ENCARDIO-RITE - User List ………. some of our
Landmark Projects
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
CONTENTS
METRO RAILWAY PROJECTS______________________________________________________ 3 SEWAGE TUNNEL PROJECTS______________________________________________________ 5 RAIL/ROAD TUNNEL AND UNDERGROUND CAVERN PROJECTS __________________________ 5 DAMS AND HYDROELECTRIC PROJECTS_____________________________________________ 7 AUTOMATIC WATER LEVEL MONITORING _________________________________________ 13 HISTORICAL MONUMENTS ______________________________________________________ 15 HIGH RISE BUILDINGS __________________________________________________________ 16 SOIL CONSOLIDATION AND GROUND IMPROVEMENT PROJECTS _______________________ 17 BRIDGES ____________________________________________________________________ 17 PRE AND POST CONSTRUCTION BUILDING CONDITION SURVEY ________________________ 18 MISCELLANEOUS PROJECTS _____________________________________________________ 20
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA
METRO RAILWAY PROJECTS Dubai Metro project-Red Line, underground Supply, installation and data monitoring with daily Metro with four underground stations and weekly reporting Obayashi Corporation, Japan Joint Venture Dubai Metro project-Green Line, underground Supply, installation and data monitoring with daily Metro with four underground stations and weekly reporting Obayashi Corporation, Japan Joint Venture TBM tunnels, Station boxes, NATM cross passages, station entrance emergency exits and Doha Metro Project – Gold Line, underground structures within the zone of influence - Supply, tunnel and stations (work in progress) - installation and data monitoring with daily and weekly reporting ALYSJ JV Pre-construction and post-construction building/structure survey works TBM tunnels, station boxes, trough structures Doha Metro Project – Green Line, Supply, installation and data monitoring with daily underground tunnel and stations (work in and weekly reporting progress) - VMT-NOACK-MTEC JV Pre construction and post-construction building/structure survey works Supply, installation and data monitoring with daily Doha Metro Project – Major stations and weekly reporting (Msheireb & Education City underground Pre construction and post-construction stations) (work in progress) - SOQ JV building/structure survey works Supply, installation and data monitoring with Delhi Metro Project-Phase I (Lines MC1A International Metro Civil Contractors (IMCC) and (4km) and MC1B (10 km) KSHI Delhi Metro Project Phase II (Lines BC15- BC Supply, installation and data monitoring with 24) underground portion and stations 20 km L & T, Senbo, CEC-SOMA, ITD, MTG Supply, installation and data monitoring with Delhi Metro Project Phase II (Lines C1-C7) SENBO Engineering, AFCON, L&T, ALPINE Underground Portions and stations 15 km) SAMSUNG, ALPINE HCC
Delhi Metro Project Phase sections) Started 2011
Bucharest Metro– Romania
Pre and post building condition survey, supply III (Various installation and monitoring of stations and tunnels with Pratibha, JK Infra, L&T, VALECHA, ERA, HCC. Metro Railway-Supply
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA
Bangalore Metro – UG-1, Coastal TTS JV
Pre and Post Building condition survey, Supply installation and monitoring
Bangalore Metro – UG-2, CEC-SOMA-CICI JV
Pre and Post Building condition survey, Supply installation and monitoring
Chennai Metro – UAA-01, Afcons TTA JV
Pre and Post Building condition survey, Supply installation and monitoring
Chennai Metro – UAA-02, GAMMON OJSC
MOSMETROSTROY JV.
Supply Of Instruments, installation and monitoring
Chennai Metro – UAA-03, GAMMON OJSC Pre and Post Building condition survey, Supply MOSMETROSTROY JV. installation and monitoring Chennai Metro – UAA-04, L&T-ECC – SUCG JV
Pre and Post Building condition survey, Supply installation and monitoring
Chennai Metro – UAA-05, Afcons TTA JV
Supply Of Instruments
Kolkotta Metro, UG-1 – Afcons TTA JV
Supply Of Instruments, Installation and Monitoring
Kolkotta Metro, UG-2 – ITD – ITD Cementation JV
Supply Of Instruments, Installation and Monitoring
Jaipur Metro, ITD-ITD Cementation JV
Supply Of Instruments, Installation and Monitoring
Torino Metro–Italy
Supply of Instruments
Izmir Metro Project, Turkey, EGE TEMEL
Rail/Road Tunnel and Underground Caverns Project, supply of instruments
Ankara-Sivas High Speed Railway Project, Turkey, MBEC-Cengiz-Limak-Mapa-Kolin JV
Metro – Railway Project, supply of instruments
Ankara-Istanbul High Speed Train Project, CİB-CENGİZ –ICTAS-BELEN JV
Metro – Railway Project, supply of instruments, supervision of installation and monitoring
Ankara Metro Project, Turkey
Metro Railway-Supply
Taiwan Metro- Taiwan
Metro Railway-Supply
Athens Metro, Greece
Metro Railway-Supply
Istanbul Metro – Turkey
Metro Railway-Supply
Hong Kong Metro –Hong Kong
Metro Railway-Supply
Santiago Metro –Chile
Metro Railway-Supply
Singapore Metro- Singapore
Metro Railway-Supply
London Metro- England
Metro Railway-Supply
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA
SEWAGE TUNNEL PROJECTS
Muharraq STP (Sewer Treatment Plant) Project, Bahrain – Samsung Engineering Co. Ltd.
STEP Project PS01- 100 m Underground Pump Station Abu Dhabi
Underground Tunnel 16 km long sewage line with 47 main shafts, Supply, installation and monitoring with daily and weekly reports Preconstruction and post-construction building/structure/utility condition survey This is the largest Pump Station Shaft in the world with a depth of 100 m, Supply installation and Monitoring works, Pre-construction and post-construction building/structure/utility condition survey Underground Link tunnel 40 km long sewage line,
STEP Project Link Sewer LS01 and LS02 Abu Supply installation and Monitoring works Dhabi Pre-construction and post-construction building/structure/utility condition survey Underground Tunnel 13 km long sewage line, STEP Project T01 Abu Dhabi
STEP Project T02 and T03 Inner Doha Resewerage Implementation Strategy (IDRIS) Main Trunk Sewer Tunnel Contract MTS-01, MTS-02 & MTS-03 (work in progress) - ACTS, Doha
Supply installation and Monitoring works Pre-construction and post-construction building/structure/utility condition survey, Pre-construction and post-construction building/structure/utility condition survey, supply and Installation Supply, installation and monitoring of initial instrumentation around proposed shafts
RAIL/ROAD TUNNEL AND UNDERGROUND CAVERN PROJECTS 4 tunnels – cut and cover, each 3 km long; Shiekh Zayed (Al Salam) Street Tunnel Supply, installation, data monitoring with daily and Project, Abu Dhabi, UAE - Samsung – Saif weekly reporting Bin Darwish Joint Venture Pre-construction building/structure condition survey NDM tunneling for storm water pipeline under Supply, installation, data monitoring with daily and Corniche road, Abu Dhabi, U.A.E. - Samsung weekly reporting. – Saif Bin Darwish Joint Venture
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA
Al Rayyan Road Project 7 Contract 2 (West of Olympic Roundabout to West of New Rayyan Roundabout), Doha, Qatar - Doğuş- Onur-JV (work in progress)
Construction and Upgrade of Road
Supply, installation and data monitoring
Konkan Railway Corporation Limited Tunnels T1, T2, T3, T5, T7, T8, T9, T10, T11, T12, Katra-Laole Section of the T38, T39, T40, T42, T43, T44, T45, T46 and T47 Udhampur-Srinagar-Baramulla Rail Link Supply, installation and data monitoring Project (Konkan Banihal) IRCON International Limited Zone-V in Pir 12 km long T-80 tunnel at km 152.00 – 164.00 on Panjal Tunnel between Udhampur Laole-Qazikund section – Supply, installation and -Srinagar-Baramulla Rail Link Project data monitoring IRCON International Limited Zone-IV in T-73 at km 143.700 to 144.340 on Laole-Qazigund PirPanjal Tunnel between Udhampur-Srinagar Section-Supply, installation and data monitoring -Baramulla Rail Link Project IRCON International Limited Zone-III (Khari) in PirPanjal Tunnel between Tunnel-T69-Supply, Udhampur-Srinagar -Baramulla Rail Link monitoring Project
installation
and
data
IRCON International Limited Zone-IV A & IV in 8.5 km Long Tunnel - T74R, T77B,T-77C,T49B Dharam-Qazigund section of Udhampur- Supply, installation, data monitoring Srinagar- Baramulla Rail Link Project Chenani-Nashri tunnel project/Leighton
9 km. long two lane tunnel Supply, installation and data monitoring
Qazikund to Banihal tunnel project/Navyug
Supply of Instruments
Northeast frontier railway
5 railway tunnel with total length of 5 km tunnel Jiribam-Tupul, Imphal - Supply and installation
Mumbai Mono Rail–L&T-SCOMI JV/ MMRDA
Pile Load Testing and Bridge Instrumentation Supply of Instruments
Rohtang Tunnel, HP/STRABAG AFCONS JV
Supply of Instruments; Carrying out tests by TSP System of Amberg Switzerland
DANS Energy Pvt. Ltd., Silliguri
Supply of Instruments
Gulbarga Rail Line Project, Bidar Gulbarga, Supply & installation of Instruments SC Railways Kiratpur-NER Engineering
Chowk
Site,
HP/IL&FS
Supply & installation of Instruments
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA
Vizag Cavern Project, ISPRL – Geotechnical and Hydrogeological EIL-SWECO, HCC Ltd., Vizag crude oil installation and data monitoring storage cavern, Vizag Padur Cavern Project, ISPRL – EIL, HCC Ltd., Padur crude oil storage cavern, Mangalore
–
Supply,
Geotechnical and Hydrogeological – Supply, installation and data monitoring
COJAAL (c/o ITOCHU Corporation) 5.6 km long tunnel for Highway Project, Algeria, Consultant-Taesei Corporation, Japan Supply of Instruments Brenner Base Tunnel (Italy to Austria)
Supply of Instruments
Platamonas tunnel, Greece
Supply of Instruments
Egnatia Motorway 680 km long – Anilio and Supply of Instruments Anthochori tunnels, Greece CCSA Subway Tunnel Line H Project, Supply of Instruments Argentina Lyon-Turin Rail Tunnel
56 km long tunnel, Supply of Instruments
Marmaray CR1 Project, Turkey, DOGUS INSAAT
Rail/Road Tunnel and Underground Caverns Project, supply of instruments
Istanbul Strait Road Tube Crossing Project, Yapi Merkezi Insaat ve Sanayi A.S. and SK Engineering & Construction Co.Ltd. JV
Supply of Instruments
DAMS AND HYDROELECTRIC PROJECTS Tala Hydroelectric Project, Bhutan, THPA/WAPCOS
Dam-Supply, installation and data monitoring
Middle Marsyangdi Hydroelectric Project, Dam, Surge/pressure shafts, Tunnels, Power Nepal: Dywidag/Fichtner Consultants, House-Supply and installation Germany Chukkha Hydro Power Corporation (CHPCL) Power House and Surge shaft- Supply and Bhutan installation Dagachhu Hydro Power Project, Bhutan
Dam & power house - Supply and installation and monitoring
Punatsagchhu-I Hydroelectric Bhutan, WAPCOS
Project,
Power House - Supply and installation
Punatsagchhu-I Bhutan, L&T
Project,
Hydroelectric
Slope stability instruments - Supply and installation
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT Punatsagchhu-II Bhutan, WAPCOS
SCOPE OF WORK/APPLICATION AREA
Hydroelectric
Project,
Power House - Supply and installation
Tehri Hydro-electric project/THDC
Dam, Power House, Tunnels -Supply and installation. Spillways-Supply, installation and data monitoring
Indira Sagar Project, NHDC
Dam and Power House-Supply, installation and data monitoring
Ranganadi HEP, NEEPCO
Dam-Supply and installation
Gerusoppa Project
Dam-Supply and installation
Doyang HEP, NEEPCO
Dam- Supply and installation
Sothuparai Reservoir
Dam-Supply and installation
Akash Ganga Project, TTD
Dam-Supply, installation and data monitoring
Kalpong project, Andaman, NHPC
Dam-Supply and installation
Mawphlang Project, Public Engineering Department, Shillong Ghatghar Lower and Projects/Patel Engineering
Health
Upper
Dam
Dam-Supply and installation
Dam-Supply and installation
Parbati HEP St II/Patel Engineering/NHPC
Dam and part HRT-Supply and installation
Kameng HEP Package I,II,III (Bichom Dam, Tenga Dam & Kimi Power House/ Patel Engg./NEEPCO
Supply and installation
Turial HEP, Patel Engineering/NEEPCO
Dam and Power House-Supply and installation
Chamera II HEP, Jaiprakash/NHPC
Dam, Penstock-Supply and installation
Teesta V HEP, Jaiprakash/NHPC
Dam, Power House and Surge Shaft-Supply, installation and data monitoring
Teesta VI-Lanco
Barrage -Supply and installation
Teesta VI, HCC / Lanco
Powerhouse – Supply and installation
Teesta IV HEP, HCC / NHPC
Dam, HRT and Powerhouse – Supply and Installation
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA
Teesta Low Dam III HEP, NHPC
Dam & powerhouse – Supply and installation
Teesta III HEP, Abir Infratech
Dam, powerhouse & HRT – Supply, installation and data monitoring
Karbi Langpi HEP, Assam Power Generation Corporation Ltd.
Dam – Supply and installation
Thoubal Irrigation Dam Project, Irrigation & Flood Control Department
Dam – Supply and installation
Khuga Irrigation Dam Project, Irrigation & Flood Control Department
Dam – Supply and installation
Chaudhary Charan Singh Lahchura Dam Irrigation Project, UP Irrigation Deptt
Dam – Supply, installation and data monitoring
Phata Bayoong, Lanco Infratech
Dam – Supply and installation
Budhil HEP, Lanco Infratech
Dam – Supply and installation
Bhilangana Hydroelectric Project, Bhilangana Hydro Power Limited
Dam – Supply and installation
Baghlihar HEP, Jaiprakash
Dam and Power House-Supply and installation
Vishnuprayag HEP, Jaiprakash
Barrage and Power House-Supply and installation
Dhauliganga Hydroelectric KDJV/HCC/NHPC Lower Goi Constructions Mangdechhu Jaiprakash
Irrigation
Project: Dam, Spillways and Power House-Supply and installation
Project,
Hydroelectric
AKR
Project,
Pench Diversion Dam, WRD, Chhindwara
Supply and installation
Dam - Supply and installation Supply and installation
Pranahita Irrigation Tunnel, Mega Engineering Supply and installation Satluj Jal Vidyut Nigam Ltd (Formerly NJPC)
Dam and desilting chambers-Supply, installation and data monitoring
Srisailam Hydroelectric Project
Dam and Power House-Supply and installation
Tarali Dam, Devgiri Engineering/MKVDC
Concrete Dam-Supply
Middle Vaitarna Dam, L&T/Soma/BMC
Roller
Compact
Concrete
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
Dam–Supply
&
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA Installation Dam– Supply, installation and Web Based Data Monitoring
Shapurkandi Project, SOMA Shongtang H.E. Engineering Ltd.
Project
(H.P.),
Patel
Supply & installation
GVK, Alaknanda Hydro Power Corpn
Power House-Supply & installation
Varahi HEP / KPCL / Indian Hume Pipes
Pen stock-Supply & installation
Purulia pumped storage project Corporation, Japan/WAPCOS
Upper Dam-Supply and installation
Taisei
Purulia pumped storage project HCC-L & T Lower Dam, Power House and Penstock-Supply JV/Taisei Corporation, Japan/WAPCOS and installation Nira Deogharand Gadnadi, NasikMaharashtra Research Engineering Institute Earth Dam-Supply (MERI) Gosikhurd Project, HCC/VIDC
Dam-Supply and installation
Chamera III HEP, HCC/NHPC
Dam, HRT installation
Uri HEP HCC/NHPC
Dam, HRT and Power House-Supply, installation and monitoring
Sewa-II HEP/Gammons/NHPC
Dam and installation
Subansiri HEP/Soma/NHPC
Dam (underground works)-Supply, installation and data monitoring
Subansiri HEP / L & T/NHPC
Underground Works-Supply, installation and data monitoring
Chutak HEP HCC / NHPC
Dam- HRT & Powerhouse Supply and installation
Koyna stage IV/Patel Engineering
Head Race Tunnel-Supply and installation
A.V. Koil/Gammons
Dam-Supply and installation
Nimoo-Bazgo HEP, HCC / NHPC
Dam-HRT & Powerhouse Supply and installation
Koldam Hydroelectric ITD/NTPC
Power
and
Power
De-silting
House-Supply
Chambers-Supply
and
and
Project, Dam and Spillways-Supply, installation and data monitoring
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA
Loharinagpala Hydroelectric Project/HCC/NTPC Koyna Dam/Devgiri Construction
Power Barrage and Desilting Chambers-Supply and installation.
Engineering/Soma Concrete Spillway installation
Strengthening–Supply
and
Vamsadhara Project Phase-II of stage-II, Earth Dam-Supply and installation Soma Patel ASI JV/AP irrigation Department Komaram Bheem Project-Navyuga Spillways-Supply and installation engineering Limited/AP irrigation Department Musurumilli Project
Supply and installation
OWK Resovior
Supply and installation
Pulichintala HEP-AP Irrigation
Supply and installation
GNSS-Padipalem Project
Supply and installation
Jeedipalli
Supply and installation
Chagallu Barrage Project Stage-II-Navyuga Earth Dam Spillways-Supply and installation Transtroy JV /AP irrigation Department Veligonda Reservoir Project-Kakarala Gap concrete dam-BSCPL-SCL JV/AP irrigation Concrete dam Supply and installation Department Sripadasagar Project, BIPPL-SUBMILE (JV), Earthern Dam and Concrete Spillways - Supply and AP irrigation Department installation Tapovan Vishnugad Project/PATEL/NTPC
Hydroelectric
Power Penstock, Power House and Butterfly Valve Chambers-Supply, installation and data monitoring
Tapovan Vishnugad Hydroelectric Project, RITHWIK/NTPC
Power
Tapovan Vishnugad Hydroelectric Project, L&T-AM JV/NTPC
Power
Barrage - Supply, installation and data monitoring HRT – Supply and installation
Gollapalli earth dam – AP irrigation
Earth dam - Supply, installation
Pranahita Chevella – TS irrigation
Tunnel - Supply, installation
UJH Dam–CWC Jammu
Supply, installation and data monitoring
Kishan Ganga HEP- NHPC HCC-Halcrow JV / Supply, installation and data monitoring NHPC
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA
Bolu Mengen Koprubasi HEPP, Turkey, YUKSEL ENERJI
Dam, supply of instruments
Livada Dam, Greece
Earth Dam-Supply
Kastoria Earth Dam, Greece
Earth Dam-Supply
Salma Dam Project, Afghanistan, Angelique Earth Dam–Supply, installation and data monitoring International Limited/WAPCOS Lechago (Jiloca river) Dam, Spain
Earth Dam-Supply
Arauzo Dam, Spain
Supply of Instruments
Pinalto Dam, Dominican Republic
Earth Dam-Supply
Koprubasi HEP, GEOgrup Dam-Turkey
Supply and Installation Of Instruments for Power House
Gibe III, Ethiopia
Earth Dam-Supply of Instruments
Ingenieria Y Construcion Cosapi S.A., Peru
Instrumentation Supply
San Martin-Contratistas Generales S.A., Peru
Instrumentation Supply
Constructora Queiroz Galvao S.A., Peru
Instrumentation Supply
Geotecnia Peruana S.R.L., Peru
Instrumentation Supply
Consorcio Cosapi-SSK, Peru
Instrumentation Supply
Traverse Olmos Project, Peru
Instrumentation Supply
Cincoop, Belo Horizonte, Brazil
Trial embankment on Gold mine tailings-Supply of Instruments
Cat Leo Project (Broken Canoe dam), Brazil
Instrumentation Supply
Canoa Quebrara Dam, Brazil
Instrumentation Supply
Achiras dam, Argentina
Instrumentation Supply
Shenjen river project-Stage III, Hong Kong
Instrumentation Supply
Upper Kotmale Hydropower Project, Sri Lanka Instrumentation Supply (Maeda Nishimatsu JV, Japan)
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA
AUTOMATIC WATER LEVEL MONITORING Directorate of Agriculture, Government of Assam
Supply and installation, online monitoring through web server (208 systems)
Ground Water Department UP, Lucknow
Supply and installation, online monitoring through web server (203 systems)
Doha Metro Project – Gold Line Underground (work in progress), ALYSJ JV
Supply and installation, online monitoring through web server (60 systems)
State Water Investigation Directorate (SWID), West Bengal
Supply and installation, online monitoring through web server (60 systems)
Water Resource Investigation Division, Punjab
Supply and installation, online monitoring through web server (50 systems)
State Hydrology Organisation, Puducherry
Supply and installation, online monitoring through web server (33 systems)
Andhra Pradesh Water Sector Improvement Project, AP/Telangana
Supply and installation, online monitoring through web server (25 systems)
Advance Construction Technology Limited IDRIS preliminary ground water monitoring works, (ACTS), Doha, Qatar Supply Advance Construction Technology Limited (ACTS), Doha, Qatar
Supply and installation (16 systems)
Advance Construction Technology Limited, Doha (Qatar)
Supply and installation (16 systems)
AQUA Explorers, Shriram Pistons & Rings Limited
Supply and installation (10 systems)
Lafarge India Pvt. Ltd.- Arasmeta Cement Plant, Champa, (CG)
Supply and installation (9 systems)
Shiv Drillers, Kolkata
Supply and installation (8 systems)
Uttar Pradesh Water Restructuring Project , Lucknow, (UP)
Supply and installation, online monitoring through web server
Central Ground Water Board, Lucknow, (UP)
Supply and installation, online monitoring through web server
Indian Institute of Technology, Chennai (TN)
Supply and installation
OP Jindal Global University, Sonipat (Haryana)
Supply and installation
Pepsico Plant, Jaunpur (UP)
Supply and installation
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA
Vitalife Laboratories
Supply and installation
Glaxo SmithKline
Supply and installation
Emami Cement
Supply and installation
Aman Environment
Supply and installation
Subros Limited
Supply and installation
Annamalai University, Department of Earth Science, Chidambaram
Supply and installation
MultiMedia Enterprise
Supply and installation
Parshav Nath Developers Ltd
Supply and installation
Ramco Cement Ltd
Supply and installation
South Asia LPG Company P.Ltd., Vizag
Supply and installation
Madras Cement Ltd., Chennai, (TN)
Supply and installation
Vikat Sagar Cement Private Limited, Hyderabad (AP)
Supply and installation
Gujrat Industry Power Company Ltd, Surat (Gujrat)
Supply and installation
Jama Corporation Limited, Kanpur (UP)
Supply and installation
Brindavan Bottlers, Safedabad (UP)
Supply and installation, online monitoring through web server
Brindavan Agro, Mathura (UP)
Supply and installation, online monitoring through web server
Indagro Foods, Unnao (UP)
Supply and installation, online monitoring through web server
Aditya Birla Chemicals (India) Limited, Chemical Division, Sonbhadra (UP)
Supply and installation, online monitoring through web server
Amrit Bottlers Pvt. Ltd, Faizabad (UP)
Supply and installation, online monitoring through web server
Lanco Anpara Power Ltd, Anpara Sonbhadra (UP)
Supply and installation, online monitoring through web server
Brindavan Agro Industries (P) Ltd. Hathras (UP)
Supply and installation, online monitoring through web server
AOV Exports Pvt. Ltd, Unnao (UP)
Supply and installation, online monitoring through web server
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA
Brindavan Beverages Pvt. Ltd , Bareilly (UP)
Supply and installation
Gallant Ispat Limited, Gorakhpur (UP)
Supply and installation, online monitoring through web server
Brindavan Bottlers Pvt. Ltd, Unnao (UP)
Supply and installation, online monitoring through web server
A Q Frozen Pvt. Ltd, Gajrola (UP)
Supply and installation, online monitoring through web server
Madras Cement Ltd., Chennai (TN)
Supply and installation
Government College of Technology, Coimbatore (TN)
Supply and installation
Ambuja Cements Limited, Bhatapara (CG)
Supply and installation
Pachaimuthu & Company, Parambikulam Dam (TN)
Supply and installation, online monitoring through web server
Subros Limited, Noida (UP)
Supply and installation, online monitoring through web server
Orient Cement, Adilabad
Supply and installation
Dalmia Cement, Ariyalur (AP)
Supply and installation
Diamond Beverages (P) Ltd., Kolkata (WB)
Supply and installation, online monitoring through web server
IIT, Madras
Supply and installation, online monitoring through web server
Trichy Corporation
Supply and installation, online monitoring through web server
HISTORICAL MONUMENTS Mirani Fort / Al-Manar International – Muscat, Oman
Web Based Data monitoring systems with sensors like borehole extensometers, temperature sensors, tilt meter, in-place inclinometers, crack meters
Cabo Fort, Governor’s Bunglow – Goa / ITD Cementation (1st & 2nd phase)
Web Based Data monitoring for the fort with In-place inclinometers and crack meters
Expansion of the Al Masjide Al Haram
Supply of Instruments
Basilica of S. Maria Assunta Carignano
Web based online monitoring with tilt and crack meters
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA
HIGH RISE BUILDINGS/FOUNDATION/EXISTING STRUCTURES Marina Bay Sands-Hotel Towers, Singapore
Group of six buildings with 64 storey each - Supply of Instruments
Burj Khalifa, Dubai
818 m tallest building in the world, foundation instruments through Bodycote
Sisli Bomonti Time Residence, Turkey, SINPAS GYO
Supply of instruments
Lodha World One - Residential Tower, India
117 storey in Mumbai, Tallest residential tower in the world - Supply of foundation Instruments
Supertech Ltd., Nova East & Nova West Project
Supply and installation of Instruments for Raft
Convention Centre - Ammico Contracting Co. WLL, Doha
108 storey tower - foundation instrumentation
AI Quid Towers - Ammico Contracting Co. WLL, Doha
100 storey tower - foundation instrumentation Pre-construction building buildings with ZOI
condition
survey
CP07B-Project in Lusail, ACTS, Doha
Supply installation, monitoring & reporting
Corniche Hotel Project, UAE
Supply and Monitoring
City Seasons Hotel Project, UAE
Supply and Monitoring
Jumeirah Village Project, UAE
Supply and Monitoring
Deira Waterfront Development, Dubai, Plot 11 Al Futtaim Carillion, Dubai
Deira Waterfront Development, Dubai, Plot 13 - Al Futtaim Carillion, Dubai
Multi Level Car Park construction; existing Red Line tunnel and shoring works monitoring Supply and Monitoring Multi Level Car Park construction; existing Green Line tunnel, Shindagha tunnel and shoring works monitoring Supply and Monitoring
Deira Waterfront Development, Dubai, Plot 03 Al Futtaim Carillion, Dubai
of
Hotel construction; shoring works/deep excavation monitoring Supply and Monitoring
Mediclinic Healthcare City Project, Dubai - KELE Contracting
Existing metro station, shaft monitoring
Masra Al Seef Project, Dubai - Dutco Balfour Beatty
Existing Red Line Metro Tunnel monitoring and surface instrumentation
Supply and Monitoring
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA Supply and Monitoring
One Za’abeel ICD Headquarters, Dubai A.P.C.C. Piling & Contracting L.L.C./Investment Corporation of Dubai
Enabling works; Existing Bridge and shoring works monitoring
Meena tower, Abu Dhabi - Arabian Construction Company
D-wall monitoring
Plot # 317-1080, Mankhool, Service Hotel apartment /residential building - Stromek
D-wall monitoring
Tamdeen high rise building project - Zetas
Supply and Monitoring
Supply and Monitoring
Supply and Monitoring D-wall, shoring works monitoring Supply and Monitoring
Dubai Water Canal Infrastructure Package-3 Canal and Coastal Works (R999/3) - Belhasa Six Construct L.L.C (Besix)/RTA
Monitoring of metro piers;
Trident Hotel - Afcons
Diaphragm wall instrumentation
Masdar City, UAE
Supply and Monitoring
Supply and Monitoring Pre construction structure condition survey
SOIL CONSOLIDATION AND GROUND IMPROVEMENT PROJECTS Kandla Port Trust (8th berth)
Soil consolidation-Supply, installation and data monitoring through Afcons
Kandla Port Trust (9th berth)
Soil consolidation-Supply, installation and data monitoring through Shantilal B Patel
Vishakhapatnam sea port project
Ground Improvement-Supply through Skanska
and
installation
Metropolitan transport project, Mumbai
Ground Improvement embankment)-Supply and installation
(railway
Runway Ground Improvement, airport Vizag
Supply and installation with Vizag project/Sohams/Airport Authority of India
Vallarpadam Port
Ground Improvement-Supply and installation
Borusan Gemlik Port Soil Improvement Project, Turkey, Borusan Logistic
Supply of instruments
ITD (GRSE), Kolkata
Supply, installation and data monitoring
airport
BRIDGES 2nd Bridge on Narmada river (NH-8)
Supply and Installation with L & T/Dar Consultants, UK
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA
Chiraiyatand Cable Stayed Bridge, Patna
Supply and installation BBR/IRCON
Naini cable stayed bridge, Allahabad
Supply and installation Kowi-Span/NHAI
Bogibeel Rail-Cum-Road Bridge Project, Assam/HCC
Supply of Instruments
Jaipur-Kishangarh Expressway
Jaipur Kishangarh NH-8 Expressway Road Project with L & T/GVK BECOM, French Engineering Consultants
Second Vivekananda Bridge Toll way Project, Kolkata
Supply, Installation ECC Division
Allahabad Bypass Bridge Project (Ganga Bridge Project)
Supply and Installation , L & T ECC Division and The Freyssinet Pre-stressed Concrete Co. Ltd.
Izmit Bay Suspension Bridge , STFA, Turkey Construction-IHI
Bridge, supply of instruments
and Monitoring with L & T
PRE AND POST CONSTRUCTION BUILDING CONDITION SURVEY Upgrading Shiekh Zayed (Al Salaam) Street tunnel project, Abu Dhabi
Pre and Post construction structure/building condition survey of 186 structures, upto 54 storeys
Muharraq STP Project, Bahrain
Underground Tunnel 16 km long sewerage line, Pre and Post construction structure/building condition survey of almost 390 structures ~100 m deep underground pump station
STEP Project PS01, Abu Dhabi
Pre and Post condition survey
construction
structure/building
STEP Project Link Sewer LS01 and LS02, Abu Dhabi
Underground Link tunnel, 40 km long sewage line, Pre and Post construction structure/building condition survey
STEP Project T01 and T03, Abu Dhabi
Underground tunnel, Pre and Post construction structure/building condition survey
Dubai Water Canal Infrastructure Package-3 Canal and Coastal Works (R999/3) - Belhasa Six Construct L.L.C (Besix)/RTA
Pre construction structure/building condition survey
Doha Metro Project – Gold Line, underground Pre and Post construction structure/building tunnel and stations (work in progress) condition survey ALYSJ JV
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA
Doha Metro Project – Gold Line Underground Pre and Post construction structure/building Extension Design Stage (work in progress), condition survey ALYSJ JV Doha Metro Project – Green Line, Pre and Post construction structure/building underground tunnel and stations (work in condition survey progress) - PSH JV Doha Metro Project – Major stations Pre and Post construction structure/building (underground stations) (work in progress) condition survey SOQ JV Doha Metro Project – Red Line South (work in Pre and Post construction structure/building progress) - QGD JV condition survey Doha Metro Project-Enabling works, HSP Enabling JV Inner Doha Resewerage Implementation Strategy (IDRIS) Main Trunk Sewer tunnel Contract MTS-01 & MTS-03, BYTP - UCC BCQ - BESSAC JV
Inner Doha Resewerage Implementation Strategy (IDRIS) Main Trunk Sewer tunnel Contract MTS-02, Al Sraiya Strabag - Hochtief Petroserv JV
Pre and Post construction structure/building condition survey Underground tunnel: ~30 km long main trunk sewerage line (MTS-01~16 km and MTS-03~14 km) Pre and Post construction structure/building/utility condition survey Underground Tunnel: ~15 km long main trunk sewerage line. Pre and Post construction structure/building/utility condition survey
AI Quid Towers/Ammico Contracting Co. WLL, Doha
Pre construction structure/building condition survey
Delhi Metro Project Phase III (CC01, CC04, CC05) Started 2011
Pre and Post construction structure/building condition survey
Bangalore Metro – UG-1, Coastal TTS JV
Pre and Post construction structure/building condition survey
Bangalore Metro – UG-2, CEC-SOMA-CICI JV
Pre and Post construction structure/building condition survey
Chennai Metro – UAA-01, Afcons TTA JV
Pre and Post construction structure/building condition survey
Chennai Metro – UAA-03, GAMMON OJSC Pre and Post construction structure/building MOSMETROSTROY JV. condition survey Chennai Metro – UAA-04, L&T-ECC – SUCG JV
Pre and Post construction structure/building condition survey
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA
MISCELLANEOUS PROJECTS Pepsico India Holdings Pvt. Ltd.- Jaunpur U.P.
Automatic Digital water Level Recorder (DWLR) with mobile readout - Supply and installation of instruments
Nuclear Power Corporation Of India Ltd.(NPCIL), Tarapur-L&T, ECC
Stressing of Cable strands building-Supply of instruments
in
reactor
Nuclear Power Corporation Of India Ltd.(NPCIL), Kaiga /Gammon/Freyssinet
Stressing of Cable strands building-Supply of instruments
in
reactor
Kettaneh Construction W.L.L., Qatar (for Ishikawajima-Harima Industries Co. Ltd. (IHI) Japan)
LNG tank installation
Al-Zour refinery Project NRP/EPC - 0048 Van Oord, Kuwait/ Kuwait National Petroleum and Refinery
Supply
Dubai Airport, Dubai
Instrumentation Supply
CSN Casa De Pedra Mine, Brazil
Instrumentation Supply
Pasir Panjang Expressway Singapore
Pile Testing-Supply
Southern Peru Copper Corporation, Peru
Instrumentation Supply
Cia. Minera Antamina S.A., Peru
Instrumentation Supply
Sepetiba Harbour Stock Piles, Brazil
Instrumentation Supply
Boa Hora Landfill project, Brazil
Instrumentation Supply
RPM mine Project, Brazil
Instrumentation Supply
ThyssenKrupp CSA Siderurgica do Atlantico Project, Brazil
Instrumentation Supply and Installation
Copper Mine Bor– Serbia
Instrumentation Supply
Gujarat Adani Port, Mundra
Tie rod instrumentation (Bulk Terminal)
Gujarat Adani Port / L&T-ECC, Mundra
Tie rod instrumentation (Bulk Terminal)
BOGAZICI UNIVERSITY Kilyos Saritepe Campus Wind Turbine Project
Instrumentation Supply
Khalifa Port and Industrial Zone Project, Abu Dhabi - Gulf Laboratories
Instrumentation Supply
KPIZ Project, Abu Dhabi
Pile testing, Instrumentation supply
Damac Heights Project, Dubai Marina -
Vibration monitoring
settlement
monitoring-Supply
50 years of excellence Real time structural monitoring… geotechnical and geophysical instrumentation
and
PROJECT/CLIENT
SCOPE OF WORK/APPLICATION AREA
ZETAS Zemin Teknolojisi A.S., Dubai Arabian Canal Project, Arab Centre for Engineering Studies (ACES), Dubai
Supply
Bloom Canal Project, UAE
Supply and Installation
Takreer’s Sea Water Intake Project-3 (SWI-3) in Ruwais
Supply
Al Raha Beach Development, Abu Dhabi ZETAS Zemin Teknolojisi A.S., Dubai
Instrumentation Supply
Suwwah Island Development Work, UAE
Supply and Installation
Lusail Development - Irrigation TSE reservoir (IR3), Qatar
Supply and Installation