American Electric Power
4.5 Advanced Metering Infrastructure
Document ID: Use case # 5.11
Title: Meter Remote Connect / Disconnect Use Case Subject Matter Expert: Margaret Goodrich
Author: David McClendon
Reviewed by: Tim Simmons
Meter Remote Connect / Disconnect
"Acknowledgment: This material is based upon work supported by the Department of Energy under Award Number DE-OE0000193." Disclaimer: "This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof."
Version History Rev. Date A 03/07/2011 B 03/14/2001 C 08/08/2011 D 08/18/2011
Author David McClendon David McClendon AEP Workshop Tim Simmons
E
10/03/2011 Brian D. Green
F
10/31/2011 Ron Cunningham
Change description Initial Release Include AMI-Head initial reply Various updates Implement various requested updates Add Narrative, Interface Diagram, Notes section and update the Actors and steps Final team review
Copyright © 2011 American Electric Power Company
American Electric Power
4.5 Advanced Metering Infrastructure
Document ID: Use case # 5.11
Title: Meter Remote Connect / Disconnect Use Case Subject Matter Expert: Margaret Goodrich
Author: David McClendon
Reviewed by: Tim Simmons
Summary: This use case addresses the messages exchanged between CIS and Smart Meter through the AMI HeadEnd and AMI Network when a meter connect/disconnect request is issued by CIS. Narrative: Traditionally, utilities send a metering service person to connect or disconnect the meter. With an AMI system, the connect/disconnect can be performed remotely by switching the internall meter switch in the Smart Meter for any of the following possible reasons: Remote Connect for Move-In Remote Connect for Reinstatement on Payment Remote Disconnect for Move-Out Remote Disconnect for Non-Payment Remote Disconnect for Emergency Load Control Unsolicited Connect / Disconnect Event A remote disconnect is issued in the Customer Information System (CIS) by the Customer Service Representative (CSR) for a legitimate reason. The message is sent to the AMI Head-End and routed to the appropriate Smart Meter via the AMI Network. When the message is received at the NIC (part of the Smart Meter), it is converted and sent on to the Meter Metrology Board (part of the Smart Meter) where the board causes the Internal Meter Switch (part of the Smart Meter) to connect or disconnect (depending on the command) and sends a confirmation back to the Meter Metrology Board to the NIC to the AMI Head-End via the AMI Network. The AMI Head-End sends the confirmation to CIS and to the Operational Data Store (ODS) where it is logged as a meter event.
Page 2 of 15
Copyright © 2011 American Electric Power Company
Rev. 7
American Electric Power
4.5 Advanced Metering Infrastructure
Document ID: Use case # 5.11
Title: Meter Remote Connect / Disconnect Use Case Subject Matter Expert: Margaret Goodrich
Author:
Reviewed by:
David McClendon
Tim Simmons
Interface Diagram:
Operations
CIS
ODS
30
29
AMI Head-End
2
AMI Network
Customer
3
Smart Meter
Note(s): The NIC, Meter Metrology Board and the Internal Meter Switch are all parts of the Smart Meter.
Page 3 of 15
Copyright © 2011 American Electric Power Company
Rev. 7
4.5 Advanced Metering Infrastructure
American Electric Power
Document ID: Use case # 5.11
Title: Meter Remote Connect / Disconnect Use Case Subject Matter Expert: Margaret Goodrich
Author: David McClendon
Reviewed by: Tim Simmons
Actor(s): The list of the actors and the roles that are participating in this use case described in the table below. Name
Role description
AMI Head-End
The AMI Head-End is the back office system that controls the Advanced Metering Infrastructure
AMI Network
The AMI network provides the communications between the AMI HeadEnd and the meters
CIS
Customer Information System is the system in place for customer data and billing
Customer Service Representative
(CSR), Initiates the Connect/Disconnect request via the CIS.
Internal Meter Switch
The switch within the Smart Meter that can be remotely operated to connect or disconnect power to the premise.
Meter Metrology Board
Internal board in Smart Meter trips or closes Service Switch
NIC
AMI network interface component with Meter Metrology Board within the Smart Meter
ODS
Operational Data Store subscribes to Connect and Disconnect messages.
Participating Business Functions: The participating business function, its acronym and what they provide in this use case are detailed in the table below. Acronym
Business Function/Abstract Component
Services or Information Provided
CIS
Customer Information System
Supplies initial Connect/Disconnect request.
AMI
Advanced Metering Infrastructure for energy monitoring and recording, load control capability, tariff/rate data collection.
Energy monitoring and control, configuration of advanced meters, offers new rate programs, distribution automation, Meter Readings, Meter Events and Alarms.
ODS
Operational Data Store
Store Connect/Disconnect events.
Page 4 of 15
Copyright © 2011 American Electric Power Company
Rev. 7
American Electric Power
4.5 Advanced Metering Infrastructure
Document ID: Use case # 5.11
Title: Meter Remote Connect / Disconnect Use Case Subject Matter Expert: Margaret Goodrich
Author:
Reviewed by:
David McClendon
Tim Simmons
Assumptions / Design Considerations: Standard International Electrotechnical Commission (IEC) 61968 Message Definition format will be followed to provide the Header, Request, Reply, and payload used when defining the messages for the design specifications. For the purpose of the use cases identified in this document these have been omitted as they are to be provided in the design specification for the Meter Remote Connect/Disconnect use case.
•
Normal Sequence: The sequences of events, showing the order in which they ocurr during the typical progression of this use case are provided in the table below. The Sequence Diagram that graphically depicts the events is presented immediately following the table. S1: A Customer Service Representative initiates a Remote Meter Connect request via CIS. Use Case Step
1
Triggering Event
Remote Connect initiated by CSR
Description Of Process
Information To Be Exchanged
Producer
Receiver
Message Type
A CSR creates a Remote Meter Connect request and sends it to CIS
Internal
2
CIS creates a Remote Meter Connect Message
Remote Meter Connect Message
CIS
Internal
Create /EndDeviceC ontrols
3
CIS sends the Remote Meter Connect Message to the AMI Head-End
Remote Meter Connect Message
CIS
AMI HeadEnd
Create /EndDeviceC ontrols
4
AMI Head-End issues a Reply to the Remote Meter Connect Message to CIS
Acknowledgem ent
AMI HeadEnd
CIS
Reply /EndDeviceC ontrols
5
AMI Head-End sends Remote Meter Connect Message to the NIC via the AMI Network
Remote Meter Connect Message
AMI HeadEnd
AMI Network
Proprietary
Page 5 of 15
Copyright © 2011 American Electric Power Company
Rev. 7
American Electric Power
4.5 Advanced Metering Infrastructure
Document ID: Use case # 5.11
Title: Meter Remote Connect / Disconnect Use Case Subject Matter Expert: Margaret Goodrich Use Case Step
Triggering Event
Author:
Reviewed by:
David McClendon Description Of Process
Tim Simmons
Information To Be Exchanged
Producer
Receiver
Message Type
6
AMI Network routes Remote Meter Connect Message to the NIC
Remote Meter Connect Message
AMI Network
NIC
Proprietary
7
NIC sends Remote Meter Connect Message to Meter Metrology Board
Remote Meter Connect (ANSI C12.19 Table Data) Message
NIC
Meter Metrolog y Board
Write ANSI C12.19 Table Data
Meter Metrology Board sends Closed Internal Meter Switch Verification to NIC
Closed Internal Meter Switch Verification (ANSI C12.19 Table Data) Message
Meter Metrolog y Board
NIC
Send ANSI C12.19 Table Data
9
NIC sends Closed Internal Meter Switch Verification to AMI Head-End via the AMI Network
Closed Internal Meter Switch Verification
NIC
AMI Network
Proprietary
10
AMI Network routes Closed Internal Meter Switch Verification to AMI Head-End
Closed Internal Meter Switch Verification
AMI Network
AMI HeadEnd
Proprietary
11
AMI Head-End passes Closed Internal Meter Switch Verification to CIS
Closed Internal Meter Switch Verification
AMI HeadEnd
CIS
Created /EndDeviceE vents
12
AMI Head-End passes Closed Internal Meter Switch Verification to ODS
Closed Internal Meter Switch Verification
AMI HeadEnd
ODS
Created /EndDeviceE vents
8
Remote Connect (close meter switch) request processed
Page 6 of 15
Copyright © 2011 American Electric Power Company
Rev. 7
American Electric Power
4.5 Advanced Metering Infrastructure
Document ID: Use case # 5.11
Title: Meter Remote Connect / Disconnect Use Case Subject Matter Expert: Margaret Goodrich
Page 7 of 15
Author: David McClendon
Reviewed by: Tim Simmons
Copyright © 2011 American Electric Power Company
Rev. 7
American Electric Power
4.5 Advanced Metering Infrastructure
Document ID: Use case # 5.11
Title: Meter Remote Connect / Disconnect Use Case Subject Matter Expert: Margaret Goodrich
Author:
Reviewed by:
David McClendon
Tim Simmons
S2: A Customer Service Representative initiates a Remote Meter Disconnect request via CIS. Use Case Step
1
Triggering Event
A remote disconnect is initiated by a CSR
Description Of Process
Information To Be Exchanged
Producer
Receiver
Message Type
A CSR creates a Remote Meter Disconnect Request to CIS
Internal
2
CIS creates a Remote Meter Disconnect Message
Remote Meter Disconnect Message
CIS
Internal
Create /EndDeviceC ontrols
3
CIS sends Remote Meter Disconnect Message to AMI Head-End
Remote Meter Disconnect Message
CIS
AMI HeadEnd
Create /EndDeviceC ontrols
4
AMI Head-End issues a reply to the Remote Meter Disconnect Message to CIS
Acknowledgem ent
AMI HeadEnd
CIS
Reply /EndDeviceC ontrols
5
AMI Head-End passes Remote Meter Disconnect Message to NIC Via AMI Network
Remote Meter Disconnect Message
AMI HeadEnd
AMI Network
Proprietary
6
AMI Network routes Remote Meter Disconnect Message to NIC
Remote Meter Disconnect Message
AMI Network
NIC
Proprietary
7
NIC sends Remote Meter Disconnect Message to Meter Metrology Board
Remote Meter Disconnect (ANSI C12.19 Table Data) Message
NIC
Meter Metrolog y Board
write ANSI C12.19 Table Data
Meter Metrology Board sends Internal Meter Switch Opened Verification to NIC
Open Internal Meter Switch Verification(AN SI C12.19 Table Data) Message
Meter Metrolog y Board
NIC
ANSI C12.19 Table Data
8
Remote Disconnec t (open meter switch) request processed Page 8 of 15
Copyright © 2011 American Electric Power Company
Rev. 7
American Electric Power
4.5 Advanced Metering Infrastructure
Document ID: Use case # 5.11
Title: Meter Remote Connect / Disconnect Use Case Subject Matter Expert: Margaret Goodrich
Reviewed by:
David McClendon
Tim Simmons
Description Of Process
Information To Be Exchanged
9
NIC sends Open Internal Meter Switch Verification to AMI Head-Enid via the AMI Network
Open Internal Meter Switch Verification
NIC
AMI Network
Proprietary
10
AMI Network routes Open Internal Meter Switch Verification to AMI Head-Enid
Open Internal Meter Switch Verification
AMI Network
AMI HeadEnd
Proprietary
11
AMI Head-End passes Open Internal Meter Switch Verification to CIS
Open Internal Meter Switch Verification
AMI HeadEnd
CIS
Created /EndDeviceE vents
12
AMI Head-End passes Open Internal Meter Switch Verification to ODS
Open Internal Meter Switch Verification
AMI HeadEnd
ODS
Created /EndDeviceE vents
Use Case Step
Triggering Event
Author:
Page 9 of 15
Producer
Receiver
Copyright © 2011 American Electric Power Company
Message Type
Rev. 7
American Electric Power
4.5 Advanced Metering Infrastructure
Document ID: Use case # 5.11
Title: Meter Remote Connect / Disconnect Use Case Subject Matter Expert: Margaret Goodrich
Page 10 of 15
Author: David McClendon
Reviewed by: Tim Simmons
Copyright © 2011 American Electric Power Company
Rev. 7
4.5 Advanced Metering Infrastructure
American Electric Power
Document ID: Use case # 5.11
Title: Meter Remote Connect / Disconnect Use Case Subject Matter Expert:
Author:
Margaret Goodrich
David McClendon
Reviewed by: Tim Simmons
Integration Scenarios Adapters will use the Common Information Model (CIM) in Extensible Markup Language (XML) to send and receive messages and events. The following are the points of integration that must be tested for this use case. Other non-CIM message interfaces may be testable in this use case. Actor
Interface Points
CIS
• • •
AMI Head-End
AMI Head-End AMI Network ODS
Pre-conditions: The following conditions that MUST be met before this use case can occur. •
CIS must have a list of valid Meter IDs
•
Meter to be connected/disconnected must be installed and registered with the AMI headend system
Post-conditions: The following events or actions that may happen after or be caused by the completion of the normal use case events, as well as the exceptions or alternative sequences are: •
If the Meter does not respond after the Remote Connect/Disconnect comand, further actions will be required from the CSR.
Page 11 of 15
Copyright © 2011 American Electric Power Company
Rev. 7
American Electric Power
4.5 Advanced Metering Infrastructure
Document ID: Use case # 5.11
Title: Meter Remote Connect / Disconnect Use Case Subject Matter Expert: Margaret Goodrich
Author: David McClendon
Reviewed by: Tim Simmons
Exceptions / Alternate Sequences: There are no exceptions, unusual events or alternate sequences defined for this use case. Use Case Step
Triggering Event
Page 12 of 15
Description Of Process
Information To Be Exchanged
Producer
Receiver
Copyright © 2011 American Electric Power Company
Message Type
Rev. 7
American Electric Power
4.5 Advanced Metering Infrastructure
Document ID: Use case # 5.11
Title: Meter Remote Connect / Disconnect Use Case Subject Matter Expert: Margaret Goodrich
Author: David McClendon
Reviewed by: Tim Simmons
Message Type(s) Diagram: The following XML Schema Definition (XSD) diagram shows the normative and informative parts of the message. Not all of the International Electrotechnical Commission’s (IEC) – CIM message optional elements must or will be used in the use of IEC – CIM for this specific use case.
Page 13 of 15
Copyright © 2011 American Electric Power Company
Rev. 7
American Electric Power
4.5 Advanced Metering Infrastructure
Document ID: Use case # 5.11
Title: Meter Remote Connect / Disconnect Use Case Subject Matter Expert: Margaret Goodrich
Page 14 of 15
Author: David McClendon
Reviewed by: Tim Simmons
Copyright © 2011 American Electric Power Company
Rev. 7
4.5 Advanced Metering Infrastructure
American Electric Power
Document ID: Use case # 5.11
Title: Meter Remote Connect / Disconnect Use Case Subject Matter Expert: Margaret Goodrich
Author: David McClendon
Reviewed by: Tim Simmons
References: Use Cases or other documentation referenced by this use case include:. •
20100625 AEP Ohio Interoperability Plan V1.docx: Section 4.5.11 (Remote Connect/Disconnect from CIS)
•
20100625 Use Cases EPRI Report_V2.4.docx: Section 5.10 (Remote Connect/Disconnect)
•
61968_9_MeterReadingAndControl_FDIS090428-final.docx: Section 5.5.2.4 (Meter disconnect and reconnect); Annex H (XML Schemas for message payloads) Section H.4 (EndDeviceControls)
Issues: None ID
Description
Status
Miscellaneous Notes: None
Page 15 of 15
Copyright © 2011 American Electric Power Company
Rev. 7