Facilities Project Management Monthly Report by Building

Approved Project 150 Wednesday, July 01, 2015 Facilities Project Management Monthly Report by Building PM  Status Accountable ID Project  Code PR...
Author: Barnard Collins
3 downloads 1 Views 256KB Size
Approved Project 150

Wednesday, July 01, 2015

Facilities Project Management Monthly Report by Building PM  Status Accountable

ID

Project  Code

PROJECT TITLE

Projects in Building

1 Leavitt Lane  Houde

3‐ In Construction

2714

FCR

4

1 Leavitt Lane ‐ Fire Suppression Work is funded, FCT ordering material and setting up the work schedule. 6‐30‐15

Design Firm:

 Woodcock

Contractor: FCT 3‐ In Construction

2319

FCR

Contractor Name:

1 Leavitt Lane ‐Warehouse Office, warehouse, and breakroom… 5/27/15_ In construction with carpet scheduled for June.

Design Firm:

 Henry

Contractor: FCT/EH 3‐ In Construction

1542

RR

Contractor Name:

1 Leavitt Lane ‐ HVAC Investigation and Evaluation Scheduling re‐cap June  2015

Design Firm: Harriman

 Woodcock

3‐ In Construction

Contractor: External 2372

FCR

Contractor Name:

TBD

1 Leavitt Lane ‐ SEED and DTZ Secure Storage Installations 6/29/2015_ Complete and waiting on prox card delivery.

Design Firm:

Contractor: FCT

Contractor Name:

Projects in Building

10 Pettee Brook Lane  Cardoso

2‐ In Design

2624

FCR

1

10 Pettee Brook Lane ‐  Fit Out Lease Space Permit/Bid documents due by July 9 with budget to be established for approval by July 16.

Design Firm: Cowan‐Goudreau

Contractor: External

Contractor Name:

Landlord

Projects in Building

10 West Edge  Henry

2‐ In Design

1292

FCR

1

10 West Edge Drive ‐  Printing Services Exhaust Vent Project has changed to a new printer type, Harriman working on estimate for new scope of  work. 5‐27

Design Firm: Harriman

Contractor: External

Contractor Name:

Milestone

Projects in Building

10 West Edge Drive  Henry

1.1‐ Plan/Est

2762

FCR

10 West Edge Drive ‐ Renovation to support new Fujifilm LED 1600 printer Sent FCR 6‐19‐15

Design Firm: Harriman

Contractor: External

Contractor Name:

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Milestone

Page 1 of 21

1

PM  Status Accountable

ID

Project  Code

PROJECT TITLE

10 West. Edge  Woodcock

3‐ In Construction

2605

FCR

Projects in Building

1

Projects in Building

2

Projects in Building

3

10 West Edge Drive ‐  est to install dishwasher in 102 6/29/2015_FCT defining schedule.

Design Firm:

Contractor: FCT

Contractor Name:

121 TECHNOLOGY DRIVE  Heckler

2‐ In Design

2518

FCR

Madbury Commons ‐ IOL Conceptual Design Review‐2 scheduled for 4/13/15.

Design Firm: Manypenny Murphy Archite

 Heckler

2‐ In Design

2519

FCR

Contractor: External

Contractor Name:

Madbury Commons ‐ UNH Innovation Conceptual Design Review‐2 scheduled for 4/13/15.

Design Firm: Manypenny Murphy Archite

Contractor:

Contractor Name:

6 Leavitt Lane  Healey

1.1‐ Plan/Est

2734

FCR

Design Firm:

 Woodcock

Marine Lot at 6 Leavitt Lane Roof System

Contractor: FCT 2‐ In Design

2324

FCR

Contractor Name:

6 Leavitt Lane ‐ BSC Office Renovations 6/29/2015_ Re‐defining scopes associated with MEP, based on scope changes 6/2015.

Design Firm: Loureiro Engineering

 Woodcock

3‐ In Construction

1567

Contractor: FCT FCR

Contractor Name:

6 Leavitt Lane ‐ Lock Shop and Facilities Office Renovation 6/29/2015_Punch list items, and controls being finalized.

Design Firm: Loureiro Engineering

Contractor: FCT

Contractor Name:

Projects in Building

88 Commercial Street  Woodcock

3‐ In Construction

2583

FCR

1

UNH Manchester ‐ Installation of 5th Floor Science Labs 6/29/2015_ OCC granted for 1st phase of labs, with schedule on track for final OCC August 2015. Building signage is to be installed 6/30/2015 & 7/1/2015 400 Comm signage to be removed 6/29/2015

Design Firm:

Contractor:

Contractor Name:

Projects in Building

Adams Tower

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Page 2 of 21

1

PM  Status Accountable

 Cardoso

2.5‐ In  Procurement

ID

Project  Code

2737

RR

PROJECT TITLE

NEC ‐ Adams Tower Elevator Drive Repair Material on order as of June 23. Work to be scheduled for middle of July.

Emergency Repair Design Firm: NA

Contractor: External

Contractor Name:

Thyssen Krupp Elevator

Projects in Building

Barton and Cole Hall  Henry

1.1‐ Plan/Est

2740

FCR

1

Cole Hall ‐ Carpeting & Electrical Rms 141 & 142 Waiting for Funding to be set up 6‐29

Design Firm:

Contractor: External

Contractor Name:

Sprague Flooring

Projects in Building

Barton Hall  Houde

1.1‐ Plan/Est

1132

RR

1

Cole Hall ‐ HVAC HU‐3 EQ5389 Cat Walks and Accessibility Modifications New, I will appropriate the aid of an engineer to provide a plan for this work.. Have to review  Cole side again.  6‐25‐15

Design Firm:

Contractor:

Contractor Name:

BARTON HALL AND COLE HALL  Healey

1.1‐ Plan/Est

2614

FCR

Projects in Building

1

Projects in Building

1

Barton Hall/Cole Hall ‐ Bottle Fill Stations 6/25/15 Estimate approved awaiting funding

Design Firm:

Contractor: FCT

Contractor Name:

Central Heat Plant  Houde

3‐ In Construction

2582

SI

Combined Heat and Power Plant ‐ Boiler # 4 Replacement Boiler demolition is 90% complete. Ext, AST abatement and removal to begin soon. 6‐30‐15

Design Firm:

Contractor:

Contractor Name:

Projects in Building

CHASE OCEAN ENGINEERING LAB  Cardoso

2‐ In Design

2668

FCR

1

Chase Ocean Engineering Building ‐ Sound Reduction HVAC‐1 and HVAC‐2 Purchase Order was sent to Harriman Associates on June 29 with design to start by July 17 and  construction to take place in early fall 2015.

Design Firm: Harriman Associates

Contractor: TBD

Contractor Name:

Projects in Building

COLE HALL  Houde

3‐ In Construction

TBD

2611

FCR

1

Barton Hall/Cole Hall ‐ Digital /Sign installation Thompson school has sent notice they will proceed with the funding of the Cole Hall digital sign  only, at this time. . Per request of the customer, work has been delayed to after 7‐27‐15,    . 6‐30‐15

Design Firm:

Contractor: FCT

Contractor Name:

Projects in Building

Conant Hall

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Page 3 of 21

2

PM  Status Accountable

 Jones

3‐ In Construction

ID

Project  Code

2279

RR

PROJECT TITLE

Conant Hall ‐ Utility Pit Replacement 6/26/15: Onsite construction is continuing. Concrete walls to be poured and excavation backfilled  by July 7. Work in tunnel in front of DeMeritt to begin on July 8. Anticipated completion is  August 21.

Design Firm: Harriman

 Woodcock

3‐ In Construction

Contractor: External 2551

FCR

Contractor Name:

RH White

Conant Hall ‐ Installation of Fume Hood Room 204 6/29/2015_FCT is currently working on scope outside of the fume hood.  CDs fromt eh engineer  are expected by 7/3/2015.

Design Firm: Harriman

Contractor: FCT

Contractor Name:

DEMERITT HALL  Healey

1.1‐ Plan/Est

2657

FCR

Projects in Building

2

Projects in Building

10

Demerritt‐  103 install 240V outlet 6/25 working with the customer to schedule.

Design Firm:

 Woodcock

Contractor: FCT 3‐ In Construction

1995

FCR

Contractor Name:

Demeritt Safety Improvements 217 6/29/2015_FCT hired,and defining schedule with subcontractor.

Design Firm: Harriman Associates

Contractor: FCT

Contractor Name:

TBD

Dimond Library  Woodcock

1.1‐ Plan/Est

2215

FCR

Dimond Library ‐ Ground Lvl compact shelving capacity study 6/29/2015_ Scope defined for engineering.  FCR to client by 7/10/15

Design Firm: Loureiro Engineering

 Henry

1.1‐ Plan/Est

806

Contractor: External SI

Contractor Name:

TBD

TEAL Classroom Submitted new budget to the Provost office, waiting for feed back. Still in holding 1‐7‐15

Design Firm:

 Heckler

Contractor: 2‐ In Design

624

SI

Contractor Name:

Dimond Library Space Repurposing ‐ Phase 2 3/26/15: Per T. Lauder, internal Dimond group working on defining and/or redefining space  uasge and needs. Outcome of those discussions will determine direction project will take.

Design Firm:

 Cardoso

Contractor: 2.5‐ In  Procurement

2064

RR

Contractor Name:

Dimond Library ‐ AHU‐ 1E Replacement Work is tenatively scheduled to begin July 13 with completion by August 28.

Design Firm: Oak Point

Contractor: FCT

Contractor Name:

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Palmer and Sicard

Page 4 of 21

PM  Status Accountable

 Houde

2.5‐ In  Procurement

ID

Project  Code

1833

FCR

PROJECT TITLE

Dimond Library‐Level III hall add lighting Client has a quote and FCR, we are waiting on funding. . 6‐26‐15

Design Firm:

 Cardoso

Contractor: FCT 2.5‐ In  Procurement

2154

RR

Contractor Name:

Dimond Library ‐ Heat Exchanger Replacement Working with Facilities  Maintenance to schedule cleaning for July, 2015.

Design Firm: N/A

 Cartabona

3‐ In Construction

Contractor: TBD 2325

RR

Contractor Name:

TBD

Dimond Library ‐ Stack Lighting Modifications 6/30/15 Yates has completed light sensor modifications on floor 1 with noticiable improvement.   Proceeding to upper floors.

Design Firm: Rist Frost Shumway

 Henry

3‐ In Construction

1711

Contractor: External FCR

Contractor Name:

Yates Electric

Dimond Library ‐ Level G UNH AV Space Renovation Project re‐opened for FCT to install new tables in Hub Rooms. 5‐20

Design Firm: Harriman

 Heckler

3‐ In Construction

Contractor: FCT 1359

FCR

Contractor Name:

Shawmut

Dimond Library ‐ Room 301 Redesign and Relocation FCT scope expected complete by 6/19. Furniture install expected week of 6/22.

Design Firm:

 Houde

Contractor: FCT 3‐ In Construction

2612

FCR

Contractor Name:

Dimond Library ‐  Digital Sign Upgrade This work has been funded. I met with Marshall White and FCT on Monday to go over details. I  am expecting TV info from Marshall and a tentative start date from FCT. 6‐30‐15

Design Firm:

Contractor: FCT

Contractor Name:

Dunlap Center  Healey

1.1‐ Plan/Est

2700

FCR

Projects in Building

1

Projects in Building

6

Dunlap‐ celing & wall repairs 6/25/15  Scheduled to begin  week of 6/29

Design Firm:

Contractor: FCT

Contractor Name:

Field House  Jones

1.1‐ Plan/Est

2469

FCR

Field House Space Reconfiguration/Remodelling rm 18 6/26/15: Architect has submitted 4 conceptual designs for the space reconfiguration. PM has sent  conceptual designs to Athletics for review and comment.

Design Firm: Harriman

Contractor:

Contractor Name:

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Page 5 of 21

PM  Status Accountable

 Cartabona

2.5‐ In  Procurement

ID

Project  Code

2596

RR

Field House ‐ Heating Coil Replacements HV 25 6/30/15 Granite State Plumbing Heating provided proposal, project was funded.  This work will  be complete by August 2015.

Emergency Repair Design Firm:

 Henry

PROJECT TITLE

Contractor: External 2.5‐ In  Procurement

672

RR

Contractor Name:

Granite State Plumbing Heating

Driveway Repair Emergency Access‐ Field House Construction Started 6‐9‐15

Design Firm: Tighe& Bond

 Cartabona

3‐ In Construction

Contractor: External 2342

RR

Contractor Name:

TBD

Field House ‐ Sprinkler Installation Phase IV Will report with 1159

Design Firm: SFC Engineering

 Cartabona

3‐ In Construction

Contractor: External 1159

RR

Contractor Name:

TBD

Field House Sprinkler Installation ‐ PHASE III 6/30/15 Exterior water line has been installed with PC / Careno Construction.  Transformer  location has been confirmed near AV pad at West Stadium.  Reviewing preliminary drawings  from Careno / Carter and submit to FM Global for review comment.

Design Firm: SFC Engineering

 Henry

3‐ In Construction

Contractor: External 177

SI

Contractor Name:

Careno Construction

Field House ‐ Asphalt parking lot Reconstruction ‐ Design and Improvements Construction Started 6‐9‐15

Design Firm: Tighe & Bond

Contractor: External

Contractor Name:

TBD

Projects in Building

Gregg Hall  Cardoso

1.1‐ Plan/Est

Emergency Repair Design Firm: N/A

2575

RR

1

Gregg Hall ‐ Strobic Motor and Drive Replacements Basix scheduled to be complete by Friday, July 3.

Contractor: External

Contractor Name:

Palmer and Sicard

Projects in Building

Hamilton Smith Hall

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Page 6 of 21

1

PM  Status Accountable

 Rouleau

2‐ In Design

ID

Project  Code

808

SI

PROJECT TITLE

Hamilton Smith Hall ‐  Major Renovation Project 7/1/2015 Update: Design development documents have been reviewed.  DD estimate came in  above budget; however VM efforts addressed this relatively easily.  Design efforts on  construction documents are ongoing.  Occupants of the rear portion of the building have all been  moved into swing space.  Abatement is ongoing in the rear portion of the building and will be  followed by demolition, which is expected to be complete prior to the fall semester.  Installation  of temporary services to the front of the building is an ongoing effort that will be complete prior  to commencement of demolition of the rear portion.  A temporary asphalt walkway has been  constructed beyond the construction limits on the T‐Hall side of the building.  Construction  fencing around the summer/fall construction zone will be installed the first week in July.   Foundation and steel work is to occur during the fall semester.  The balance of Hamilton Smith  will be vacated after finals in December 2015 and the contractor will fully mobilize in January  2016.  Construction is expected to be complete such that we can re‐occupy the building in time  for fall 2017 classes.

Design Firm: DiMella Shaffer Associates

Contractor: FCT

Contractor Name:

Skanska USA, Inc.

Projects in Building

Health Services  Henry

3‐ In Construction

2647

FCR

1

Health Services Retro Commissioning RFS (Jerry Graybill) started project and will start looking closer at building systems on 5‐18.

Design Firm:

Contractor:

Contractor Name:

Projects in Building

Hewitt Annex  Cartabona

2.5‐ In  Procurement

2775

RR

2

Hewitt Annex ‐ Site Restoration and Utility Isolation 6/30/15 Site restoration and entrance to Hewitt basement to be provided.

Design Firm:

 Cartabona

Contractor: External 2.5‐ In  Procurement

2417

SI

Contractor Name:

TBD

Hewitt Annex ‐ Building Demolition 6/30/15 Building utilities have been isolated.  All material has been removed from the building.   DFD will begin training 7/6/15; demo to begin around 7/22.

Design Firm:

Contractor: FCT

Contractor Name:

Envirovantage

Projects in Building

Hewitt Hall  Woodcock

1.1‐ Plan/Est

1964

RR

Hewitt Hall ‐ Carpet Investigation and Reinstallation 6/29/15_Estimating costs asoociated with broadloom or carpet square installation.

Design Firm:

 Healey

Contractor: External 1.1‐ Plan/Est

2735

FCR

Contractor Name:

TBD

Hewitt  Painting of rooms 125, 115 and 111 6/25/15  scheduled to begin the week of 7/6/15

Design Firm:

Contractor: FCT

Contractor Name:

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Page 7 of 21

4

PM  Status Accountable

 Woodcock

3‐ In Construction

ID

Project  Code

2057

FCR

PROJECT TITLE

Hewitt Space Renovation 139 & 141 6/29/2015_Construction continues with completion by 8/15/15.

Design Firm: TBD

 Healey

3‐ In Construction

Contractor: FCT 2738

FCR

Contractor Name:

Hewitt Painting rooms 183 & 187 Estimate submitted on 6/25/15

Design Firm:

Contractor: FCT

Contractor Name:

Projects in Building

Holloway Hall  Cardoso

1.1‐ Plan/Est

2549

FCR

4

Holloway Commons Elevator Improvements Work was completed on March 18. Additional work to be performed during week of July 13.

Design Firm: N/A

 Cartabona

3‐ In Construction

Contractor: External 2397

FCR

Contractor Name:

Stanley Elevator

Holloway Upgrade Digital Voice Evacuation System 6/30/15 Norris has recommended smoke detectors throughout the building be replaced as they  currently perform weekly inspection of the smoke detector.  This proposal will be submitted to  OBA for review and approval.

Design Firm:

 Cardoso

Contractor: External 3‐ In Construction

1835

FCR

Contractor Name:

Norris Inc.

Holloway Commons ‐ Iron Pipe Investigation As of June 29, pipe replacement is complete with new cleanout installation schedueld to be  complete by July 3. Patching of finishes to be completed by July 17.

Design Firm: The Turner Group

 Rouleau

3‐ In Construction

1657

Contractor: FCT CP

Contractor Name:

Palmer and Sicard

Holloway Commons ‐ Expansion Project 7/1/2015 Update: Demolition is nearly complete.  Significant new construction activity is  occurring throughout the existing building.  Steel, concrete on deck and roofing have been  completed on half of the third floor addition and will be commencing soon on the balance of the  third floor addition.  Foundation for the main entry/stair/elevator addition was placed  yesterday.  Related steel framing is to commence imminently.  Construction is to continue  through early‐February 2016.  Dining will be up and running for the fall semester, although the  additional seating will not be available until February.

Design Firm: Miller Dyer Spears

Contractor: FCT

Contractor Name:

Horton Hall  Healey

3‐ In Construction

2623

FCR

North Branch Construction

Projects in Building

1

Projects in Building

3

Horton Misc work suite 128 6/25/15 Door camera complete

Design Firm:

Contractor: FCT

Contractor Name:

Horton Social Science Center

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Page 8 of 21

PM  Status Accountable

 Henry

1.1‐ Plan/Est

ID

Project  Code

2552

FCR

PROJECT TITLE

Horton Hall ‐ Renovation of 1st Floor Deferred design until 4th floor work is under way 4‐14‐15

Design Firm: Harriman

 Healey

3‐ In Construction

Contractor: External 2478

RR

Contractor Name:

TBD

Horton Hall ‐ Egress Door Hardware Installation 6/25 Removing the installed hardware. Returning partial hardware for credit.

Design Firm:

 Henry

Contractor: FCT 3‐ In Construction

2475

FCR

Contractor Name:

Horton Hall ‐Renovation of 4th floor Project under partial Abatement, with Demo on remaining section. 5‐29

Design Firm: Harriman

Contractor: External

Contractor Name:

TBD

Projects in Building

Huddleston Hall  Henry

3‐ In Construction

2670

RR

2

Huddleston Hall ‐ Interior Repairs Rooms G03A, G03B, G03E, and G03 Scheduling investigation work on floors and walls May 28/29

Design Firm:

 Henry

Contractor: External 3‐ In Construction

2585

RR

Contractor Name:

Milestone

Huddleston Hall ‐ Mechanical Room Repairs DMA funding, will schedule work after May 1st when heating plant shuts down, Stakeholders  requesting work start 5‐28/29

Design Firm:

Contractor: External

Contractor Name:

TBD

Projects in Building

Jackson Laboratory  Woodcock

3‐ In Construction

2621

RR

Jackson Laboratory ‐ Greenhouse Repair and Restoration 6/29/2015 Repairs are complete to original standards.  SFMO requires calculations for snow  load.  Securing a structural engineer to perform the task.

Emergency Repair Design Firm:

Contractor: External

Contractor Name:

Orlando Greenhouse Sales Inc

James Hall  Houde

3‐ In Construction

1

1020

FCR

Projects in Building

1

Projects in Building

1

James, 80 below freezer to generator circuit. Project has been funded ,work is in progress. . 6‐26‐15

Design Firm:

Contractor: FCT

Contractor Name:

Jessie Doe  Woodcock

2.5‐ In  Procurement

2655

FCR

Jessie Doe ‐  Attic Insulation and Soffit Repairs 6/29/2015_ Renovations complete by FCT.  Waiting till August to finalize roofing scope.

Design Firm:

Contractor: FCT

Contractor Name:

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Page 9 of 21

PM  Status Accountable

ID

Project  Code

PROJECT TITLE

Projects in Building

Kendall Hall  Cardoso

1.1‐ Plan/Est

2360

RR

3

Kendall Hall ‐  Abatement and Planning Phase 1 work complete as of January 16, 2015. Phase 2 work on floors 2 and 5 was completed on  March 25, 2015. Next round of abatement to be coordinated for Fall ʹ15.

Design Firm: TBD

 Cardoso

1.1‐ Plan/Est

Contractor: FCT 1773

RR

Contractor Name:

Dec‐Tam

Kendall Hall ‐ Ceiling Tile Abatement Phase I of II Please refer to Project ID 2360 for the status of these activities.

Design Firm: N/A

 Cartabona

Contractor: FCT

2‐ In Design

55

RR

Contractor Name:

Dec‐Tam

Kendall Hall Fire Alarm and Emergency Lighting Replacement 6/30/15 SFC Engineering finalizing design documents, expect this project will be issued to  purchasing for RFB by 7/15.

Design Firm: SFC Engineering

Contractor: FCT

Contractor Name:

TBD

Projects in Building

Kingsbury Hall  Jones

1.1‐ Plan/Est

33

RR

4

Kingsbury Hall ‐ VCT Flooring Repair Rooms N113 and N121 6/26/15: Patch repairs have been completed in N121. PM is developing scope with flooring  contractor for repairs/replacement in N113. Construction to begin during week of July 6 and will  work around nearby class and occupancy schedules.

Design Firm:

 Woodcock

Contractor: External 2‐ In Design

2263

RR

Contractor Name:

Kingsbury Hall ‐ Roof Safety Restraint System Phase II of II 6/29/2015 Out for design with ARM & Safe Approach.

Design Firm: ARM

 Woodcock

3‐ In Construction

Contractor: External 1933

FCR

Contractor Name:

TBD

Kingsbury Hall ‐ Area of Refuge Project 6/29/2015_ Scheduling work to start early July

Design Firm: HL Turner

 Jones

3‐ In Construction

Contractor: FCT 934

RR

Contractor Name:

Site Stair Replacement ‐ Kingsbury Hall Entrance Stair STR_0141 6/26/15: Construction is continuing, remaining work includes installation of railings and site  restoration. Completion date is anticipated July 3, 2015.

Design Firm: Hoyle Tanner

Contractor: External

Contractor Name:

Gauthier Bros.

Projects in Building

Library Storage Building

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Page 10 of 21

2

PM  Status Accountable

 Cartabona

2‐ In Design

ID

Project  Code

1387

FCR

PROJECT TITLE

Library Storage Building ‐ Review of cooling system capacity 6/30/15 Harriman meeting with UNH to ensure all necessary components of the design are being  addressed.  New Dean has past experience with mold in storage facility and want to ensure our  plan is appropriate.

Design Firm: Harriman Associates

 Woodcock

3‐ In Construction

2012

Contractor: External FCR

Contractor Name:

TBD

Library Storage‐ Alarm System Relocation 6/29/2015_ Cleaning up punch list items related to the cameras with UNH IT.

Design Firm:

Contractor: External

Contractor Name:

Norris Inc

MacFarlane Greenhouse  Healey

1.1‐ Plan/Est

2768

FCR

Projects in Building

1

Projects in Building

2

MacFarlane Greenhouse Rotten Corner Posts 6/25/15  Walkthrough 6/24  Writing estimate

Design Firm:

Contractor: FCT

Contractor Name:

MacFarlane Grnhse & Pesticide Lab  Cardoso

3‐ In Construction

2468

FCR

Greenhouse Small Boiler Installation rm 117 Work is ongoing with completion scheduled by July 17.

Design Firm: TBD

 Henry

3‐ In Construction

Contractor: FCT 2538

FCR

Contractor Name:

Palmer and Sicard

MacFarlane Greenhouse ‐ Fume Hood Alarm Upgrades Limited scope of work apporved and funded, scheduling 9‐11‐15

Design Firm:

Contractor: FCT

Contractor Name:

Memorial Union Bldg  Henry

3‐ In Construction

2299

FCR

Projects in Building

1

Projects in Building

4

MUB ‐ New Deck Railings Project funded. PO in process, waiting for shop dwgs 6‐11‐15

Design Firm:

Contractor: External

Contractor Name:

Memorial Union Building  Healey

1.1‐ Plan/Est

2607

FCR

Milestone

MUB‐ rm 18 est to replace lighting fixtures 6/25/15  Work has been approved & is scheduled for June 29‐ July4.

Design Firm:

 Healey

Contractor: FCT 3‐ In Construction

2606

FCR

Contractor Name:

MUB‐ Refinish 45 Doors 6/25/15 Approved.  Reviewing list of doors. Most to be done in August

Design Firm:

Contractor: FCT

Contractor Name:

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Page 11 of 21

PM  Status Accountable

 Cardoso

3‐ In Construction

ID

Project  Code

1984

FCR

PROJECT TITLE

Memorial Union Bldg permanently divide rooms 158 & 158B Work is proceeding on schedule with completion expected by July 31.

Design Firm: Manypenny‐Murphy

 Cartabona

3‐ In Construction

1475

Contractor: External FCR

Contractor Name:

Green Leaf Construction

Memorial Union Building ‐ Lactation Room Floor 3 6/30/15 Construction is complete.  Awaiting door signage to arrive.  FCT will install automatic  opener on restroom.

Design Firm: Mannypenny Murphy

Contractor: FCT

Contractor Name:

Milestone

Projects in Building

Mills Hall  Rouleau

1.1‐ Plan/Est

2225

FCR

2

Mills Hall ‐ Chiller Plant Retrocommissioning 7/1/2015 Update: Retrocommissioning is complete except for final verification, which cannot  occur until a failed differential pressure sensor is corrected by UNH Zone 3 and there is  sufficient load to verify chiller sequencing.  As it stands now, only the 250‐ton chiller is operating  due to the fact that Holloway Commons is mostly off‐line.  It may not be until late‐August or  early‐September when students return and Holloway is back on‐line that final verification can  occur.  Related Projects: Portal ID#s 1443 and 1657

Design Firm: RFS Commissioning

 Jones

3‐ In Construction

2278

Contractor: FCT RR

Contractor Name:

Rist‐Frost‐Shumway Engineering (commissionin

Mills to Fairchild ‐ Steam Line Replacement 6/26/15: Onsite construction began on June 24. Anticipated project completion is August 21.  Work blocking entrance of Mills will begin July 6 when building is mostly unoccupied.

Design Firm: Harriman

Contractor: External

Contractor Name:

RH White

Morrill Hall  Woodcock

1.1‐ Plan/Est

2609

RR

Design Firm:

Projects in Building

4

Morrill Hall ‐ 1st Floor Window Replacement‐ Ice Damage

Contractor:

Contractor Name:

Morse Hall 1.1‐ Plan/Est

1

6/29/2015_Currently estimating repairs, building secure.

Emergency Repair

 Healey

Projects in Building

2765

FCR

Morse 163 Build Crate Estimate submitted 6/23/15

Design Firm:

 Henry

Contractor: FCT 2.5‐ In  Procurement

2384

FCR

Contractor Name:

Morse Hall Renovations rm 345 Have revised drawings, Milestone, looking at cost and schedule 5‐27

Design Firm: Harriman

Contractor: External

Contractor Name:

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

TBD

Page 12 of 21

PM  Status Accountable

 Geuther

3‐ In Construction

ID

Project  Code

2592

FCR

PROJECT TITLE

Morse Hall ‐ School of Marine Science Renovations 6‐24: Furniture installation scheduled for the week of July 13th. Move scheduled for the week of  July 27.

Design Firm: Manypenny‐Murphy Archite Contractor: External

 Cartabona

3‐ In Construction

1108

FCR

Contractor Name:

Build‐It Construction

Morse Hall ‐ Redundant Chiller Installation 6/30/15 This project is complete.  UNH / Basix / RFS will commission the system 7/2/15.

Design Firm: Leading Edge Design

Contractor: External

Contractor Name:

Eckhardt & Johnson / Yates / Basix

Projects in Building

Nesmith Hall  Woodcock

1.1‐ Plan/Est

1972

RR

2

Nesmith Hall ‐ Exterior Brick Wall and Parapet Repointing 6/29/2015_ Working with FCT to secure vendor and extend scope for project 1716.

Design Firm: TBD

 Woodcock

3‐ In Construction

Contractor: External 1716

RR

Contractor Name:

TBD

Nesmith Hall ‐ Repair and Renovate 8 Classrooms 6/29/2015_ Under construction through FCT.

Design Firm:

Contractor: FCT

Contractor Name:

Projects in Building

New England Center  Henry

3‐ In Construction

1683

FCR

1

New England Center ‐ Relocation of Photo Video Department Construction under way, looking at June completion date 5‐27, In addition working with group  to re‐organize, moving 67 staff.

Design Firm: Harriman / Many Penny

Contractor: External

Contractor Name:

Milestone

New Hampshire Hall  Woodcock

2.5‐ In  Procurement

940

RR

Projects in Building

1

Projects in Building

2

New Hampshire Hall ‐ Major Roof Replacement 6/29/2015_ Project to be re‐bid in late fall for a May 2016 start.

Design Firm: TBD

Contractor: External

Contractor Name:

TBD

NHVDL  Cartabona

3‐ In Construction

2053

RR

NHVDL ‐ Campus Deferred Repair Costs reported with ID 1537

Design Firm: Port City Architecture

 Cartabona

3‐ In Construction

1537

Contractor: External SI

Contractor Name:

Allied Cook

NHVDL Relocation 6/30/15 Interior sheetrock is ongoing.  Equipment / casework to begin arriving in July.  Schedule  completion / move in August 2015.

Design Firm: Port City Architecture

Contractor: External

Contractor Name:

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Allied Cook

Page 13 of 21

PM  Status Accountable

ID

Project  Code

PROJECT TITLE

Projects in Building

Parsons Hall  Jones

1.1‐ Plan/Est

1030

RR

3

Parsons Hall ‐ Hallway Ductwork Insulation / Ceiling Repairs 6/26/15: PM has engaged services of term mechanical engineer to view sweating ductwork if it  occurs and recommend possible solutions. PM has also been in contact with renovation architect  to troubleshoot. Chemistry department is closing doors to stairwells. PM is working with FCT to  seal doorways.

Design Firm:

 Cartabona

Contractor: FCT 2‐ In Design

2626

RR

Design Firm: EYP 2‐ In Design

Parsons Hall ‐ Processed Chiller Modifications 6/30/15 EYP submitted suggetions for adjustment, however UNH cannot verify the sensors are  installed.  EYP will follow up with UNH week of 7/6.

Emergency Repair

 Woodcock

Contractor Name:

Contractor: External 1704

RR

Contractor Name:

TBD

Parsons Hall ‐ Mechanical Penthouse Waterproofing DESIGN ONLY 6/29/2015_ Schematics in for review and estimating.

Design Firm: EYP/ARM

Contractor: TBD

Contractor Name:

Projects in Building

Paul Creative Arts Center  Jones

2‐ In Design

2286

RR

4

PCAC ‐ Front Entrance and Foundation Drainage Repairs‐ DESIGN ONLY 6/26/15: design is complete (refer to project 2290 for construction updates)

Design Firm: Tighe & Bond

 Cartabona

2.5‐ In  Procurement

Contractor: 46

RR

Contractor Name:

PCAC Sprinkler Installation and Egress Modifications DESIGN 6/30/15: Awaiting confirmation from Port City Architecture, if less 20% wall coverage installed  tack board solution may be modified.

Design Firm: Port City Architecture/ SFC E Contractor: FCT

 Cartabona

2.5‐ In  Procurement

1157

RR

Contractor Name:

PCAC ‐ Egress Modifications Phase 1 of 2 Please refer to ID 46 for ongoing updates ‐ All work will be reported and tracked ID 46.

Design Firm: Port City Architecture / SFC 

 Jones

3‐ In Construction

2290

RR

Contractor: FCT

Contractor Name:

TBD

PCAC ‐ Art Wing Foundation Drainage Repairs 6/26/15: Project is under construction and on schedule. Drain line installation is complete along  the art wing of PCAC. Remaining work includes grass seed and sitting wall, to be completed by  July 3.

Design Firm:

Contractor: External

Contractor Name:

T&S

Projects in Building

Pettee Hall

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Page 14 of 21

2

PM  Status Accountable

 Jones

1.1‐ Plan/Est

ID

Project  Code

2317

RR

PROJECT TITLE

Site Stair Replacement and Pettee Hall Drainage Repairs 6/26/15: Design is complete. Funds for construction have been tentatively deferred to FY2016, but  the project will be bid‐ready should funds become available for construction in summer 2015.

Design Firm: Hoyle Tanner

 Cartabona

2‐ In Design

Contractor: 2631

RR

Contractor Name:

Pettee Hall ‐ Restoration and Recommissioning HV‐1 and HV‐2 6/30/15: RFS has identified areas to isolate and identify difficencies.  Preparing a method to  balance and retro commission the building.  Also, emergency lighting inverter failed due to  moisture in mechanical room, this work will be added to the scope as well as cleaning  mechanical room, modifying drainage and epoxy floor.

Emergency Repair

Design Firm: RFS

Contractor: FCT

Contractor Name:

TBD

Philbrook Dining Hall  Houde

3‐ In Construction

2686

FCR

Projects in Building

1

Projects in Building

1

Dining upgrading biometric readers and turnstiles Work is in progress.    6‐30‐15

Design Firm:

Contractor: FCT

Contractor Name:

Philbrook Hall  Cartabona

2‐ In Design

2492

FCR

Philbrook Refrigeration Rack System 6/30/15 Harriman design proposal has been submitted to OBA for funding / approval.

Design Firm: Harriman Assoc.

Contractor: External

Contractor Name:

TBD

Projects in Building

Presidents House  Geuther

2‐ In Design

2650

RR

1

Presidents House ‐ Porch Enclosure and ADA Modifications 6‐24: Construction Documents have been reviewed and are being completed. Waiting for  confirmation on scheduled start date which is anticipated to be the week of July 6.

Design Firm: ManyPenny‐ Murphy Archit

Contractor: External

Contractor Name:

Milestone Construction

Projects in Building

Putnam Hall  Houde

3‐ In Construction

2006

FCR

1

Putnam Hall ‐ Room Renumbering Welch sign would like to install on 7‐06015.   Waiting on OK from dept. 6‐30‐15

Design Firm:

Contractor: FCT

Contractor Name:

Projects in Building

Ritzman Lab  Cartabona

2.5‐ In  Procurement

Welch sign

1794

FCR

1

Ritzman Lab ‐ Conference Room Technology 6/16/15:  New monitor for floor 1 space as well as furniture for both rooms.

Design Firm:

Contractor: FCT

Contractor Name:

Adtech / Creative Office Pavillion

Projects in Building

Roads/Grounds

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Page 15 of 21

10

PM  Status Accountable

 Pesci

1.1‐ Plan/Est

ID

Project  Code

295

SI

Design Firm:

 Bencks

1.1‐ Plan/Est

184

SI

1.1‐ Plan/Est

2767

RR

Contractor Name:

Ravine Culvert Replacement 6/26/15: PM has reviewed project and tentatively plans to repair pavement by mid‐August. UNH  Facilities to consider complete culvert re‐design and replacement project in summer 2016.

Design Firm:

Contractor: 2‐ In Design

Contractor Name:

Signs ‐ Campus wayfinding and University building sign improvements

Contractor:

Emergency Repair

 Henry

Bike Rack Installations

Contractor:

Design Firm:

 Jones

PROJECT TITLE

1115

SI

Contractor Name:

South Drive ‐ Design Advancement Permits approved, this phase of the design complete. CP looking for funding options, nothing  scheduled for 2014.

Design Firm: Tigh & Bond

 Henry

2‐ In Design

Contractor: External 1142

RR

Contractor Name:

MUB / Ravine Walkway Replacement ‐ DESIGN ONLY Heating Line SOW added to project, and now requires changes in building, Harriman added to  design team, Design will resume this summer ,  construction Summer 2016. Design back on track  5‐27‐15

Design Firm: Tigh & Bond

 Jones

2‐ In Design

Contractor: External 2692

RR

Contractor Name:

TBD

2016 Sidewalk and Walkway Repairs 6/26/15: POs have been issued for walkway repairs at corners of Edgewood & Main, Main Street  near Scott Hall, Morrill, and Edgewood Road near McLaughlin. Schedule of repairs TBD. Smith  parking lot repair is complete.

Design Firm:

 Jones

Contractor: External 2‐ In Design

1728

RR

Contractor Name:

2016 Road Repairs and Crack Sealing 6/26/15: Project is in planning stage for construction in summer 2015. Areas to be crack sealed  potentially include T‐Hall parking lot, College Road, and Ballard Street. PM has contacted crack  sealing contractor to begin estimates and scheduling.

Design Firm:

 Jones

Contractor: 2‐ In Design

1739

RR

Contractor Name:

2016 Site Stair Repairs 6/26/15: Pos have been issued for stair repairs at Dimond Library entrance, eastern side of  Murkland, PCAC exit only doorway, and the wall between Fairchild and Huddleston. Specific  dates have not been set, but work will be finished by August 21.

Design Firm:

Contractor:

Contractor Name:

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Page 16 of 21

PM  Status Accountable

 Houde

3‐ In Construction

ID

Project  Code

75

SI

PROJECT TITLE

University Campus Exterior Lighting Improvements  All the exterior lighting has been installed. It needs to be reviewed. , There is a small punch list.  6‐25‐15

Design Firm:

 Henry

Contractor: 3‐ In Construction

1117

SI

Contractor Name:

Morce Circle Covered Bike Parking Bike Racks installed, waiting for closeout information 5‐27

Design Firm:

Contractor: External

Contractor Name:

TBD

Projects in Building

Rudman Hall  Houde

1.1‐ Plan/Est

764

RR

5

Rudman/Spaulding Hall ‐ Replacement of built in Glass Washers  Phase II of II The dept has to choose the product. . 6‐27‐15

Design Firm:

 Cartabona

Contractor: 1.1‐ Plan/Est

2352

RR

Contractor Name:

Rudman Hall ‐ Fire Alarm Replacement Fire alarm installation will occur following design. Coordinate acitivity with building occupants  prior to construction schedule.

Design Firm:

 Cartabona

Contractor: 2‐ In Design

1149

RR

Contractor Name:

Rudman Hall ‐ Fire Alarm design 6/30/15 SFC to provide 50% drawings by end of July 2015

Design Firm: SFC Engineering

 Cartabona

3‐ In Construction

Contractor: External 1787

RR

Contractor Name:

TBD

Rudman Hall ‐ Fume Hood / HVAC Modifications and Repairs 5/26/15 FCT sealed pipe penetrations in shaft 122 / 222 / 322 week of 5/18.  Also assist with  coordination steam insulation on pipe above 322 ceiling.  Next step is to begin replacing all  controls on floor 3 that are not Andover controls.

Design Firm: RFS

 Henry

3‐ In Construction

Contractor: FCT 2591

FCR

Contractor Name:

TBD

Rudman G15 Office Space Configuration Project is almost finished, working on commissioning and close out. 6‐11‐15

Design Firm: Harriman

Contractor: External

Contractor Name:

Milestone

Projects in Building

Service Building  Cardoso

1.1‐ Plan/Est

1465

RR

Service Building ‐ Replacement and Installation of Isolation valves Meeting to be scheduled with Zone Manager in July to review scope.

Design Firm: N/A

Contractor: External

Contractor Name:

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

TBD

Page 17 of 21

4

PM  Status Accountable

 Woodcock

2‐ In Design

ID

Project  Code

2593

RR

PROJECT TITLE

Service Building ‐ Ice Melt System Fire Dept Roof 6/29/2015_ Ice melt in proposal phase.

Design Firm:

 Cardoso

Contractor: FCT 2‐ In Design

2358

RR

Contractor Name:

Service Building ‐ Heating Line Replacement Design Harriman Associates has been selected as the design firm. Design began in June 2015.  Construction anticipated for summer 2016.

Design Firm: Harriman Associates

 Henry

3‐ In Construction

2331

Contractor: External FCR

Contractor Name:

TBD

Service Bldg DFD Kitchen new vent hood rm F214 Instillation under way, FCT has an issue with the Hood, bad electronics, part on order. 5‐27

Design Firm:

Contractor: FCT

Contractor Name:

Projects in Building

Spaulding Hall  Henry

2.5‐ In  Procurement

1000

RR

4

Spaulding Hall ‐ VAT Abatement Rooms G07, G11, and G27 Working on a flooring repair, schedule to be developed by FCT. 5‐27

Design Firm:

 Cardoso

Contractor: FCT 3‐ In Construction

2745

RR

Contractor Name:

Spaulding Hall ‐ Sewer Vent and Mechanical System Replacements As of June 29, working with Shawmut Construction to complete work finalize costs being  tracked on a time and material basis. Please see ID 2157 for additional updates.

Design Firm: HL Turner

 Henry

3‐ In Construction

Contractor: External 2539

FCR

Contractor Name:

Shawmut Design and Construction

Spaulding Hall ‐ Fume Hood Alarm Upgrades Limited scope of work apporved and funded, scheduling 9‐11‐15

Design Firm:

 Cardoso

Contractor: FCT 3‐ In Construction

2157

FCR

Contractor Name:

Spaulding Hall ‐ Instructional Improvements to Rooms 140, 150 and 160 As of June 29, MEP rough‐in is subtantially complete with drywall and masonry wall  reinstallation ongoing. Overall progress currently on schedule for an August 7 completion.

Design Firm: The HL Turner Group

Contractor: FCT

Contractor Name:

Stoke Hall  Healey

2.5‐ In  Procurement

2619

FCR

Shawmut

Projects in Building

1

Projects in Building

1

Stoke Hall ‐ Water Meter Installation 6/25/15 Scheduled to begin June 27

Design Firm:

Contractor: FCT

Contractor Name:

TELECOMMUNICATIONS CENTER

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Page 18 of 21

PM  Status Accountable

 Cardoso

3‐ In Construction

ID

Project  Code

1993

FCR

PROJECT TITLE

Telecom Air Conditioning Infrastructure As of June 29, the new cooling units at the Telecomm Building are operational with Gregg Hall  scheduled to be completed by July 6.

Design Firm: WV Engineering

Contractor: FCT

Contractor Name:

Green Leaf Construction

Projects in Building

Thompson Hall  Cartabona

2‐ In Design

2727

RR

1

Thompson Hall ‐ Presidents/Trustee Conference Rooms AC 6/30/15 Review short term / long term solution for AC at President Conference Room and Lubow  conference room.  Harriman will review chilled water capacity in the building to install ductless  split system in both conference room.

Design Firm: Harriman

Contractor: FCT

Contractor Name:

Projects in Building

Utility Distribution  Jones

1.1‐ Plan/Est

1750

RR

5

McDaniel Drive Steam Vault Repairs Phase II 5/26/15: Contractor has finished working in pits 3, 6, and 7. Repairs to steam line conduit near pit  2 were on hold as contractor waited for material delivery. Anticipated completion is May 29.

Design Firm: Harriman

 Jones

2‐ In Design

Contractor: External 2362

RR

Contractor Name:

RH White

Quad Way ‐ Utility Line Replacement (Design Only) 6/26/15: Project is in planning stage for construction in summer 2016. Design is under contract  and will be completed by October 31, 2015.

Design Firm: Tighe & Bond

 Houde

3‐ In Construction

Contractor: 2555

FCR

Contractor Name:

Sub Station 3 ‐ Transformer Repairs/Replacement Work is in progress, The old equipment has been removed. The new transformer is in place. The  new swithgear expected mid Aug. I expect completion before Sept 1    5‐26‐15

Design Firm:

 Jones

Contractor: 3‐ In Construction

2058

RR

Contractor Name:

Main Street ‐ Structural Tunnel Concrete Repairs 6/26/15: Onsite construction is continuing on schedule. Steam shutdown to remove bypass is  scheduled for July 7, 2015. Final completion is anticipated by July 31.

Design Firm: Hoyle Tanner

 Houde

3‐ In Construction

Contractor: External 2658

SI

Contractor Name:

RH White

Ravine Electrical Circuit 11B Extension Project is funded. Contractor has PO.   The temp power to the Hood hse, Ham‐Smith project is in  place. On July 10th the front of H/S will be placed on temp cirt. #4. On July 11th cirt #2 will be  disconnected in pit 8‐9 and H/S 1968 power will be connected to temp power circuit #4.  ,  6‐30‐15

Design Firm:

Contractor: External

Contractor Name:

IC Reed & Sons Inc.

Projects in Building

VISITORS INFORMATION CENTER

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Page 19 of 21

2

PM  Status Accountable

 Cartabona

2‐ In Design

ID

Project  Code

2396

FCR

PROJECT TITLE

Visitors Information Center ‐ Fire Alarm System/Replacement 6/30/15 FCR submitted to OBA for approval. Review scope of work with Norris Inc to determine  if this work could be completed with term agreement and installation complete summer 2015.

Design Firm: SFC Engineering

 Houde

3‐ In Construction

Contractor: External 2379

FCR

Contractor Name:

Norris Inc.

Visitors Information Center ‐ Install & Activate CNG Refueling Equipment Project plan has been presented to the SFMO. Work will progress with the understanding  engineering to back up any progress will be provided before final inspections.Work is  progressing  6‐30‐15

Design Firm:

Contractor: FCT

Contractor Name:

Badger Rand / Yates & others

Projects in Building

Water Treatment Plant  Hagstrom

2‐ In Design

38

SI

1

UNH R&R Water Treatment Plant Improvements spring pilot test complete. Wright Pierce to provide report.  fall testing to start 10/15. will do  subsurface investigation at waterworks site this  summer

Design Firm: Wright‐Pierce

Contractor: External

Contractor Name:

Projects in Building

West Stadium  Geuther

3‐ In Construction

1947

SI

1

West Stadium ‐ Design and Construction of New Facility 6‐24: Site work and site electrical is on going. Blasting complete. Piles being installed. Scheduled  to start concrete foundations within two weeks. Finalizing 1B.

Design Firm: Populous/LaVallee Brensinge Contractor: External

Contractor Name:

PC Construction

Projects in Building

Whittemore Center  Cartabona

1.1‐ Plan/Est

2720

FCR

2

Whittemore Center ‐ Arena Ice Making System Mechanical Replacements 6/30/15 FCT will relocate operations personnel 7/2; Milestone will begin preparation for chiller  removal on 7/6 ‐ opening will be prepared no later than 7/17.  American Refrigerations (ARC)  will begin on site 8/10/15 following all summer hockey camps.  This work is scheduled to be  complete 8/27 to allow for UNH hockey team to begin using ice for practice.

Design Firm: Hoyle Tanner

 Cartabona

3‐ In Construction

Contractor: FCT 2721

FCR

Contractor Name:

American Refrigeration Company, Inc. / Milesto

Whittemore Center ‐ Arena Block Wall Removal and Structural Support Installation 6/30/15 ‐‐ Please refer to 2721 for updates

Design Firm:

Contractor:

Contractor Name:

Projects in Building

WHITTEMORE CENTER ‐ ARENA  Houde

2‐ In Design

2578

FCR

Whittemore Center ‐ Arena ‐ Generator Upgrade The study is in progress I expect OPA to supply results of the study in a week or so.  . 6‐30‐15

Design Firm: OPA

Contractor:

Contractor Name:

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Page 20 of 21

2

PM  Status Accountable

 Houde

2‐ In Design

ID

Project  Code

2581

FCR

PROJECT TITLE

Whittemore Center ‐ Arena Ice Sensor System Back Up Power The study is in progress I expect a report from OPA in a week or so. . 6‐30‐15

Design Firm: OPA

Contractor:

Contractor Name:

Projects in Building

WHITTEMORE CENTER ‐ HAMEL  Hagstrom

3‐ In Construction

1176

CP

1

Hamel Recreation Center ‐ Renovation and Expansion Project CDʹs in.  2 addenda upcoming.  GMP due 7/17.  Piles complete.  Pile caps starting.

Design Firm: HGA

Contractor: External

Contractor Name:

Shawmut

Whittemore Center Arena  Woodcock

3‐ In Construction

2584

FCR

Projects in Building

1

Projects in Building

1

Whittemore Center ‐ Arena ‐ Videoboard 6/29/2015_Awarded project, and scheduling kick‐off meetings.

Design Firm: AJP

Contractor: External

Contractor Name:

Daktronics

Woodside Community Center  Healey

1.1‐ Plan/Est

2708

FCR

WOODSIDE APTS COMMUNITY BUILDING ‐ Door Estimate submitted on 5/19/15

Design Firm:

Contractor: FCT

Contractor Name:

Brenda Whitmore, Director

Facilities Project Management

Wednesday, July 01, 2015

University of New Hampshire

Page 21 of 21