Energy and Infrastructure Company

  Energy and  Infrastructure Company       Energy and  Infrastructure Company   Page 2 VISION To be one of the leading EPC companies in the Ener...
0 downloads 2 Views 1MB Size
 

Energy and  Infrastructure Company  

 

 

Energy and  Infrastructure Company   Page 2

VISION To be one of the leading EPC companies in the Energy  and                   Infrastructure sector.  

MISSION We  provide  overall  solu ons  to  the  sa sfac on  of  our  customers.  Our  aim  is  to  build  up  the  values  of  the  company  based  on  customers’        demand. 

 

 

Energy and  Infrastructure Company   Page 3

INTRODUCTION The  name  Juffali  is  not  new  in  the  energy  sector  of  Saudi  Arabia.  Since the late 1940’s  Juffali has played a major role in the develop‐ ment of Saudi Arabia. It has introduced many new quality products,  as well as innova ve services solu ons and advanced technologies  to the country. Un l 1980’s,companies under Juffali like Saudi Na‐ onal  Electricity  Company  (SNEC),  Madinah  Electricity  Company  and  others  were  responsible  for  the  power  supply  to  the  general  public as well as to several industrial units in the west and east of  Saudi  Arabia.  In  keeping  with  the  tradi on  of  serving  the  energy  sector  of  Saudi  Arabia  and  to  provide  its  ci zens  the  best  in  class  service Energy and Infrastructure Company was formed.    Energy  and  Infrastructure  Company  (EICO)  is  a  joint  venture          between  Sinoma  Interna onal  Engineering  Co.    Ltd.  and  Walid      Ahmad Juffali Company. The headquarter of the company is based  in Jeddah, Saudi Arabia.    Sinoma is one of the leading engineering companies in China with  more than 10,000 employees worldwide. Sinoma is mainly involved  in LSTK of large‐scale projects in China and worldwide ranging from  engineering  consultancy,  engineering  design,  civil  works,  construc‐ on, erec on, mechanical and electrical equipment manufacturing,  commissioning,  opera on  and  maintenance  etc.  Sinoma  has        successfully executed projects in over 60 countries. 

 

 

Energy and  Infrastructure Company   Page 4

With the forma on of this joint‐venture , the doors for the large  energy  market  are  now  open  to  EICO.  The  competence  of  this  joint‐venture is expected to establish a new bench mark in the  energy  sector  by  providing  excellent  project  execu on  proce‐ dures with quality products from our world‐wide contacts. The  engineering  capability  as  well  as  the  strength  of  project    man‐ agement  available  to  EICO  is  par‐excellence  and  will  place  the  company  at  compe

ve  advantage  to  the  current  par cipants  

in the Saudi Arabian market. 

 

 

Energy and  Infrastructure Company   Page 5

AREA OF EXPERTISE The registration of EICO in various sectors in Saudi Arabia, will enable the execution of projects in the following areas: 

Power Stations



High Voltage Substations



Solar Power



Desalination Plants



Infrastructure and Industrial Construction

 

 

Energy and  Infrastructure Company   Page 6

POWER STATIONS The company assets include a specialized team with extensive experience within the region and worldwide in the power sector. EICO is well equipped with in-house resources to perform activities within the value-chain of power plant’s. We also provide expert advice on expansion, operation and maintenance. Scope of Work: 

Engineering and Construction of Power Plants.



Services and Extension works related to Power Plants.



Steel Structure Works.



Substation, Control and SCADA buildings.

 

 

Page 7

Energy and  Infrastructure Company  

HIGH VOLTAGE SUBSTATIONS EICO is specialized in execution of turnkey substation project. The company has executed, in the industrial sector of Saudi Arabia as well as worldwide, several high voltage substations. The company is capable of executing Extra High Voltage & High Voltage substations, transmission lines and underground cable works on turnkey basis. Scope of Work: 

High Voltage and Extra High Voltage Substations.



Transmission Lines.



Underground Cable works.



Retrofitting.



Civil and Electromechanical works.



In-house Engineering & Design.

 

 

Energy and  Infrastructure Company   Page 8

SOLAR POWER The company specializes in the technology, engineering design, construction, operation and management of renewable energy, particularly in solar photovoltaic field (PV) and concentrated solar power (CSP). Our experienced team is able to execute projects on an EPC basis for photovoltaic power stations and concentrated solar power solutions. Scope of Work: 

Design and Engineering.



PV/CSP Consulting.



Equipment procurement.



Installation.

 

 

Energy and  Infrastructure Company   Page 9

DESALINATION PLANTS EICO in collaboration with its partners are able to perform the activities in the desalination sector. Our partners have specially designed soft and hardware platforms, professionally talented team, extensive experience in consultation, design, manufacturing, installation, debugging and operation of desalination plant. Scope of Work: 

Engineering and Design of desalination plant.



Desalination of Sea Water.



Brackish/Industrial Wastewater Treatment and Sewage Reuse Facilities.



Extraction of chemical resources in sea water.

 

 

Energy and  Infrastructure Company   Page 10

INFRASTRUCTURE AND INDUSTRIAL CONSTRUCTION In addition to various power projects the company gradually secured its place as a major contractor for complete infrastructure and industrial construction. Scope of Work: 

LSTK Cement Plants.



Towers, buildings and offices.



Steel Structure buildings.



Piling.



Roads and Paving.

 

 

Page 11

Energy and  Infrastructure Company  

QUALITY POLICY Quality is and will continue to be one of the top most priorities in the company. EICO is committed to providing quality services and product’s to its customers. We deliver cutting edge technologies and tailor made quality solutions. Quality for EICO means understanding the customers’ requirements “inside out” and putting them into practice with our innovative strength and know-how. We have well established quality management system which is documented and is in line with the international quality requirements. The quality management system is regularly reviewed and monitored.

 

 

Energy and  Infrastructure Company   Page 12

SAFETY POLICY The personnel environment , as well as the health and safety of each employee at EICO is considered as one of the most important responsibilities of our management. The management is committed to providing a safe working environment for all its employees and customers. The management ensures that environment health and safety are the key elements of business objectives and are integrated to all planning activities. Each employee is fully committed and dedicated to following the health and safety guidelines. Our goal on every project is to work in safe and healthy environment.

 

 

Energy and  Infrastructure Company   Page 13

ENVIRONMENT POLICY EICO conducts its business operations in a manner that preserves the environment and protects the health and safety of workers, customers and all involved stake holders. We are committed to comply with or exceed all relevant regulatory requirements, to prevent pollution and to work on continual improvement in the environmental, health and safety performance of our operations, processes and products. In EICO we encourage our suppliers to improve their environmental, health and safety performance.

 

 

Energy and  Infrastructure Company   Page 14

REFERENCES

2x30MW thermal power plant for Alepp cement factory in Syria.  

2x600MW power plant in Suzhou city, China. 

 

 

Energy and  Infrastructure Company   Page 15

REFERENCES

132KV substa on for Saudi Cement Company in Eastern Region, KSA. 

500KV substa on in Xuancheng city, China. 

 

 

Energy and  Infrastructure Company   Page 16

REFERENCES

132KV substa on in Malaysia. 

 

 

Energy and  Infrastructure Company   Page 17

REFERENCES

500KV transmission line from substa on of Huaibei city to substa on of Bengbu city   in China (length=128Km).  

±800kV UHV DC transmission line from substa on of Xiangjiaba city  to substa on of Shanghai city in China (length= 99km).    

 

Energy and  Infrastructure Company   Page 18

REFERENCES

10MWP photovoltaic power plant in Tibet ,China. 

500KWP photovoltaic power in Schwabisch Gmund, Germany.  

 

 

Energy and  Infrastructure Company   Page 19

REFERENCES

2×4,500m3/d,  MED desalina on facility EPC project in Indramayu, Indonesia.  

10000TPD United Cement Factory in UAE. 

 

 

Energy and  Infrastructure Company   Page 20

REFERENCES

RCC 5000TPD cement factory in Riyadh, KSA. 

2500TPD American cement factory in Dominica. 

 

 

Energy and  Infrastructure Company   Page 21

REFERENCES

33KV substa on for Oman Cement Company located in Oman, Muscat.  

 

 

Energy and  Infrastructure Company   Page 22

REFERENCES

33KV substa on for Al‐Ain Cement Factory located in Abu Dhabi, UAE.  

 

 

Energy and  Infrastructure Company   P.O.Box 13080, Jeddah 21493 Kingdom of Saudi Arabia

Phone: +966 2 2637636 Fax: +966 2 2637667 Website: www.eico-me.com E-mail: [email protected]

 

Suggest Documents