ESS!Construction!Phase!Cost!Book!2014!

Programme!Report! ! ! ! Document!Number! ESS40002802! Date! Mar!13,!2013! Revision 2!(1)! State Preliminary! ! ! ! ! ! ! ! ESS!Construct...
1 downloads 2 Views 570KB Size
Programme!Report!

!

!

!

Document!Number!

ESS40002802!

Date!

Mar!13,!2013!

Revision

2!(1)!

State

Preliminary!

!

! ! ! ! ! !

ESS!Construction!Phase!Cost!Book!2014!

! ! !

! ! !

Name!

Affiliation!

Authors!

Johan!Brisfors!

ESS!

Reviewers!

EPG,!EMT!

ESS!

Approver!

James!Yeck!

ESS!

!

Programme!Report! Document!Number!

ESS40002802!

Date!

Mar!13,!2013!

Preliminary!

!

!

!

!

! ! ! ! ! ! ! ! The!ESS!Construction!Phase!Cost!Book!2014!is!an!annex!to!the!ESS!Cost!Report!April!2013.!

2(70)!

Programme!Report! Document!Number!

ESS40002802!

Date!

Mar!13,!2013!

Preliminary!

!

!

!

!

TABLE!OF!CONTENTS! 1.! Introduction!.............................................................................................................................!5! 2.! Summary!..................................................................................................................................!7! 2.1! Construction!cost!...........................................................................................................................!7! 2.2! Assumptions!..................................................................................................................................!7! 2.3! Scope!.............................................................................................................................................!8! 2.4! Major!milestones!...........................................................................................................................!8! 3.! Conventional!Facilities!.............................................................................................................!9! 3.1! Introduction!...................................................................................................................................!9! 3.2! Scope!.............................................................................................................................................!9! 3.3! Major!milestones!...........................................................................................................................!9! 3.4! Conventional!Facilities!Cost!.........................................................................................................!10! 4.! Licensing!(ES!&!H)!...................................................................................................................!13! 4.1! Introduction!.................................................................................................................................!13! 4.2! Scope!...........................................................................................................................................!13! 4.3! Major!milestones!.........................................................................................................................!13! 4.4! Licensing!(ES!&!H)!Cost!................................................................................................................!14! 5.! Energy!....................................................................................................................................!17! 5.1! Introduction!.................................................................................................................................!17! 5.2! Scope!...........................................................................................................................................!17! 5.3! Major!milestones!.........................................................................................................................!17! 5.4! Energy!Cost!..................................................................................................................................!18! 6.! Infrastructure!Support!............................................................................................................!21! 6.1! Introduction!.................................................................................................................................!21! 6.2! Scope!...........................................................................................................................................!21! 6.3! Infrastructure!Support!Cost!.........................................................................................................!21! 7.! Accelerator!Systems!...............................................................................................................!23! 7.1! Introduction!.................................................................................................................................!23! 7.2! Scope!...........................................................................................................................................!23! 7.3! Major!milestones!.........................................................................................................................!23! 7.4! Accelerator!Cost!..........................................................................................................................!24! 8.! Target!Station!.........................................................................................................................!37! 8.1! Introduction!.................................................................................................................................!37!

3(70)!

Programme!Report! Document!Number!

ESS40002802!

Date!

Mar!13,!2013!

Preliminary!

!

!

!

!

8.2! Scope!...........................................................................................................................................!37! 8.3! Major!milestones!.........................................................................................................................!37! 8.4! Target!Station!Cost!......................................................................................................................!38! 9.! Integrated!Control!Systems!....................................................................................................!45! 9.1! Introduction!.................................................................................................................................!45! 9.2! Scope!...........................................................................................................................................!45! 9.3! Major!milestones!.........................................................................................................................!45! 9.4! Integrated!Control!Systems!Cost!.................................................................................................!46! 10.! Design!and!Engineering!........................................................................................................!51! 10.1! Introduction!...............................................................................................................................!51! 10.2! Scope!.........................................................................................................................................!51! 10.3! Design!and!Engineering!Cost!.....................................................................................................!52! 11.! Neutron!Scattering!Systems!.................................................................................................!55! 11.1! Introduction!...............................................................................................................................!55! 11.2! Scope!.........................................................................................................................................!55! 11.3! Major!milestones!.......................................................................................................................!55! 11.4! Cost!per!instrument!type!...........................................................................................................!56! 11.5! Neutron!Scattering!Systems!Cost!..............................................................................................!57! 12.! Project!Support!and!Administration!.....................................................................................!65! 12.1! Introduction!...............................................................................................................................!65! 12.2! Scope!.........................................................................................................................................!65! 12.3! Major!milestones!.......................................................................................................................!65! 12.4! Project!Support!and!Administration!Cost!..................................................................................!66! 13.! Contingency!.........................................................................................................................!69! 13.1! Introduction!...............................................................................................................................!69! 13.2! Contingency!Cost!.......................................................................................................................!69! 14.! Document!Change!Summary!................................................................................................!70!

4(70)!

Programme!Report! Document!Number!

ESS40002802!

Date!

Mar!13,!2013!

Preliminary!

!

!

!

!

1.

INTRODUCTION!

This!ESS!Construction!Phase!Cost!Book,!which!is!an!annex!to!the!ESS!Cost!Report!and!should!be!read! as!such,!provides!the!cost!for!the!construction!of!the!ESS!facility!at!a!more!detailed!level!than!in!the! Cost!Report.! The!Cost!Book!contains!the!total!cost!for!the!construction!of!the!ESS!facility.!For!each!project/area! the!cost!is!broken!down!into!detailed!packages!for!which!is!stated:! • • • • •

Name! Start!Date!and!End!Date! Short!Description! Cost!Value! Indication!of!In4Kind!Potential!(percentage!of!the!cost!value!of!the!item)!

For!each!Work!Package!and!Work!Unit!the!work!and!cost!described!is!for!2014!–!End!of!Construction.! ! ! ! ! ! ! ! ! ! ! ! ! !

The!ESS!Cost!Book!is!not!for!public!distribution!and!is!provided!for!information!ESS! partners!and!potential!partners!in!support!of!discussions!for!inWkind!agreements! between!ESS!and!the!partner.!The!release!of!the!cost!values!in!the!Cost!Book!to! parties!other!than!the!intended!recipients!requires!written!approval!of!the!ESS!AB.! !

!

5(70)!

Programme!Report! Document!Number!

ESS40002802!

Date!

Mar!13,!2013!

Preliminary!

!

!

!

!

! ! ! ! ! ! ! ! ! This!page!is!intentionally!left!blank.!

6(70)!

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

2.

SUMMARY)

2.1

Construction)cost)

2.2 • • •

The(Construction(of(ESS(consists(of(the(following(items:( ) Conventional(Facilities(

Million)Euros)(€))



423(

• • •

Licensing((ES&H)(

13(

Energy(

13(

Infrastructure(Support(

2(

Accelerator(Systems(

509(

Target(Station(

155(

Integrated(Control(System(

73(

Design(and(Engineering(

31(

Neutron(Scattering(Systems(

350(

Project(Support(and(Administration(

113(

Contingency(

161(

Total)

1,843)

(In4kind(potential(

41(%)(

(

(

7(70)(

Assumptions) Construction(Phase(only(( January(2013(cost(level( VAT(not(included(in(cost((assumed(to(be(deductible(as(it(is(today(for( ESS)( Labour(cost(based(on(actual(cost(for(ESS(staff(during(Pre4 construction( Euro(assumed((no(cost(for(hedging(included)( Not(tax(for(energy(included( Leasing(of(office(and(lab(building(s)(instead(of(building;(i.e.(not( included(in(construction(cost(

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

2.3

Scope)

2.3.2

2.3.1

Included)

• •



Conventional(Facilities( −



Energy( −



− •

Capable(of(5(MW(

Major)milestones)

Ground(Break(

Q2(2014(

First(installations(on4site(

Q4(2016(

First(Beam(on(Target(

Q4(2019(

Machine(installed(for(2.0(GeV(

Q4(2022(

(

For(the(whole(facility(

Neutron(Scattering(Systems( − −

Investment(in(renewable(energy(sources((e.g.(windmills)( Options(and(upgrades(of(the(facility(

Last(of(Construction(Phase(Instruments(handover(to(Operations( Q4(2025(

Integrated(Control(System( −



Capable(of(5(MW(

Target(station( −



Sustainable(Research(Centre(4(Responsible,(Renewable(&( Recyclable(

Accelerator(Systems( −



2.4

Includes(all(buildings(for(the(facility,(except(office(and(lab( buildings(which(are(constructed(under(an(operational(lease( agreement(

Not)included)

16(Instruments( Includes(neutron(guides,(development(of(new(detector( technology(etc.( Data(Management(Software(Centre(in(Copenhagen(

Administration,(project(support(functions(and(CEO(office(

(

8(70)(

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

3.

CONVENTIONAL)FACILITIES)

3.1

Introduction)

3.3

Conventional(Facilities(is(responsible(for(the(design(and(civil(construction( of(the(buildings,(and(the(landscape(surrounding(the(building.(

Major)milestones)

ITT(for(contract(C101((

Q3(2013(

Contract(signed(C101(

Q1(2014(

First(Building(Permit(received(

Q1(2014(

3.2

Scope)

Constructions(on(site(start(

Q2(2014(

3.2.1

Included)

ITT(for(contract(C201(

Q1(2015(

Contract(signed(C201(

Q4(2015(

The(scope(consists(of(the(design(and(construction(of(all(buildings,( landscaping,(and(utilities(serving(the(facility(on(the(site(in(Lund.( 3.2.2

(

Excluded)

The(following(is(not(included(in(the(scope:( • • • • • • • • • • •

Shielding(in(any(form,(except(the(earth(berm(above(the(accelerator( tunnel( Other(buildings(not(located(on(site( Data(cabling(for(ICS( Temporary(facilities(and(utilities(for(other(projects(on(site(during( construction( Earthquakes(above(10E45( Office,(Lab.(Guest(house,(Canteen,(Recreation( District(heat(piping(to(Central(utility(building( Sprinklers( Procurement(of(land( FF&E(((Furniture(Fixtures(Equipment)( Operating(costs(of(buildings(after(full(access(

9(70)(

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

3.4

Conventional)Facilities)Cost)

Table)1)

Conventional)Facilities)Cost)(Responsible:(Kent(Hedin))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

15(

Conventional( Facilities(20144 EOC(R1(

14Nov413(

234Dec422(

The(buildings,(infrastructure(and(landscape(that(compromise(the(spaces( that(house(ESS(research(equipment,(machines,(instruments(and(human( beings.(

)

(

(

(

14Jan413(

314Dec413(

Cost(2013(

(

(

15.1(

Management(&( Administration(

74Jan414(

234Dec422(

The(management(activities(for(the(CF.(

)

(

15.1.1(

Staff(

74Jan414(

234Dec422(

The(ESS(staff(employed(to(manage(the(CF.(

(

(

15.1.2(

Contracted(Staff(

74Jan414(

204Dec419(

Contracted(staff(that(holds(a(position(in(the(CF(management(organization.( Mainly(100%(project(allocated.(

(

(

15.1.3(

Travel(

74Jan414(

204Dec419(

Travel(costs(for(the(project.(

(

(

15.1.4(

Procurement(

74Jan414(

224Dec417(

Procurement(activities(for(procuring(the(construction(contractors(as(well(as( some(design(services.(Costs(for(services(procured(in(order(to(assist(in(this( work.(

(

(

15.1.6(

Preconstruction(

74Jan414(

224Jan418(

Works(performed(before(the(construction(start(on(site,(such(as(inspection( of(existing(buildings,(construction(of(external(roads,(main(power( connection(and(archeological(investigations.(

(

(

15.2(

Design(

74Jan414(

254Feb420(

All(design(performed(by(CF(in(order(to(construct(the(facilities.(Procured( trough(our(framework(agreements(initially.(New(procurement(necessary(in( 2015.(

)

(

15.2.2(

Preliminary( Design(

74Jan414(

254Aug416(

The(second(stage(of(the(design,(where(the(scope(is(detailed.(

(

(

15.2.3(

Detailed(Design(

74Jan414(

144Jul417(

The(final(stage(of(design,(where(the(drawings(and(descriptions(that( are(used(for(the(construction(are(produced.(

(

(

Budget)(€))

10(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)1)

Conventional)Facilities)Cost)(Responsible:(Kent(Hedin))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

15.2.5(

General(

74Jan414(

254Feb420(

Design(Costs(that(are(not(specific(for(PD(or(DD.(

(

(

15.3(

Construction(

74Jan414(

204Dec419(

All(construction(of(the(facilities.(Procured(in(competition.(

)

(

15.3.4(

ESS(Site(prep(&( site(running(

74Jan414(

204Dec419(

Costs(for(the(construction(that(will(not(be(a(part(of(the(Contractors(scope.(

(

(

15.3.11(

Contractors(fee(

24Jun414(

204Dec419(

Costs(for(Contractors(fee.(

(

(

15.3.10(

C101(4(Site( Preparations(and( Site(Running(

74Jan414(

204Dec419(

Mobilization,(temporary(fencing,(temporary(utilities,(temporary(roads(and( parking,(site(security.(

(

(

15.3.7(

Earth(Works(

104Jun414(

284Jun419(

Mass(balancing(the(site,(excavation(for(main(utilities,(permanent(roads(and( parking,(storm(water,(water(and(sewage.(

(

(

15.3.6(

Main(Utilities(&( Ground( Installations(

144Jan415(

314May416(

All(utilities(to(the(facility(from(the(border(of(the(site.(All(utilities(on(the(site( to(and(from(the(Central(Utility(Building.(

(

(

15.3.5(

Auxiliary(Bldgs.(

74Apr414(

274Jun417(

All(support(buildings(for(the(facilities.(

(

(

15.3.1(

Accelerator(Bldg.(

184Nov414(

314Oct417(

The(buildings(and(tunnel(housing(the(Accelerator(and(its(support( infrastructure(incl.(the(Klystron(Gallery.(

(

(

15.3.2(

Target(Bldg.(and( Experimental(Hall( 410,420(

134Jan415(

274Sep418(

The(buildings(housing(the(Target(and(the(two(Experimental(Halls(adjacent( to(the(Target.(This(also(includes(labs(and(other(rooms(that(are(incorporated( in(the(buildings.(

(

(

15.3.3(

Experimental(Hall( 430(and(Guide( halls(#(8422(

194May416(

224Aug418(

The(third(Experimental(hall(housing(the(medium(long(instruments,(incl.(the( guide(ways(stretching(from(Experimental(Hall(2(towards(Experimental(Hall( 3.(

(

(

Budget)(€))

11(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)1)

Conventional)Facilities)Cost)(Responsible:(Kent(Hedin))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

15.4(

Testing(&( Commissioning(

294Aug414(

284Oct419(

Testing(and(commissioning(of(the(Conventional(Facilities.(

)

(

15.4.01(

Earth(Works(

14Jul419(

84Oct419(

Testing(and(commissioning(of(the(Earth(works(constructed.(

(

(

15.4.07(

Main(Utilities(&( Ground( Installations(

74Jan416(

124Sep416(

Testing(and(commissioning(of(the(Main(Utilities(&(Ground(Installation( works(constructed.(

(

(

15.4.06(

Auxiliary(Bldgs.(

294Aug414(

274Nov417(

Testing(and(commissioning(of(the(Auxiliary(buildings(constructed.(

(

(

15.4.02(

Accelerator(Bldg.(

94Jun416(

264Feb418(

Testing(and(commissioning(of(the(Accelerator(buildings.(

(

(

15.4.03(

Target(Bldg.(and( Experimental(Hall( 410,420(

34Apr418(

284Jan419(

Testing(and(commissioning(of(the(Target(building(and(Experimental(Hall( 410,420.(

(

(

15.4.04(

Experimental(Hall( 430(and(Guide( halls(

194Jun418(

204Dec418(

Testing(and(commissioning(of(the(Experimental(Hall(3(and(the(Guide(Halls.(

(

(

15.5(

Cost(for( additional(scope(

14Jan415(

314Dec419(

Additional(scope((Hosts(responsibility).(

)

(

Budget)(€))

(

12(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

4.

LICENSING)(ES)&)H))

4.1

Introduction)

4.3

Licensing(is(responsible(for(the(getting(and(handling(the(necessary( permits(from(the(Environmental(Court((EC)(and(the(Swedish(Radiation( Safety(Authority((SSM).(It(also(handles(the(finalisation(of(the( archaeological(investigation,(which(from(2014(an(onwards(only(is(paper( work.(It(also(includes(the(work(done(by(the(Environment,(Safety(&(Health( (ESH)(division(of(supporting(the(construction(and(design(of(the(facility( regarding(ESH(requirements.(

4.2

Scope)

4.2.1

Included)

4.2.2

Excluded)

The(following(is(not(included(in(the(scope:( • • • • •

Permit(from(SSM,(construction((step(1)(

Q2(2014(

Permit(from(EC,(construction(

Q2(2014(

Permit(from(SSM,(start(of(installation(

Q1(2016(

Permit(from(SSM,(start(of(commissioning(

Q4(2016(

(

The(scope(consists(of(producing(necessary(safety(reports(and(analyses(in( order(to(get(the(licensing(permits.(It(also(handles(the(start4up(of(and( safety(and(security(organisation(in(order(to(be(prepared(for(the(initial( operations.(

(Cost(for(equipment(necessary(for(the(start4up(of(the(radiation(safety( group((e.g.(dosimeters,(monitoring(equipment)( Cost(for(security(personal( Cost(for(security(systems( Cost(for(rad(waste(handling(equipment( Cost(for(rad(waste(handling(by(external(company(during( commissioning(phase( 13(70)(

Major)milestones)

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

4.4

Licensing)(ES)&)H))Cost)

Table)2)

Licensing)(ES)&)H))Cost)(Responsible:(Peter(Jacobsson))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

19(

Licensing(20144 EOC(R1(

14Nov413(

314Jan419(

Work(Package((WP)("Management(of(SHE(&(Licensing(issues".(

)

(

(

(

14Jan413(

314Dec413(

Cost(2013(

(

(

19.0(

Management(&( Administration(

74Jan414(

234Dec416(

Activities(covering(the(man4hours(needed(for(the(WP.(

)

(

19.0.1(

Staff(

74Jan414(

234Dec416(

ESS(Employees.(

(

(

19.0.2(

Contracted(Staff(

74Jan414(

314Mar414(

Consultants(in(an(ESS(position.(

(

(

19.0.7(

Travel(

74Jan414(

234Dec416(

Travel(costs(for(the(project.(

(

(

19.1(

Radiation(Safety( Management(

74Jan414(

314Jan419(

Supporting(and(setting(the(requirements(for(radiation(safety(and( management(of(activities(for(receiving(a(license(from(SSM.(

)

(

19.1.4(

SSM(Annual(Fee(

74Jan414(

314Jan419(

Annual(Fee(to(SSM(2014(–(2019.(

(

(

19.1.1(

License(from(SSM(

74Jan414(

34Nov416(

Management(of(activities(for(receiving(necessary(licenses(from(SSM.(

(

(

19.2(

Conventional( Safety( Management(

74Jan414(

234Dec414(

Supporting(and(setting(the(requirements(for(fire(safety(and(other( occupational(safety(issues.(

)

(

19.2.1(

Fire(Safety(

74Jan414(

234Dec414(

Setting(the(requirements(for(fire(safety(and(other(occupational(safety( issues.(

(

(

Budget)(€))

14(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)2)

Licensing)(ES)&)H))Cost)(Responsible:(Peter(Jacobsson))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

19.3(

Security( Management(

74Jan414(

234Dec414(

Supporting(and(setting(the(requirements(for(security.(

)

(

19.4(

Environmental( Management(

114Feb414(

144May414(

Supporting(and(setting(the(requirements(for(the(environmental( management(program(&(permit(from(the(EC.(

)

(

19.4.1(

Permit(from( Environmental( Court(

114Feb414(

144May414(

Activities(for(having(the(permit(from(the(Environmental(Court.(

(

(

19.5(

Property(&(Land( Management(

74Jan414(

234Dec416(

Activities(connected(to(Property(&(Land(Management.(

)

(

19.5.2(

Archaeological( investigations(

74Jan414(

234Dec416(

Cost(for(final(examination(of(the(ESS(property.(

(

(

19.6(

Radiological( Waste( Management(

74Jan414(

234Dec414(

Supporting(and(setting(the(requirements(for(handling(of(radioactive(waste.(

)

(

19.6.1(

Rad.(Waste( Handling(

74Jan414(

234Dec414(

Supporting(and(setting(the(requirements(for(handling(of(radioactive(waste.(

(

(

Budget)(€))

( (

(

15(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

( ( ( ( ( ( ( ( ( This(page(is(intentionally(left(blank.(

16(70)(

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

5.

ENERGY)

5.1

Introduction)

5.3

The(Energy(Project(is(responsible(for(the(energy(goals(‘Responsible,( Renewable(and(Recyclable’.(This(entails(implementing(and(maintaining(an( Energy(Management(System(and(developing(technical,(economic(and( legal(solutions(for(renewable(energy(production(and(recycling(of(surplus( heat.(Additionally,(the(Energy(Project(is(responsible(for(the(acquiring(the( appropriate(connections(to(public(power(grids(for(electrical(power(and( heat(recycling.(

5.2

Scope)

5.2.1

Included)

• • • • • 5.2.2

Business(plan(for(Renewable(Energy(and(Heat(Recycling(

Q4(2014(

Electrical(Grid(Connection(

Q1(2016(

Heat(Grid(Connection((

Q1(2016(

(

The(Energy(project(includes(the(following(Work(Breakdown(Structure:( Management( Energy(Management(System( Renewable(Energy( Heat(Recycling( Electrical(and(Heat(Grid(Connection( Excluded)

The(costs(for(acquiring(solutions(for(renewable(energy(and(surplus(heat( will(be(financed(by(other(means.(

17(70)(

Major)milestones)

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

5.4

Energy)Cost)

Table)3)

Energy)Cost)(Responsible:(Thomas(Parker))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

16(

Energy(20144EOC( R1(

14Nov413(

204Dec419(

Energy(Project.(

)

(

(

(

14Jan413(

314Dec413(

Cost(2013(

(

(

16.1(

Management(&( Administration(

74Jan414(

204Dec419(

Activities(covering(the(man4hours(needed(for(the(WP((

)

(

16.1.3(

Staff(

74Jan414(

204Dec419(

Management(of(Division(and(WP(performed(by(employees.(

(

(

16.1.4(

Contracted(Staff(

74Jan414(

234Dec415(

Management(of(Division(and(WP(performed(by(persons(on(long4term( contract.(

(

(

16.1.5(

Travel(

74Jan414(

204Dec419(

Travel(by(management.(

(

(

16.3(

Renewable( Energy(Sources(

74Jan414(

84Dec417(

Realize(full(provision(of(energy(need(emanating(from(renewable(energy( sources(at(a(stable(and(predictable(price.(

)

(

16.3.3(

Open(call( Renewable(

74Jan414(

164Dec414(

Process(to(identify(and(select(a(supplier(of(renewable(energy.(

(

(

Budget)(€))

18(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)3)

Energy)Cost)(Responsible:(Thomas(Parker))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

16.4(

Heat(recycling(

74Jan414(

294Jun418(

The(objective(of(the(work(package(is(to(achieve(recycling(of(surplus(heat(in( accordance(with(the(goal("Recyclable".(

)

(

16.4.2(

Formation(of(R&D( 74Jan414( consortium((SSEC)(

234Dec415(

Project(management(of(energy(collaboration.(

(

(

16.5(

Grid(Connection(

74Jan414(

234Dec415(

The(purpose(of(the(work(package(is(to(supply(connections(to(the(necessary( energy(grids,(the(electrical(power(grid(and(the(district4heating(grid.(

)

(

16.5.4(

Grid(Connection( cost(

74Jan414(

234Dec415(

Connection(tariff(payable(to(grid(operator.(

(

(

16.5.5(

Heating(Grid( Connection(cost(

74Jan414(

234Dec414(

Costs(for(connecting(ESS(to(the(heat4recycling(grid.(

(

(

Budget)(€))

( (

(

19(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

( ( ( ( ( ( ( ( ( This(page(is(intentionally(left(blank.(

20(70)(

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

6.

INFRASTRUCTURE)SUPPORT)

6.1

Introduction)

6.2

Scope)

The(scope(consists(of(supporting(and(managing(the(Infrastructure( Division.(Infrastructure(Support(also(manages(the(Conventional(Facilities( Advisory(Committee((CFAC).(

Infrastructure(support(is(a(support(and(management(function(that( includes(Conventional(Facilities,(Energy(and(Licensing((ESH).(

(

(

6.3

Infrastructure)Support)Cost)

Table)4)

Infrastructure)Support)Cost)(Responsible:(Örjan(Larsson))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

20(

Infrastructure( Support(20144 EOC(R1(

74Jan413(

94Jan420(

The(management(activities(for(Infrastructure.(

)

(

(

(

14Jan413(

314Dec413(

Cost(2013(

(

(

20.7(

Management(&( Administration(

74Jan413(

94Jan420(

The(management(activities(for(Infrastructure.(

(

(

20.7.1(

Staff(

74Jan413(

204Dec419(

The(ESS(staff(employed(to(manage(Infrastructure.(

)

(

20.7.4(

Contracted(Staff(

74Jan413(

204Dec419(

Contracted(staff(that(holds(a(position(in(the(Infrastructure(management( organization.(

(

(

20.7.2(

Travel(

14Nov413(

94Jan420(

Travel(costs(for(the(project.(

(

(

20.7.3(

CFAC(

74Jan414(

204Dec419(

Conventional(Facilities(authority(committee.(

(

(

(

Budget)(€))

(

21(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

( ( ( ( ( ( ( ( ( This(page(is(intentionally(left(blank.( (

22(70)(

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

7.

ACCELERATOR)SYSTEMS)

7.1

Introduction)

7.3

Major)milestones)

First(Klystrons(and(IOT’s(prototypes(ordered(

Q4(2014(

Spoke(cavity(prototype(available(

Q4(2014(

The(ESS(accelerator(is(a(linear(proton(accelerator(consisting(of(a(normal( conducting(front4end,(followed(by(three(families(of(superconducting( cavities.(The(front(end(consists(of(a(proton(source,(an(RFQ,(and(five(DTL( tanks.(The(superconducting(part(has(one(section(of(double(spoke(cavities,( one(section(of(medium(beta(elliptical(cavities,(and(a(final(section(of(high( beta(elliptical(cavities.(The(final(proton(energy(will(be(in(the(range(of(2.0( GeV,(with(the(current(approaching(62,5(mA.(

First(LLRF(Prototype(

Q1(2015(

Start(of(Modulator(and(klystron(prototype(testing(

Q2(2015(

Medium(Beta(Cavities(Serial(production(starts(

Q3(2016(

Start(Installation(of(Accelerator(Cryoplant(

Q2(2017(

T&I(cryogenics(available(

Q3(2017(

7.2

Scope)

First(spoke(cryomodule(tested(

Q4(2017(

7.2.1

Included)

Proton(Source(and(LEBT(ready(for(beam(commissioning(

Q4(2017(

Med(Beta(cryomodule(high(power(testing(starts(

Q4(2017(

Spoke(section(ready(for(RF(and(cryogenic(commissioning(

Q4(2018(

80MeV(protons(available(

Q2(2019(

First(Proton(to(Target(

Q2(2019(

Handover(570(MeV(Machine(to(Operations(

Q3(2019(

570(MeV(Protons(available((late(finish)(

Q4(2019(

Handover(570(MeV(Machine(to(Op.((late(finish)(

Q4(2019(

1370(MeV(Protons(Available(

Q3(2021(

High(Beta(cryomodule(high(power(testing(ends(

Q2(2022(

2.0(GeV(Protons(available(

Q3(2022(

Handover(2.0(GeV(Machine(to(Operations(

Q3(2022(

The(accelerator(system(construction(project((ACCSYS)(includes(the( management(of(the(project,(detailed(design(of(all(sub(systems,( prototyping(and(evaluation(of(prototypes(and(the(construction(of(the( accelerator(components.(It(also(includes(the(testing,(installation(and( commissioning(of(the(accelerator(and(all(it(sub4systems.(The(accelerator( project(delivers(cryogenics(and(vacuum(design,(construction(and( installation(for(all(of(ESS.( 7.2.2

Excluded)

The(early(design,(safety(&(reliability(analyses(and(requirements(for( Machine(Protection(System(are(part(of(the(ICS(project.(WP(planning(for( safety,(reliability,(and(machine(protection(system(is(on(going,(and(could(at( least(partly(be(supported(by(in4kind(contributors.(

23(70)(

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

7.4

Accelerator)Cost)

Table)5)

Accelerator)Cost)(Responsible:(Mats(Lindroos))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

11(

Accelerator( Systems(20144 EOC(R1(

14Apr413(

224Sep422(

The(ACCSYS(project(WBS(is(based(on(the(October(2012(Technical(Design( Report(for(the(ESS(Linac(and(the(following(redesign(from(2013.(

)

82(

(

(

14Jan413(

314Dec413(

Cost(2013(

(

(

11.1(

Management(&( Administration(

74Jan414(

204Dec419(

This(work(package(will(lead(the(execution(of(the(accelerator(construction( project.(It(assures(contract(management,(planning(and(communication(for( the(project.(

)

(

11.1.1(

Management(&( Administration(

74Jan414(

284Jun419(

This(work(unit(assures(the(execution(of(the(project.(This(work(unit(covers( the(costs(associated(with(ACCSYS(administration(including(Team(Assistant( labor(and(supplies.(It(also(contains(the(budget(plug(for(2013(costs.(

(

(

11.1.5(

Communications(

74Jan414(

204Dec419(

This(work(unit(assures(the(support(for(the(Collaboration(meetings,(Project( meetings(and(Site(visits.(

(

(

11.1.7(

Line(costs(

74Jan414(

204Dec419(

This(work(unit(covers(the(costs(associated(with(ACCSYS(travel(and(visiting( Warsaw(students.(

(

(

11.1.8(

Recruitment(costs( 74Jan414(

194Dec417(

This(work(unit(covers(all(ACCSYS(costs(associated(with(recruitment.(

(

(

11.2(

Accelerator( Physics(

74Jan414(

224Sep422(

This(work(package(covers(the(ESS(accelerator4physics(tasks(and(operations.(

)

23(

11.2.1(

Management(&( Administration(

74Jan414(

204Dec419(

This(work(unit(holds(the(planning(of(accelerator4physics(work,(staff( management(and(other(administrative(duties(within(the(WP(organization.(

(

(

11.2.2(

Beam(Dynamics(

74Jan414(

284Jun419(

This(work(unit(is(a(continuation(and(refinement(of(the(work(done(during( Accelerator(Design(Update.(Tools(for(modeling(of(the(beam(must(be( developed,(and(an(excellent(theoretical(understanding(of(relevant(beam4 physics(issues(must(be(acquired.(

(

65(

Budget)(€))

24(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)5)

Accelerator)Cost)(Responsible:(Mats(Lindroos))

WBS)Code)

WBS)Name)

11.2.3(

Configuration(and( 74Jan414( Integration(

11.2.4(

Commissioning( and(Operations( Management(

11.2.5(

Start)

Finish)

Description)

Budget)(€))

224Dec416(

This(work(unit(holds(the(maintenance(of(the(BLED(database(with(the(one4 dimensional(configuration(of(the(linac(with(respect(to(active(components.(

(

(

124May414(

284Jun419(

The(accelerator4physics(group(will(lead(the(commissioning(of,(first,(the( normal(conducting(and(the(superconducting(linac(at(low(beam(power,(and( finally(the(entire(accelerator(to(the(target(at(high(power.(

(

(

Control(Room( Environment(

74Jan414(

284Jun419(

During(the(construction(phase,(the(software(environment(in(the(control( room(will(be(prepared.(This(includes(constructing(an(on4line(model(of(the( linac(that(allows(the(behavior(of(the(beam(to(be(derived(from(hardware( settings.(

(

6(

11.2.6(

Upgrade(Studies(

74Jan416(

284Jun419(

Upgrade(scenarios(are(expected(to(evolve(continuously(during(the(ESS( project(as(science(at(ESS(develops(and(new(technologies(become(available.(

(

100(

11.2.7(

Normal( Conducting(Beam( Commissioning(

54Jul418(

54Feb419(

This(work(unit(holds(the(beam(commissioning(of(the(normal(conducting( part(of(the(accelerator:(source,(LEBT,(RFQ,(MEBT,(DTL(and(all(supporting( systems.(

(

(

11.2.8(

Super(Conducting( Beam( Commissioning(

234Apr419(

224Sep422(

This(work(unit(holds(the(beam(commissioning(of(the(superconducting(part( of(the(accelerator:(spoke(cryomodules(and(elliptical(cryomodules,(and(all( the(supporting(systems.(

(

(

11.3(

Normal( Conducting(Front( End(

74Jan414(

284Jun419(

This(WP(covers(the(construction,(testing(and(the(delivery(of(the(normal( conducting(front4end(of(the(ESS(linac.(It(contains(the(following(accelerating( systems:(sources,(LEBT,(RFQ,(MEBT,(and(DTL's.(

)

93(

11.3.1(

Management(&( Administration(

74Jan414(

284Jun419(

The(management(of(WP3(holds(the(synchronization(of(different(activities( within(the(ESS(construction(phase.(It(contains(an(ESS/Lund(liaison(to(work( with(the(remote(work(package/unit(managers.(

(

59(

11.3.2(

Proton(Source( and(LEBT(

74Jan414(

124Apr418(

This(work(unit(deals(with(two(ion(sources(and(one(LEBT(line(to(be(delivered( for(SAT(at(ESS(in(Lund.(

(

77(

25(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)5)

Accelerator)Cost)(Responsible:(Mats(Lindroos))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

11.3.3(

RFQ(

74Jan414(

44Jul418(

The(WU(deals(with(the(RFQ(to(be(delivered(for(SAT(at(ESS(in(Lund.(The(task( consists(of(industrial(drawings,(procurements,(adjustments,(construction( and(assembly(and(finally(dismantling(and(transport(to(ESS(at(Lund.(

(

94(

11.3.4(

MEBT(

74Jan414(

224May418(

The(WU(deals(with(the(MEBT(to(be(delivered(for(SAT(at(ESS(in(Lund.(The( task(includes(the(prototyping(of(critical(components,(MEBT(procurement,( adjustments,(assembly(and(light(tests(and(finally(dismantling(and(transport( to(Lund.(

(

97(

11.3.5(

DTL(

74Jan414(

154Dec417(

The(WU(deals(with(the(5(DTL(tanks(to(be(ready(for(SAT(after(being(fully( assembled(in(the(ESS(workshop(in(Lund.(The(task(includes(the(prototyping( of(critical(components,(procurement,(adjustments,(assembly(of(tanks(and( DTs(separately,(transport(to(Lund.(

(

100(

11.4(

Spoke(Activities( and(Cryomodules(

74Jan414(

284Jun419(

This(work(package(covers(the(construction,(testing(and(installation(phase(of( the(spoke(cryomodule(prototype(and(the(procurement,(assembly,(testing,( and(transport(of(13(spoke(cryomodules.(

)

91(

11.4.1(

Management(&( Administration(

74Jan414(

284Jun419(

The(aim(of(this(work(unit(is(to(plan,(coordinate,(organize,(monitor,(and( report(on(the(work(to(be(performed(within(this(WP.(This(includes(an( ESS/Lund(liaison(to(work(with(the(remote(work(package/unit(managers.(

(

12(

11.4.2(

Spoke( Cryomodule( Prototype(

74Jan414(

254Jan416(

This(work(unit(holds(the(procurement,(construction,(preparation/assembly( and(cryogenic(test(at(2K((at(low(RF(power(at(IPNO(and(high(power(at( Uppsala)(of(the(first(complete(spoke(cryomodule(integrating(2(fully(dressed( double(spoke(cavities.(

(

(

11.4.4(

Spoke(Series( Procurement(

24Nov415(

304Apr418(

This(WU(holds(the(procurement(of(Niobium,(26(spoke(cavities,(26(power( couplers,(26(cold(tuning(systems,(13(cryomodules(and(valve(boxes,( Cryogenic(control(box,(insulation(vacuum.(

(

100(

Budget)(€))

26(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)5)

Accelerator)Cost)(Responsible:(Mats(Lindroos))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

11.4.5(

Spoke(Cavity( Packages( Preparation(and( Test(

14Mar417(

134Jul418(

The(cavity(packages(consist(of(the(spoke(cavities,(power(couplers,(cold( tuning(systems,(and(require(preparation(and(tests(prior(to(their(installation( in(the(cryomodules.(

(

100(

11.4.6(

Spoke( Cryomodules( Assembly(

214Apr417(

234Oct418(

This(work(unit(holds(the(assembly(plan(and(schedule(along(with(the( resources(necessary(to(perform(and(manage(the(assembly(of(the(series( cryomodules.(

(

100(

11.4.7(

Spoke( Cryomodules( Transport(

74Jun417(

54Oct418(

After(the(assembly,(each(cryomodule(will(be(transported(to(the(high(power( 352(MHz(test(station(for(the(final(acceptance(test.(

(

100(

11.4.8(

Spoke( Cryomodule(tests( at(High(Power(

64Jul417(

114Dec418(

After(the(cryomodule(has(been(assembled,(each(cryomodule(will(be(tested( under(nominal(conditions(of(RF(excitation(and(temperature(for(the(final( acceptance(and(performances(assessment.(

(

100(

11.5(

Elliptical(Cavities( and(Cryomodules(

74Jan414(

154Sep422(

This(work(package(covers(the(construction(and(high(power(testing(of(the( elliptical(cryomodules,(including(21(high4beta(and(9(medium4beta(elliptical( cavity4packages.((

)

95(

11.5.1(

Management(&( Administration(

74Jan414(

154Sep422(

The(management(of(the(WP5(consists(in(organizing(and(monitoring(the( progress(of(the(design,(fabrication,(assembly,(and(testing(of(the(medium( and(high(beta(structures.(This(includes(an(ESS/Lund(liaison(to(work(with(the( remote(work(package/unit(managers.(

(

98(

Budget)(€))

27(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)5)

Accelerator)Cost)(Responsible:(Mats(Lindroos))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

11.5.2(

Medium(Beta( Structures(

74Jan414(

254Feb419(

This(work(unit(includes:(

11.5.3(

High(Beta( Structures(

74Jan415(

234May422(

Budget)(€))



One(medium4beta(elliptical(cavity(cryomodule(technology( demonstrator,(M4ECCTD(



The(fabrication(of(4x9(SRF(cavities(



The(designer(cavity(follow4up(



4x9(power(couplers(fabrication(



4x9(tuning(system(fabrication(



9(cryomodules(fabrication(



The(infrastructure(necessary(for(the(cryomodule(assembly(

This(work(unit(includes:( •

One(high4beta(elliptical(cavity(cryomodule(technology( demonstrator,(H4ECCTD(



The(fabrication(of(4x21(SRF(cavities(



The(designer(cavity(follow4up(



4x21(power(couplers(fabrication(



4x21(tuning(system(fabrication(



21(cryomodules(fabrication(



The(infrastructure(necessary(for(the(cryomodule(assembly(

In)Kind) Potential)(%)) (

86(

(

100(

11.6(

HEBT(and( Conventional( Magnet(Systems(

74Jan414(

314Mar420(

This(WP(holds(all(normal4conducting(magnets,(excluded(are(magnets(for( the(LEBT(and(MEBT.(All(special,(radiation(hard,(magnets(prepared(for( remote(disconnection,(exchange(and(reconnection,(all(associated(power( supplies,(collimators.(

)

92(

11.6.2(

Management(and( Administration(

74Jan414(

204Dec419(

This(work(unit(coordinates(and(reports(the(activities(performed(under(WP6( HEBT(and(conventional(magnets.(

(

100(

28(70)(

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)5)

Accelerator)Cost)(Responsible:(Mats(Lindroos))

WBS)Code)

WBS)Name)

11.6.3(

Start)

Finish)

Description)

Budget)(€))

HEBT(beam(optics( 34Mar414( design(

224Dec417(

This(work(unit(will(keep(the(HEBT(beam(optics(updated(and(perform( simulations(as(needed(to(support(the(design(of(lattice(components(in(the( WP.(

(

100(

11.6.4(

Magnets(

14Jul414(

294Mar419(

The(work(unit(covers(the(supply(of(the(all(magnets(within(this(WP.(

(

100(

11.6.5(

Magnet(Power( Supplies(

74Jan415(

214Dec418(

The(work(unit(covers(the(supply(of(the(all(PS(within(this(WP.(

(

100(

11.6.6(

Linac(Warm(Units( (LWU's)(

74Jan414(

154Jan418(

This(work(unit(covers(the(supply(of(the(LWU's.(

(

76(

11.6.7(

HEBT(Beam(Line(

14Apr415(

204Dec419(

This(work(unit(covers(all(other(activities(in(the(HEBT(not(covered(in(the( other(work(units.(

(

100(

11.6.8(

LEDP(and(HEDP(

34Jul417(

134Sep419(

This(work(unit(covers(the(design(and(construction(of(the(LEDP(and(HEDP( units.(

(

100(

11.6.9(

WP6(ESS(activities( 74Jan414(

314Mar420(

This(work(unit(covers(the(design(and(integration(of(the(facilities(needs(to( integrate(the(infrastructure(need(to(support(the(installation(of(equipment( in(the(A2T(area.(

(

(

11.7(

Beam(Diagnostics(

74Jan414(

104Mar421(

This(work(package(includes(the(procurement,(assembly,(testing(and( installation(of(all(the(beam(diagnostics(equipment(in(the(ESS(accelerator,( up(to(and(including(the(spot(size(measurement(on(the(target.(

)

84(

11.7.1(

Management(&( Administration(

74Jan414(

284Jun419(

This(work(unit(includes(the(overall(coordination(effort(for(beam(diagnostics( as(well(as(monitoring/reporting(of(the(other(work(units.(

(

(

11.7.2(

74Jan414( Non(Reoccurring( Engineering((NRE)( BD(

34Jul419(

This(work(unit(contains(the(non4recurring(engineering((design,( development,(prototyping(and(testing(of(the(different(beam(diagnostics( types)(for(all(beam(diagnostics.(This(work(unit(is(being(re4packaged(for(in4 kind.(

(

78(

29(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)5)

Accelerator)Cost)(Responsible:(Mats(Lindroos))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

11.7.3(

LEBT(Diagnostics(

74Jan414(

154Jun417(

This(includes(the(construction(cost(for(the(diagnostics(in(the(LEBT.(The( detailed(scope(is(currently(under(review(and(the(work(unit(is(being(re4 packaged(for(in4kind.(

(

100(

11.7.4(

MEBT(Diagnostics(

74Jan416(

194Dec417(

This(includes(the(construction(cost(for(the(diagnostics(in(the(MEBT.(The( detailed(scope(is(currently(under(review(and(the(work(unit(is(being(re4 packaged(for(in4kind.(

(

100(

11.7.5(

DTL(Diagnostics(

74Jan416(

154Jun417(

This(includes(the(construction(cost(for(the(diagnostics(of(the(DTL.(The( detailed(scope(is(currently(under(review(and(the(work(unit(is(being(re4 packaged(for(in4kind.(

(

100(

11.7.6(

Spoke(LINAC( Diagnostics(

74Jan416(

154Jun417(

This(includes(the(construction(cost(for(the(diagnostics(of(the(Spoke(Linac.( The(detailed(scope(is(currently(under(review(and(the(work(unit(is(being(re4 packaged(for(in4kind.(

(

100(

11.7.7(

Medium(Beta( Elliptical(LINAC( Diagnostics(

74Jan416(

154Jun417(

This(includes(the(construction(cost(for(the(diagnostics(of(the(Medium(Beta( Elliptical(LINAC.(The(detailed(scope(is(currently(under(review(and(the(work( unit(is(being(re4packaged(for(in4kind.(

(

100(

11.7.8(

High(Beta( Elliptical(LINAC( Diagnostics(

74Jan416(

154Jun417(

This(includes(the(construction(cost(for(the(diagnostics(of(the(High(Beta( Elliptical(LINAC.(The(detailed(scope(is(currently(under(review(and(the(work( unit(is(being(re4packaged(for(in4kind.(

(

100(

11.7.9(

HEBT(High(Beta( Upgrade( Diagnostics(

74Jan416(

84Jun417(

This(includes(the(construction(cost(for(the(diagnostics(of(the(HEBT(High( Beta(Upgrade.(The(detailed(scope(is(currently(under(review(and(the(work( unit(is(being(re4packaged(for(in4kind.(

(

100(

11.7.10(

Beam4on4target( Diagnostics(

74Jan416(

84Jun417(

This(includes(the(construction(cost(for(the(diagnostics(of(the(Beam4on4 target.(The(detailed(scope(is(currently(under(review(and(the(work(unit(is( being(re4packaged(for(in4kind.(

(

100(

Budget)(€))

30(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)5)

Accelerator)Cost)(Responsible:(Mats(Lindroos))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

11.7.11(

Tune4up(dump( line(Diagnostics(

74Jan416(

84Jun417(

This(includes(the(construction(cost(for(the(diagnostics(of(the(Tune4up(dump( line.(The(detailed(scope(is(currently(under(review(and(the(work(unit(is(being( re4packaged(for(in4kind.(

(

100(

11.7.12(

Insert(able(Beam( Dumps(

14Jul419(

104Mar421(

This(includes(the(construction(cost(for(the(Insert(able(Beam(Dumps.(The( detailed(scope(is(currently(under(review(and(the(work(unit(is(being(re4 packaged(for(in4kind.(

(

100(

11.8(

Radio(Frequency( Systems(

34Jun413(

314Aug422(

This(work(package(covers(the(design,(prototyping,(specifications,( procurement,(test,(and(installation(of(the(Radio(Frequency(Systems.(

)

86(

11.8.1(

Management(&( Administration(

74Jan414(

314Aug422(

The(RF(system(design(Management(WU(covers(the(coordination(and(the( management(of(the(construction(of(all(subparts(of(the(RF(system.(

(

(

11.8.2(

Low(Level(RF( Control(and( control(system(

74Jan414(

114Oct418(

The(LLRF(WU(covers(construction(of(the(systems(that(allow( controlling/maintaining(amplitude(and(phase(stability(of(the(accelerating( fields(in(pulse(mode(for(all(the(RF(cavities(along(the(Linac(+(the(local(RF(cell( control(and(interlock(system.(

(

95(

11.8.3(

Master(Oscillator( 74Jan414( phase(distribution(

144Nov417(

The(Master(oscillator(/(phase(distribution(WU(covers(design,(construction,( purchase,(and(installation(of(the(systems(for(generation(of(the(reference( phase(and(timing((master(oscillator(and(distribution(of(the(reference(phase( to(the(cavities(of(the(linac.(

(

7(

11.8.4(

High(Power( Amplifiers(

34Jun413(

84Nov421(

The(High(power(Amplifiers(WU(covers(design,(construction,(purchase,(and( installation(of(the(systems(for(generating(from(the(LLRF(signals(the(high(RF( power(needed(to(power(the(cavities(of(the(linac.(

(

88(

11.8.5(

High(Power( Voltage( Converters(

14Oct413(

184Apr418(

The(High(power(Voltage(Converters(WU(covers(design,(construction,( purchase,(and(installation(of(the(systems(for(generating(the(high(voltage(or( the(electrical(power(needed(to(power(the(high(power(amplifiers(of(the( linac.(

(

89(

Budget)(€))

31(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)5)

Accelerator)Cost)(Responsible:(Mats(Lindroos))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

11.8.6(

RF(Distribution(

14Apr414(

134Jan420(

The(RF(distribution(WU(covers(design,(construction,(purchase,(and( installation(of(the(systems(needed(to(distribute(the(high(power(RF(to(the( cavities(of(the(linac.(

(

96(

11.8.7(

Gallery(

24Jul414(

224Sep417(

The(Gallery(WU(covers(design,(construction,(purchase,(and(installation(of( systems(in(the(gallery.(This(also(includes(access(and(working(platforms,( lifting(devices(and(jigging.(

(

60(

11.8.8(

RF(installation( phase(1(

44Jan416(

114Apr419(

This(work(unit(holds(the(schedule(for(the(installation(of(the(RF(systems(up( to(and(including(the(Medium(Beta(Cryomodules.(It(includes(83%(of(what(is( specified(in(the(TDR.(

(

100(

11.8.9(

RF(installation( phase(2(

174Dec418(

184Nov421(

This(work(unit(holds(the(schedule(for(the(installation(of(the(RF(systems(for( the(High(Beta(Cryomodules.(

(

100(

11.10(

Test(Stands(

74Jan414(

234Jun422(

This(work(package(covers(the(test(stand(in(Uppsala(and(the(local(test(stand( in(Lund(for(the(main(accelerator(components.(

)

58(

11.10.1(

Management(&( Administration(

74Jan414(

204Dec419(

This(work(unit(covers(the(management(and(administration(required(for(WP( 10.(It(includes(interface(and(coordinating(activities(between(the(test(stand( WP(and(other(WPs(as(well(as(reporting(activities.(

(

(

11.10.2(

Test(Stand(in( Lund(phase(I(

74Jan414(

174Aug417(

This(work(unit(covers(phase(1(of(the(test(stands,(which(is(the(test(stand(for( the(main(RF(equipment(prototype(soak(tests,(namely(the(modulators(and( klystrons.(

(

81(

11.10.3(

Test(Stand(in( Lund(phase(II(

74Jan414(

234Jun422(

This(work(unit(covers(phase(2(of(the(test(stands,(which(concerns(the(site( acceptance(tests(of(the(series(production(elliptical(cryomodules.(

(

98(

11.10.4(

Uppsala((P2B( WP19)(

74Jan414(

184Feb419(

This(work(unit(covers(the(Uppsala(test(stand,(which(will(be(used(to(test(the( spoke(cavity(cryomodule(prototype(and(the(spoke(cavity(cryomodule(series( production.(

(

(

Budget)(€))

32(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)5)

Accelerator)Cost)(Responsible:(Mats(Lindroos))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

11.11(

Cryogenics(

74Jan414(

234Dec420(

This(work(package(covers(all(the(cryogenics(systems(associated(with(the( ESS(project.(It(includes(3(cryoplants(and(the(cryogenic(distribution.(

)

98(

11.11.1(

Management(&( Administration(

74Jan414(

234Dec420(

This(WU(concerns(the(management(and(administration(required(for(WP(11.( It(includes(interface(and(coordinating(activities(between(WPs(as(well(as( reporting(activities.(

(

(

11.11.2(

Accelerator( Cryoplant(

74Jan414(

244Oct418(

This(work(unit(covers(all(the(activities((design,(specification,(procurement,( installation(and(commissioning)(of(the(accelerator(cryoplant(that(will( provide(cryogenic(cooling(to(the(cryomodules(via(the(distribution(system.(

(

99(

11.11.3(

Instruments(and( test(stand( cryoplant(

74Jan414(

34Jul417(

This(cryoplant(provides(2(K(and(40(K(refrigeration(to(the(cryomodule(test( stands(as(well(as(providing(up(to(50(L/hr(of(LHe(for(the(beam(line( instrumentation.(

(

98(

11.11.4(

Target(Cryoplant(

74Jan414(

214Dec418(

This(work(unit(covers(all(the(design,(specification,(procurement,(installation( and(commissioning(of(the(target(cryoplant(that(provides(cooling(via(He(gas( at(16(K(to(the(liquid(hydrogen((LH2)(moderators.(

(

100(

11.11.5(

Cryogenic( Distribution(

74Jan414(

214Nov418(

This(work(unit(covers(the(cryogenic(distribution(systems(for(Test(Stand(and( Accelerator.(

(

99(

11.12(

Vacuum(

74Jan414(

74Jan421(

This(work(package(covers(the(vacuum(systems(associated(with(ESS.(

)

60(

11.12.6(

Management(&( Administration(

74Jan414(

74Jan421(

Provides(for(the(management(and(administration(of(the(vacuum(group.(

(

(

11.12.1(

Vacuum(for( Accelerator( General(Tasks(

74Jan414(

224Dec420(

This(work(unit(covers(the(vacuum(equipment(standardization,(the( Accelerator(Vacuum(Manual,(the(Accelerator(Operations(Manual,(and( commissioning(support.(

(

(

11.12.2(

Vacuum(for( Accelerating( Systems(

74Jan414(

314Mar420(

This(work(unit(covers(the(vacuum(systems(for(all(parts(of(the(LINAC(up(to( and(including(the(HEBT.(

(

75(

Budget)(€))

33(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)5)

Accelerator)Cost)(Responsible:(Mats(Lindroos))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

11.12.3(

Vacuum(for( Accelerator( Support( Equipment(

74Jan414(

74Jan420(

This(work(unit(includes(the(design,(procurement(and(the(fabrication(of( equipment(needed(to(support(for(vacuum(systems(operations.(

(

59(

11.13(

Safety(and( Availability(

74Jan414(

284Jun419(

This(work(package(contains(the(safety(and(availability(related(work(related( to(the(accelerator.(

)

(

11.13.1(

Management(&( Administration(

74Jan414(

284Jun419(

This(work(unit(contains(the(management(of(the(safety(and(availability( related(work(related(to(the(accelerator.(

(

(

11.13.2(

Radiation(Safety(

74Jan414(

284Jun419(

This(work(unit(contains(the(work(related(to(radiation(safety(in(the( accelerator.(

(

(

11.13.4(

Machine( Protection(and( Safety(Liaison(

74Jan414(

284Jun419(

This(work(unit(contains(the(work(related(to(machine(protection(in(the( accelerator(project((distinct(from(implementation(work(in(ICS).(

(

(

11.13.5(

74Jan414( Availability(and( Reliability(analysis(

284Jun419(

This(work(unit(contains(the(work(related(to(reliability(and(availability( analysis(in(the(accelerator.(

(

(

11.14(

Lead(Engineers( and(Liaisons(

74Jan414(

284Jun419(

This(Work(Package(covers(the(costs(associated(with(the(Engineering( Management(of(the(ACCSYS(project.(

)

(

11.14.1(

Lead(Engineers(

74Jan414(

284Jun419(

This(Work(Unit(covers(all(the(costs(and(resources(associated(with(the( ACCSYS(Lead(Engineer.(

(

(

11.14.3(

Design(Support(

74Jan414(

284Jun419(

This(Work(Unit(covers(all(the(costs(associated(with(engineering(and(design( support(required(for(the(Lead(Engineers(and(Liaisons(to(conduct(their(work.(

(

(

11.14.4(

Systems( Engineering(

74Jan414(

284Jun419(

This(work(unit(assure(the(writing(and(tracking(of(requirements,(the(writing( and(tracking(interfaces(and(leads(the(reviews(and(validation(process.(

(

(

Budget)(€))

34(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)5)

Accelerator)Cost)(Responsible:(Mats(Lindroos))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

11.15(

Cooling(and( Electrical(Support(

74Jan414(

154Sep422(

This(work(package(covers(costs(associated(with(modeling(of(technical( utilities(ESS(wide(and(design(and(construction(of(technical(utilities(for( ACCSYS.(

)

(

11.15.1(

Management(&( Administration(

74Jan414(

154Sep422(

Provides(for(the(management(and(administration(of(the(electrical(power( and(water4cooling(system(work.(

(

(

11.15.2(

Electrical(System( Modeling(

74Jan414(

24Dec415(

This(work(unit(covers(analytical(modeling(to(optimize(the(electrical(power( distribution(system(for(ACCSYS,(TARGET,(NSS(and(CRYO(and(provides(input( to(WU(11R1.15.4.(

(

(

11.15.3(

Grounding( System( Development(&( Design(

74Jan414(

104Jun422(

This(work(unit(covers(the(definition(of(a(Common(Bonding(Network((CBN)( for(ACCSYS,(TARGET,(NSS(and(CRYO(and(further(measures(for(EMC( mitigation(and(control(for(ACCSYS.(

(

(

11.15.4(

74Jan414( Definition(of( Electric(Power( Interfaces(&( Connections(to( Technical(Systems(

294Oct420(

This(work(unit(covers(the(design,(procurement,(construction(and( commissioning(of(the(electrical(power(distribution(system(for(ACCSYS.(

(

(

11.15.5(

Water(Cooling( System(Modeling(

74Jan414(

254Aug414(

This(work(unit(covers(analytical(modeling(to(optimize(the(water4cooling( network(for(ACCSYS,(Target,(NSS(and(CRYO.(

(

(

11.15.6(

74Jan414( Definition(of( Water(Cooling( Interfaces(&( Connections(to( Technical(Systems(

104Mar422(

This(work(unit(covers(the(design,(construction(and(commissioning(of(the( water(cooling(systems(associated(with(ACCSYS,(Target,(NSS(and(CRYO.(

(

(

Budget)(€))

35(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)5)

Accelerator)Cost)(Responsible:(Mats(Lindroos))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

11.99(

Integration(and( Installation(

74Jan414(

224Sep422(

Planning,(coordinating(and(executing(the(following(activities:(ACCSYS( installation.(

)

50(

11.99.1(

Management(&( Administration(

74Jan414(

154Sep422(

Management,(administration(and(coordination(of(the(work(performed( within(the(WP.(Reporting(and(handshaking(activities(between(this(WP(and( other(ESS(WPs.(

(

(

11.99.2(

Accelerator( integration(

74Jan414(

264Aug419(

Accelerator(plant(space(organization(and(allocation,(development(of(an( integrated(3D(layout(and(an(integrated(installation(plan.(

(

(

11.99.3(

Non4conventional( utilities(

74Jan414(

114Oct421(

Configuration,(acquisition(and(installation(of(non4conventional(utilities(in( the(gallery,(tunnel(and(technical(labs.(

(

75(

11.99.4(

Conventional( facilities(interface(

74Jan414(

244May416(

Provision(of(a(single(point(of(contact(with(Conventional(Facilities(in(the( framework(of(the(ACCSYS(project(to(support,(verify,(validate(and(accept(the( accelerator(conventional(facilities(designs(and(activities.(

(

(

11.99.5(

Facilities(and( tools(

74Jan416(

194Apr417(

Development(of(facilities(and(tools(as(needed(to(support(the(activities(of( other(WUs(within(the(WP.(

(

(

11.99.6(

Installation(phase( 1(

154Aug416(

194Apr419(

Installation(of(systems(residing(in(the(gallery(tunnel(and(technical(labs(in( order(to(accelerate(the(beam(up(to(570(MeV.(It(includes(SAT,(coordination( of(other(WPs(installation(activities,(systems(alignment,(connections(and(dry( commissioning.(

(

57(

11.99.7(

Installation(phase( 2(

114Feb420(

224Sep422(

Installation(of(systems(residing(in(the(gallery(tunnel(and(technical(labs(in( order(to(accelerate(the(beam(up(to(2,5(GeV(and(deliver(5(MW(on(target.(It( includes(SAT,(coordination(of(other(WPs(installation(activities,(systems( alignment,(connections(and(dry(commissioning.(

(

80(

11.99.8(

Accelerator( survey(and( alignment(

214Mar414(

44Oct417(

Configuration(and(installation(of(the(accelerator(alignment(and( fiducialization(network.(Accelerator(systems(alignment.(Metrology(and(SAT( quality(assurance.(

(

100(

Budget)(€))

36(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

8.

TARGET)STATION)

8.1

Introduction)

8.3

The(Target(Station(is(the(spallation(centre(of(the(ESS(Facility,(receiving(the( proton(beam(from(the(accelerator(and(delivering(neutrons(to(the( instruments.(

8.2

Scope)

8.2.1

Included)

The(Target(Station(includes(proton(beam(window,(moderator(and( reflector(plug,(target(wheel(unit,(neutron(beam(ports,(cooling(equipment,( associated(supplies(for(cooling,(handling(of(contaminated(supplies(and( shielding(to(keep(the(facility(safe,(active(cells(and(remote(handling( equipment(including(all(development,(manufacturing,(installation(and( testing(for(these(areas.( 8.2.2

Moderator(Concept(Finalized(

Q4(2014(

Major(Raw(Materials(Secured(

Q4(2015(

Critical(Components(Manufactured(

Q4(2017(

Early(Access(to(Target(Building(

Q4(2017(

Installation(Completed(

Q2(2018(

Cold(Commissioning(Completed(

Q2(2019(

(

Excluded)

The(Target(Station(Project(does(not(include(conventional(HVAC(system,( cranes(in(the(target(building,(utilities(into(the(target(building,(collimators,( A2T(area,(and(other(items(within(the(target(building(whose(purpose(are( not(related(to(the(target.(

37(70)(

Major)milestones)

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

8.4

Target)Station)Cost)

Table)6)

Target)Station)Cost)(Responsible:(John(Haines))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

12(

Target(Station( 20144EOC(R1(

14Jul413(

204May420(

Target(Station(Construction(Project.(

)

70(

(

(

14Jan413(

314Dec413(

Cost(2013(

(

(

12.1(

Management(&( Administration(

14Jul413(

284Jun419(

This(WP(manages(steering(and(control(of(Target(Station(Construction( Project.(Cost(incl.(PM(cost,(project(admin(and(travel.(

)

(

12.1.1(

Target(Project( Management(&( Administration(

14Jul413(

284Jun419(

Management(and(administration(of(the(Target(Systems(Project(including( the(Project(Manager,(Deputy(Project(Manager(and(Administrative( Assistant.(

(

(

12.1.2(

Systems( Engineering(

304Aug413(

284Jun419(

Systems(Engineering(and(integration(at(the(overall(Target(Systems(level(

(

(

12.2(

Target(Systems(

74Jan414(

104Mar420(

This(work(package(covers(all(components(associated(with(the(spallation( target(including(the(target(material,(container,(drive(mechanisms(for( rotating(the(target,(and(helium4cooling(loop.(

)

80(

12.2.1(

Management(&( Administration(

74Jan414(

284Jun419(

Efforts(associated(with(planning(and(managing(the(Target(Systems(work( package.(

(

(

12.2.2(

Target(Wheel(

74Jan414(

34Jun419(

Design,(analysis,(engineering(development(and(demonstration,( procurement,(and(assembly(of(the(spallation(target(wheel.(

(

80(

12.2.3(

Target(Drive(and( Shaft(

74Jan414(

294Nov419(

Design,(analysis,(engineering(development(and(demonstration,( procurement,(and(assembly(of(the(spallation(target(drive(system(including( the(shaft,(bearing(unit,(feed(through,(and(motive(system.(

(

89(

12.2.4(

Target(Helium( Cooling(System(

74Jan414(

284Jun419(

Design,(analysis,(engineering(development(and(demonstration,( procurement,(and(assembly(of(the(helium(cooling(system(used(to(remove( the(heat(deposited(in(the(spallation(target.(

(

90(

Budget)(€))

38(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)6)

Target)Station)Cost)(Responsible:(John(Haines))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

12.2.5(

Water(Cooling( Backup(Option(

74Jan414(

54May414(

Backup(solution(for(the(spallation(target(using(water4cooling.(

(

(

12.2.70(

Installation,( Testing(and( Commissioning(

94Nov418(

94Jan420(

Assembly,(installation,(testing,(and(commissioning(of(Target(Systems(at(the( ESS(site.(

(

(

12.2.80(

Target(Systems( Close4Out(Phase(

94Jan420(

104Mar420(

Perform(closeout(activities(including(finalizing(documentation,(as4built( design(drawings/CAD(models,(and(compiling(lessons4learned(for(Target( Systems.(

(

(

12.3(

Moderator(and( Reflector(Systems(

74Jan414(

64May420(

This(work(package(covers(all(components(associated(with(the(neutron( moderator(and(reflector(systems(including(the(reflector(plug,(handling( systems,(moderator(assemblies,(associated(shielding,(supercritical(helium( loop,(and(cryogenic(hydrogen(subsystem.(

)

89(

12.3.1(

Management(&( Administration(

74Jan414(

294Nov419(

Efforts(associated(with(planning(and(managing(the(Moderator(and( Reflector(Systems(work(package.(

(

(

12.3.2(

Plug(Structures( and(Handling( Systems(

74Jan414(

34Jun419(

Design,(analysis,(procurement,(and(assembly(of(subsystems(for(the( reflector(plug(structures(and(handling(systems.(

(

72(

12.3.3(

Moderator(and( Reflector( Assemblies(

74Jan414(

294Nov419(

Design,(analysis,(engineering(development(and(demonstration,( procurement,(and(assembly(of(subsystems(for(the(Moderator(and(Reflector( Assemblies.(

(

84(

12.3.4(

Cryogenic(Cooling( System(

74Jan414(

214Feb420(

Activities(needed(for(design,(analysis,(Engineering(Development(and( Demonstration,(procurement,(installation(and(commissioning(of(the( hydrogen(moderator(loop(and(helium(refrigerator(and(cooling(loop(used(to( maintain(the(hydrogen(temperature.(

(

99(

Budget)(€))

39(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)6)

Target)Station)Cost)(Responsible:(John(Haines))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

12.3.70(

Installation,( Testing(and( Commissioning(

94Jul418(

54Mar420(

Assembly,(installation,(testing,(and(commissioning(of(Moderator(and( Reflector(unit(at(the(ESS(site.(

(

(

12.3.80(

Moderator(and( Handling(Systems( Close4Out(Phase(

54Mar420(

64May420(

Perform(closeout(activities(including(finalizing(documentation,(as4built( design(drawings/CAD(models,(and(compiling(lessons4learned(for(Moderator( and(Reflector(Systems.(

(

(

12.4(

Monolith(Systems(

74Jan414(

204May420(

This(work(package(covers(all(components(associated(with(the(monolith( systems(including(enabling(systems,(confinement(systems,(shielding( systems,(and(tuning(beam(dump.(

)

69(

12.4.1(

Management(&( Administration(

74Jan414(

294Nov419(

Management(and(administration(of(the(Monolith(Systems(Work(Package.(

(

(

12.4.2(

Enabling(Systems(

74Jan414(

294Nov419(

Design,(analysis,(procurement,(and(assembly(of(the(monolith(enabling( systems(including(the(target(monitoring(plug,(proton(beam(instrumentation( plug,(and(irradiation(module.(

(

18(

12.4.3(

Confinement( Systems(

74Jan414(

294Nov419(

Design,(analysis,(procurement,(and(assembly(of(the(monolith(confinement( systems(including(the(neutron(beam(windows,(covers(and(penetrations,( and(helium(atmosphere(system.(

(

68(

12.4.4(

Shielding(Systems(

74Jan414(

294Nov419(

Design,(analysis,(procurement,(and(assembly(of(the(monolith(shielding( systems(including(the(internal(monolith(structures,(monolith(bulk(shielding,( and(monolith(removable(shielding.(

(

97(

12.4.5(

Tuning(Beam( Dump(

74Jan414(

254Sep418(

Design,(analysis,(procurement,(installation,(and(commissioning(of(the( Tuning(Beam(Dump.(

(

86(

12.4.70(

Installation,( Testing(and( Commissioning(

254Aug417(

204Apr420(

This(work(unit(includes(final(assembly(and(installation(at(the(ESS(site,(site( acceptance(tests,(commissioning,(and(closeout(for(the(Monolith(Systems( (excluding(the(Tuning(Beam(Dump).(

(

(

Budget)(€))

40(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)6)

Target)Station)Cost)(Responsible:(John(Haines))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

12.4.80(

Monolith(Systems( Close4Out(Phase(

204Apr420(

204May420(

Perform(closeout(activities(including(finalizing(documentation,(as4built( design(drawings/CAD(models,(and(compiling(lessons4learned(for(Monolith( Systems,(excluding(Tuning(Beam(Dump.(

(

(

12.5(

Fluid(Systems(

74Jan414(

294Nov419(

This(work(package(covers(all(cooling(related(areas(as(well(as(supply(and( disposal(of(activated(fluids,(excluding(the(helium4cooling(loop(for(the( Target(Wheel(and(the(cryogenic(helium(and(hydrogen(loops(used(for(the( cryogenic(moderator(systems.(

)

78(

12.5.1(

Management(&( Administration(

74Jan414(

294Nov419(

Planning,(controlling(and(follow(up(for(all(work(within(Fluid(Systems.(

(

(

12.5.2(

Primary(Water( Cooling(Systems(

74Jan414(

184Sep419(

Design,(analysis,(procurement,(installation,(and(cold(commissioning(of(the( primary(water(cooling(systems(for(the(reflector,(water(moderator,(and( shielding(cooling(systems(and(intermediate(water(cooling(systems(for(the( primary(cooling(loops.(

(

91(

12.5.3(

Intermediate( Water(Cooling( Systems(

74Jan414(

64Sep419(

Target(station(intermediate(cooling(systems(and(PBW(cooling.(

(

90(

12.5.4(

Radioactive( Gaseous(Effluent( and(Confinement( (RGEC)(System(

74Jan414(

94Sep419(

Design,(analysis,(procurement,(installation,(and(cold(commissioning(of(the( ventilation((HVAC&RGEC),(vacuum(pumps,(cover(gas(handling(systems,(gas( purification(and(storage,(water(purification(and(storage,(radioactive( monitoring(system.(

(

88(

12.5.5(

Ancillary(Helium( Systems(

74Jan414(

244Oct419(

Design,(analysis,(procurement,(installation,(and(cold(commissioning(of(the( ancillary(systems.(

(

83(

12.5.6(

Ancillary( Contaminated( Water(System(

34Mar414(

304Aug419(

Design,(analysis,(procurement,(installation,(and(cold(commissioning(of(the( ancillary(contaminated(water(systems.(

(

(

Budget)(€))

41(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)6)

Target)Station)Cost)(Responsible:(John(Haines))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

12.5.7(

Fluids(Supply(and( Process(Vacuum(

74Jan414(

24Jul419(

Design,(analysis,(procurement,(installation,(and(cold(commissioning(of(the( fluid(supply(and(process(vacuum(systems.(

(

(

12.6(

Remote(Handling( Systems(

74Jan414(

64Dec419(

This(work(package(covers(design,(analysis,(engineering(development(and( demonstration,(procurement,(installation,(and(commissioning(of(remote( handling(equipment(and(cells(within(the(target(building(and(storage(and( transport(casks(for(radioactive(waste.(

)

94(

12.6.1(

Management(&( Administration(

74Jan414(

284Jun419(

Cost(and(resource(planning(and(tracking,(schedule(planning(and(update,( risk(management,(quality(plan,(procurement(management,(WP(interface( control.(

(

(

12.6.2(

Active(Cells(

74Jan414(

64Dec419(

Management(support(for(WU.(Hot(cell(facility(for(processing,( refurbishment,(intermediate(storage(and(shipment(of(activated(waste.( Contains(3(main(WU´s:(confinement,(handling(and(equipment.(Main( purpose:(to(treat(high(and(intermediate(level(waste.(

(

100(

12.6.3(

Active(Cells( Commissioning(

114Jun419(

64Dec419(

The(final(commissioning(of(the(active(cells.(All(systems(should(fulfill(their( requirements(and(all(remote(handling(operations(validated.(The( commissioning(should(be(done(prior(to(beam(on(target.(

(

(

12.6.4(

Internal(Casks(and( 34Mar414( Associated( Handling(Devices(

224Nov419(

Management(support(for(WU.(Casks(and(transport(equipment(for(safe( transport(of(radioactive(and(contaminated(components(from(their(point(of( installation(to(the(active(cells(facility,(i.e.(only(ESS(internal(transportation.(

(

100(

12.6.5(

Machining,( Testing(and( Tooling(

74Jan414(

284Jun419(

Management(support(for(WU.(Workshop(contaminated(parts(&(Mock4up( and(test(stand(for(new(comps.(Workshop(will(handle(slightly(contaminated( comps.(Test(stand(will(have(possibility(for(site(acceptance(tests(&(alignment( test(of(new(components.(Staff(training.(

(

64(

12.6.6(

Complementary( Shielding(

74Jan414(

284Jun419(

Management(support(for(WU.(Shielding(not(covered(by(other(WP's(like( "Monolith(and(Plugs".(Typically(neutrons(back(scattering(shielding(in(the( A2T(as(one(example.(

(

100(

Budget)(€))

42(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)6)

Target)Station)Cost)(Responsible:(John(Haines))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

12.7(

Controls(

74Jan414(

284Jun419(

This(work(package(covers(the(target(specific(control(system,(including( design,(procurement(and(installation(and(testing(of(the(Target(Safety( Systems(and(the(interface(between(Target(Station(and(the(overall(ESS( Integrated(Control(System.(

)

(

12.7.1(

Management(&( Administration(

74Jan414(

284Jun419(

Management(and(Administration(support(for(Controls(WP.(

(

(

12.7.2(

Design(of(Target( Safety(System(

74Jan414(

164Jan417(

Design(effort(needed(to(define(the(Target(Safety(System(including(safety( evaluations,(detailed(design,(engineering(development(and(demonstration,( and(preparations(for(procuring(Controls(system(elements.(

(

(

12.7.3(

Manufacturing(

164Jan417(

314Oct417(

Procurement(of(Controls(elements.(

(

(

12.7.4(

Integration(

314Oct417(

114Sep418(

Installation(and(on(site(testing(of(Controls(hardware(and(software.(

(

(

12.7.5(

Commissioning(

114Sep418(

84Jan419(

Commissioning(of(Controls(system.(

(

(

Budget)(€))

43(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)6)

Target)Station)Cost)(Responsible:(John(Haines))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

12.8(

Physics(

74Jan414(

284Jun419(

This(work(package(covers(physics(related(support(function(for(the(Target( Station.(

)

(

12.8.1(

Management(&( Administration(

74Jan414(

284Jun419(

Management(of(the(Target(Physics(work(package(including(schedule(and( resource(planning(and(EVMS(tracking(and(reporting.(

(

(

12.8.2(

Neutronics(

74Jan414(

284Jun419(

Develop(an(optimized(target4moderator4reflector4shield.(Calculate(heat( loads(and(radiation(damage.(Maintain(relevant(codes(and(libraries.(

(

(

12.8.3(

Shielding(

74Jan414(

224Dec417(

Calculations(of(shield(requirements(for(operations.(

(

(

12.8.4(

Waste( Management(

74Jan414(

284Jun419(

Calculate(radionuclide(activities.(

(

(

12.8.5(

Safety(and( Licensing(Support(

74Jan414(

214Dec418(

Support(for(ESS(Safety(and(Licensing(activities.(

(

(

12.8.6(

Materials(

74Jan414(

284Jun419(

Support(the(design(by(providing(material(properties(and(materials(data(for( materials(used(to(construct(the(Target(Station.(

(

(

Budget)(€))

(

44(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

9.

INTEGRATED)CONTROL)SYSTEMS)

9.1

Introduction)

those(parts(of(Target(Systems(that(are(not(classified(under(safety(system( regulations.( The(ICS(construction(project(does(not(include(the(following(activities,( which(are(defined(as(initial(operations(activities:(

The(ESS(Control(System(is(a(complex(network(of(hardware,(software,(and( configuration(databases(that(integrate(the(operations(of(the(Accelerator,( Target,(Instrument(and(Conventional(Facility(infrastructures.(It(is(essential( for(the(synchronisation(and(day4to4day(running(of(all(the(equipment( responsible(for(the(production(of(neutrons(for(the(experimental( programmes.(The(Integrated(Control(System((ICS)(project(manages(the( activities(involved(in(the(design,(construction,(installation,(and( commissioning(of(the(ESS(Control(System.(

• • •

9.3

Commissioning(and(operation(of(control(system(core(components( defined(in(work(packages(2,(3,(4(and(5( Commissioning(of(control(system(infrastructure(defined(in(work( package(7( Control(box(support(after(June(2019(

Major)milestones)

9.2

Scope)

ICS(hardware(platform(freeze(

Q3(2014(

9.2.1

Included)

Lattice(database(v2(ready((

Q3(2014(

Audit(on(MPS(technical(design(specification(

Q4(2014(

ICS(hardware(ready(for(start(of(installation(

Q3(2016(

ICS(ready(for(superconducting(linac(commissioning(

Q2(2019(

End(of(construction((

Q4(2019(

The(ESS(Integrated(Controls(System(includes:( • •

• • 9.2.2

Requirements(and(overall(system(design( Design(and(installation(of(control(system(core(components( organised(in(four(work(packages(for(applications,(software,( hardware,(and(protection( Integration(support(with(all(integration(efforts(for(ICS(stakeholders( Control(System(Infrastructure(enabling(the(control(system(to( operate(

(

Excluded)

ICS(is(not(responsible(for(the(Target(Safety(System.(The(TSS(is(the( responsibility(of(the(Target(Division,(and(ICS(provides(control(systems(for(

45(70)(

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

9.4

Integrated)Control)Systems)Cost)

Table)7)

Integrated)Control)Systems)Cost)(Responsible:(Garry(Trahern))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

14(

Integrated( Control(Systems( 20144EOC(

204May413(

184Nov419(

Integrated(Control(System(is(a(network(of(hardware,(software(and( configuration(databases(that(integrates(the(operations(of(accelerator,( target,(instruments(and(conventional(facilities(infrastructure.(

)

59(

(

(

14Jan413(

314Dec413(

Cost(2013(

(

(

14.1(

Management(&( Administration(

074Jan414(

124Aug419(

All(management(activities(within(the(ICS(project,(including(planning,( monitoring(and(control,(training,(correspondence,(organizing(meetings(and( general(administration.(

)

(

14.1.1(

Management(&( Administration(

074Jan414(

124Aug419(

All(management(activities(within(the(ICS(project,(including(planning,( monitoring(and(control,(training,(correspondence,(organizing(meetings(and( general(administration.(

(

(

14.1.2(

Line(expenses(

104Mar414(

184Nov415(

Follow(up(of(non4project(services(and(material(costs.(

(

(

14.2(

Applications(

074Jan414(

284Jun419(

Development(and(implementation(system(applications.(

)

53(

14.2.1(

Application( Development(

074Jan414(

074May418(

Development,(support(and(maintenance(of(graphics(user(interfaces,(GUIs.(

(

47(

14.2.2(

Frameworks(and( Toolkits(

074Jan414(

284Jun419(

Applications,(tools(and(frameworks(used(to(address(non4functional( requirements(where(the(need(of(the(data(visualization(and(the(logic(of(the( application(go(beyond(the(simple(acquisition(and(setting(of(EPICS(signals.(

(

54(

14.2.3(

Applications( Software(Quality( Assurance(

014Apr414(

304Sep414(

Guarantee(the(software(quality(of(the(GUIs(and(that(software(is(done( following(standards(and(well4established(procedures.(Establish(the( guideline(for(software(quality(assurance(regarding(application( development.(

(

(

Budget)(€))

46(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)7)

Integrated)Control)Systems)Cost)(Responsible:(Garry(Trahern))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

14.2.4(

Development( environment(

074Jan414(

314Jan419(

Defining(and(implementing(a(standardized(toolset(and(infrastructure( providing(ICS(developers(and(ICS(stakeholders(with(a(standardized( environment,(services(and(sets(of(tools.(

(

55(

14.3(

Software(Core( Components(

074Jan414(

284Jun419(

Development(and(implementation(of(data(management,(control(system( services(and(naming(convention(

)

42(

14.3.1(

Configuration( data( management(

074Jan414(

284Jun419(

The(configuration(databases(and(related(software(tools(for(accelerator,( target,(neutron(instruments(and(conventional(facility(equipment(related(to( the(control(system.(

(

50(

14.3.2(

Control(system( services(

074Jan414(

054Oct418(

The(development(and(implementation(of(software(services(common(to(the( control(system(applications.(

(

38(

14.3.3(

Naming( convention(

074Jan414(

054Jul417(

The(software(and(processes(necessary(to(support(a(consistent(naming( convention(of(equipment.(

(

(

14.3.0(

Management(&( Administration(

074Jan414(

214Feb417(

(

(

(

14.4(

Hardware(Core( Components(

074Jan414(

284Jun419(

Development(and(delivery(of(timing(system(and(control(boxes.(

)

74(

14.4.1(

Timing(System(

034Feb414(

284Jun419(

Requirements(capture,(design(and(development(of(a(timing(system(and( underlying(infrastructure(for(ESS.(A(timing(master(and(a(number(of(timing( receivers(will(provide(synchronization(and(event4driven(triggers(distribution( to(ESS(facility(

(

82(

14.4.2(

Control(boxes(

074Jan414(

024May419(

Prototyping(and(development(of(standardized(hardware(platform(s)(to( integrate(ESS((sub)(systems(into(the(Integrated(Control(System.(Timing( receivers(and(local(control(loops(for(different(subsystem(will(be(hosted(by( this(platform(s).(

(

65(

Budget)(€))

47(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)7)

Integrated)Control)Systems)Cost)(Responsible:(Garry(Trahern))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

14.5(

Protection(Core( Components(

074Jan414(

284Jun419(

Development(and(implementation(of(machine(protection(system(and( personnel(safety(system.(

)

12(

14.5.1(

Machine( Protection( System(

074Jan414(

284Jun419(

Coordination(of(activities(related(to(protection(of(machine(equipment.( Delivery(of(interlock(systems(stopping(beam(upon(detection(of(critical( conditions,(tools(ensuring(correct(machine(configuration(settings,(tools(to( identify(a(root(cause(of(a(beam(trip.(

(

(

14.5.2(

Personnel(Safety( System(

034Feb414(

284Jun419(

The(PSS(must(protect(on4site(staff(and(users(from(unnecessary(exposure(to( hazards(from(the(machine,(including(radiation,(electrical(shock(and(other( dangerous(phenomena(such(as(faulty(ventilation,(helium(release,(and( oxygen(deficiency(hazards.(

(

39(

14.6(

Equipment(

054May414(

284Jun419(

Hardware(needed(to(integrate(the(devices(in(accelerator,(target,(neutron( scattering(systems,(conventional(facilities(and(test(stands.(

)

74(

14.6.1(

Accelerator( control(boxes(

024Jun414(

224Feb419(

Hardware(needed(to(integrate(accelerator(devices(into(ICS.((

(

40(

14.6.2(

Target(control( boxes(

224Jun415(

034Apr418(

Hardware(needed(to(integrate(the(target(station(into(ICS.(

(

100(

14.6.3(

NSS(control(boxes(

144Mar416(

054Jul418(

Hardware(needed(to(integrate(neutron(scattering(systems(into(ICS.(

(

100(

14.6.4(

Conventional( Facilities(control( boxes(

184Aug414(

294Sep417(

Hardware(needed(to(integrate(conventional(facilities(into(ICS.(

(

97(

14.6.5(

Test(stand(control( 204Oct414( boxes(

044Jul418(

Hardware(needed(to(integrate(test(stands(into(ICS.(

(

91(

14.6.6(

MPS(

034Nov414(

314May418(

Hardware(for(MPS.(

(

(

14.6.7(

PSS(

244Nov414(

284Jun419(

Hardware(for(PSS.(

(

100(

Budget)(€))

48(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)7)

Integrated)Control)Systems)Cost)(Responsible:(Garry(Trahern))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

14.6.8(

Hardware(for( control(room(

254May415(

284Jun419(

Hardware(for(control(room.(

(

97(

14.6.9(

Hardware(for( data(center(

074Jan415(

284Jun419(

Hardware(for(data(center.(

(

100(

14.6.10(

Hardware(for( control(system( networks(

074Jan415(

154Jan418(

Hardware(for(control(system(networks.(

(

100(

14.6.11(

Cables(and(wiring(

124Jul416(

164Dec416(

Material(cost(for(cabling(and(wiring.(

(

100(

14.6.12(

Timing(system(

054May414(

174Apr418(

Hardware(for(timing(system.(

(

98(

14.7(

Control(System( Infrastructure(

014Apr414(

284Jun419(

Develop(and(procure(all(infrastructure(required(for(ICS(to(perform(its( functions(and(operate(the(ESS(facility.(Includes(WU(control(room,(data( center,(control(system(networks,(cabling(&(wiring,(scientific(computing( infrastructure(and(develop(environment.(

)

75(

14.7.1(

Control(Room(

074Jan415(

284Jun419(

Design(and(implementation(of(the(main(ESS(Control(Room.(Covers(also(the( requirements,(specifications,(validation,(verification(and(acceptance(of( specific,(localized((remote)(control(rooms.(

(

62(

14.7.2(

Data(Centre(

014Jul414(

284Jun419(

Includes(implementation(of(on4site(server,(virtualization(and(storage( infrastructure(required(for(CS(operation(during(development,( commissioning(and(operations(phase.(

(

77(

14.7.3(

Control(System( Networks(

014Jul414(

284Jun419(

Implementation(of(network(s)(connecting(Control(Boxes(to(the(Data( Centre,(Data(Centre(to(Control(Room(s)(and(Control(Boxes(to(user(devices.(

(

82(

14.7.4(

Cabling(&(Wiring(

014Apr414(

244Mar417(

Design(and(implementation(of(connections(between(Control(Boxes(and( stakeholder(systems,(subsystems(or(devices.(

(

63(

Budget)(€))

49(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)7)

Integrated)Control)Systems)Cost)(Responsible:(Garry(Trahern))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

14.8(

Physics(

074Jan414(

284Jun419(

Development(and(implementation(of(machine(mode.(

)

36(

14.8.1(

Machine(model(

074Jan414(

284Jun419(

Development(and(implementation(of(ESS(Linac(simulator.(

(

21(

14.8.2(

Scientific( computing(

074Jan415(

284Feb419(

Infrastructure(providing(HPC((and(other)(services(to(ICS(stakeholders.(

(

82(

14.10(

Accelerator( integration( support(

074Jan414(

154Nov419(

All(activities(required(integrating(accelerator(devices(into(ICS.(

)

69(

14.10.1(

Accelerator( integration( coordination(

074Jan414(

154Nov419(

All(coordination(activities(required(integrating(accelerator(into(ICS.(

(

65(

14.10.2(

Accelerator( integration( support(

144Jan414(

264Jan416(

All(support(activities(required(to(integrate(accelerator(into(ICS.(

(

79(

14.11(

Target(integration( 024Apr414( support(

284Jun419(

All(activities(required(integrating(target(station(into(ICS.(

)

(

14.12(

Instruments( integration( support(

034Mar414(

284Jun419(

All(activities(required(to(integrate(neutron(scattering(systems(into(ICS(

)

67(

14.13(

Conventional( Facilities( integrations( support(

034Feb414(

244Oct417(

All(activities(required(integrating(conventional(facilities(into(ICS.(

)

72(

14.14(

Test(stands( integration( support(

034Mar414(

184Dec418(

Delivery(and(installation(of(control(boxes(for(test(stands.(HMI(and(hi(level( applications,(control(system(services,(connections(between(control(boxes( and(test(stand(sub4systems(and(commissioning(of(interfaces.(

)

70(

Budget)(€))

50(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

10.

DESIGN)AND)ENGINEERING))

10.1

Introduction)

10.2.2 • (

Design(and(engineering(collects(non4project(related(management(costs( for(the(machine(directorate,(overall(system(engineering(and(engineering( support.(Engineering(support(consists(of(supporting(functions(for( CAD/PDM,(integration,(survey(&(alignment(and(all(support(activities( related(to(ESS(shared(engineering(resources.(

10.2

Scope)

10.2.1

Included)

• •

• •



The(machine(directorate(includes(costs(for(machine(directors,( assistants(and(arranging(technical(advisory(committee(meetings( System(engineering(includes(costs(for(framework(and(procedures( for(the(management(of(the(ESS(technical(requirements,(design( process(and(verification(process( Integration(includes(coordination(of(the(3D(master(model(and(the( ESS(Plant(Layout(Model( CAD/(PDM(support(includes(implementations,(user(support,( methodology(&(training(for(the(support(of(design(work,(product( data(management(and(exchange(of(design(data( Survey(and(Alignment(will(advise(appropriate(engineering(groups( on(design,(fabrication,(installation(of(equipment(stands,(monument( systems(and(other(alignment(systems(for(ESS(

51(70)(

Excluded) Any(costs(within(the(scope(of(the(Accelerator,(Target(and(ICS( projects(are(excluded(

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

10.3

Design)and)Engineering)Cost)

Table)8)

Design)and)Engineering)Cost)(Responsible:(Johan(Lehander))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

18(

Engineering( Support(20144 EOC(R1(

14Jan413(

234Dec422(

Machine(Administration.(

)

(

(

(

14Jan413(

314Dec413(

Cost(2013(

(

(

18.1(

Management(&( Administration(

14Jan413(

284Jun419(

Engineering(support(top(management.(

)

(

18.3(

Engineering( support(

74Jan414(

234Dec422(

Coordination(of(the(engineering(support,(design(integration,(tools(and( Survey(&(Alignment.(

)

(

18.3.1(

Management(&( Administration(

74Jan414(

234Dec422(

Coordination(of(all(engineering(support,(including(design(processes,( Component(Standardization(and(Design(Technology(Development.(

(

(

18.3.2(

Integration(

74Jan414(

164Dec422(

Coordination(and(integration(of(the(3D(master(model,(ESS(Plant(Layout( Model.(

(

(

18.3.3(

CAD/PDM( support(

74Jan414(

204Dec419(

CAD(&(PDM(implementations,(user(support,(methodology(&(training(for(the( support(of(design(work,(product(data(management(and(exchange(of(design( data.(

(

(

18.3.4(

Survey(&( Alignment(

74Jan414(

164Dec422(

Survey(and(Alignment(will(advise(appropriate(engineering(groups(on( design,(fabrication,(installation(of(equipment(stands,(monument(systems( and(other(alignment(systems(for(ESS.(

(

(

18.3.5(

Engineering( Services(

74Jan414(

204Dec419(

All(support(activities(related(to(ESS(shared(engineering(resources.(Added( scope(September(2013.(

(

(

Budget)(€))

52(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)8)

Design)and)Engineering)Cost)(Responsible:(Johan(Lehander))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

18.4(

Systems( Engineering(

74Jan414(

214Dec422(

Establishing(and(maintaining(the(technical(cohesiveness(of(all(individual(ESS( elements,(and(overall(framework(and(procedures(for(the(management(of( the(ESS(technical(requirements,(design(process(and(verification(process.(

)

(

18.4.1(

Management(&( Administration(

74Jan414(

214Dec422(

Coordination(of(overall(system(engineering.(

(

(

18.4.2(

Technical( management(

74Jan414(

214Dec422(

Planning((implementing(strategy,(technical(effort(definition,(schedule(and( org.,(technical(plans,(work(directives),(Assessment((progress(against(plans( and(schedules,(requirements,(technical(reviews),(and(Control((outcomes( management,(information(dissemination).(

(

(

18.4.3(

Systems(Design(

74Jan414(

214Dec422(

Requirement(definition(process,(and(solution(definition(process((logical,( physical).(

(

(

18.4.4(

Product( realization(

74Jan414(

214Dec422(

Implementation(process,(and(transition(to(use(process.(

(

(

18.4.5(

Technical( evaluation(

74Jan414(

214Dec422(

System(analysis(process((effectiveness,(tradeoff,(risk),(requirement( validation(process,(system(verification(process((design(solution,(end( product,(enabling(product(readiness),(and(end(products(validation(process.(

(

(

18.4.6(

Travel,(training(&( workshops(

74Jan414(

204Dec419(

This(activity(includes(all(travel,(training(and(expenses(for(supporting( workshops(for(the(Systems(Engineering(Work(Package(during(the( Construction(Phase.(

(

(

Budget)(€))

( (

(

53(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

( ( ( ( ( ( ( ( ( This(page(is(intentionally(left(blank.(

54(70)(

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

11.

NEUTRON)SCATTERING)SYSTEMS)

11.1

Introduction)

11.2.2

Excluded)

The(buildings(and(their(utility(infrastructure,(target(and(accelerator( shielding,(ICS(control(boxes(and(programming(efforts,(and(the(IT( infrastructure(between(the(Lund(and(Copenhagen(sites(are(all(specifically( excluded,(plus(any(work(not(described(in(the(relevant(project( specifications.(

The(Neutron(Scattering(Systems(Project((NSS)(will(deliver(a(suite(of(public( neutron(scattering(instruments(to(the(user(community(by(2025.(The( instruments(will(be(complemented(by(suitable(technical(and(IT(supports( infrastructure,(such(as(user(interface(and(operational(software,(data( analysis,(and(storage(capabilities,(and(the(experiment(proposal(software( that(is(necessary(to(operate(successfully(the(neutron(scattering( instruments(and(the(user(program.(The(infrastructure(put(in(place(will( allow(on4going(operation,(maintenance(or(development(and(instrument( upgrades(beyond(the(“ESS(Construction(Programme”.(

11.3

Major)milestones)

Major((global)(milestones(of(the(NSS(Project(are(shown(in(the(“ESS(Cost( Report”(and(include:( Handover(of(16(instruments(to(Hot(Commissioning(

2019(–(25(

Start(of(preliminary(Engineering(Design(phase(for(instr.(143(

Q1(2014(

Start(of(preliminary(Engineering(Design(phase(for(instr.(447(

Q1(2015(

NSS(will(enable(scientific(excellence(and(high(quality(scientific(user(service( with(reliable(and(sustainable(operations.(

Start(of(preliminary(Engineering(Design(phase(for(instr.(8411(

Q1(2016(

Start(of(preliminary(Engineering(Design(phase(for(instr.(12413(

Q1(2017(

11.2.1

Start(of(preliminary(Engineering(Design(phase(for(instr.(14416(

Q1(2018(

Early(Access(to(Instrument(Labs/Workshops(

Q1(2018(

Early(Access(to(Neutron(Tech(Labs(

Q1(2018(

Begin(Construction(in(Experimental(Hall(

Q3(2017(

Start(of(User(Program(on(first(instruments(

Q2(2023(

11.2

Scope)

Included)

The(Neutron(Scattering(Systems(Project(will(deliver:( • • • • •

Instrument(concepts(mature(enough(for(decision(to(be(made(to( build( Supporting(scientific(infrastructure((such(as(laboratories(and( sample(environment)( The(16(public(neutron(scattering(instruments( The(required(technologies(to(support(those(instruments( The(required(IT(infrastructure(for(the(instruments(via(the(Data( Management(and(Software(Centre((DMSC)(

Some(of(the(major(NSS(milestones(depend(on(other(projects(achieving( their(respective(major(milestones,(such(as(“First(Proton(on(Target”(or( “License(–(Beam(Permit”.(

55(70)(

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

11.4

reduce(not(only(financial,(schedule(and(technological(risks(to(the( individual(instrument(project,(but(also(positively(affect(operations(of( instruments(and(consequently(lower(operational(costs(of(ESS,(which(is( significant(considering(the(lifetime(of(the(facility.(It(is(assumed(that(some( of(the(investment(for(supporting(technology(will(contribute(‘indirectly’(to( the(overall(cost(of(instruments.(Similarly,(the(ICS(project(holds(resources( and(in4kind(opportunities(exist(in(the(WBS(codes(indicated(below.(

Cost)per)instrument)type)

Cost(per(instrument(types(at(ESS(includes(activities,(which(are(due(to(e.g.( standardisation(efforts,(distributed(across(different(projects.(Likewise,( general(development(efforts(required(e.g.(for(10B(based(detector( technology(are(decoupled(from(the(individual(instrument(projects,(and( coordinated(by(dedicated(technical(groups.(Such(centralised(approach(will( )

Value)in)Mio)€) per)instrument)

In_kind) potential) Yes

Project)

Integrated Control Systems (ICS) Contributions Instrument Project Administration & Common Systems Engineering Instrument Construction Preparation Guide Bunker & Monolith Shroud Instrument Technologies Contribution (*)

0.17

0.17 1.25 0.58

Yes Yes Yes

NSS NSS NSS

Science Support Systems Contributions (&) DMSC Contributions (^)

0.07 0.24

Yes Yes

NSS NSS

SUM Net cost Type A Type B Type C Total cost Type A Type B Type C

2.69 Yes

NSS

0.21

9.00 12.00 15.00 11.69 14.69 17.69

ICS NSS

WBS)Code)

Comment)

ICS 14.6.3; ICS 14.12( NSS 13.6.1

Hardware and programming efforts related to EPICS and Control Boxes for instruments Management & Administration

NSS 13.6.1 NSS 13.6.2 NSS 13.5.1 NSS 13.5.2 NSS 13.5.3 NSS 13.5.4 NSS 13.3.4 NSS 13.4.2 NSS 13.4.3 NSS 13.4.4

Management & Administration Guide Bunker & Monolith shroud Chopper Systems Neutron Optics & Shielding Electrical Engineering Detector Systems Sample Environment Technology and Systems Operations Data Acquisition, Reduction and Management Analysis, Modeling, Simulations and Visualization

NSS 13.6.3

Instrument Construction Resources

Per instrument type A/B/C, including standardization activities distributed across other WP’s

Note:(Estimated(‘indirect’(investment,((*)(20(%,((&)(15(%(and((^)(20(%( 56(70)(

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

11.5

Neutron)Scattering)Systems)Cost)

Table)9)

Neutron)Scattering)Systems)Cost)(Responsible:(Oliver(Kirstein))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

13(

Neutron( Scattering( Systems( Project20144EOC( R1(

14Jan413(

194Dec425(

Identify(and(develop(instrument(concepts(and(supporting(technologies(in( parallel(with(the(actual(construction(of(the(instruments,(the(required( neutron(technologies,(the(scientific(infrastructure(required(by(the( instruments(and(the(supporting(computing.(

)

51(

(

(

14Jan413(

314Dec413(

Cost(2013(

(

(

13.1(

Management(&( Administration(

74Jan414(

194Dec422(

The(overall(management(of(the(NSS(project(will(ensure(fulfillment(of( project(goals.(Provide(the(oversight(reviews,(cost,(scheduling(of(all(WPs(and( co4ordinate(activities(required(to(deliver(the(project(goal(in(terms(of(scope,( time,(cost(and(quality.(

)

(

13.1.1(

Science( Directorate(

74Jan414(

204Dec419(

Management(and(Administration(for(the(Science(Directorate.(

(

(

13.1.2(

Project( Coordination(

74Jan414(

194Dec422(

Provide(the(oversight(reviews,(cost,(scheduling(of(all(work(packages(and(co4 ordinate(activities.(

(

(

13.2(

Instrument( Concepts(

74Jan414(

204Dec419(

Delivery(of(22(instrument(concepts(for(construction.(

)

12(

13.2.1(

Management(&( Administration(

74Jan414(

204Dec419(

High4level(Management(and(coordination(of(the(Instrument(Design(Work,( as(well(as(the(Associated(review(and(selection(processes.(

(

(

13.2.2(

Concepts( Development(

74Jan414(

184Dec419(

Development(of(conceptual(design,(science(case(and(preliminary(costing(of( possible(neutron(instruments,(resulting(in(a(sufficient(number(of( instrument(construction(proposals(to(choose(22(world4leading(instruments.( Limited(prototyping(can(be(performed.(

(

52(

Budget)(€))

57(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)9)

Neutron)Scattering)Systems)Cost)(Responsible:(Oliver(Kirstein))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

13.2.3(

Neutron(Science( &(Methods(

74Jan414(

204Dec419(

Scientific(research(and(method(development(within(the(Neutron(research( area.(

(

(

13.3(

Science(Support( Systems(

74Jan414(

204Dec423(

Provide(Science(Support(Systems((sample(environment(equipment,(user( support(labs(and(facilities(as(well(as(scientific(coordination(and(user(office( infrastructure)(required(for(instruments(and(the(scientific(use(of(ESS(during( operations.(

)

34(

13.3.1(

Management(&( Administration(

74Jan414(

204Dec419(

Management(and(Administration(for(Science(Support(Systems.(

(

(

13.3.2(

Science( Coordination(and( User(Office(

74Jan414(

204Dec419(

Delivers(the(adequate(Science(Coordination(and(User(office(infrastructure( required(towards(the(ESS(user(program.(

(

12(

13.3.3(

Laboratories(and( Facilities(

74Jan414(

154Dec422(

Delivers(the(adequate(neutron(science(support(labs(and(facilities(required( for(the(ESS(user(program.(

(

31(

13.3.4(

Sample( Environment(

74Jan414(

204Dec423(

Delivers(the(non4instrument(specific(sample(environment(equipment( within(neutron(scattering(systems(required(for(the(ESS(user(program.(

(

53(

13.4(

DMSC(

74Jan414(

154Dec422(

Develop,(construct(and(operate(the(scientific(computing(environment( (software,(hardware,(and(support)(required(for(data(acquisition,(reduction( and(the(analysis((incl.(modeling(&(simulation)(of(experiments(performed(on( ESS(instruments(in(the(user(program.(

)

52(

13.4.1(

Management(&( Administration(

74Jan414(

14Jul422(

Management(and(administrative(support(for(DMSC(staff(including( interfacing(to(the(ESS(Administration(Directorate.(

(

(

13.4.2(

Technology(and( System( Operations(

74Jan414(

204Dec419(

Construction(and(operation(of(DMSC(high(performance(computer(systems( (compute(+(disk)(and(networks,(software(development(environments(and( cyber(security.(

(

50(

Budget)(€))

58(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)9)

Neutron)Scattering)Systems)Cost)(Responsible:(Oliver(Kirstein))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

13.4.3(

Data(Acquisition,( Data(Reduction( and(Data( Management(

74Jan414(

194Dec419(

Development(of(software(for(instrument(control,(data(acquisition,(data( reduction,(and(data(management((incl.(data(cataloguing(and(download)( including(user(interfaces.(

(

66(

13.4.4(

Analysis,( Modeling,( Simulations(and( Visualization(

74Jan414(

194Dec419(

Integration(of,(and(development(of,(software(for(fitting,(modeling,( advanced(visualization(and(simulations,(of(the(experiments(on(the(ESS( instruments.(Integration(of(software(on(ESS(instrument.(

(

61(

13.4.5(

User(Office( Software(

24Oct417(

154Dec422(

Integration(of(and/or(development(of(software(for(user(registration,( proposals,(training,(and(sample(management.(

(

95(

13.5(

Instrument( Technology(

74Jan414(

234Dec422(

Instrument(Technology(work(packages(covering(Detectors,(EE,(Choppers( and(Neutron(Guides.(

)

(

13.5.1(

Neutron(Chopper( Systems(

74Jan414(

234Dec422(

Work(package(covering(the(study,(selection,(and(validation(of(technologies( and(design(concepts(for(Neutron(Chopper(Systems(to(be(implemented( across(the(ESS(suite(of(scientific(instruments.(

)

5(

13.5.1.1(

Management(&( Administration(

74Jan414(

234Dec422(

Group(Management(Activities(including(Recruitment,(NSS(Project(reporting,( Cross(Functional(Work(Groups(activities,(External(collaboration(Activities(&( Travel.(

(

(

13.5.1.2(

Method(&( Technology( development(

74Jan414(

234Dec422(

Method(&(Technology(Development(for(Choppers(Systems.(

(

(

13.5.1.3(

Disc(Chopper( Technologies(

164Jan414(

184Apr417(

Work(unit(covering(the(study,(test(and(validation(of(technologies(related(to( Disc(type(neutron(choppers(implementation(at(ESS.(

(

21(

13.5.1.4(

Prompt(Pulse( Suppression( Technologies(

104Feb414(

234Dec422(

Work(unit(covering(the(study,(test(and(validation(of(technologies(related(to( neutron(choppers(intended(for(the(suppression(of(the(prompt(neutron( pulse((T4zero(choppers).(

(

(

Budget)(€))

59(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)9)

Neutron)Scattering)Systems)Cost)(Responsible:(Oliver(Kirstein))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

13.5.1.5(

System(&( Technologies(

104Feb414(

174Nov414(

Work(unit(covering(the(elaboration(of(processes,(methods,(guidelines(and( standards(for(the(design(and(implementation(of(ESS(neutron(chopper( installation.(

(

(

13.5.1.6(

Facilities(

74Jan414(

84Nov422(

Work(unit(covering(the(setup(and(basic(operating(costs(of(the( Lab/Workshop(required(for(the(conduct(of(chopper(group(activities(and( frontline(instrument(support.(

(

(

13.5.1.7(

Radiation( Resistant( Technologies(

14Oct414(

134Jun417(

Work(unit(covering(the(study,(selection(of(technologies(related(to(radiation( resistance(of(neutron(chopper(systems.(

(

(

13.5.1.8(

Support(Systems(

154Jul414(

114Jul418(

Work(unit(covering(the(study,(selection(of(technologies(and(design( concepts(for(neutron(chopper(systems(support,(extraction(and( maintenance.(

(

(

13.5.2(

Neutron(Optics(&( Shielding(

74Jan414(

234Dec422(

The(work(package(for(neutron(optics(and(shielding(within(neutron( scattering(systems.(

)

27(

13.5.2.1(

Management(&( Administration(

74Jan414(

234Dec422(

Project(Management.(

(

(

13.5.2.2(

Method(&( Technology( development(

74Jan414(

234Dec422(

Method(&(Technology(Development(for(Neutron(Optics(Systems.(

(

(

13.5.2.3(

Neutron(Guide( Systems(&( Shielding(

74Jan414(

214Dec422(

Research,(Development,(Design(and(Deployment(of(Cost4Effective,(Robust( Beam(Extraction,(Beam(Delivery,(and(Instrument(Shielding(System.(Perform( Conceptual(and(Engineering(Design(of(Instrument(Beam(Lines(to(meet( Instrument(Requirements.(

(

(

13.5.2.4(

Super(mirrors(

74Jan415(

234Dec422(

Research(and(Development(into(methods(and(processes(for(making( deposition(systems(for(improving(neutron(optics.(

(

44(

Budget)(€))

60(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)9)

Neutron)Scattering)Systems)Cost)(Responsible:(Oliver(Kirstein))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

13.5.2.5(

Alignment( Monitoring(and( Miscellaneous(

74Jan415(

94Dec422(

Equipment(and(systems(for(performing(alignment(and(measurement(of( neutron(optics(for(neutron(instruments.(

(

91(

13.5.2.6(

Neutron(Optics( Laboratory(

74Jan415(

294Jan421(

Neutron(optics(laboratory:(Development(of(a(safe(area(for(Storage,( Characterisation,(Metrology,(Alignment(and(Assembly(of(Delicate(Neutron( Optical(Systems(prior(to(Installation.(

(

100(

13.5.3(

Electrical( Engineering(

74Jan414(

234Dec422(

The(work(package(for(electrical(engineering(systems(within(neutron( scattering(systems.(

)

23(

13.5.3.1(

Management(&( Administration(

74Jan414(

234Dec422(

Project(Management(including(recruitment,(training(+(travelling(for(the( whole(work(package,(coordinating(development(with(in4kind(contributors( and(other(ESS((sub4)(projects.(

(

(

13.5.3.2(

Method(&( Technology( development(

74Jan414(

234Dec422(

Method(&(Technology(Development(for(EE(Systems.(

(

(

13.5.3.3(

Motion(Control( Systems( Development(

74Jan414(

234Dec422(

Tasks(to(define,(evaluate(&(test(Generic(Motion(Control(System(used(for(all( ESS(instruments,(includes(identification,(characterisation(&(test(of( components(like(motors,(encoders(etc.(also(in(harsh(environments( (radiation,(magnetic(fields(&(vacuum).(

(

32(

13.5.3.4(

PLC(Systems( Development(

24Jun414(

234Dec416(

Tasks(to(support(the(development(of(the(PLC(systems(for(general(use(on( the(majority(of(applications(including(characterisation(of(generic( components(like(sensors,(pneumatic(valves(etc.((done(by(ICS).(

(

(

13.5.3.5(

Personal(Safety( and(Interlock( Systems(

24Jun414(

204Dec419(

Tasks(to(support(the(development(of(the(Personal(Safety(System(for( instruments(access(control((done(by(ICS).(

(

(

Budget)(€))

61(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)9)

Neutron)Scattering)Systems)Cost)(Responsible:(Oliver(Kirstein))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

13.5.3.6(

Embedded( Software( Engineering(

74Jan414(

224Dec422(

Software(engineering(tasks(for(the(development(and(integration(of(Motion( Control,(PLC(and(Interlock(Systems(into(EPICS,(support(of(other(work( packages(within(Instrument(Technologies,(overlapping(interface(to(ICS.(

(

(

13.5.3.7(

Cabling,( Installation(and( Electrical( Shielding( Procedures(

24Jun414(

214Dec418(

Tasks(to(develop(and(standardise(cabling(and(the(installation(and(electrical( shielding(procedures(as(well(as(the(appropriate(materials(and(components( for(all(technologies(on(the(ESS(instruments(including(building(a( demo/model(&(EMC(tests.(

(

47(

13.5.3.8(

Electrical( Engineering( Laboratory(and( Workshops(

134Jan414(

294May420(

The(tasks(to(define(the(space(and(purchase(the(equipment(needed(for(the( electrical(engineering(work(during(development,(construction,(testing(and( maintenance(of(the(Neutron(Instruments((including(tools(and(running( expenses).(

(

53(

13.5.4(

Detector(Systems(

74Jan414(

224Dec422(

The(work(package(for(neutron(detectors(within(neutron(scattering(systems.(

)

11(

13.5.4.1(

Management(&( Administration(

24Sep413(

224Dec422(

Project(management(of(the(Detector(work(package.(

(

(

13.5.4.2(

Method(&( Technology( development(

74Jan414(

194Dec419(

Method(&(Technology(Development(for(Detector(Systems(

(

(

13.5.4.3(

10B(Systems( Development(

184Jun413(

224Dec420(

The(research(and(development(of(technique(and(hardware(for(detecting( neutrons(with(10B.(

(

(

13.5.4.4(

Scintillator( Systems( Development(

74Jan414(

204Dec419(

The(research(and(development(of(technique(and(hardware(for(detecting( neutrons(with(scintillators.(

(

(

13.5.4.5(

High(Resolution( High(Rates( Development(

74Jan414(

204Dec419(

The(research(and(development(of(technique(and(hardware(for(detecting( neutrons(at(high(resolution(and(high(rates.(

(

(

Budget)(€))

62(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)9)

Neutron)Scattering)Systems)Cost)(Responsible:(Oliver(Kirstein))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

13.5.4.6(

Detector(Other( Systems(

74Jan414(

204Dec419(

The(research(and(development(of(technique(and(hardware(for(detecting( neutrons(with(other(systems.(

(

(

13.5.4.7(

Detector( Laboratory(

14Nov413(

74Jan420(

A(laboratory(with(the(tools,(equipment(and(supplies(needed(to(perform( R&D(on(neutron(detector(systems.(

(

7(

13.5.4.8(

Instrument( Projects(

14Apr414(

214Dec415(

Detectors(for(Instrument(Projects.(

(

(

13.5.4.9(

Detector(In4kind(

74Jan415(

204Dec419(

Detector(In4Kind(work(Packages(

(

100(

13.6(

Instrument( Construction(

74Jan414(

194Dec425(

Contains(the(work(packages(for(the(guide(bunker(and(the(16(neutron( scattering(instruments.(

)

69(

13.6.1(

Management(&( Administration(

74Jan414(

194Dec425(

Chief(Instrument(Project(Engineer's(Office(4(The(people(that(manage(the( sub4project,(its(design(and(construction.(Project(management,(monitoring( progress,(tracking(risks,(etc.(

(

(

13.6.2(

Guide(Bunker(&( Monolith(Shroud(

74Jan414(

24Dec419(

Common(Shielding(for(the(Instrument(Suite.(

(

86(

13.6.3(

Construction( costs(for( instrument(1416(

74Jan414(

174Dec419(

Construction(costs(for(instruments(1(–(16.(Each(of(the(16(instrument( projects(has(a(Preliminary(Engineering(Design(Phase(of(424(k€(where(the( baseline(for(the(instrument(is(developed(from(the(accepted(instrument( proposal.(

(

70(

Budget)(€))

( (

(

63(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

( ( ( ( ( ( ( ( ( This(page(is(intentionally(left(blank.( (

64(70)(

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

12.

PROJECT)SUPPORT)AND)ADMINISTRATION)

12.1

Introduction)

12.3

The(nature(of(the(support(organisation(makes(it(difficult(to(divide(all(work( into(milestones(since(much(of(the(work(is(repeated(daily.(

The(Support(organisation(is(responsible(for(providing(the(necessary( administrative(infrastructure,(including(services,(tools,(and(resources.(Our( customers(are(mainly(the(rest(of(the(organisation.(

12.2

Scope)

12.2.1

Included)

The(Project(Support(and(Administration(budget(includes(Project(Support( &(Admin(Management,(IT,(and(HR,(which(are(the(main(cost(drivers(and( where(direct(costs(and(support(costs(are(based(on(the(FTE(assumptions( for(ESS(organisational(growth(projection.(The(budget(also(includes(the( service(functions(within(Project(Support,(General(Services,(Finance,( Procurement,(Communication,(Legal,(Directors(Services(and(ESH(&(QA.( 12.2.2

Major)milestones)

Excluded)

The(costs(cover(operations(at(ESS’s(current(offices(in(Lund(or(similar( facilities;(additional(or(more(expensive(offices(are(not(included.(The( estimate(does(not(cover(the(transformation(of(ESS(AB(into(an(ERIC(and( the(establishment(of(such(an(organisation.(The(Project(Support(and( Administration(budget(covers(the(company(insurance(but(it(does(not( cover(the(project(insurance.(Direct(costs(related(to(relocation(of( employees(are(not(covered(by(the(HR(budget(since(these(cost(are(directly( calculated(in(each(project(budget.(

65(70)(

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

12.4

Project)Support)and)Administration)Cost)

Table)10)

Project)Support)and)Administration)Cost)(Responsible:(Matti(Tiirakari))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

60(

Project(Support( and(Administra4 tion(Cost(20144 EOC(

34Jun413(

314Jan420(

The(Support(organization(i.e.(the(Administration,(Director's(services(is( responsible(for(providing(the(necessary(administrative(infrastructure( including(services,(tools(and(resources.(

)

(

(

(

14Jan413(

314Dec413(

Cost(2013(

(

(

60.1(

Project(Support( and(Administra4 tion(Management(

74Jan414(

204Dec419(

This(work(unit(contains(management(for(the(overall(Project(Support(and( Administration(Directorate.(

)

(

60.1.1(

General(

74Jan414(

204Dec419(

(

(

(

60.2(

General(Services(

74Jan414(

204Dec419(

This(work(unit(contains(managing(the(current(office(buildings,(including( rent(in(Sweden(and(Denmark.(

)

(

60.2.1(

General(

74Jan414(

204Dec419(

(

(

(

60.3(

Human(Resources( 74Jan414(

204Dec419(

The(objective(of(the(HR(department(is(to(ensure(that(the(organization(has( the(required(human(resources(by(attracting,(recruiting,(retaining(and( developing(ESS(staff.(

)

(

60.3.1(

General(

74Jan414(

204Dec419(

(

(

(

60.3.2(

Recruitment(and( Relocation(

74Jan414(

204Dec419(

This(work(unit(includes(activities(for(recruitment.(

(

(

60.4(

Finance(

74Jan414(

204Dec419(

The(objective(of(the(Finance(department(is(to(deliver(a(complete(and( reliable(finance(function(complying(with(financial(laws(and(ethics(as(well(as( other(statutory(requirements.(

)

(

60.4.1(

General(

74Jan414(

204Dec419(

(

(

(

Budget)(€))

66(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)10)

Project)Support)and)Administration)Cost)(Responsible:(Matti(Tiirakari))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

60.4.2(

DMSC(

74Jan414(

204Dec419(

(

(

(

60.5(

IT(

74Jan414(

204Dec419(

IT(is(responsible(for(all(administrative(IT(within(the(organization.(The(overall( objective(is(to(deliver(an(efficient(and(secure(IT4platform(with(high( reliability(and(adequate(support.(It(also(contains(all(standard(computer( costs.(

)

(

60.5.1(

General(

74Jan414(

204Dec419(

(

(

(

60.6(

Procurement(

74Jan414(

204Dec419(

The(procurement(division(shall(supply(a(cost(efficient(and(reliable( procurement(process(in(compliance(with(the(existing(legal(frameworks.(It( handles(and(coordinates(all(In4kind(contributions.(It(shall(also(manage( receiving(goods.(

)

(

60.6.1(

General(

74Jan414(

204Dec419(

(

(

(

60.6.2(

Equipment( logistics(

74Jan414(

204Dec419(

This(work(package(handles(the(goods(on(site(and(includes(the(following( activities:(management,(on(site(moving,(shipping(&(receiving,(storage( management.(

(

(

60.6.3(

In4kind(

74Jan414(

204Dec419(

The(scope(for(In4kind(is(to(manage(partnerships(of(In4kind(collaborators.(

(

(

60.7(

Communication(

74Jan414(

204Dec419(

Services(rendered(by(the(Communication(department(in(order(to(handle( internal(as(well(as(external(communication.(

)

(

60.7.1(

General(

74Jan414(

204Dec419(

(

(

(

60.8(

Project(Support(

74Jan414(

204Dec419(

Supports(the(projects(with(cost,(budget,(planning(and(risk(management.(

)

(

60.8.1(

General(

74Jan414(

204Dec419(

(

(

(

60.9(

Legal(

74Jan414(

204Dec419(

The(objective(of(the(legal(function(is(to(support,(advice(and(monitor(legal( aspects(of(issues(concerning(ESS(governance,(procurement,(commercial( agreements(and(contracts(etc.(

)

(

60.9.1(

General(

74Jan414(

204Dec419(

(

(

(

Budget)(€))

67(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

Table)10)

Project)Support)and)Administration)Cost)(Responsible:(Matti(Tiirakari))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

60.20(

Director's( Services(

74Jan414(

204Dec419(

The(objective(of(Director's(services(is(to(support(the(CEO(and(the( governance(of(the(organization.(

)

(

60.20.2(

DG(Services(

74Jan414(

204Dec419(

Services(rendered(by(the(CEO.(

(

(

60.20.3(

Steering(services(

74Jan414(

204Dec419(

Services(rendered(assisting(the(CEO(and(general(corporate(matters.(

(

(

60.21(

Operations,( Safety,(Health(&( Environment,( Quality(Assurance(

74Jan414(

204Dec419(

This(WP(is(responsible(for(Operations,(SHE(and(Quality.(

)

(

60.21.2(

Associate(Director( 74Jan414( for(Operations,( SHE(and(QA(

204Dec419(

This(work(unit(includes(the(cost(for(the(Associate(Director.(The(AD(is( responsible(for(Operations,(SH&E,(and(Quality.(

(

(

60.21.3(

Quality(Assurance(

204Dec419(

This(work(unit(includes(activities(for(Quality(Management(and(Quality( Assurance.(It(also(includes(the(cost(for(using(Norms(&(Standards.(

(

(

74Jan414(

Budget)(€))

(

68(70)(

In)Kind) Potential)(%))

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

13.

CONTINGENCY)

challenges,(unforeseen(events(etc.(a(Cost(Contingency(has(been(included( in(the(cost(for(Construction(of(ESS.(

13.1

Introduction)

(

To(cover(uncertainty(as(to(the(precise(content(of(all(items(in(the( estimates,(exactly(how(work(will(be(performed,(what(work(conditions(will( be(like(when(the(project(is(executed,(market(conditions,(technical( (

13.2

Contingency)Cost)

Table)11)

Contingency)Cost)(Responsible:(James(Yeck))

WBS)Code)

WBS)Name)

Start)

Finish)

Description)

44(

Contingency(

14Jan413(

314Dec425(

Cost(Contingency(for(Construction(phase.(

Budget)(€))

(

69(70)(

In)Kind) Potential)(%)) )

(

Programme(Report( Document(Number(

ESS40002802(

Date(

Mar(13,(2013(

Preliminary(

(

(

(

(

14.

Chapter)7)

DOCUMENT)CHANGE)SUMMARY)



General) • •

Order(of(chapters(changed( Made(minor(text(corrections(throughout(the(entire(document,( mainly(clarifications(

Chapter)8) •

Chapter)2) • •







• • •

New(chapter(“Licensing((ES(&(H)”(introduced,(previously(in(some( parts(included(in(“Programme(Support”(

Previously(chapter(5,(introduction(and(scope(updated( Chapter(with(cost(per(instrument(type(introduced( Budget(changed(from(389(to(350(Million(€(

Chapter)12)

Previously(chapter(8,(budget(changed(from(14(to(13(Million(€(

• • •

Chapter)6) •

New(chapter(“Design(and(Engineering”(introduced,(previously(in( some(parts(included(in(“Programme(Support”(

Chapter)11)

Chapter)5) •

Previously(chapter(6,(major(milestones(updated(and(budget( changed(from(71(to(73(Million(€(

Chapter)10)

Previously(chapter(7,(major(milestones(updated(and(budget( changed(from(463(to(423(Million(€( Cost(for(additional(scope(introduced(

Chapter)4) •

Previously(chapter(4,(major(milestones(updated(and(budget( changed(from(174(to(155(Million(€(

Chapter)9)

Construction(cost(items(and(Scope(updated( In4kind(potential(and(major(milestones(introduced(

Chapter)3) •

Previously(chapter(3,(major(milestones(updated(and(budget( changed(from(563(to(509(Million(€(

New(chapter(“Infrastructure(Support”(introduced,(previously(in( some(parts(included(in(“Conventional(Facilities”(

Previously(chapter(10(“Administration(and(Line(Management”( Introduction(and(scope(updated( Budget(changed(from(107(to(113(Million(€(

Chapter)13) • 70(70)(

New(chapter(“Contingency”(introduced(