Electronic Cost Handbook

THAILAND 2016 Electronic Cost Handbook We have a number of option for accessing an electronic version of our Cost Handbook : 1. Download the PDF ver...
25 downloads 1 Views 2MB Size
THAILAND 2016

Electronic Cost Handbook We have a number of option for accessing an electronic version of our Cost Handbook : 1. Download the PDF version from our website to your iPhone or iPad o Using Safari brower,go to www.LangdonSeah.com o Tap "Publications" at the top menu o Select "Annual Construction Cost Handbook" category o Select "Thailand" region o Tap "PDF Download" o Tap "Open in..." o Tap "Open in iBook" o You can then go to iBooks to read the downloaded 2016 Construction Cost Handbook, even when your Smart Phone is in Airplane mode 2. For Android Smart Phone and Tablet users, scan the QR code below to directly access the PDF flie. o Tap "PDF Dowload" o You can then go to "Download" folder to read the downloaded 2016 Construction Cost Handbook, even when your Smart Phone is in Airplane mode

3. Or download our App to your Smart Phone or iPad by searching for Langdon & Seah Cost Handbook in the App Store or Google play.

1

2 4 3

5

Handbook Cover Photos:1. Canapaya Residence, Rama3 2. G Land Tower Grand Rama9 3. Icon Siam 4. The Landmark Waterfront 5. Central Plaza Rayong

The following handbook of information relating to the Thailand construction industry has been compiled by:

Langdon & Seah (Thailand) Ltd. in collaboration with LECE (Thailand) Co., Ltd. An Arcadis Company 10th Floor, Kian Gwan Building II, 140/1 Wireless Road, Lumpini, Patumwan, Bangkok 10330 Thailand Telephone Fax Email Website Business Reg. No

: (66 2) 2531438 : (66 2) 2534977 : [email protected] : www.arcadis.com : 0105533002676

© Langdon & Seah (Thailand) Ltd. All rights reserved. No part of this publication may be reproduced or copied in any form without prior written permission from Langdon & Seah (Thailand) Ltd.

For private circulation to staff and business associates only. Printed: 2016

TABLE OF CONTENT Table of Content Calendars About Us

1 2 4

1. CONSTRUCTION COST DATA Construction Cost Specification Construction Costs for Thailand Construction Costs for Selected Asian Cities Major Rates for Thailand Major Rates for Selected Asian Cities M&E Costs for Selected Asian Cities Fit-Out Costs for Bangkok

6 8 10 18 20 26 32

2. GENERAL CONSTRUCTION DATA Estimating Rules of Thumb Construction Material Price Index Percentage Change of Construction Material Price Index Construction Material Price Index Graph

35 36 37 38

3. PROPERTY Land Transaction Construction Areas Approved in Municipal Zone Land Titles and Measurement

40 41 42

4. FINACIAL Financial Definitions & Formulae Prime Rates & Base Lending Rates Exchange Rates

44 46 47

5. OTHER INFORMATION Utility Costs for Selected Asian Cities Weight & Measures Public Holidays Directory of Offices

TABLE OF CONTENT

50 52 54 64

1

2015

CALENDARS S M T W T F S 4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

1 8 15 22 29

2 9 16 23 30

JAN

3 10 17 24 31

S M T W T F S 5 12 19 26

6 13 20 27

7 14 21 28

1 8 15 22 29

2 9 16 23 30

3 10 17 24

APR

4 11 18 25

S M T W T F S 5 12 19 26

6 13 20 27

7 14 21 28

1 8 15 22 29

2 9 16 23 30

3 10 17 24 31

JUL

4 11 18 25

S M T W T F S 4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

1 8 15 22 29

2 9 16 23 30

2016

OCT

3 10 17 24 31

S M T W T F S 31 3 10 17 24

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

1 8 15 22 29

JAN

2 9 16 23 30

S M T W T F S 31 3 10 17 24

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

1 8 15 22 29

APR

2 9 16 23 30

S M T W T F S 31 3 10 17 24

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

1 8 15 22 29

JUL

2 9 16 23 30

S M T W T F S 30 2 9 16 23

31 3 10 17 24

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

OCT

2

1 8 15 22 29

S M T W T F S 1 8 15 22

2 9 16 23

3 10 17 24

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

FEB

S M T W T F S 1 8 15 22 29

2 9 16 23 30

3 10 17 24 31

4 11 18 25

5 12 19 26

6 13 20 27

MAR

7 14 21 28

S M T W T F S

S M T W T F S

31 3 10 17 24

7 14 21 28

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

2 9 16 23 30

1 8 15 22 29

MAY

S M T W T F S 30 2 9 16 23

31 3 10 17 24

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

AUG

1 8 15 22 29

S M T W T F S 1 8 15 22 29

2 9 16 23 30

3 10 17 24

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

NOV

S M T W T F S 7 14 21 28

1 8 15 22 29

2 9 16 23

3 10 17 24

4 11 18 25

5 12 19 26

6 13 20 27

FEB

S M T W T F S 1 8 15 22 29

2 9 16 23 30

3 10 17 24 31

4 11 18 25

5 12 19 26

6 13 20 27

MAY

7 14 21 28

S M T W T F S 7 14 21 28

1 8 15 22 29

2 9 16 23 30

3 10 17 24 31

4 11 18 25

5 12 19 26

AUG

6 13 20 27

S M T W T F S 6 13 20 27

7 14 21 28

1 8 15 22 29

2 9 16 23 30

3 10 17 24

4 11 18 25

5 12 19 26

NOV

1 8 15 22 29

2 9 16 23 30

3 10 17 24

4 11 18 25

5 12 19 26

JUN

6 13 20 27

S M T W T F S 6 13 20 27

7 14 21 28

1 8 15 22 29

2 9 16 23 30

3 10 17 24

4 11 18 25

SEP

5 12 19 26

S M T W T F S 6 13 20 27

7 14 21 28

1 8 15 22 29

2 9 16 23 30

3 10 17 24 31

4 11 18 25

DEC

5 12 19 26

S M T W T F S 6 13 20 27

7 14 21 28

1 8 15 22 29

2 9 16 23 30

3 10 17 24 31

4 11 18 25

MAR

5 12 19 26

S M T W T F S 5 12 19 26

6 13 20 27

7 14 21 28

1 8 15 22 29

2 9 16 23 30

3 10 17 24

JUN

4 11 18 25

S M T W T F S 4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

1 8 15 22 29

2 9 16 23 30

SEP

3 10 17 24

S M T W T F S 4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

1 8 15 22 29

2 9 16 23 30

DEC

3 10 17 24 31

CALENDARS

S 1 8 15 22 29

M T W T F S 2 9 16 23 30

3 10 17 24 31

4 11 18 25

5 12 19 26

6 13 20 27

JAN

7 14 21 28

S M T W 1 5 6 7 8 12 13 14 15 19 20 21 22 26 27 28

T 2 9 16 23

F 3 10 17 24

FEB

S 4 11 18 25

S M T W T F S

S M T W T F S

30 2 9 16 23

1 7 8 14 15 21 22 28 29

3 10 17 24

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

APR

1 8 15 22 29

S M T W T F S 30 2 9 16 23

31 3 10 17 24

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

JUL

1 8 15 22 29

30 2 9 16 23

31 3 10 17 24

4 11 18 25

5 12 19 26

6 13 20 27

OCT

7 14 21 28

S M T W T F S 7 14 21 28

1 8 15 22 29

2 9 16 23 30

3 10 17 24 31

4 11 18 25

5 12 19 26

6 13 20 27

M 2 9 16 23 30

T 3 10 17 24

W 4 11 18 25

T 5 12 19 26

F 6 13 20 27

S 7 14 21 28

JAN

S 1 8 15 22 29

APR

3 10 17 24 31

4 11 18 25

5 12 19 26

MAY

6 13 20 27

S M T W T F S 6 13 20 27

7 14 21 28

1 8 15 22 29

2 9 16 23 30

3 10 17 24 31

4 11 18 25

AUG

5 12 19 26

S M T W T F S 5 12 19 26

6 13 20 27

7 14 21 28

1 8 15 22 29

2 9 16 23 30

3 10 17 24

NOV

4 11 18 25

S M T W T F S 4 11 18 25

1 5 6 7 8 12 13 14 15 19 20 21 22 26 27 28

2 9 16 23

3 10 17 24

F 4 11 18 25

S 5 12 19 26

FEB

S M T 1 6 7 8 13 14 15 20 21 22 27 28 29

W 2 9 16 23 30

T 3 10 17 24 31

MAY

S M T W T F S

S M T W T F S

4 11 18 25

1 8 15 22 29

1 8 15 22 29

2 9 16 23 30

3 10 17 24 31

5 12 19 26

6 13 20 27

JUL

7 14 21 28

7 14 21 28

1 8 15 22 29

2 9 16 23 30

3 10 17 24 31

4 11 18 25

5 12 19 26

OCT

CALENDARS

6 13 20 27

6 13 20 27

7 14 21 28

3 10 17 24 31

AUG

4 11 18 25

S M T W T F S 4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

1 8 15 22 29

2 9 16 23 30

NOV

3 10 17 24

F 3 10 17 24 31

MAR

S 4 11 18 25

S M T W T F S 4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

1 8 15 22 29

2 9 16 23 30

JUN

3 10 17 24

S M T W T F S 3 10 17 24

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

1 8 15 22 29

SEP

S 31 3 10 17 24

M T W T F 1 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29

DEC

S M T W T 1 4 5 6 7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29

2 9 16 23 30 S 2 9 16 23 30

F 2 9 16 23 30

S 3 10 17 24 31

S M T W T F 1 3 4 5 6 7 8 10 11 12 13 14 15 17 18 19 20 21 22 24 25 26 27 28 29

S 2 9 16 23 30

MAR JUN

S M T W T F S 30 2 9 16 23

3 10 17 24

4 11 18 25

S 30 2 9 16 23

M 31 3 10 17 24

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

SEP

1 8 15 22 29

T W T F S 1 5 6 7 8 12 13 14 15 19 20 21 22 26 27 28 29

DEC

2018

S M T W T F S

5 12 19 26

2 9 16 23 30

T 2 9 16 23 30

2017

S M T W T F S 29 1 8 15 22

2 9 16 23 30

S M T W 1 5 6 7 8 12 13 14 15 19 20 21 22 26 27 28 29

3

About Us Langdon & Seah (Thailand) Ltd. (formerly, named Davis Langdon & Seah (Thailand) Ltd.) was established in 1990 to operate in conjunction with our sister company LECE (Thailand) Co.,Ltd. (Langdon Every Cost Engineering) which was first established in 1984 to provide cost engineering and project management support services to the Oil Industry in Thailand. In 1987, responding to popular demand, the activities were extended to cover the whole range of quantity surveying / cost management services for the Building and Construction Industry in general.

Langdon & Seah (Thailand) Ltd. LECE (Thailand) Co., Ltd. Quantity Surveyors & Construction Cost Consultants

4

1

1

CONSTRUCTION COST DATA

CONSTRUCTION COST SPECIFICATION The costs for the respective categories given on the following pages are averages based on fixed price competitive tenders. It must be understood that the actual cost of a building will depend upon the design and many other factors and may vary from the figures shown. The costs per square metre are based on construction floor areas measured to the outside face of the external walls/external perimeter, and are inclusive of lift shafts, stairwells, plant rooms, water tanks and the like. All buildings are assumed to have no basements (except otherwise stated) and are built on flat ground, with normal soil conditions and minimal external works. The costs excludes land cost, professional fees, finance costs and legal expenses. The standards for each category of building vary from country to country and do not necessary follow those of Malaysia.

DOMESTIC Air-Conditioning allowed for luxury apartments and prestige houses. Prestige houses include provision of functional light fittings only. Interior Fit-out and Decoration is excluded. No light fittings have been allowed for other types of domestic construction.

OFFICE / COMMERCIAL Based on buildings 20 – 30 storeys high with floor plans minimum 1,000 m2 per level. Average standard offices and shopping centres exclude A/C ducting and light fittings to tenants areas. Prestige offices have curtain wall elevations, granite

6

CONSTRUCTION COST DATA

INDUSTRIAL Flatted factories excludes manufacturing equipment, airconditioning and electrical distribution system to tenants areas. Owner operated factories excludes manufacturing equipment, air-conditioning and special services provisions.

HOTELS F.F. & E. includes interior decoration and loose furniture etc. but excludes operator’s items (e.g. cutlery, crockery, linen etc.).

OTHERS Schools with standard government provisions. Student hostels to university standard.

CONSTRUCTION COST DATA

7

8 Baht/m2 KOH SAMUI

PHUKET

N/A N/A 55,000 - 65,000 50,000 - 60,000 N/A N/A 70,000 - 80,000 60,000 - 70,000 10,000 - 13,000 N/A N/A N/A 15,000 - 18,000 N/A N/A N/A 18,000 - 22,000 N/A N/A N/A 24,000 - 30,000 26,000 - 32,000 N/A N/A 21,000 - 28,000 N/A N/A N/A 32,000 - 38,000 32,000- 38,000 N/A N/A

CHIANGMAI

21,000 - 26,000 21,000 - 26,000 21,000 - 26,000 N/A N/A 27,500 - 35,000 27,500 - 35,000 N/A N/A N/A 20,500 - 26,500 N/A N/A 19,000 - 21,000 N/A 27,500 - 28,500 27,500 - 28,500 28,000 - 29,500 N/A 25,000 - 28,000

17,500 - 25,000 26,000 - 31,500 10,000 - 13,000 15,000 - 18,000 17,000 - 20,000 21,500 - 26,000 20,500 - 26,500 32,000 - 38,000

PATTAYA

Notes : Detached houses and bungalows - Bare shell, good quality provisions, with M&E main plant, but excluding garden and parking etc. - Full fit, good quality provisions, with air-conditioning, kitchen cabinets and home appliances, but excluding decorative light fittings and loose furniture, garden and parking etc. Terraced houses - Bare shell joined houses in row(s), with M&E main plant, but excludes garden and parking etc. - Full fit joined houses in row(s), with air-conditioning, kitchen cabinets and home appliances, but excluding decorative light fittings and loose furniture, garden and parking etc. Average standard apartments, high rise - Bare shell, with lifts and M&E main plant - Full fit, with air-conditioning, kitchen cabinets and home appliances, but excluding decorative light fittings and loose furniture Luxury apartments, high rise - Bare shell, good quality provisions; with lifts and M&E main plant - Full fit, good quality provisions, with air-conditioning, kitchen cabinets and home appliances, but excluding decorative light fittings and loose furniture Average standard offices, high rise - Average standard offices with central air conditioning but excluding finishes, A/C ducting and light fittings within tenant areas Prestige offices, high rise - Prestige offices with curtain wall elevations (or similar grade facade), tenant areas finished with raised floor, suspended ceiling, A/C ducting and light fittings Average Shopping Centres – Retail with shop fronts but excluding finishes and M&E distribution within shops Prestige Shopping Centres – Retail, good quality provisions, but excluding finishes and M&E distribution within shops

DOMESTIC Detached houses and bungalows [ Bare-shell ] Detached houses and bungalows [ Full-fit ] Terraced houses [ Bare-shell ] Terraced houses [ Full-fit ] Average standard apartments, high rise [ Bare-shell ] Average standard apartments, high rise [ Full-fit ] Luxury apartments, high rise [ Bare-shell ] Luxury apartments, high rise [ Full-fit ] OFFICE / COMMERCIAL Average standard offices, high rise Prestige offices, high rise Average Shopping centres Prestige Shopping centres

BANGKOK

1 CONSTRUCTION COST DATA

Construction Costs for Thailand

CONSTRUCTION COST DATA

CONSTRUCTION COST DATA

(Cont’d)

9

N/A N/A

16,000 - 20,000 16,000 - 20,000 N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A

18,000 - 23,500 18,000 - 23,500 6,000 - 9,600 6,000 - 9,600 N/A N/A N/A N/A N/A N/A

N/A 7,000 - 10,000 N/A N/A N/A

N/A N/A N/A N/A N/A

N/A 8,000 - 14,000 N/A N/A N/A

56,000 - 80,000 56,000 - 80,000 56,000 - 80,000 80,000 - 90,000 75,000 - 85,000 37,500 - 41,500 37,500 - 41,500 38,000 - 42,000 48,000 - 55,000 40,000 - 48,000 56,000 - 60,000 56,000 - 60,000 56,000 - 60,000 75,000 - 90,000 65,000 - 70,000

N/A N/A

16,000 - 20,000 16,000 - 20,000 N/A N/A

Notes : Light duty flatted factories - 7.5kpa (150lb) loading, multi-tenancy factory buildings with minimal finishes. No provision of air-conditioning and special services to tenant areas Heavy duty flatted factories and warehourses - 15kpa (300lb) loading, multi-tenancy factory buildings with minimal finishes. No provision of air-conditioning and special services to tenant areas Single storey conventional factory with structural steel roof - Factories excluding air conditioning and special services provisions, All hotels to include the following F.F. & E. : 1) Interior decoration, 2) Furniture (fixed and movable), 3) Special light fittings (chandeliers etc.) Carparks, above ground - Multi storey car parks open on all sides with parapet Rates are nett of VAT & Contingencies

INDUSTRIAL Light duty flatted factories Heavy duty flatted factories and warehouses Single storey conventional factory of structural steelwork Owner operated factories, low rise HOTELS Resort hotels 3-star budget hotels, inclusive of F.F.&E. 5-star luxury hotels, ditto OTHERS Basement car park (< 3 levels) Elevated car parks (< 4 levels) Primary and Secondary Schools Student hostels Sports clubs including F.F.& E.

10

HOTELS Budget hotels - 3-star, mid market Business hotels - 4/5-star Luxury hotels - 5-star

OFFICE / COMMERCIAL Medium/high rise offices, average standard High rise offices, prestige quality Out-of-town shopping centre, average standard Retail malls, high end

DOMESTIC Apartments, high rise, average standard Apartments, high rise, high end Terraced houses, average standard Detached houses, high end

542 - 599 599 - 646

627 - 698 926 - 1,045

636 - 722 879 - 998 342 - 442 922 - 1,112

JAKARTA

515 - 615 635 - 825

575 - 665 835 - 1,130

305 - 460 735 - 880 210 - 305 715 - 880

KUALA LUMPUR

1,537 - 1,840 1,093 - 1,292 965 - 1,350 2,167 - 2,471 1,492 - 1,663 1,675 - 1,960 2,225 - 2,528 1,596 - 1,805 1,855 - 2,175

789 - 1,092 1,040 - 1,343

576 - 744 772 - 800

1,053 - 1,165 1,348 - 1,544 1,573 - 1,685

813 - 1,116 1,149 - 1,453

813 - 1,116 1,004 - 1,307 526 - 829 800 - 1,103

BRUNEI

590 - 730 772 - 983

604 - 730 899 - 1,067 421 - 505 730 - 885

BANGKOK

US$/m2

1,180-1,375 1,350-1,685 1,575-2,030

735-870 1,080-1,260

820-870 1,260-1,365

860-920 1,170-1,310 605-690 1,280-1,370

MANILA

2,180-2,360 2,790-3,145 2,790-3,145

1,930-2,075 2,075-2,290

1,750-1930# 1,930-2145#

1,360-1,540 2,075-3,075 1,750-1,965 2,215-2,930

SINGAPORE

1 CONSTRUCTION COST DATA

Construction Costs for Selected Asian Cities

CONSTRUCTION COST DATA

CONSTRUCTION COST DATA

(Cont’d)

11

BAHT 35.61

287-310 N/A N/A

442-541

310-343

287-310

Rates exclusive VAT and contingencies. Rates are nett of VAT

Rates are exclusive of contingencies and include 12% VAT

Bangkok Jakarta

Manila

200 - 255 210 - 235 265 - 295

345 - 475

415 - 465

305 - 385

460 - 606 690 - 765 690 - 765

510 - 560

560 - 650

450 - 460

665 - 945^ N/A 1,610 - 1,750

945 - 1,290

N/A

740 - 945

B$ 1.37

IDR 13750 RM4.33

PHP 47.00

SG 1.40

1,640 - 1,943 998-1,496 560 - 610 1,180 - 1,425 2,000 - 2,145 1,843 - 2,146 N/A 835 - 1,040 1,350 - 1,475 2,790 - 2,930

416 - 720 610 - 913 713 - 1,016

168-270 N/A N/A

N/A N/A

N/A

511 - 814

N/A

505-660

375 - 678

449-562

The above costs are at 4th Quarter 2015 levels, inclusive of preliminaries and contingencies unless otherwise stated. Singapore Rates are exclude VAT and contingencies # Includes raised floor and ceiling to tenanted areas but excludes office carpets (normally under tenant's fit-out) ^ Open on all sides with parapet

Exchange Rate Used : US$1 =

OTHERS Underground/basement car parks (

Suggest Documents