This is to be used as a general checklist; it is not inclusive of all code requirements and inspection criteria.

FOUNDATION INSPECTION Look for indications of a cesspool or septic tank. With stamped approved plans, inspect form width and depth and reinforcing steel. With signed survey, check setbacks using pins or property corner tags and possibly a string line. Obtain soils memo and/or observe competency of the excavation bottoms. (See Practices and Procedures #2 and #3) Check hardware such as hold-down embedment, location, type. Inspect UFER ground. [LOCAL CODE82.2.10] Check that shoring letter or letters have been submitted to City; may require soils engineer's signature as well as project engineer's signature. (where applicable) Check to see if sewer cap and demolition have been signed off. (where applicable) Sewer cap must be inspected and signed off prior to approving the foundation inspection. Parking garage and carport sizes (driveway slope requirement maximum 20% w/6’ min chords @ 12% max transitions). Stairs - equal treads - check exterior stairs’ width with allowance for fences, handrails, and guardrails. Minimum stairs’ clearance width shall be 36". Notice that grade beam needs deputy inspection and laboratory reports for 3000 psi. Expansive soils requirements. [LOCAL CODE 81.2.16] Zone 3 and 4 requirements. [UBC 1806.6]

Revised 12/02/05

Page 1 of 17

City of Santa Monica Building and Safety Division Foundation/UG Work/Floor Joist /Rough Plumbing Checklist GROUND WORK PLUMBING Verify backwater valve for fixtures below upstream manhole. [UPC 710]. Number of toilets: greater than three toilets requires 4-inch drain line. [UPC Table 7-5, note 4] Sump pump. (Only for discharge from fixtures below public sewer crown level.) [UPC 710.2] Grade (1/4” / foot). [UPC 718] Clean-outs at top of line, bldg. drain/sewer connection, 135o maximum bends. [UPC 719] Ten-foot head of water under test for DWV. [UPC 712.1]. Copper under test. [UPC 609.4] Type of materials Check gas lines to be properly sleeved, vented, and tested. Check that Sanitary Tee fitting is not on its back. Wrapping for expansion protection. [UPC 313.2] Condominium requirements: no back to back drains or vents; separate bldg. sewers. Plastic. DWV allowed in one and two story residential only. [LOCAL CODE 83.2.3] Commercial Buildings - all metal. [LOCAL CODE 82.2.3]

FLOOR JOISTS Cross-vents, 1 square foot for each 150 square feet of underfloor area, or knockouts, equal distribution. [UBC 2317.7] Joists 18" clearance to ground, girders minimum 12" to ground, or treated wood or approved wood of natural resistance to decay. [UBC 2317.3] Minimum 18" by 24" unobstructed access for all underfloor areas. [UBC 2317.3]

Revised 12/02/05

Page 2 of 17

City of Santa Monica Building and Safety Division Foundation/UG Work/Floor Joist /Rough Plumbing Checklist Positive connection between post and girder. [UBC 2314] Wood post must be minimum 6" above grade or treated wood or approved wood or natural resistance to decay. [UBC 2317.5] Cripple walls 14" or higher requires solid blocking or plywood. [UBC 2326.11.5] Hold downs and bolts as required by plan and anchor bolts (5/8”, 2”x2”x3/16” washers), 2 per piece, within 12" of ends, 6 foot on center. [UBC 1806.6] Shear transfer, shear plywood, and nailing as required by plan. Block all points of bearing on joists and girders. Joists under and parallel to bearing partitions shall be doubled. [UBC 2320.8.5]

ROUGH PLUMBING 10’ column of water for DWV test. [UPC 712.2] Gas line air test. (10# for 15 minutes) [UPC 1204.3.2] Support all vents, drains, gas line, and closet bends. [UPC 314] Backwater valves access. [UPC 710] (where applicable) Penetration of firewalls (and the required proper protection). [UBC 709] Shower stall’s size/dimension and the minimum required area in square inches. [UPC 412.7]; Showers must have pressure balance valves [UPC 420] Toilet clearance (front and sides). [UBC 2904] Disabled person toilet requirements, if required (commercial buildings). See handout. [State Building Code] Check grade (no reverse). Vent - [UPC 905]; Drain - [UPC 708]. Water heater maximum vent and connector (horiz max 75% of vert) [UPC 516] [UMC 805]. Revised 12/02/05

Page 3 of 17

City of Santa Monica Building and Safety Division Foundation/UG Work/Floor Joist /Rough Plumbing Checklist Water heater vent minimum 4' from property line. [UPC 517.6] ULF toilets and urinals notification. Water pressure regulator. [UPC 608] (where applicable) Trap primers. [UPC 1007] Clothes washer standpipe 18"-30" above trap; trap inlet 6"-18" above floor. Minimum trap-arm length twice diameter pipe size. [UPC 1002.2] Ream check required for copper water pipe. [UPC 609]. Under-slab gas line venting. [UPC 1211.3] Water hammer protection. [UPC 609.10] Floor drains for commercial kitchens, laundries, restroom with two or more WCs OR a WC and a urinal, multifamily common laundries. [UPC 412.2] Ck penetration of rated separations. [ UBC 709.6, 714] No combustibles over two stories. [LOCAL CODE 83.2.3] Electrical isolation of UG ferrous gas lines. [UPC 1211.6; MEC 1312.7]

ROUGH ELECTRICAL ‰

Wire size to amp - service entrance conductor unless underground. [NEC 310-16, Table 3]

‰

Subpanel - size of feeder. [NEC 310-16]

‰

Kitchen, bathroom fluorescent lighting notice. [CEC Title 24]

‰

Written notice to prepare for underground utilities inspection as condition for approval of rough electrical inspection.

‰

Smoke detector locations, alarms (include basement; 24" + high ceiling above hall = 2 detectors: high ceiling & hall). ’91 UBC requires battery backup, and in all bedrooms. [UBC 310.9]

Revised 12/02/05

Page 4 of 17

City of Santa Monica Building and Safety Division Foundation/UG Work/Floor Joist /Rough Plumbing Checklist ‰

Ground wire - outside (Armored Cable) protected, size (e.g., 200 amps = #4; 100 amps = #8). [NEC Table250-94]

‰

Subpanel prohibited location - clothes closet [NEC240-24 (d)], common wall garage/ house [UBC 709.7].

‰

Penetration through occupancy separation wall or ceiling - 16 square inches per opening and 100 square inches for 100 square feet of wall. [UBC 709.7]

‰

Twelve-foot outlet spacing (commercial and residential); kitchen - within 2’ from any end, 4’ o.c. elsewhere. For any counter 12’ or wider needs outlets 4’ o.c. Residential hall 10’ or longer needs at least 1 outlet. [NEC 210-52]

‰

All grounds to be mechanically connected at all metal boxes including switches, fixtures, and outlets. [NEC 250-114]

‰

Protect conductors less than 1-1/4" from face of stud. [NEC 300-4(d)]

‰

Outlet adjacent to each bathroom lav and GFCI outlets for front and back required.

‰

Grounding of ranges & clothes dryers (existing circuits) [NEC 250.60]

‰

Ck rated penetrations

‰

No NM, NMC, NMS in non-residential [LOCAL CODE 82.2.6]

‰

No used materials [LOCAL CODE 82.2.5]

ROUGH MECHANICAL ‰

Required disconnect [UMC 306]

‰

Clearances (head room, combustibles, floor, roof, vent).

‰

Equipment access. [UMC 307]

‰

Listed for use. [UMC 302]

‰

Adequate combustion air. [UMC 702, 707]

‰

Horizontal vent maximum 75% of the length of vertical (horizontal equals less than 45 degrees from vertical). [UMC 805.1]

Revised 12/02/05

Page 5 of 17

City of Santa Monica Building and Safety Division Foundation/UG Work/Floor Joist /Rough Plumbing Checklist ‰

Vent connector minimum slope is quarter inch horizontal. [UMC 805.2]

‰

Energy design compliance (efficiency, BTUs model, and make).

‰

Closet FAU return air separate from combustion air.

‰

Closet allowance for upper and lower combustion air and return air. [UMC 702]

‰

Closet platform fire stopped.

‰

Closet clearances at final energy; energy design at final.

‰

Vent and clearances and plate line fire stops.

‰

Wall heater - adequate heat to meet UBC 70 degrees three feet above floor.

‰

Wall heater vent clearances BW, 12 inches to door, 18 inches to overhangs, six inches to wall.

‰

Under floor forced air unit - same as attic except if on ground, slab four inches. If suspended, forced air unit six inches to ground.

‰

If floor furnace, six-inch clearance.

‰

If multiple appliance venting, must be listed, same floor, the areas of the largest plus 50% of areas of additional vent connectors. [UMC 809]

‰

Manufacturers or Code vent termination (four feet from property line). [UMC 806.5]

‰

Direct vent - Less than or equal to 50,000 - minimum nine (9) inches from any opening; greater than 50,000 and less than or equal to 65,000 - 12-inch vent termination clearances; bottom of vent and air intake minimum 12 inches across grade. [UMC 806.5]

‰

Exhaust fan connection - three (3) feet from opening.

‰

Vacuum lines - penetration/metal in garage

‰

Garage exhaust, if required.

‰

Smooth dryer vent [UMC 504.1]. [UMC 504.3] maximum 14’ + 2 - 90’s (beyond 2 - 90’s subtract 2 feet from overall maximum length for additional 90’s).

‰

Installation Instruction. [UMC 305.1]

‰

Secondary condensate. [UMC 15]

Revised 12/02/05

Page 6 of 17

City of Santa Monica Building and Safety Division Foundation/UG Work/Floor Joist /Rough Plumbing Checklist ‰

Electrical isolation of UG ferrous gas lines. [UPC 1211.6; MEC 1312.7]

‰

Outside air supply [UMC 403.1]

‰

Equipment roof platforms [LOCAL CODE 89.2.3]

‰

Guardrail for roof equipment (30” drop w/I 10’) [UMC 307.5]

‰

No return air from rated corridors. [UMC 404.1]

ATTIC F.A.U. ‰

Access to 30” x 30” or equal to remove heater

‰

Combustion air

‰

Attic light and platform

‰

B Vent only

‰

No gas flex thru heater wall - hard pipe then flex

‰

clearance to combustible construction

‰

Possible gas test

‰

Ducting sizing

‰

Return air filter

‰

Set back thermostat

‰

No return air from a kitchen

‰

F.A.U. sway bracing

‰

No F.A.U. access thru a bedroom-thru the walk-in closet OK

‰

If T-24 caulks are required, check model number

‰

30” minimum attic height requirement

‰

If the house has an indoor water heater - the return air opening must be 10’ away from this area

Revised 12/02/05

Page 7 of 17

City of Santa Monica Building and Safety Division Foundation/UG Work/Floor Joist /Rough Plumbing Checklist

IF AIR CONDITIONING IS ADDED TO F. A. U.: ‰

Primary condensate should drain to a LAV tail piece *

‰

Secondary condensate should drain to a visible location *

‰

*(Never tie the two together to drain to one location)

‰

An overflow pan may be required

‰

Check outdoor condenser for side yard clearance

‰

Condenser mounted on a 3” slab

‰

High and low voltage in EMT or seal flex

‰

Both F.A.U. and condenser on its own circuit

‰

Suction line refrigerant must have arm flex (black) insulation (the suction line is the bigger of the two)

‰

Both the F.A.U. and condenser must have a means of disconnecting the power

‰

Look for a trap of 2” with the vent after the trap.

ROUGH ROOF NAILING (FRAMING SYSTEM) ‰

Roof height certification or inspector verification as appropriate.

‰

Eaves projection clearance - 1-hour requirements.

‰

Roof drain and overflow (scupper 3X area of the drain).

‰

Straps.

‰

Blocking.

‰

Drag struts.

‰

Rafter

‰

Shear transfer - roof plywood to block to top plates.

Revised 12/02/05

Page 8 of 17

City of Santa Monica Building and Safety Division Foundation/UG Work/Floor Joist /Rough Plumbing Checklist ‰

Lumber grade.

‰

Plywood grade.

‰

Structural (spans, spacing).

‰

Attic vents clearance.

‰

All penetrations including vents, flues, solar, exhaust through sheathing before inspection.

‰

Nail penetration of plywood.

‰

Shiners

‰

All roof metal (flashing, dormer vents, roof to wall, drain, overflow, and ventilation).

‰

Skylights-doubled rafters and joists.

‰

Chimney height clearance - two feet above, 10 feet away from roof.

‰

Maximum 3-foot width and 5-foot length including cap can be 5 feet over maximum building height. Larger dimensions cannot be over maximum height.

FRAMING ‰

Three (3) levels or more may require structural observation.

‰

Anchor bolts: location, spacing, size (diameter + length).

‰

Plate breaks.

‰

Lateral support [UBC 2306.7], 1:7 full depth block, 8 foot on center or 1:6 full depth block both edges held in place for full length.

‰

Holddowns - anchor bolt location and the proper standoff.

‰

Identify construction details.

‰

A35's connections, hardware: location, spacing, shear transfer, load path continuity.

‰

Identify shear panels, nailing, blocking if drywall, 3x members where needed, sillplate nailing on raised or second floor, A35's, double sided shear.

‰

Drag strut connections: strap size, nailing, proper connection.

Revised 12/02/05

Page 9 of 17

City of Santa Monica Building and Safety Division Foundation/UG Work/Floor Joist /Rough Plumbing Checklist ‰

Joist system: spacing, size, grade, span, blocking, nailing. [UBC2326.8] Approved shop drawings. Glulam certificates, welding certificate and shop certification.

‰

Headers, trimmers, trimmer supports to floor, window size, sill height escape requirements, bathroom vent minimum one and one-half square feet and 1/20 of the floor area. If no full height trimmer or trimmer not nailed to king stud, then header hanger is required.

‰

Notching, boring, and drilling. [UBC 2326.8.3; 2326.11.9; 2326.11.10; 2326.12.4]

‰

Stairway rise run width, stringers not in contact with concrete, support on heel; identify stairway type: circular, winding - check stairway clear width minimum 36". [UBC 1006]

‰

Rail or guard balusters may not encroach into 36-inch width of stair. [UBC 1006]

‰

Hall width not less than 36". Minimum 7’0" clear headroom. [UBC 310]

‰

Diagonal bracing of exterior walls. [UBC 2326.11.3]

‰

Fire stop drops, chimneys, and duct pass-through floors.

‰

Walls higher than 10 feet require solid blocking.

‰

Finish measurements: Habitable ceiling height = 7'6"; others: kitchen, hallway, bath, stairway, landing = 7'; stairs = 6'8". [UBC 310, 1006]

‰

Strap or post base for piers.

‰

Sisal kraft around exterior openings - lap flashing. [UBC 1402]

‰

Windows set, default labels. CEC Title 24, effective 1/1/93.

‰

One-hour walls less than three (3) feet to property line, bay windows minimum three (3) feet to property line.

‰

Open and unenclosed interior stairs (Planing and Zoning requirements).

‰

Hinge walls are not allowed (for balloon framing).

‰

Fireplace less than 3’ to property line to have combustion air opening. May not be parallel to property line plus gas key not within required hearth.

‰

National Elevator Inspection Service (800) 886-6347.

‰

Fire Department okay where fire sprinklers are required.

Revised 12/02/05

Page 10 of 17

City of Santa Monica Building and Safety Division Foundation/UG Work/Floor Joist /Rough Plumbing Checklist ‰

Copy of grade beam lab report and deputy inspector report.

‰

Check rated walls, assemblies

‰

Stairway to roof in 4 or more storied structures

‰

Masonry chimney anchoring. [LOCAL CODE 81.2.22]

INSULATION ‰

Review the California Energy Design for project address - CF-1R.

‰

Check "R" value of all insulation per Energy Design requirements.

‰

Caulk all floor soleplates and exterior openings.

‰

At raised floors, paper or foil backing shall not be exposed.

‰

Request Certificate of Insulation (City form) for final building inspection.

‰

Check that clips or wires are used at raised floors to keep insulation in place.

‰

Zero clearance to recessed I.C. lights in required areas. Nonrated lights in other than required areas to have 3" clearance on each side.

‰

1” air-space between insulation and roof sheathing. [UBC 1505.3]

LATH AND DRYWALL ‰

Check plans for shear nail requirements (drywall and/or lath).

‰

Weep screed four (4) inches above grade minimum.

‰

Double grade D paper at plywood where exterior lath. [1993 Accum. Supplement]

‰

Shingle fashion lap of bottom sill of windows except wood windows with sill overhang.

‰

Corner reinforcement unless lath furred and lapped - one support on frame.

‰

Lap backing of shower lath paper over tub edge.

Revised 12/02/05

Page 11 of 17

City of Santa Monica Building and Safety Division Foundation/UG Work/Floor Joist /Rough Plumbing Checklist ‰

No green board when used for tile of bathroom ceiling unless supported 12" O.C. or closer.

‰

Usable space under stair and at common areas between garage and living area must have one hour fire resistive construction (Type X, 5/8" drywall).

‰

Check soffits, attics, and behind baths for complete drywall shear.

‰

Lath fasteners to be of corrosion-resistant material. [UBC2506.2]

‰

1-hr rating between tenants [LOCAL CODE 81.2.6]

‰

Protection of roof-ceiling & deck framing members to full span. [UBC 504.6.4, 504.6.6, 709.4]

FINAL PLUMBING ‰

Final gas test

‰

Anti-siphon devices on hose bibs.

‰

Water Heater:

‰

Earthquake strap top 1/3 and bottom 1/3

‰

Pressure relief valve and drain

‰

R-16 insulation total

‰

R-4 insulation on inlet and outlet in unconditioned space

‰

R-4 new energy code

‰

High and low combustion air

‰

Check sink lavatory traps and toilet for leakage and other than plastic in 3-level units.

‰

Check caulk or seal of lavatories and toilets.

‰

Air gap between dishwasher and garbage disposal not trapped.

‰

Sump pump. (where applicable)

‰

Property line and building clean-outs to grade.

Revised 12/02/05

Page 12 of 17

City of Santa Monica Building and Safety Division Foundation/UG Work/Floor Joist /Rough Plumbing Checklist ‰

Backwater valve accessible. (where applicable)

‰

Twenty-two inch (22") shower clear opening minimum with minimum 30" circle inside with minimum 1,024 square inches.

‰

Clean-out penetration through occupancy separation wall may not be plastic.

‰

Tub access trap to slip joints at occupancy separation to be rated.

‰

Clean-outs in path of vehicle must be listed to bear weight of vehicles.

‰

Toilet clearance - 30" wide - 15" centered - 24" clear in front.

‰

ULF toilets and urinals.

‰

Water pressure regulator required if 80 pounds or greater, release valve required.

‰

Trap Primer.

‰

CF-6R form posted and supplied to inspector.

‰

Alternating double rain water pumps for “public occupancy” bldgs. [UPC 1101.13]

‰

Roof drain strainers [UPC 1105.2]

FINAL MECHANICAL ‰

Attic forced air unit switch, light and outlet

‰

Clearance (headroom, combustibles, floor, roof, vent).

‰

Attic work platform and catwalk if required by manufacturer. One inch millboard plus 26 gauge sheet metal where burners horizontal and parallel within 6" of base/floor if required by manufacturer.

‰

Listed for use.

‰

Adequate combustion air (Shall not reduce required attic ventilation.)

‰

Horizontal vent maximum 75% of the length of vertical (horizontal equals less than 45 degrees from vertical).

‰

Vent connector minimum slope quarter inch horizontal.

Revised 12/02/05

Page 13 of 17

City of Santa Monica Building and Safety Division Foundation/UG Work/Floor Joist /Rough Plumbing Checklist ‰

Energy design compliance (efficiency, BTUs model, and make).

‰

Closet FAU return air separate from combustion air.

‰

Closet allowance for upper and lower combustion air, and return air.

‰

Closet platform fire stopped.

‰

Closet clearances at final.

‰

Vent and clearances.

‰

Wall heater vent clearances BW, 12 inches door, 18 inches to overhangs, six inches to wall.

‰

Under floor forced air unit - same as attic except if on ground, slab four inches. If suspended, forced air unit six inches to ground.

‰

If floor furnace, six inch clearance.

‰

If multiple appliance venting, must be listed, same floor, the areas of the largest plus 50% of areas of additional vent connectors.

‰

Manufacturers or Code vent termination (four feet from property line).

‰

Direct vent - Less than or equal to 50,000 - minimum nine inches from any opening; greater than 50,000 and less than or equal to 65,000 - 12 inch vent termination clearances; bottom of vent and air intake minimum 12 inches above grade.

‰

Exhaust fan working.

‰

Range hood connection (metal, smooth interior). UMC 116.1 and 532 subsection A + Accum Supplement.

‰

Garage exhaust, if required.

‰

Grease hoods (air balance, Fire Dept. bag test).

‰

Registers UMC 116.1

‰

CF-6R form posted and supplied to inspector.

‰

Ladders for roof equipment - outlet within 25’ of roof equipment for commercial application.

Revised 12/02/05

Page 14 of 17

City of Santa Monica Building and Safety Division Foundation/UG Work/Floor Joist /Rough Plumbing Checklist ‰

Roof platform [LOCAL CODE 89.2.3]

‰

Clothes dryer exhaust & make-up air [UMC 504, 908]

FINAL ELECTRICAL ‰

Check grounding and bonding clamps and access.

‰

Open subpanels - Grounding to grounding bar at neutral.

‰

Check Jacuzzi pump - cold water bond and GFI.

‰

Test GFI circuits.

‰

Check fluorescent lighting requirements.

‰

Identify panel circuits.

‰

GFI stickers on outlets that are controlled elsewhere.

‰

Ground wire on hanging fixtures.

‰

Required kitchen outlets counter 12" plus.

‰

Check underground of utilities if required.

‰

Smoke detector locations, battery backup, and testing.

‰

Check skinny circuit breakers for phasing balance of neutral.

‰

Self-grounding receptacle may or may not be attached to ground wire in metal box.

‰

Outlets within 25’ of roof equipment

‰

Grounding electrode and cold water ground. [LOCAL CODE 82.2.9]

‰

100 amp min service [LOCAL CODE 82.2.8]

‰

20-amp circuit required for residential laundry. [NEC 210-52(d)]

‰

20-amp circuit required for residential bathroom. [NEC 210-52(f)]

Revised 12/02/05

Page 15 of 17

[NEC-200-10b]

City of Santa Monica Building and Safety Division Foundation/UG Work/Floor Joist /Rough Plumbing Checklist FINAL BUILDING ‰

Certificate of Insulation posted at site and copy to the inspector.

‰

Street address front (and rear if alley). [Kaneen]

‰

Stairway handrails.

‰

Stairway requirements (equal risers and treads, width).

‰

Fireplace per installation instructions (clearances, decorative caps, hearth, mantel, doors, combustion air, fire caulking of gas pipe).

‰

Engineering, Environmental, Grading, Planning, and Fire Department final approvals.

‰

Weather-stripping.

‰

Garage door to dwelling shall be 20 minutes or one and three-eighths inch (1-3/8") solid core, self-closing, and self-latching, and weather stripped. [UBC 302.3]

‰

Tempered/safety glass.

‰

Shower doors - 22" wide, safety glazing.

‰

Grade to slope away from building.

‰

Drainage device requirements.

‰

Clearance over range - minimum 30 inches.

‰

Window shading (default curtains and drapes excluded), verify with CF 1R form on plan.

‰

Thermal mass - thickness and area, verify with CF 1R form on plan.

‰

Double-glazing.

‰

Automatic door test (electric door openers without electricity) to meet T-24 requirements.

‰

Self-closing, self-latching rated doors and smoke detectors for corridors.

‰

Glass block - fire rating.

‰

Disabled Access requirements (signs etc.)

‰

Floor level, thresholds, door swing, landings at exterior doors.

Revised 12/02/05

Page 16 of 17

City of Santa Monica Building and Safety Division Foundation/UG Work/Floor Joist /Rough Plumbing Checklist ‰

Low level exit lighting and signs path of travel.

‰

Fire damper proper installation.

‰

Exit signs - emergency lighting.

‰

Fire stop between fire resistive rated occupancy separations.

‰

National Elevator Inspection Service (800) 886-6347.

‰

Owner Builder Verification.

‰

Degree of driveway slope not to exceed 15%.

‰

Security lighting = indirect, diffused or shielded. (ex. no halogen) OCMB 10.60.120 D.2.

‰

Check rated openings

‰

Fire spr requirements [LOCAL CODE 81.2.9]

‰

Stairway to roof/ locked roof access/ unlocking connection to central control station/ unlocked if power failure [LOCAL CODE 81.2.11]

‰

Glazing supported on all sides [UBC 2401.1]

Revised 12/02/05