Building construction

Building construction PORR Tradition. Continuity. Innovation. 1906 In the 19th century PORR built numerous magnificent buildings along the newly fo...
Author: Shona Rice
5 downloads 0 Views 5MB Size
Building construction

PORR Tradition. Continuity. Innovation.

1906 In the 19th century PORR built numerous magnificent buildings along the newly formed Vienna Ringstrasse. One of the high points of the epoch, known in architectural history as “Late Historism”, was the Haus der Industrie at Schwarzenbergplatz. 1869 "Allgemeine österreichische

Baugesellschaft"

was founded and listed on the stock exchange. In 1927 it merged with A. Porr

Betonbauunterneh-

mung GmbH.

1930 Pioneering achievements such as the “Großglockner High Alpine Road”; building various power plants, road, rail and industrial facilities.

2

1953 PORR began construction of Ringturm tower on the Donau­kanal to Erich Boltenstern’s plans. The building boasts 20 storeys and has a height of 73 metres. It is considered to be Vienna’s first “real” high-rise and an innovative project for the reconstruction of the city.

1980 PORR recognised the potential in Eastern Europe even before the fall of the Iron Curtain and expanded into countries in the former Eastern Bloc. In this way it was involved in extending the Ferihegy II airport in Budapest.

1990s PORR's expertise and skills were in high demand on the construction of multiple major power plants along the Danube. The company thereby made an important contribution to securing Central Europe's energy supply.

3

With around 11,000 staff the PORR Group is one of Austria’s largest construction

companies

and

is

also a big player in numerous other countries. With many locations in the home markets and other countries in Central, South-Eastern and Eastern Europe, the company is involved in realising many trailblazing construction projects. On top of this, PORR is implementing international projects in the Middle East.

As a flexible full service provider in infrastructure, PORR offers a comprehensive portfolio which covers every aspect of the modern construction industry and is oriented towards the most demanding requirements: Porr Design & Engineering GmbH: general planning, project management, architecture, 3D-visualisation, static analysis, building services, sustainability – DGNB/ÖGNI-certification, construction preparation, site supervision Porr Bau GmbH: construction, design/build and general contractor (building, office, industrial, communal, hotel and housing construction, educational facilities, hospitals, care facilities, stadiums as well as revitalisation), civil engineering (roads, tunnels, powerstation and plant construction, railways, bridges, metro construction, special civil engineering, resources, infrastructure operator models, environmental engineering)

4

PORR Modern. International. Trailblazing. STRAUSS & PARTNER Development: project development (from design and execution through to sales and ongoing operations – office, residential, commercial, infrastructure, concessions) PORREAL: asset management, property management, facility management and consulting TEERAG-ASDAG AG: civil engineering (road construction, environmental construction, asphalt mixing plants, sealing and waterproofing, road markings, leisure facilities)

A seamless value chain, comprehensive expertise and extensive experience have made PORR into an expert partner for realising the most complex projects. “Powered by PORR” is synonymous with dynamism and growth. The basis for top quality comes from PORR’s in-depth knowhow, staff members who are motivated and well trained, a thirst for innovation and the willingness to constantly keep on learning and improving. In addition, national and international partnerships guarantee the group’s competitive edge.

5

High-rise buildings In conjunction with international architects and in close cooperation with Strauss & Partner Development, we implement ambitious and often innovative tower-building and revitalisation projects. We accompany our clients, if they wish, through all the phases of a project – from development, planning and design to construction and finally through to operation.

Sea Towers, Gdynia

6

Gross floor area

56,000 m2

Height of construction

138 m

Construction period

24 months

IZD Tower, Vienna Gross floor area

95,373 m2

Height of construction

140 m

Construction period

22 months

Zagreb Tower, Zagreb Gross floor area

30,000 m2

Height of construction

79 m

Construction period

25 months Ares Tower, Vienna

7

Equator, Warsaw Gross floor area

33,300 m2

Height of construction

63 m

Construction period

20 months

Europe Tower, Budapest Gross floor area

42,619 m2

Height of construction

50 m

Construction period

22 months

from left: Warsaw Towers, Warsaw InterContinental Hotel, Warsaw Financial Center

8

Andromeda Tower, Vienna Gross floor area

34,450 m2

Height of construction

113 m

Construction period

26 months

9

Office buildings As a full-service provider for project development, planning and design as well as construction we are fully aware of the importance that lies in the design and implementation of office projects: an optimal work environment creates delight in work, boosting the personal satisfaction and the productivity of the people who use the building.

Slovenská Sporitel’na ˇ a.s., Bratislava

10

Gross floor area

58,800 m2

Number of floors

2 BGL / 10 AGL

Construction period

26 months

Uniopt-Pachleitner Headquarters, Graz

Euro Plaza, Building G, Vienna Gross floor area

88,049 m2

Number of floors

3 BGL / 9 AGL

Construction period

23 months

Poleczki Business Park, Warsaw Gross floor area

68,800 m2

Number of floors

1 BGL / 4 AGL

Construction period

22 months

11

Eurovea International Trade Center, Bratislava

The Park, Prague

12

Gross floor area

240,000 m2

Number of floors

3 BGL / 8 AGL

Construction period

29 months

Siemens City, Vienna Gross floor area

85,000 m2

Number of floors

1 BGL / 14 AGL

Construction period

24 months

Quadrum, Vecsés Gross floor area

15,000 m2

Number of floors

1 BGL / 7 AGL

Construction period

14 months

13

Hotels Offices, apartments, industrial facilities, council housing or hotels – we realise them all as

a

building-construction

specialist in the European Economic Area. And every successful project allows us to extend our expertise and build up valuable experience – for the lasting benefit of our clients from every nation.

Ramada Innsbruck Tivoli Hotel

14

Gross floor area

9,940 m2

Number of floors

12 AGL

Construction period

31 months

andel's Hotel, Łódz´

Silver Mountain, Brasov Gross floor area

17,000 m2

Number of floors

2 BGL / 6 AGL

Construction period

17 months

Sheraton Hotel, Bratislava Gross floor area

21,000 m2

Number of floors

3 BGL / 7 AGL

Construction period

29 months

15

ETAP & IBIS Hotel, Krakow Gross floor area

11,000 m2

Number of floors

1 BGL / 6 AGL

Construction period

15 months

Pestana Berlin Tiergarten Hotel

16

Gross floor area

7,700 m2

Number of floors

1 BGL / 7 AGL

Construction period

15 months

Park Inn by Radisson Hotel, Krakow Gross floor area

12,500 m2

Number of floors

1 BGL / 6 AGL

Construction period

17 months

Kempinski Hotel Das Tirol, Kitzbühel

17

Living & Dwelling As a leading construction group we build for people. We invest all our knowledge and energy in people. Our goal is to ensure we can all live and work better and in greater comfort and greater beauty. This is reflected in our innovative housing projects, which point the way by offering both efficiency and high living quality.

Vile Jordanovac, Zagreb Gross floor area

5,700 m2

Number of floors

1 BGL / 3 AGL

Construction period

19 months

Nordbahnhof residential complex, Vienna

18

Bike City, Vienna Gross floor area

16,828 m2

Number of floors

1 BGL / 10 AGL

Construction period

21 months

Bike & Swim, Vienna Gross floor area

30,981 m2

Number of floors

1 BGL / 10 AGL

Construction period

20 months

19

Reichenau residential complex, Tyrol Gross floor area

12,280 m2

Number of floors

1 BGL / 6 AGL

Construction period

20 months

Hotel and residential complex, Seepark Velden

20

Monte Laa complex, Lot 8.1 Vienna Gross floor area

24,500 m2

Number of floors

3 – 10 AGL

Construction period

22 months

Angel Wings, Wrocław Gross floor area

46,230 m2

Number of floors

2 BGL / 10 AGL

Construction period

11 months

21

Schools & Universities Buildings dedicated to the training and education of future generations must strive for much more than simple functionality. These structures shape our cityscape and leave a striking impression on visitors as well as on the characters of the young people who learn, grow and develop in them. Creating buildings that exert a positive impact both on urban images and people is what we consider our great responsibility and one of our noblest challenges.

Warsaw School of Economics

22

Gross floor area

9,700 m2

Number of floors

6 AGL

Construction period

26 months

FH Campus Vienna

Monte Laa Campus, Vienna Gross floor area

13,409 m2

Number of floors

1 BGL / 4 AGL

Construction period

27 months

Audimax, Jagiellonen University, Krakow Gross floor area

10,500 m2

Number of floors

2 BGL / 4 AGL

Construction period

9 months

23

BOKU BioTech Center, Vienna Gross floor area

30,255 m2

Number of floors

2 BGL / 4 AGL

Construction period

26 months

University Library, Warsaw

24

Gross floor area

61,000 m2

Number of floors

2 BGL / 4 AGL

Construction period

44 months

Gertrude Fröhlich-Sandner Campus, Vienna Gross floor area

12,751 m2

Number of floors

1 BGL / 3 AGL

Construction period

15 months

Institute of Zoology of the Jagiellonen University, Krakow Gross floor area

14,000 m2

Number of floors

1 BGL / 4 AGL

Construction period

25 months

University and research centre, Tulln

25

Health Care PORR has proved its leadership expertise not least in the large number of hospital projects, which ensure health care for the population while enhancing sustainable economic development and the standard of living in the region. This calls for state-of-the-art know-how as well as maximum efficiency in the implementation of projects. Both of which are PORR's great strengths. Aqualux thermal bath, Fohnsdorf, Styria

26

Gross floor area

8,950 m2

Number of floors

2 BGL / 2 AGL

Construction period

14 months

Leopoldstadt residential care home, Vienna

Waldsanatorium Perchtoldsdorf, Lower Austria Gross floor area

14,500 m2

Number of floors

2 BGL / 5 AGL

Construction period

16 months

Grimming thermal spa, Bad Mitterndorf, Styria Gross floor area

22,900 m2

Number of floors

1 BGL / 1 – 6 AGL

Construction period

23 months

27

Simmering residential care home, Vienna

Regional Hospital Surgical Ward West II Gross floor area

19,000 m2

Number of floors

2 BGL / 5 AGL

Construction period

28 months

CMZ regional hospital, Klagenfurt © Gisela Erlacher

28

Gross floor area

38,100 m2

Number of floors

2 BGL / 6 AGL

Construction period

24 months

Münster rehabilitation centre, Tyrol 14,668 m2

Number of floors

3 – 5 AGL

Construction period

29 months

© Florian Holzherr

Gross floor area

Hollenburg private clinic, Krems, Lower Austria Gross floor area

12,700 m2

Number of floors

1 BGL / 4 AGL

Construction period

12 months

29

Revitalisation As a long-standing construction company with a rich tradition we are well aware of the importance of historical buildings. They are part of our culture and contribute to the individual identity of cities, regions and nations. Drawing future economic benefits from these values of the past simultaneously represents a challenge and proof of expertise. This means converting old structures that have stood the test of time into something new and innovative, so as to create objects of lasting value for future generations.

Theater in der Josefstadt, Vienna

30

Gross floor area

3,440 m2

Number of floors

3 AGL

Construction period

12 months

Le Palais Hotel, Prague Gross floor area

7,600 m2

Number of floors

2 BGL / 5 AGL

Construction period

17 months

Chamber of Labour, Linz Gross floor area

18,000 m2

Number of floors

2 BGL / 6 AGL

Construction period

24 months

Palais Hansen, Vienna

31

Kempinski Hotel Hybernská, Prague

32

Gross floor area

8,300 m2

Number of floors

6 AGL

Construction period

19 months

Central station, Warsaw

andel's Hotel, Łódz´ Gross floor area

40,200 m2

Number of floors

2 BGL / 7 AGL

Construction period

24 months

Albertina, Vienna Gross floor area

42,000 m2

Number of floors

2 BGL / 6 AGL

Construction period

24 months

33

Industrial buildings From individual real-estate units through to complex urban development schemes – we are working on some of today’s most spectacular development projects. Decades of cooperation with clients who keep entrusting us with new projects not only give evidence of our skill but reflect our quality in giving personal advice and taking care of their projects. Our clients trust us – knowing that we give our best for each task.

Distribution centre Overseas, Lucko-Zagreb ˇ

34

Gross floor area

5,540 m2

Number of floors

3 AGL

Construction period

6 months

Inzersdorf meat factory, Vienna

Acerinox, Warsaw Gross floor area

11,800 m2

Number of floors

1 AGL

Construction period

13 months

CCG Immobilien GmbH Kühne & Nagel, Werndorf Hall Gross floor area

3,210 m2

Number of floors

1 AGL

Office Gross floor area

510 m2

Number of floors

2 AGL

Construction period

6 months

CCG Immobilien GmbH Leykam Alpina, Werndorf Hall Gross floor area

3,550 m2

Number of floors

1 AGL

Office Gross floor area

950 m2

Number of floors

2 AGL

Construction period

6 months

35

VA SSC, Tychy Gross floor area

13,300 m2

Number of floors

3 AGL

Construction period

10 months

Miba Steeltec, Vráble

36

Gross floor area

18,000 m2

Number of floors

2 AGL

Construction period

8 months

Egger, Suceava Gross floor area

72,000 m2

Number of floors

1 AGL

Construction period

12 months

Tilly production hall, Treibach-Althofen, Carinthia

37

Stadiums On the occasion of the EURO 2008, PORR carried out extensive new construction and renovation of the stadiums in Klagenfurt, Wals-Siezenheim and Innsbruck. The con­ struction of a multi-functional stadium also requires supplementary infrastructure measures for the development of the surrounding area. In many cases, sports facilities need to be dismantled after the successful completion of major events. As a full-service-provider, PORR is an expert partner for the realisation of even the most complex projects. There are major events planned for the future which will require perfect

stadiums

with

corresponding

infrastructure (e.g. 2018 FIFA World Cup in Russia and 2022 in Qatar, Africa Cup of Nations / Tripoli stadium).

Tivoli Stadium, Innsbruck

38

Seats (net capacity)

30,000

Construction period

23 months

Wörthersee Stadium, Klagenfurt

Salzburg Stadium, Wals-Siezenheim Seats (net capacity)

30,000

Construction period

23 months

Wörthersee Stadium, Klagenfurt Seats (net capacity)

32,000

Construction period

23 months

39