NICOLAUS COPERNICUS HALL RENOVATIONS TO THE DIGITAL PRINTING AND GRAPHICS TECHNOLOGY LAB APRIL 18, 2016 CS-1 D-1 D-2 A-1 A-2 A-3 A-4
STATE PROJECT NO.: N.A.
COVER SHEET CODE INFORMATION SHEET PARTIAL FIRST FLOOR DEMOLITION PLAN, DEMOLITION NOTES & KEY NOTES PARTIAL FIRST FLOOR DEMOLITION CEILING PLAN, DEMOLITION NOTES & KEY NOTES PARTIAL FIRST FLOOR PLAN, LEGEND, KEY NOTES AND NOTES PARTIAL FIRST FLOOR REFLECTED CEILING PLAN, CEILING DETAILS & LEGEND PROPOSED INTERIOR ELEVATIONS, DOOR SCHEDULE AND DOOR DETAILS PROPOSED WALL TYPES AND MILLWORK DETAILS
P-1 P-2 M-1 M-2 E-1 E-2 EQ-1
PARTIAL FIRST FLOOR PLUMBING PLAN PLUMBING SCHEDULES & LEGENDS PARTIAL FIRST FLOOR MECHANICAL PLAN MECHANICAL DETAILS PARTIAL FIRST FLOOR POWER AND LIGHTING PLAN, LEGEND & NOTES ELECTRICAL NOTES AND SCHEDULES PARTIAL FIRST FLOOR EQUIPMENT PLAN AND SCHEDULE
OFFICE OF CENTRAL CONNECTICUT STATE UNIVERSITY ARCHITECT
CCSU. PROJECT NO.: 23-118
Central Connecticut State University
APPLICABLE CODE INFORMATION INTERNATIONAL EXISTING BUILDING CODE 2003 INTERNATIONAL BUILDING CODE 2003 + STATE BUILDING CODE 2005 CONNECTICUT SUPPLEMENT 2013 AMENDMENT TO THE 2005 CONNECTICUT SUPPLEMENT AND 2009 IECC
2.0
NEW BUILDINGS OR ADDITIONS: 2.1 EXCEEDS THRESHOLD BUILDING LIMITS
NO NO
3.0
USE GROUP CLASSIFICATION: 3.1 MIXED USES:
B (BUSINESS) YES
4.0
HEIGHT AND AREA COMPUTATION :
N/A
T
YES, BUILT IN 1974 YES NO
R
AL
C ON N
EC
TI
EXISTING BUILDING: 1.1 CONTINUATION OF EXISTING USE 1.2 CHANGE OF USE
C UT
CEN
N/A
4.3
AREA CONVERSION FACTOR:
N/A
4.4 4.5 4.6 4.7 4.8 4.9 4.10
ACTUAL GROSS FLOOR AREA (LARGEST FLOOR) ACTUAL GROSS FLOOR AREA (ENTIRE BUILDING) ADJUSTED TABULAR AREA (ACTUAL GROSS FLOOR AREA/CONVERSION FACTOR) = ALLOWABLE BUILDING AREA PER FLOOR (CONVERSION FACTOR x TABULAR AREA) = MINIMUM TYPE OF CONSTRUCTION REQUIRED: MINIMUM TYPE OF CONSTRUCTION PROVIDED: TYPE OF CONSTRUCTION ASSUMED FOR REVIEW
A
OPEN PERIMETER COMPUTATION:
ST
4.2
T
TY
A-3 (ASSEMBLY)
E
SI
1.0
U N IV
ER
1615 Stanley Street New Britain, CT 06050
54,677 SF 181,261 SF N/A N/A 2C 2C 2C
REVISIONS NUMBER
DATE
DESCRIPTION
8.0 FIRE RESISTANT RATING OF STRUCTURE 3B ELEMENTS (TABLE 601) REFER TO CONSTRUCTION DOCUMENTS FOR THE FOLLOWING: 8.1
EXTERIOR WALLS:
EXISTING
8.2
FIRE WALLS & PARTY WALLS
EXISTING
8.3
FIRE SEPARATION ASSEMBLIES: 8.3.1 FIRE ENCLOSURE OF EXITS 8.3.2 SHAFTS 8.3.3 OTHER SEPARATION ASSEMBLIES:
EXISTING EXISTING EXISTING
8.4
FIRE PARTITIONS
N/A
8.5
DWELLING UNIT SEPARATIONS
N/A
8.6
SMOKE BARRIERS
N/A
8.7
OTHER NON BEARING PARTITIONS
EXISTING
North
13.0 CODES TO WHICH THIS PROJECT WAS DESIGNED CONNECTICUT BUILDING CODE
8.8
8.9
INTERIOR BEARING WALLS, BEARING PARTITIONS, COLUMNS, GIRDERS, TRUSSES AND FRAMING: 8.8.1 SUPPORTING MORE THAN ONE FLOOR: EXISTING 8.7.1 SUPPORTING ONE FLOOR ONLY OR A ROOF: EXISTING 8.7.2 STRUCTURAL MEMBERS SUPPORTING WALL: EXISTING CORRIDOR WALLS 1ST FLOOR
EXISTING
8.10 FLOOR CONSTRUCTION INCLUDING BEAMS
EXISTING
8.11 ROOF CONSTRUCTION 8.11.1* 15 FT OR LESS: 8.11.2* 15 FT OR MORE: 8.11.3* 20 FT OR MORE:
EXISTING 0 HRS 0 HRS
INTERNATIONAL BUILDING CODE INTERNATIONAL EXISTING BUILDING CODE CONNECTICUT SUPPLEMENT CONNECTICUT AMENDMENTS INTERNATIONAL MECHANICAL CODE INTERNATIONAL PLUMBING CODE NFPA 70 NATIONAL ELECTRICAL CODE ENERGY CONSERVATION CODE CONNECTICUT FIRE PREVENTION CODE CONNECTICUT STATE FIRE SAFETY CODE NFPA 101 WITH APPENDIX CONNECTICUT SUPPLEMENT & AMENDMENTS INTERNATIONAL FIRE CODE THE WORK IS BEING CONSTRUCTED IN ACCORDANCE WITH PARTS I, II AND III. SECTION 504
9.0
FIRE PROTECTION SYSTEM 9.1 9.2 9.3 9.4 9.5
FIRE SUPPRESSION SYSTEM ALARMS AUTOMATIC FIRE DETECTION SYSTEM SMOKE CONTROL SYSTEM SUPERVISION
YES YES YES NO YES
CLASSIFICATION OF OCCUPANCY CONSTRUCTION CLASSIFICATION MINIMUM CONSTRUCTION TYPE REQUIRED ACTUAL CONSTRUCTION TYPE PROVIDED NOTIFICATION/ALARMS DETECTION EXTINGUISHMENT REQUIREMENTS:
11.0 SPRINKLER PROTECTION
SUMMARY OF PROJECT DESCRIPTION: DATED 2003 2003 2005 2011 2003 2003 2011 2009 2010
2003 2005 2003 2005 CURRENT
- REHABILITATION ACT 1973 INCLUDING UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS) AND 504 REGULATIONS - ICC/ANSI A117.1-2003 INCLUDING THE CURRENT CONNECTICUT BUILDING CODE - THE AMERICANS WITH DISABILITIES ACT AND PUBLIC LAW 101-336 INCLUDING AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG) AND ADA REGULATIONS
CHAPTER 16 - STRUCTURAL DESIGN
10.0 STATE FIRE SAFETY CODE 1.0 2.0 3.0 4.0 5.0 6.0 7.0
FIRST FLOOR - CODE PLAN
B (BUSINESS) A-3 (ASSEMBLY) 2C 2C 2C YES YES NO
YES
ENTIRE BUILDING LIMITED AREA
SEISMIC DESIGN BASED ON 2003 INTERNATIONAL BUILDING CODE W/2005 CT STATE BUILDING CODE SUPPLEMENT W/2009 CT AMENDMENT. CALCULATIONS INDICATED SEISMIC GROUP 'B'
RENOVATION OF FIRST FLOOR DIGITAL PRINTING AND GRAPHICS LAB OF NICOLAUS COPERNICUS HALL WILL INCLUDE : - DEMOLITION: - REMOVE ALL EXISTING CABINETS, PLUMBING & ELECTRICAL LINES IN SCREEN PROCESSING ROOM AS SHOWN. - REMOVE ALL EXISTING CABINETS, PLUMBING & ELECTRICAL LINES IN GRAPHICS LAB AS SHOWN ON DRAWINGS. - REMOVE SECTION OF MASONRY WALL TO CREATE A NEW OPENING INTO SCREEN PROCESSING ROOM. - REMOVE SECTION OF MASONRY WALL TO CREATE A NEW DOOR OPENING INTO COMPUTER LAB. - REMOVE EXISTING DOOR AND FRAME LEADING INTO SCREEN PROCESSING ROOM. - REMOVE AND RELOCATE EXISTING PAIR OF DOORS LEADING INTO COMPUTER LAB. - REMOVE EXISTING DOOR AND FRAME LEADING INTO STAIR CORRIDOR. ROOM 1310000. - NEW CONSTRUCTION: - CONSTRUCT NEW PARTITIONS & ALL ASSOCIATED MECHANICAL & ELECTRICAL EQUIP. FOR TWO NEW OFFICES. - CONSTRUCT NEW PARTITIONS & ALL ASSOCIATED MECHANICAL & ELECTRICAL EQUIP. FOR NEW VESTIBULE. - INSTALL NEW CEILINGS IN THE TWO NEW OFFICES. - INSTALL NEW CEILING IN THE NEW VESTIBULE. - INSTALL NEW CEILING PADS IN EXISTING GRID IN GRAPHICS LAB, COMPUTER LAB & SCREEN PROCESSING ROOM. - INSTALL NEW LIGHT FIXTURES, SWITCHES AND OUTLETS IN ALL ROOMS. - INSTALL NEW DOOR AND FRAME LEADING INTO COMPUTER LAB. - INSTALL NEW DOOR AND FRAME LEADING INTO STAIR CORRIDOR. ROOM 1310000. - REINSTALL EXISTING PAIR OF DOORS INTO NEW FRAME LEADING INTO VESTIBULE. - INSTALL NEW CABINETS AND PLUMBING LINES IN SCREEN PROCESSING ROOM. - INSTALL NEW CURTAIN AND TRACK INTO SCREEN PROCESSING ROOM AND OFFICES. - REPAIR AND EPOXY COAT EXISTING FLOORS IN GRAPHICS LAB AND SCREEN PROCESSING ROOM. - REPAIR AND PAINT EXISTING RADIATOR COVERS IN COMPUTER LAB. - INFILL EXISTING OPENING IN WALL WITH NEW MASONRY AND PAINT WALL IN COMPUTER LAB, SCREEN PROCESSING ROOM AND OFFICES.
NICOLAUS COPERNICUS HALL RENOVATION TO THE DIGITAL PRINTING AND GRAPHICS TECHNOLOGY LAB
E
KEY PLAN
N
S w
PER A.S.C.E. 7-02 SECOND EDITION SECTION 9.61: EXCEPTION 2: ARCHITECTURAL COMPONENTS IN SEISMIC DESIGN CATEGORY B (OTHER THAN PARAPETS) PROVIDED THAT THE IMPORTANCE FACTOR = 1.0 (WHICH IS DOES) EXCEPTION 3: MECHANICAL AND ELECTRICAL COMPONENTS IN SEISMIC CATEGORY B.
12.0 ADDITIONAL INFORMATION COMMON PATH OF TRAVEL (CSBC 1013.3): DEAD ENDS (CSBC 1016.3): TRAVEL DISTANCE USE GROUP B (CSBC 1015.1):
100 FT. WITH SPRINKLERS 50 FT. WITH SPRINKLERS 300 FT. WITH SPRINKLERS
CODE INFORMATION SHEET
23 CS-1
2
3
Central Connecticut State University
T
A
7 8
EC
CEN ST
6
C ON N
C UT
5
R
AL
TI
T
4
TY
1
KEY NOTES
E
SI
#
DEMOLITION NOTES:
U N IV
ER
1615 Stanley Street New Britain, CT 06050
9
REVISIONS
10 NUMBER
3
DATE
DESCRIPTION
11
12 13
14
15
11
16 17
10
18 19
NICOLAUS COPERNICUS HALL RENOVATION TO THE DIGITAL PRINTING AND GRAPHICS TECHNOLOGY LAB
20 16 21
17
T
12
20 4
15
18 1
16 5
19 13
7
E
KEY PLAN 8
6
S w
5 16
N
21 13 2
3
5 9
North
1
11
11
14
DIGITAL PRINTING AND GRAPHICS LAB - DEMOLITION FLOOR PLAN
PARTIAL FIRST FLOOR DEMOLITION PLAN, DEMOLITION NOTES & KEY NOTES
23
D-1
#
KEY NOTES
DEMOLITION NOTES:
LEGEND
1
2 3
Central Connecticut State University C ON N
EC
C UT
CEN
5
R
AL
TI
T
4
A
E
SI
ST
T
TY
6
U N IV
ER
1615 Stanley Street New Britain, CT 06050
REVISIONS NUMBER
DATE
DESCRIPTION
NICOLAUS COPERNICUS HALL 5
RENOVATION TO THE DIGITAL PRINTING AND GRAPHICS TECHNOLOGY LAB
4
3
2
E
KEY PLAN
N
S w
6
PARTIAL FIRST FLOOR DEMOLITION CEILING PLAN, DEMOLITION NOTES & KEY NOTES
North
1
DIGITAL PRINTING AND GRAPHICS LAB - REFLECTED CEILING DEMOLITION PLAN
23
D-2
#
ROOM FINISH SCHEDULE
KEY NOTES
1
5
2
6
3
7
Central Connecticut State University C ON N
EC
C UT
CEN
R
AL
TI
T
4
A
T
SUBMITTALS: SUBMIT PRODUCT DATA, CAT. CUTS, COLORED SAMPLES OF ALL MATERIALS AND SHOP DRAWINGS OF ALL THE ITEMS TO BE INSTALLED. REFER TO SPECIFICATIONS.
E
SI
ST
LEGEND
TY
ROOM FINISH ABBREVIATIONS
U N IV
ER
1615 Stanley Street New Britain, CT 06050 6
CODE REQUIREMENTS: ALL WORK MUST COMPLY WITH THE REQUIREMENTS OF ALL APPLICABLE CODES, RULES, AND REGULATIONS.
6
107
A
1 A-1
REVISIONS NUMBER
ALL DIMENSIONS ARE APPROXIMATE AND SHOULD BE FIELD VERIFIED BY CONTRACTOR.
101
DATE
DESCRIPTION
W1
B
1
W1
5
102
NOTES B A W2
2 A-3
NICOLAUS COPERNICUS HALL
W1
C
1 A-3
W1
W2
5
A
101
7
RENOVATION TO THE DIGITAL PRINTING AND GRAPHICS TECHNOLOGY LAB
7
B
104 106
3
1
4
2 3 A-3
103
1
E
7
KEY PLAN
A
5
N
S w
105
4
D
7
North
1
PARTIAL FIRST FLOOR PLAN, LEGEND, KEY NOTES AND NOTES
DIGITAL PRINTING AND GRAPHICS LAB - FLOOR PLAN
23
A-1
#
KEY NOTES
Central Connecticut State University
LEGEND
C ON N
EC
A
2
E
SI
ST
T
TY
C UT
CEN
R
AL
TI
T
1
U N IV
ER
1615 Stanley Street New Britain, CT 06050
CEILING DETAIL AT WALL
REVISIONS NUMBER
DATE
DESCRIPTION
NICOLAUS COPERNICUS HALL RENOVATION TO THE DIGITAL PRINTING AND GRAPHICS TECHNOLOGY LAB
E
KEY PLAN
N
S w
1
PARTIAL FIRST FLOOR REFLECTED CEILING PLAN, CEILING DETAILS & LEGEND
North
1
DIGITAL PRINTING AND GRAPHICS LAB - REFLECTED CEILING PLAN
23
A-2
DOOR SCHEDULE H6
J6
H6
M6
J6
M6
Central Connecticut State University
H6
WINDOW TYPE ST
A
T
TY
FRAME TYPES
W2
E
SI
DOOR TYPES
ALL DIMENSIONS ARE APPROXIMATE AND SHOULD BE FIELD VERIFIED BY CONTRACTOR.
W1
EC
CEN
DOOR ABBREVIATIONS
2
C ON N
C UT
1
R
AL
TI
T
H6
U N IV
ER
1615 Stanley Street New Britain, CT 06050
REVISIONS NUMBER
S1
H1
HEAD DETAIL
H2
HEAD DETAIL
H3
HEAD DETAIL
H4
HEAD DETAIL
H5
DATE
DESCRIPTION
SILL DETAIL
HEAD DETAIL
H6
HEAD DETAIL
NICOLAUS COPERNICUS HALL RENOVATION TO THE DIGITAL PRINTING AND GRAPHICS TECHNOLOGY LAB
J1
JAMB DETAIL
J2
JAMB DETAIL
JAMB DETAIL
J3
1 A-4
J4
JAMB DETAIL
J5
JAMB DETAIL
J5A
JAMB DETAIL
J6
JAMB DETAIL
2 A-4
E
KEY PLAN M6
N
S w
MULLION DETAIL
3
EAST INTERIOR ELEVATION SCREEN PROCESSING ROOM
1
SOUTH INTERIOR ELEVATION DIGITAL AND GRAPHICS LAB
PROPOSED INTERIOR ELEVATIONS, DOOR SCHEDULE AND DOOR DETAILS
2
NORTH INTERIOR ELEVATION DIGITAL AND GRAPHICS LAB
23
A-3
C ON N
EC
A
E
SI
ST
T
TY
C UT
CEN
R
AL
TI
T
Central Connecticut State University
U N IV
ER
1615 Stanley Street New Britain, CT 06050
REVISIONS NUMBER
3
INFILL CONCRETE SLAB DETAILS
2
SECTION @ SCREEN PROCESSING ROOM (HC)
1
SECTION @ SCREEN PROCESSING ROOM
DATE
DESCRIPTION
NICOLAUS COPERNICUS HALL RENOVATION TO THE DIGITAL PRINTING AND GRAPHICS TECHNOLOGY LAB
E
KEY PLAN
N
S w
PROPOSED WALL TYPES AND MILLWORK DETAILS
WALL TYPES
23
A-4
1
2
Central Connecticut State University
6 7
8
5
3
11
ST
4
T
A
11
PLUMBING SYMBOLS 2
EC
CEN
7 5
5
10
C ON N
C UT
6
B
R
AL
TI
A
4
T
9
ENLARGED PLUMBING PLAN - IN PRINTING AND GRAPHICS LAB
TY
NOTES
KEY NOTES
E
SI
#
U N IV
ER
1615 Stanley Street New Britain, CT 06050 S S IW
REVISIONS NUMBER
DATE
DESCRIPTION
ORWL RWL ST C PCD XXX
TW TWR
AV
AW
NICOLAUS COPERNICUS HALL RENOVATION TO THE DIGITAL PRINTING AND GRAPHICS TECHNOLOGY LAB
2 P-1 3
4 E
KEY PLAN
N
S w
1
10
9 2
PARTIAL FIRST FLOOR PLUMBING PLAN
8
11 North
1
DIGITAL PRINTING AND GRAPHICS LAB - PLUMBING FLOOR PLAN
23
P-1
Central Connecticut State University
PLUMBING SCHEDULE
C ON N
EC
A
PLUMBING SYMBOLS
E
SI
ST
T
TY
C UT
CEN
R
AL
TI
T
PLUMBING FIXTURE SCHEDULE
U N IV
ER
1615 Stanley Street New Britain, CT 06050 S S
REVISIONS
IW NUMBER
ORWL
DATE
DESCRIPTION
ISOMETRIC VIEW
RWL ST C PCD XXX
TW TWR
SECTION A
NICOLAUS COPERNICUS HALL
AV
RENOVATION TO THE DIGITAL PRINTING AND GRAPHICS TECHNOLOGY LAB
SECTION B
AW
A
B
PLAN E
1
UNDERMOUNT SINK DETAILS
KEY PLAN
N
S w
PLUMBING SCHEDULES & LEGENDS
23
P-2
RETROFIT SUPPLY VALVE SCHEDULE
CONSTRUCTION- LEGEND
DIFFUSER SCHEDULE
N
N
Central Connecticut State University C ON N
EC
A
TY
T
E
T
SI
ST
RSV
C UT
CEN
R
AL
TI
T
NOTES
U N IV
ER
1615 Stanley Street New Britain, CT 06050
DEMOLITION- LEGEND REVISIONS
N 600 CFM
NUMBER
DATE
DESCRIPTION
D
G
G
418 CFM N N
N
N 418 CFM
418 CFM
C
C
N A
T
RSV
T A
NICOLAUS COPERNICUS HALL
418 CFM
N
418 CFM
A
N
N
N 418 CFM
418 CFM T
N
G
409 CFM
N 418 CFM
C
RENOVATION TO THE DIGITAL PRINTING AND GRAPHICS TECHNOLOGY LAB
C
G
T F
N 100 CFM
409 CFM E
N
N N B
C
N
409 CFM 167 CFM
500 CFM N
A
167 CFM
A
E
KEY PLAN N 418 CFM
N 418 CFM
C
N 418 CFM
C
C
1000 CFM
400 CFM N
N
N
N
N E
167 CFM
North
B
1
1120 CFM
B
1120 CFM
N A
N 167 CFM
1120 CFM
S w
N
D
N
167 CFM
A
PARTIAL FIRST FLOOR MECHANICAL PLAN
N A
167 CFM
A
B
DIGITAL PRINTING AND GRAPHICS LAB - MECHANICAL FLOOR PLAN
23 M-1
C ON N
EC
A
E
SI
ST
T
TY
C UT
CEN
R
AL
TI
T
Central Connecticut State University
U N IV
ER
1615 Stanley Street New Britain, CT 06050
REVISIONS NUMBER
DATE
DESCRIPTION
NICOLAUS COPERNICUS HALL RENOVATION TO THE DIGITAL PRINTING AND GRAPHICS TECHNOLOGY LAB
1
RSV BOX WITH REHEAT COIL CONTROL DETAIL E
KEY PLAN
N
S w
MECHANICAL DETAILS
2
HOT WATER HEATING COIL PIPING DETAIL (PART OF RSV BOX)
23 M-2
KEY NOTES
#
ALL LIGHTING CIRCUIT WIRING TO BE NEW & COMPLETE TO EXISTING LIGHTING PANEL.
NOTES
SYMBOL LEGEND
C ON N
EC
A
E
SI
ST
T
TY
C UT
CEN
R
AL
TI
T
1
Central Connecticut State University
U N IV
ER
1615 Stanley Street New Britain, CT 06050 EM2 REVISIONS EM2 A
A
A
A
A
A
A
NUMBER
DATE
DESCRIPTION
A
A
NIGHT LIGHT
A
NICOLAUS COPERNICUS HALL
A A
A
A
EM1
RENOVATION TO THE DIGITAL PRINTING AND GRAPHICS TECHNOLOGY LAB
A A NIGHT LIGHT
A
A
A
A
C
C
C
B C
A
EM2
A
A
A
A
B
A
A
A
EM2
E
KEY PLAN
C A
EM1
A
A
A
A
A
A
A
A
A
A
A
A
N
S w
1
B C
B C A
A
A
A
A
A
NIGHT LIGHT
A
A
A
A
A
PARTIAL FIRST FLOOR POWER AND LIGHTING PLAN, LEGEND & NOTES
A A
North
1
DIGITAL PRINTING AND GRAPHICS LAB - ELECTRICAL FLOOR PLAN
A
A
A
23
E-1
C ON N
EC
A
E
SI
ST
T
TY
C UT
CEN
R
AL
TI
T
Central Connecticut State University
U N IV
ER
1615 Stanley Street New Britain, CT 06050
REVISIONS NUMBER
DATE
DESCRIPTION
SYMBOL LEGEND (CONT.)
NICOLAUS COPERNICUS HALL RENOVATION TO THE DIGITAL PRINTING AND GRAPHICS TECHNOLOGY LAB
E
KEY PLAN
N
S w
ELECTRICAL NOTES AND SCHEDULES
23
E-2
Central Connecticut State University C ON N
EC
A
E
SI
ST
T
TY
C UT
CEN
R
AL
TI
T
EQUIPMENT SCHEDULE
U N IV
ER
1615 Stanley Street New Britain, CT 06050
REVISIONS NUMBER
DATE
DESCRIPTION
KEY NOTES - PROPOSED FLOOR PLAN
CODE REQUIREMENTS: ALL WORK MUST COMPLY WITH THE REQUIREMENTS OF ALL APPLICABLE CODES, RULES, AND REGULATIONS.
ALL DIMENSIONS ARE APPROXIMATE AND SHOULD BE FIELD VERIFIED BY THE CONTRACTOR.
ALL EQUIPMENT SHOWN (N.I.C.) IS FOR REFERENCE ONLY UNLESS OTHERWISE ONLY.
NICOLAUS COPERNICUS HALL RENOVATION TO THE DIGITAL PRINTING AND GRAPHICS TECHNOLOGY LAB
E
KEY PLAN
N
S w
PARTIAL FIRST FLOOR EQUIPMENT PLAN AND SCHEDULE
North
1
DIGITAL PRINTING AND GRAPHICS LAB - EQUIPMENT FLOOR PLAN
23 EQ-1