HOLD DOWN LUGS MUST BE INSTALLED ACCORDING TO WIND CLASSIFICATION
WIND CLASSIFICATION N1, N2 = 2x HOLD DOWN LUG (HMHL) N3 = 2x HOLD DOWN LUG (HMHL)
SHMSSSDHM1##
2
BEFORE YOU START Prior to installation, it is important that you contact your local government authority to determine if building approval is required. To ensure that the installation and erection of your Stratco Handi-MateTM Shed proceeds smoothly you should confirm that all the components and materials listed on the delivery documentation, and in this installation guide, have been supplied. Carefully read this installation guide to familiarise yourself with all the steps involved, and ensure that you have the correct tools and equipment for the job. NOTE: Use heavy gloves when handling steel sheeting and flashings and never attempt to install a shed in windy conditions.
TOOLS REQUIRED
x2
x4
SSPHMRS915AZ
ROOF SHEET
WALL SHEET
CORNER WALL SHEET
SSPHMWS1900##
SSPHMWSCNR1900##
COMPONENTS
x2
x2
x1
x1
x1
x1
x2
HMDJ1900GA
HMDCVE1900GA
!
DOOR JAMB
VERTICAL DOOR CHANNEL
HMDCBO1090GA
HMDCTO1090GA
SSPHMSD1900##
SSPHMSW1900##
!
BOTTOM DOOR CHANNEL
TOP DOOR CHANNEL
SPLIT DOOR SHEET
SPLIT WALL SHEET
3
!
!
x2
4 LEFT HAND BARGE CAP
RIGHT HAND BARGE CAP
HMBCL935##
HMBCR935##
10x25 WASHER SCREW
x1 DOOR TONGUE
x4 MAA847
DOOR HANDLE
1750 WALL CHANNEL
HMWC1750GA
HMWC700GA
RUNNER RAIL HMTH HMDT
10x16 WASHER SCREW
700 WALL CHANNEL
HMRRBO1697GA
HMBR1750GA
SLIDING RAIL TEKNNW1016
RIV4-3
BOTTOM CHANNEL
HMSR1750GA
HMBS1697GA
10x22 WAFER
10x16 SCREW
x1
x2 M8x47 MASONRY ANCHOR
N1/N2 N3
x1
CORNER BRACKET
x8
HMHL
10x16 WAFER
RIVET
TEK1016
x2
RIV4-3##
HANDLE MOUNT
x1
HMCBGA
x2
x1
ALUMINIUM RIVET
x1
TEK1025##
DOOR WHEEL
DOOR LATCH
x1
WTK1022
x2
HMDM##
DOOR NUT
WTK1016
x1
x1 HMDLGA
x1 DOOR STOP
BARGE SUPPORT
DOOR SHROUD
HMRB750GA
RIDGE BEAM
HMRC435GA
RIDGE CAP HMDW
HMNN6
HMSS
x2
x2
HMDSBO975GA
x2
N1/N2 N3
x6 x6 HOLD DOWN LUG
x2 x2
5
SITE AND ASSEMBLY PREPARATION Preventing Wind Uplift All Stratco Handi-MateTM Sheds must be securely bolted to a permanent concrete base with sufficient masonry anchors to prevent wind uplift. It is particularly important that masonry anchors are placed within all four corner brackets of the Handi-MateTM Shed. Further anchors and mounting brackets are also used to fix the Handi-MateTM Shed to the permanent concrete base according to shed size. The mounting brackets are to be evenly spaced along the length of the wall.
Concrete Floor Option 1 - Before building the shed, pour a base that is larger than the area by at least 200mm in each direction. The base should be poured so the concrete that will be outside the shed floor area slopes away from the shed to help prevent water from entering the shed. Option 2 - Substantial concrete pads may be used at each anchor location as an alternative to a complete concrete floor. It is recommended pads are minimum Ø250mm x 400mm deep, embedded into a firm natural soil base.
1.86
2.00
1.80
0.85
Important Notes • • •
It is essential to clear and level the site prior to assembling your Stratco Handi-MateTM Shed. Before starting to build the shed, please refer to the previous pages of this guide for a list of recommended shed assembly tools and shed components. Also note there are different types and colour screws. Ensure that the right type and colour screw is being used at each location.
•
Stability and performance of the shed relies on the door being closed during high wind events.
•
Do not traverse the roof of the Handi-Mate MateTM. If this is unavoidable, ensure crawl boards or ladders are used over the roof surface to distribute load.
6
DOOR ASSEMBLY DOOR WHEEL
DOOR WHEEL DOOR NUT TOP DOOR CHANNEL DOOR NUT
1 VERTICAL DOOR CHANNEL
HANDLE MOUNT
10x16 WAFER SCREW HANDLE MOUNT
2 ! ! SPLIT DOOR SHEET
WALL SHEET
!
BOTTOM DOOR CHANNEL
3
7 MAKE SURE PRE-PUNCHED HOLES LINE UP IN ALL 4 CORNERS
POSITION THE WALL SHEETS SO THE SCREWS ARE DRIVEN INTO THE CENTRE OF THE PEAK.
!
1
BOTTOM CHANNEL 1
9
10x16 SCREW
150mm
DOOR JAMB
DOOR JAMB
POSITION THE WALL SHEET SO THE SCREWS ARE DRIVEN INTO THE CENTRE OF THE PEAK.
2
!
10
BACK WALL ASSEMBLY
WALL SHEET CORNER WALL SHEET
SPLIT WALL SHEET
1 1750 WALL CHANNEL
! 1750 WALL CHANNEL
2
11
10x16 SCREW x4
1
2
POSITION THE WALL SHEETS SO THE SCREWS ARE DRIVEN INTO THE CENTRE OF THE PEAK.
! 2
1
2
1
3
RIVET
RIVET
10x16 SCREW
! 10x16 SCREW
4
POSITION THE WALL SHEETS SO THE SCREWS ARE DRIVEN INTO THE CENTRE OF THE PEAK FOR ALL SCREWS.
12
SIDE WALL ASSEMBLY
700 WALL CHANNEL
CORNER WALL SHEET
700 WALL CHANNEL
!
1
13
2
3
2
1
3 1
10x16 SCREW
1
! POSITION THE WALL SHEET SO THE SCREWS ARE DRIVEN INTO THE CENTRE OF THE PEAK.
2
2
14
!
15
SHED ASSEMBLY
1 MAKE SURE PRE-PUNCHED HOLES IN CORNER BRACKET AND WALL PANELS ARE ALIGNED.
1
! CORNER BRACKET
REPEAT PROCESS FOR THIRD WALL
2
2
10x16 SCREW
16
3
17 4
4
DOOR SHROUD
1
10x16 SCREW
3
!
USE DOOR SHROUD AS SPACER TEMPLATE BETWEEN BOTH DOOR JAMBS. DO NOT FIX.
2
RIVET
4 3 10x16 SCREW
2
4
18
600mm 10x16 SCREW
!
! 600mm 10x16 SCREW
10x16 SCREW 10x16 SCREW
BARGE SUPPORT 10mm MAX.
RUNNER RAIL BOTTOM CHANNEL
SLIDING RAIL
20°
1
!
5
!
19
CH
EC
KD
IAG
ON
AL
S FO
RS QU
! MASONRY ANCHOR FIX TO CONCRETE ONCE SQUARE
6
10x16 SCREW RIDGE BEAM
m
5m
83
7
AR
E
20
2
ALIGNED
1 TURN UP VALLEYS ON SHEET TO ENCOURAGE WATER TO FLOW TOWARDS WALLS
8
21
2
1
FIXING LOCATIONS FOR ALL ROOF SHEETS
1.3 2.3
9
1.2 2.2
1.1 2.1
ALL FIXINGS 10x16 WASHER SCREWS
22 105mm IN FROM BACK EDGE OF RIDGE CAP THEN CONTINUE WITH 300mm SPACING. RIDGE CAP 10x16 WASHER SCREW
RIDGE CAP RIDGE BEAM
2 RIDGE CAP
1
5mm
10
23
REMOVE ANY SWARF FROM SLIDING RAIL BEFORE SLIDING DOOR ONTO SHED
630mm
DOOR STOP & 10x22 WAFER
11
24
10x22 WAFER
12
TIGHTEN SCREW
25
DOOR SHROUD
10x16 SCREW
10x16 SCREW X2
13
26
10x25 WASHER SCREW
MAX 20mm
10x25 WASHER SCREW
LEFT BARGE CAP
14
27
210mm MIN
LEFT BARGE CAP
RIGHT BARGE CAP
RIGHT BARGE CAP
15
SECURE THE SHED CONTACT
1300 165 165
The installer is responsible for ensuring the slab or concrete squares are sufficient to support the shed and sustain wind loading. Do not directly anchor your shed to pavers.
!
1
MAXIMUM DISTANCE BETWEEN HOLD DOWN LUGS (CENTRE TO CENTRE) IS DETERMINED BY WIND CLASSIFICATION
2
WIND CLASSIFICATION
N1, N2 = 1400mm MAXIMUM (CENTRE TO CENTRE) N3 = 900mm MAXIMUM (CENTRE TO CENTRE)
MAX. DIST. MAX. DISTANCE
HOLD DOWN LUG
MAX. DISTANCE
ALL HOLD DOWN LUG SCREWS SHALL BE SECURED THROUGH BOTH THE WALL CHANNELS AND WALL SHEETS.
MAX. DIST.
MAX. DISTANCE
FIX TO CONCRETE WITH MASONRY ANCHORS
MAX. DISTANCE
MAX. DIST.
TEK1016
(NOT ACTUAL SHED)
MAX. DIS.
MAX. DIST.
HANDY HINT
SHEETS OFF GROUND DURING WALL ASSEMBLY
MAINTENANCE Your Stratco Handi-MateTM Shed will maintain its good looks for even longer with a simple wash and wipe down. Cleaning should be performed as often as is required to remove any dirt, salt and pollutants.
All brands and logos/images accompanied by ® or ™ are trade marks of Stratco (Australia) Pty Limited.
www.stratco.com.au
Stratco Handi-MateTM Sheds are produced from the highest quality materials and will provide many years of service. Refer to the ‘Selection Use and Maintenance’ brochure for more information on how to get the best out of your product. BROCSSDHM1