Chemrec History and Future Plants

Chemrec History and Future Plants Feb 03 2012 Mats Lindblom, Process manager Chemrec AB CHEMREC 1 Energy to Succeed Chemrec DP1 History - In Brie...
Author: Hannah Hampton
3 downloads 0 Views 5MB Size
Chemrec History and Future Plants Feb 03 2012

Mats Lindblom, Process manager Chemrec AB

CHEMREC 1

Energy to Succeed

Chemrec DP1 History - In Brief 2001: Piling for the new Chemrec DP1 lab

2002: Design of the Reactor

2002 -2003: The DP1 building 2004 Eng. & Mech. Construction

2

CHEMREC Energy to Succeed

Chemrec BLG Development Plant • • • • •

Located at the Smurfit Kappa Kraftliner mill in Piteå, Sweden

Oxygen-blown and operated at 30 bar(g) Capacity 20t BLS/d (3 MWth)

In operation since 2005, >14 500 accumulated operating hours Used for development and technical demonstration

CHEMREC 2/6/2012

3

Energy to Succeed

What is Black liquor? BLACK LIQUOR

Biomass in liquid form Wood Type

Cellulose

Hemicellulose

Lignine

Extractives + others

Spruce

42%

28%

27%

3%

Fir

41%

28%

27%

4%

Birch

41%

34%

21%

4%

CHEMREC

2/6/2012

4

Energy to Succeed

Why gasify Black liquor?

• Liquid – – – –

Easy to feed to a pressurized gasifier Can be atomized to fine droplets Rapid gasification rates Stable properties over time

• Efficient gasification – Full carbon conversion at ~1000 deg C – No tar formation – Low methane formation

• Available in large quantities – World BL capacity about 660 TWh – Corresponds to 340 TWh / 40 million m3 gasoline equivalents per year – Typically 250-300 MW of BL per pulp mill 2/6/2012

5

CHEMREC Energy to Succeed

The Gasifier and the Gas Cooler Steam Black Liquor

Cooling water

Oxygen

BFW Steam

REACTOR

GAS COOLER

LPsteam

Cooled raw syngas

Raw syngas MPsteam

QUENCH

Green Liquor Weak Wash

Condensate

CHEMREC Energy to Succeed

THE PROJECT Supported by: *)

CHEMREC

*) The Swedish Energency 7

Energy to Succeed

Some facts about the BioDME project

Smurfitkappa Kraftliner Piteå

Chemrec DP1

The Solander Centre

Chemrec BioDME

Energitekniskt Centrum (ETC)

DME Production capacity:

4 tons / day

Pipe installation:

~10 000 m

Hand valves & on off valves:

~1400 pieces

Instruments:

~450 pieces

Vessels:

~30 pieces

Heat exchangers:

~25 pieces

Process Plant Foot Print

20 x 30 m

Construction cost: Kolugnsvägen

8

European Project BioDME 7th Framework Programme

~ € 20 million

CHEMREC Energy to Succeed

Chemrec DP1, and the new BioDME plant DP1 plant

Flare

CO-shift, MeOH-/DMEsynthesis, DMEdistillation

Aminewash

Carbon filters

CHEMREC 9

Energy to Succeed

Block flow diagram of the BioDME-project H2S / CO2 to mill MeOHSynthesis 2

ZnO-bed

MeOH Synthesis 1

Amine wash MeOH (fr recirc)

COshift

Waste gas

DMEProduct

Steam

DMEsynthesis

Raw MeOH (95%) Carbonfilter

Evaporator

~ 4 tpd of BioDME

Water

2/6/2012

10

CHEMREC Energy to Succeed

Amine Wash / Syngas Compressor / Condensate drum

CHEMREC 11

Energy to Succeed

BioDME Field Test • 10 Volvo DME trucks in customer operation • Demonstrate and verify DME technology in commercial operation • Planned yearly distance 100 000 km per truck (avg)

CHEMREC 12

Energy to Succeed

Final construction - Late Autumn/winter 2010 • Severe winter conditions on site stressed the importance of winterization of the plant

• By at the10th of January all critical construction work was finalized.

CHEMREC Energy to Succeed

Pre-commissioning during winter condition

CHEMREC Energy to Succeed

BioBME Plant Start-Up 2011 June 6th: Start of gasifier. July 18th: Start of Bio-meOH production August 1st: 7m3 of Bio-meOH produced

CHEMREC Energy to Succeed

First Bio-methanol produced Methanol sample from intermediate methanol production step

Host mill outage in August – mid September Minor modifications in the BioDME plant. Restart October 17

CHEMREC Energy to Succeed

BioDME during 2011 (..cont´d) • • •

November 10: First production of BioDME

December 1: First transfer of on-spec BioDME to Storage tank December 21: First delivery of BioDME to PREEM, Gothenburg

CHEMREC 17

Energy to Succeed

Stockolm BioDME filling Station

Investment 180 000€ CHEMREC 18

Energy to Succeed

BioDME Truck 10

Customer: BDX Företagen AB Truck supplying SmurfitKappa paper plant with timber

CHEMREC 19

Energy to Succeed

BioDME Truck 9

Customer: Burlink Transport AB, in cooperation with Smurfit Kappa. Truck transporting paper from SmurfitKappa paper plant to Haraholmen harbour

CHEMREC 20

Energy to Succeed

DME technology for HD trucks

400 bar pump

Piping and filters

Two pumps increase the pressure with ~8bar

Source: Volvo

CHEMREC Energy to Succeed

THE PULP MILLS One Powerful

way to green chemistry CHEMREC 22

2/6/2012

Energy to Succeed

Conventional Paper Pulp Production of Today Fresh Wood for Pulping

Flue gas

Pulp MIll

Electric Power

Waste Heat/ Cooling water

Paper Pulp

2012-01-11

23

CHEMREC Energy to Succeed

A typical Pul Mill One feedstock – one product

Paper Pulp

Typically 5-600 MW

Black Liquor Energy

Biomass (bark) 2012-01-11

24

CHEMREC Energy to Succeed

The Chemrec Biorefinery Concept: Turn the Pulp Mills of Today into Modern Biorefineries

Today

Tomorrow Fresh Wood for Pulping

Fresh Wood for Pulping

Biomass Fuel

Massafabrik

Paper Pulp

Paper Pulp 2012-01-11

Automotive Fuels

Bioraffinaderi

25

CHEMREC Energy to Succeed

The Chemrec Pulp Mill based Biorefinery has outstanding Product efficiency

Wood for pulping

New technology for recovery of chemicals and energy HP-steam

Biofuel boiler

~

Power

Cellulose /Pulp mill

Biomass Fuels

Steam

Green liquor+ H2S

cellulose/ paper pulp

Product efficiency =

Black liquor

BLGMF plant

Biomethanol/ BioDME Added Biomass fuels

Biomethanol or BioDME

= 66-67 %

CHEMREC Energy to Succeed

Domsjö BioFuels plant (BFP)

• >300 Million Euro investment at Domsjö Aditya Birla mill • 120/170 kton BioDME/methanol per year from Chemrec gasification of thick liquor • Eliminates 220 000 ton/yr fossil CO2 • Production of BioDME corresponds to 2400 heavy vehicles . CHEMREC 2/6/2012

27

Energy to Succeed

Recovery boilers in Sweden Nr

Mill owner, name

Nominal capacity

1

Billerud, Karlsborg

2

SCA, Munksund

3

Smurfit Kappa, Lövholmen

1450

4

SCA, Obbola

1000

5

Husum, M-Real

750

1100

1965

6

Husum, M-Real

700

2000

1978

7

Husum, M-Real

1100

1300

1988

8

Domsjö, Domsjö

375

1958

9

Domsjö, Domsjö

375

1964

10

Dynäs, Mondi

915

1978

11

Östrand, SCA

3300

2006

4

12

Iggesund, Holmen

520

900

1966

13

Iggesund, Holmen

520

900

1967

14

Vallvik, Rottneros

760/1000

1200

1974/1999

5 6 7 8 9 10 11

15

Korsnäs, Korsnäs

865

1330

1968

16

Korsnäs, Korsnäs

1550

1550

1987

17

Skutskär, StoraEnso

585

650

1967

18

Skutskär, StoraEnso

1900

2800

1976

19

Frövi, Korsnäs

520

1260

1970

20

Skoghall, Stora Enso

2200/(3350)

2005

21

Gruvön, Billerud

2500/(3300)

2000

22

Billingsfors, Munksjö

230

330

1976

23

Bäckhammar, Wermland Paper

570

750

1976

24

Aspa, Munksjö

510

1200

1973

25

Skärblacka, Billerud

1250

1850

1976

26

Värö, Södra

2500

2002

27

Mönsterås, Södra

4000

1996

28

Mörrum, Södra

2000

1250

Current capacity 1500

600

Year of start-up

Approx: 5000 MW Black Liquor

1980 1965

1950

1972 2007

2260

1

”Domsjö x 25”

1213

14 15 16 17 18 20 23 21 22 24

19

25

27

26 28

1995

28

2 3

2/6/2012

CHEMREC Energy to Succeed

Chemrec Unit Design Package well under way Steam Drum

Reactor

Quench

CCC

CHEMREC Energy to Succeed

Gasification unit including low structure Steam Drum

Green liquor Flash system

Green liquor tanks

Pipe Bridge with all connections to unit

Black liquor tanks

CHEMREC Energy to Succeed

Kort om Chemrecs teknik Drivmedelsproduktion baserad på Chemrecs teknik vid samtliga svenska massabruk skulle ge: 1. Miljövinster Reduktion om ca. 10% av Sveriges fossila CO 2 utsläpp (6 miljoner ton CO2 per år) motsvarar hälften av alla tyngre

fordonstransporter i Sverige

2. Ekonomi och energibalans Ersätter import av fossilt fordonsbränsle med biodrivmedel till ett värde av ca 10 miljarder SEK per år.

3. Gynnsamt för svensk industri o sysselsättning -Fordonsindustrin tar fram nya miljövänliga fordon -Massa o pappersindustrin får ökad lönsamhet -Arbetstillfällen skapas under byggtid och drift

2012-01-11 31

31

CHEMREC Energy to Succeed