.7km) and subsequent operation and maintenance phase.

Project

Description

Chillon River regulation works

Reiver

Announced

70,00

20-30 year concession delivery under the DFBOT modality of a dam about 28 MMC useful volume, to store excess surface water in the upper basin of the Chillon River during the flood season (DecemberApril), and later delivery during dry season.

Energy supply to hydroelectric plants

Power Generation

Announced

2700,00

Project under feasibility studies. Government to release information during 2015 second quarter.

Prisons

Announced

N/A

Relocation of 4 correctional facilities currently located within the Lima and Cusco metropolitan areas

14

Build 5 prison substitutes.

Mexico Project

Sector

Procurement Stage

Transaction Value ($m)

Palenque-San Cristóbal Highway PPP

Roads

Announced

661,00

Airports

Announced

6000,00

Construction and subsequent operation of the new airport.

Rapid Train México-Querétaro

Rail

Pre-launch

3600,00

Currently suspended.

Peninsular train Merida – Punta Vendado

Rail

Pre-launch

1180,00

Currently suspended.

Obregon City Bypass

Roads

Pre-launch

73,00

Don Nogales Highway

Roads

Pre-launch

1029,00

Further information has not been given by the Mexican government.

Ciudad del Carmen highway bypass

Roads

Pre-launch

225,00

Construction of a 12km double lane bypass.

Tuxtla Gutiérrez - Villaflores Highway

Roads

Pre-launch

56,50

Improvement 74km single lane highway.

New Airport for Mexico City

15

Description

Construction of single lane and 174km improvement.

Construction of a 34.2km bypass.

Mexico Project

Sector

Procurement Stage

Transaction Value ($m)

Coatzacoalcos a Tuxtla Gutiérrez. Highway

Roads

Pre-launch

69,40

Communic ations

Pre-launch

8593,00

Installation regional 700Mhz network.

Rail

Pre-launch

143,00

32,5km rail lane improvement.

Acapulco Bypass

Roads

Pre-launch

231,30

Further information has not been given by the Mexican government.

Puerto Vallarta Highway

Roads

Pre-launch

132,00

Construction 46.9km road.

I Phase Aguascalientes Guadalajara I Short Rail

Rail

Pre-launch

715,10

188.1km rail lane improvement.

Mexico State Rail Network

Rail

Pre-launch

766,70

Mexico State Massive Rail network construction.

Roads

Pre-launch

429,60

Further information has not been given by the Mexican government.

Shared Movil Service Network Installation

Lagunera Region Rail

Las Varas - Bahía de Banderas Highway

16

Description

Expansion of 4 14,4km lanes.

Mexico Project

Sector

Procurement Stage

Transaction Value ($m)

Logistics platform Isthmus region

Ports

Pre-launch

211,50

Modernization of transport infrastructure for the installation of a logistics platform in the Isthmus region.

Orizaba - Cordoba Peripheral

Roads

Pre-launch

366,40

Construction of a 36.5km peripheral.

Mazatlan Port modernisation

Ports

Pre-launch

702,30

Relocation of Terminal, commercial tourism development, dredging and tender of two new terminals.

17

Description

Paraguay Project

Sector

Procurement Stage

Transaction Value ($m)

Description Duplication of stretches on the San Bernadrino - Cnel. Oviedo and Cnel. Oviedo – 183km of national routes 2 and 7. The project requires 140km of duplication of national routes (REVIEW AT CLOSING AS PREQUALI MAY BE EXPIRED). Project is purely toll based and includes a 30 year concession. The project includes the improvement of several stretches of road and the duplication of existing road stretches Bella Vista Sur Encarnacion, Empalme Acceso Sur - Carapegua, Ytororo - Empalme Ruta 1 and Ita – Itaugua.

Duplication of National routes 2 and 7

Roads

Pre-launch

400,00

Rehabilitation and improvement of routes 1 and 6 of the national road network

Roads

Pre-launch

700,00

Dredging of the Paraguay River

Water

Pre-launch

110,00

The Paraguayan government is seeking the dredging, operation and maintenance of the Paraguay river from the Apa River to the confluence with the Parana River.

Construction of new international airport

Airports

Pre-launch

250,00

The Paraguayan government is looking to establish a PPP for the construction of a new international airport on the grounds of current airport Silvio Pettirossi of Asuncion.

18

P3 Opportunities in Latin America by sector

19

Airports Project

Procurement Stage

Transaction Value ($m)

Country

Description Brazil's civil aviation authority SAC approved the construction of a new airport to serve Rio Grande do Sul state capital Porto Alegre. 3,200m by 45m runways, an international cargo and passenger terminal. Council of public private partnership (PPP), has published a request for expression of interest (RFEOI) to hire consultants to develop feasibility studies. Project cost to be determined.

Rio Grande do Sul airport

Pre-Launch

505,00

Brazil

Uberaba international airport

Pre-Launch

N/A

Brazil

Tender of the Airport Internacional Arturo Merino Benitez

Tendering

700,00

Chile

Airport improvement, maintenance and operation .

Concession Aeródromo de Balmaceda

Announced

31,00

Chile

Enlargement and development of passenger terminal.

Airport Diego Aracena de Iquique (4th tendering offer)

Announced

N/A

Chile

Satisfy specific demands of an international airport (development and expansion).

Airport El Tepual de Puerto Montt (4th tendering offer)

Announced

N/A

Chile

Construction of passenger terminal, road improvements and new parking lots.

Tendering offer Airport Carriel South

Announced

45,00

Chile

Expansion, relocation and improvement of the airfield facilities.

El Dorado II Airport PPP

Announced

N/A

Colombia

Further information has not been given by the Colombian government.

New Airport for Mexico City

Announced

6000,00

Mexico

Construction and subsequent operation of the new airport.

Construction of new international airport

Pre-launch

250,00

Paraguay

20

The Paraguayan government is looking to establish a PPP for the construction of a new international airport on the grounds of current airport Silvio Pettirossi of Asuncion.

Energy Project

Street lighting PPP

Procurement Stage

Transaction Value ($m)

Country

Pre-Launch

N/A

Brazil

Description Feasibility studies were under review by local authorities. No updated information has been published. World Bank has stated interest in project. 8GW Hydro power plant requiring an estimated investment of US$12.8 billion.

Sào Luiz do Tapajós Hydropower Plant Complex

Planned

9200,00

Brazil

PPP for the Machu PicchuAbancay-Cotaruse power transmission line.

Unknown

90,00

Peru

Construction and implementation of a 220kV transmission and 200km power line.

PPP for the Mantaro – Caraveli, Montalvo transmission line

Unknown

146,00

Peru

Contract suspended. Government currently evaluating new procurement.

Announced

2700,00

Peru

Project under feasibility studies. Government to release information during 2015 second quarter.

Energy supply to hydroelectric plants

21

Healthcare Project

Procurement Transaction Stage Value ($m)

Country

Description

Child and Youth Social Security Institute

Announced

N/A

Peru

Design, construction, equipment, operation and maintenance of complementary services to enable the provision of high complexity assistance to 0-17 years old population nationwide.

Chimbote High Complexity Hospital

Announced

N/A

Peru

Design, construction, equipment, operation and maintenance of complementary services to enable the provision of high complexity assistance in the Ancash Department.

Piura High Complexity Hospital

Announced

N/A

Peru

Design, construction, equipment, operation and maintenance of complementary services to enable the provision of high complexity assistance in the Piura Department.

22

Ports Procurement Stage

Transaction Value ($m)

Country

International ground port Antofagasta

Announced

45,00

Chile

Cartagena Dredging

Announced

60,00

Colombia

Logistics platform Isthmus region

Pre-launch

211,50

Mexico

Modernization of transport infrastructure for the installation of a logistics platform in the Isthmus region.

Mazatlan Port modernisation

Pre-launch

702,30

Mexico

relocation of Terminal, commercial tourism development, dredging and tender of two new terminals.

Project

23

Description

Construction of a new 20 hectares port.

Further information has not been given by the Colombian government.

Rail Project

Procurement Stage

Transaction Value ($m)

Country

Lucas do Rio Verde-Campinorte Railroad Concession

Pre-Launch

3650,00

Brazil

35 year concession. 1920km extension Construction to be completed up to the 5th year of the concession term.

Maracaju-Lapa Railroad Concession

Pre-Launch

3130,00

Brazil

35 year concession. 989km extension Construction to be completed up to the 5th year of the concession term.

Blue line PPP of Curitiba metro

Pre-Launch

2000,00

Brazil

Construction and 35 year concession of a new rail lane.

Brazil

Overall, the railway system will be 431km long and have two routes, the Norte-Sul (north-south) and the Leste-Oeste (eastwest). Phase I, budgeted at 5.5bn reais, involves a public-private partnership to build a 135km railway linking the city of Americana to state capital São Paulo.

Colombia

Development of an underground transportation system for the city of Bogota. Initial designs include 27km of line and 27 stations, fully underground and electrical at an estimated investment cost of about US$7 trillion.

Sao Paulo Intercity train network PPP

Pre-launch

Bogota Metro PPP

Announced

Lima Metro Line 3

Announced

9300,00

N/A

Peru

Consultant is developing the pre-investment study project level profile. Award provided for III quarter 2016.

Peru

Preparation of final engineering studies (design), financing, construction, electromechanical equipment, rolling stock acquisition, operation and 30km track maintenance.. Scheduled Award 2017.

1800,00 Lima Metro Line 4

24

Announced

Description

Rail Procurement Stage

Transaction Value ($m)

Country

Arequipa fast monorail

Announced

N/A

Peru

To be defined.

Huancayo - Huancavelica railway

Announced

N/A

Peru

Rehabilitation works (128.7km), and subsequent operation and maintenance phase.

Rapid Train México-Querétaro

Pre-launch

3600,00

Mexico

Currently suspended.

Peninsular train Merida – Punta Vendado

Pre-launch

1180,00

Mexico

Currently suspended.

Lagunera Region Rail

Pre-launch

143,00

Mexico

32.5km rail lane improvement.

I Phase Aguascalientes Guadalajara I Short Raoil

Pre-launch

715,10

Mexico

188.1km rail lane improvement.

Mexico State Rail Network

Pre-launch

766,70

Mexico

Mexico State Massive Rail network construction.

Project

25

Description

Roads Procurement Stage

Transaction Value ($m)

Country

Road concession Longitudinal Chiloé

Announced

263,00

Chile

Improvement and expansion of a 101km dual highway.

Access road concession to Valdivia

Announced

209,00

Chile

Improvement and expansion of a dual highway. Extent to be determined by the Chilean Government.

Connection road 78 until 68

Announced

107,84

Chile

Connectivity improvement between the to routes (78 and 68).

Conurbación La Serena Coquimbo

Announced

133,00

Chile

Improve the road infrastructure and the sustainability of developing tourism .

Improvement of connectivity road 68

Announced

200,00

Chile

Improve the connectivity conditions between two regions (Metropolitana and Valparaiso, increase the design speed and improve the road safety.

improvement Ruta Nahuelbuta

Announced

221,21

Chile

Enlargement of the 55km actual into a double carriageway.

Relicitación Concesión Camino Nogales – Puchuncaví

Announced

148,00

Chile

Improvement of a 27km highway.

Tender offer of the tunel "El Melon"

Announced

120,00

Chile

Construction, maintenance and exploitation and improvement current service levels.

Project

26

Description

Roads Procurement Stage

Transaction Value ($m)

Country

Road G21, Access to the ski center

Announced

107,00

Chile

Improvement of a 30km highway.

Road G-66, Camino de La Fruta

Announced

N/A

Chile

Improvement and maintenance of a 138km urban road.

Autopista Mar 1 highway PPP

Pre-launch

621,70

Colombia

Tunnel construction (4.7km), double lane (33km), improvement (34km), bridges (50).

Villavicencio - Yopal Highway PPP

Tendering (TdR published 1-2015)

1064,00

Colombia

Construction double lane (48km) and rehabilitation (212km).

Autopista Mar 2 highway PPP

Pre-launch

670,00

Colombia

Improvement (118km), tunnels (2.2km), construction single lane (15.5km).

Sisga - El Secreto highway PPP

Tendering (TdR published 2-5-15

395,00

Colombia

Rehabilitation (137km).

Stder. Quilichao – Popayán highway PPP

Tendering (TdR published 1-2015)

680,90

Colombia

Construcion double lane (76km), 36 bridges, 7 bypass.

Puerta de Hierro - Cruz del Viso Tendering (TdR - Palmar de Varela highway published 1-20PPP 15)

510,64

Colombia

Improvement 175km.

Project

27

Description

Roads Procurement Stage

Transaction Value ($m)

Country

Neiva – Girardot highway PPP

Pre-launch

553,00

Colombia

Construction of a double lane (79km) and improvement (190km).

Barrancabermeja – Bucaramanga: highway PPP

Pre-launch

1148,90

Colombia

Construction of a double lane (66km), single lane (128km), and improvement (67km).

Bogota - Villavicencia Sector 1

Pre-launch

851,00

Colombia

Construction of a double lane, third lane carril and improvement.

Tendering (TdR published 1-2015)

1276,60

Colombia

Construction double lane (22km), single lane (32km) and rehabilitation (422km).

Pasto – Popayán highway PPP

Announced

1236,00

Colombia

Double lane and several bypass. Extent to be defined.

Barbosa – Bucaramanga highway PPP

Announced

N/A

Colombia

Double lane (10km), improvement (179km), bypass (3), rehabilitation (62km) and Third lane (17km).

Bucaramanga – Pamplona highway PPP

Announced

N/A

Colombia

Construction 22km roadlane, improvement (53km) and rehabilitation (77km).

Project

Santana - Mocoa – Neiva highway PPP

28

Description

Roads Procurement Stage

Transaction Value ($m)

Country

Pamplona – Cúcuta highway PPP

Announced

N/A

Colombia

Rehabilitation (43km) , and construction second lane (47km).

Sogamoso – Aguazul – Maní highway PPP

Announced

1254,00

Colombia

Improvement of 172km and 2 bypass.

Bogota - Girardot 3 PPP

Announced

1021,28

Colombia

Construction of double lane. Further information has not been given by the Colombian government.

Cucuta-Ocaña highway PPP

Announced

534,00

Colombia

Improvement of 169km, rehabilitation 23km and 2 bypass.

Pamplona - Duitama Highway PPP

Announced

354,00

Colombia

Rehabilitation (213km), improvement (95km) and 3 bypass.

Barbosa - Zipaquira Highway PPP

Announced

1685,00

Colombia

Double lane (76km), improvement (107km), rehabilitation (172km), third lane (14km) and 4 bypass.

Chinchina - Mariquita

Announced

310,60

Colombia

Rehabilitation (33km) , improvement (103km), Viaduct (1) and bypass (3).

Longitudinal de la sierra 4

Announced

340,00

Peru

Project

29

Description

Improvement and rehabilitation (117km), initial maintenance (280km); and its subsequent maintenance and operation.

Roads Procurement Stage

Transaction Value ($m)

Country

Longitudinal de la sierra 5

Announced

N/A

Peru

Palenque-San Cristóbal Highway PPP

Announced

661,00

Mexico

Construction single lane and 174km improvement.

Obregon City Bypass

Pre-launch

73,00

Mexico

Construction of a 34.2km bypass.

Don Nogales Highway

Pre-launch

1029,00

Mexico

Further information has not been given by the Mexican government.

Ciudad del Carmen highway bypass

Pre-launch

225,00

Mexico

Construction of a 12km double lane bypass.

Tuxtla Gutiérrez - Villaflores Highway

Pre-launch

56,50

Mexico

Improvement 74km single lane highway.

Coatzacoalcos a Tuxtla Gutiérrez. Highway

Pre-launch

69,40

Mexico

Expansion of 4 14.4km lanes.

Acapulco Bypass

Pre-launch

231,30

Mexico

Further information has not been given by the Mexican government.

Project

30

Description

Initial Periodic maintenance and the consequent operation and maintenance of 422km track.

Roads Procurement Stage

Transaction Value ($m)

Country

Puerto Vallarta Highway

Pre-launch

132,00

Mexico

Construction 46.9m road.

Las Varas - Bahía de Banderas Highway

Pre-launch

429,60

Mexico

Further information has not been given by the Mexican government.

Orizaba - Cordoba Peripheral

Pre-launch

366,40

Mexico

Construction of a 36.5km peripheral.

Project

Duplication of National routes 2 and 7

Rehabilitation and improvement of routes 1 and 6 of the national road network

31

Pre-launch

Pre-launch

400,00

700,00

Description

Paraguay

Duplication of stretches on the San Bernadrino - Cnel. Oviedo and Cnel. Oviedo –183km of national routes 2 and 7. The project requires 140km of duplication of national routes. Project is purely toll based and includes a 30 year concession.

Paraguay

The project includes the improvement of several stretches of road and the duplication of existing road stretches Bella Vista Sur Encarnacion, Empalme Acceso Sur - Carapegua, Ytororo Empalme Ruta 1 and Ita – Itaugua.

Water Project

Rolim de Moura Wastewater PPP

Procurement Stage

Transaction Value ($m)

Country

Description

Pre-Launch

36,00

Brazil

Concession approved on February 5, 2015. Project to be given in a 30 year concession for the provision of water and wastewater services to the city.

Santo André Wastewater Concession

Pre-Launch

N/A

Brazil

35 year concession for the construction and operation of a wastewater managing facility through PPP financing. Feasibility studies are being made and by October 2014, the authorities of Sao Andre declared they still have interest in the project.

Sao Paulo desalination PPP

Pre-Launch

538,00

Brazil

Very recently launched. The state has requested companies to express their interest in preparing feasibility studies.

Minas Gerais river transposition project

Pre-Launch

383,00

Brazil

Redirecting water from the Paraopeba river to the Manso river (supplies Belo Horizonte). Governor is seeking federal government support. 20-30 year concession delivery under the DFBOT modality of a dam about 28 MMC useful volume, to store excess surface water in the upper basin of the Chillon River during the flood season (December-April), and later delivery during dry season.

Chillon River regulation works

Dredging of the Paraguay River

32

Announced

70,00

Peru

Pre-launch

110,00

Paraguay

The Paraguayan government is seeking the dredging, operation and maintenance of the Paraguay river from the Apa River to the confluence with the Parana River.

Other Procurement Stage

Transaction Value ($m)

Country

Military College of Manaus

Pre-Launch

N/A

Brazil

Military College of Manaus announced partnership for recovery of Epaminondas street in downtown Manaus.

Minas Gerais Aerospace Center

Pre-Launch

33,30

Brazil

Project structuring proposals were filed on November 2014. 35 year concession. Bidding process set to be launch by the end of 2015 or first trimester 2016.

Praia Mansa cultural complex PPP

Pre-Launch

N/A

Brazil

Construction of cultural and touristic complex Public hearings were planned to take place during last trimester of 2014. No recent information available .

Rio Digital - Optic Fiber Connection Project

Pre-Launch

N/A

Brazil

Declared as a priority PPP Project by Secretary Julio Bueno In late January, 2015. Currently undergoing feasibility studies.

Sorocaba Bus Rapid Transit (BTR) PPP project.

Pre-Launch

NA

Brazil

PPP Program Administrator and local agencies are planning public hearings. Project cost to be defined.

Pre-tendering

387,00

Chile

Reservoir to irrigate which provides agricultural and economic development.

Nuevo Complejo Fronterizo los Libertadores

Tendering

84,00

Chile

The main connection between Chile and Mercosur (highest flow of people and goods). The goal is to build a control and inspection building and a hosting building for officers, among others.

Civic center de Valdivia

Announced

25,68

Chile

Construction of Valdivia civic neighbourhood to create a government identity.

Project

Embalse Punilla

33

Description

Other Procurement Stage

Transaction Value ($m)

Country

Underground parking Centro Cívico Concepción

Announced

12,00

Chile

Construction of underground parking lots with a 431 car capacity.

Cabel railway Bicentenario

Announced

29,63

Chile

Public transport system (4.5km line) operation.

Iquique Cabel railway

Announced

40,00

Chile

Railway improvement.

Concessionaire

323,00

Peru

Connection of 180 municipalities.

Project

National Fibre Optic Backbone Project

Description

LNG Supply System

Announced

568,00

Peru

Concession to design, finance, construction, operation and maintenance of a supply system which will provide a reserve of natural gas liquid produced in the gas liquefaction plant with a capacity of 130,000 m3.

Relocation of 4 correctional facilities currently located within the Lima and Cusco metropolitan areas

Announced

N/A

Peru

Building5 prison substitutes.

Shared Movil Service Network Installation

Pre-launch

8593,00

Mexico

34

Installation regional 700Mhz network.

BD#23258080v1

Disclaimer Norton Rose Fulbright US LLP, Norton Rose Fulbright LLP, Norton Rose Fulbright Australia, Norton Rose Fulbright Canada LLP and Norton Rose Fulbright South Africa Inc are separate legal entities and all of them are members of Norton Rose Fulbright Verein, a Swiss verein. Norton Rose Fulbright Verein helps coordinate the activities of the members but does not itself provide legal services to clients. References to ‘Norton Rose Fulbright’, ‘the law firm’ and ‘legal practice’ are to one or more of the Norton Rose Fulbright members or to one of their respective affiliates (together ‘Norton Rose Fulbright entity/entities’). No individual who is a member, partner, shareholder, director, employee or consultant of, in or to any Norton Rose Fulbright entity (whether or not such individual is described as a ‘partner’) accepts or assumes responsibility, or has any liability, to any person in respect of this communication. Any reference to a partner or director is to a member, employee or consultant with equivalent standing and qualifications of the relevant Norton Rose Fulbright entity. The purpose of this communication is to provide general information of a legal nature. It does not contain a full analysis of the law nor does it constitute an opinion of any Norton Rose Fulbright entity on the points of law discussed. You must take specific legal advice on any particular matter which concerns you. If you require any advice or further information, please speak to your usual contact at Norton Rose Fulbright.

36