Demands for a spatial information infrastructure fit for Cadastre 2034

5. September 2013 Demands for a spatial information infrastructure fit for Cadastre 2034 Christian Kaul Office for Spatial Development Dr. J. Luethy...
Author: Cecil Hart
7 downloads 0 Views 902KB Size
5. September 2013

Demands for a spatial information infrastructure fit for Cadastre 2034 Christian Kaul Office for Spatial Development

Dr. J. Luethy SWR Geomatik

SWR GEOMATIK • WAGISTRASSE 6 • CH-8952 SCHLIEREN • T +41 43 500 44 00 [email protected] • WWW.SWR-GEOMATIK.CH

Introduction • Transition from data collection to data analysis

Costs

Spatial Data Infrastructure

Spatially enabled Society

Cadastre 2034

Single Use

Data Collection

Benefit FIG Working Week 2015

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

2

1

5. September 2013

Thesis 1: Spatial data build the foundation of Spatial Information Infrastructure

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

3

Consequences • Established concepts: – Data models; – Feature capture rules; – Portrayal models.

• Data centric, not product centric; • Semantic interoperability; • Legal base in general, open data strategy in specific!

FIG Working Week 2015

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

4

2

5. September 2013

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

5

Thesis 2:The benefit of spatial information can massively be increased by combining spatial and textual data FIG Working Week 2015

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

6

3

5. September 2013

Consequences • • • •

Flexible data integration; Harmonising keys and object granularity; Responsibility for inter-system communication; Stable SDI: – Switch the focus from spatial data assembling, aggregation visualisation and provisioning to data integration; – supplemented with processing services.

• Visualisation capabilities: – pivot tables, diagrams and maps stories.

• Life cycle of phenomenon: – Stable keys; – Different life cycles depending on information system  not physically deleting objects, but change status. FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

7

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

8

FIG Working Week 2015

4

5. September 2013

Thesis 3: The demand for ubiquitous availability of spatial datasets will increase: current data, real-time access, always, everywhere, fast and free of charge. FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

9

Consequences • Web-clients must be enhanced for data maintenance and standardized tasks (reports, analysis) and the SII must therefore consequently being designed as web-applications. • Importance of safety and security will massively increase for ensuring data and service quality; • Growing demand for free-of-charge spatial data should be used to position the SII as public infrastructure similar to roads and highways, paving the way for securing the funds for continuous enhancements of the SII.

FIG Working Week 2015

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

10

5

5. September 2013

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

11

Thesis 4: A change from data quality to system quality is needed in the context of distributed data, shared responsibilities and decoupling data users from data owners FIG Working Week 2015

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

12

6

5. September 2013

Consequences • Provision and support of a holistic data quality; • System quality for availability, traceability and integrity; • Better controlled entire data chain; • Data driven community needs system quality to avoid decisions being taken with incorrect information.

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

13

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

14

FIG Working Week 2015

7

5. September 2013

Thesis 5: The third and the fourth dimensions are inherent ingredient of the spatial infrastructure FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

15

Consequences • Paradigm shift in system design; • 3D-based topological validation rules; • the entire lifecycle including future changes: – marked as withdrawn or inactive instead of physically deleting an object.

• 3D: Cadastre in competition with Gaming Industry, Big Data Providers, UAV-sensor platforms for cheap mass data acquisition.

FIG Working Week 2015

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

16

8

5. September 2013

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

17

Thesis 6: Distributed responsibilities are a fact and will not decrease. It’s more productive building an infrastructure to handle this in an effective way, than changing grown structures. FIG Working Week 2015

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

18

9

5. September 2013

Consequences • Open attitude and the intention of the parties, to taking the advantages of distributed responsibilities seriously; • Open system architecture based on web-services and clear separation between data storage, application logic and presentation layer (tiers); • Systematic and standardized coupling of application parts and well defined interfaces between the tiers; • High-performance network infrastructures (band-with, latency); • Ensure, that the SII in its entirety does not contain gaps in the responsibility.

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

19

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

20

FIG Working Week 2015

10

5. September 2013

Conclusion and Outlook • It can be expected, that the spatial information will follow the "ubiquitous computing" and become permanently present; • The demand for more and "better" (spatial) information will increase; • The public agencies must be aware that the provision of governmental data offers more changes and benefits than disadvantages; • The cadastral community should actively influence the transformation processes and take over a pioneer role for SII. FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

• Contact information: • [email protected][email protected]

21

?

Thank you for your attention and…

FIG Working Week 2015

FIG Working Week 2015

Demands for a spatial information infrastructure fit for Cadastre 2034

22

11

5. September 2013

Get to know us Come along, have a drink, and get surprised!!! Wednesday, 20 May, 17h30-18h30 at "Culture Beat"

FIG Working Week 2015

National Palace of Culture

Culture Beat

12

Suggest Documents