Different types of Energy Assessments and some Experiences

Different types of Energy Assessments and some Experiences Erja Reinikainen Olof Granlund Oy / Finland Energy Assessment Protocol Demonstration, Septe...
0 downloads 2 Views 429KB Size
Different types of Energy Assessments and some Experiences Erja Reinikainen Olof Granlund Oy / Finland Energy Assessment Protocol Demonstration, September 17, 2009

Copyright Granlund

|

www.granlund.fi

What exactly is an Energy Audit?

Copyright Granlund

|

EAR

|

www.granlund.fi

2

Energy Auditing has many names • the activity has different names in different countries • in Europe mainly term Energy Audit is used • in the US Energy Assessments • other names: energy surveys, energy scans... • but we all mean the same thing: identifying energy saving possibilities and reporting them to the building owner

Copyright Granlund

|

www.granlund.fi

3

What is an Energy Audit? Energy audit is a systematic procedure where the purpose is to

• evaluate the existing energy consumption • identify of the saving measures • report the findings in existing buildings/sites/objects...

Copyright Granlund

|

www.granlund.fi

4

Energy Audit Model Theory This is the heart of the energy audit Evaluation Identification of saving measures Reporting

The ”topping” is how it is done in practice in different countries / sites / levels of audits

Copyright Granlund

|

www.granlund.fi

5

Energy audits / assessments some background and history

Copyright Granlund

|

www.granlund.fi

6

Energy Auditing is a good tool • energy auditing since 1980’s in many countries • audits are essential for finding the most effective measures to improve energy efficiency • energy auditing is a useful tool for reducing energy costs and CO2-emissions • energy auditing is often used as the practical tool in energy efficiency agreements, environmental management, facility management long term planning, etc

Copyright Granlund

|

www.granlund.fi

7

EU-level targets •

Greenhouse gas emissions

• • Reduction of by 20% from 1990 level by 2020 • Reduction target 30% if other industrialized countries take similar action • Reduction of 60-80% by 2050 in industrialized countries •

Renewable energy: • Increase the share of renewables to 20% in the EU by 2020 • In the transport sector increase renewable fuels to 10% by 2020



Energy efficiency improvement 20% by 2020 from baseline of 2005

• Copyright Granlund

|

EU stands in front line against climate change www.granlund.fi

8

EU Energy-efficiency Policies / Energy Audits Energy Auditing has a key role in the EU-level directives: • energy performance of buildings -directive • energy certification of buildings is mandatory • the certificate includes a list of energy saving measures • energy end-use efficiency and energy services -directive • energy audit schemes must be available in EU member states • national audit programmes are being developed

Copyright Granlund

|

www.granlund.fi

9

The AUDIT-projects The material in this slideshow is partly based on the material from 2 international projects that created energy auditing theory:



SAVE-project AUDIT I 1998-2000 • comprehensive study on energy auditing in EU countries • developing definitions on energy auditing • developing state-of-the-art approaches to energy auditing



SAVE-project AUDIT II 2001-2003 • Finland (Motiva), Norway (IFE), Austria (EVA), France (ADEME), Greece (CRES), Portugal (Adene) • The main aim is to start EU-level co-operation • Country reports on Energy Auditing (EU) • Topic reports on Audit Program Elements

Copyright Granlund

|

www.granlund.fi

10

What are the different options for doing an audit?

Copyright Granlund

|

EAR

|

www.granlund.fi

11

Energy Audit Procedure in general START-UP MEETING COLLECTING BASIC DATA FIELD WORK

...but there are many different ways to do it

ANALYSIS OF THE DATA REPORTING IMPLEMENTATION OF SAVING MEASURES Copyright Granlund

|

www.granlund.fi

12

Why different Audit Models? • An energy audit analyses the present energy use and points out profitable saving measures, but

• energy is used for different purposes (e.g. heating or process)

• the scale of energy consumption varies (e.g. school or power plant)

• the site can be at various stages of its life cycle • •

(e.g. new, updated, completely renovated) the size of the site varies (e.g. petrol station or city hospital) the scope of the energy audit varies (walk-through / thorough analysis, system-specific / wide scope…)

• Different needs for • amount of work • audit phases • reporting Copyright Granlund

|

www.granlund.fi

13

What kind of audit? • what is the aim: • • • •

to find easy savings (“cream skimming”) to define all saving possibilities (comprehensive audit) to identify possible areas for further assessments (first step) to identify possibilities for ESCO /EPC

• what is the scope: • whole building or site • a specific area of energy use

• what does the audit work include: • quick walk-through • more detailed assessment with measuring Copyright Granlund

|

EAR

|

September 2007

www.granlund.fi

14

Energy Audit Scope and Aim

THE SCOPE Specific System/Area General Potential Assessment General Energy Saving Areas

Copyright Granlund

|

NARROW

WIDE

Every System / All Site

THE THOROUGHNESS ROUGH COMB

FINE COMB

Detailed Potential Assessment

THE AIM TO POINT OUT

TO PROPOSE

Specific Energy Saving Measures

www.granlund.fi

15

Small site

Large site

SCANNING MODELS

ANALYSING MODELS

point out saving areas

propose saving measures

WALKTHROUGH AUDIT

SELECTIVE AUDIT

Auditor chooses

TARGETED AUDIT

Defined in guidelines

PRELIMINARY AUDIT

SYSTEMSPECIFIC AUDIT

Copyright Granlund

|



ACCURACY

MAGNITUDE

Different targets for audits

COMPREHENSIVE AUDIT

www.granlund.fi

16

Scanning Energy Audits “The main aim is to point out areas, where energy saving potentials exist or may exist and also the obvious, normally “good housekeeping” and no-cost measures. Do not go deeply into the profitability of the measures” THE WALK THROUGH ENERGY AUDIT

THE PRELIMINARY ENERGY AUDIT

Area of application: • small tertiary sector, industrial • buildings with standard systems in general

Area of application: • energy intensive process industry Content of work: • detailed consumption analysis • defining of areas where energy consumption is significant and • where the Analysing Models are needed as a second step • listing the obvious savings • complete reporting on breakdown but brief on measures

Content of work: • overview of site´s energy use • rough consumption breakdown • points out the obvious savings • rough estimates of potentials • may have simple calculations • simple & brief documentation • suggestions for the next steps Working time: • from a few hours to a day or two Copyright Granlund

|

Working time: • typically 3 to 6 weeks

www.granlund.fi

17

Analysing Energy Audits “The aim is to cover the whole site, locate all profitable energy saving opportunities and propose concrete measures with adequate data for decision making ” THE SELECTIVE ENERGY AUDIT Area of application: • all buildings, all sectors • for good and targetoriented energy auditors

Area of application: • all “standard” buildings • no special requirements for the auditors

Content of work: • only general guidelines • auditor has freedom to choose what to do on site • concentrates on majors, • ignores the minors, • points out the obvious • can be very cost-effective • but also cream-skimming • detailed report on “findings”

Content of work: • detail guidelines • all systems audited and work is in balance • systems to be audited are known in advance • consumption breakdown • detail calculations on savings and investments • detailed standard reporting Working time: • 1,2…1,5 x Selective

Working time: • few days to 1…2 weeks

Copyright Granlund

THE TARGETED ENERGY AUDIT

|

THE COMPREHENSIVE ENERGY AUDIT Area of application: • medium & large industry Content of work: • covers everything “inside the fence”, work balance based on the breakdown • detail calculations on savings and investments • detailed standard reporting Working time: • 3…5+ weeks THE SYSTEM SPECIFIC ENERGY AUDIT • requires “special auditors” • very compact procedure • detailed standard18 reporting www.granlund.fi

Different levels of audits LEVEL 0 = Pre-assessment phase • Selection of objects for energy audits

LEVEL I

Scanning

Screening = Preliminary energy & process optimization assessment, qualitative analysis • Walk-through audit • Analysis of consumption figures & documents • List of possible energy saving opportunities

energy audit

LEVEL II

Comprehensive

= In-depth quantitative analysis to verify Level I results • Full energy audit • Measurements • List of measures for funding & implementation

energy audit

LEVEL III = Detailed engineering analysis • Implementation • Performance measurement & verification • Continuous commissioning Copyright Granlund

|

EAR

|

www.granlund.fi

19

Energy audits yes, but how to run the show?

Copyright Granlund

|

www.granlund.fi

20

The Elements of an Energy Audit Scheme

GOALS OF THE PROGRAMME

ADMINISTRATION KEY PLAYERS

STRUCTURE OF ADMINISTRATION IMPLEMENTING INSTRUMENTS

LEGISLATIVE FRAMEWORK

PROMOTION & MARKETING

SUBSIDY POLICY

QUALITY OF AUDITS TRAINING OF AUDITORS AUDITOR´S TOOLS Copyright Granlund

|

AUTHORISATION OF AUDITORS MONITORING SYSTEM

QUALITY CONTROL ENERGY AUDIT MODELS www.granlund.fi

21

Key Players and their Roles

ADMINISTRATION

SUBSIDY POLICY

GUIDELINES MONITORING QUALITY CONTROL TRAINING

PROMOTION

AUTHORISATION

AUDIT WORK MARKETING

INTEGRATION

Copyright Granlund

|

EAR

|

www.granlund.fi

22

Why Monitoring? To be able to prove it has been effective. Monitoring and evaluation are essential elements in an energy auditing activity to provide information on the impact of the activity. The financier will want to know exactly what comes out of the money and resources they allocate to the activity. In addition, monitoring and evaluation are of interest for the clients and auditors, since it will give them feedback on the results and the quality of the work.

Copyright Granlund

|

EAR

|

www.granlund.fi

23

Inc rea sin g

i nf

orm ati on

va lue a

nd co sts

Different levels of Monitoring 6. Verified results 5. Measured savings at site level

4. Theoretical savings of implemented measures 3. Savings potential

2. Energy Audit Volumes

1. Expenditure (subsidies for audits) Copyright Granlund

|

EAR

|

www.granlund.fi

24

Data available from a Monitoring System • Data for clients, auditors, administrator, media • Annual reports on the Energy Audit Programme • subsidies, audit volumes, saving potentials • implemented savings • typical savings

• Sample studies • • • •

number of audits in sample specific consumption data (kWh/m3…) total energy use, total cost total saving potential, typical saving measures

• Connection to Voluntary Agreements monitoring Copyright Granlund

|

EAR

|

www.granlund.fi

25

Why Training and Quality Control?

It is all about quality. The final aim of an energy auditing activity is to save money and reduce greenhouse gas emissions. To make this happen, the auditors must be able to do good energy audits and produce reports, which provide the client adequate information for the implementation of the measures.

Copyright Granlund

|

EAR

|

www.granlund.fi

26

Training, Authorisation, Quality Control

Prequalification of auditors

Training of auditors

Quality control of audits

Copyright Granlund

|

EAR

|

Authorisation of auditors

www.granlund.fi

27

Quality Control- Main points to check • The general guidelines have been followed • The presented numbers are realistic • saving potential compared to present consumption level • investment costs for suggested measure

• The content of the report is technically correct • The proposed measures are appropriate and realistic

• The report “looks ok”

Copyright Granlund

|

EAR

|

www.granlund.fi

28

Why Tools for Auditors?

The auditors' tools include a large family of support documents and applications which are intended to facilitate the work of auditors in the view both of minimising audit costs and maximising audit quality. The tools usually describe the Energy Audit Models but may address different stages in the audit procedure and provide help either on technical matters or on marketing aspects.

Copyright Granlund

|

EAR

|

www.granlund.fi

29

Tools for Auditors Information, brochures, case studies, benchmarks Check list, Walk through guide

START-UP MEETING COLLECTING BASIC DATA

Data collection forms

FIELD WORK

Audit guide or handbook

ANALYSIS OF THE DATA

Report templates Quality check list

Copyright Granlund

|

EAR

|

Calculation methods or software

REPORTING IMPLEMENTATION OF SAVING MEASURES

Data transfer tools (automatic), ..

www.granlund.fi

30

Energy Audit Model Features

Energy Audit Scheme Scheme properties: - key players - legislative framework - subsidies - audit procedure - monitoring - quality control - auditors’ training - etc

Copyright Granlund

|

Model 3

Model 4

Energy Audit Energy Audit Model 1 Model 2 Model features: - time and cost - phasing - reporting

Model features: - time and cost - phasing - reporting

www.granlund.fi

31

Some Experiences & Results from Finland

Copyright Granlund

|

EAR

|

www.granlund.fi

32

Long history of Energy Auditing Voluntary Agreements 2008>>

The Finnish Energy Audit Programme is one of the pioneers - and still going strong

Voluntary Agreements 1997>

”Subsidy scheme” 1981-82 First EA development project and campaign

Copyright Granlund

|

EAR

|

”Subsidy scheme” 1986-87

”Subsidy scheme” 1992…

1993 Goals set for the EA Programme

www.granlund.fi

33

And why has it been successful? • Energy Audits are connected to Voluntary Energy Conservation Agreements (industry, service sector, energy production) - large volumes

• Monitoring system proves that it has been efficient • Client feedback is positive • Energy auditors do audits as a part of their regular business • Implementation tools have been developed to help clients

Copyright Granlund

|

EAR

www.granlund.fi

34

Energy Audit Procedure 1 CONTACT BETWEEN CLIENT AND AUDITOR APPLICATION FOR SUBSIDIES START-UP MEETING • Evaluation of the client needs and goals • Timetables and contact persons •Special interests and requirements in reporting

COLLECTING BASIC DATA • Energy consumption from 3 to 5 years period • Design, operation and maintenance documents • Planning of the field work and measurements

FIELD WORK • Auditing the building • Measurements • Implementation of the no-cost saving measures Copyright Granlund

|

EAR

|

September 2007

www.granlund.fi

35

Energy Audit Procedure 2 ANALYSIS OF THE DATA • Breakdown of the total consumption • Evaluation of possible saving measures • Calculation of investments and savings • Feasibility study

REPORTING • Writing the Final report • Presentation to the Client

• Subsidy request

• Quality control • Results to database

IMPLEMENTATION OF THE SAVING MEASURES • monitoring of results

Copyright Granlund

|

EAR

|

www.granlund.fi

36

Energy Audit Models in Finland 1 • Service sector • Building Energy Audit - the basic model for service sector buildings, includes two categories of buildings: simple (schools, offices, etc) and complicated (swimming halls, ice arenas, etc)

• Energy Inspection - the model for small buildings, light reporting • Post-acceptance Energy Audit - the model for new and renovated buildings, “tuning” the energy use to optimal level

• Follow-up Energy Audit - the model to update the previous energy audit

• In these models the audit cost (and subsidy) are related to the building volume

Copyright Granlund

|

www.granlund.fi

37

Energy Audit Models in Finland 2 • Industry • Energy Inspection - can be applied for extra-small SME’s • Industrial Energy Audit - the model for sites with low energy intensive production process, looks at the energy use of the building and the process supply systems

• Industrial Energy Analysis - the heavier model for sites with medium energy intensive production process, includes the process analysis

• Process Industry Energy Analysis - the two-phase model for energy intensive process industry, the first step scans the needs for following Industrial Energy Audits and Analyses

• These models can be used as Follow-up Audits also

• In these models the audit cost (and subsidy) are related to yearly energy and water cost Copyright Granlund

|

www.granlund.fi

38

Energy Audit Models in Finland 3 • Energy sector • District Heating Audit - the model for district heating plants and heat distribution networks

• Power Plant Energy Analysis - the model for power plants

• System specific audits: •

Compressed air system energy audit



Refrigeration plant energy audit

• Transport chain energy audit

Copyright Granlund

|

www.granlund.fi

39

Energy Audit Results 1 / Motiva database Total consumption, costs, saving potential, investments of 1 164 energy audits in the service sectors (37 milj. rm3) reported 2002-2007 Present consumption 1164

SERVICE SECTOR Saving potential 2002-2007

Heat 1 181 076 MWh/a 39 405 161

€/a

173 382 MWh/a 5 596 519

€/a

14,7 % 14,2 %

Electricity 1 023 810 MWh/a 57 909 814

€/a

66 456 MWh/a 4 080 196

6,5 %

€/a

7,0 %

Water 3 547 825

m3/a

213 873

m3/a

6,0 %

7 777 341

€/a

449 799

€/a

5,8 %

Total consumptions

105 092 316

Copyright Granlund

|

EAR

|

€/a

Total savings

10 126 515

€/a

Investments

9,6 %

16 142 906 €

www.granlund.fi

40

Energy Audit Results 2 / Motiva database Total consumption, costs, saving potential, investments of 177 energy audits in the industrial sector with total energy consumption of less than 70 GWh/a during the period 2002-2007 Present consumption 177

INDUSTRY, Energy consumption < 70 GWh/a Saving potential 2002-2007

Heat 1 199 462 MWh/a 35 296 540

€/a

257 815 MWh/a 7 599 559

€/a

21,5 % 21,5 %

Electricity 1 019 827 MWh/a 45 969 711

€/a

61 452 MWh/a 3 361 503

€/a

6,0 % 7,3 %

Water 6 219 977

m3/a

657 969

m3/a

7 050 586

€/a

778 167

€/a

Total consumptions

88 316 837

Copyright Granlund

|

EAR

|

€/a

10,6 % 11, %

Total savings

11 739 229

€/a

Investments

13,3 %

32 743 365 €

www.granlund.fi

41

Energy Audit Results 3 / Motiva database Sector-specific saving potential in the 5 228 energy audits reported in 1997-2007 REPORTED BUILDINGS 1992-2007 (5228 BUILDINGS) SECTOR

BUILD-

SAVINGS-

INGS

POTENTIAL

PBT INVEST-

SAVING POTENTIAL

MENT

TOTAL

HEAT energy

energy pcs

milj. €/a

a

milj.€

GWh/a

ELECTRICITY

costs

energy

power

WATER

costs energy

water

costs

km³/a

milj. €/a

power

milj. €/a milj. €/a GWh/a milj. €/a milj. €/a

PJ Public services

3124

17,6

1,9

33,4

397,1

9,5

1,0

74,8

3,9

1,7

743,2

1,4

PY Private services

1338

17,7

1,7

30,0

339,6

8,5

0,7

122,4

6,3

1,4

458,9

0,9

TE Industry, Energy consumption < 500 GW

738

41,1

2,2

89,2

1 184,5

24,0

1,6

239,8

9,7

2,6

3 718,2

3,2

TE Industry, Energy consumption > 500 GW

8

21,6

3,7

79,9

1 202,1

14,5

0,1

197,0

5,1

1,7

6 872,8

0,2

20

0,2

1,4

0,2

6,2

0,1

0,0

1,5

0,1

0,0

21,9

0,0

5228

98,1

2,4

232,8

3 129

56,5

3,3

636

25,1

7,5

11 815

5,7

EA Heat and power TOTAL

Copyright Granlund

|

EAR

|

www.granlund.fi

42

Energy Audit Results 4 / Motiva database The saving potential of the 1 368 energy audits (reported 2002-2007) divided according to pay back time 10

5 000

9

4 500 Number of measures 4 000

7

3 500

6

3 000

5

2 500

4

2 000

3

1 500

2

1 000

1

500

0

0 0

0-1

1-2

2-3

3-4

4-5

5-6

6-7

7-8

8-9

9-10

>10

Pay back time (year) Copyright Granlund

|

www.granlund.fi

43

Number of measures

Saving potential million €

Saving potential 8

Energy Audit Results 5 / Motiva database The saving potential, required investment and number of measures according to measure classification (9 972 measures reported years 2002-2007) 45 % Number of measures

40 %

Saving potential

Investment

35 % 30 % 25 % 20 % 15 % 10 % 5% 0% Heating system

Copyright Granlund

|

Ventilation system

Domestic water

Electricity

Cooling system

Construction

Pneumatic system

www.granlund.fi

Other energy saving measures

44

Top 7 saving measures in the service sector • Reduction of ventilation running hours • Changes in lighting (low energy bulbs, schedules, controls, etc)

• Adjustment of temperature settings (heating and ventilation)

• Reduction of water flows in faucets and toilets • Changes in tariffs = cost savings • Adjustments in electrical heating (freezing protection, car heating, etc) • Improvement of heat recovery system (existing or new) Copyright Granlund

|

www.granlund.fi

45

Experiences: savings • saving potential in old and new buildings is about the same

• top 7 measures apply to most buildings • no-cost measures are the majority • in industry process-related savings = high potential + cost

• simple is beautiful, high-tech solutions considered expensive and unreliable

• clear suggestions are appreciated in report • savings must not be over-estimated • pay-back time requirements: 2-3 years • maintenance staff training useful during audit Copyright Granlund

|

www.granlund.fi

46

Energy Audit Results 6 / Motiva database Implementation rate of saving potential by pay back time (1 957 energy audits, 14 868 savings measures) 14,0 Implemented

Decided

Considered

Not implemented

No information

12,0

Savings million €

10,0

8,0

6,0

4,0

2,0

0,0 0

Copyright Granlund

|

0-1

1-2

2-3

3-4 4-5 5-6 6-7 Pay back time (year)

7-8

8-9

9-10

www.granlund.fi

47

10

Why are not all measures implemented? • why saving measures are not implemented? • • • • •

Copyright Granlund

|

EAR

|

No risks taken (indoor air quality, process, etc) No resources (good idea, but no staff for implementation) No money for investment Energy is not an important cost factor Audit report does not convince the client

www.granlund.fi

48

More information about Energy Audits • www.motiva.fi > choose English website > • Areas of operation > Energy auditing in Finland • Projects and Campaigns > SAVE II -projects > Audit I and Audit II • Projects and Campaigns > IEE-projects > Audit ‘06 conference material



Copyright Granlund

|

EAR

|

www.granlund.fi

49

Suggest Documents