Capital Improvement Program Summary The Capital Improvement Program section of the budget includes the programs that directly support the purchase and maintenance of County-owned properties, such as parks, Thun Field, Tacoma Narrows Airport, the County-City Building, the ferry system, sewer systems, solid waste sites, the County jail, and the emergency communications network, to name a few. Funding Source Taxes/Fees Service Fees Grants and Contributions Bonds Intergovemental Loans Fund Balance Total

2015 $

16,511,660 7,836,300 22,428,170 — 36,240,000 54,562,470 137,578,600

$

Percent of Total 12.0% 5.7% 16.3% 0.0% 26.3% 39.7% 100.0%

2012 to 2015 Capital Improvement Program funding in 2015 is 60%, or $50.6 million, higher than the previous three years. The $50.6 million increase from 2012 to 2015 is largely due to the availability of increased revenue as the County recovers from the recession, and the major investment in the expansion of the Chambers Creek Regional Wastewater Treatment Plant. In 2015, the expansion of the Wastewater Treatment Plant accounts for $94.1 million, or 69.3%, of total Capital Improvement funds.

2015 Current Budget In 2015, infrastructure items that were delayed due to the recession are now being prioritized and completed. Bonds have been issued to fund the Wastewater Treatment Plant expansion through 2016.

Capital Improvement Program Page 506 515 516 519 522 526 528 534 537 540 542 544 547 548

Airports District Court Emergency Management Ferry System General Admin Buildings Juvenile Court Parks and Recreation Roads Bldgs and Facilities Sewer Utility Sheriff Sheriff's Corrections and Detention Center Solid Waste Superior Court Surface Water & River Total

Pierce County 2015 Budget

2015 Budget $ 3,235,500 — 2,000,000 4,435,000 1,450,000 75,000 2,261,230 2,218,000 94,086,270 225,000 200,000 167,000 — 27,225,600 $ 137,578,600

493

Program Summaries Pierce County updates the six-year Capital Improvement Plan annually and appropriates funding for the first year of the plan.

2015 Funding $249,500 , 8% $240,000 , 7%

$2,110,000 , 65%

$225,000 , 7%

$412,000 , 13% Federal Grants

State Grants

1st REET

Unfunded

Local

Airports State and federal grants will fund 20% to 27% of capital improvement costs in 2015. Other sources of funds will be taxes, fees and other local funds. Local funds supporting the airports’ capital program consist of 1st Real Estate Excise Tax (REET), fees, and an intergovernmental loan. See pages 506-514 for more details. Project

2015

2016-20

Total

$0

$3,702,000

$3,702,000

$1,775,000

$0

$1,775,000

Planning

$380,000

$140,000

$520,000

Preserva tion

$142,500

$689,000

$831,500

Water System

$603,000

$207,000

$810,000

Other

$335,000

$104,000

$439,000

$3,235,500

$4,842,000

$8,078,500

Runways Hangar

Total

Emergency Management The primary focus is implementation of the new radio communications system. See pages 516-518 for more details. Funding for projects come from service fees. Project Towers

494

2015

2016-20

Total

$200,000

$0

$200,000

Network

$1,800,000

$0

$1,800,000

Total

$2,000,000

$0

$2,000,000

Pierce County 2015 Budget

Capital Improvement Program Summaries

2015 Funding $2,214,000 , 50%

Ferry $700,000 , 16% $84,000 , 2%

County Road

$1,437,000 , 32% Ferry Fees

Surface Transportation

Unknown/grant

The capital program for the Pierce County ferry system focuses on preservation and new capacity. See pages 519-521 for more details. Project

2015

2016-20

Total

Anderson Island

$1,528,000

$2,000

$1,530,000

Steilacoom Landing

$2,907,000

$2,000

$2,909,000

$0

$2,080,000

$2,080,000

$4,435,000

$2,084,000

$6,519,000

Ketron Landing Total

General Administration The capital program for General Administration Buildings is funded by 1st REET. See pages 522-525 for more details. Project Backfill Plan

2016-20

Total

$1,000,000

$0

$1,000,000

CCB

$225,000

$0

$225,000

Various Projects Studies

$225,000

$0

$225,000

Out year projects

$0

$23,115,000

$23,115,000

$1,450,000

$23,115,000

$24,565,000

Total

Pierce County 2015 Budget

2015

495

Capital Improvement Program Summaries

Juvenile Court The capital program for Juvenile Court is funded by 1st REET. See pages 526-527 for more details. Project

2015

Exit remodel to match code

Total

$75,000

$0

$1,075,000

$0

$1,000,000

$0

$75,000

$1,000,000

$1,075,000

Repair Projects Total

2016-20

Parks and Recreation The capital program for Pierce County Parks and Recreation Services is funded primarily by Park Impact Fees, Park REET (2nd REET), and Park Sales Tax. See pages 528-533 for more details.

2015 Funding

$535,000 , 24% $539,260 , 24%

$180,000 , 8%

$70,000 , 3% Park REET

Grants

Park Impact Fees

Fund Balance

$936,970 , 41% Park Sales Tax

Project

2016-20

Total

Sprinker

$604,100

$2,512,590

$3,116,690

S Prairie

$862,900

$5,195,000

$6,057,900

Lakewood

$91,430

$1,816,310

$1,907,740

Swan Crk

$128,800

$0

$128,800

Puyallup

$180,000

$426,650

$606,650

Heritage

$0

$1,340,000

$1,340,000

Lk Tapps

$0

$175,000

$175,000

Spanaway

$0

$1,020,000

$1,020,000

Dawson

$0

$80,000

$80,000

County Wide

$259,000

$0

$259,000

Ashford

$125,000

$0

$125,000

Cascade Junction

$10,000

$0

$10,000

$2,261,230

$12,565,550

$14,826,780

Total

496

2015

Pierce County 2015 Budget

Capital Improvement Program Summaries

2015 Funding

Road Buildings and Facilities The capital program for Road Buildings and Facilities is funded by grants and the County Road Fund. See pages 534-536 for more details.

$1,218,000 55%

$1,000,000 45% Grants

County Road Fund

Project W Cty Facility Decant Phase 2 Salt Sheds Total

2%

$2,000 0%

$107,388,620 71%

$41,300,000 27% Fees

Grants

Bonds

2016-20

Total

$175,000

$10,015,000

$10,190,000

$1,330,000

$0

$1,330,000

$713,000

$0

$713,000

$2,218,000

$10,015,000

$12,233,000

Sewer Utility

2015 Funding $3,094,900

2015

Loans

The capital program for the Sewer Utility is funded by the Sewer Utility Construction Fund through revenues collected from ratepayers. See pages 537-539, and 385-388 for more details, fees, grants, bonds, and loans. The project list and associated expenditures are found in the Sewer Utility Const/Reserve/Preservation Fund section of this document.

Sheriff Facilities The capital program for Sheriff’s facilities is funded by 1st REET. See pages 540-541 for more details. Project Retaining Wall Security Fencing Other Total

Pierce County 2015 Budget

2015

2016-20

Total

$75,000

$0

$75,000

$150,000

$0

$150,000

$0

$600,000

$600,000

$225,000

$600,000

$825,000

497

Capital Improvement Program Summaries

Sheriff’s Corrections Bureau and Detention Facilities

This capital program is funded by 1st REET. See pages 542-543 for more details. Project Water Piping

2015

2016-20

Total

$200,000

$0

$200,000

Main Jail Remodel

$0

$3,800,000

$3,800,000

Plumbing

$0

$4,245,000

$4,245,000

Other

$0

$1,940,000

$1,940,000

$200,000

$9,985,000

$10,185,000

Total

Solid Waste The capital program for the Solid Waste Division is funded by the Solid Waste Management Fund (disposal fees). See page 544-546 for more details. Project Transfer Facility Transfer Expansion Total

2015 Funding

$1,765,500 7% $1,222,000 5%

1st REET

498

Fees

Tax

2016-20

Total

$167,000

$0

$167,000

$0

$1,143,000

$1,143,000

$167,000

$1,143,000

$1,310,000

Surface Water and River Improvement $253,600 $3,308,800 1% 13%

$19,182,600 74%

2015

Grants

The capital program for Surface Water and River Improvements is funded primarily by grants and 1st REET. See pages 548-549 and 399-403 for more details. Specific projects can be found in the Surface Water Management Construction Fund on pages 393-398.

Donations

Pierce County 2015 Budget

Capital Improvement Overview Introduction The Capital Improvement Program (CIP) is the operational implementation of the Capital Facilities Plan (CFP). The CFP is one of the elements of Pierce County's comprehensive plan that is required by Washington's Growth Management Act (GMA).

GMA The GMA requires the CFP to identify public facilities that will be needed to address development expected to occur during the next six years. The CFP must identify the location and cost of the facilities and the sources of revenue that will be used to fund the facilities needed to support development. The CFP must be financially feasible; in other words, dependable revenue sources must equal or exceed anticipated costs. If the costs exceed the revenue, the County must reduce its level of service, reduce costs by implementing non-capital alternatives or other methods, or modify the land use element to bring development into balance with available or affordable facilities. Other requirements of the GMA mandate forecasts of future needs for capital facilities and the use of standards for level of service facility capacity as the basis for public facilities contained in the CFP. As a result, public facilities in the CFP must be based on quantifiable, objective measures of capacity, such as traffic volume capacity per mile of road or acres of park per capita. One of the goals of the GMA is to: "Ensure that those public facilities and services necessary to support development shall be adequate to serve the development at the time the development is available for occupancy and use . . ." In Pierce County, concurrency is required for sanitary sewer, septic and community systems, water, surface water, County roads, transit, and ferries. For these facilities, the following is required: 1) facilities serving the development to be in place at the time of development (or, for some types of facilities, Pierce County 2015 Budget

499

Capital Improvement Overview that a financial commitment is made to provide the facilities within a specified period of time), and 2) such facilities have sufficient capacity to serve development without decreasing level of service below minimum standards adopted in the CFP. The GMA requires concurrency for transportation facilities. For transportation facilities, concurrent with development means "improvements or strategies are in place at the time of development, or that a financial commitment is in place to complete the improvements or strategies within six years." GMA also requires public facilities and services to be "adequate." These public facilities and services include: streets, roads, highways, sidewalks, street and road lighting systems, traffic signals, domestic water systems, storm and sanitary sewer systems, parks and recreational facilities, schools, fire protection and suppression, law enforcement, public health, education, recreation, environmental protection, and other governmental services. The County's development regulations, adopted July 1995, implement the plan and provide detailed regulations and procedures for implementing the requirements of the plan. The purpose of the CFP is to use sound fiscal policies to provide adequate public facilities consistent with the Land Use Element on a schedule concurrent with, or prior to, the impacts of development in order to achieve and maintain adopted standards for level of service, and to exceed the adopted standards, when possible. There are at least three reasons to plan for capital facilities: 1) growth management, 2) good management, and 3) eligibility for grants and loans. A. Growth Management. 1. A CFP is required by the GMA. The CFP is one of six required elements of the local government's comprehensive plan. 2. Capital facilities plans are required in a comprehensive plan to:

500

a. Provide capital facilities for land development that is envisioned or authorized by the land use element of the comprehensive plan. b. Maintain the quality of life for existing and future development by establishing and maintaining standards for the level of service of capital facilities. c. Coordinate and provide consistency among the many plans for capital improvements, including: (1) Other elements of the comprehensive plan (i.e., transportation, land use, and utilities elements); (2) Plans and other studies of the local government; (3) Plans for capital facilities of state and regional significance; (4) Plans of other adjacent local governments; and, (5) Plans of special districts. d. Ensure the timely provision of adequate facilities as required by the GMA. e. Document capital projects and their financing (including projects to be financed by impact fees and real estate excise taxes that are authorized by the GMA). 3. The CFP is the element that makes the rest of the comprehensive plan real. By establishing Level of Service as the basis for providing capital facilities and for achieving concurrency, the CFP determines the quality of life in the community. Funding sources identified in the CFP are assumed to be commitments by the County. If any of these commitments for concurrency Pierce County 2015 Budget

Capital Improvement Overview related improvements cannot be fulfilled, the County must make adjustments in the land use plan, find non-capital alternatives or use other methods to meet the need, or modify the level of service standard. In this way, the CFP can affect the size and configuration of an urban growth area. B. Good Management. Planning for major capital facilities and their costs enables Pierce County to: 1. Demonstrate the need for facilities and the need for revenues to pay for them; 2. Estimate eventual operation and maintenance costs of new capital facilities that will impact the annual budget; 3. Take advantage of sources of revenue (i.e., grants, impact fees, real estate excise taxes) that require a CFP in order to qualify for the revenue; and, 4. Get better ratings on bond issues when the County borrows money for capital facilities (thus reducing interest rates and the cost of borrowing money). C.

Prioritizing Employment Centers. Creating a jobs-based economy for Pierce County is one of the major goals of this Comprehensive Plan. Policies in the Economic Development and Land Use Elements direct the Capital Facilities Element to give priority to providing public facilities and services to locations identified as designated Employment Centers. The Employment-Based Planned Community land use designation includes suitable areas for commercial/industrial acreage; however, the provision of public facilities and services to these areas is the responsibility of the developer of the project site. Employment Centers are identified in the Economic Development Element of the Comprehensive Plan. Changes to the list and locations of

Pierce County 2015 Budget

Employment-Based Planned Communities and Employment Centers are based upon amendments to the Comprehensive Plan and annexation or incorporation. D. Phasing of Urban Growth. The countywide Planning Policies for Phasing of Development within the urban growth area call for the County and each municipality to seek to direct growth as follows: 1. First to centers and urbanized areas with existing infrastructure capacity; 2. Second to areas that are already urbanized such that infrastructure improvements can be easily extended; and, 3. Last to areas requiring infrastructure improvements.

major

In addition, the countywide Planning Policies provide directions regarding provision of infrastructure as follows: 1. Capital facilities plans shall identify existing, planned, and future infrastructure needs within urban growth areas. 2. The County and each municipality in the County should identify appropriate levels of service and concurrency standards that address schools, sewer, water, and parks. 3. The County and each municipality in the County shall identify appropriate levels of service and concurrency standards that address roads. E. Eligibility for Grants and Loans. The State of Washington Department of Commerce’s Public Works Trust Fund requires that local governments have some type of CFP in order to be eligible for loans. Some other grants and loans have similar requirements, or give preference to governments that have a CFP. 501

Capital Improvement Overview

Recurring and Non-Recurring Capital Improvements Recurring capital improvements are non-major repairs and maintenance, and minor upgrades. Pursuant to the Washington Budgeting, Accounting, and Reporting System (BARS), these expenditures are generally coded in object 35 (minor equipment) or object 48 (repairs and maintenance). These expenditures are excluded from the CFP. Examples include IT hardware and software upgrades, Sheriff’s patrol aircraft and K-9 units, chairs, and printers.

Repairs and Maintance Costs Dollars (Million)

30 25

24.31 18.78

20

20.89

20.01

15 10

The Capital Improvement Program in this budget document sets the first year based on the County Council authorized capital program expenditures. The CFP projects are prepared and submitted by the departments. The Budget and Finance and the Planning and Land Services Departments coordinate preparation and publication of the plan. The County Executive approves the draft plan and forwards it to the Planning Commission. The Planning Commission reviews the draft, holds hearings in which some departments may be asked to provide additional explanation and detail, and then forwards the plan to the County Council with recommendations. After Committee hearings, the County Council adopts the CFP by resolution concurrent with the operating budget.

Prioritization

5 0 2012

2013

2014

2015

A “non-recurring capital improvement” for the CFP expenditure must be for the acquisition of a physical asset which has a useful life of at least 10 years. Excluded from the definition are such items as vehicles, office and data processing equipment, other equipment items (unless they are an integral part of the larger physical improvement), and normal repairs and maintenance. Also, projects with a total expenditure of less than $150,000 are excluded from the CFP, but are included here in order to maintain consistency with the adopted budget. Projects funded by real estate excise tax (REET) or the General Fund are usually budgeted and managed by the Facilities Management Department.

Process The Plan is updated annually to reflect a new sixyear timeframe, current population projections, and changes to proposed capital improvement projects. The County uses population estimates 502

prepared annually by the Washington State Office of Financial Management (OFM) and extrapolated (straight line) for future years.

The County Executive and County Council establish policies and priorities to meet service and public policy goals. Generally, preservation and maintenance of existing, essential public facilities are the highest priority followed by upgrades and expansion to meet level of service and concurrency goals. Some projects must be undertaken to meet external mandates (such as National Pollutant Discharge Elimination System (NPDES) or to take advantage of grant opportunities. Each applicable department prepares six-year (14 in the case of the Ferry System) project plans and budgets to meet these goals. The County Executive, County Council, and departments are also guided by specific master plans such as the Park Recreation Open Space Plan, and other long range and community plans. Since current and anticipated revenues almost always fall short, many projects do not receive funding. However, these unfunded projects are listed in the complete CFP in order to inform future deliberations.

Pierce County 2015 Budget

Capital Improvement Overview

Total Capital Facilities Plan

(Excluding Transportation Improvement Program) 176,551

Dollars (1,000)

139,236 82,623

2008

54,433

52,283

2009

2010

67,498

2011

137,579

85,193

2012

2013

2014

2015

The Sewer Utility has begun a major expansion of the Waste Water Treatment Plant. See the Public Works and Utilities section for additional details. The following departments have capital expenditures budgeted for 2015 through 2020.

Capital Improvement Project Summary Airports District Court Emergency Management Ferry System General Admin Buildings Juvenile Court Parks and Recreation Roads Bldgs and Facilities Sewer Utility Sheriff Sheriff's Corrections and Detention Center Solid Waste Superior Court Surface Water & River Total

$

2015 2016 2017 3,235,500 $ 468,000 $ 451,000 — — — 2,000,000 — — 4,435,000 4,000 30,000 1,450,000 13,440,000 8,925,000 75,000 200,000 200,000 2,261,230 5,115,400 6,158,500 2,218,000 5,865,000 3,650,000 94,086,270 37,976,700 12,651,000 225,000 600,000 — 200,000 2,760,000 5,725,000

167,000 — 229,000 — — — 27,225,600 31,247,100 26,236,000 $ 137,578,600 $ 97,676,200 $ 64,255,500 $

2015 Capital Improvement Projects Sources of Funds The sources of funds for capital improvement projects have been grouped into five major categories: Taxes/Fees - This source of revenue includes non-dedicated taxes and fees such as sales tax, property tax, court fines, licenses, and permits. This category also includes dedicated

Pierce County 2015 Budget

$

2018 2019 123,000 $ 430,000 — — — — 50,000 1,000,000 250,000 250,000 200,000 200,000 615,000 250,000 500,000 — 15,812,600 20,321,000 — — 1,500,000 —

$

362,000 200,000 — — 17,188,000 18,470,000 36,600,600 $ 41,121,000 $

2020 3,370,000 — — 1,000,000 250,000 200,000 426,650 — 20,300,000 — — 352,000 — 18,641,000 44,539,650

taxes and fees such as park impact fees, park sales tax, and gas taxes. Service Fees - These fees are for specific services provided. Examples are E911, golf course fees, sewer fees, and surface water management fees. Grants & Contributions - This source of revenue includes federal, state, and city contributions for specific projects or purposes. Examples include road funds, parks donations and grants, mental health and human services 503

Capital Improvement Overview grants, and the City of Tacoma portion of the County-City Building. Bonds - This is interest bearing debt issued by the County.

Intergovernmental Loans - This category is used for loans from one department to another, or from a tax/fees fund to a user fee (enterprise) fund.

Capital Improvement Source of Funds Taxes/Fees Service Fees Grants and Contributions Bonds Intergovemental Loans Fund Balance Total

2015 2016 $ 16,511,660 $ 28,634,190 $ 7,836,300 19,397,700 22,428,170 25,719,310 — 22,850,000 1,075,000 36,240,000 54,562,470 — $ 137,578,600 $ 97,676,200 $

2015 Impact on the Operating Budget Each subsection provides a forecast of the future maintenance and operating costs of capital improvement projects. The impacts of each project are presumed to begin in the year after the year in which the project is completed. Since it is not possible to forecast the completion date of each project, impacts have not been developed for any portion of the year in which the project is completed. The forecast of operating impacts is included because the substantial cost impacts of some facilities may be a factor in the County's decision to construct the project. No “financing plan” is offered for the operating costs, and the County will be obliged to find revenue to pay for such costs. Some of the revenue may come from increases to the tax base that accompany the new development that created the need for the capital facility. There is no assurance, however, that the increased tax revenue from new development will

504

2017 2018 2019 2020 23,154,200 $ 4,446,000 $ 4,525,000 $ 4,973,650 14,692,500 22,197,700 25,038,000 25,340,000 21,758,800 9,456,900 11,200,000 12,411,000 — — 3,650,000 500,000 1,000,000 — 358,000 1,815,000 — — — — 64,255,500 $ 36,600,600 $ 41,121,000 $ 44,539,650

be sufficient to pay for the cost of operating the new facilities. The operating impact costs reflect the amount by which each future year's operating budget will increase compared to the current operating budget. The same project is shown to have the same annual impact on each succeeding year's operating budget. Sometimes, the completion of a capital improvement project will result in savings in operating costs, rather than incur new costs. In other instances, such as maintenance, renovation or repair projects, there will be no impact on operating costs. In these cases, zeroes are entered. For some projects the operating impact of the capital improvement projects cannot be calculated because of too many unknown factors, such as final configuration and type of facility, realignment of staffing, or the amount of shared infrastructure with current facilities. The departments in the table (shown on the next page) are those that are able to estimate impacts at this time.

Pierce County 2015 Budget

Capital Improvement Overview

Capital Improvement Impact on the Operating Budget Airports District Court Emergency Management Ferry System General Admin Buildings Juvenile Court Parks and Recreation Roads Bldgs and Facilities Sewer Utility Sheriff Sheriff's Corrections and Detention Center Solid Waste Superior Court Surface Water & River Total

$

$

2015

2016

2017

2018

2019

2020

— $ — 3,917,000 — — — 236,200 — — —

— $ — 4,112,750 — — — 219,700 — — —

— $ — 4,318,288 — — — 209,000 — — —

— $ — 4,534,102 — — — 218,300 — — —

— $ — 4,760,707 — — — 228,000 — — —

— — 4,998,642 — — — 237,800 — — —

— — — — 4,153,200 $

— — — — 4,332,450 $

— — — — 4,527,288 $

— — — — 4,752,402 $

— — — — 4,988,707 $

— — — — 5,236,442

In closing, this document contains summary capital improvement information. The complete CFP and detailed CIPs are available online. •

Capital Facilities Plan: http://www.piercecountywa.org/index.aspx?nid=94



Capital Improvement Plan: http://www.piercecountywa.org/TIP

Pierce County 2015 Budget

505

2015 Capital Improvement Projects

AIRPORTS The two County airports provide general and corporate aviation access to the east and western parts of Pierce County. Airports are to remain open 24 hours a day, 365 days a year, and be available for day to day service and emergency response/search and rescue support as needed. Adequate Public Facilities: It is the intent of the County CFP that adequate Airport facilities be available no later than occupancy of each new development. However, no development permit should be denied based on the County's inability to maintain level of service standards for the Department of Public Works and Utilities facilities.

2015 Projects

Obstruction Survey Thun Field Location Links to Other Projects Facilties Description Need Notes

Pierce County Airport - Thun Field (PLU), Puyallup

Aeronautical survey to increase the safety and efficiency of the airport and airspace Meet FAA requirements Program number 4392 2015 2016 2017 2018 2019 $ 120,000 $ — $ — $ — $

Total Cost

Annual M&O



Pierce County Airport - Thun Field (PLU), Puyallup 2015

Total Cost

2020 — $

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Wildlife Hazard Assessment Tacoma Narrows Location Links to Other Projects Facilties Description Need Notes Total Cost

506

Tacoma Narrows Airport (TIW), Gig Harbor

Wildlife hazard assessment Meet FAA requirements Program number 6806 2015 2016 $ 55,000 $

2017 — $

2018 — $

2019 — $

2020 — $



Pierce County 2015 Budget

2015 Capital Improvement Projects

Wildlife Hazard Assessment Tacoma Narrows Annual M&O

Tacoma Narrows Airport (TIW), Gig Harbor 2015

Total Cost

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



New Hangar Construction Thun Field Location Links to Other Projects Facilties Description Need Notes

Pierce County Airport , Thun Field (PLU), Puyallup

Construct one new hangar building containing 10 hangars Hangar need has exceeded available capacity Program number 4380 2015 2016 2017 $ 400,000 $ — $ — $

Total Cost

Annual M&O

2019 — $

2020 — $



Pierce County Airport , Thun Field (PLU), Puyallup 2015

Total Cost

2018

2016 — $

$

2017 — $

2018 — $

2019 — $

2020 — $



Airport Master Plan Update Thun Field Location Links to Other Projects Facilties Description Need Notes

Pierce County Airport , Thun Field (PLU), Puyallup All Update Airport Master Plan to reflect current conditions and future development plans FAA required and practical planning document for airport development Program number 6836 2015 2016 2017 2018 2019 $ 140,000 $ 140,000 $ — $ — $

Total Cost

Annual M&O

— $



Pierce County Airport , Thun Field (PLU), Puyallup 2015

Total Cost

2020

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Preservation-Hangars Thun Field Location Links to Other Projects Facilties Description Need Notes Total Cost

Pierce County Airport - Thun Field (PLU), Puyallup

Program number 4393 2015 $ 1,375,000 $

Pierce County 2015 Budget

2016

2017 — $

2018 — $

2019 — $

2020 — $



507

2015 Capital Improvement Projects

Preservation-Hangars Thun Field Annual M&O

Pierce County Airport - Thun Field (PLU), Puyallup 2015

Total Cost

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Preservation-Other Buildings Thun Field Location Links to Other Projects Facilties Description Need Notes

Pierce County Airport - Thun Field (PLU), Puyallup

SpanaFlight Building Upgrades and Facility Maintenance Replace leaking roof Program number 4394 2015 2016 2017 $ 1,500 $ 38,000 $ 20,000 $

Total Cost

Annual M&O

$

2019 20,000

$

2020 20,000

Pierce County Airport - Thun Field (PLU), Puyallup 2015

Total Cost

2018 20,000

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Preservation-Pavement Thun Field Location Links to Other Projects Facilties Description Need Notes

Pierce County Airport - Thun Field (PLU), Puyallup

Regrade and repave main parking area (4391) Program number 4395 2015 $ 20,000 $

Total Cost

Annual M&O



$

2017 84,000 $

2018

2019 — $

2020 — $



Pierce County Airport - Thun Field (PLU), Puyallup 2015

Total Cost

2016

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Preservation-Security Thun Field Location Links to Other Projects Facilties Description Need Notes Total Cost

508

Pierce County Airport - Thun Field (PLU), Puyallup

Program number 4396 2015 $ 1,000 $

2016

2017 — $

2018 — $

2019 — $

2020 — $



Pierce County 2015 Budget

2015 Capital Improvement Projects

Preservation-Security Thun Field Annual M&O

Pierce County Airport - Thun Field (PLU), Puyallup 2015

Total Cost

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Preservation-Miscellaneous Thun Field Location Links to Other Projects Facilties Description Need

Pierce County Airport - Thun Field (PLU), Puyallup

Notes

Program number 4397 2015 $ 2,000 $

Total Cost

Annual M&O

2017 — $

2018

2019

— $

— $

2020 — $



Pierce County Airport - Thun Field (PLU), Puyallup 2015

Total Cost

2016

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Chlorination System Tacoma Narrows Location Links to Other Projects Facilties Description Need Notes

Tacoma Narrows Airport (TIW), Gig Harbor

Program number 6808 2015 $ 6,000 $

Total Cost

Annual M&O

2017 — $

2018

2019

— $

— $

2020 — $



Tacoma Narrows Airport (TIW), Gig Harbor 2015

Total Cost

2016

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Water Meters Tacoma Narrows Location Links to Other Projects Facilties Description Need Notes Total Cost

Tacoma Narrows Airport (TIW), Gig Harbor

Install water meters at each service connection Required by code by 2017 Program number 6814 2015 2016 2017 $ 57,000 $ — $

Pierce County 2015 Budget

2018 — $

2019 — $

2020 — $

— 509

2015 Capital Improvement Projects

Water Meters Tacoma Narrows Annual M&O

Tacoma Narrows Airport (TIW), Gig Harbor 2015

Total Cost

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



New Bathroom Facility Tacoma Narrows Location Links to Other Projects Facilties Description Need Notes

Tacoma Narrows Airport (TIW), Gig Harbor

Install a new public restroom facility in preparation for increased traffic during 2015 U.S. Open Increased capacity

Total Cost

Annual M&O

$

2015 76,000 $

2017 — $

2018 — $

2019 — $

2020 — $



Tacoma Narrows Airport (TIW), Gig Harbor 2015

Total Cost

2016

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Stormwater Outfall Improvements Tacoma Narrows Location Links to Other Projects Facilties Description Need Notes

Tacoma Narrows Airport (TIW), Gig Harbor

Program number 6817 2015 $ 540,000 $

Total Cost

Annual M&O

2017 — $

2018 — $

2019 — $

2020 — $



Tacoma Narrows Airport (TIW), Gig Harbor 2015

Total Cost

2016

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Entry Signage and Gateway Tacoma Narrows Location Links to Other Projects Facilties Description Need Notes Total Cost

510

Tacoma Narrows Airport (TIW), Gig Harbor

New airport entry signage Enhance airport gateway aesthetic

$

2015 150,000 $

2016

2017 — $

2018 — $

2019 — $

2020 — $



Pierce County 2015 Budget

2015 Capital Improvement Projects

Entry Signage and Gateway Tacoma Narrows Annual M&O

Tacoma Narrows Airport (TIW), Gig Harbor 2015

Total Cost

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Obstruction Survey Tacoma Narrows Location Links to Other Projects Facilties Description Need Notes

Tacoma Narrows Airport (TIW), Gig Harbor

Aeronautical survey to increase the safety and efficiency of the airport and airspace Meet FAA requirements Program number 6804 2015 2016 2017 2018 2019 $ 120,000 $ — $ — $ — $

Total Cost

Annual M&O



Tacoma Narrows Airport (TIW), Gig Harbor 2015

Total Cost

2020 — $

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Wildlife Hazard Assessment Tacoma Narrows Location Links to Other Projects Facilties Description Need Notes

Tacoma Narrows Airport (TIW), Gig Harbor

Wildlife hazard assessment Meet FAA requirements Program number 6806 2015 2016 $ 55,000 $

Total Cost

Annual M&O

2018 — $

2019 — $

2020 — $



Tacoma Narrows Airport (TIW), Gig Harbor 2015

Total Cost

2017 — $

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Preservation-Hangars Tacoma Narrows Location Links to Other Projects Facilties Description Need Notes Total Cost

Tacoma Narrows Airport (TIW), Gig Harbor

Replace and repair doors on county-owned hangars Service life has been reached Program number 4393 2015 2016 2017 $ 25,000 $ 25,000 $ 85,000

Pierce County 2015 Budget

$

2018 51,000 $

2019

2020 — $



511

2015 Capital Improvement Projects

Preservation-Hangars Tacoma Narrows Annual M&O

Tacoma Narrows Airport (TIW), Gig Harbor 2015

Total Cost

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Preservation-Other Buildings Tacoma Narrows Location Links to Other Projects Facilties Description Need Notes

Tacoma Narrows Airport (TIW), Gig Harbor

Facility Maintenance Program number 4394 2015 $ 20,000 $

Total Cost

Annual M&O

2017 32,000

$

$

2018 32,000

$

2019 32,000

$

2020 32,000

Tacoma Narrows Airport (TIW), Gig Harbor 2015

Total Cost

2016 68,000

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Preservation-Pavement Tacoma Narrows Location Links to Other Projects Facilties Description Need Notes

Tacoma Narrows Airport (TIW), Gig Harbor

Program number 4395 2015 $ 1,000 $

Total Cost

Annual M&O

2017 — $

2018 — $

2019 — $

2020 — $



Tacoma Narrows Airport (TIW), Gig Harbor 2015

Total Cost

2016

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Preservation-Security Tacoma Narrows Location Links to Other Projects Facilties Description Need Notes Total Cost

512

Tacoma Narrows Airport (TIW), Gig Harbor

Fencing and Gates Program number 4396 2015 $ 70,000 $

2016 100,000 $

2017

2018 — $

2019 — $



$

2020 30,000

Pierce County 2015 Budget

2015 Capital Improvement Projects

Preservation-Security Tacoma Narrows Annual M&O

Tacoma Narrows Airport (TIW), Gig Harbor 2015

Total Cost

$

2016

2017

— $

2018

— $

— $

2019 — $

2020 — $



Preservation-Miscellaneous Tacoma Narrows Location Links to Other Projects Facilties Description Need Notes

Tacoma Narrows Airport (TIW), Gig Harbor

Program number 4397 2015 $ 1,000 $

Total Cost

Annual M&O

2017 — $

2018 — $

2019 — $

2020 — $



Tacoma Narrows Airport (TIW), Gig Harbor 2015

Total Cost

2016

$

2016

2017

— $

2018

— $

— $

2019 — $

2020 — $



Source of Funds WA State DOE Grant FAA Grant WSDOT Grant REET Local Funds Unfunded Total Sources

2015 405,000 $ 225,000 7,000 248,500 2,110,000 240,000 3,235,500 $

$

$

2016

2017

— $ 126,000 7,000 140,000 20,000 175,000 468,000 $

2018

— $ 161,000 5,000 133,000 52,000 100,000 451,000 $

2019

— $ — — 51,000 72,000 — 123,000 $

2020

— $ — — — 72,000 358,000 430,000 $

— 1,199,000 12,000 272,000 72,000 1,815,000 3,370,000

Total Annual M&O 2015 Total Cost

$

Pierce County 2015 Budget

2016 — $

2017 — $

2018 — $

2019 — $

2020 —

$



513

2015 Capital Improvement Projects

Relation to Growth Management Act The GMA recognizes general aviation airports as essential public facilities and requires that the capital needs of these facilities be considered within the Comprehensive Plan and Capital Facilities Plan. The airports’ capital plans through 2015 are exclusive to maintenance, improvements, and preservation of current capital assets. These projects will not increase the level of service but will improve the safety and longevity of the current infrastructure.

Airports Level of Service Aircraft Operations Demand Aircraft Operations Capacity Net Reserve or (Deficiency) Thun Field 2014 Estimated 2015-2019: Growth Total as of 2019 2020-2024: Growth Total as of 2024

62,000

150,000

88,000

150,000

83,000

72,000

150,000

78,000

59,000

230,000

171,000

230,000

167,000

230,000

163,000

5,000 67,000 5,000

Tacoma Narrows 2014 Estimated 2015-2019: Growth Total as of 2019 2020-2024: Growth Total as of 2024

514

4,000 63,000 4,000 67,000

Pierce County 2015 Budget

2015 Capital Improvement Projects

DISTRICT COURT

The mission of Pierce County District Court, as an independent and impartial branch of government, is to promote respect for law, society, and individual rights; provide open, accessible, and effective forums for dispute resolution; resolve legal matters in a just, efficient, and timely manner; and, assure the dignified and fair treatment of all parties.

Pierce County District Court is a court of limited jurisdiction over the following cases: traffic infractions; criminal, traffic, and gross misdemeanors; civil matters for damages for injury to individuals or personal property, penalties and contract disputes no greater than $75,000; civil claims, known as “small claims,” for recovery of money only where the amount claimed does not exceed $5,000; name changes; and, anti-harassment protection orders. Adequate Public Facilities: It is the intent of the County CFP that adequate District Court facilities be available no later than occupancy of each new development. However, no development permit should be denied based on the County's inability to maintain level of service standards for District Court facilities.

2015 Projects There are no projects funded for the 2015-2020 years. Upon completion the recommendations of the Justice Center Planning Committee will be reflected in future Capital Facilities Plans.

Relation to Growth Management Act The level of service for District Court is one courtroom per judicial position.

District Court Level of Service Court Case Per Year 2015 Estimated 2013-2020: Growth Total as of 2020

Pierce County 2015 Budget

90,931 6,880 97,400

Courtrooms Required at 1 Per Judicial Officer

Current Courtrooms Available

Net Reserve

8

8









9

8

(1)

515

2015 Capital Improvement Projects

EMERGENCY MANAGEMENT The mission of the Department of Emergency Management (DEM) is the preparation of Pierce County for disaster through public education, training, and planning; the support of a system of emergency medical and trauma care; the prevention of fires through inspection, plan review, education, and investigation; and the administration of radio communication needs and the Enhanced 911 program. Adequate Public Facilities: It is the intent of the County CFP that adequate DEM facilities be available no later than occupancy of each new development. However, no development permit should be denied based on the County's inability to maintain level of service standards for DEM facilities.

2015 Projects

DEM - Radio Emergency Communications Network Location Links to Other Projects Facilties

Tacoma None

Description

Pierce County’s current radio communications system is a 1970s technology that is on a VHF radio frequency that is not interoperable with radio systems in Tacoma, Puyallup, Lakewood, Steilacoom, Bonney Lake, and King and Snohomish Counties. Thurston County is also in the process of transitioning to a different radio system. Pierce County DEM and the Sheriff’s Department have been jointly working together with King and Snohomish Counties in a tri-county emergency communications group to evaluate the feasibility of a next generation interoperable communications system that could link all three counties. We have progressed far enough in the process to understand that our next generation system will be on the 700/800MHz radio bands. This will require design and development of additional radio sites. The current VHF radio system is obsolete and does not provide enough frequencies for our current operations and there is a lack of additional VHF frequencies available. Further, the VHF band is not utilized by other law enforcement and fire agencies that we need to communicate on a daily basis or during larger scale regional operations and emergencies. Lastly the current VHF technology does not provide the latest features able to identify officers by a keying of their microphones, and other modern features. These features will provide dramatic safety improvements for the deputies in the field.

Need

Notes Total Cost

2015 1,800,000 $

$

Annual M&O

Tacoma

Total Cost

$

516

2015 3,915,000 $

2016

2017 — $

2016 4,110,750 $

2018 — $

2017 4,316,288 $

2019 — $

2018 4,532,102 $

2020 — $



2019 4,758,707 $

2020 4,996,642

Pierce County 2015 Budget

2015 Capital Improvement Projects

Three Sisters Radio Site Location Links to Other Projects Facilties

Enumclaw (Owned by Pierce County) None

Description

Pierce County’s current radio communication system is a 1970s technology that is on a VHF radio frequency that is not interoperable with radio systems in Tacoma, Puyallup, Lakewood, Steilacoom, Bonney Lake, and King and Snohomish Counties. Thurston County is also in the process of transitioning to a different radio system. Pierce County DEM and the Sheriff’s Department have been jointly working together with King and Snohomish Counties in a tri-county emergency communications group to evaluate the feasibility of a next generation interoperable communications system that could link all three counties. We have progressed far enough in the process to understand that our next generation system will be on the 700/800MHz radio bands. This will require design and development of additional radio sites. The current VHF radio system is obsolete. It does not provide enough frequencies for our current operations and there is a lack of additional VHF frequencies available. Further, the VHF band is not utilized by other law enforcement and fire agencies that we need to communicate with on a daily basis or during larger scale regional operations and emergencies. Lastly, the current VHF technology does not provide the latest features able to identify officers by keying their microphones and other modern features. These features will provide dramatic safety improvements for the deputies in the field.

Need

Notes Total Cost

2015 200,000 $

$

2016

Annual M&O

Enumclaw (Owned by Pierce County)

Total Cost

$

2015

2017 — $

2016 2,000 $

2018 — $

2017 2,000 $

2019

2018 2,000 $

2020

— $

— $

2019 2,000 $



2020 2,000 $

2,000

Source of Funds 2015 Federal Grant Local-County Local-Other Total Sources

$

$

— $ 2,000,000 — 2,000,000 $

2016

2017 — $ — — — $

2018 — $ — — — $

2019 — $ — — — $

2020 — $ — — — $

— — — —

Total Annual M&O Total Cost

$

2015 3,917,000 $

Pierce County 2015 Budget

2016 4,112,750 $

2017 4,318,288 $

2018 4,534,102 $

2019 4,760,707 $

2020 4,998,642

517

2015 Capital Improvement Projects

Relation to Growth Management Act The Department of Emergency Management (DEM) provides a variety of services to both unincorporated and incorporated areas within Pierce County. Those services consist of emergency preparedness training, hazard mitigation, fire prevention activities, County radio communications, and administration of emergency medical services. The DEM operates the Emergency Operations Center (EOC) during incidents and events, such as major flooding, windstorms, earthquakes, and man-made emergency incidents. Additionally, the DEM provides contract services for emergency management activities to cities and towns within Pierce County which require additional administrative and programmatic support. The Urban Search and Rescue warehouse houses the logistical support staff and the full cache of the Pierce County-sponsored Task Force. The Fire Prevention Bureau is in the Public Services Building (Annex). The Bureau is responsible for conducting fire inspections, inspections of business, issuance of permits, reviews of plans, and providing a public education program on fire safety and prevention for the benefit of all in the County. The 2015 proposed level of service (LOS) is directly attributable to the Radio Communications Tower sites and the coverage these sites provide to facilitating and supporting system-wide emergency communications by DEM and its partnering agencies. The optimal performance of the radio communications systems is expressed in terms of a load capacity that is not more than 80% of its total capacity. This LOS accurately reflects the true need of the DEM to provide on-going service to citizens of Pierce County.

518

Pierce County 2015 Budget

2015 Capital Improvement Projects

FERRY SYSTEM

The Pierce County ferry system provides sole, essential public ferry transportation between the town of Steilacoom, Anderson Island, and Ketron Island. The over-riding performance goals are to provide a 90-plus percent on time ferry service during scheduled ferry runs and to be prepared to provide emergency service whenever requested. The Pierce County ferry system includes two ferry vessels and three ferry terminals. Adequate Public Facilities: It is the intent of the County CFP that adequate Department of Public Works and Utilities facilities be available no later than occupancy of each new development. However, no development permit should be denied based on the County's inability to maintain level of service standards for Department of Public Works and Utilities facilities. Additional details are provided in the Transportation Improvement Program incorporated by reference herein.

2015 PROJECTS

Dolphins Location Links to Other Projects Facilties Description Need Notes

Anderson Island Landing None Replace ferry landing dolphins Environmental protection during construction Program Number 6947 2015 2016 2017 $ 1,393,000 $ 2,000 $

Total Cost

Annual M&O

— $

2019 — $

2020 — $



Anderson Island Landing 2015

Total Cost

2018

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Preservation Location Links to Other Projects Facilties Description Need Notes Total Cost

Steilacoom Ferry Landing None Repair dolphins, replace the transfer span main cylinder, and replace the main back-up generator Environmental protection during construction Program Number 6951 2015 2016 2017 2018 2019 $ 2,000 $ — $ — $ — $ — $

Pierce County 2015 Budget

2020 —

519

2015 Capital Improvement Projects

Preservation Annual M&O

Steilacoom Ferry Landing 2015

Total Cost

$

2016

2017

— $

2018

— $

2019

— $

— $

2020 — $



Wingwalls and Dolphins Location Links to Other Projects Facilties Description Need

Steilacoom Ferry Landing None Replace Wingwalls and Dolphins Environmental protection during construction Program Number 6959 2015 2016 2017 $ 2,905,000 $ 2,000 $

Notes Total Cost

Annual M&O

2019 — $

2020 — $



Steilacoom Ferry Landing 2015

Total Cost

2018 — $

$

2016

2017

— $

2018

— $

2019

— $

— $

2020 — $



Wingwall Preservation Location Links to Other Projects Facilties Description Need Notes

Anderson Island Ferry Landing None Repair timber wingwalls Program number 6146 2015 $ 135,000 $

Total Cost

Annual M&O

2017 — $

2018 — $

2019 — $

2020 — $



Anderson Island Ferry Landing 2015

Total Cost

2016

$

2016 — $

2017 —

$

2018 — $

2019 — $

2020 — $



Source of Funds County Road Fund Unidentified Traffic Impact Fee Ferry Boat Discretionary Surface Transportation Program (Rural) Total Sources 520

$

$

2015 1,437,000 $ 84,000 — 2,214,000 700,000 4,435,000 $

2016 4,000 — — — —

$

4,000 $

2017 30,000 — — — —

$

30,000 $

2018 50,000 — — — —

$

50,000 $

2019 1,000,000 — — — —

$

1,000,000 $

2020 1,000,000 — — — — 1,000,000

Pierce County 2015 Budget

2015 Capital Improvement Projects

Total Annual M&O 2015 Total Cost

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Relation to Growth Management Act The Ferry System is a component of Pierce County’s transportation system and a required capital facilities component pursuant to the Growth Management Act. The level of service established for the Ferry System is to maintain ferry capacity at 100% peak winter weekday demand.

Ferry System Level of Service Capacity Demand 2013 Actual 2013 to 2020: Growth Total as of 2020

Pierce County 2015 Budget

Capacity Available 513.0

Net Reserve 694

181.0

694

144.0

37 550.0

521

2015 Capital Improvement Projects

GENERAL ADMINISTRATION BUILDINGS General Administration Buildings house several Pierce County departments in a variety of leased ANNEX and owned space throughout the County. The majority of General Administration departments are located around the County-City Building (CCB) campus in downtown Tacoma and the Annex campus located at 2401 S. 35th St. Other General Administration facilities are located at various locations around the County, from the County owned Public Works and Utilities Environmental Services Building in University Place to the County owned Soundview Building at 3611 D St. The majority of Public Works administration services are housed in leased facilities around the Tacoma Mall. General Administration Departments Assessor-Treasurer Auditor Communications County Council Economic Development Facilities Management Human Resources South Sound 911 Parks Administration Prosecuting Attorney

Assigned Counsel Budget and Finance/Fleet Garage Community Connections County Executive Emergency Management Tacoma Pierce County Health Department Information Technology Medical Examiner Planning and Land Services Public Works and Utilities Administration

Adequate Public Facilities: It is the intent of the County CFP that adequate General Administration facilities be available as needed and resulting from increased demand for services from new development. However, no development permit should be denied based on the County's inability to maintain level of service standards for General Administration facilities.

2015 2015 PROJECTS Projects beyond 2015 are found in the 2015-2020 Capital Facilities Plan.

Backfill Projects Design Work Location

Various County facilities

Links to Other Projects Facilties Description Need

Backfill Planning/Remodel Projects

Notes

Total Cost

522

Continue design work for Justice Center (backfill) projects Design work needed for proper scoping of backfill projects Design work needed for proper scoping of backfill projects 2015 2016 2017 $ 1,000,000 $ — $ — $

2018

2019 — $

2020 — $



Pierce County 2015 Budget

2015 Capital Improvement Projects

Backfill Projects Design Work Various County facilities

Annual M&O

2015 Total Cost

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



CCB Data Center and SOC Relocation Location Links to Other Projects Facilties Description Need

Notes

Total Cost

County City Building None Complete design to resize and relocate data center and security operations center to the basement from the 7th and 2nd floors This will create a more secure monitoring and control area for the Courthouse Security function in the County-City Building and create space on the 7th Floor needed for tenant relocations and is essential for phasing of the Justice Center work This will create a more secure monitoring and control area for the Courthouse Security function in the County-City Building and create space on the 7th Floor needed for tenant relocations and is essential for phasing of the Justice Center work 2015 2016 2017 2018 2019 2020 $ 100,000 $ — $ — $ — $ — $ — County City Building

Annual M&O

2015 Total Cost

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Various GA Tenant Improvements Location Links to Other Projects Facilties

Various County facilities None

Description

County-wide tenant improvement work for various departments

Need

Existing tenant spaces are worn out and need to be updated

Notes Total Cost

2015 105,000

$

Annual M&O

$

Pierce County 2015 Budget

$

2017 100,000

$

2018 100,000

$

2019 100,000

$

2020 100,000

Various County facilities 2015

Total Cost

2016 100,000

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



523

2015 Capital Improvement Projects

Feasibility Studies Location Links to Other Projects Facilties Description

Various County facilities None Conduct various feasibility studies for improvements to county facilities to include items such as ADA upgrades and tenant improvement work

Need Notes Total Cost

2015 25,000

$

$

2016 50,000

$

2017 50,000

$

2018 50,000

$

2019 50,000

$

2020 50,000

Various County facilities

Annual M&O

2015 Total Cost

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Medical Examiner (M.E.) Security Camera Replacement Location Links to Other Projects Facilties Description

Medical Examiner - Exterior None

Need Notes

Cameras are at end of life and need replacement

Total Cost

Purchase and install security cameras to replace end of life cameras (2)

2015 20,000 $

$

2016

2017 — $

2018 — $

2019 — $

2020 — $



Medical Examiner - Exterior

Annual M&O

2015 $

Total Cost

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



CCB Cooling Tower Refurbishment Location Links to Other Description Need Notes Total Cost

Annual M&O Total Cost

524

County City Building None Refurbish Marley Cooling Tower on C-Wing Roof

$

2015 125,000 $ County City Building 2015 $ — $

2016

2017 — $

2016

2018 — $

2017 — $

2019 — $

2018 — $

2020 — $

2019 — $



2020 — $



Pierce County 2015 Budget

2015 Capital Improvement Projects

Annex West Security Camera Replacement Location Links to Other Description Need

Annex West None Replace end of life PTZ cameras with fixed cameras (8) Current cameras are at end of life, replacing with more appropriate cameras

Notes Total Cost

$

2015 75,000 $

2016

Annex West 2015 $ — $

Annual M&O Total Cost

2017 — $

2016

2018 — $

2017 — $

2019

2020

— $

2018 — $

— $

2019



2020

— $

— $



2018 150,000 $ 150,000 $

2019 150,000 $ 150,000 $

2020 150,000 150,000

Source of Funds Real Estate Excise Tax Total Sources

$ $

2015 2,450,000 $ 2,450,000 $

2016 150,000 $ 150,000 $

2017 150,000 $ 150,000 $

Total Annual M&O 2015 Total Cost

$

2016 — $

2017 —

$

2018 — $

2019 — $

2020 —

$



Relation to Growth Management Act The level of service for General Administration Buildings has historically been calculated using the most currently available population growth for incorporated and unincorporated Pierce County to calculate and project future office space needs for the general administrative function of the County. Given the dynamic nature of today’s and the future’s workforce and the variety of work space utilization, such as hotelling, job sharing, teleconferencing, telecommuting, and remote computer connectivity, this level of service calculation is no longer relevant. A more meaningful methodology is being researched by the Facilities Management Department staff and will be utilized in future years. In the meantime, the Facilities Management Department continues to lead Master Planning efforts that will help detail appropriate and efficient use of office space for the General Administration departments.

Pierce County 2015 Budget

525

2015 Capital Improvement Projects

JUVENILE COURT

The Pierce County Juvenile Court has exclusive jurisdiction over those juveniles within Pierce County who violate the criminal laws of this state or who are in need of protection and/or advocacy as a result of abuse, neglect, or abandonment. The Juvenile Department is responsible for the provision of probation, court, detention, adoption, and support services. To facilitate the operation of these statutory mandates, the agency is organized into specific sections: Administrative Services, Probation, Detention, and Court Services. All programs for the Pierce County Juvenile Court are currently housed in facilities located at 5501 6th Ave., Tacoma, also known as Remann Hall. These facilities are in poor condition and are not well suited for the program delivery. The Justice Center Planning Committee is analyzing the feasibility of consolidating and colocating justice programs onto the downtown County campus on Tacoma Avenue. The recommendations of this committee will be reflected in future Capital Facilities Plans. Adequate Public Facilities: It is the intent of the County CFP that adequate Court facilities and detention facilities be available no later than occupancy of each new development. However, no development permit should be denied based on the County’s inability to maintain level of service standards for court and detention facilities.

2015 Projects Additional projects that may impact Juvenile Court are listed in the General Administrative section and in the Juvenile Court section of the Capital Facilities Plan for 2015-2020.

Remann Hall School Wing Remodel Location Links to Other Projects Facilties Description

Remann Hall None Remodel and correct existing exiting at the Remann Hall School Wing to correct code deficiencies based on current use of space Code deficiencies need correcting

Need Notes Total Cost

Annual M&O

2015 75,000 $

$

2017 — $

2018 — $

2019 — $

2020 — $



Remann Hall 2015

Total Cost

2016

$

2016 —

2017

$



$

2018 —

$

2019 — $

2020 — $



Source of Funds Real Estate Excise Tax Total Sources 526

$ $

2015 75,000 $ 75,000 $

2016

2017 — $ — $

2018 — $ — $

2019 — $ — $

2020 — $ — $

— —

Pierce County 2015 Budget

2015 Capital Improvement Projects

Total Annual M&O 2015 Total Cost

$

2016 —

$

2017 —

$

2018 —

$

2019 —

$

2020 —

$



Relation to Growth Management Act The 2015 proposed level of service is 0.131 beds per 1,000 population. This was derived from 107 beds per 2013 countywide estimated population of 814,500.

Pierce County 2015 Budget

527

2015 Capital Improvement Projects

PARKS AND RECREATION

Created in 1958, Pierce County Parks and Recreation Services (PCP&RS) provides park and recreation services to the residents of Pierce County, focusing on the unmet needs of residents living in unincorporated areas. The Department is divided into four divisions: Resource Stewardship, Parks, Recreation, and Administrative Services.

Pierce County owns and manages 5,039 park-land acres that are the subject of level of service (LOS) under the Growth Management Act (GMA). Adequate Public Facilities: It is the intent of the County CFP that adequate recreation opportunities, parks, trails, and open space facilities be available no later than occupancy of each new development.

Ashford County Park at Ashford

2015 Projects

Foothills Trail Puyallup to Buckley Location

South Prairie to Buckley

Links to Other Projects Facilties Description

None

Need Notes

Per County Regional Trail Plan

Construct 2.3 miles of trail between Puyallup and Buckley

Total Cost

$

2015 862,900 $

2016 2,565,000

Annual M&O

South Prairie to Buckley

Total Cost

$

2015 232,700 $

$

2016

2017 2,565,000

$

2017

239,600 $

2018 65,000 $

2019

2018

246,900 $

2020 — $

2019

254,200

$



2020

261,900 $

269,700

SRC Elevator Replacement Location Links to Other Projects Facilties

Sprinker Recreation Center None

Description

Replace passenger elevator

Need

Original elevator is 40 years old. Controls and hydraulic system are prone to failure and beyond useful life.

Notes Total Cost

528

$

2015 121,900 $

2016

2017 — $

2018 — $

2019 — $

2020 — $



Pierce County 2015 Budget

2015 Capital Improvement Projects

SRC Elevator Replacement Annual M&O

Sprinker Recreation Center 2015

Total Cost

$

2016 500 $

2017 500

2018

$

2019

500 $

500 $

2020 500

$

500

SRC Roof Replacement Location Links to Other Projects Facilties Description Need

Sprinker Recreation Center None Replace roof over tennis center and community rooms Roof is 40 years old and leaking causing damage to other parts of building

Notes Total Cost

Annual M&O

Total Cost

2015 316,940 $

$

2016

2017 — $

2018

2019

— $

— $

2020 — $



2019 1,000 $

2020 1,000

2019

2020

Sprinker Recreation Center 2015 1,000 $

$

2016 1,000

2017 $

2018 1,000 $

1,000 $

LCC Gymnasium HVAC Location

Lakewood Community Center

Links to Other Projects Facilties Description

None

Need Notes

Exisiting 34 year old unit is non functional and at the end of its useful life

Replace existing HVAC unit serving gymnasium

Total Cost

Annual M&O

$

2015 91,430 $

2017 — $

2018 — $

— $

— $



Lakewood Community Center 2015

Total Cost

2016

$

Pierce County 2015 Budget

2016 500 $

2017 500

$

2018 500 $

2019 500 $

2020 500

$

500

529

2015 Capital Improvement Projects

Swan Creek Bridge Replacement Location Links to Other Projects Facilties Description Need Notes Total Cost

Annual M&O

Swan Creek Park None Replace existing pedestrian bridge over Swan Creek with new structure Existing bridge is at end of its useful life and needs replacement Working with Metro Parks Tacoma to partially fund construction 2015 2016 2017 2018 $ 128,800 $ — $ — $ — $

2020 — $



Swan Creek Park 2015

Total Cost

2019

$

2016 300 $

2017 300

$

2018 300 $

2019 300 $

2020 300 $

300

SRC Cooling Tower Scafolding Location Links to Other Projects Facilties Description Need Notes

Sprinker Recreation Center None Provide metal scaffolding around cooling tower in order to provide safe maintenance access Safe access to cooling tower for staff

Total Cost

Annual M&O

$

2015 30,480 $

2017 — $

2018 — $

2019 — $

2020 — $



Sprinker Recreation Center 2015

Total Cost

2016

$

2016 100 $

2017 100

$

2018 100 $

2019 100 $

2020 100

$

100

SRC Fire Station Property Location Links to Other Projects Facilties Description Need Notes

Sprinker Recreation Center None Purchase .35 acres owned by fire district in SW corner of parking lot Preserve parking lot size

Total Cost

Annual M&O

$

2015 121,900 $

530

2017 — $

2018 — $

2019 — $

2020 — $



Sprinker Recreation Center 2015

Total Cost

2016

$

2016 100 $

2017 100

$

2018 100 $

2019 100 $

2020 100

$

100

Pierce County 2015 Budget

2015 Capital Improvement Projects

PROS Plan Revisions Location Links to Other Projects Facilties Description Need Notes

Countywide Plan None Revisions to PROS Plan based on Comprehensive Plan integration

Total Cost

Annual M&O

$

2015 75,000 $

2016

2017 — $

2018 — $

2019 — $

2020 — $



Countywide Plan 2015

2016

Total Cost

$

— $

Location Links to Other Projects Facilties Description

Various Park Sites None

2017 —

$

2018 — $

2019 — $

2020 —

$



Conceptual Design Work

Conceptual design for various park properties to improve recreation facilities, reduce long-term maintenance costs, and improve sustainability practices

Need Notes Total Cost

Annual M&O

$

2015 184,000 $

2017 — $

2018 — $

2019 — $

2020 — $



Various Park Sites 2015

Total Cost

2016

$

2016 — $

2017 —

$

2018 —

$

2019 — $

2020 —

$



Ashford Park Retainage Location Links to Other Projects Facilties Description Need Notes

Ashford Park None Retainage for completion of Phase II construction of Ashford Park

Total Cost

Annual M&O

$

2015 125,000 $

2017 — $

2018 — $

2019 — $

2020 — $



Ashford Park 2015

Total Cost

2016

$

Pierce County 2015 Budget

2016 — $

2017 —

$

2018 —

$

2019 — $

2020 —

$



531

2015 Capital Improvement Projects

Foothills Trail Location Links to Other Description Need Notes

Cascade Junction to Carbonado None Per County Regional Trail Plan

Total Cost

Annual M&O Total Cost

$

2015 10,000 $

2016

2017 — $

Cascade Junction to Carbonado 2015 2016 $ 1,000 $ 1,000 $

2018 — $

2017

2019 — $

2018 1,000 $

1,000

$

2020 — $



2019 1,000 $

2020 1,000

2019

2020

Sprinker Temporary Fencing Location Links to Other Projects Facilties Description Need Notes

Sprinker Recreation Center None Add restroom on 2nd floor

Total Cost

Annual M&O

$

2015 12,880 $

2017 — $

2018 — $

— $

— $



Sprinker Recreation Center 2015

Total Cost

2016

$

2016 — $

2017 —

$

2018 —

$

2019 — $

2020 — $



Meridian Habitat Park Location Links to Other Projects Facilties Description Need Notes

Meridian Habitat Park None Playground Addition

Total Cost

Annual M&O

$

2015 180,000 $

532

2017 — $

2018 — $

2019 — $

2020 — $



Meridian Habitat Park 2015

Total Cost

2016

$

2016 — $

2017 —

$

2018 — $

2019 — $

2020 —

$



Pierce County 2015 Budget

2015 Capital Improvement Projects

Source of Funds Federal State Grants Donations Interfund Loan Path and Trails Fund Parks Impact Fees Parks Sales Tax Parks REET Metro Parks Tacoma Unfunded Fund Balance

$

Total Sources

$

2015 20,000 — — — 535,000 539,260 936,970 50,000 — 180,000

$

2,261,230 $

2016 1,250,000 $ — 900,000 — 415,000 354,090 380,000 — 1,816,310 —

2017 2,240,000 $ — 900,000 — 415,000 350,000 425,000 — 1,828,500 —

5,115,400 $

6,158,500 $

2018

2019

2020

— $ — — — 65,000 550,000 — — — —

— $ — — — — 250,000 — — — —

— — — — — 426,650 — — — —

615,000 $

250,000 $

426,650

Total Annual M&O Total Cost

$

2015 236,200 $

2016 219,700 $

2017 209,000 $

2018 218,300 $

2019 228,000 $

2020 237,800

Relation to Growth Management Act The Pierce County Council adopted an update to the Park, Recreation, and Open Space Plan (PROS Plan) on July 22, 2008. This plan is part of the County’s Land Use Plan under Growth Management. The updated PROS Plan restates the regional emphasis of the County park system. The PROS Plan provides Capital Improvement and Capital Facilities selection criteria that implements section 19A.100.010 D29 (a) of the County Land Use Plan. The PROS Plan establishes a level of service standard for Parks at 3.0 Acres-Per-1,000 in population. For the six-year planning period 2013 to 2018 no additional land is needed to accommodate new growth. In fact, at the conclusion of the planning period, the County will have a surplus of 2,413.08 acres of land.

Pierce County 2015 Budget

533

2015 Capital Improvement Projects

ROADS BUILDINGS AND FACILITIES

Pierce County government, in accordance with Title 36 RCW, plans, constructs, operates, preserves, and maintains over 1,500 miles of roads and bridges within Pierce County, Washington. These public roads fall under the authority of the Pierce County Engineer and are supported by a myriad of funding combinations comprised of federal, state, and local taxes and private capital.

Adequate Public Facilities: It is the desire of the County that adequate arterial road facilities be available no later than occupancy of each new development. However, the Growth Management Act (GMA), as found in Chapter 36.70A RCW, and the Pierce County Code, as found in PCC 19A.100.030 C recognizes that the development of arterial road facilities is a complex and time consuming task, and therefore provide a sixyear “grace period” after a road has failed concurrency to bring the road back within concurrency standards. For an arterial road to fail the road concurrency standards, the Service Standard (V/S) ratio for a road segment must be greater than the adopted Service Standard. In its most basic form, the “Service Standard” is a measure that attempts to quantify a public’s “acceptance” of a certain level of traffic congestion. If the Service Standard is exceeded on an arterial road segment, the arterial road segment has “failed” or “violated” the concurrency standards. This is also known simply as a road segment has failed concurrency. If the concurrency standards have been violated on an arterial road segment, mitigation must be implemented within six years of the failed concurrency date in order for development permits to continue to be approved in areas that are contributing to the traffic impact upon the failed arterial road segment. The concurrency system for arterial roads within Pierce County is used as a management tool. In accordance with the GMA, it is the intent of Pierce County that an arterial road system be constructed in a manner that accommodates growth and development in the County in accordance with its Comprehensive Plan. The monitoring of both current V/S ratios and projected V/S ratios (for the following six year period) provides the County with a management tool to measure the adequacy of the County's arterial roads and aids in the decision making of where to focus future arterial road improvements. The use of traffic volumes (V), Service Thresholds (S), and an adopted Service Standard (V/S ratio) provides a consistent method for monitoring “concurrency levels” of all arterial road segments. Site-specific transportation impacts will be monitored and mitigated through the State Environmental Policy Act (SEPA) review process. To gauge the performance of the County arterial road system in relation to its ability to accommodate growth and development, Service Thresholds and a Service Standard are adopted by the Pierce County Council as part of this Capital Facilities Plan. Adequate Public Facilities: It is the intent of the County CFP that adequate Roads buildings and facilities be available no later than occupancy of each new development. However, no development permit should be denied based on the County's inability to maintain level of service standards for County Roads building and facilities. 534

Pierce County 2015 Budget

2015 Capital Improvement Projects

2015 Projects

Central Maintenance Facility Decant/Vactor Station Improvements Phase 2 6241 Location Links to Other Projects Facilties Description Need

Central Maintenance Facility - Frederickson area Central Maintenance Facility (Completed May 2008) & CMF Facility Decant (Est Completion November 2014) Central Maintenance Facility Decant/Vactor Station Road Operations completed Phase 1 construction of new Decant / Vactor Station in 2014. This is Phase 2 of the Vactor Decant Facility project and will consist of building a paved materials storage and processing area, two covered storage buildings, decant water reuse and underbody truck wash, and a stormwater reuse system. Pierce County will have facilities which will allow for more efficient storage, processing, and reuse of vactor waste and street sweeping materials. Road Operations staff will apply for a Department of Ecology stormwater grant in the fall of 2014. Grant funds received from Stormwater Retrofit & Low Impact Development (LID) Competitive grants from Department of Ecology. Grant award is pending.

Notes

Total Cost

2015 1,330,000 $

$

2016

2017 — $

2018 — $

2019 — $

2020 —

$



Annual M&O Central Maintenance Facility - Frederickson area 2015 Total Cost

$

2016 — $

2017 —

$

2018 — $

2019 — $

2020 — $



West County Maintenance Facility (New Purdy Shop) - 5995 Location Links to Other Projects Facilties

Wauna area of Key Peninsula Eventual surplus of existing Purdy road maintenance facility

Description

West County Maintenance Facility (New Purdy Shop)

Need

A facilities plan was developed in 2002 with the goal to optimize the delivery of road maintenance, operations, and preservation services for the anticipated future of Pierce County. This cost benefit plan includes solutions for immediate needs and incorporates strategies to meet the needs of Pierce County's expanding road network. This plan outlined the East County Maintenance Facility (completed in Aug 2007), the Central Maintenance Facility (completed in May 2008), and the West County Maintenance Facility. Pierce County Road Operations owns the existing land where this new site is planned

Notes Total Cost

2015 175,000 $

$

2016 5,865,000

$

2017 3,650,000

$

2018 500,000 $

2019

2020 — $



Annual M&O Wauna area of Key Peninsula 2015 Total Cost

$

Pierce County 2015 Budget

2016 — $

2017 —

$

2018 — $

2019 — $

2020 — $



535

2015 Capital Improvement Projects

Road Operations Salt Sheds - 6242 Location

Poleline Pit, Rhodes Lake Pit and Blau Pit

Links to Other Projects Facilties Description Need

None Salt Shed and foundations for County wide salt storage Salt material supply requires protection from weather. A permanent structure will reduce the risk of pollution to the environment and streamline operations when working with the salt material for snow and ice response. Stragetically placing salt material supplies throughout the County assists with streamlined processes and access during emergency snow and ice response. This type of permanent storage with proper foundation will meet Pierce County's National Pollutant Discharge Elimination System (NPDES) permit requirements 2015 2016 2017 2018 2019 2020 $ 713,000 $ — $ — $ — $ — $ —

Notes

Total Cost

Annual M&O Poleline Pit, Rhodes Lake Pit and Blau Pit 2015 Total Cost

2016

$

— $

2017 —

$

2018 — $

2019 — $

2020 — $



Source of Funds County Road Fund Grant Funds Bond Financing Total Sources

$

$

2015 1,218,000 $ 1,000,000 — 2,218,000 $

2016 4,015,000 $ — 1,850,000 5,865,000 $

2017

2018

— $ — 3,650,000 3,650,000 $

2019

— $ — 500,000 500,000 $

2020 — $ — — — $

— — — —

Total Annual M&O 2015 Total Cost

$

2016 —

$

2017 — $

2018 — $

2019 —

$

2020 — $



Relation to Growth Management Act The level of service (LOS) for County Roads is based on transportation concurrency and is detailed in the Transportation Improvement Plan (TIP), the Transportation Element of the Comprehensive Plan, and this document. The Revised Code of Washington (RCW) requires that the TIP be published separately from the annual budget and capital improvement plan. There is no LOS specific to roads, buildings, and facilities.

536

Pierce County 2015 Budget

2015 Capital Improvement Projects

SEWER AND WATER DIVISIONS OF PUBLIC WORKS AND UTILITIES The mission of the Sewer Division is to provide customers with high quality, cost effective, sanitary sewer services by collecting and treating all wastewater generated from County service areas in accordance with applicable local, state, and federal permit requirements. It is the intent of the Pierce County Comprehensive Plan that adequate wastewater collection and treatment facilities shall be made available no later than occupancy of each new development. Expansion of the sewer collection system Chambers Creek Regional Wastewater Treatment Plant Expansion Mid 2014 is primarily accomplished through new development paying for the construction of new lines and connections to the existing collection system to carry wastewater to the Chambers Creek Regional Wastewater Treatment Plant, the City of Tacoma’s Central Wastewater Plant, and the Cascadia Wastewater Treatment Plant. Much of Pierce County’s urban growth area is located above a sole source aquifer. Pierce County’s Comprehensive Plan Section 19A.90.050, Utility-Sewer Objective 14 requires the use of sewers in the County’s urban growth and urban zoned areas. The Sewer Division is also responsible for managing the Chambers Creek Properties water rights and water infrastructure. At this time there is approximately 2.62 million gallons per day of municipal water rights and smaller amounts of other ground and surface water rights. The current primary water source is a new production well that draws groundwater from a deep aquifer. The Chambers Creek Properties water is currently being used for irrigation on the properties and for dust control during construction projects. The Sewer Division continues to market the municipal water and investigate wholesale water opportunities with local retail water companies. The Sewer Division is also in the process of constructing reclaimed water facilities as part of the Wastewater Treatment Plant expansion construction project and anticipates that in the future reclaimed water will be used for irrigation of the properties, thus freeing up more groundwater sources for potential wholesale distribution. Adequate Public Facilities: It is the intent of the County CFP that adequate Sewer and Water Division of Public Works be available no later than occupancy of each new development. However, no development permit should be denied based on the County's inability to maintain level of service standards for the County’s Sewer and Water Division buildings and facilities.

Pierce County 2015 Budget

537

2015 Capital Improvement Projects

2015 Projects The large number of projects scheduled for 2015 are detailed in the Sewer Utility Construction/Reserve Fund section.

Source of Funds 2015 2016 2017 2018 2019 2020 $ 3,703,800 $ 16,976,700 $ 12,651,000 $ 15,812,600 $ 20,321,000 $ 20,300,000 — — — — — — — 21,000,000 — — — — — — — — — 36,000,000 54,382,470 — — — — — $ 94,086,270 $ 37,976,700 $ 12,651,000 $ 15,812,600 $ 20,321,000 $ 20,300,000

Service Fees Grants Bonds Loans Fund Balance Total Sources

Total Annual M&O 2015 Total Cost

$

2016 —

$

2017 —

$

2018 —

$

2019 —

$

2020 —

$



Relation to Growth Management Act Sewer Utility Pierce County Code Section 19A.90.050 – Sewer and Wastewater Treatment – states the following objectives: • •

UT-S Objective 14. Provide sewer service in support of an Urban Growth Area. UT-S Objective 15. Promote reliable and cost-effective service.

In compliance with the State of Washington Growth Management Act and the Pierce County Capital Facilities Plan Section 3.3: “…adequate sanitary sewer facilities must be available no later than occupancy of each new development.” The Sewer Division is dedicated to this objective throughout the service basin to meet demand from residential, commercial, manufacturing, and industrial users and strives to promote reliable and cost effective service through development-driven expansion for residential and commercial construction, and selected interceptor improvements to allow optimal business expansion throughout the urban growth areas of Pierce County. Pierce County Code Section 19A.90.070 - Domestic Water Systems - states the following objectives: • • • • •

UT-Wa Objective 21. Promote reliable water service throughout Pierce County. UT-Wa Objective 22. Ensure adequate water supplies for future growth. UT-Wa Objective 24. Coordinate water resource planning. UT-Wa Objective 25. Implement the satellite management program for new or failing water systems. UT-Wa Objective 26. Protect the quality of groundwater used for domestic water supplies.

The Sewer Division supports these objectives by effectively managing the Chambers Creek Properties water rights and infrastructure to serve current uses and provide for future regional water supply needs and by 538

Pierce County 2015 Budget

2015 Capital Improvement Projects providing technical assistance to water systems that are experiencing problems in order to avoid County receivership of a failed water system.

Pierce County 2015 Budget

539

2015 Capital Improvement Projects

PIERCE COUNTY SHERIFF’S DEPARTMENT

The mission of the Pierce County Sheriff’s Department is to protect life and property, to uphold rights, and to help build stronger, more livable communities.

The Sheriff’s Department is a full service law enforcement agency which provides a variety of services throughout the County to include patrol, traffic, and investigative services in unincorporated Pierce County. The following services are provided to both incorporated and unincorporated areas: jail, property room, and civil process services. Additional specialty services of Forensics Investigations, Search and Rescue, Marine and Lake Patrol, Dive Rescue, Air Support, Special Weapons and Tactics, Narcotics, and Meth Lab Teams are provided throughout the County. Further, the Sheriff’s Department provides contract law enforcement services around the County The Sheriff’s Department is headquartered in the County-City Building and personnel are deployed around the County from a South Hill Precinct, four substations and four contract agency offices. A new Parkland precinct opened in 2014. Some of the Sheriff’s facilities are inadequate to provide the services demanded by the public and to support staff. The substations are converted office spaces that lack true police station capabilities and security. Some facilities are overcrowded; lack adequate deputy work spaces, prisoner interviewing and holding spaces; and, lack adequate storage and public meeting spaces. This overcrowding results in a heavily worn appearance at some Sheriff’s facilities. Adequate Public Facilities: It is the intent of the County CFP that adequate Sheriff’s facilities be available no later than occupancy of each new development. However, no development permit should be denied based on the County's inability to maintain level of service standards for Sheriff’s facilities.

2015 PROJECTS Additional projects that may impact the Pierce County Sheriff’s Department are listed in the General Administrative section and in the Sheriff’s section of the Capital Facilities Plan for 2015-2020.

Sheriff East Precinct Retaining Wall Replacement Location Links to Other Projects Facilties Description Need Notes Total Cost

Annual M&O

East Precinct (South Hill) None Replace deteriorated retaining wall supporting fence line adjacent to mobile home park

$

2015 75,000

2016 $

540

$

2018 —

$

2019 —

$

2020 —

$



East Precinct (South Hill) 2015

Total Cost

2017 —

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



Pierce County 2015 Budget

2015 Capital Improvement Projects

Sheriff Parkland-Spanaway Precinct Location Links to Other Projects Facilties Description Need Notes

Parkland-Spanaway Sheriff Precinct PSSP Construction Install security fencing around perimeter including automatic access gates and Lenel card access

Total Cost

2015 150,000

$

Annual M&O

2016

2017

$



2018

$



$

2019 —

$

2020 —

$



Parkland-Spanaway Sheriff Precinct 2015

Total Cost

2016

$

— $

2017 — $

2018

2019

— $

— $

2020 — $



Source of Funds Real Estate Excise Tax Total Sources

$ $

2015 225,000 $ 225,000 $

2016

2017 — $ — $

2018

2019

— $ — $

— $ — $

2020 — $ — $

— —

Total Annual M&O 2015 Total Cost

$

2016 —

$

2017 —

$

2018 —

$

2019 —

$

2020 —

$



RELATION TO GROWTH MANAGEMENT ACT The level of service (LOS) was carefully examined in 2004 and adjusted to a more realistic square footage need. The reduction in 2008 occurred as a result of DEM being separated from PCSD’s CFP. The Sheriff is discussing an “Officers per Thousand Population” LOS. Until an additional or a new LOS is adopted, the current level of 0.5 square feet per capita will remain in effect. .

Sheriff Level Of Service Sq. Ft./Population 1993 Baseline 1994 1995-2003 2004-2007 2008-2018

Pierce County 2015 Budget

0.2 0.3 0.3 0.6 0.5

541

2015 Capital Improvement Projects

SHERIFF’S CORRECTIONS BUREAU AND DETENTION CENTER

The mission of the Pierce County Sheriff’s Department is to protect life and property, to uphold rights, and to help build stronger, more livable communities.

The mission of the Pierce County Detention and Corrections Center is the management, in a safe and secure manner, of persons who have been charged with or convicted of offenses. It recognizes that, for sentenced prisoners, confinement in itself is punishment. For pre-trial prisoners, confinement is to ensure the safety of the public and the individual. The Center serves the entire criminal justice system. The Sheriff’s Corrections Bureau is responsible for operating two large jail facilities with a potential total bed count of 1,717. The Corrections Center houses both pre-trial misdemeanor and felony defendants, those sentenced to jail, and also rents bed space for offenders from the federal and state Departments of Corrections. Adequate Public Facilities: It is the intent of the County CFP that adequate Sheriff’s Correctional facilities be available no later than occupancy of each new development. However, no development permit should be denied based on the County's inability to maintain level of service (LOS) standards for Corrections facilities.

2015 PROJECTS Additional projects that may impact the Pierce County Sheriff’s Corrections Bureau and Detention Center are listed in the General Administrative section and in the Sheriff’s Corrections Bureau and Detention Center section of the Capital Facilities Plan for 2015-2020.

Jail Corrections 2002 Domestic Water Piping Replacement Location Links to Other Projects Facilties Description

Corrections 2002 (New Jail) None

Need

Existing piping systems are corroded to the point of failure

Complete replacement of the domestic water piping in the 2002 jail which was started previously. Phase 1 is the loop under the pavement between jails.

Notes Total Cost

$

2015 200,000 $

2016 225,000 $

Annual M&O

Corrections 2002 (New Jail)

Total Cost

$

2015

542

2016 — $

2017 225,000

2017 — $

2018 $

2019 —

$

2018 — $

2020 —

$

2019 — $



2020 — $



Pierce County 2015 Budget

2015 Capital Improvement Projects

Source of Funds Real Estate Excise Tax Total Sources

$ $

2015 200,000 $ 200,000 $

2016 225,000 $ 225,000 $

2017 225,000 $ 225,000 $

2018

2019 — $ — $

2020 — $ — $

— —

Total Annual M&O 2015 Total Cost

$

2016 — $

2017 — $

2018 — $

2019 — $

2020 — $



RELATION TO GROWTH MANAGEMENT ACT The LOS is based upon statistics from the Bureau of Justice (BOJ) Bulletin which publishes statistics for jail bed demand nationally. The BOJ reported in 2004 that jail bed usage continues to increase for local jails. The 2013 WASPC crime report shows that crime per 1,000 residents in Pierce County is 5% higher than the Washington State average.

Sheriff’s Corrections Bureau and Detention Center Level of Service 2013

Countywide Population 814,777

2018 2022

Pierce County 2015 Budget

2.0 Beds per Thousand

Current Beds Available

Net Reserve or (Deficiency)

1,630

1,213

(416)

858,691

1,718

1,213

(505)

895,911

1,792

1,213

(579)

543

2015 Capital Improvement Projects

SUSTAINABLE RESOURCES (SOLID WASTE MANAGEMENT FUND)

Public Works and Utilities empowers Pierce County residents and businesses to reduce wasteful consumption, conserve natural resources, save money, and build a more livable community. The Solid Waste Management Fund finances capital improvements necessary for sustaining the comprehensive solid waste system that serves unincorporated Pierce County and 19 cities and towns. Associated programs include waste reduction and recycling, environmental education, and code enforcement.

Pierce County contracts with private companies to operate five County-owned solid waste facilities, and to gain access and capacity at an additional four facilities. Existing facilities provide sufficient capacity to handle both garbage requiring disposal and organic materials suitable for composting throughout the six years covered by this CFP. Sustainable Resources has launched six initiatives designed to reduce disposal volumes up to 90,600 annually as part of a larger effort to shrink disposal volumes to 1.09 pounds per person per day by 2032. In 2014 significant progress was made in the development of a system to more closely monitor waste generation and disposal data on an ongoing basis (the waste trends analysis), initiation of a top-to-bottom review of countyowned solid waste facilities to enhance recycling opportunities, and working with the private sector to capture and divert a larger percentage of recyclable construction debris. Adequate Public Facilities: It is the intent of the County CFP that adequate Sustainable Resources, Solid Waste management, buildings and facilities be available no later than occupancy of each new development. However, no development permit should be denied based on the County's inability to maintain level of service standards for Sustainable Resources, Solid Waste Management, buildings and facilities.

2015 PROJECTS

Purdy Transfer Station Improvements Location 14515 54th Ave NW Links to Other Customer Service, Asset Management, and System Sustainability Plan - PWU Sustainable Resources Projects Facilties Description Pierce County’s Purdy Transfer Station serves as the primary point of disposal for all residential and commercial solid waste generated on the Gig Harbor and Key Peninsulas, the City of University Place, and the Town of Fircrest. Garbage collection routes run by American Disposal and University Place Refuse/Westside Disposal use the Purdy Transfer Station to tip or dispose of waste collected from homes and businesses. The facility is the only 7-day a week disposal and recycling site available to self-haulers on the Peninsulas. The facility has been open since 1989 with minimal capital improvements. This phased project has resulted in the siting of a new scalehouse, realignment of the entrance road, new recycling and household hazardous waste collection sites, a new maintenance facility, a more energy efficient blower system for the compost facility, a new screening system that will result in a capacity gain in the compost facility, and a new public drop-off for compostable yardwaste. The 2015 efforts will replace concrete and asphalt near public tipping areas and scalehouse. Need

These improvements were noted as essential for continued operations as part of an annual facility assessment conducted as part of the Customer Service, Asset Management, and System Sustainability (CAS) Program.

Notes Total Cost 544

$

2015 167,000

2016 $

2017 —

$

2018 —

$

2019 —

$

2020 —

$

Pierce County 2015 Budget



2015 Capital Improvement Projects

Purdy Transfer Station Improvements 14515 54th Ave NW

Annual M&O

2015 Total Cost

$

2016

2017

— $

— $

2018 — $

2019 — $

2020 — $



2019 200,000 $ 200,000 $

2020 352,000 352,000

Source of Funds Fees Total Sources

$ $

2015 167,000 $ 167,000 $

2016 — $ — $

2017 229,000 $ 229,000 $

2018 362,000 $ 362,000 $

Total Annual M&O 2015 Total Cost

$

2016 — $

2017 —

$

2018 —

$

2019 — $

2020 —

$



RELATION TO GROWTH MANAGEMENT ACT The level of service for Solid Waste Disposal Capacity is established in Appendix F to the 2008 Supplement to the Tacoma-Pierce County Solid Waste Management Plan (SWMP). The SWMP reaffirmed waste reduction and recycling as County priorities and set a goal to reduce per capita waste disposal needs from 4.5 pounds per day (2007 level) to less than 1.1 pounds per day by 2032. Continued implementation of more aggressive recycling and waste reduction programs will be necessary to achieve these goals. Refer to the chart on the following page.

Pierce County 2015 Budget

545

2015 Capital Improvement Projects

Solid Waste Level of Service Year

546

Planned LOS

Actual / Projected (Trend Scenario) Disposal Per Capita

2008

4.50

4.10 (actual disposal 8.9% less than plan)

2009

4.39

3.63 (actual disposal 17% less than plan)

2010

4.28

3.39 (actual disposal 21% less than plan)

2011

4.17

3.33 (actual disposal 20% less than plan)

2012

4.06

3.23 (actual disposal 20% less than plan)

2013

3.95

3.30 (actual disposal 16% less than plan)

2014

3.82

3.20 (projected disposal need 16% less than plan)

2015

3.69

3.08 (projected disposal need 17% less than plan)

2016

3.57

2.97 (projected disposal need 17% less than plan)

2017

3.44

2.85 (projected disposal need 17% less than plan)

2018

3.31

2.73 (projected disposal need 18% less than plan)

2019

3.15

2.61 (projected disposal need 17% less than plan)

2020

2.99

2.50 (projected disposal need 16% less than plan)

2024

2.34

2.03 (projected disposal need 14% less than plan)

2028

1.71

1.56 (projected disposal need 9% less than plan)

2032

1.09

1.09 (projected disposal need equal to plan)

Pierce County 2015 Budget

2015 Capital Improvement Projects

SUPERIOR COURT

Under the Constitutional doctrine of separation of powers, government consists of executive, legislative, and judicial branches. The Superior Court is the highest level trial court in state government and the only trial court of general jurisdiction in Pierce County. Any civil suit may be filed in Superior Court and all suits in excess of District Court’s limited jurisdiction must be filed in Superior Court. The Superior Court is also an appellate court for District and Municipal Courts. There are 22 Superior Court judges and eight court commissioners in Pierce County.

Many of the Court’s responsibilities are mandated by law and must be provided. For example, all felony criminal proceedings must be filed in Superior Court. The services provided by Superior Court are many and varied. The Court is constantly investigating programs, which would maximize the use of its resources as well as exploring methods to reduce court congestion and delay, ensure courtroom security, and maintain the dignity of the judicial system without sacrificing individual justice. Adequate Public Facilities: It is the intent of the County CFP that adequate Superior Court facilities be available no later than occupancy of each new development. However, no development permit should be denied based on the County's inability to maintain level of service (LOS) standards for Superior Court facilities.

2015 PROJECTS There are no projects funded for the 2015-2020 years. Upon completion the recommendations of the Justice Center Planning Committee will be reflected in future Capital Facilities Plans.

RELATION TO GROWTH MANAGEMENT ACT The LOS for Superior Court is one permanent courtroom in the County-City Building for each Superior Court judge; one hearing room per criminal division; one hearing room per commissioner assigned to the CountyCity Building; and one courtroom/hearing room per judicial officer when serving at locations away from the County-City Building.

Pierce County 2015 Budget

547

2015 Capital Improvement Projects

SURFACE WATER MANAGEMENT AND RIVER IMPROVEMENT

The mission of the Surface Water Management Division is to be a responsive service organization that efficiently addresses flood control, water quality, and the preservation of natural drainage systems. Adequate Public Facilities: It is the intent of the County CFP that adequate storm facilities be available no later than occupancy of each new development. However, no development permit should be denied based on the County's inability to maintain level of service (LOS) standards for Public Works and Utilities facilities.

CURRENT FACILITY INVENTORY Storm System Facilities are located throughout the County and currently there are over 500 publicly-owned stormwater facilities in the system and two pump stations. There are also 73 miles of levees/revetments along the Puyallup, White, Carbon, and Greenwater Rivers and two miles of levees on the Nisqually River. Facilities are shown within the County GIS system under the Utility layers.

2015 PROJECTS Projects are provided in the Public Utilities section.

Source of Funds Real Estate Excise Tax Service Fees Tax Grants Donations Total Sources

2015 2016 2017 2018 2019 2020 $ 3,308,800 $ 2,020,000 $ 5,050,000 $ 2,020,000 $ 10,025,000 $ 10,025,000 1,919,040 20,316,000 8,826,500 7,491,100 4,445,000 4,616,000 1,222,000 5,430,000 4,550,000 1,200,000 — — 19,182,600 2,488,000 7,809,500 6,476,900 4,000,000 4,000,000 253,600 — — — — — $ 25,886,040 $ 30,254,000 $ 26,236,000 $ 17,188,000 $ 18,470,000 $ 18,641,000

RELATION TO GROWTH MANAGEMENT ACT The baseline level of service for the County Stormwater Facilities is to provide conveyance facilities to accommodate a 4% annual chance flood (25-year, 24-hour design storm) and holding facilities to accommodate a 1% annual chance flood (100-year, 24-hour design storm). Infiltration facilities must be designed to accommodate the 100-year, 24-hour design storm or the 100-year, 7-day design storm, whichever results in a larger facility. Water quality treatment is provided for the volume of runoff from the 91st percentile, 24-hour runoff volume (or 91% of surface water runoff). The LOS for Flood Management facilities along the rivers is being set in the update to the Comprehensive Flood Hazard Management Plan and varies with the adopted river reach management strategy as described in section 3.2 Project Policies. The specific LOS (level of protection) for each river reach is described in Appendix F and varies from 200-year to maintaining the existing levee prisms. There are also erosion protection levels for revetments to reduce the risk from channel migration. The consideration of which level of protection to apply to a given reach involves the infrastructure (roads and buildings) either currently, present, 548

Pierce County 2015 Budget

2015 Capital Improvement Projects or planned in the future that is at risk. Design of levees for a level of protection also includes three feet of freeboard above the Storm Recurrence Year flood elevation. A 200-year level of service is the flood elevation for a storm with a 0.5% chance of occurring any given year (plus three feet of freeboard).

Pierce County 2015 Budget

549

2015 Capital Improvement Projects

550

Pierce County 2015 Budget