INFRASTRUCTURE ASSET MANAGEMENT LIFE CYCLE OPTIMIZATION

INFRASTRUCTURE ASSET MANAGEMENT LIFE CYCLE OPTIMIZATION Supports Your Project Lifetime 1 2 Capacity 3 4 5 Infrastructure Asset Management Life...
Author: Ella Schäfer
10 downloads 2 Views 8MB Size
INFRASTRUCTURE ASSET MANAGEMENT LIFE CYCLE OPTIMIZATION Supports Your Project

Lifetime

1 2

Capacity

3

4

5

Infrastructure Asset Management Life Cycle Optimization

Basis Grundlagen

Inspection history, maintenance history, BoQs, quality of data Inspektionshistorie, Instandhaltungshistorie, Massenermittlung, Datenqualität

To enable proper and long-term maintenance planning for a huge and heterogeneous set of engineering structures VCE developed an integrated life cycle management tool that offers

Visual Inspection Indicator

Assessment Bewertung

tailored solutions with regard to the given location, involved materials, fabricates and the underlying design code at the time of construction.

 Surveillance  Checking  Inspection of structures

The focus of the model is the prediction of the condition development of civil engineering structures and

Loading Indicator  Design (underlying code)  Load modelling  FE-simulation  Traffic progression

 Überwachung  Kontrolle  Prüfung von Kunstbauten

their components, which is calculated for every structure/component dependent on the structure type, de-

Monitoring Indicator  Dynamic measurements  Material testing  Other field tests  BRIMOS® database

 Bemessung und zugrundeliegende Norm  Lastmodellierung  FE-Simulation  Verkehrsentwicklung

 Dyn. Messung  Materialprüfung  andere Sonderprüfmethoden  BRIMOS® Datenbank

sign, product, age, documented condition and the norm status in force at the respective construction time. In Condition Index

addition upper and lower limits of the condition process are determined by means of probabilistic methods. The result – a maintenance plan for all bridges and components – is the basis for optimization calculations regarding costs and availability.

Ageing Model Alterungsmodell

Für die Erhaltungsplanung einer großen Anzahl verschiedenartiger Bauwerke über einen langen Zeitraum

Service life [year]

Zeit [Jahre]

1

Bearings / Lager Bridge equipment / Ausrüstung Pavement / Fahrbahnbelag Expansion joints / Fahrbahnübergang etc.

2 3 4

wurde von VCE ein integrales Life Cycle Modell entwickelt, das an die Gegebenheiten und speziellen Anforderungen jedes

5

einzelnen Projekts angepasst werden kann.

Cost Model Kostenmodell

Kern des Modells ist die Prognose der Zustandsentwicklung von Ingenieurtragwerken und deren Bauteilen, die für jedes Bauwerk/

6.000.000 [€] 5.000.000 4.000.000 3.000.000 2.000.000 1.000.000 0

Accumulated maintenance costs Akkumulierte Erhaltungskosten

Bauteil abhängig vom Bauwerkstyp, der Bauart, des Fabrikats, des Alters, des dokumentierten Erhaltungszustandes und der jeweils zum Errichtungszeitpunkt gültigen Normenlage berechnet werden. Mit Hilfe probabilistischer Methoden werden zudem obere und untere Grenzen des Zustandsverlaufes erarbeitet. Das Ergebnis – ein Erhaltungsplan für sämtliche Brücken und Bauteile – ist

Obj. No.

Life Cycle Prognosis Life Cycle Prognose

Grundlage für Optimierungsberechnungen hinsichtlich Kosten und Verfügbarkeit.

Obj. No.

Analysis period Maintenance concept

Obj. No.

1

Condition Index (t)

2 3

Basis for maintenance planning (15/20/30/… years) Basis für Erhaltungsplanung (15/20/30/… Jahre)

Knooppunt

Kleinpolderplein

Knooppunt

Kethelplein

Harmsen brug

Thomassen Tunnel

Brielsebrug

A15

A20 Knooppunt

Terbregseplein

A20

Benelux Tunnel Hartelkruis

Botlekbrug

Hartelbrug SPIJKENISSE

Botlektunnel

A16

Vaan Plein

Knooppunt

Benelux

2001

2061

Betrachtungszeitraum Erhaltungskonzept

2081

2101

Obj. No. Obj. No. Obj. No. Replacement/Austausch

Year/Jahr 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047

Pavement / Fahrbahn

A15

time span for maintenance / Zeitspanne für Erhaltungsmaßnahmen X ... average end of life expectancy / mittleres Ende der Lebenserwartung

A15 Knooppunt

A16

X

etc.

Ridderster

Ridderkerk

X

Bearings / Lager

Knooppunt

A29

X

Edge beam / Randbalken

Knooppunt

Ijsselmonde

X

Expansion joints / Fahrbahnübergang

Van Brienenoordbrug

Knooppunt

5 1981

Maintenance Planning Erhaltungsplan

ROT TERDAM

A4

4

Optimization – Network Level Optimierung auf Netzebene

 Construction sections  Cross-asset aspects  Structural condition requirements initial/in operation/handover  Minimization of costs  Maximization of availability  Statistical scatter  Environmental costs

expected investment costs / zu erwartende Erhaltungskosten

 Bauabschnitte  Anlagenübergreifend  Zustandsanforderungen Abnahme/ Betrieb/Übergabe  Kostenminimierung  Verfügbarkeitsmaximierung  Statistische Streuung  Umweltkosten

Asset Management Approach

Input Data Eingangsdaten

Input Data Eingangsdaten The required input data includes information on all

Die erforderlichen Eingabedaten enthalten Informationen über alle

structures (age, geometric data, construction type, ma-

Bauwerke (Alter, geometrische Daten, Konstruktionsart, Material, Pläne,

terial, drawings, static calculations) as well as condition

statische Berechnungen) sowie zustandsrelevante Informationen

relevant information (ratings, results of visual inspec-

(Bewertungen, Ergebnisse visueller Inspektionen, Monitoring-Ergeb-

tions, monitoring results). Historic ratings and treat-

nisse). Historische Bewertungen und Verfahren sind auch relevant. Alle

ments are also relevant. All information is structured in

Informationen werden zur weiteren Untersuchung in eine Datenbank

a database for further analysis.

eingegeben.

Condition Classes Zustandsklassen

Maintenance Plan IH-Plan

The algorithms implemented in the asset man-

Condition Data Zustandsdaten

Structural Type Anlagenart

2

Drawings Planunterlagen

Structural Age Anlagenalter

agement software calculate the future ageing behaviour including the upper and lower limits by

Inspection Results Inspektionsergebnisse

means of probabilistic methods. The prediction is done for

Condition Overhead Contact Lines Zustand Oberleitung Condition Tunnels Zustand Tunnel Condition Bridges Zustand Brücken Condition Retaining Walls Zustand Stützmauern

each individual structure on structural member level and Die in der Asset-Management-Software angewandten Algorithmen berechnen das zukünftige Alterungsverhalten,

Alterungsmodelle LC-Prognose

einschließlich der Ober- und Untergrenzen, durch probabilistische Methoden. Für jedes Bauwerk wird auf Bauteilebene eine

Ageing Models Alterungsmodelle

Vorhersage getätigt und dann mit einer globalen Vorhersage für jedes Bauwerk kombiniert.

Optimierung The optimization process is based on the ageing prediction, available treatments, treatment costs, non-availability costs and external costs like environmental costs if needed. Der Optimierungsprozess basiert auf der Alterungsvorhersage, den vorhandenen Verfahren, Verfahrenskosten, Kosten bei Nichtverfügbarkeit und bei Bedarf externen Kosten wie Umweltkosten.

Output Ergebnis

Real ageing behaviour = forecast model Reales Alterungsverhalten = Prognosemodell

Development of Treatments Maßnahmenableitung Road Infrastruktur Straßeninfrastruktur

Railway Infrastruktur Schieneninfrastruktur

Bridges Overhead Brücken Contact Lines Retaining Walls Oberleitungen Stützmauern Noise Barriers Lärmschutzwände Mechanical & Electrical Equipment Permanent Way Elektrotechnik Oberbau Pavement Tunnels Fahrbahn Tunnel

Gantries Überkopfwegweiser

Cross-Asset Maintenance Plan Gewerkeübergreifender Erhaltungsplan

Grouping & Optimization of Measures Maßnahmen Bündelung & Optimierung

Maintenance not yet carried out => measures to be planned Instandsetzung noch nicht erfolgt => Maßnahmen einzuplanen Real ageing behaviour worse than model => measures to be planned earlier Reales Alterungsverhalten schlechter als Modell => Maßnahmen früher einzuplanen

structure level and on global level. Die Ergebnisse des Prozesses sind optimierte Erhaltungspläne für jedes Bauwerk und auf globaler Ebene für den gesamten Bestand. Diese Erhaltungspläne beinhalten auch die Verfahrenstypen und die Kosten auf Bauwerksebene und auf globaler Ebene.

160

155

165

170

175

180

185

190

195

200

205 210 215 Track [km] / Strecke [km]

Example: single-span beam − slab − reinforced concrete Beispiel: Einfeldträger − Platte − Stahlbeton 0

0

10

20

30

40

50

60

70

80

90

100

110

10

Abutment, pier, bearing structure, sealing, equipment

20 30

Abutment, pier, bearing structure, sealing, equipment, edge beams, bearings, expansion joints ...

Widerlager, Pfeiler, Tragwerk, Abdichtung, Ausrüstung

40

Widerlager, Pfeiler, Tragwerk, Abdichtung, Ausrüstung, Randbalken, Lager, Übergangskonstruktion

1

2

3

4

Total ranking Gesamt Ranking 5

0

10

Medium condition note Mittlere Zustandsnote

20

30

40

iStructures Bridge: single-span beam - slab - reinforced concrete iBauwerke Brücken: Einfeldträger-Platte-STB 50

60

70

80

90

100

110

Age [years] / Bauwerksalter [Jahre]

(Wirtschaftlichkeit und Verfügbarkeit) 2025

Maintenance Plan

2024

Erhaltungsmaßnahmen-Pläne

2023 2022 2021 2020

ules for each individual structure and on global level for the nance plans also include the treatment types and the costs on

5

Real ageing behaviour better than model => measures to be planned later Reales Alterungsverhalten besser als Modell => Maßnahmen später einzuplanen

The results of the process are optimized maintenance schedwhole included asset stock (block building). These mainte-

4

Ageing Models LC-Prediction

then combined to a global prediction for each structure.

Optimization

3

Condition index Zustandsindex

Algorithmus

Catalogue of Measures Maßnahmenkatalog

Condition note Zustandsnote

Algorithm

1

2019

Condition Prediction 2025+ Zustandsprognose 2025+

Overhead Contact Lines Oberleitung Permanent Way Oberbau Bridges Brücken Retaining Walls Stützmauern

1018 1017 2016 2015 2014 2013

155

160

165

170

175

180

185

190

195

200

205 210 215 Track [km] / Strecke [km]

Ageing Model Alterungsmodell

Outcome: Optimized Maintenance Schedules regarding Costs Optimierte Erhaltungspläne hinsichtlich Kosten Maintenance Costs Erhaltungskosten

Theoretical Ageing Model

Initial condition Anfangszustand

Theoretisches Alterungsmodell

Bridges Brücken Tunnels Tunnel Gantries Überkopfwegweiser

Defined LIMIT STATE Definierter Grenzzustand a

/3 (e-a)

/3 (e-a)

1

/3 (e-a)

1

1

max

Schwerpunkt

Zeit

A(t) = p0 + p1 · t + p2 · t² + p3 · t³

A(t) dt Wahrscheinlichkeit des Abganges in %

Safety level Sicherheitsebene Lifetime Lebensdauer

Lower bound life expectancy Lebenserwartung untere Grenze

Sum Summe Accumulatd sum Akkumulierte Summe

e

Design Upper bound life life expectancy rechn. Lebenserwartung Lebensdauer obere Grenze

Years / Jahre

Outcome: Optimized Maintenance Schedules regarding Infrastructure Availability

Ageing Model for Structural Members

Optimierte Erhaltungspläne hinsichtlich Verfügbarkeit

Alterungsmodell für Bauteile

Nonavailability Hours / Nichtverfügbarkeitsstunden 1.800

Local Ageing of Components Lokale Alterung Bauteile

80

90

0,40

10

0,80

5

15

1,20

20

1,60

25

2,00

0,00

0

10

20

30

40

50

60

70

80

90

0,50 1,00 1,50 2,00 2,50 3,00

0,00

0

10

20

0

10

20

30

40

50

60

30

40

50

60

70

80

90

0,20

80

90

100

Widerlager, Pfeiler, Tragwerk, Abdichtung, Ausrüstung, Randbalken, Lager, Übergangskonstruktion ...

40

0,60

Optimized maintenance strategy Optimierte Erhaltungsstrategie

0,80

3,50 1,00

Nutzungsdauer = 90 Jahre Höhere Lebenszykluskosten

Ageing: delayed maintenance

Alterung: verspätete Instandhaltung

Reduced service life − Premature reinvestment Same use of resources as in optimal case

Reduzierte Nutzungsdauer − vorzeitige Reinvestition gleicher Mitteleinsatz wie optimal

Ageing: ”do-nothing“-strategy

Alterung: „do-nothing“-Strategie

Reduced service life − Premature reinvestment

Reduzierte Nutzungsdauer − vorzeitige Reinvestition

99.20%

99.40%

99.00%

Years / Jahre

0

0

10

20

30

40

50

60

70

80

90

10 30

Maintenance Erhaltung

Maintenance Erhaltung

Reinvest

38,500

43,500

48,500

2032 2030 2028

0

2026

20

2024

30

2022

40

2020

Maintenance Erhaltung

Maintenance Erhaltung

0

Reinvest

0 10 20 30

Reinvest

Treatments: highway bridges Maßnahmen: Autobahnbrücken

Location: central reservation crossing Standort: Mittelstreifenüberfahrt

Treatments: ASPHALT pavement Maßnahmen: ASPHALT-Fahrbahn

Treatments: flyovers Maßnahmen: Autobahnüberführungen

Potential, additional central reservation crossing Potentielle, zusätzliche Mittelstreifenüberfahrt

Treatments: pavement on bridges along the ASPHALT pavement Maßnahmen: Brücken-Überbau entlang ASPHALT-Fahrbahn

2018

30

Reinvest

Treatments: CONCRETE pavement Maßnahmen: BETON-Fahrbahn

2016

20

Maintenance Erhaltung

Location: engineering structures Standort: Kunstbauten

2019

10

40

33,500

2033

10

40

28,500

2036 2034

20 40

100

23,500 2042

2040 2038

A5 18 B7 No 1

Service life = 90 years Higher life-cycle costs

Condition index Zustandsindex

Alterung: verspätete Instandhaltung

Condition index Zustandsindex

Ageing: delayed maintenance

Condition index Zustandsindex

Nutzungsdauer = 90 Jahre Optimale Lebenszykluskosten

Condition index Zustandsindex

Age [years] Bauwerksalter [Jahre]

Service life = 90 years Optimal life-cycle costs

Reduced Speed reduzierte Geschwindigkeit

99.60%

Grafisches Streckenband inklusive bauliche Erhaltungsmaßnahmen

Lebenszyklus Optimierung Alterung: Sollverlauf

99.80%

Graphical Strip Map including Maintenance Treatments

Optimization of Life-Cycle Costs Ageing: target progress

100.00%

Standard Hours / Normalstunden Driving Direction not available / Fahrtrichtung gesperrt Closed Lane Fahrspur gesperrt

”do-nothing“-strategy „do-nothing“ -Strategie

Years / Jahre

Annual Availability Level / Jährliche Verfügbarkeit

Reduced Speed reduzierte Geschwindigkeit

Abutment, pier, bearing structure, sealing, equipment, edge beams, bearings, expansion joints ...

15

30 Widerlager, Pfeiler, Tragwerk, 35 Abdichtung, Ausrüstung

0,40

70

10

20 Abutment, pier, bearing 25 structure, sealing, equipment

Edge beams Randbalken

Sealing Abdichtung

Condition Index

5

0

A5 Ü36

70

Central reservation crossing 7 Mittelstreifenüberfahrt 7 End of contract section Baulosende

60

A5 Ü35

50

AST Poysbrunn

40

A5 Ü34

30

Central reservation crossing 6 Mittelstreifenüberfahrt 6

20

A5 Ü33 A5 33

10

A5 Ü32

0

A5 32

0,00

0

A5 Ü30 A5 Ü31

90

Central reservation crossing 5 Mittelstreifenüberfahrt 5

30

80

A5 31

20

70

200

A5 Ü29

10

60

Age [years] Bauwerksalter [Jahre]

400

A5 30 A5 Ü28

0

50

600

Peak Hours / Spitzenstunden Driving Direction not available Fahrtrichtung gesperrt Closed Lane Fahrspur gesperrt

Structure Type: Bridge / Single-span beam – slab – reinforced concrete Bauwerkstyp: Brücke / Einfeld-Träger – Platte – Stahlbeton

Equipment Ausrüstung 40

800

Global Ageing Curve per Structure Resultierende globale Alterung (bauwerksspezifisch)

AST Walterskirchen

0

90

A5 Ü27

Superstructure Tragwerk

80

Central reservation crossing 4 Mittelstreifenüberfahrt 4

6

70

A5 29 A5 Ü26

12

60

A5 27 B7 No 2 A5 28 A5 Ü25

5

1.000 50

A5 Ü23 A5 Ü24 A5 26

4

40

A5 25

8 10

30

A5 Ü22

3

20

A5 Ü21

2

6

10

Central reservation crossing 3 Mittelstreifenüberfahrt 3

4

0

AST Wilfersdorf Nord

2

1

A5 24

0

A5 23

90

A5 Ü19

80

Central reservation crossing 2 Mittelstreifenüberfahrt 2

70

A5 20 A5 21 A5 22 A5 S3a

60

A5 Ü18

50

A5 Ü17

40

AST Wilfersdorf Süd

30

A5 Ü16

20

A5 19

10

Central reservation crossing 1 Mittelstreifenüberfahrt 1

0

1.200

Expansion joints Fahrbahnübergänge

Start of contract section Baulosanfang

0

1.400

A5 Ü20

Abutments, piers Widerlager, Pfeiler

1.600

Reference Projects: Roadway Referenzprojekte: Straße Bypass Zwettl

A-Lanes A15 Maasvlakte – Vaanplein

Lower Austria, Austria / Niederösterreich, Österreich

The Netherlands / Niederlande

The roadway project bypass Zwettl is

Die 11,7 km lange Orts-Umfahrung Zwettl

Providing of an integral Life Cycle Concept for

Erstellung eines integralen Life Cycle Konzepts

represented by a 11.7 km long road section.

soll in den nächsten Jahren im Rahmen eines

120 bridges, tunnels, retaining walls and noise

für 120 Brücken, Tunnel, Stützmauern und

The contract and operation period has been

PPP-Projekts errichtet und 25 Jahre (2018–2043)

barriers. For newly built structures mainte-

Lärmschutzwände. Für neu zu errichtende Bau-

defined with 25 years (2018–2043).

lang betrieben werden.

nance plans over 20 years were generated, for

werke wurden Erhaltungspläne über 20 Jahre

Client: Granit GmbH, Graz

Auftraggeber: Granit GmbH, Graz

already existing structures the maintenance

erstellt, für bestehende Bauwerke über 25 Jahre

Maintenance Concept (LCA & LCC) for 25 years

Erhaltungskonzept (Maßnahmen-, Zeit- und

plans span both – the 5 year construction

(Bau- und Erhaltungsphase).

Kostenplanung) für 25 Jahre

phase and the 20 year operation phase.

Auftraggeber: A15 A-Lanes

Client: A15 A-Lanes

© A15 A-Lanes

Bridge Object 1618-150

BAB A9 AS Lederhose – Border Thuringia–Bavaria

New Jersey, USA

Germany / Deutschland

All relevant findings of a visual inspection

Alle Ergebnisse einer visuellen sowie einer

VCE developed a maintenance concept for

Erstellung eines Erhaltungskonzepts für 130

and a dynamic bridge investigation were in-

dynamischen Untersuchung wurden in dem

the 130 engineering structures comprised on

Ingenieurtragwerke auf einem 45 km langen

corporated into a theoretical lifecycle model.

theoretischen Lebenszyklus-Modell hinsichtlich

a 45 km long highway section for a timeframe

Streckenabschnitt für die nächsten 20 Jahre

Recommendations for retrofit interventions

notwendiger Instandhaltungsmaßnahmen und

of 20 years. The concept had to be consistent

unter Einhaltung der DIN 1076 und der Funkti-

were given, evaluating their consequences

deren Auswirkungen auf die Restlebensdauer

with DIN 1076 and had to meet the require-

onsanforderungen der RI-EBW-PRÜF.

on the remaining lifetime and the mainte-

und die Erhaltungskosten verwertet.

ments defined in the guideline RI-EBW-PRÜF.

Auftraggeber: Alpine Bau GmbH

nance costs.

Auftraggeber: EU Kommission FP7

Client: Alpine Bau GmbH

Client: EU Comission FP7

A5 Northern Motorway Schrick – Poysbrunn

Research Project Smooth Operator

Lower Austria, Austria / Niederösterreich, Österreich

Österreichischen Forschungsförderungsgesellschaft (FFG)

The project is represented by a 25 km long

Ein 25 km langes Teilstück der A5 soll als

For two years VCE did intensive research in

VCE forschte zwei Jahre intensiv im Bereich

section of the A5 motorways and will be op-

PPP-Projekts errichtet und 25 Jahre betrieben

the scope of structural maintenance meas-

des Einflusses von baulichen Erhaltungsmaß-

erated for 25 years. A maintenance concept

werden. Ein Erhaltungskonzept wurde für die

ures and their impact on the availability of

nahmen auf die Verfügbarkeit der Straßen-

has been developed for the entire highway

gesamte Strecke bestehend aus dem Stra-

road infrastructure. Focus of the project was

infrastruktur. Projektschwerpunkt war die

section consisting of pavement, 40 bridges,

ßenoberbau, 40 Brücken, Lärmschutzwänden

the increase in efficiency of traffic and use of

Steigerung der Effizienz des Verkehrs und der

noise barriers and gantries.

und Überkopfwegweisern erstellt.

infrastructure by means of information and

Infrastrukturnutzung durch Informations- und

Client: PORR Bau GmbH

Auftraggeber: PORR Bau GmbH

communications systems.

Kommunikationssysteme.

S6 Expressway

New Danube Bridge Linz

Austria / Österreich

Linz, Austria / Linz, Austria

Preparation of a maintenance concept and

Erstellung einer umfassenden Lebenszyklus-

As part of an issued realization competition

Im Zuge eines Realisierungswettbewerbes für

the maintenance measures to be derived for

analyse und der daraus abzuleitenden Erhal-

a Life Cycle Costs Analysis was conducted for

die Errichtung der neuen Donaubrücke Linz

a route section of the S6 with approx. 100

tungsmaßnahmen für einen Streckenabschnitt

the construction of the new Danube Bridge

wurden auf Grundlage des Entwurfs neben

civil engineering structures.

der S6 mit ca. 100 Kunstbauwerken.

Linz by VCE in addition to static calculations,

statischen Berechnungen, Massenermittlungen

Client: ASFINAG

Auftraggeber: ASFINAG

mass investigations and planning of con-

und der Bauphasenplanung auch eine Lebens-

LCA, maintenance planning, LCC, traffic

LCA, Erhaltungsmaßnahmen und Zeitplan, Koste-

struction phases.

kostenanalyse von VCE durchgeführt.

management

nermittlung Verkehrsbeeinflussung

Client: City of Linz

Auftraggeber: Landeshauptstadt Linz

Reference Projects: Railway Referenzprojekte: Schiene

© Toni Rappersberger

Linz–Wels Line Condition Analysis

Bruck a.d.M.–Graz Hbf – Integrated Life Cycle Methodology

Upper Austria, Austria / Oberösterreich, Österreich

Austria / Österreich

The railway section Linz – Wels will be put out

Der Abschnitt Linz – Wels soll stillgelegt wer-

To enhance the technical condition of the

Um den technischen Zustand der Strecke auf

of service. Based on a Life Cycle Prognosis

den. Anhand einer Life Cycle Prognose wurden

incorporated assets on the section VCE devel-

ein nachhaltiges Niveau zu heben, wurde ein

VCE elaborated those maintenance measures

für die Gewerke Konstruktiver Ingenieurbau,

oped an integrated life-cycle methodology to

gewerke-übergreifendes Life-Cycle Modell

that are the minimum requirements for dif-

Unterbau und Elektrotechnik die minimal

optimized maintenance treatment plans.

entwickelt. /

ferent subsections (construction engineering,

notwendigen Erhaltungsmaßnahmen ausge-

Client: ÖBB Infrastruktur AG

Auftraggeber: ÖBB Infrastruktur AG

substructures and electrical engineering).

arbeitet.

Condition analysis, maintenance planning,

Zustandsanalyse, Life-Cycle-Prognose, Erhaltungs-

Client: ÖBB Infrastruktur AG

Auftraggeber: ÖBB Infrastruktur AG

deterioration modelling, cross-asset optimisa-

planung, Maßnahmenplanung, Zustandsprog-

tion, condition prognosis 2025

nose 2025

Kugelstein Bridge

Network Arch Bridge TW 5.1

Austria / Österreich

Vienna, Austria / Wien, Österreich

For this bridge concept a comprehensive Life

Für das Brückenobjekt wurde anhand dreier

A comprehensive Life Cycle Cost Analysis was

Für die zweigleisige Netzwerkbogenbrü-

Cycle Cost Analysis of different construction

Konstruktionsvarianten eine umfassende Le-

conducted by means of comparing the cur-

cke wurde eine umfassende, vergleichende

types was conducted. The bridge construc-

benszykluskostenanalyse erstellt. Es wurden die

rent bridge object – a double-track network

Lebens­z ykluskostenanalyse erstellt, indem

tion types used for comparison were a

Konstruktionstypen Stahlbetonbogenbrücke,

arch bridge – with alternative construction

dieses Brückentragwerk alternativen Konstrukti-

reinforced concrete arch bridge, a steel truss

Stahlfachwerkbrücke bzw. Verbundbogenbrü-

types – having the same span length.

onsvarianten gegenübergestellt wurde.

bridge and a composite arch bridge.

cke zum Vergleich herangezogen.

Client: ÖBB Infrastruktur AG

Auftraggeber: ÖBB Infrastruktur AG

Client: ÖBB Infrastruktur AG

Auftraggeber: ÖBB Infrastruktur AG

Exchange of structures Wiener Linien – MA29

LCE Study on Corrosion Protection System for Steel Bridges

Vienna, Austria / Wien, Österreich

Lower Austria, Austria / Niederösterreich, Österreich

Capitalized maintenance costs were calcu-

Nach dem Ablösemodell der RVS 15.03.12

The influence of different corrosion protec-

Es wird der Einfluss von unterschiedlichen Kor-

lated for 13 existing structures according to

wurden kapitalisierte Erhaltungskosten für 13

tion types and maintenance cycles was ana-

rosionsschutzarten und Instandhaltungszyklen

the redemption fee guideline of RVS 15.03.12.

Bauwerke unterschiedlicher Bauart (Rampe,

lyzed and compared. In addition the different

untersucht und miteinander verglichen. Ebenso

Client: municipal department MA 29 / Wiener

Brücke, Tunnel) ermittelt.

consequences for the total life-cycle costs of

sollen die auftretenden unterschiedlichen

Linien

Auftraggeber: MA 29 / Wiener Linien

the bridge were to be determined.

Auswirkungen auf die gesamten Lebenszyklus-

Estimation of the remaining useful life and the

Abschätzung der Restnutzungsdauer und der

Client: ÖBB Infrastruktur AG

kosten der Brücke festgestellt werden.

new construction costs

Neuerrichtungskosten

Auftraggeber: ÖBB Infrastruktur AG

Railway Bridge Tulln

Railway Bridges Jamal

Lower Austria, Austria / Niederösterreich, Österreich

Siberia, Russia / Sibirien, Russland

In the course of decision making concerning

Im Zuge der Entscheidungsfindung hinsichtlich

In the course of a pilot project data of four

Schwingungsmessungen an vier Eisenbahn-

the ideal load-bearing structure system in

des optimalen Tragwerksystems in Kombi-

railway bridges in northern Russia, on the

brücken (Baujahr 2008) auf der Bahnstrecke von

combination with the superstructure system

nation mit dem Oberbausystem wurde eine

railroad from Obskaya to Bovanenkovo have

Obskaya nach Bovanenkovo auf der Halbinsel

an LCC-analysis (life cycle-costs-analysis) for

LCC-Analyse für unterschiedliche Varianten für

been analyzed. The railway is the northern-

Jamal. Diese Eisenbahn ist die weltweit nörd-

different variants was carried out.

Tragwerk und Oberbau durchgeführt.

most railway in service in the world and was

lichste im Betrieb befindliche Strecke und wird

Client: ÖBB Infrastruktur AG

Auftraggeber: ÖBB Infrastruktur AG

completed by early 2010.

seit Anfang 2010 durchgängig befahren.

Cost estimate for erection, LCC-analysis

Errichtungskostenschätzung, LCC-Analyse

Client: Gazprom

Auftraggeber: Gazprom

Vienna Consulting Engineers ZT GmbH

VCE Vienna Consulting Engineers ZT GmbH Office Vienna Untere Viaduktgasse 2, 1030 Wien T +43 1 897 53 39 F +43 1 893 86 71 [email protected] www.vce.at

VCE Vienna Consulting Engineers S.R.L. Office Bukarest Strada Gheorghe Manu, Nr. 3, Etaj 3 010442 Bucuresti, Romania T +40 31 437037 [email protected] www.vce.ro Office Cluj Strada Ciresilor 32-36, Cluj-Napoca 400487 Judetul Cluj, Romania [email protected] www.vce.ro

Î.C.S. VCE Consulting Engineers S.R.L. Office Chişinău Bulevardul Moscova 21, ap.(of ) 802 2045 Chişinău, Moldova [email protected]

VCE Vienna Consulting Engineers ZT GmbH Office Athen Vas, Alexandrou 27 151 22 Amaroussio, Greece T +30 210 211 19 47 F +30 210 211 65 39 [email protected]

VCE Vienna Facility Management LLC Office Doha CR: 75110, P.O. Box 18698 Regency Business Centre, 1st Floor (101) Al Baladiya Street, Old Salata Doha, Qatar

www.vce.at