Display Actual Cost Line Items for Projects. Table of Contents
Job Aid
Display Actual Cost Line Items for Projects
Table of Contents Overview.........................................................................
Table of Contents Overview............................................................................................................................... 2 1. What can the t-code do? ....................................................................................................... 3 2. How is the t-code used?......................................................................................................... 3 3. Define user-specific layout..................................................................................................... 7 4. Difference between CJI3 and Project Systems Analysis Area in BI ......................................... 9
[Display Actual Cost Line Items for Projects]
Umoja Training
1/9
Display Actual Cost Line Items for Projects
Job Aid
Overview This Job Aid explains the usage of transaction code or T-code CJI3 to generate Projec t Line Item Reports. The transaction is assigned to users with the following Umoja Enterprise Roles:
1. What can the t-code do? The Project Line Item Report shows actual FI postings by Cost Element as well as cost settlements to FI and/or CO. Please note, that CJI3 does not show any commitments or pre-commitments raised against WBS elements. The Project Line Item Report can be run ad-hoc to check and analyse project expenditures within a defined time frame. Please note that a copy of this ECC report was reproduced as a Project Systems Analysis Area in BI. For performance reasons, we recommend to go to BI for bigger analysis of project expenses comprising multiple projects. Based on the Project Line Item Report you can track project expenses (e.g., good receipts, service entry sheets, payroll and travel) validate moth-end settlements to AuCs or Cost Centers validate full settlements from AuC to the final assets confirm settlement reversals
2. How is the t-code used?
[Display Actual Cost Line Items for Projects]
Umoja Training
3/9
Job Aid
Display Actual Cost Line Items for Projects
[Display Actual Cost Line Items for Projects]
Umoja Training
4/9
Job Aid
Display Actual Cost Line Items for Projects
Note Pre-dfined layout /PJ_AUC includes below dimensions which are relevant to month-end cost settlement; Business Transaction (=KOAO for all cost settlements to Cost Centers) Originial Business Transaction (=KOAE for all cost settlements to AuCs) Reversed (indicator =X for all lines due to settlement reversals)
[Display Actual Cost Line Items for Projects]
Umoja Training
5/9
Job Aid
Display Actual Cost Line Items for Projects
Note Please note that the settlement lines will not show the settlement receiver, i.e. the Cost Center or AuC. To run a report on settlement rules, please go to KOSRLIST KOSRLIST_PR (with Selection Variant)
[Display Actual Cost Line Items for Projects]
Umoja Training
6/9
Job Aid
Display Actual Cost Line Items for Projects
3. Define user-specific layout
[Display Actual Cost Line Items for Projects]
Umoja Training
7/9
Job Aid
Display Actual Cost Line Items for Projects
Note
! If the Default setting option is checked, the layout created will be defaulted every user
[Display Actual Cost Line Items for Projects]
Umoja Training
8/9
Display Actual Cost Line Items for Projects
Job Aid
4. Difference between CJI3 and Project Systems Analysis Area in BI Please note that the Project Line Item report was reproduced in the Project Systems Analysis Area in BI to facilitate a more comprehensive analysis of expenditures across projects. To this end, the below fields from the Poject Builder have only become available in BI;
Thematic Assignment 1 (UN Assignments data tab) Thematic Assignment 2 (UN Assignments data tab) External Symbol (User Fields data tab) External ProjID (User Fields data tab) IMIS Org Unit (User Fields data tab) IMIS Prog ID (User Fields data tab)
Revision History (Soft Copy only) Date 18 March 2016