Studios TECHNICIAL SPECIFICATIONS. Megan Williams Office & Program Coordinator E

Studios TECHNICIAL SPECIFICATIONS 2014 Megan Williams Office & Program Coordinator E [email protected] Michael Carr Production & Operations Ma...
Author: Dorcas Wells
2 downloads 0 Views 4MB Size
Studios

TECHNICIAL SPECIFICATIONS 2014

Megan Williams Office & Program Coordinator E [email protected] Michael Carr Production & Operations Manager E [email protected]   CHUNKY MOVE E [email protected] P +61 3 9645 5188 F +61 3 9645 5199 A 111 Sturt St Southbank 3006 VIC Australia  

CHUNKY MOVE STUDIOS TECHNICIAL SPECIFICATIONS 2014

TABLE OF CONTENTS PAGE 3 7 7 4 5 6 6 6 7 8

Updated: 18/02/14 Page 2 of 9 SUBJECT TO CHANGE

AREA General Information Location & Access Enquiries & Bookings Room Specifications – Studio 1 Room Specifications – Studio 2 Technical Specifications – Studio 1 Technical Specifications – Studio 2 Technical Specifications – Shared Equipment Hirer’s Obligations Appendix A – Venue Plans

111 STURT ST SOUTHBANK VIC 3006 P: +613 9645 5188 F: +613 9645 5199 E: [email protected]

CHUNKY MOVE STUDIOS TECHNICIAL SPECIFICATIONS 2014

GENERAL INFORMATION The Chunky Move Studios are Melbourne’s premiere, purpose built dance studios. They feature large, usable spaces, sprung floors, high bay lighting, daylight from skylights, versatile power facilities, building amenities and security. Chunky Move holds rehearsals, dance classes and performances in the two studios. The studios are also a versatile and attractive venue for: • Corporate Events – workshops and classes • Performance Rehearsals – dance and theatre • One-off Workshops & Classes – dance, theatre and yoga The following pages detail the technical specifications of both studios and the available facilities. For all enquiries, please contact the Office & Program Coordinator.

ENQUIRIES & BOOKINGS For all enquiries regarding studio hire rates and availability, please contact the Office & Program Coordinator (details first page). An Enquiry form is downloadable from the Chunky Move website. Please note that all Studio Hires are subject to the availability of the studios and the discretion of the Company. Due to the demands of the Company’s rehearsal, performance and class schedule we are not always able to facilitate hire requests.

LOCATION & ACCESS Chunky Move is located at 111 Sturt Street, Southbank, Victoria. Chunky Move Studios are located on the first floor; access is via lift or stairs. On-street metered parking is available on Dodds, Sturt and Grant streets. There are also nearby car parks at the Australian Ballet Centre and the Victorian Arts Centre. Alternatively, take Route 1 South Melbourne Tram to Stop No 18, or Tram Routes 3,5,8,16,64,67, or 72 to Tram Stop No 17 on St Kilda Road, followed by a two-minute walk down Grant Street.

 

Updated: 18/02/14 Page 3 of 9 SUBJECT TO CHANGE

111 STURT ST SOUTHBANK VIC 3006 P: +613 9645 5188 F: +613 9645 5199 E: [email protected]

CHUNKY MOVE STUDIOS TECHNICIAL SPECIFICATIONS 2014

ROOM SPECIFICATIONS – STUDIO 1 (LARGE STUDIO) Length (Wall to wall): 19750mm Width (Wall to steel girders): 13750mm Height Sloped ceiling with steel truss supports.

Rigging positions are hung below steel truss supports. Floor to roof truss (min): 5200mm Floor to roof truss (max): 5800mm Total 300pax over both studios & offices.

Capacity Floor Fully sprung flat floor (no rake) with 19mm ply skin Loading Access

Floor is stained orange to match walls. Screwing into the floor is not allowed under any circumstances. General access is via the front door ( see Public Access ). Alternative access for the loading in of large or bulky items via the Malthouse workshop can be arranged with prior notice. Please contact the Chunky Move Production Manager to discuss further. Door Dimensions are as follows: External door dimensions ( W x H ): 1250x2650mm Internal door dimensions (W x H): 1660x2680mm Lift load capacity: 750kg Lift dimensions: 1110mm wide x 1250mm deep x 2200mm high. Doors are 900mm wide.

Black Out All skylights have motorised blinds and can be blacked out. Note. This does not provide total blackout during daylight hours.

Public Access Access to Chunky Move is via the ground floor entrance located on the north side of the Coles Emergency Exits Climate Control Data Points Kitchen Additional Information

Myer Courtyard between The Malthouse and The ACCA building. Via Chunky Move foyer or Malthouse workshop door. These exits must be kept clear at all times. 22°C controlled by Production & Operations staff. Internet access available via wireless LAN upon request. Facilities available upon negotiation. Toilets and shower available (shared with office/visitors). Lock up storeroom available upon request.

Black wool drapes around perimeter of space are hung on Jands heavy duty track. Drapes are designed to fit the entirety of the space. Please consult the Chunky Move Production and Operations Manager for further information.

Updated: 18/02/14 Page 4 of 9 SUBJECT TO CHANGE

111 STURT ST SOUTHBANK VIC 3006 P: +613 9645 5188 F: +613 9645 5199 E: [email protected]

CHUNKY MOVE STUDIOS TECHNICIAL SPECIFICATIONS 2014

ROOM SPECIFICATIONS – STUDIO 2 (SMALL STUDIO) Length (Wall to steel girders): 13750mm Width (Wall to wall – room narrows to south end): 7000mm-9000mm Height Sloped ceiling with steel truss supports. Rigging positions are hung below steel truss supports. Floor to roof truss (min): 5271mm Floor to roof truss (max): 5730 Total 300pax over both studios & offices.

Capacity Floor Fully sprung flat floor (no rake) with 19mm ply skin Loading Access

Floor is stained orange to match walls. Screwing into the floor is not allowed under any circumstances. General access is via the front door ( see Public Access ). Alternative access for the loading in of large or bulky items via the Malthouse workshop can be arranged with prior notice. Please contact the Chunky Move Production Manager to discuss further. Door Dimensions are as follows: External door dimensions ( W x H ): 1250x2650mm Internal door dimensions (W x H): 1660x2680mm Lift load capacity: 750kg Lift dimensions: 1110mm wide x 1250mm deep x 2200mm high. Doors are 900mm wide.

Black Out All skylights have motorized blinds and can be blacked out. This does not provide total blackout during daylight hours.

Public Access Access to Chunky Move is via the ground floor entrance located on the north side of the Coles Emergency Exits Climate Control Data Points Kitchen Additional Information

Myer Courtyard between The Malthouse and The ACCA building. Via Chunky Move foyer or Malthouse workshop door. These exits must be kept clear at all times. 22°C controlled by Production & Operations staff. Internet access available via wireless LAN upon request. Facilities available upon negotiation. Toilets and shower available (shared with office/visitors). Lock up storeroom available upon request.

Please consult the Chunky Move Production and Operations Manager for further information.

Updated: 18/02/14 Page 5 of 9 SUBJECT TO CHANGE

111 STURT ST SOUTHBANK VIC 3006 P: +613 9645 5188 F: +613 9645 5199 E: [email protected]

CHUNKY MOVE STUDIOS TECHNICIAL SPECIFICATIONS 2014

TECHNICIAL SPECIFICATIONS – STUDIO 1  

Power Work Lights Sound Equipment

AV Equipment

3x 32a 3-phase outlet (wilco socket) 4x 10a single phase GPO circuits 10x 400w mercury vapour lamps hung from roof points. Control switch beside studio main door. 1x Allen and Heath zed-10FX 2x Mackie RM450 powered speakers 1x Denon DN4500 dual CD player 1x 3.5mm input cable (iPod or computer) Cabling to suit. 1x TV trolley 32” Philips LCD TV (HDMI/composite/S-Video/component inputs) 1x Pioneer DVD player

 

TECHNICIAL SPECIFICATIONS – STUDIO 2  

Power Work Lights Sound Equipment

AV Equipment

1x 20a 3-phase outlet (Wilco socket) 3x 10a single phase GPO circuits 6x 400w Mercury vapour lamps hung from roof points. Control switch beside studio main door. 1x Yamaha powered mixer (W/ Integrated Amp) 2x Yamaha passive speakers (400w Each) 1x Denon DN4500 dual CD player 1x 3.5mm input cable (iPod or computer) Cabling to suit. 1x TV trolley 32” Philips LCD TV (HDMI/composite/S-Video/component inputs) 1x Pioneer DVD player

TECHNICAL SPECIFICATIONS – SHARED EQUIPMENT All equipment below is shared between studios – please contact for availability. Rigging

Lighting Equipment

Furniture

Other Equipment

300mm tri truss suspended from roof girders via chain blocks. Reconfigurable to suit the space being used. A selection of 48mm OD Pipe, Clamps and H-Stands is also available upon request. Please see Chunky Move Production & Operations Manager for further information. 1x Zero88 Jester 24/48 console 1x Jands 4Pak 6x 650w Selecon acclaim fresnel inc. barn doors & frames 2x 1200w Selecon rama PC inc. barn doors & frames 6x 650w Selecon pacific 23-50 degree zoom inc. frames 6x 500w QI lamps. 5x 30m 4-Way looms (240v 10A) with headers and tails. 240v extension leads for stock lamps (various lengths) 2x 2000x1000mm wooden tables 2x 1800x700mm folding wooden tables on wheels 8x padded chairs w/ armrests 30x black folding chairs 5x 4000mm freestanding ballet bars 8x freestanding stretched mylar mirrors (w/ castors)

  Updated: 18/02/14 Page 6 of 9 SUBJECT TO CHANGE

111 STURT ST SOUTHBANK VIC 3006 P: +613 9645 5188 F: +613 9645 5199 E: [email protected]

CHUNKY MOVE STUDIOS TECHNICIAL SPECIFICATIONS 2014

HIRER’S OBLIGATIONS The Hirer’s obligations are outlined in detail in in the Studio Hire Agreement. They include the following: Permitted Use The studio will be made available to the Hirer during normal working hours, 9:00am to 5:30pm on weekdays. Hire periods outside of these hours will incur additional charges to cover the cost of a hall minder. Chunky Move may require the use of the studio outside of the hours of the hire period (ie: in the evenings for Chunky Move Dance Classes). It is agreed that the Hirer will leave the space clear of any props, furniture etc. on a daily basis throughout the hire period, unless otherwise negotiated. Prohibited Uses The Hirer shall not use or permit the use of hard shoes, any naked flame, smoke machine or similar devices in the studio nor shall the Hirer permit any person to smoke a cigarette, cigar or pipe in any part of the Building. The Hirer will submit a Risk Assessment when confirming the Studio Hire. Electrical Equipment All Electrical equipment used in the Chunky Move Studios that is not the property of Chunky Move must be tested and tagged at the Hirer’ss expense prior to the commencement of the hire. Insurance The Hirer must maintain the appropriate insurance, such as public liability insurance and workers compensation insurance for employees of the Hirer. Damage to the Building The Hirer shall not under any circumstance cause or allow to be caused any damage to the Building including the studio. The Hirer must notify Chunky Move of any damage to the studio at the time of its occurrence. Any costs associated with damage to the studios that occurs as a direct result of the Hirer’s use of the studios will be the Hirers responsibility, as determined by Chunky Move. Rubbish The Hirer shall remove and place in suitable waste containers all rubbish created as a result of the use of the studio by the Hirer from the Building and to the reasonable satisfaction of Chunky Move.

 

Updated: 18/02/14 Page 7 of 9 SUBJECT TO CHANGE

111 STURT ST SOUTHBANK VIC 3006 P: +613 9645 5188 F: +613 9645 5199 E: [email protected]

CHUNKY MOVE STUDIOS TECHNICIAL SPECIFICATIONS 2014

VENUE PLANS – APPENDIX A  

Updated: 18/02/14 Page 8 of 9 SUBJECT TO CHANGE

 

111 STURT ST SOUTHBANK VIC 3006 P: +613 9645 5188 F: +613 9645 5199 E: [email protected]

CHUNKY MOVE STUDIOS TECHNICIAL SPECIFICATIONS 2014

VENUE PLANS – APPENDIX A  

Updated: 18/02/14 Page 9 of 9 SUBJECT TO CHANGE

111 STURT ST SOUTHBANK VIC 3006 P: +613 9645 5188 F: +613 9645 5199 E: [email protected]