STI - Standardization Initiative Felles, omforente krav vil bidra til reduserte og effektiviserte leveranser av dokumentasjon og informasjon fra leverandør til prosjekt og videre til drift.

Bjørn Berli

Exploration & Production Information Management

EPIM Members

www.epim.no

3

EPIM – Exploration & Production Information Management Association

www.epim.no

4

About EPIM • EPIM (Exploration & Production Information Management Association) is a non-profit membership organization established in November 2007. • EPIM is governed by the operators on the NCS. • Norsk olje & gass approved the establishment of EPIM, an organization that would provide the industry with effective management of common information and communication technology (ICT) solutions.

www.epim.no

5

STI - Standardization Initiative Unified Requirements

STI Steering Committee Meeting

STI Reference Group

• Aibel

• Anita Lindtner

BP Norge

• Frode Dyrdal

Centrica Energy E&P Norway

• Arild Toft

ConocoPhillips

• Per Valheim

Eni Norge

• Atle Severson

ExxonMobil

• Tor Ove Holsen

GDF Suez E&P Norge

• Ivar Miljeteig

LOTOS Exploration & Production Norge

• Kjell Tore Vinningland

Premier Oil

• Jan Helge Petersen

Repsol

• Ingrid Sternhoff

Shell

• Per-Arne Røstadsand

Statoil

• Petroleum Bjørn Thomas Bache (Observer) Safety Authority

• Wenche Havn

Total E&P Norge

• Merten Becker

Wintershall Norge

• From EPIM

Project Owner Ove Ryland

• Ove Ryland

EPIM

• From EPIM

Project Manager Bjørn Berli

• Marit Bjordal

EPIM

• Bjørn Berli

EPIM

Jan Ståle Skår, EVP Modifications

• Aker Solutions Jann Slettebakk, VP Methods • BP Norge

Bertrand Barouti, Quality & IMDC Team Leader

• ConocoPhillips Robert Skrede, Manager Engineering and Asset Integrity • Repsol

Agnes Jorunn Høie, IM Team Leader

• Statoil

Terese Kvinge, SVP Modifications

• Wintershall

Sigbjørn Pedersen, Chief Enterprise Architect

www.epim.no

7

Standard information and documentation be delivered with the physical equipment

T R A N S M I T T E R

V A L V E

www.epim.no

8

Reducing manhours and costs through common focus on industry standardization (Unified Requirements)

www.epim.no

9

Engineering and Procurement in parallel with Preparations for Operation Preparations for Operations and Operations: -MA (incl. spare parts evaluation) -RMM (Regularity & Maintenance Management) -Operations -Correct and sufficient availability of information and documentation

Common Industry Focus • Unified Requirements • Based on national and international standards • Standard documentation in the industry

Engineering, Procurement, Construction, Commissioning, Handover, Modifications: -Large number of contractors, projects and resources, and a large number of PO’s towards suppliers. -Project execution methods to ensure efficient projects, applying company knowledge, systems and structure across a large number of projects and organisations. -Avoid re-punching of information.

www.epim.no

• Covering all phases, including projects and operations • Cost reduction for the industry • Industry participation

10

Standard Information and Documentation for Projects and Operations Common Industry Focus

Preparations for Operations and Operations Common Industry HUB for Supplier Equipment (Based on STI)

www.epim.no

• Unified Requirements • Based on national and international standards • Standard documentation in the industry

Engineering, Procurement, Construction, Commissioning, Handover, Modifications

• Covering all phases, including projects and operations • Cost reduction for the industry • Industry participation

11

STI - Information and documentation for Equipment Cost efficient: Supplier delivers information once to the industry

Less cost efficient: Additional supplier work for each PO delivery to each Operator Eng. Contr. 1

Oil&Gas 1

Supplier 1

Industry HUB for Supplier Equipment

Supplier 2

Supplier 1

Oil&Gas 1

Eng. Contr. 3 Oil&Gas 2 Supplier 2

Oil&Gas 2

Supplier 3

Oil&Gas 3

Oil&Gas 3

Supplier 3

Eng. Contr. 2

Slightly different contractor requirements may cause different PO requirements for the same field development project. Page  10 www.epim.no

12

Cost reduction through Industry Initiatives

(Unified Requirements)

STI Requirements Management

Info Exchange

Other Initiatives

From: PTIL Dokumentasjonsprosjekt

www.epim.no

13

Standard information and documentation be delivered with the physical equipment

T R A N S M I T T E R

V A L V E

www.epim.no

15

STI Concept Working Groups for each discipline with representatives from operators, contractors and suppliers will identify unified requirements for each equipment type within the STI Scope of Work. Establishing the required attributes and documents for each equipment type requires participants from: suppliers, contractors and operations.

www.epim.no

Each attribute/document will also have an extra attribute indicating the primary phase(s) for use through engineering, construction, operations, modifications, demolition.

16

Use and reference to NORSOK standards from many operators on the NCS has decreased in the same period

www.epim.no

17

Common terminology and Unified requirements Overall Plan for the Industry

PSA and NPD

Norsk olje og gass

Norsk Industri

EPIM

Operators

Instrument Equipment Types

Electro Bulk & Field Equipment

Valves

Contractors

Suppliers

Unified requirements through common terminology, based on use of international standards

I-001

Z-001 Z-018 www.epim.no

NORSOK

ISO

IEC, etc.

18

Simplified work process with clearly defined equipment types for Equipment deliveries

STI Concept #3

Work Processes

Requirements

Commissioning

Operations

Strategy

As

Database

Deliver information and documentation for Equipment

Use information and documentation for Equipment

PO

Design/ Fabrication

FAT

Handover

1: Information and documentation for Equipment deliveries from Supplier to Standard Information and Documentation Hub 2: Standard Information and Documentation for Equipment available during Study phase, FEED and Main project 3: PO based on Standard Information and Documentation available in the Hub 4: Standard Information and Documentation for Equipment used during engineering and fabrication 5: Standard Information and Documentation for Equipment available for FAT 6: Engineering and fabrication Information and documentation in Contractor systems 7: Standard Information and Documentation for Equipment referred to or imported to Project systems before handover 8: Acceptance from Operations 9: One Hub for Information and Documentation, here duplicated for illustration purposes

Acceptance

8

7

or as Documents

6

2

Supplier

Engineering

Strategy

Hub for Standard Information and Documentation

5

6

3 5

1

www.epim.no

4

9

9 Hub for Standard Information9and Documentation 9for Equipments

9

9

21