Czech ITS corridors: Accelerating development of cooperative

Czech ITS corridors: Accelerating development of cooperative technologies 26 April 2016 WBC Amsterdodam CODECS has received funding from the Europea...
Author: Bethany Foster
0 downloads 0 Views 2MB Size
Czech ITS corridors:

Accelerating development of cooperative technologies 26 April 2016 WBC Amsterdodam

CODECS has received funding from the European Union’s Horizon 2020 research and innovation programme under Grant Agreement No 653339.

Agenda • ITS strategy, C-ITS Vision in the CZ • Supporting C-ITS activities, tests and trials, experience • First Czech ITS co-operative corridor • C-ITS in the CZ: Architecture and Services • Future plans of C-ITS Deployment in the CZ

26/04/2016

Deployment is underway!

2

Action & Implementation plans (AP ITS, IP ITS) • •

• • • •



ITS action plan 2020 (incl. a Vision by 2050) adopted by the Government of the CZ in May 2015 Sub-strategy of the Czech Transport policy 2014 – 2020 adopted by the government under no. 449 on 6/2013 Follows and enhances EU and national documents AP ITS is used to justify cohesion funds projects, OPT 2014+ All modes of transport included (rail, road, rail, air and water) ITS Implementation plan (IP ITS): associated strategic document – a pool of projects under development, to be approved by Gov. in 2016 C-ITS and autonomous cars are clearly recognized and supported by the Czech AP ITS and IP ITS.

26/04/2016

Deployment is underway!

3

RMD C-ITS deployment ROADMAP • Based on R&D project results, following testing and AP ITS • Close cooperation between o Ministry of transport (Dep. Strategy, ITS and Road infrastructure) o Road and Motorway Directorate o SDT (ITS&S) Czech o SKODA AUTO (E4T)

• Tendency to be front runner in Europe C-ITS activities • Connection to ITS corridor activities

26/04/2016

Deployment is underway!

4

Vision of C-ITS Deployment

ITS Corridor

SCOOP@F

26/04/2016

Deployment is underway!

5

C-ITS pilots and tests on Czech Motorways

BaSIC D5 testing

26/04/2016

Deployment is underway!

6

BaSIC project: Objectives • Test of C2X technology in the Czech environment • Evaluate theoretical knowledge in real operation • Test following D1 applications Slow moving vehicle warning (SMVW) Stationary vehicle / trailer information (SVI) Decentralized FCD Approaching Emergency Vehicle Warning (AEVW) Traffic Jam Ahead Warning (TJAW) In-Vehicle Signage (IVS) • Road line traffic control (max. speed, lane allowance) • Other information (road works, rain, fog, snow etc.) – Road Works Warning (RWW) – – – – – –

• Develop set of recommendation for future deployment – Technical, legal and operational 26/04/2016

Deployment is underway!

7

BaSIC project: Live operational tests

26/04/2016

Deployment is underway!

8

BaSIC +

Pilot project BaSIC

26/04/2016

Deployment is underway!

9

C-ITS pilot on D5 motorway • Primary focus on real deployment issues from road operator perspective – – – –

• • • •

Warranties Responsibilities Duties Operation

Maintenance vehicles and warning trailers Selected ITS infrastructure Maintenance monitoring and performance Support decision for next steps

26/04/2016

Deployment is underway!

10

D5 C-ITS pilot: Infrastructure and vehicles

26/04/2016

Deployment is underway!

11

Cooperative ITS corridor Mirošovice Rudná

The aim is to deploy C-ITS (ITS G5) along the major part of the Prague Motorway ring (marked in red)

26/04/2016

Deployment is underway!

12

ITS corridor Mirošovice – Rudná at present • • • • • • • • •

New motorway D0 (Prague by pass) Total length of 50 km Highest traffic volumes in the CZ 2x SSÚD (maintenance centers) with over 150 vehicles 2x tunnels in length approx. 1,8 km each 1x bridge flyover in length 2,7 km Connection to main roads of Prague city Dynamic lane traffic control and advanced tunnel control Robust ITS equipment – (loops, CCTV cameras, meteo, Deployment is underway!WIM etc.)

26/04/2016

13

ITS corridor Mirošovice – Rudná at present

26/04/2016

Deployment is underway!

14

Czech corridor: C-ITS System architecture Centrální back office systémy

NDIC / HDŘÚ / LŘD ….

Mobilní síť (VPN)

Centrální C-ITS server

ŘSD ČR OK DIS

SOS hlásky s kamerami, meteohlásky

Portáy LŘD, ZPI/PZD

Mobilní informační vozíky

Vozy údržby SSÚD

Mobilní instalace RVU/OBU

Pevné (fixní) instalace RSU

26/04/2016

ITS G5

ITS G5

ITS G5

ITS G5

Deployment is underway!

15

Czech Corridor: C-ITS Communication architecture

26/04/2016

Deployment is underway!

16

Czech Corridor: C-ITS applications • • • • •

Fleet vehicles management and monitoring Additional data collection Road work warning In vehicle signage Probe vehicle data

26/04/2016

Deployment is underway!

17

Fleet vehicles management and monitoring • • • • •

Summer / Winter maintenance Observation and supervision 79 lorries, 42 trailers, 13 cars Movement monitoring Road wark planning

ITS G5

Osobní vozidlo

Mobilní instalace FMU

Osobní vozidlo

Mobilní instalace OBU

Centrální back office systémy

NDIC

C-ITS Back office

WAN

Mobilní síť GPRS/3G/LTE (VPN)

WAN INTRANET

Dispečerské pracoviště SSÚD / Správa vozového parku

ITS G5

ITS G5

• Assistance breakdown / accident

Mobilní informační vozíky

Vozy údržby SSÚD

Mobilní instalace RVU

26/04/2016

Deployment is underway!

18

Czech corridor: Additional data sources • Every 2 km new detection technology for JT – BT / WiFi / C2X

• Integration into existing traffic management algorithm – Tunnels, Road line traffic control, VMS etc.

26/04/2016

Deployment is underway!

19

C-ITS applications • Road work warning • In vehicle signage • Probe vehicle data

26/04/2016

Deployment is underway!

20

Future plans for C-ITS deployment in the CZ • Address outstanding issues for deployment – – – –

Mitigate 5,8 and 5,9 interoperability issue Address security aspects Define clear responsibilities and duties Adopt selected D1 applications with European partners

• Support C-ITS deployment – – – – 26/04/2016

ITS corridor (ongoing) Prague tunnel and corridor (in pilot operation) CEF – C-ROADS CZ project (expecting evaluation) Prepare for cross border testing and large scale projects Deployment is underway!

21

Map of Czech C-ITS deployment pilot sites

Thank you for your attention. QUESTIONS? Contact: [email protected]

15/09/2015

Deployment is underway!