1906 In the 19th century PORR built numerous magnificent buildings along the newly formed Vienna Ringstrasse. One of the high points of the epoch, known in architectural history as “Late Historism”, was the Haus der Industrie at Schwarzenbergplatz. 1869 "Allgemeine österreichische
Baugesellschaft"
was founded and listed on the stock exchange. In 1927 it merged with A. Porr
Betonbauunterneh-
mung GmbH.
1930 Pioneering achievements such as the “Großglockner High Alpine Road”; building various power plants, road, rail and industrial facilities.
2
1953 PORR began construction of Ringturm tower on the Donaukanal to Erich Boltenstern’s plans. The building boasts 20 storeys and has a height of 73 metres. It is considered to be Vienna’s first “real” high-rise and an innovative project for the reconstruction of the city.
1980 PORR recognised the potential in Eastern Europe even before the fall of the Iron Curtain and expanded into countries in the former Eastern Bloc. In this way it was involved in extending the Ferihegy II airport in Budapest.
1990s PORR's expertise and skills were in high demand on the construction of multiple major power plants along the Danube. The company thereby made an important contribution to securing Central Europe's energy supply.
3
With around 11,000 staff the PORR Group is one of Austria’s largest construction
companies
and
is
also a big player in numerous other countries. With many locations in the home markets and other countries in Central, South-Eastern and Eastern Europe, the company is involved in realising many trailblazing construction projects. On top of this, PORR is implementing international projects in the Middle East.
As a flexible full service provider in infrastructure, PORR offers a comprehensive portfolio which covers every aspect of the modern construction industry and is oriented towards the most demanding requirements: Porr Design & Engineering GmbH: general planning, project management, architecture, 3D-visualisation, static analysis, building services, sustainability – DGNB/ÖGNI-certification, construction preparation, site supervision Porr Bau GmbH: construction, design/build and general contractor (building, office, industrial, communal, hotel and housing construction, educational facilities, hospitals, care facilities, stadiums as well as revitalisation), civil engineering (roads, tunnels, powerstation and plant construction, railways, bridges, metro construction, special civil engineering, resources, infrastructure operator models, environmental engineering)
4
PORR Modern. International. Trailblazing. STRAUSS & PARTNER Development: project development (from design and execution through to sales and ongoing operations – office, residential, commercial, infrastructure, concessions) PORREAL: asset management, property management, facility management and consulting TEERAG-ASDAG AG: civil engineering (road construction, environmental construction, asphalt mixing plants, sealing and waterproofing, road markings, leisure facilities)
A seamless value chain, comprehensive expertise and extensive experience have made PORR into an expert partner for realising the most complex projects. “Powered by PORR” is synonymous with dynamism and growth. The basis for top quality comes from PORR’s in-depth knowhow, staff members who are motivated and well trained, a thirst for innovation and the willingness to constantly keep on learning and improving. In addition, national and international partnerships guarantee the group’s competitive edge.
5
High-rise buildings In conjunction with international architects and in close cooperation with Strauss & Partner Development, we implement ambitious and often innovative tower-building and revitalisation projects. We accompany our clients, if they wish, through all the phases of a project – from development, planning and design to construction and finally through to operation.
Sea Towers, Gdynia
6
Gross floor area
56,000 m2
Height of construction
138 m
Construction period
24 months
IZD Tower, Vienna Gross floor area
95,373 m2
Height of construction
140 m
Construction period
22 months
Zagreb Tower, Zagreb Gross floor area
30,000 m2
Height of construction
79 m
Construction period
25 months Ares Tower, Vienna
7
Equator, Warsaw Gross floor area
33,300 m2
Height of construction
63 m
Construction period
20 months
Europe Tower, Budapest Gross floor area
42,619 m2
Height of construction
50 m
Construction period
22 months
from left: Warsaw Towers, Warsaw InterContinental Hotel, Warsaw Financial Center
8
Andromeda Tower, Vienna Gross floor area
34,450 m2
Height of construction
113 m
Construction period
26 months
9
Office buildings As a full-service provider for project development, planning and design as well as construction we are fully aware of the importance that lies in the design and implementation of office projects: an optimal work environment creates delight in work, boosting the personal satisfaction and the productivity of the people who use the building.
Slovenská Sporitel’na ˇ a.s., Bratislava
10
Gross floor area
58,800 m2
Number of floors
2 BGL / 10 AGL
Construction period
26 months
Uniopt-Pachleitner Headquarters, Graz
Euro Plaza, Building G, Vienna Gross floor area
88,049 m2
Number of floors
3 BGL / 9 AGL
Construction period
23 months
Poleczki Business Park, Warsaw Gross floor area
68,800 m2
Number of floors
1 BGL / 4 AGL
Construction period
22 months
11
Eurovea International Trade Center, Bratislava
The Park, Prague
12
Gross floor area
240,000 m2
Number of floors
3 BGL / 8 AGL
Construction period
29 months
Siemens City, Vienna Gross floor area
85,000 m2
Number of floors
1 BGL / 14 AGL
Construction period
24 months
Quadrum, Vecsés Gross floor area
15,000 m2
Number of floors
1 BGL / 7 AGL
Construction period
14 months
13
Hotels Offices, apartments, industrial facilities, council housing or hotels – we realise them all as
a
building-construction
specialist in the European Economic Area. And every successful project allows us to extend our expertise and build up valuable experience – for the lasting benefit of our clients from every nation.
Ramada Innsbruck Tivoli Hotel
14
Gross floor area
9,940 m2
Number of floors
12 AGL
Construction period
31 months
andel's Hotel, Łódz´
Silver Mountain, Brasov Gross floor area
17,000 m2
Number of floors
2 BGL / 6 AGL
Construction period
17 months
Sheraton Hotel, Bratislava Gross floor area
21,000 m2
Number of floors
3 BGL / 7 AGL
Construction period
29 months
15
ETAP & IBIS Hotel, Krakow Gross floor area
11,000 m2
Number of floors
1 BGL / 6 AGL
Construction period
15 months
Pestana Berlin Tiergarten Hotel
16
Gross floor area
7,700 m2
Number of floors
1 BGL / 7 AGL
Construction period
15 months
Park Inn by Radisson Hotel, Krakow Gross floor area
12,500 m2
Number of floors
1 BGL / 6 AGL
Construction period
17 months
Kempinski Hotel Das Tirol, Kitzbühel
17
Living & Dwelling As a leading construction group we build for people. We invest all our knowledge and energy in people. Our goal is to ensure we can all live and work better and in greater comfort and greater beauty. This is reflected in our innovative housing projects, which point the way by offering both efficiency and high living quality.
Vile Jordanovac, Zagreb Gross floor area
5,700 m2
Number of floors
1 BGL / 3 AGL
Construction period
19 months
Nordbahnhof residential complex, Vienna
18
Bike City, Vienna Gross floor area
16,828 m2
Number of floors
1 BGL / 10 AGL
Construction period
21 months
Bike & Swim, Vienna Gross floor area
30,981 m2
Number of floors
1 BGL / 10 AGL
Construction period
20 months
19
Reichenau residential complex, Tyrol Gross floor area
12,280 m2
Number of floors
1 BGL / 6 AGL
Construction period
20 months
Hotel and residential complex, Seepark Velden
20
Monte Laa complex, Lot 8.1 Vienna Gross floor area
24,500 m2
Number of floors
3 – 10 AGL
Construction period
22 months
Angel Wings, Wrocław Gross floor area
46,230 m2
Number of floors
2 BGL / 10 AGL
Construction period
11 months
21
Schools & Universities Buildings dedicated to the training and education of future generations must strive for much more than simple functionality. These structures shape our cityscape and leave a striking impression on visitors as well as on the characters of the young people who learn, grow and develop in them. Creating buildings that exert a positive impact both on urban images and people is what we consider our great responsibility and one of our noblest challenges.
Warsaw School of Economics
22
Gross floor area
9,700 m2
Number of floors
6 AGL
Construction period
26 months
FH Campus Vienna
Monte Laa Campus, Vienna Gross floor area
13,409 m2
Number of floors
1 BGL / 4 AGL
Construction period
27 months
Audimax, Jagiellonen University, Krakow Gross floor area
10,500 m2
Number of floors
2 BGL / 4 AGL
Construction period
9 months
23
BOKU BioTech Center, Vienna Gross floor area
30,255 m2
Number of floors
2 BGL / 4 AGL
Construction period
26 months
University Library, Warsaw
24
Gross floor area
61,000 m2
Number of floors
2 BGL / 4 AGL
Construction period
44 months
Gertrude Fröhlich-Sandner Campus, Vienna Gross floor area
12,751 m2
Number of floors
1 BGL / 3 AGL
Construction period
15 months
Institute of Zoology of the Jagiellonen University, Krakow Gross floor area
14,000 m2
Number of floors
1 BGL / 4 AGL
Construction period
25 months
University and research centre, Tulln
25
Health Care PORR has proved its leadership expertise not least in the large number of hospital projects, which ensure health care for the population while enhancing sustainable economic development and the standard of living in the region. This calls for state-of-the-art know-how as well as maximum efficiency in the implementation of projects. Both of which are PORR's great strengths. Aqualux thermal bath, Fohnsdorf, Styria
26
Gross floor area
8,950 m2
Number of floors
2 BGL / 2 AGL
Construction period
14 months
Leopoldstadt residential care home, Vienna
Waldsanatorium Perchtoldsdorf, Lower Austria Gross floor area
14,500 m2
Number of floors
2 BGL / 5 AGL
Construction period
16 months
Grimming thermal spa, Bad Mitterndorf, Styria Gross floor area
22,900 m2
Number of floors
1 BGL / 1 – 6 AGL
Construction period
23 months
27
Simmering residential care home, Vienna
Regional Hospital Surgical Ward West II Gross floor area
19,000 m2
Number of floors
2 BGL / 5 AGL
Construction period
28 months
CMZ regional hospital, Klagenfurt © Gisela Erlacher
28
Gross floor area
38,100 m2
Number of floors
2 BGL / 6 AGL
Construction period
24 months
Münster rehabilitation centre, Tyrol 14,668 m2
Number of floors
3 – 5 AGL
Construction period
29 months
© Florian Holzherr
Gross floor area
Hollenburg private clinic, Krems, Lower Austria Gross floor area
12,700 m2
Number of floors
1 BGL / 4 AGL
Construction period
12 months
29
Revitalisation As a long-standing construction company with a rich tradition we are well aware of the importance of historical buildings. They are part of our culture and contribute to the individual identity of cities, regions and nations. Drawing future economic benefits from these values of the past simultaneously represents a challenge and proof of expertise. This means converting old structures that have stood the test of time into something new and innovative, so as to create objects of lasting value for future generations.
Theater in der Josefstadt, Vienna
30
Gross floor area
3,440 m2
Number of floors
3 AGL
Construction period
12 months
Le Palais Hotel, Prague Gross floor area
7,600 m2
Number of floors
2 BGL / 5 AGL
Construction period
17 months
Chamber of Labour, Linz Gross floor area
18,000 m2
Number of floors
2 BGL / 6 AGL
Construction period
24 months
Palais Hansen, Vienna
31
Kempinski Hotel Hybernská, Prague
32
Gross floor area
8,300 m2
Number of floors
6 AGL
Construction period
19 months
Central station, Warsaw
andel's Hotel, Łódz´ Gross floor area
40,200 m2
Number of floors
2 BGL / 7 AGL
Construction period
24 months
Albertina, Vienna Gross floor area
42,000 m2
Number of floors
2 BGL / 6 AGL
Construction period
24 months
33
Industrial buildings From individual real-estate units through to complex urban development schemes – we are working on some of today’s most spectacular development projects. Decades of cooperation with clients who keep entrusting us with new projects not only give evidence of our skill but reflect our quality in giving personal advice and taking care of their projects. Our clients trust us – knowing that we give our best for each task.
Distribution centre Overseas, Lucko-Zagreb ˇ
34
Gross floor area
5,540 m2
Number of floors
3 AGL
Construction period
6 months
Inzersdorf meat factory, Vienna
Acerinox, Warsaw Gross floor area
11,800 m2
Number of floors
1 AGL
Construction period
13 months
CCG Immobilien GmbH Kühne & Nagel, Werndorf Hall Gross floor area
3,210 m2
Number of floors
1 AGL
Office Gross floor area
510 m2
Number of floors
2 AGL
Construction period
6 months
CCG Immobilien GmbH Leykam Alpina, Werndorf Hall Gross floor area
3,550 m2
Number of floors
1 AGL
Office Gross floor area
950 m2
Number of floors
2 AGL
Construction period
6 months
35
VA SSC, Tychy Gross floor area
13,300 m2
Number of floors
3 AGL
Construction period
10 months
Miba Steeltec, Vráble
36
Gross floor area
18,000 m2
Number of floors
2 AGL
Construction period
8 months
Egger, Suceava Gross floor area
72,000 m2
Number of floors
1 AGL
Construction period
12 months
Tilly production hall, Treibach-Althofen, Carinthia
37
Stadiums On the occasion of the EURO 2008, PORR carried out extensive new construction and renovation of the stadiums in Klagenfurt, Wals-Siezenheim and Innsbruck. The con struction of a multi-functional stadium also requires supplementary infrastructure measures for the development of the surrounding area. In many cases, sports facilities need to be dismantled after the successful completion of major events. As a full-service-provider, PORR is an expert partner for the realisation of even the most complex projects. There are major events planned for the future which will require perfect
stadiums
with
corresponding
infrastructure (e.g. 2018 FIFA World Cup in Russia and 2022 in Qatar, Africa Cup of Nations / Tripoli stadium).
Tivoli Stadium, Innsbruck
38
Seats (net capacity)
30,000
Construction period
23 months
Wörthersee Stadium, Klagenfurt
Salzburg Stadium, Wals-Siezenheim Seats (net capacity)
30,000
Construction period
23 months
Wörthersee Stadium, Klagenfurt Seats (net capacity)
32,000
Construction period
23 months
39
© 2012 Allgemeine Baugesellschaft – A. Porr Aktiengesellschaft
ABAP Ref. 521e/08.12/0,5M | Photo page 1: © Siemens
Porr Bau GmbH Absberggasse 47, A-1100 Vienna Phone: +43 (0) 50 626-0 Fax: +43 (0) 50 626-1111 www.porr-group.com