01 1,1 4. 'T i f, i
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
FINAL
FLIGHT PLAN APOLLO 8 AS-503/GSM- /03
NOV 79,1968
PREPARED BY FLIGHT PLANNING BRANCH FLIGHT CREW SUPPORT DIVISION
MANNED SPACECRAFT CENTER HOUSTON, TEXAS
APOLLO AS503/CSM 103 FINAL FLIGHT PLAN November 22, 1968
Submitted by:
Cr a
T. A. Guillory Flight Planning Branch
et,
Approved by: ,,,
W. J. North Chief, Flight Crew Support Division
,
Dona d'IC. Slayton Director of Flight Cre4 Operations
Concurrence:
Concurrence:
46/1.1-7// 2 George M. Low Manager, Apollo Spacecraft Program
/
Christophe JC. Kr qf t, Jr. Director of Fligh Operations Any comments or questions regarding this document should be forwarded to T. A. Guillory, Flight Planning Branch, Extension 4271, Mail Code CP34.
TABLE OF CONTENTS Page Introduction
ii
Abbreviations
iii Section I - General
1. Flight Plan Description
1-1
2. Flight Plan Notes
1-4
3. Scheduled Communication Tests
1-6
4. Update Forms
1-7 Section II - Detailed Timeline
1. Launch
2-i
2. Translunar Insertion
2-3
3. Lunar Orbit Insertion
2-51
4. Lunar Orbit Circularization
2-55
5. Transearth Insertion
2-71
6. Reentry
2-117 Section III - Consumables Analysis
1. SN-RCS
3-1
2. CM-RCS
3-40
3. SPS
3-41
4. Cryogenics
3 -42
5. Average Electrical Power Loads Section IV - Detailed Test Objectives
3-45
1. Test Objective Activities
4-1
2. Test Objective/Mission Activity Cross Reference
4-2
3. Test Objectives
4-8
Section V - Summary Flight Plan
5-1
INTRODUCTION
This Flight Plan has been prepared by the Flight Planning Branch, Flight Crew Support Division, with technical support by TRW Systems. This document schedules the AS503/CSM1O3 operations and crew activities to fulfill, when possible, the test objectives defined in the Mission Requirements, SA503JCSM103, C Type Mission, (Lunar Orbit). The trajectory Parameters used in this Flight Plan are for a December 21,1968 launch, with a 72° launch azimuth and were supplied by Mission Planning and Analysis Division as defined by the Apollo Mission C' Spacecraft Operational Trajectory. The Apollo 3 Flight Plan is under the configuration control of the Crew Procedures Control Board (CPCB). All proposed changes to this document that fall in the following categories should be submitted to the CPCB via a Crew Procedures Change Request: 1. Items that impose additional crew training or impact crew procedures. 2. Items that impact the accomplishment of detailed test objectives. 3. Items that result in a Significant RCS or EPS budget change. 4. Items that result in moving major activities to a different activity day in the Flight Plan. Items that require a change to the flight data file. The Chief, Flight Plnning Branch (FCSD) will determine what proposed changes fall in the above categories. Mr. T. A. Guillory will act as co-ordinator for all proposed changes to the Apollo 8 Flight Plan. This Flight Plan is not to be reproduced without the written approval of the Chief; Flight Crew Support Division.
ii
•
0
• •
0 ABBREVIATIONS
H.
Accelerometer ACCEL Activation ACT Acquisition ACQ Abort Electronics Assembly AEA Abort Guidance Sybsystem AGS Ampere Hours Ali ALIGN Alignment ALT Altitude AMP or amp Ampere AMPL Amplifier ANG Antigua Ant Antenna AOS Acquisition of Signal AOT Alignment Optical Telescope Ascent Propulsion Subsystem APS Atmosphere Revitalization ARS Ascension ASC Ascent AS CT Attitude ATT AUX Auxiliary AZ Azimuth BAT BDA BP BT Bio B iW BU BRKT
Battery Bermuda Barber Pole Burn time Bio-Medical Data on Voice Downlink Black & white Backup Bracket
CAL CAL CAM CB
Pt. Arquillo, California Calibration Angle Camera Circuit Breaker
ODE CDR CDU CIRC CK CM CMC CONT CMD CMP CNTL CNTLS C.O. C/O COAS COMM COMP CONFIG CP CR0 CRY 0 CSI CSM C&WS GYI
Constant Delta Altitude Commander Control Data Unit Circularization Check Command Module . Command Module Computer Continue Command Command Module Pilot Control Controls Cut off Check out Crew Optical Alignment Sight Communications Computational Configuration Control Point Carnarvon, Australia Cryogenic Coelliptic Sequence Initiation Maneuver Command Service Module Caution and Warning System Grand Canary Island
DAP D/B DEDA DEGS DEPL DET DIFF DK DOI
Digital Auto Pilot Deadband Data Entry and Display Assembly Degrees Depletion Determination or Digital Event Timer Difference Docked Descent Orbit Insertion
ABBREVIATIONS (Cont'd) DP S DSE DSKY DIO DUA DWN
Descent Propulsion Subsystem Data Storage Equipment Display and Key Board Detailed Test Objective Digital Uplink Assembly Down
E
ECS EPH EI ELDMK EMS ENU EPO EPS EQUIP EST EVAP EVT EXT
Erasable Environmental Control Subsystem Earth Far Horizon Earth (atmosphere) Interface Earth Landmark Entry Monitor System Earth Near Horizon Earth Parking Orbit Electrical Power Subsystem Equipment Eastern Standard Time Evaporator Extravehicular Transfer External
FC FDAI FLT FM FOV fps FQ FT or ft FTP
F Stop Fuel Cell Flight Director Attitude Indicator Flight Frequency Modulated Field of View Feet per second Flight Qualification Feet Full Throttle Position
GBI GDC GDS
Grand Bahama Gyro Display Coupler Goldstone, California
GET GETI GLY GMT G&N GNCS GWM GYM
Ground Elapsed Time Ground Elapsed Time of Ignition Glycol Greenwich Mean Time Guidance and Navigation Guidance Navigation Control System Guam Guaymas, Mexico
HA HAW HBR HD HGA HI Hp HSK HTR HTV
Apogee Altitude Hawaii High Bit Rate (TLM) Highly Desirable High Gain Antenna High Perigee Altitude Honeysuckle (Canberra, Australia) Heater USNS Huntsville
ID IGN IAN INIT INT IP IU I VT
Identification Ignition Inertial Measurement Unit Initialization Intervalometer Initial Point Instrumentation Unit Intravehicular Transfer
JETT
Jettison
kwh
Kilowatt Hour
Latitude LAT LBR Low Bit Rate (TLM) LBS or lbs Pounds
0 •
0 ABBREVIATIONS (Cont'd)
LCG LDG LDMK LEB LFH LGC LH L/H LHEB LHFEB LION LLM LLOS LM LMP LNH LOT LONG LOS LPO LR LT LTG LV L/V LVPD .
Liquid Cooled Garment Landing Landmark Lower Equipment Bay Lunar Far Horizon LM Guidance Computer. Left-hand Local Horizontal Left-hand Equipment Bay Left-hand Forward Equipment Bay Lithium Hydroxide Lunar Landing Mission Landmark Line of Sight Lunar Module Lunar Module Pilot Lunar Near Horizon Lunar Orbit Insertion Longitude Loss of Signal Lunar Parking Orbit Landing Radar Light Lighting Launch Vehicle Local Vertical Launch Vehicle Pressure Display
M
Mandatory Madrid, Spain Manual Maximum Maximum Dynamic Pressure Midcourse Correction Mission Control Center,- Houston Main Display Console
MAD MAN MAX MAX Q MCC MCC-N MDC
MEAS MER MET M/I MIN MLA MNVR MON MSFN MTVC
Measurement DSNS Mercury Mission Event Timer Minimum Impulse Minimum Merritt Island Maneuver Monitor Manned Space Flight Network Manual Thrust Vector Control
NAV NCC NOM NSR NXX
Navigation Corrective Combination Maneuver Nautical Miles Nominal Nominal Slow Rate Noun XX
OBS 0/F OP ER ORB ORDEAL ORIENT OVHD
Observation Oxidizer to Fuel Operate Orbital Orbit Rate Display Earth and Lunar Orientation Overhead
P PAD PCM PC PGA PCNCS PIPA PM P OL
Pitch Voice Update Pulse Code Modulation Pericyntiian Pressure Garment Assembly Primary Guidance Navigation Control Section Pulse Integrating Pendulous Accelerometer Phase Modulated Polarity or Polarizing
TIM
ABBREVIATIONS (Cont'd)
PREF PREP PRESS PRIM PT PRN PROP PU PUGS PTC PWR Pxx
Preferred Preparation Pressure Primary Point Pseudo-Random Noise Proportional Propellant Utilization Propellant Utilization and Gaging System Passive Thermal Control Power Program XX
Qty
Quantity
R R&B RAD RCDR RCS RCU RCV RED REFSMMAT REG REQD RH RNDZ RR RSI RT RTC Rxx
Roll Red & Blue Radiator Recorder Reaction Control Subsystem Remote Control Unit Receiver USNS Redstone Reference Stable Member Matrix Regulator Required Right-hand Rendezvous Rendezvous Radar Roll Stability Indicator Real Time Real-Time Command Routine XX
0
S SA S/C SCE SCS SCT SEC SECO SEP SEQ SLA SLOS SM SPOT SPS SR SRX SS STX STBY Sw SXT SYNC
Shaft Shaft Angle Spacecraft Signal Conditioning Equipment Stabilization Control System Scanning Telescope Secondary S-IVB Engine Cut-off Separate Sequence Service Module LM Adapter Star Line-of-Sight Service Module Spot Meter Service Propulsion System Sunrise S-Band Receiver Mode No. X Sunset S--Band Transmit Mode No. X Standby Switch Sextant Synchronization
T T
Trunnion Time of Ephemeris Update
EPHEM TA TAN TCA TBD TEC TEI
Trunnion Angle Tananarive Time of Closest Approach To Be Determined Trans Earth Coast Transearth Insertion
0
ABBREVIATIONS (Cont' d)
TEMP TERM TEX T &D TGT TIC TLC TLI TLM TPF TPI TPM T/R TRANS TV TVC TWR
Temperature Terminate Corpus Christi, Texas Transposition and Docking Target Time of Ignition Trans Lunar Coast Translunar Insertion Telemetry TeLwinal Phase Final Terminal Phase Initiation Terminal Phase Midcourse Transmitter/Receiver Translation Television Thrust Vector Control Tower
UMB UNDK US
Umbilical Undock United States Pass
VHF VLV Vxx
Very High Frequency Valve Verb xx
W/0 WRT WTN
Without With Respect to USNS Watertown
XFER XMIT XPONDER
Transfer Transmit or Transmitter Transponder Yaw
AV AV C AR
Velocity Change (Differential) Velocity Change at Engine Cutoff Position Change (Differential)
8-balls LBS or lbs
Flight Director Attitude Indicator (FDAI) Pounds
CAMERA NOMENCLATURE
2/80/B3 - Hasselblad No. 2/80mm Lens/Stowage Location 16/18/20 - 16mm Camera/18mm Lens/20 Frames Per Second 1/150/New B&W/INT - Hasselblad No. 1/150mm Lens/VSE New B&W Magazine/with interferometer C-EX - color film - external Polarization filter, Shutter Speed 1/4 POL FILTER 1/4 S0368 - Type of External Film 2/80/H.S. - Hasselblad No. 2/80mm Lens/High Speed Film Cable/BRRT/R&B - Use Power Cable, Camera Mounted on Bracket with Red & Blue Filter -
LUNAR TERMINATOR
S
N
SPACECRAFT SUNSET
ESFN LOS DARKNESS SPACECRAFT SUNRISE LUNAR TERMINATOR WINDOW (HEADS UP)
S-DAND EGA OPTICS LUNAR SURFACE POINT MSPN AOS EARTH
viii
SECTION I - GENERAL
e e
e
•
•
FLIGHT PLAN DESCRIPTION DAY 1
The spacecraft is launched into a 100-nm circular orbit with a launch azimuth that varies between 72° and 108° during the daily launch window. The lift-off time varies during the monthly launch window, but is constrained to daylight launches. The trajectory for this flight plan is a 72° launch azimuth December 21, 1968 with a 12:51:00 GMT (7:51:00 AM, EST) lift-off. Both the variable lift-off time and launch azimuth effect the earth-orbit station coverage, INN alignment time, translunar and transearth coast time, and lunar surface lighting conditions. The spacecraft remains attached to the S-IYB for approximately 4 hours. During this time, the crew checks out the OSM systems, performs an optics check, IMU realignment to the pad REFSMMAT, monitors the TLI maneuver, and performs transposition and separation from the S-IVB. The crewmen doff and stow their helmets and gloves prior to TLI and they are not donned again. The TLI maneuver places the S/C in a free return lunar trajectory. Following TLI, the CAP doffs his PGA, performs an IMU realign,'and a series of star/earth horizon sightings. All translunar and transearth sightings contain three marks per set. After these sightings, the CDR and LMP doff and stow their PGA's. At this point, the first eat period is scheduled.
•
At TLI + 6 hours (09:00 GET), the first MCC decision point is scheduled. Before this point and prior to each midcourse, there is a MCC-H state vector update, target load, maneuver pad update, an IMU alignment, and systems checks. For the nominal trajectory, the midcourses are nominally zero. a series of star/earth landmark sightings is scheduled at which MCCl' time the CDR sleep period begins (11:00 GET) followed by the CMP and LMP sleep period (18:00 GET). During the CDR sleep period, the CAP performs a series of star/earth horizon sightings. After
DAY 2
•
Crew activity on day .2 begins at approximately 24:00 GET. At 26:30 GET, the CMP performs a series of star/earth horizon sightings, then MCC 2 at TLI + 25 hours (28:00 GET), followed by another series of star/earth horizon sightings. Then the CDR sleep period begins (29;00 GET) followed by the CMP and LMP sleep period (36:00 GET). During the CDR sleep period, TV is scheduled for 15 minutes (31:15 GET) and a series of star/earth horizon sightings is performed at (34:15 GET). During day 2, MCC 3 occurs at LOI -22 hours (47:00 GET). The maneuver is preceded by a series of star/earth horizon sightings.
1-1
DAY 3
Crew activity on day 3 begins at approximately 48:00 GET. During the CDR sleep period (52:00 GET), the CMP performs a series of star/lunar horizon sightings (52:15 GET) and TV is scheduled for 15 minutes (55:15 GET). At LOT - 8 hours (61:00 GET), MCC is scheduled. The OMP and LMP sleep period 4 (62:00 GET) is scheduled between MCC 4 and LOI 1 . At 69:07 GET, the LCI
maneuver places the S/C into a 60 x 170-nm lunar I orbit. Scheduled during the first two lunar revolutions are camera preparation, eat period, COAS ground track determination, control point and pseudo landing site, observations, photographs of targets of opportunity, TV transmission, and L01 2 preparation. The IMU is realigned once during each dark period in lunar orbit. DAY 4
Crew activity on day 4 begins at approximately 72:00 GET. At 73:31 GET, the LOI 2 circularization maneuver places the S/0 into a 60-am circular orbit. Scheduled during revolutions 3 and 4 are a 2-hour CMP rest period, landmark training photography, vertical stereo photography, and landmark lighting evaluation. Scheduled during revolutions 5 and 6 are a 3-hour CDR rest period, one control point landmark tracking, and a pseudo landing site tracking during each daylight period. Each tracking consists of 4 marks. Scheduled during revolutions 7 and 8 are a 2-hour LMP rest period, three control point landmark trackings, and a pseudo landing site tracking during each daylight period. Each tracking consists of 4 marks. Scheduled during revolutions 9 and 10 are a 2-hour OMP rest period, convergent stereo photography, an eat period, TEl preparation, and the TEl maneuver at 89:15 GET.
After TEI, the CDR sleep period begins (89:20 GET) followed by the CMP and the DMP sleep period (94:00 GET). During the CDR sleep period, the CMP performs a. series of star/lunar horizon sightings. DAY 5
Crew activity on day 5 begins at approximately 96:00 GET. After the sleep period, the CMP performs a series of star/lunar horizon and star/earth horizon sightings; then MCC at TEI 15 hours (104:00 GET), followed by 5 TV transmission at 104:15 GET and a series of star/earth horizon sightings (105:15 GET). During the CDR sleep period (105:00 GET), the CMP performs a series of star/lunar horizon and star/earth horizon sightings. The CMP and LMP sleep periods begin at 112:00 GET. 1-2
410
•
DAY 6 Crew activity on day 6 begins at approximately 120:00 GET. After a series of star/earth horizon sightings, MCC 6 is scheduled at TEI 33 hours (122:00 GET) followed by a series of star/lunar horizon and star/earth horizon sightings. Also scheduled is the CDR sleep period (127:00) and both the CMP and IMP sleep periods (134:00). During the CDR sleep period, TV transmission is scheduled (128:00 GET), and the CMP performs a series of star/earth horizon and star/lunar horizon sightings. After the sleep period, the CMP does a series of star/earth horizon sightings. DAY 7 Crew activity on day 7 begins at approximately 144:00 GEI'. At El minus 2 hours (144:50 GET), MCC 7 is scheduled. CM/SM separation nominally occurs at 146:35 GET with splashdown in the Pacific Ocean approximately 20 minutes later.
FLIGHT PLAN NOTES A. CREW 1. Crew designation is as follows:
Designation
Couch Postion
Commander (CDR) Command Module Pilot (CMS) Lunar Module Pilot (LMP)
Left Center Right
Prime
Backup
Borman Armstrong Lovell Aldrin Anders Haise
2. The crew will nominally follow a 17-hour work/7-hour rest cycle where possible. One crewman will be awake at all times with all crewmen awake during major burns. The crew will eat together when possible with additional activities held to a minimum during eat periods. The eat period is normally one-hour duration. -
3. The pressure suits will be doffed after TLI and donned prior to entry. Helmets and gloves will be doffed prior to TLI and will remain off until prior to entry. 4. A crew status report will be made twice a day on each crewman. 5. General flight plan updates containing changes to the following day's activity schedule, will be voiced up once per day. 6. Negative reporting will be used in reporting completion of each checklist. B. COMMUNICATIONS AND INSTRUMENTATION
1.
S-band will be prime for voice, ranging and PCM with the VHF used as backup for voice during near earth phases (< 4000 nm). The S--band backup voice system will be checked during the first orbit and the high gain antenna checked after S-I'VB/CSM separation.
2. The Flight Qual Recorder will be used as follows: a. b. c. d.
Lift-off -45 seconds through 0:12:00 GET TLI -2 minutes through TLI cutoff +1 minute CSM/S-IVB Sep -2 minutes through Sep +1 minute LOI -2 minutes to end of tape 1
3. The DSE will normally be dumped by real time command (RTC). 4. During communications, the spacecraft will be referred to as 'Apollo 8" and the ground as "Houston". The crew member call sign will be their assigned crew position. O. CSM SYSTEMS 1. The spacecraft . (S/C) lift-off switch positions are listed in Apollo (CSM 103) Operations Handbook (AOH), Volume 2, August 1, 1968. 2. Fuel cell purging for H2 and 0 2 will be scheduled R/T. 3. The S/C will remain fully poweredup throughout the mission (IMU, 0M0 and SOS always in operate) with the optics on as required. 4. IMU drift checks are scheduled. after TLI, before LOIl' on revolutions 2 and 4 through 10 in lunar orbit, and prior to entry. 5. The potable water is chlorinated at 24-hour intervals. 6. All onboard gage readings will be mead directly from the spacecraft gages and not corrected by the appropriate factors.
SCHEDULED COMMUNICATION TESTS GET
ALTITUDE nm
03:20
CSM ANTENNA
SIGNAL COMBINATION
GROUND ANT
COMMUNICATIONS MODE
OMNI
4.2
85' GDS
Carrier,PRN,voice, 51.2 KBPS TM
05:45
24,000 24,000 24,000
HI GAIN HI GAIN HI GAIN
4. 2 6.2 .2
85' GDS 85' GDS 85' GDS
Carrier,PRN,voice, HBR TM Oarrier,PRN,Voice, HBR TM Plybk of Recorded Voice & LBR TM
07:00 to 08:00
35,000 35,000 35,000 35,000
HI HI HI HI
4.3
85' 85' 85' 85'
Carrier,PRN,voice, LBR TM Carrier,PRN,voice, LBR TM Carrier,PRN,voice HBR TM Carrier,voice and LBR TM
29:00 to 30,000 or 125,000 to 126,000
GAIN GAIN GAIN GAIN
110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000
HI GAIN HI GAIN HI GAIN HI GAIN HI GAIN HI GAIN HI GAIN HI GAIN OMNI OMNI OMNI OMNI OMNI OMNI
31:15
120,000
HI GAIN
69:00
205,000 205,000 205,000
HI GAIN HI GAIN HI GAIN
89:00
205,000
HI GAIN
6.3 5.2 8.1
GDS GDS GDS GDS
30' ASC 30' ASC
4 5 6 8
4.2 5.2 4.3 8.1 1
.5 .6
1.7 .8 .10
30' 30' 30' 30' 30' 30' 30' 30' 30' 30' 30' 30'
ASC ASC ASO ASC ASC ASC ASO ASC ASC ASC ASC ASC
Carrier, Carrier, Carrier, Carrier, Carrier, Carrier, Carrier, Carrier, Carrier, Carrier, Carrier, Carrier, Carrier, Carrier,
PRN, Voice PRN, Updata PRN, Voice, Updata BU Voice PRN, Voice, HER TM PRN, Voice, HBR TM PRN, Voice, LBR TM Voice, HBR TM PRN LBR TM Key Subcarrier PRN Ranging BU Voice, LBR TM BU Voice
85' GDS CSM Television .4 NORMAL OPERATING MODES 6.2 Carrier, PRN, Voice, HBR TM 85' 6.3 85' Carrier, PRN, Voice, LBR TM .2 Plybk of Recorded voice &LBR TM 85' 85'
.4
1-6
CSM television
Pages 1-8 thru 1-21 contain the following voice update forms and the explanation for the abbreviations and symbols used. Pg 1-8 and 1-9
TLI PAD/EXPLANATION
Pg 1-10 and 1-11
P27 UPDATE PAD/EXPLANATION
Pg 1-12 thru 1-14
MANEUVER PAD/EXPLANATION
Pg 1-15 thru 1-17
ENTRY PAD/EXPLANATION
Pg 1-18 thru 1-21
MAP UPDATE PAD/EXPLANATION
TLI X
• •
;
; X . X
X
x
x
x
X
X
X
X
X
X
X
X
X
;
•a
X
TB6p IR
X X X
H i
X
XX
.
Y
X X X
;
BT ,
• +
'
+
P
.8VC I VI
X X
X
X , X ,. X
X
X
X
X XX
X
X
X
XX
X
. -
R SEP P SEP Y SEP
TLI PAD TB6p
X:XX:XX(HRS:MIN:SEC)
PREDICTED TIME OF BEGINNING OF S-IVB RESTART PREPARATION FOR TLI IGN -9 MIN) TLI (TB6
R Y
XXX (DEG) XXX (DEG) XXX (DEG)
PREDICTED SPACECRAFT IMU GIMBAL ANGLES AT TLI IGNITION
BT
XX:XX (MIN:SEC)
DURATION OF TLI BURN
AVC'
XXXXX.X (fps)
NOMINAL TLI AV SET INTO EMS AV CONTROL
VI
+XXXXX (fps)
NOMINAL INERTIAL VELOCITY DISPLAYED ON DSKY AT TLI CUTOFF
R SEP P SEP Y SEP
XXX (DEG) XXX (DEG) XXX (DEG)
PREDICTED SPACECRAFT IMU GIMBAL ANGLES AT COMPLETION OF S-IVB MNVR TO CSM/S-IVB SEP ATTITUDE
P27 UPDATE PURP
V
GET 304 0
V
•
•
INDEX
INDEX
•
IS INDEX
02 03 04 05 06 F
1--
07 10 II 12 13 14 15
'
16 17 20 2I 22 23 24 N34
HRS
X X
MIN
X X XX
X
X X
X•X
NAV CHECK SEC N43
LAT
0
X
X X X X•X
X •
0,
•
LONG ALT
+ 0
1-b
I
, +
0
'
_•
1
•
P27 UPDATE PURP
XXX
TYPE OF DATA TO BE RECEIVED (SUCH AS: NAV - LIFT-OFF TIME)
V
XX
TYPE OF COMMAND LOAD (70 - 71 - 72 - 73)
GET
XXX:XX:XX(HR:MIN:SEC)
TIME DATA RECORDED
01
XX (OCTAL)
INDEX NO. OF COMMAND WORDS IN LOAD
02-24 XXXXX
NO. OF CORRECTION COMMAND WORDS
NAV CHECK
TO CONFIRM POINT ABOVE GROUND TRACK FOR A GIVEN TIME
T
XX:XX:XX(HRS:MIN:SEC)
TIME
LAT
XX:XX (DEG)
LATITUDE
LONG
XXX:XX (DEG)
LONGITUDE
ALT
XXX.X (nm)
ALTITUDE
MANEUVER •
PUR;'051::
NDRTH L SOUTH SET STARS
P.S'OP/GUk:)
R ALIGN P ALIGN Y ALIGN
WT
;. J 47
"8
0
0
PTRhA
0
0
YTRI: A
I+
0
0
HRS GET
+
0
0
WN N33
+
0
SEC
ULAGE
nvx
U
X X
X
X
X
X
HX X
X
•
LIVy
•
nVZ
NE-1
R
N4-3- 1
P • :]VT
•
HORIZON/WINDOW
XXX
•
i3T .]VC
X X
SXTS
XX X •
0 SFT . 0 SRN BSS
X X X
X
X
• ,
XX OT H ER
SPA SXP
XI
LAT
0
N61
LONG 11/_----,L--
RTGO
EMS
VIO •
•
1-12
•
•
I GET
.05G
MANEUVER PAD PURPOSE
XXXXXX
PROP/GUID
TYPE OF MNVR TO BE PERFORMED PROPULSION SYSTEM (SPS/RCS)/ GUIDANCE (SCS/G&N)
WT
XXXXX (lbs)
PREMANEUVER VEHICLE WEIGHT
P TRIM
X.XX (DEG)
SPS PITCH GIMBAL OFFSET TO PLACE THRUST
Y TRIM
X.XX (DEG)
SPS YAW GIMBAL OFFSET TO PLACE THRUST
GETI -
XX:XX:XX (HRS:MIN:SEC)
TIME OF MNVR IGNITION
AVX AVY AVZ
XXXX.X (fps) XXXX.X (fps) XXXX.X (fps)
P30 VELOCITY TO BE GAINED COMPONENTS IN LOCAL VERTICAL COORDINATES
R
XXX (DEG) XXX (DEG) XXX (DEG)
IMU GIMBAL ANGLES OF MANEUVER ATTITUDE
HA
XXXX.X (nm)
PREDICTED APOGEE ALTITUDE AFTER MANEUVER
HP
XXXX.X (nm)
PREDICTED PERIGEE ALTITUDE AFTER MANEUVER
XXXX.X
TOTAL VELOCITY OF MANEUVER
BT
X:XX (MIN:SEC)
MANEUVER DURATION
AVC
XXXX.X (fps)
PREMANEUVER AV SETTING IN EMS AV COUNTER
SXTS
XX (OCTAL)
SEXTANT STAR FOR MANEUVER ATTITUDE CK
SFT
XXX.X (DEG)
SEXTANT SHAFT SETTING FOR MANEUVER ATTITUDE CK
TRN
XX.X (DEG)
SEXTANT TRUNNION SETTING FOR MANEUVER ATTITUDE CK
BSS
XXX (OCTAL)
BORESIGHT STAR FOR MANEUVER ATTITUDE CK USING THE COAS
SPA
XX.X (DEG)
BSS PITCH ANGLE ON COAS
P Y
AVT
1-13
MANEUVER PAD
(cont'd)
SXP
X.X (DEG)
BSS X POSITION ON COAS
LAT LONG
XX.XX XXX.XX
LATITUDE AND LONGITUDE OF THE LANDING POINT FOR ENTRY GUIDANCE
RTGO
XXXX.X
RANGE TO GO FOR EMS INITIALIZATION
VIO
XXXXXX (fps)
INERTIAL VELOCITY AT .05G FOR EMS INITIALIZATION
GET(.05G)
XX:XX:XX
TIME OF .05G
NORTH & SOUTH SET STARS
STARS FOR TELESCOPE FOR BACKUP GDC ALIGN
R, P, Y ALIGN)
ATTITUDE TO BE SET IN ATTITUDE SET TW FOR BACKUP GDC ALIGN
ULLAGE
NO. OF SM RCS JETS USED AND LENGTH OF TIME OF ULLAGE
HORIZON WINDOW
WINDOW MARKING AT WHICH HORIZON IS PLACED AT A SPECIFIED TIG (ATT CK)
(
ENTRY AREA
xIxIx x xxix
•
R .05G
X
X
X
X
X
P .05G
X
X
X
Y
.05G
GET X
XX
P
0
LAT
HOR CK N6 I
LONG MAX G
X X
V400K N60
,
0 0
0
0
T4OOK
+
RTGO
+
•
VIO
4- 1
••
•
•
•
xx 0
+
0
+
0 0
X
X
+
0
'
+i 0
.
EMS
RRT
••
RET. 05G *
••
DL MAX *N69 DL M IN
0 0
VL MAX * *IVLMN
XX X
X.X
X
• • •
X
XX
X
• •
X
X
4 X. X , X
x x: •
•
XX
Do
X
X :X . X X
X
X •
X
X
RET VCIRC
••
RETB BO
• •
RETEBO RETDRO SX TS
X X
SFT !O XX
;0
0 X
X
X
TRN
X
BSS • _ SPA SXP •
X
XX
XXX
XX
X
X X X X.
X
X
X
1-15
0
X
LIFT VECTOR
ENTRY PAD AREA
XXX
SPLASHDOWN AREA DEFINED BY TARGET LINE
R .05G P .05G Y .050
XXX(DEG) XXX(DEG) XXX(DEG)
SPACECRAFT IMU GIMBAL ANGLES REQUIRED FOR AERODYNAMIC TRIM AT .050
GET (H0R CK)
TIME OF ENTRY ATTITUDE XX:XX:XX (HRS:MIN:SEC). HORIZ CHECK AT EI -17 MIN.
P (HOR CK)
XXX(DEG)
PITCH ATTITUDE FOR HORIZON CHECK AT EI -17 MIN
LAT
±XX.XX(DEG)
LATITUDE OF TARGET POINT
LONG
±XXX.XX(DEG) LONGITUDE OF TARGET POINT
MAX G
XX.X (G's)
PREDICTED MAXIMUM REENTRY ACCELERATION
V 400K
XXXXX (fps)
INERTIAL VELOCITY AT ENTRY INTERFACE
Y400K
X.XX(DEG)
INERTIAL FLIGHT PATH ANGLE AT ENTRY INTERFACE
RTGO
+XXXX.X(nn)
RANGE TO GO FROM .05G TO TARGET FOR EMS INITIALIZATION
VIO
+XXXXX.(fps)
INERTIAL VELOCITY AT .05G FOR EMS INITIALIZATION
RRT
XX:XX:XX (HRS:MIN:SEC)
REENTRY REFERENCE TIME BASED ON GET OF PREDICTED 400K (DET START)
RET .05G
XX:XX (MIN:SEC)
TIME OF .05G FROM 400K (RRT)
D L MAX
X.XX (G's)
D MIN
X.XX (G's)
MAXIMUM ACCEPTABLE VALUE OF PREDICTED DRAG LEVEL (FROM CMC) MINIMUM ACCEPTABLE VALUE OF PREDICTED DRAG LEVEL (FROM CMC)
V MAX
XXXXX (fps)
MAXIMUM ACCEPTABLE VALUE OF EXIT VELOCITY (FROM CMC)
V MIN
XXXXX (fps)
MINIMUM ACCEPTABLE VALUE OF EXIT VELOCITY (FROM CMC) 1-16
ENTRY PAD (cont'd) DO
X.XX (G's)
PLANNED DRAG LEVEL DURING CONSTANT G
RET V CIRC
XX:XX (MIN:SEC)
TIME FROM EI THAT S/C VELOCITY BECOMES CIRCULAR
RETBBO
XX:XX (MIN:SEC)
TIME FROM EI TO THE BEGINNING OF BLACKOUT
RETEBO
XX:XX (MIN:SEC)
TIME FROM EI TO THE END OF BLACKOUT
RETDRO
XX:XX (MIN:SEC)
TIME FROM ET TO DROGUE DEPLOY
SXTS
XX(OCTAL)
SEXTANT STAR FOR ENTRY ATTITUDE CHECK
SFT
XXX.X(DEG)
SEXTANT SHAFT SETTING FOR ENTRY ATTITUDE CHECK
TRN
XX.X(DEG)
SEXTANT TRUNNION SETTING FOR ENTRY ATTITUDE CHECK
BSS
XXX(OCTAL)
BORESIGHT STAR FOR ENTRY ATTITUDE CHECK USING THE COAS
SPA
XX.X(DEG)
BSS PITCH ANGLE ON COAS
SXP
X.X(DEG)
BSS X POSITION ON COAS
LIFT VECTOR
XX
LIFT VECTOR DESIRED AT .05G's BASED ON ENTRY CORRIDOR
MAP UPDATE REV 1/2 GET (hrs:min:sec) LOS
REMARKS
PM AOS SS LOS SR PM AOS SS
REV 2/3
REMARKS
GET (hrs:min:sec) LOS SR PM AOS SS
REV 3/4 .
REMARKS
GET (hrs:min:sec) LOS SR PM AOS SS
1-18
MAP UPDATE
•
REV 7/8 GET (hrs:min:sec) LOS PM AOS SS
•. -.
.• -. ..
REV 8/9 GET (hrs:min:sec) LOS . .• SR PM ' AOS .SS
REV 9/10 GET (hrs:min:sec) LOS •— -. SR PM AOS SS
REMARKS
REMARKS
.• : : -.
REMARKS
' . '
REV 10 GET (hrs:min:sec) LOS .• SR • ADS •. SS '
REMARKS
1-19
MAP UPDATE REMARKS
REV 4/5 GET (hrs:min:sec) LOS .• ' .• SR •' . PM AOS SS
•
•
REV 5/6
REMARKS
GET (hrs:min:sec) LOS . SR . PM
.•
AOS
:
. .-
SS
REV 6/7 GET (hrs:min:sec) . LOS
REMARKS *
SR
•.
PM
.
•
•.
AOS
.•
.•
SS
.•
1-20
MAP UPDATE
•
LOS
XX:XX:XX(HRS:MIN:SEC)
TIME OF MSFN LOSS OF SIGNAL IN LUNAR ORBIT
AOS
XX:XX:XX(HRS:MIN:SEC)
TIME OF MSFN SIGNAL
SS
XX:XX:XX(HRS:MIN:SEC)
TIME
SR
XX:XX:XX(HRS:MIN:SEC)
TIME OF SPACECRAFT SUNRISE IN LUNAR ORBIT
PM
XX:XX:XX(HRS:MIN:SEC)
TIME OF CROSSING OF MOON'S PRIME MERIDIAN (150°W)
ACQUISITION OF
OF SPACECRAFT SUNSET IN LUNAR ORBIT
• 1-21
•_:..
•
SECTION II - DETAIL-RD TTNELIn
e
•
e
•
•
0 0
0 FLIGHT PLAN
,
-00:45
LMP:
FLT RCDR - RECORD
-00:09
LCC:
IGNITION COMMAND L/V ENGINE LTS (5) - OUT
-00:01 00:00
REMARKS
EVENT
TIME
LCC:CDR:
LIFT-OFF LT - ON, MET STARTS COUNT
REPORT LIFT-OFF P11 AUTO
00:02
CDR:
REPORT YAW MNVR
00:11
CDR:
REPORT ROLL AND PITCH PROGRAM
,
INITIATE CDR
REPORT ROLL COMPLETE
MCC-H:CDR:
REPORT MARK MODE 1B
00:50
LMP:
REPORT CABIN PRESS DECREASE
01:17
CDR:
REPORT MAX Q
01:50
MCC-H:CDR:
REPORT MARK MODE 10
02:00
MCC-H:CDR:
REPORT GO./NO GO FOR STAGING
02:05
CDR:
REPORT INBOARD ENGINE CUTOFF
02:31
CDR:
REPORT OUTBOARD ENGINE CUTOFF
LTS 1, 2, 3, & 4 - ON
02:32
CDR:
REPORT S-IC/S-II STAGING
LTS OFF
00:28 .00:42
MISSON AS503/103 MSC FORM 2114C (JUL 67)
EDITION
FINAL
DATE November 22,1968
PAGE 2-1
FLIGHT PLAN REMARKS
EVENT
TIME
03:00
CDR:
REPORT 2ND PLANE SEP
03:07
CDR:
REPORT TWR JETT & MODE II
03:25
CDR:
REPORT GUIDANCE INITIATE
03:53
MCC-H:
REPORT TRAJECTORY AND GUID.
>65% THRUST-S-II SEP LIGHT OUT
GO/NO GO 04:00
CMP:
REPORT S/C GO/NO GO
05:00
LMP:
REPORT S/C GO/NO GO
05:53
MCC-H:CDR:
REPORT S-IVB TO ORBIT CAPABILITY
06:00
CDR:
REPORT S/C GO/NO GO
06:15
LMP:
OMNI ANT-D
CDR:
REPORT S/C GO/NO GO
08:20
MCC-H:CDR:
REPORT GO/NO GO FOR STAGING
08:40
CDR:
REPORT S-II CUTOFF,
IF LAUNCH AZIMUTH
•
3
BURN CHART
LOI 2
P or Y RATES
ATT DEVIATION
SHUTDOWN TIME
10°/SEC TAKEOVER
10° TAKEOVER
B/T +1 SEC
RESIDUALS NO TRIM
,V gx 1V gY V gz AV C FUEL j)); :UNBALANCE
REMARKS:
0
0 0
•
0
0 • FLIGHT PLAN
73:00 -MNVR TO BURN ATT GO INERTIAL
73:0•
b
2/80/B&W, 1/250 16/18/C EX, 1/250 F CHART, 6 fps, BRACK
SXT STAR CK TRANSFER TO COUCH
73:09
MCC—H
LIMP
CMP •
CDR
1/150/B&W, 1/60, CHART, BRKT PRE LOI SYSTEMS CKS
73:17
GOC ALIGN TO IMU
SM RCS MONITOR CK GETI = 73:30:54 AV = 138.5 fps BT = 9.7 SEC
BEGIN REV 3
SPS MONITOR CK
GDC ALIGN TO IMU/ORB RATE (60 nm)
V66 TRANS CSM STATE VECTOR TO LM SLOT SM RCS MONITOR CK
ROLL RIGHT 180° AT 2°/SEC PITCH DWN AT 0.2°/SEC (HEADS OWN TRACKING ATT) ORDEAL 180, 308, 0 BEGIN ORB RATE
INITIATE BAT CHARGE
ACQUIRE S/C V64 ACQUIRE MSFN ON HGA
73:48 LOI 2BURN STATUS REPORT
PIPA BIAS CK
REST PERIOD (2 HOURS)
BIOMED Sw - RIGHT 74:00 MISSION
EDITION
AS503/103
FINAL
MSC Fun 1910 (Nov 69)
TIME
DATE
November 22, 1962
73:00 - 74:00
FLIGHT PLANNING BRANCH
1
DAY/REV
PAGE
4/LPO
2-55
FLIGHT PLAN LMP •
CMP
CDR •
MCC—H
TRAINING PHOTOGRAPHY
'TRAINING PHOTOGRAPHY
PITCH UP TO TRACK LDMK
START CAMERAS 7 MIN PRIO LDMK 70mm - 20 SEC INT UNTIL TRACKING - THEN 5 SEC F STOP FROM CHART
7
4 : 1
,70mm & 16mm
5:
74:17 STOP CAMERA
STOP CAMERAS
PITCH DWN TO HEADS DWN TO REACQUIRE MSFN ORDEAL 180, 0, 0 GO INERTIAL
1/80/HS, 1/4, F 2.8 VERIFY SYSTEMS STATUS REST PERIOD (2 HOURS)
RECORD MAP UPDATE
VOICE UPDATE: MAP UPDATE 3/4 DUMP DSE
IMU REALIGN P52 REFSMMAT OPTION 3 AND GYRO DRIFT TEST STAR ID STAR ANGLE DIFF TORQUE ANGLES: X
Y
I
INSTALL 16 MM CAMERA GDC ALIGN TO IMU RECORD BLOCK DATA (TEI 3 & TEI 4 )
•
75:00 =I MISSION
AS5L3/103 MSC Form 1810 (Nov 88)
EDITION
LINAI
a
r"-^",„,,o
DATE
November 22, 1968 FLIGHT PLANNI
TIME
74:00 - 75:00
VOICE UPDATE: BLOCK •DATA
DAY/REV
PAGE
4/LPO
2-56
FLIGHT PL AN 75:00
PITCH UP TO VERTICAL AT 0.2°/SEC (+Z FWD) ORDEAL 180, 270, O. BEGIN ORB RATE
1/80/NEW B&W, 1/250, F 2.8 BRKT/INT 2/150/B&W
16/18/NEW C EX/1 fps 1/250, F 2, 1 fps START CAMERA S/S SR 46 MIN
75:09 75:15
MCC—H U
LMP
CMP
CDR
•
START CAMERA 1 S/C SR 6 MIN
VERTICAL STEREO PHOTOGRAPHY EXTRA EXP EACH 5 MIN - NOTE TIME REST PERIOD (2 HOURS)
75:30 BEGIN REV 4 SUBSOLAR POINT 75:46 ROLL RIGHT 180° AT 2°/SEC (-Z. FWD) MAINTAIN ORB RATE
75:46
INSTALL SXT BRKT & 16mm CAMERA. TAKE PHOTOS AS TIME PERMITS,
ACQUIRE MSFN ON
ACQUIRE S/C
QMNI ANT SA 0° TA 0 ° 76:00 MISSION
AS503/103 MSC Form 1910 (Nov 68)
EDITION
FINAL
TIME
DATE
November 22, 1968
75:00 - 76:00
FLIGHT PLAMNING BRANCH
DAY/REV
4/LPO
PAGE
2-57
FLIGHT PLAN CALF T
CDR
76:0
PITCH UP AT 0.2°/SEC TO 0, 35, 5, 0
IPI ACQ
76:15
• .
.
..
.
.•
.
{LDMK LIGHTING EVALUATION (THRU OPTICS) OF LDMK 81
STOP CAMERAS AT TERMINATOR
MCC-H
AT PITCH UP 1/80/B&W, 1/250, F 11
.
IPII ACQ
BEGIN ORB RATE
LMP
STOP CAMERA 1 AT TERM RECORD MAP UPDATE
VOICE UPDATE: MAP UPDATE 4/5 P27 UPDATE: STATE VECTOR
V64 ACQUIRE MSFN ON HGA
ACQUIRE S/C
76:21
ROLL RIGHT 180° AT 2°/SEC (HEADS DWN) GO INERTIAL
76:30 —1
IMU REALIGN P52 OPTION 3 - REFSMMAT AND GYRO DRIFT TEST STAR ID STAR ANGLE DIFF , — --
S F
EAT PERIOD GDC ALIGN TO IMU
1/80/HS, 1/4, F 2.8 '(20 SEC STRIP - 20 EXP) VERIFY SYSTEMS STATUS RECORD BLOCK DATA: (TEI 4 & TEI 5 )
TORQUE ANGLE S : X Y Z . 1
AS503/103 MSC Form 1910 (Nov 68)
•
0
EDITION
FINAL
VOICE UPDATE: BLOCK DATA
TRANS TO LEFT COUCH
1/80/B&W, 1/250, F 2.8 INT (CDR). BIOMED Sw - CENTER
76:58 77:00 MISSION
DUMP DSE
TIME
DATE
November 22, 1968
76:00 - 77:00
FLIGHT PLANNING BRANCH
DAY/ REV
4/LPO
PAGE
2-58
0 FLIGHT PLAN 77:00
•
ROLL LEFT 180° AT 2°/SEC PITCH DWN AT 0.2°/SEC TO ORDEAL 0, 5, O. BEGIN ORB RATE.
MAP REVIEW
77:08
MCC -H ti
LMP
CMP
CDR
2/150/B&W, 1/250 F 2.8 77:14
P22 MANUAL ACQ SA 0°, TA 10° EAT PERIOD
BEGIN REV 5
I CNTL POINT SIGHTING IP I ACQ
77:30
2/150/B&W, 1/250 (CDR) PITCH DWN AT 0.3°/SEC AT ACQ
CP2 NO. 526 LAT -10.200°S LONG/2 +77.550 ° +000.00 ALT nm NEW COORDINATES LAT LONG/2 ALT
77:44
ACQUIRE S/C
nm ACQUIRE MSFN ON OMNIS AT LOSS PITCH UP AT 0.2°/SEC TO ORDEAL 0, 5, O. BEGIN ORB RATE.
REST PERIOD (3 HOURS)
REPORT NEW CP COORDINATES
REVIEW LDMK MAP
78:00 MISSION
EDITION
DATE
TIME
AS503/103
FINAL
November 22, 1968
77:00 - 78:00
MSC Form 1910 (Nov 88)
FLIGHT PLANNING BRANCH
DAY/REV
PAGE
4/LPO
2-59
FLIGHT PLAN LMP
CMP •
CDR
MCC—H 6
PSEUDO LDG SITE SIGHTINGS P22 - AUTO OPTICS IPI TCA LDMK NO, 81 LAT +02.675°N LONG/2 +17.512° -000.99 nm ALT NEW COORDINATES LAT + LONG/2 + ALT
PITCH DWN 0.3°/SEC AT ACQ AT LOSS ROLL RIGHT 180° AT 2°/SEC TO HEADS DWN GO INERTIAL
0
n
V64 ACQUIRE MSFN ON HGA 1/80/HS, 1/4, F 2.8
ACQUIRE S/C P27 UPDATE: STATE VECTOR VOICE UPDATE: BLOCK DATA MAP_ UPDATE 5/6
REPORT NEW COORDINATES RECORD BLOCK DATA (TEI 6 ), & MAP UPDATE
REST PERIOD (3 HOURS) IMU REALIGN P52 OPTION 3 - REFSMMAT AND GYRO DRIFT TEST STAR ID STAR ANGLE DIFF --
VERIFY SYSTEMS STATUS
DUMP DSE
TORQUE ANGLES: X
zY
. GDC ALIGN TO IMU 16/18/ C EX, 1/250, 1 fps MAGS) 2/150/C121/1/250 SPOT GENERAL OBSERVATIONS a
MISSION
AS503/103 MSC Form 1910 (Nov 68)
•
0
EDITION
FINAL
DATE
Novemb e r 22, 1968
TIME
78:00 - 79:00
DAY/REV
4/LPO
PAGE
2-60
FLIGHT PLAN
ti
•
•1
0 0
0
FLIGHT PLAN MCC—H S
LMP
CMP
CDR
REVIEW CONTROL POINT MAP ROLL 180° AT 2°/SEC PITCH DWN AT 0.2°/SEC TO ORDEAL 0, 5, O. BEGIN ORB RATE
!CNTL POINT SIGHTING]
REST PERIOD (3 HOURS)
P22 - AUTO OPTICS IPI TCA CP2 NO. 526 LAT -10.200°S LONG/2 +77.550° ALT
+000.00 nm
NEW COORDINATES LAT LONG/2 ALT
PITCH DWN 0.3°/SEC AT AC 0 nm
T LOSS PITCH UP AT 0.2°/SEC TO ORDEAL 0, 5, O. BEGIN ORB RATE
REVIEW LDMK MAP
CQUIRE MSFN ON OMNIS
ACQUIRE S/C
REPORT NEW COORDINATES
'PSEUDO LDG
SITE SIGHTING!
•
MISSION
AS503/103 MSC Form 1910 (Nov Ea)
EDITION
FINAL
TIME
DATE
November 22, 1968
79:.00 - 80:00
FLIGHT PLANNING BRANCH
DAY/REV
PAGE
4/LPO
2-61
FLIGHT PLAN CMP
CDR
80:00
LPAP
P22 AUTO OPTICS IPII TCAI LDMK NO. B1 LAT +02.675°N LONG/2 +17.512° -000.99 nm ALT NEW COORDINATES LAT LONG/2 ALT
80:13
0:19
PITCH DWN 0.3°/SEC AT ACQ
0 nm
IMU REALIGN P52 OPTION 3 - REFSMMAT AND GYRO DRIFT TEST STAR ID , STAR ANGLE DIFF
2/150/B&W, 1/250 (R&B) TRANS TO RIGHT COUCH
TORQUE ANGLET— -Xy
MISSION
EDITION
AS503/103
FINAL
MSC Form 1910 (Nov 88)
•
0
AT LOSS ROLL RIGHT 180° AT 2°/SEC. GO INERTIAL V64 ACQUIRE MSFN ON HGA ACQUIRE S/C P27 UPDATE: STATE REPORT NEW COORDINATES VECTOR RECORD BLOCK DATA VOICE (TEI 7 )& MAP UPDATE UPDATE: BLOCK DATA & MAP UPDATE 6/7 VERIFY SYSTEMS STATUS DUMP DSE 1/80/B&W, 1/250 F 2.8 IN
REST PERIOD (3 HOURS)
ROLL LEFT 180° AT 2°/SEC PITCH UP AT 0.2°/SEC TO BEGIN ORDEAL 0, 5, O. ORB RATE
MCC—H
•
EAT PERIOD 16/SXT/NEW C XT, 6 fps
TIME
DATE
November 22, 1968
80:00 - 81:00
FLIGHT PLANNING
DAY/REV
PAGE
f
2-62
4/LPO
H
14 ,
0 •
0 • FLIGHT PLAN 81:00 --
MCC—H
LMP
CMP
CDR
BIOMED Sw - LEFT
ICNTL PT SIGHTINGS (3)1 81:05-
81:11 -
P22 MAN ACQ SA 0° TA 10° IPI PITCH DWN AT 0.3°/SEC AT ACQ ACQ CP1 NO. 504 ---05.250°S LAT AT LOSS PITCH UP AT LONG/2 -81.350° 0.5°/SEC TO +000.00 nm ALT ORDEAL 0, 5, 0
EAT PERIOD
NEW COORDINATES LAT LONG/2 ALT EAT PERIOD NEW COORDINATES LAT LONG/2 ALT
P22 MAN ACQ SA 0° TA 10° IPI I ACQ I .• NEW COORDINATES CP3 NO. 334 -09.100°S LAT PITCH OWN AT 0.3°/SEC AT LAT . LONG/2 +47.950° LONG/2 CQ +000.00 nm ALT ALT
nm
ACQUIRE 5/C °
nm
'PSEUDO LOG SITE SIGHTING' P22 AUTO OPTICS
MISSION
EDITION
DATE
AS503/103
FINAL
November 22, 1968
MSC Form 1910 (Nov 68)
nm
T
P22 AUTO OPTICS IPI I -TCA 1 ' PITCH DWN AT 0.3°/SEC AT CP2 NO. 526 -10.200°S ACQ LAT LONG/2 +77.550 ° +000.00 nm ALT T LOSS PITCH UP AT 0.5°/SEC TO RDEAL 0, 5, 0
AT LOSS PITCH UP AT 0.5°/SEC TO ORDEAL 0, 5, 0
0
FUG
TIME
81:00 - 82:00
DAY/REV
PAGE
4/LPO
2-63
FLIGHT PLAN CMP •
82:00 —
PITCH DWN AT 0.3°/SEC AT ACQ 82:11 AT LOSS ROLL RIGHT 180° AT 2°/SEC GO INERTIAL ACQUIRE MSFN ON HGA
82:17
LMP
IP I TCA LDG SITE NO. B1 LAT +02.675°N LONG/2 +17.512° ALT -000.99 nm NEW COORDINATES LAT LONG/2 ALT
MCC—H
0
nm
REPORT NEW COORDINATES RECORD MAP UPDATE & BLOCK DATA (TEI 8 ) REST PERIOD (2 HOURS)
IMU REALIGN P52 OPTION 3 - REFSMMAT AND GYRO DRIFT TEST STAR ID STAR ANGLE JIF!F --
82:30 —
ACQUIRE S/C P27 UPDATE: STATE VECTOR VOICE UPDATE: MAP UPDATE 8 BLOCK DATA DUMP DSE
TORQUE ANGLES: X Y Z GDC ALIGN TO IMU
82:53
83:00
— I
•
ROLL LEFT 180° AT 2°/SEC TO HEADS UP
16/SXT/CXT„6 fps
I
MISSION
AS503/103, MSC Form 1910 (Nov 08)
0 0
EDITION
FINAL
DATE
November 22, 1968
TIME
82:00 - 83:00
DAY/REV
4/LPO
PAGE
2-64
FLIGHT PLANNI
0
0
0 •
•
0
FLIGHT PLAN PITCH DWN AT. 0.2°/SEC TO ICNTL PT SIG}-TINGS (3) ORDEAL 0, 5, 0 P22 AUTO OPTICS 11)1 __. .._, __ __ TCA CP1 NO. 504 LAT -05.250°S LONG/2 -81.350° PITCH DWN AT 0.3°/SEC ALT +000.00 nm AT ACQ
83:03
83:10
P22 AUTO OPTICS IPI
AT LOSS PITCH UP AT 0.5°/SEC TO ORDEAL 0, 5, 0
EGIN REV 8
TCA
PITCH OWN AT 0.3°/SEC AT ACQ
83:30
MCC-H ti
LMP
CMP
CDR
3:00
REST PERIOD (2 HOURS) NEW COORDINATES LAT LONG/2 ALT
nm
. •
.
CP2 NO. 526 LAT -10.200 ° S LONG/2 +77.550° +000.00 nm ALT
NEW COORDINATES LAT LONG/2 ALT
0 nm
PITCH UP AT 0.5 ° /SEC TO ORDEAL 0, 5, 0
83:39 ACQUIRE MSFN ON OMNIS . PITCH OWN AT 0.3°/SEC AT ACQ
P22 AUTO OPTICS IPII TCA • CP3 NO. 334 LAT • -09.100°S LONG/2 +47.950 ° +000.00 nm ALT
ACQUIRE S/C NEW COORDINATES LAT LONG/2 ALT
0
nm
PITCH UP AT 0.5°/SEC TO ORDEAL 0, 5, 0
PSEUDO LOG SITE SIGHTINGI
•
P22 AUTO OPTICS
84:00 MISSION
EDITION
AS503/103
FINAL
MSC Form 1910 (Nov 68)
TIME
DATE
November 22, 1968
83:00 - 84:00
FLIGHT PLANNING BRANCH
DAY, REV
4/LPO
PAGE
2-65
FLIGHT PLAN 84:0
IPI
PITCH DWN AT 0.3°/SEC AT ACQ 84:10 AT LOSS ROLL RIGHT 180° AT 2°/SEC (HEADS DWN) GO INERTIAL ACQUIRE MSFN ON HGA
84:16
I
CMP •
TCA LDMK NO. 81 LAT +02.512°N LONG/2 +17.512° ALT +000.99 nm
NEW COORDINATES LAT LONG/2 ALT
I
nm
REST PERIOD (2 HOURS)
1
LION CANISTER CHANGE (CARTRIDGE 10 FROM B5 INTO CANISTER B)
ACQUIRE S/C
2/150/NEW B&W, 1/250 (R&B)
IMU REALIGN P52 OPTION 3 - REFSMMAT AND GYRO DRIFT TEST STAR ID , _ STAR ANGLE DIFF
84:30 —
MCC—H
LMP
BIOMED Sw - RIGHT
P27 UPDATE: STATE VECTOR
VERIFY SYSTEMS STATUS
DUMP DSE VOICE UPDATE: MAP UPDATE 8/9 BLOCK DATA
TORQUE ANGLES: X RECORD MAP UPDATE & BLOCK DATA (TEI 9 )
z DC ALIGN PITCH UP AT 0.2°/SEC TO ORDEAL 180, 0, 0 (HEADS DWN) BEGIN ORB RATE
84:51
1/80/H.S. B, f2.8, POL REST PERIOD (2 HOURS)
SR -12 MIN START DARK 1/80 B&W, 1/4, f4,POL
16/18/NEW CEX, 1/250, f2.8, 1 fps
85: 00 -I
•
•
MISSION
I DITION
AS503/103
FINAL
MSC Form 1910 (Nov 58)
•
SR -4 MIN START CORONA
0
TIME
DATE
November 22, 1968
84:00 - 85:00
DAY/REV
4/LPO
FLIGHT PLANNING BRANCH
0
PAGE
2-66
•
,4r
FLIGHT PL AN AT S/C SR PITCH UP 60° AT 0.5°/SEC` TO ORDEAL 180, 300, 0 CONTINUE ORB RATE START CAMERA AT S/C SR +12 MIN
85:08
MCC—H •
LMP •
CMP •
CDR
85:00 85:0
1/80/NEW C BRKT INT
START CAMERA I AT SR +12 MIN
ZERO PHASE TARGETS OF OPPORTUNITY
BEGIN REV 9
CONVERGENT STEREO PHOTOGRAPHY-EXTRA EXP EACH 5 MIN NITE TIME
85:30 REST PERIOD
85:3
(2 HOURS)
PITCH UP 40° AT 0.2°/SEC TO ORDEAL 180, 260, 0
ACQUIRE MSFN ON HGA
ACQUIRE S/C
RECORD MAP UPDATE
VOICE UPDATE:
MAP UPDATE 9/10
]
ROLL RT AS REQD TO SHADE WINDOWS-KEEP X-AXIS +10° ON TRACK 2/80 B&W/R&B
TV
4 STOPS WIDER
86: 00 TIME
MISSION
EDITION
DATE
AS503/103
FINAL
November 22, 1968
MSC Farm 1910 No
6 8)
FLIGHT PL
N I
85:00 - 86:00
DAY/REV
PAGE
4/LF0
2-67
FLIGHT PLAN CMP
CDR •
LMP
MCC—H
I
ri
REST PERIOD (2 HOURS)
STOP CAMERA AT TERM
STOP CAMERA AT TERM 2/80/HS, 1/4 f2.8
ROLL RIGHT 180° IF REQD PITCH DWN 60° AT 0.2°/SEC TO ORDEAL 180, 310, 0 (HEADS DWN) GO INERTIAL
P27 UPDATE: STATE VECTOR RECORD BLOCK DATA (TEI 10 ) & MNVR PAD
VOICE UPDATE: BLOCK DATA MNVR PAD DUMP DSE
IMU REALIGN P52 OPTION 3 - REFSMMAT AND GYRO DRIFT TEST , STAR ID STAR ANGLE DIFF
VERIFY SYSTEMS STATUS
TORQUE ANGLEST----x Y PITCH DWN AT 0.2°/SEC TO ORDEAL 180, 180, 0 BEGIN ORB RATE (HEADS DWN +Z FWD)
1/80/NEW B&W 1/250, f2.8 INT (CDR) 2/150/C, 1/250
• MISSION
EDITION
DATE
AS503/103
FINAL
i November 22, 1968
MSC Form 1910 (Nov 68)
TIME
86:00 - 87:00
DAY/REV
PAGE
4/LPO
2-58
FLIGHT PLANNING BRANCH
0
0
I
• FLIGHT PLAN MCC—H •
LMP
CMP
CDR
•
MNVR TO TEI ATT SXT STAR CK PITCH UP AT 0.2°/SEC TO ORDEAL 180, 180, 0 BEGIN ORB RATE
BEGIN REV 10
EAT PERIOD
EAT PERIOD
EAT PERIOD
2/150/B&W OR 0,1/250 ACQUIRE MSFN ON HGA
ACQUIRE S/C
RECORD MNVR PAD, BLOCK DATA (TEI 11 ), MAP UPDATE
-
MISSION
AS503/103 MSC Form 1910 (Nov 68)
EDITION
FINAL
TIME
DATE
November 22, 1968
87:00 - 88:00
FLIGHT PLANNING BRANCH
DUMP DSE PIPA BIAS CK P27 UPDATE: STATE VECTOR TARGET LOAD VOICE UPDATE:
MNVR PAD BLOCK DATA
1'
MAP UPDATE 10
DAY/REV
PAGE
4/LPO
2-69
FLIGHT PLAN CMP •
CDR
88:00 —
LMP
MCC—H
BIOMED Sw - GO/NO GO LEFT
GO/NO GO FOR TEI
88:07 88:13 2/150/C SPOT 16/75/CEX/1 fps/SPOT
IMU REALIGN P52 OPTION 3 - REFSMMAT AND GYRO DRIFT TEST STAR ID STAR ANGLE DIFF
PRE TEI SYSTEMS CKS C&W CK CM RCS CK SM RCS CK SPS PERIODIC MONITOR EPS PERIODIC MONITOR ECS PERIODIC MONITOR
TORQUE AGES
Y
88:30 — EXTERNAL AV P30 EMS TEST SPS THRUST P40 MNVR TO BURN ATT
PUGS MODE Sw - AUX
MISSION
EDITION
AS503/103
FINAL
MSC Form 1910 (Nov 68)
• •
SXT STAR CK TRANSFER TO COUCH
TIME
DATE
November 22, 1968
88:00 - 89:00
DAY/REV
_
4/LPO
PAGE
2-70
FLIGHT PLANNING BRANCH
(4
0
0 TEI BURN CHART
BURN STATUS REPORT X I X X X
ATIG BT •t
T RIM >XXi 1 XI X X )()0 !
V gx
IY
REMARKS:
10 ° /SEC TAKEOVER
2850-950
gx
V gY T-V gz C
X XIX X X A Xti 'X X:Xi
TEl
ATT DEVIATION 10° TAKEOVER
SHUTDOWN TIME B/T+2 SEC & AV -40 fps c
RESIDUALS TRIM TO 2,0 fps
TEI ABORT MODES-SYSTEMS PROBLEMS:15-MIN ABORT CHART OTHERWISE TEI V qo B/T ABORT MODE TRAJECTORY V
t
P or Y RATES
FUEL . !Ox - 'UNBALANCE
950-600 600-0
0 -2:00 LUNAR ORBIT MODE III AFTER 1 REV 2:00-2:20 UNSTABLE 5-HR COAST, MODE I 2:20-2:54 HYPERBOLIC COAST OUT OF SPHERE - P37
FLIGHT PLAN CMP •
CDR •
89 : 0 0
LMP
MCC—H
•
SM RCS MON CK GETI = 89:15:07 AV = 3532 fps BT = 3, MIN 26 SEC
GDC ALIGN TO IMU
iTEII
89:76 -
SM RCS MON CK
PITCH UP TO VERTICAL +Z FWD) TO ACQ MOON
SPS MON CK
IN WIND W
ACQUIRE MSFN WITH HGA
CDR CREW STATUS REPORT TRANS CSM STATE VECTOR TO LM SLOT 89:30 —
SLEEP PERIOD (5 HOURS)
ml
REINITIALIZE W MATRIX R +00094 1 R 2 +00571 R 3 +00003
ACQUIRE S/C
TEI BURN STATUS REPORT
INITIATE BAT CHARGE BIOMED Sw - CENTER
89:45 -
I
DUMP DSE UPDATE ENTRY REFSMMAT •
•
90:00 :I MISSION
AS503/103,
EDITION
FINAL
DATE
TIME
November 22, 1968
•
89:00 - 90:00
DAY/ REV
4/TEC
PAGE
2-71
FLIGHT PLANNING BRANCH
MSC Form 1310 (Nov 68)
4I)
4D 0
0
0 • FLIGHT PLAN
MCC— H
LMP •
LMP •
CDR
90:00 --
MNVR TO P52 ATT IMU REALIGN P52 OPTION 1 - PREFERRED STAR ID STAR ANGLE DIF — 90:15-
TORQUE ANGLET- -X
90:30
SLEEP PERIOD (5 HOURS)
TRN BIAS MNVR TO SIGHTING ATT
LCISLUNAR NAVIGATION P231 1. STAR 01 LNH L H STAR 2 SETS — 90:45 -
2. STAR 02 LNH STAR L H
•
•
91:00 --
, MISSION
EDITION
DATE
AS503/103
FINAL
November 22,1968
MSC Form 1910 (Nov 68)
TIME
90:00 - 91:00
FLIGHT PLANNING BRANCH
DAY/REV
PAGE
4/TEC
2-72
FLIGHT PLAN
.
CMP
CDR
MCC—H
LMP
91:00
91:15
TRN BIAS MNVR TO SIGHTING ATT 3.
STAR 10 LFH STAR L
H
2 SETS 91:30
F
SLEEP PERIOD (5 HOURS)
4. STAR 11 LFH STAR
L
H
2 SETS
91:45
92:00 MISSION
AS503/103 MSC Form 1910 (Nov 08)
EDITION
FINAL
TIME
DATE
November 22,1968
91:00 - 92:00
DAY/REV
4/TEC
PAGE
2-73
FLIGHT PLANNING BRANCH
0
•
0
0
FLIGHT PL AN e•-11L—i
MCC—H I
LMP •
OAP •
CDR
92:00
MNVR TO PTC ATT P 029 Y 315 P Y ROLL 0,1°/SEC
92:15
S
92:30
F
SLEEP PERIOD (5 HOURS)
92:45
93:0
i MISSION
AS503/103 MSC Form 1910 (Nov 69)
EDITION
FINAL
TIME
DATE
November 22,1968
92:00 - 93:00
FLIGHT PLANNING BRANCH
DAY/REY
PAGE
4/TEC
2-74
FLIGHT PLAN CDR
CMP
MCC—H
CMP
93: 00—
SLEEP PERIOD (5 HOURS)
93:30 -
EAT PERIOD
EAT PERIOD
BIOMED Sw LEFT CMP/LMP CREW STATUS REPORT
MIR
94:00 —
94:30 -
95:00
EAT PERIOD
SLEEP PERIOD (7 HOURS)
]
MISSION
EDITION
AS503/103
FINAL
MSC Farm 1910 (Nov BB)
•
SLEEP PERIOD (5 HOURS)
0
TIME
DATE
November 22, 1968
93:00 - 95:00
DAY/REV
4/TEC
PAGE
2-75
FLIGHT PLANNING BRANCH
•
0 0
•
0
'0
0
FLIGHT PLAN 95:00_
CDR •
•
CMP
thiP
MCC—H I
CDR CREW STATUS REPORT
95:15 -
95:30
SLEEP PERIOD (5 HOURS)
S F
—
SLEEP PERIOD (5 HOURS)
N
95:45 -
LiOH CANISTER CHANGE (CARTRIDGE NO. 10 FROM B5 INTO CANISTER B)
MNVR TO P52 ATT 96:00-MISSION
EDITION
DATE
TIME
AS503/103
FINAL
November 22, 1968
95:00 - 96:00
MSC Farm 1918 (Nov 68)
FLIGHT PLANNING BRANCH
DAY/REV
4/TEC
PAGE
2-76
FLIGHT PLAN CDR
LMP
CMP
MCC-H
I
96: 00 — IMU REALIGN P52 OPTION 3 - REFSMMAT STAR ID STAR ANGLE DI FF --TORQUE ANGLES: X
Y
96:75
MNVR TO PTC ATT P 029 Y 315 ROLL 0.17TEC
SLEEP PERIOD (5 HOURS)
96:30 —
SLEEP PERIOD (5 HOURS)
96:45 —
97:00
:1
I MISSION
EDITION
AS503/103
FINAL
MSC Form 1910 (Nov E8)
0
TIME
DATE
November 22, 1968
96:00 - 97:00
FLIGHT PLANNING BRANCH
DAY/REV
5/TEC
PAGE
2-77
• •
•
0 0
FLIGHT PLAN CDR
MCC—H
LMP
C MP
97: 00—
97:30 -
SLEEP PERIOD (5 HOURS)
98:00_
F N
SLEEP PERIOD (5 HOURS)
98:30 -
99:00
•
•
MISSION
EDITION
AS503/103
FINAL
MSC Form 1910 (Nov 68)
TIME
DATE
November 22,
1968
97:00 - 99:00
FLIGHT PLANNING BRANCH
DAY/REV
5/TEC
PAGE
2-78
FLIGHT PL AN CMP
CDR
LMP
MCC—H
99:00 —
BIOMED Sw -,C ENTER
99:15 -
99:30 —
EAT PERIOD
EAT PERIOD
I
EAT PERIOD
1=1
99:45 -
100:00
•
MISSION
EDITION
AS503/103
FINAL
MSC Form 1910 (Nov 68)
0
DATE
November 22,
TIME
1968
99:00 - 100:00
DAY/ REV
5/TEC
PAGE
2-79
FLIGHT PLANNING BRANCH
0
•••
0 0 FLIGHT PLAN
100:00
MNVR TO P52 ATT
MCC—H
LMP
CMP
CDR
CMP/LMP CREW STATUS REPORT
IMU REALIGN P52 OPTION 3 - REFSMMAT STAR ID STAR ANGLE DIFF TORQUE ANGLES: X
100:15
MNVR TO SIGHTING ATT
TRN BIAS LCISLUNAR NAVIGATION P231 1. STAR 02 LNH STAR L H -1 SET
100:30
2.
STAR 11 STAR 1 SET
LFH L
H
100:45 STAR 01 LNH L STAR 1 SET
3.
H
MNVR TO SIGHTING ATT
•
10 1 :00 MISSION
S503 103 MSC Form 1910 (Nov 68)
EDITION
DATE
TIME
FINAL
November 22, 1968
100:00 - 101:00
FLIGHT PLANNING BRANCH
DAY/REV
PAGE
5/TEC
2-80
FLIGHT PLAN CMP
CDR
IMP •
101:00
•
MCC—H
101:15
TRN BIAS
CISLUNAR NAVIGATION P23 STAR 22 EFH STAR E H 2 SETS
101:30
• STAR 26 ENH STAR E 101 :45
H
2 SETS
BIOMED Sw - RIGHT 102:00
a
MISSION
EDITION
AS503/103
FINAL
MSC Form 1910 (Nov 00)
0
TIME
DATE
November 22, 1968
101:00 - 102:00
FLIGHT PLANNING BRANCH
DAY/REV
PAGE
5/TEC
2-81
0 0
0 FLIGHT PL AN
MCC—H
LMP
CMP
CDR
I
102:00 3.
STAR 31 ENH STARE 2 SETS --
H
102:15
P27 UPDATE STATE VECTOR TGT LOAD REFSMMAT
102:30
MNVR TO P52 ATT
VOICE UPDATE: MNVR PAD
RECORD MNVR PAD IMU REALIGN P52 OPTION 3 - RESFMMAT STAR ID STAR ANGLE DI FF-
102:45
TORQLTE ANGUE-S. .-- -X
103:00 MISSION
EDITION
AS503/103
FINAL
MSC Form 1919 (Nov ES)
DATE
November 22, 1968 FLIGHT
TIME
102:00 103:00
DAY/REV
PAGE
5/TEC
2-82
MCC ' S
BURN STATUS REPORT
X
X
X
X
---- 7TRIM X X X
BURN CHART
tTIG ,BT V gx
P or Y RATES
ATT DEVIATION
SHUTDOWN TIME
10° TAKEOVER
B/T +1
RESIDUALS
_ MCC(ALL) 10°/SEC TAKEOVER
R
P
X X X
SEC
TRIM TO 0.2 fos
'XXX
V ....+ _.
;\) 1 co I.)
V
gx gY
v gz
P
AV C
X X X
FUEL
X X X
Ox
X X X
UNBALANCE
REMARKS:
0 0
•
•
•
0
0 0
FLIGHT PLAN ,
103:15
MCC —H
LMP •
CMP •
CDR
103:00
I
V47 TRANS LM STATE VECTOR TO CSM SLOT EXT hV P30 SPS/RCS THRUST P40/41
103:30 MNVR TO BURN ATT SXT STAR CK
103:45
EMS TEST
TEI+15
GDC ALIGN TO IMU 1CT 5 0.--- NOMINALLY ZERO
PIPA BIAS CK
TRANS TO COUCH
SM RCS MON CK
104:00
, MISSION
AS503/103 MSC Form 1210 (Nov 68)
EDITION
FINAL
TIME
DATE
November 22, 1968
103:00 - 104:00
FLIGHT PLANNING BRANCH
DAY/REV
5/TEC
PAGE
2-83
FLIGHT PLAN CDR
•
104:00 --
CMP
V66 TRANS CSM STATE VECTOR TO LM SLOT
MCC-11
LMP
MCC 5 BURN STATUS REPORT INITIATE BAT CHARGE
SM RCS MON CK
I
UNSTOW TV CAMERA
104:15 — TV
104:30 —
EAT PERIOD
F
EAT PERIOD
EAT PERIOD
.l-
N
STOW TV CAMERA
104:45 —
CDR CREW STf TUS REPORT 105:00 —1 MISSION
EDITION
DATE
AS503/103
FINAL
November 22 1968
MSC Form 1910 (Nov 68)
•
TIME
104:00 - 105:11
DAY/REV
PAGE
1111/111111111/111111
FLIGHT PLANNING BRANCH
0 0
0 0
0 FLIGHT PLAN •
105:00--
LiOH CANISTER CHANGE (CARTRIDGE NO. 12 FROM B6 INTO CANISTER 13)
105:15 -
MCC—H
LMP •
crow
CDR
6
BIOMED Sw - CENTER TRANS TO LH COUCH MNVR TO SIGHTING ATT
TRN BIAS CISLUNAR NAVIGATION P23 1.
STAR 22 EFH E H STAR 2 SETS
M 105:30 —
S F
N
SLEEP PERIOD (7 HOURS)
2. STAR 26 ENH STAR E H 1 SET 105:45 -
STAR 31 ENH STAR E H 2 SETS
3.
•
106:00-MISSION
EDITION
AS503/103
FINAL
MSC Form 1610 (Nov 68)
TIME
DATE
November 22, 1968
105:00 - 106:00
FLIGHT PLANNING
N
DAY/REV
PAGE
5/TEC
2-85
FLIGHT PLAN LMP •
CMP •
CDR
106:00
MCC —H
S
MNVR TO SIGHTING ATT
TRN BIAS STAR 02 LNH STAR L 1 SET
1.
106:15
STAR 11 LEH STAR L
2. 106:30
S
F
SLEEP PERIOD (7 HOURS)
H
H
1 SET
N 3.
STAR 01 LNH STAR L
H
1 SET 106:45 RETURN TO EARTH P37
107:00-1 MISSION
EDITION
AS503/103
FINAL
MSC Form i9:0 (Nov 68)
0 0
DATE
November 22, 1968
TIME
106:00 - 107:00
DAY/REV
5/TEC
PAGE
2-86
FLIGHT PLANNI
0 0
•
•
41
0
I
.
FLIGHT PLAN MCC—H •
LIMP
CDR
107:00
107:15
107:30
S
F
N
SLEEP PERIOD (7 HOURS)
MNVR TO P52 ATTITUDE
IMU REALIGN P52 OPTION 3 - REFSMMAT STAR ID STAR ANGLE DEFT 1 07:45
TORQUE ANGLES:
MNVR TO SIGHTING ATT
•
108:00 MISSION
EDITION
DATE
AS503/103
FINAL.
November 22,1968
MSC Form 191O (Nov 68)
TIME
107:00 - 108:00
FLIGHT PLANNING BRANCH
DAY/REV
5/TEC
PAGE
2-87
FLIGHT PLAN CMP •
CDR
108:00 --
LMP •
MCC—H •
CISLUNAR NAVIGATION P231 BIOMED Sw - RIGHT 1.
STAR 22 EFH STAR E H 1 SET
2.
STAR 26 ENH STAR E 2 SETS --
3.
STAR 31 ENH STAR E H 2 SETS
108:15 -
1
108: 30—
SLEEP PERIOD (7 HOURS)
-I
MNVR TO PTC ATT P 029 Y 315 P Y ROLL 0.1°/SEC P&Y FREE REESTABLISH PTC AT +15° IN P OR Y AND RECORD GET
108:45
RETURN TO EARTH P37
109:00 :1 MISSION
EDITION
AS503/103
FINAL
MSC Form 1910 (Nov 08)
9 0
TIME
DATE
November 22,1968
108:00 - 109:00
FLIGHT PLANNING BRANCH
DAY/REV
5/TEC
PAGE
2-88
•
0
FLIGHT PLAN MCC—H •
LMP •
CMP
CDR
109:00
109:30
H S 1 10:0 0
F N
SLEEP PERIOD (7 HOURS)
110: 3 0
•
•
111:00 MISSION
AS503/103 MSC FLIrm 1910 (Nov 6$)
EDITION
FINAL
TIME
DATE
November 22,1968
109:00
- 111:00
FLIGHT PLANNING BRANCH
DAY/REV
PAGE
5/TEC
2-89
FLIGHT PLAN CDR
CMP
LMP
MCC— H
111:00
SLEEP PERIOD (7 HOURS)
111:30
EAT PERIOD
I
EAT PERIOD
CMP/LMP CREW STATUS REPORT BIOMED Sw - LEFT 112:00
EAT PERIOD
112:30
113:00
SLEEP PERIOD (7 HOURS)
SLEEP PERIOD (7 HOURS)
-I MISSION
AS503/103 MSC Form 1910 (Nov 58)
EDITION
FINAL
TIME
DATE
November 22,
196e
111:00 - 113:00
DAY/ L
Inv
5/TEC
PAGE
2-90
FLIGHT PLANNING BRANCH
0 0
•
0
• 4• FLIGHT PLAN MCC-H
LMP
CMP
CDR
f
113:00
CDR CREW STATUS REPORT 113:30 -
.M1
114:00 —
S
SLEEP PERIOD (7 HOURS)
F N
SLEEP PERIOD (7 HOURS)
114:30
.=1
MNVR TO P52 ATT
•
115:00 MISSION
EDITION
AS503/103
FINAL
MSC Form 19:0 (Nov 68)
TIME
DATE
November 22, 1968
113:00 - 115:00
FLIGHT PLANNING BRANCH
DAY/REV
5/TEC
PAGE
2-91
FLIGHT PLAN CDR
CMP
L PAP
MCC—H 4
115:00 IMU REALIGN P52 OPTION 3 - REFSMMAT STAR ID STAR ANGLE DIFF TORQUE ANGLES: X Y
115:15
MNVR TO PTC ATT P 029 Y 315 P Y ROLL 0.1 °/SEC SLEEP PERIOD (7 HOURS)
115:30
SLEEP PERIOD (7 HOURS)
115:45
116:00
i MISSION
EDITION
DATE
AS503/103
FINAL
November 22,1968
MSC Form 1910 (Nov 68)
• 0
TIME
115:00 - 116:00
FLIGHT PLANNING BRANCH
DAY/REV
5/TEC
PAGE
2-92
•
0 0
•
FLIGHT PL AN CDR
CMP
LMP
SLEEP PERIOD (7 HOURS)
SLEEP PERIOD (7 HOURS)
MCC-H
116:00
116:30
117:00
117:30
•
118:00 MISSION
EDITION
DATE
AS503/103
FINAL
November 22,1968
MSC Form 1910 (Nov 66)
TIME
116:00 - 118:00
FLIGHT PLANNING BRANCH
DAY/REV
5/TEC
PAGE
2-93
FLIGHT PLAN 118:00 —
EAT PERIOD
118:30 -
SLEEP PERIOD (7 HOURS)
SLEEP PERIOD (7 HOURS)
LiOH CANISTER CHANGE (CARTRIDGE NO. 13 FROM B6 INTO CANISTER A)
M S 119:00 —
MCC ..-14 S
L MP
CMP
CDR
•
F
BIOMED S - CENTER
N
119:30 —
EAT PERIOD
EAT PERIOD
1 MNVR TO SIGHTING ATT
TRN BIAS
•
120:00 MISSION
EDITION
DATE
AS503/103
FINAL
November 22,1968
•
MSC Form 1910 (Nov 68)
0
TIME
118:00 - 120:00
DAY/REV
PAGE
5/TEC
2-94
FLIGHT PLANNING BRANCH
0 0
FLIGHT PLAN •
CISLUNAR NAVIGATION P23 .
STAR 22 EFH STARE 1 SET -
CMP/LMP CREW STATUS REPORT
H
.
STAR 26 ENH STAR E H — 1 SET
.
STAR 31 ENH STAR E H — 1 SE 7-
120:15 -
MCC—H •
LMP •
CMP
CDR
120:00 -
120:30
120:45 -
RECORD MNVR PAD
P27 UPDATE: STATE VECTOR TOT LOAD VOICE UPDATE: MNVR PAD
121:00 -MISSION
EDITION
AS503/103
FINAL
MSC Form 1919 (Nov 98)
TIME
DATE
November 22, 1968
120:00 - 121:00
FLIGHT PLANNING BRANCH
DAY/REV
6/TEC
PAGE
2-95
MCC'S
BURN STATUS REPORT X
•
X
XX
BURN CHART
_ATIG
•
BT V gx
TRIM. XXX
R
XXX
P
X XX
Y V V
V
c)
P or V RATES MCC(ALL) 10°/SEC TAKEOVER
ATT DEVIATION
SHUTDOWN TIME
10° TAKEOVER
B/T +1
SEC
RESIDUALS TRIM TO 0.2 fns
gx gY
9.2 AV c
X X X
FUEL
X
X
X
Ox
X X
X
UNBALANCE
REMARKS:
•
0
'
0 • FLIGHT PL AN
MCC—H •
LMF
CMP •
CDR •
121:00
MNVR TO P52 ATT IMU REALIGN P52 OPTION 3 - REFSMMAT STAR ID STAR ANGLE DIFF -121:15
ToRqUT ANGLET— -X Y
Z V47 TRANS LM STATE VECTOR TO CSM SLOT EXT AV P30 121:30 SPS/RCS THRUST P40/41 MNVR TO BURN ATT
SXT STAR CK 121:45
TEI f 33 HRS
EMS TEST
TRANS TO COUCH
GDC ALIGN MCC 6 ❑ V=NOMINALLY ZERO
SM RCS MON CK
PIPA BIAS CK
•
122:00 MISSION
EDITION
DATE
AS503/103
FINAL
November 22,1968
MSG Form 1810 (Nov 68)
TIME
121:00 - 122:00
FLIGHT PLANNING BRANCH
DAY/REV
6/TEC
PAGE
2-96
FLIGHT PLAN CDR
CMP
MCC—H
LMP
I
122:00 V66 TRANS CSM STATE VECTOR TO LM SLOT
SM RCS MON CK
MCC 6 BURN STATUS REPORT INITIATE BAT CHARGE
STONED Sw - RIGHT 122:15
MNVR TO SIGHTING ATT
122:30
TRN BIAS
1CISLUNAR NAVIGATION P231 1.
STAR 02 LNH STAR L H 2 SETS
2.
STAR 01 LNH STAR L H 1 SET
122:45
I
123:00 MISSION
EDITION
DATE
AS503/103
FINAL
November 22,1968
MSC Form 1910 (Nov 68)
TIME
122:00 - 123:00
DAY/REV
6/TEC
PAGE
2-97
FLIGHT PLANNING BRANCH
0
0 FLIGHT PLAN 123:00
MCC—H
OAP •
CMP •
CDR
RETURN TO EARTH P37 MNVR TO SIGHTING ATT
123:30
123:30
F N TRN BIAS [CISLUNAR NAVIGATION P23 1.
STAR 22 EFH STAR E H 2 SETS —
2.
STAR 26 ENH E STAR 1 SET
123:45
124:00 MISSION
EDITION
AS503/103
FINAL
MSC Form 1910 (Nov 68)
H • TIME
DATE
November 22, 1968
1
123:00 - 124:00
FLIGHT PLANNING BRANCH
DAY/REV
PAGE
6/TEC
2-98
FLIGHT PLAN CMP
CDR
1MP
124:00 —,
MCC—H
STAR 31 ENH STAR E H 2 SETS —
124:15 -
MNVR TO PTC ATT P 029 Y 315
124:30
RETURN TO EARTH P37
ROLL 0.17 EC
124:45 -
125:00-1 MISSION
EDITION
DATE
AS503/103
FINAL
November 22,1968
MSC Form 1910 (Nov 68)
•
0
TIME
•
124:00 - 125:00
DAY/REV
6/TEC
PAGE
2-99
FLIGHT PLANNING BRANCH
0 0
•
• •
0 FLIGHT PLAN
MCC—H •
LMP
CMP
CDR •
•
125:00 --
BIOMED Sw - CENTER
125:30 -
M S F
126:00 —
N
126:30 -
EAT PERIOD
EAT PERIOD
EAT PERIOD
CDR CREW STATUS REPORT 4
6
127:00 -MISSION
EDITION
AS503/103
FINAL
MSC Form 1910 (Nov 68)
TIME
DATE
November 22,1968
125:00 - 127:00
FLIGHT PLANNING BRANCH
DAY/REV
PAGE
6/TEC
2-100
FLIGHT PLAN LMP
CMP
CDR
MCC—H
127:00 — LiOH CANISTER CHANGE (CARTRIDGE NO. 14 FROM B6 INTO CANISTER B)
127:30 11.
BIOMED Sw - RIGHT UNSTOW TV CAMERA SLEEP PERIOD (7 HOURS)
128:00 —
TV
.m1
STOW TV CAMERA 128:30 —
i 129:00 MISSION
EDITION
DATE
AS503/103
FINAL
November 22,1968
MSC Form 1610 (Nov 68)
TIME
127:00 - 129:00
DAY/REV
PAGE
6/TEC
2-101
FLIGHT PLANNING BRANCH
0 0
0 FLIGHT PLAN 129:00 —
•
MCC —H
LMP
CMP •
CDR
•
I
129:15 -
M 129:30 —
S F N
SLEEP PERIOD (7 HOURS) MNVR TO P52 ATT
IMU REALIGN P52 OPTION 3 - REFSMMAT , STAR ID STAR ANGLE 15-I-FF -129:45 -
TORQUE ANGLE S : X Y
MNVR TO SIGHTING ATT
TRN BIAS
•
130:00-- •
MSC
MISSION
EDITION
AS503/103
FINAL
Form 1910 (Nov 68)
TIME
DATE
November 22,1968
129:00 - 130:00
FLIGHT PLANNING BRANCH
DAY/REV
PAGE
6/TEC
2-102
FLIGHT PLAN CMP •
CDR
130:00 —
MCC—H
LMP
CISLUNAR NAVIGATION P23 ' STAR 02 LNH STAR_ 2 SETS —
H
130:15 -
S 130:30 —
F N
SLEEP PERIOD (7 HOURS)
MNVR TO SIGHTING ATT
TRN BIAS
130:45 —
.
STAR 22 EFH STAR E 2 SETS
H
S
131:00 MISSION
AS503/103 MSC Forin 1910
•
(NoV $8)
EDITION
FINAL
TIME
DATE
November 22,
1968
130:00
-
131:00
DAY/REV
6/TEC
PAGE
2-103
FLIGHT PLANNING BRANCH
0
0
0 0 FLIGHT PLAN MCC-H
LMP
CMP
CDR
6
131 :00 BIOMES Sw - CENTER
2.
STAR 26 ENH E H STAR 2 SETS
3.
STAR 31 ENH STARE H 2 SETS --
131 :15
131 :30
S F
N
SLEEP PERIOD (7 HOURS)
131:45
MNVR TO PTC ATT P 029 Y 315
P RETURN TO EARTH P37 132:00 MISSION
EDITION
DATE
AS503/103
FINAL
November 22,1968
MSC Form 1910 (Nov 68)
TIME
131:00 - 132:00
FLIGHT PLANNING BRANCH
Y
ROLL 0.1°/SEC • DAY/REV
6/TEC
PAGE
2-104
FLIGHT PLAN CDR
CMP
LMP
MCC—H
132:00
EI -15 HRS P27 UPDATE: STATE VECTOR GO/NO GO VOICE UPDATE: BLOCK DATA FOR EI -2 HOURS MCC .
STATE VECTOR GO/NO GO RECORD BLOCK DATA FOR EI -2 HOURS 13230
SLEEP PERIOD (7 HOURS)
133:00
EAT PERIOD
133:30
EAT PERIOD
I
CMP/LMP CREW STATUS REPORT
_
BIOMED Sw - LEFT 1 3 4:00 -1 MISSION
AS503/103 11SC Form 1910 (Nov 68)
• 0
EDITION
FINAL
DATE
November 22,1968
TIME
132:00 - 134:00
DAY/REV
6/TEC
PAGE
2-10 5
FLIGHT PLANNING BRANCH
0 e0
• •
•
4;
FLIGHT PL AN MCC- H
LMP
CMP
CDR
134:00
134:15
134:30
EAT PERIOD
SLEEP PERIOD (7 HOURS)
SLEEP PERIOD (7 HOURS)
134:45
•
135:00 MISSION
EDITION
DATE
AS503/103
FINAL
November 22,1968
MSC Form 1910 (Nov 68)
TIME
134:00 - 135:00
FLIGHT PLANNING BRANCH
DAY/REV
PAGE
6/TEC
2-106
FLIGHT PLAN CMP
CDR
135:00
•
LMP
MCC—H
BEGIN CABIN COLD SOAK CDR CREW STATUS REPORT
135:15 -
MNVR TO P52 ATT 1
135:30 —
SLEEP PERIOD (7 HOURS)
IMU REALIGN P52 OPTION 3 - REFSMMAT STAR ID , STAR ANGLE DIFF
SLEEP PERIOD (7 HOURS)
TORQUE ANGLES: X
135:45
REESTABLISH PTC P 029 Y 315
P
Y
ROLL 0.1'/SEC 136:00 MISSION
AS503/103 MSC Form 1910 (Nov 68)
0
EDITION
FINAL
DATE
November 22, 1968
TIME
135:00 - 136:00
DAY/REV
PAGE
6/TEC
2-107
FLIGHT PLANNING BRANCH
•
0 FLIGHT PLAN
136:30
LMP
SLEEP PERIOD (7 HOURS)
SLEEP PERIOD
MCC—H
-
M 137:00 —
137:30
CMP
CDR s.
136:00 —
S F
(7 HOURS)
-
•
138:00 — MISSION
EDITION
AS503/103
FINAL
MSC Finn 1910 (Nov 68)
TIME
DATE
November 22 o
1968 136:00 - 138:00
FLIGHT PLANNING BRANCH
DAY/REV
PAGE
6/TEC
2-108
FLIGHT PLAN CMP
CDR
LMP
MCC—H 6
138:00
138:15
SLEEP PERIOD (7 HOURS)
SLEEP PERIOD (7 HOURS)
138:30
138:45
139:00 MISSION
AS503/103 MSC Form 1910 (Nov 66)
EDITION
FINAL
TIME
DATE
November 22,
196E
138:00 - 139:00
DAY/REV
6/TEC
PAGE
2-109
FLIGHT PLANNING BRANCH
0 0
•
•
FLIGHT PLAN CDR
139:00
CMP
LMP
SLEEP PERIOD (7 HOURS)
SLEEP PERIOD (7 HOURS)
MCC—H 6
LIOH CANISTER CHANGE (CARTRIDGE NO. 15 FROM A2 INTO CANISTER A)
139:15 MNVR TO P52 ATT IMU REALIGN P52 OPTION 3 - REFSMMAT STAR ID STAR ANGLE DIFF 139:30
TORQUE ANGLES: X
REESTABLISH PTC P 029 Y 315 Y P ROLL 0.1°/SEC
139:45
•
140:00 MISSION
AS503/103 MSC Form :9i
(Nay 68)
EDITION
FINAL
TIME
DATE
November 22, 196S
139:00 - 140:00
FLIGHT PLANNING BRANCH
DAY/REV
6/TEC
PAGE
2-110
FLIGHT PLAN CDR
MCC— H
CMP
OAP
SLEEP PERIOD (7 HOURS)
SLEEP PERIOD (7 HOURS)
140:0
140:15
EAT PERIOD 140:30
140:45
141 :00 MISSION
EDITION
DAT E
AS503/103
FINAL
November 22,1968
MSC Form 1910 (Nov 68)
0 •
TIME
DAY/REV
-
PAGE
140:00 - 141;00
2-111
FLIGHT PLANNING BRANCH
0
j
ip
0
0 • FLIGHT PLAN MNVR TO SIGHTING ATT
LOSS OF COMM CONTINGENCY
BIOMED Sw - RIGHT'
TRN BIAS [CISLUNAR NAVIGATION P23 1. 141:15 2,
MCC—H
LMP
CMP I
CDR
141:00
STAR 22 EFH STAR E 1 SET
H
STAR 26 ENH STAR E 1 SET—
H
STAR 31 ENH STAR E H 1 SET — 141:30
EAT PERIOD -
I
EAT PERIOD
TIME
DAY/REV
141;45
142:00 MISSION
EDITION
DATE
AS503/103
FINAL
November 22,1968
MSC Form 1910 (Nov 68)
141:00 - 142:00
FLIGHT PLANNING BRANCH
PAGE
2-112
FLIGHT PL AN CMP
LMP
EAT PERIOD
EAT PERIOD
CDR
MCC-H 4
142:00
142:15
142:3
LOSS OF COMM CONTINGENCY TRN BIAS
ISLUNAR NAVIGATION P231 1.
STAR 22 EFH STAR E H 1 SET
2.
STAR 26 ENH STAR E--H 1 SET
142:45
I MISSION
AS503/103 MSC Form 1910 (Nov 68)
•
•
•
143:00 -1
0
EDITION
FINAL
TIME
DATE
November 22,1968
142:00 - 143:00
FLIGHT PLANNING BRANCH
DAY/REV
PAGE
2-113
•
0
FLIGHT PL AN CAW •
CDR
143:00
MCC- Ii
OAP
ar
P27 UPDATE: STATE VECTOR (LM & CSM SLOTS) REFSMMAT
El-3.5 HRS RECORD MNVR AND ENTRY PAD
VOICE UPDATE: MNVR PAD ENTRY PAD
143:30 MNVR TO P52 ATT IMU REALIGN P52 OPTION 3 - REFSMMAT STAR ID STAR ANGLE RI F F -- —
ECS CK
TORQUE ANGLES7— -X
EI-3 HRS
EPS CK SPS CK SM/CM RCS CK C&W CK
CMC SELF CK DSKY COND LT TEST
•
144:00 MISSION AS503/103 MSC Form 1910 (Nov 68)
EDITION FINAL
TIME
DATE November 22, 1968
143:00 - 144:00
FLIGHT PLANNING BRANCH
DAY/REV 6/TEC
2 PAGE -114
■
BURN STATUS. REPORT X - -.. X ATIG 1 X X• T
MCC'S
+ •
_
X X X
, • I W___1174 IR
XX
IP
XX
X
gx
BURN CHART P or Y RATES MCC(ALL) 10°/SEC TAKEOVER
ATT DEVIATION
SHUTDOWN TIME
10° TAKEOVER
BIT +1 SEC
RESIDUALS TRIM TO 0.2 fps
1Y !V gx iV gy
F-1
IVgz
AV C
XX
X X ; X X
X,
i
;FUEL
OX ;UNBALANCE
'REMARKS:
0 0
.
ill I
0
410
+
FLIGHT PLAN MCC-H
LMP
CMP •
CDR
144:00
EXT AV P30
EI-2.5 HRS
144:30 SPS/RCS THRUST P40/41 MNVR TO BURN ATT COAS & SXT STAR CK
GDC ALIGN TO IMU MCC 7 AV=NOMINALLY ZERO
EI-2 HRS
MCC BURN STATUS REPORT
V66 TRANS CSM STATE VECTOR TO LM SLOT
•
.145:00
MISSION
EDITION
AS503 103
FINAL
MSC Form 1910 (Nov 08)
allIMIE31.11.
DATE November 22,
196
144:00 - 145:00
FLIGHT PLANNING BRANCH
DAY/REV 7/TEC
=MI 2-115
FLIGHT PLAN CDR
LMP
CMP
MCC-H
145: 00 —
MNVR TO ENTRY ATT CCU STAR CK
LOSS OF COMM CONTINGENCY CISLUNAR NAVIGATION P23 1. STAR 33 ENH STARE H 1 SET -- --
BIOMED Sw - LEFT
SXT STAR CK IMU REALIGN P52 OPTION 3 - REFSMMAT AND GYRO DRIFT TEST STAR ID , -STAR ANGLE DIFF
EI-1.5 HR
PIPA BIAS CK
TORQUE ANGLES: X Y
145:30 — GDC ALIGN TO IMU FINAL STOWAGE
E I -1 HR
FINAL STOWAGE INITIATE CM RCS PREHEAT WASTE H 2 O DUMP - OFF UR DUMP HT - OFF
FINAL STOWAGE
EMS CK
FINAL GDC DRIFT CK 146:00 —1 MISSION
AS503/103_ MSC form 1310 (Nov 68)
•
0
EDITION
FINAL
TIME
DATE
November 22, 196E
145:00 - 146:00
FLIGHT PLANNING BRANCH
r
DAY/REV
7/TEC
•
PAGE
2-116
4I■
0 FLIGHT PL AN MCC—H
LMP
CMP
CDR
I
•
146:00
TERM CM RCS PREHEAT SET DET TO EI EMS INITIALIZATION RSI ALIGN TO GDC CM RCS CK
PYRO BAT CK
RECORD ENTRY PAD & RCVY INFO
P27 UPDATE: STATE VECTOR VOICE UPDATE: ENTRY PAD & RCVY INFO
ENTRY BATS - ON
EI-30 MIN
146:30 EI-15 MIN
SEPARATION CK LIST
SEPARATION CK LIST
SEPARATION CK LIST
MNVR TO CM/SM SEP ATT
P61 ENTRY PREP
GO FOR PYRO ARM
GO FOR PYRO ARM
[CM/SM SEP MNVR TO ENTRY ATT
P62 ENTRY ATTITUDE
P63 ENTRY INITIATE [ET = 4QOK1
146:50
P64 ENTRY POST .05G
147:00 MISSION
EDITION
DATE
TIME
AS503/103
FINAL
November 22, 1968
146:00 - 147:00
MSC Form 1910 (Nov 98)
FLIGHT PLANNING BRANCH
DAY/REV
7/TEC
PAGE
2-117
FLIGHT PLAN 147 : 00 —
CMP
CDR •
•
LMP
•
MCC-H •
EARTH LANDING PHASE
LSPLASHDOWN
147:30 —
•
148:00 — MISSION
SE03/103 MSC Form 1910 (Nov 60)
0 0
EDITION
FINAL
DATE
November 22, 1968
TIME
147:00 - 148:00
DAY/REV
PAGE
2-118
7/TEC
FLIGHT PLANNING BRANCH
•
•