Exploration Drilling Shale Gas Exploration Sjöbo, Alum Shale Exploration Executed Services Drilling of three Shale Gas exploration wells to a depth of app. 800 m - 950 m in an Alum shale deposit Destructive drilling to the top of shale deposit, afterwards wire line coring section of app. 200 m with triple core barrel 6 ¼“ x 95 mm Securing of drilling progress from 200 m with diverter
Characteristics / Technical Data Rotary drilling method Drilling with diameter 17 1/2", 12 1/4" and 8 1/2" Installation of three 3 casing segments per borehole – 13 3/8" to 25 m – 9 5/8" to 200 m – 7 " to 800 / 900 m Rigs: AGBO 750
Client
Execution
Shell
2010
Value
Location Skåne Province, Sweden © BAUER Resources GmbH, D-86529 Schrobenhausen
Exploration Drilling LDC (Large Diameter Coring) Loznica, Jadar Lithiumborate Project Executed Services Drilling of three large diameter reverse circulation exploration boreholes in the Jadar deposit in Serbia for a feasibility study Bulk sampling of jaderite mineral, a unique sodium lithium borosilicate mineral
Characteristics / Technical Data Exploration drilling in RC (reverse circulation) − 3 x 450 m, − Ø 26” (660 mm) to 150 m, Ø 20” (508 mm) to 450 m Exploration drilling as LDC (large diameter coring) − 410 m - 450 m − cores Ø 11 1/3” (288 mm) drilling Ø (14 ½”) • Installation of 30“, 22“ casings Rigs: Wirth B5
Client
Execution
Rio Sava Exploration d.o.o (Subsidiary of Rio Tinto)
July 2012 - March 2013
Value
Location Loznica, Serbia © BAUER Resources GmbH, D-86529 Schrobenhausen
Exploration Drilling Deep Wireline Coring (Inclined) Exploration Drilling ‘Griesbergtal’ Executed Services Continuous wireline core drilling from top to final depth in the Austrian Alps for the development of geological data used for the design of the Brenner Base Tunnel Drilling was executed with an inclination of 30° Execution of extensive down hole and hydraulic tests
Characteristics / Technical Data 1,050 m drilling depth Core diameter 100 mm to 730 m and 80 mm to final depth Drilling site was about 1,600 m above sea level Rigs: AGBO 750
Client
Execution
BBT (Brenner Base Tunnel)
2012
Value
Location Griesbergtal, Austria © BAUER Resources GmbH, D-86529 Schrobenhausen
Exploration Drilling
Cores from Brenner Base Tunnel – Dia. 95 mm
© BAUER Resources GmbH, D-86529 Schrobenhausen
Geothermal Drilling Planning & Supervision Project St. Gallen Executed Services 1 x 4,500 m Feasibility study DWOP (Drilling Well On Paper) Risk management Well planning Preparation of tender documents Supervision of drilling operation as representative of city St. Gallen
Client
Execution
Public utility city St. Gallen
2012 - 2013
Value
Location
-
St. Gallen, Switzerland © BAUER Resources GmbH, D-86529 Schrobenhausen
Geothermal Drilling Workover of geothermal coaxial probe Geothermal Pontresina Executed Services The Saratz Hotel intends to lower its heating oil consumption by supplying parts of its hotel with energy generated by coaxial probes Workover of deep geothermal coaxial probe Fishing and milling operations Completion with 8.5/8” casing and cementation Install 4 ½” GFK inner tubing
Characteristics / Technical Data 1,500 m drilling depth 8.5/8” casing 4 ½” GFK Rigs: Wirth B5 / AGBO 750
Cellar Wellhead 2m Drilling Diameter 17 ½“ Conductor Pipe 13 3/8“ 50 m Cement 4 ½“ GFK Standpipe Drilling Diameter 10 5/8“ Steel Casing 8 5/8“ Cement
Casing Shoe depth 4 ½“ GFK 1308 m Standpipe 1339 m Casing Shoe depth 8 5/8“ 1502m Final Depth
Client
Execution
Hotel Saratz AG
April 2014 - August 2014
Value
Location Pontresina, Switzerland © BAUER Resources GmbH, D-86529 Schrobenhausen
Exploration Drilling Deep Wireline Coring Exploration drilling ‘Tulves’ Executed Services Continuous vertical wireline core drilling from top to final depth in the Italian Alps for the development of geological data used for the design of the Brenner Base Tunnel Execution of extensive down hole and hydraulic tests Drilling site was about 2,200 m above sea level
Characteristics / Technical Data 1,430 m drilling depth Core diameter 158 mm to 900 m and 124 mm to final depth Rigs: AGBO 750
Client
Execution
BBT (Brenner Base Tunnel)
2012
Value
Location Tulves, Italy © BAUER Resources GmbH, D-86529 Schrobenhausen
Well Drilling Oil Well Drilling with BAUER rig TBA 300 Orinoco Belt, Oil Exploration Executed Services Technical support and supervision for BAUER Equipment 300 ton modern electro hydraulic driven drilling rig with automatic pipe handling system
Characteristics / Technical Data 10 boreholes with drilling depth of 1,000 - 2,500 m
Rigs: BAUER TBA 300
Client
Execution
BAUER Equipment
2014
Value
Location Orinoco Belt, Venezuela © BAUER Resources GmbH, D-86529 Schrobenhausen
Geothermal Drilling Workover of a geothermal well Geothermal Workover Executed Services 1 x 1,850 m Workover of a deep Geothermal well Airlift operation Scraping operation Rigs: Wirth B5
Client
Execution
Geothermal Sonderborg
2014
Value
Location Denmark, Sonderborg © BAUER Resources GmbH, D-86529 Schrobenhausen
Well Drilling Rotary drilling for extensometer wells Rotary Drilling Gösgen Executed Services 1 x 830 m + 1 x 400 m Rotary drilling dia. 12 1/4” to 6 3/4” at final depth. Completion with steel CSG and GFK pipes for stress-measuring extensometer wells. The system is used for monitoring earthquake risks in the area of a nuclear power plant. Rigs: AGBO 750
Client
Execution
Swiss Nuclear
Sept – Dec 2014
Value
Location Gösgen, Switzerland © BAUER Resources GmbH, D-86529 Schrobenhausen
Geothermal Drilling Workover of a geothermal well Geothermal Schlattingen Executed Services 1 x 2,013 m Workover of a deep Geothermal well Window milling operation in horizontal sections Acid injection and airlift operation
Characteristics / Technical Data Project planning: NAGRA (Nationale Genossenschaft für die Lagerung radioaktiver Abfälle) Rigs: Wirth B5
Client
Execution
Gemüse & Landbau Schlattingen
Nov 2014 - Dec 2014
Value
Location
-
Schlattingen (Switzerland) © BAUER Resources GmbH, D-86529 Schrobenhausen
Geothermal Drilling Geothermal injection well Geothermal Copenhagen Executed Services 1 x 2,660 m deep Geothermal well Vertical well construction Surface diameter 30” – final diameter 12 ¼” Final casing completion 9 5/8”
Characteristics / Technical Data - Rig: Foralith B120 (120 t hydraulic drilling rig) - Pump capacity: 2 x 1000 HP mud pumps - Mud tank volume: 120 m³
The trailer mounted drilling rig B120 has a small footprint to reduce cost in well site building. It’s a highly mobile rig for quick transport and fast rig up.
Client
Execution
Hofor
Aug 2015 - Nov 2015
Value
Location
-
Copenhagen (Denmark) © BAUER Resources GmbH, D-86529 Schrobenhausen
Geothermal Drilling Geothermal injection well Geothermal Copenhagen Executed Services 1 x 2,660 m deep Geothermal well Vertical well construction Surface diameter 30” – final diameter 12 ¼” Final casing completion 9 5/8”
Characteristics / Technical Data - Rig: Foralith B120 (120 t hydraulic drilling rig) - Pump capacity: 2 x 1000 HP mud pumps - Mud tank volume: 120 m³
The trailer mounted drilling rig B120 has a small footprint to reduce cost in well site building. It’s a highly mobile rig for quick transport and fast rig up.
Client
Execution
Hofor
Aug 2015 - Nov 2015
Value
Location
-
Copenhagen (Denmark) © BAUER Resources GmbH, D-86529 Schrobenhausen