BAH-MILCON Life Cycle Cost Analysis

Appendix J1 – Camp Lejeune, NC BAH-MILCON Life Cycle Cost Analysis In this appendix, we present the sources used for developing the inputs for the li...
2 downloads 0 Views 4MB Size
Appendix J1 – Camp Lejeune, NC

BAH-MILCON Life Cycle Cost Analysis In this appendix, we present the sources used for developing the inputs for the life cycle cost analysis (LCCA). The CD placed in the back inside cover contains the LCCA spreadsheet models for the five sample installation sites.

2010$

Construction Information Service life (years) Spaces E1-E5

400

Gross SF Design costs (USACE) Government Construction Cost Sustainment and Modernization

% occupancy 95% $ $

Source 55 DoD Facilities Pricing Guideline 2 July 07 page 25 FAC 7210 1391, FY09, 11 March 2009, Coronado BEQ 380 1391, FY09, 11 March 2009, Coronado BEQ

101,611 1391, FY10, 11 May 2009, Lejeune BEQ 1,739,200 Per OSD Housing (George Mino) ~ 4% of constr costs for design-build 43,480,000 1391, FY10, 11 May 2009, Lejeune BEQ.

$/square foot

Sustainment

$

3.72

Annual modernization of primary facility

$

3.04

Sustainment and Modernization Supporting Facilities Operations

$

5.46

Water & Wastewater

$

0.24

Real Property Mgmt

$

Grounds Maintenance

1

FY11 unit cost based on 7210 FAC buildings at Lejeune from FPRS version 377,992 29 March 2010. See Sustainment, Lejeune tab. Converted to FY10 dollars

$

$

FY11 unit cost based on 7210 FAC buildings at Lejeune from FPRS version 308,721 29 March 2010. See Modernization, Lejeune tab. Converted tog FY10 dollars See Sust-Mod. Of Supporting Fac. Tab. Factor applied to percentage of square feet that equals the percentage of cost breakdown of Support vs 102,438 Primary. Converted to FY10 dollars

1

$

FY11 unit cost based on 7210 FAC buildings at Lejeune from FPRS version 24,340 29 March 2010. See Operations, Lejeune tab. Converted to FY10 dollars

0.44

1

$

FY11 unit cost based on 7210 FAC buildings at Lejeune from FPRS version 44,874 29 March 2010. See Operations, Lejeune tab. Converted to FY10 dollars

$

0.32

1

$

FY11 unit cost based on 7210 FAC buildings at Lejeune from FPRS version 32,825 29 March 2010. See Operations, Lejeune tab. Converted to FY10 dollars

Energy

$

0.99

1

$

Custodial Services

$

0.12

1

$

Refuse Collection

$

0.09

1

$

FY11 unit cost based on 7210 FAC buildings at Lejeune from FPRS version 101,040 29 March 2010. See Operations, Lejeune tab. Converted to FY10 dollars FY11 unit cost based on 7231 FAC buildings in 2009 DoD Facilities Pricing Guide. Converted to FY10 dollars using Lejeune area factor. See 11,986 Operations, Lejeune tab. FY11 unit cost based on 7212 FAC buildings in 2009 DoD Facilities Pricing Guide. Converted to FY10 dollars using Lejeune area factor. See 9,591 Operations, Lejeune tab.

$ $

FY11 unit cost based on 7213FAC buildings at Lejeune from FPRS version 4,009 29 March 2010. See Operations, Lejeune tab. Converted to FY10 dollars 228,666

Pest Control Total operation costs Other UPH Related Costs

Barracks Management

$

$

$

0.04

18,765.78

1

$/space

$

173,148

Furnishings, Initial

$

1,348,750

Furnishings, Replacement (every 8 years)

$

869,000

Furnishings, Replacement (every 4 years)

$

217,250

$26,544

$

26,544

$195

$

77,822

Washers and Dryers

Fire and Police

$433

Email from George Mino dated 4/6/10 regarding discussions with Lt. Col. Pat Hittle from Housing. Very similar to Bragg FSBI program of $416.06 per room/space. Dollars converted to FY10 at a 2% escalation factor. Email from George Mino dated 3/23/10 regarding cost estimates provided by the USMC; FY10 dollars Email from George Mino dated 3/23/10 regarding cost estimates provided by the USMC; FY10 dollars Email from George Mino dated 3/23/10 regarding cost estimates provided by the USMC; FY10 dollars Email from George Mino dated 3/23/10 regarding cost estimates provided by the USMC; FY10 dollars $187 per year per bedroom cost based on an email from George Mino on 4/7/10 to use Hampton Roads bachelor housing rate. Costs were in FY07 dollars and have been converted to FY10 dollars.

Number of Occupants 70 70 70 48 47

Monthly BAH rate per occupant $6.90 $7.20 $7.80 $8.10 $8.70

E1 E2 E3

133 133 133

$6.90 $7.20 $7.80

$10,488 For E1-E3 analysis $10,944 $11,856 $33,288

E1 E2 E3 E4

70 70 70 95

$6.90 $7.20 $7.80 $8.10

$5,506 $5,746 $6,224 $8,772 $26,249 For E1-E4 analysis

E4

200

$8.10

$18,468 For E4 analysis

E5

200

Partial BAH Rates E1 E2 E3 E4 E5

Total Partial BAH cost $5,506 FY10 Numbers. Assumes a perfect split amongst all E1-E3 and E4-E5's. $5,746 $6,224 $4,432 $4,661 $26,570

E1-E3 without Dep.

400

$8.70 $19,836 Monthly BAH rate per occupant Total Full BAH Rate $ 849 $ 2,032,506 $ 849 $ 464,573 $ 954 $ 511,153 $ 3,008,232 $ 849 $ 3,871,440

E1-E4 without Dep.

305

$

849

$

2,951,973 E1-E4 analysis

E-4 without Dep.

200

$

849

$

1,935,720 E4 Only Analysis

200

$

954

$

2,175,120 E5 Only Analysis

BAH Rates - Coronado, CA E1-E3 without Dep. E-4 without Dep. E-5 without Dep.

E-5 without Dep. Mixed use occupancy E1-E3 Occupants E5 occupants Discount and Inflation Rates

Number of Occupants 210 48 47

For E5 analysis

Lejeune, NC, zip code 28542; FY10 Split the 95 E-4 and E-5's equally

E1-E3 Only Analysis

$ 239,400 210 95

210 95

Real discount rate (30-year)

2.70%

Inflation - goods and services 2007 2008 2009 2010 2011 2012 2013 2014 2015 Inflation - construction

2.30% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 2.00% 3.50%

Based on anticipated usage specified in the 1391 OMB A-94 Appendix C Revised January 2008. 30-year real interest rate. Assumed all costs would inflate with general inflation rates and therefore A94 allows for use of real rates instead of nominal rates.

DoD Comptroller approved rates

Assumptions: 1) MILCON construction project starts in 2010 with occupancy by 2012 and the privatization scenario assumes BAH payments start in 2012. 2) Added operating costs for custodial services, refuse collection, and pest control not identified in the DoD Facilities Pricing Guideline for FAC 7210 3) 210 modules are intended to be filled with E1-E3's and 95 E4-E5's are to fill the remaining spaces, per the intent described in the 1391. Analyses has also been done for E1-E3 only, only E4s, and only E5s. 4) Although the Facility Modernization Model uses empirical costs for program-wide budgeting purposes, the primary facility cost from the 1391 was used in lieu of empirical costs for greater accuracy. 5) Assumes costs will inflate along with general inflation. Therefore costs were not escalated and the real discount rate identified by OMB was used. 6) This 55-year lifecycle cost analysis does not use the O&M and Utility cost sources as specified in OSD Final Housing Privatization Life Cycle Cost Policy, dated Nov 4, 2005.

Expressed in 2010 dollars

1

2

3

4

5

6

7

8

2 2012

3 2013

4 2014

5 2015

6 2016

7 2017

8 2018

9 2019

Scenario E1-E5 Occupancy 0 2010 Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

$ $

Total Cost Discounted costs

$

21,740,000

100%

$ $

$

23,479,200

$

$ $ $ $ $ $ $ 21,740,000 $

$ $

1,739,200 21,740,000

$

21,168,452

100%

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Costs Number of bedrooms BAH and milcon funding if privatized Gov't contribution BAH E1-E5

1,739,200 21,740,000

1 2011

NPV - 55 years $ 1,739,200 $ 42,908,452 $ 10,482,630 $ 8,561,585

$ $ $ $ $ $ $

2,840,868 6,341,460 4,801,803 4,529,238 2,158,192 736,130 85,836,407 $ $3,013,790 $627.87 400

$

23,479,200

$

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

102,438 $ 228,666 $ 173,148 $ 1,348,750 77,822 $ 26,544 $ 26,570 $ 2,670,650 $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

102,438 $ 228,666 $ 173,148 $ 217,250 77,822 $ 26,544 $ 26,570 $ 1,539,150 $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $ $

$ $ $ $ 77,822 $ 26,544 $ 26,570 $ 1,321,900 $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

305,435 $ 249,461 $

297,405 242,903

358,378 $ 292,702 $

348,956 $ 285,007 $

339,782 $ 277,514 $

330,849 $ 270,218 $

322,151 $ 263,114 $

313,682 $ 256,196 $

$ $ $ $ $ $ $ 21,168,452 $

97,123 $ 216,801 $ 164,163 $ 1,278,764 $ 73,784 $ 25,167 $ 25,191 $ 2,532,072 $

94,570 $ 211,101 $ 159,847 $ $ 71,844 $ 24,505 $ 24,529 $ 1,220,358 $

92,083 $ 205,551 $ 155,645 $ $ 69,955 $ 23,861 $ 23,884 $ 1,188,275 $

89,662 $ 200,147 $ 151,553 $ $ 68,116 $ 23,233 $ 23,256 $ 1,157,035 $

87,305 $ 194,885 $ 147,568 $ 185,156 $ 66,325 $ 22,623 $ 22,645 $ 1,311,772 $

85,010 $ 189,761 $ 143,689 $ $ 64,582 $ 22,028 $ 22,049 $ 1,096,997 $

82,775 184,773 139,911 62,884 21,449 21,470 1,068,157

$ $ $ $ $ $ $ $

80,599 179,915 136,233 61,231 20,885 20,905 1,040,075

$

$ $

377,992 308,721

$ $

103%

NPV 55 years $ 85,836,407

$ $

-

$ $

-

$ $

3,095,163 3,095,163 2,934,557

$ $ $

Assuming a 55 year facility life, MILCON is equal to paying 103% of BAH over the 55 years to 95% of the maximum estimated E1-E5 occupants.

3,095,163 3,095,163 2,857,407

$ $ $

3,095,163 3,095,163 2,782,286

$ $ $

3,095,163 3,095,163 2,709,139

$ $ $

3,095,163 3,095,163 2,637,915

$ $ $

3,095,163 3,095,163 2,568,564

$ $ $

3,095,163 3,095,163 2,501,036

$ $ $

3,095,163 3,095,163 2,435,283

Expressed in 2010 dollars

9

10

11

12

13

14

15

16

17

18

19

20

10 2020

11 2021

12 2022

13 2023

14 2024

15 2025

16 2026

17 2027

18 2028

19 2029

20 2030

21 2031

Scenario E1-E5 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $ $ $ $ $ $

102,438 228,666 173,148 869,000 77,822 26,544 26,570 2,190,900

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 $ 228,666 $ 173,148 $

102,438 228,666 173,148

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

102,438 228,666 173,148 869,000 77,822 26,544 26,570 2,190,900

102,438 228,666 173,148

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $

77,822 26,544 26,570 1,321,900

102,438 228,666 173,148 217,250 77,822 26,544 26,570 1,539,150

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $

289,586 236,517

$ $

281,973 230,299

$ $

274,560 224,244

$ $

267,342 218,349

$ $

260,313 212,608

$ $

253,469 207,019

$ $

246,806 201,576

$ $

240,317 196,277

$ $

233,999 191,116

$ $

227,847 186,092

$ $

221,857 181,200

$ $

216,024 176,436

60,125 $ 134,212 $ 101,627 $ $ 45,677 $ 15,580 $ 15,595 $ 775,872 $

58,544 130,684 98,955 44,476 15,170 15,185 755,474

$ $ $ $ $ $ $ $

BAH and milcon funding if privatized Gov't contribution BAH E1-E5 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

78,480 $ 175,185 $ 132,651 $ 665,756 $ 59,621 $ 20,336 $ 20,356 $ 1,678,488 $

$ $ $

3,095,163 3,095,163 2,371,259

76,417 $ 170,579 $ 129,164 $ $ 58,053 $ 19,801 $ 19,821 $ 986,107 $

$ $ $

3,095,163 3,095,163 2,308,919

74,408 $ 166,095 $ 125,768 $ $ 56,527 $ 19,281 $ 19,299 $ 960,182 $

$ $ $

3,095,163 3,095,163 2,248,217

72,451 $ 161,728 $ 122,462 $ $ 55,041 $ 18,774 $ 18,792 $ 934,938 $

$ $ $

3,095,163 3,095,163 2,189,111

70,547 $ 157,476 $ 119,242 $ 149,614 $ 53,594 $ 18,280 $ 18,298 $ 1,059,973 $

$ $ $

3,095,163 3,095,163 2,131,559

68,692 $ 153,336 $ 116,107 $ $ 52,185 $ 17,800 $ 17,817 $ 886,425 $

$ $ $

3,095,163 3,095,163 2,075,520

66,886 $ 149,305 $ 113,055 $ $ 50,813 $ 17,332 $ 17,349 $ 863,121 $

$ $ $

3,095,163 3,095,163 2,020,954

65,128 $ 145,380 $ 110,083 $ $ 49,477 $ 16,876 $ 16,892 $ 840,429 $

$ $ $

3,095,163 3,095,163 1,967,823

63,415 $ 141,558 $ 107,189 $ 537,962 $ 48,176 $ 16,432 $ 16,448 $ 1,356,296 $

$ $ $

3,095,163 3,095,163 1,916,088

61,748 $ 137,836 $ 104,371 $ $ 46,910 $ 16,000 $ 16,016 $ 796,820 $

$ $ $

3,095,163 3,095,163 1,865,714

$ $ $

3,095,163 3,095,163 1,816,664

$ $ $

3,095,163 3,095,163 1,768,904

Expressed in 2010 dollars

21

22

23

24

25

26

27

28

29

30

31

32

22 2032

23 2033

24 2034

25 2035

26 2036

27 2037

28 2038

29 2039

30 2040

31 2041

32 2042

33 2043

Scenario E1-E5 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $ $ $ $ $ $

102,438 228,666 173,148 217,250 77,822 26,544 26,570 1,539,150

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 $ 228,666 $ 173,148 $

102,438 228,666 173,148

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

102,438 228,666 173,148 217,250 77,822 26,544 26,570 1,539,150

102,438 228,666 173,148

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $

77,822 26,544 26,570 1,321,900

102,438 228,666 173,148 869,000 77,822 26,544 26,570 2,190,900

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $

210,345 171,797

$ $

204,815 167,281

$ $

199,430 162,883

$ $

194,187 158,601

$ $

189,082 154,431

$ $

184,111 150,371

$ $

179,271 146,418

$ $

174,558 142,568

$ $

169,969 138,820

$ $

165,500 135,171

$ $

161,149 131,617

$ $

156,913 128,157

$ $ $ $ $ $ $ $

57,005 $ 127,248 $ 96,353 $ 120,895 $ 43,306 $ 14,771 $ 14,786 $ 856,508 $

43,673 $ 97,487 $ 73,818 $ $ 33,178 $ 11,317 $ 11,328 $ 563,566 $

42,524 94,924 71,877 32,306 11,019 11,030 548,749

BAH and milcon funding if privatized Gov't contribution BAH E1-E5 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

$ $ $

3,095,163 3,095,163 1,722,399

55,506 $ 123,903 $ 93,820 $ $ 42,168 $ 14,383 $ 14,397 $ 716,273 $

$ $ $

3,095,163 3,095,163 1,677,117

54,047 $ 120,645 $ 91,354 $ $ 41,059 $ 14,005 $ 14,018 $ 697,442 $

$ $ $

3,095,163 3,095,163 1,633,025

52,626 $ 117,474 $ 88,952 $ $ 39,980 $ 13,637 $ 13,650 $ 679,106 $

$ $ $

3,095,163 3,095,163 1,590,093

51,243 $ 114,385 $ 86,613 $ 434,699 $ 38,929 $ 13,278 $ 13,291 $ 1,095,951 $

$ $ $

3,095,163 3,095,163 1,548,289

49,895 $ 111,378 $ 84,336 $ $ 37,905 $ 12,929 $ 12,942 $ 643,868 $

$ $ $

3,095,163 3,095,163 1,507,584

48,584 $ 108,450 $ 82,119 $ $ 36,909 $ 12,589 $ 12,601 $ 626,940 $

$ $ $

3,095,163 3,095,163 1,467,949

47,306 $ 105,599 $ 79,960 $ $ 35,938 $ 12,258 $ 12,270 $ 610,458 $

$ $ $

3,095,163 3,095,163 1,429,357

46,063 $ 102,822 $ 77,858 $ 97,689 $ 34,994 $ 11,936 $ 11,948 $ 692,098 $

$ $ $

3,095,163 3,095,163 1,391,779

44,852 $ 100,119 $ 75,811 $ $ 34,074 $ 11,622 $ 11,633 $ 578,782 $

$ $ $

3,095,163 3,095,163 1,355,189

$ $ $

3,095,163 3,095,163 1,319,560

$ $ $

3,095,163 3,095,163 1,284,869

Expressed in 2010 dollars

33

34

35

36

37

38

39

40

41

42

43

44

34 2044

35 2045

36 2046

37 2047

38 2048

39 2049

40 2050

41 2051

42 2052

43 2053

44 2054

45 2055

Scenario E1-E5 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $ $ $ $ $ $

102,438 228,666 173,148 869,000 77,822 26,544 26,570 2,190,900

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 $ 228,666 $ 173,148 $

102,438 228,666 173,148

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

102,438 228,666 173,148 869,000 77,822 26,544 26,570 2,190,900

102,438 228,666 173,148

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $

77,822 26,544 26,570 1,321,900

102,438 228,666 173,148 217,250 77,822 26,544 26,570 1,539,150

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $

152,787 124,787

$ $

148,770 121,507

$ $

144,859 118,312

$ $

141,051 115,202

$ $

137,343 112,173

$ $

133,732 109,224

$ $

130,216 106,353

$ $

126,793 103,557

$ $

123,459 100,834

$ $

120,213 98,183

$ $

117,053 95,602

$ $

113,976 93,089

$ $ $ $ $ $ $ $

41,406 $ 92,429 $ 69,988 $ 351,257 $ 31,456 $ 10,729 $ 10,740 $ 885,579 $

31,722 $ 70,811 $ 53,619 $ $ 24,099 $ 8,220 $ 8,228 $ 409,354 $

30,888 68,950 52,209 23,466 8,004 8,012 398,592

BAH and milcon funding if privatized Gov't contribution BAH E1-E5 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

$ $ $

3,095,163 3,095,163 1,251,090

40,318 $ 89,999 $ 68,148 $ $ 30,629 $ 10,447 $ 10,457 $ 520,275 $

$ $ $

3,095,163 3,095,163 1,218,198

39,258 $ 87,633 $ 66,356 $ $ 29,824 $ 10,173 $ 10,183 $ 506,597 $

$ $ $

3,095,163 3,095,163 1,186,172

38,226 $ 85,329 $ 64,612 $ $ 29,040 $ 9,905 $ 9,915 $ 493,279 $

$ $ $

3,095,163 3,095,163 1,154,987

37,221 $ 83,085 $ 62,913 $ 78,937 $ 28,276 $ 9,645 $ 9,654 $ 559,248 $

$ $ $

3,095,163 3,095,163 1,124,622

36,242 $ 80,901 $ 61,259 $ $ 27,533 $ 9,391 $ 9,400 $ 467,683 $

$ $ $

3,095,163 3,095,163 1,095,056

35,289 $ 78,774 $ 59,648 $ $ 26,809 $ 9,144 $ 9,153 $ 455,387 $

$ $ $

3,095,163 3,095,163 1,066,266

34,362 $ 76,703 $ 58,080 $ $ 26,104 $ 8,904 $ 8,913 $ 443,415 $

$ $ $

3,095,163 3,095,163 1,038,234

33,458 $ 74,687 $ 56,553 $ 283,832 $ 25,418 $ 8,670 $ 8,678 $ 715,590 $

$ $ $

3,095,163 3,095,163 1,010,939

32,579 $ 72,723 $ 55,066 $ $ 24,750 $ 8,442 $ 8,450 $ 420,407 $

$ $ $

3,095,163 3,095,163 984,361

$ $ $

3,095,163 3,095,163 958,482

$ $ $

3,095,163 3,095,163 933,283

Expressed in 2010 dollars

45

46

47

48

49

50

46 2056

47 2057

48 2058

49 2059

50 2060

51 2061

Scenario E1-E5 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $ $ $ $ $ $ $ $ $

Assuming a 55 year facility life, MILCON

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

102,438 $ 228,666 $ 173,148 $ 217,250 77,822 $ 26,544 $ 26,570 $ 1,539,150 $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

102,438 228,666 173,148 869,000 77,822 26,544 26,570 2,190,900

$ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $

102,454 83,679

$ $

99,761 81,479

$ $

97,138 79,337

27,036 $ 60,350 $ 45,698 $ 229,349 $ 20,539 $ 7,006 $ 7,012 $ 578,230 $

26,325 58,764 44,496 19,999 6,821 6,828 339,708

$ $

110,979 90,641

$ $

108,062 88,258

$ $

105,221 85,938

$ $ $ $ $ $ $ $

30,076 67,137 50,837 63,785 22,849 7,793 7,801 451,898

$ $ $ $ $ $ $ $

29,285 65,372 49,500 22,248 7,588 7,596 377,910

$ $ $ $ $ $ $ $

28,516 $ 63,653 $ 48,199 $ $ 21,663 $ 7,389 $ 7,396 $ 367,974 $

BAH and milcon funding if privatized Gov't contribution BAH E1-E5 Total Cost Discounted costs

377,992 308,721

$ $ $

3,095,163 3,095,163 908,747

$ $ $

3,095,163 3,095,163 884,856

$ $ $

3,095,163 3,095,163 861,593

27,766 $ 61,980 $ 46,932 $ $ 21,094 $ 7,195 $ 7,202 $ 358,300 $

$ $ $

3,095,163 3,095,163 838,942

$ $ $

3,095,163 3,095,163 816,886

$ $ $

3,095,163 3,095,163 795,410

Expressed in 2010 dollars

51

52

53

54

55

52 2062

53 2063

54 2064

55 2065

56 2066

Scenario E1-E5 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

102,438 228,666 173,148 217,250 77,822 26,544 26,570 1,539,150

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $ $ $

77,822 26,544 26,570 1,321,900

$ $

94,584 77,251

$ $

92,098 75,220

$ $

89,676 73,242

$ $

87,319 71,317

$ $

85,023 69,442

$ $ $ $ $ $ $ $

25,633 57,219 43,326 19,473 6,642 6,649 330,777

$ $ $ $ $ $ $ $

24,959 55,714 42,187 18,961 6,467 6,474 322,081

$ $ $ $ $ $ $ $

24,303 54,250 41,078 51,541 18,463 6,297 6,304 365,155

$ $ $ $ $ $ $ $

23,664 52,823 39,998 17,977 6,132 6,138 305,369

$ $ $ $ $ $ $ $

23,042 51,435 38,947 17,505 5,971 5,976 297,340

BAH and milcon funding if privatized Gov't contribution BAH E1-E5 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

$ $ $

3,095,163 3,095,163 774,498

$ $ $

3,095,163 3,095,163 754,137

$ $ $

3,095,163 3,095,163 734,310

$ $ $

3,095,163 3,095,163 715,005

$ $ $

3,095,163 3,095,163 696,207

Expressed in 2010 dollars Scenario E1-E5 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms BAH and milcon funding if privatized Gov't contribution BAH E1-E5 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

Expressed in 2010 dollars

1

2

3

4

5

6

7

8

2 2012

3 2013

4 2014

5 2015

6 2016

7 2017

8 2018

9 2019

Scenario E1-E3 Occupancy 0 2010 Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

$ $

Total Cost Discounted costs

$

21,740,000

100%

$ $

$

23,479,200

$

$ $ $ $ $ $ $ 21,740,000 $

$ $

1,739,200 21,740,000

$

21,168,452

100%

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Costs Number of bedrooms BAH and milcon funding if privatized Gov't contribution BAH E1-E3

1,739,200 21,740,000

1 2011

NPV - 55 years $ 1,739,200 $ 42,908,452 $ 10,482,630 $ 8,561,585

$ $ $ $ $ $ $

2,840,868 6,341,460 4,801,803 4,529,238 2,158,192 736,130 86,022,714 $ $3,020,332 $629.24 400

$

23,479,200

$

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

102,438 $ 228,666 $ 173,148 $ 1,348,750 77,822 $ 26,544 $ 33,288 $ 2,677,368 $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

102,438 $ 228,666 $ 173,148 $ 217,250 77,822 $ 26,544 $ 33,288 $ 1,545,868 $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $ $

$ $ $ $ 77,822 $ 26,544 $ 33,288 $ 1,328,618 $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

305,435 $ 249,461 $

297,405 242,903

358,378 $ 292,702 $

348,956 $ 285,007 $

339,782 $ 277,514 $

330,849 $ 270,218 $

322,151 $ 263,114 $

313,682 $ 256,196 $

$ $ $ $ $ $ $ 21,168,452 $

97,123 $ 216,801 $ 164,163 $ 1,278,764 $ 73,784 $ 25,167 $ 31,561 $ 2,538,441 $

94,570 $ 211,101 $ 159,847 $ $ 71,844 $ 24,505 $ 30,731 $ 1,226,560 $

92,083 $ 205,551 $ 155,645 $ $ 69,955 $ 23,861 $ 29,923 $ 1,194,314 $

89,662 $ 200,147 $ 151,553 $ $ 68,116 $ 23,233 $ 29,136 $ 1,162,915 $

87,305 $ 194,885 $ 147,568 $ 185,156 $ 66,325 $ 22,623 $ 28,370 $ 1,317,498 $

85,010 $ 189,761 $ 143,689 $ $ 64,582 $ 22,028 $ 27,625 $ 1,102,572 $

82,775 184,773 139,911 62,884 21,449 26,898 1,073,586

$ $ $ $ $ $ $ $

80,599 179,915 136,233 61,231 20,885 26,191 1,045,361

$

$ $

377,992 308,721

$ $

80%

NPV 55 years $ 86,022,714

$ $

-

$ $

-

$ $

3,101,881 3,101,881 2,940,927

Assuming a 55 year facility life, MILCON is equal to paying 80% of BAH over the 55 years to 95% of the maximum E1-E3 occupants.

$ $ $

3,101,881 3,101,881 2,863,609

$ $ $

3,101,881 3,101,881 2,788,325

$ $ $

3,101,881 3,101,881 2,715,019

$ $ $

3,101,881 3,101,881 2,643,641

$ $ $

3,101,881 3,101,881 2,574,139

$ $ $

3,101,881 3,101,881 2,506,464

$ $ $

3,101,881 3,101,881 2,440,569

Expressed in 2010 dollars

9

10

11

12

13

14

15

16

17

18

19

20

10 2020

11 2021

12 2022

13 2023

14 2024

15 2025

16 2026

17 2027

18 2028

19 2029

20 2030

21 2031

Scenario E1-E3 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $ $ $ $ $ $

102,438 228,666 173,148 869,000 77,822 26,544 33,288 2,197,618

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 $ 228,666 $ 173,148 $

102,438 228,666 173,148

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

102,438 228,666 173,148 869,000 77,822 26,544 33,288 2,197,618

102,438 228,666 173,148

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $

77,822 26,544 33,288 1,328,618

102,438 228,666 173,148 217,250 77,822 26,544 33,288 1,545,868

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $

289,586 236,517

$ $

281,973 230,299

$ $

274,560 224,244

$ $

267,342 218,349

$ $

260,313 212,608

$ $

253,469 207,019

$ $

246,806 201,576

$ $

240,317 196,277

$ $

233,999 191,116

$ $

227,847 186,092

$ $

221,857 181,200

$ $

216,024 176,436

60,125 $ 134,212 $ 101,627 $ $ 45,677 $ 15,580 $ 19,538 $ 779,815 $

58,544 130,684 98,955 44,476 15,170 19,024 759,313

$ $ $ $ $ $ $ $

BAH and milcon funding if privatized Gov't contribution BAH E1-E3 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

78,480 $ 175,185 $ 132,651 $ 665,756 $ 59,621 $ 20,336 $ 25,503 $ 1,683,635 $

$ $ $

3,101,881 3,101,881 2,376,406

76,417 $ 170,579 $ 129,164 $ $ 58,053 $ 19,801 $ 24,832 $ 991,118 $

$ $ $

3,101,881 3,101,881 2,313,930

74,408 $ 166,095 $ 125,768 $ $ 56,527 $ 19,281 $ 24,179 $ 965,061 $

$ $ $

3,101,881 3,101,881 2,253,096

72,451 $ 161,728 $ 122,462 $ $ 55,041 $ 18,774 $ 23,544 $ 939,690 $

$ $ $

3,101,881 3,101,881 2,193,862

70,547 $ 157,476 $ 119,242 $ 149,614 $ 53,594 $ 18,280 $ 22,925 $ 1,064,600 $

$ $ $

3,101,881 3,101,881 2,136,185

68,692 $ 153,336 $ 116,107 $ $ 52,185 $ 17,800 $ 22,322 $ 890,930 $

$ $ $

3,101,881 3,101,881 2,080,024

66,886 $ 149,305 $ 113,055 $ $ 50,813 $ 17,332 $ 21,735 $ 867,507 $

$ $ $

3,101,881 3,101,881 2,025,340

65,128 $ 145,380 $ 110,083 $ $ 49,477 $ 16,876 $ 21,164 $ 844,700 $

$ $ $

3,101,881 3,101,881 1,972,094

63,415 $ 141,558 $ 107,189 $ 537,962 $ 48,176 $ 16,432 $ 20,607 $ 1,360,455 $

$ $ $

3,101,881 3,101,881 1,920,247

61,748 $ 137,836 $ 104,371 $ $ 46,910 $ 16,000 $ 20,065 $ 800,870 $

$ $ $

3,101,881 3,101,881 1,869,763

$ $ $

3,101,881 3,101,881 1,820,607

$ $ $

3,101,881 3,101,881 1,772,743

Expressed in 2010 dollars

21

22

23

24

25

26

27

28

29

30

31

32

22 2032

23 2033

24 2034

25 2035

26 2036

27 2037

28 2038

29 2039

30 2040

31 2041

32 2042

33 2043

Scenario E1-E3 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $ $ $ $ $ $

102,438 228,666 173,148 217,250 77,822 26,544 33,288 1,545,868

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 $ 228,666 $ 173,148 $

102,438 228,666 173,148

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

102,438 228,666 173,148 217,250 77,822 26,544 33,288 1,545,868

102,438 228,666 173,148

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $

77,822 26,544 33,288 1,328,618

102,438 228,666 173,148 869,000 77,822 26,544 33,288 2,197,618

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $

210,345 171,797

$ $

204,815 167,281

$ $

199,430 162,883

$ $

194,187 158,601

$ $

189,082 154,431

$ $

184,111 150,371

$ $

179,271 146,418

$ $

174,558 142,568

$ $

169,969 138,820

$ $

165,500 135,171

$ $

161,149 131,617

$ $

156,913 128,157

$ $ $ $ $ $ $ $

57,005 $ 127,248 $ 96,353 $ 120,895 $ 43,306 $ 14,771 $ 18,524 $ 860,246 $

43,673 $ 97,487 $ 73,818 $ $ 33,178 $ 11,317 $ 14,192 $ 566,430 $

42,524 94,924 71,877 32,306 11,019 13,819 551,538

BAH and milcon funding if privatized Gov't contribution BAH E1-E3 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

$ $ $

3,101,881 3,101,881 1,726,137

55,506 $ 123,903 $ 93,820 $ $ 42,168 $ 14,383 $ 18,037 $ 719,913 $

$ $ $

3,101,881 3,101,881 1,680,757

54,047 $ 120,645 $ 91,354 $ $ 41,059 $ 14,005 $ 17,563 $ 700,986 $

$ $ $

3,101,881 3,101,881 1,636,570

52,626 $ 117,474 $ 88,952 $ $ 39,980 $ 13,637 $ 17,101 $ 682,557 $

$ $ $

3,101,881 3,101,881 1,593,544

51,243 $ 114,385 $ 86,613 $ 434,699 $ 38,929 $ 13,278 $ 16,652 $ 1,099,311 $

$ $ $

3,101,881 3,101,881 1,551,649

49,895 $ 111,378 $ 84,336 $ $ 37,905 $ 12,929 $ 16,214 $ 647,140 $

$ $ $

3,101,881 3,101,881 1,510,856

48,584 $ 108,450 $ 82,119 $ $ 36,909 $ 12,589 $ 15,788 $ 630,127 $

$ $ $

3,101,881 3,101,881 1,471,136

47,306 $ 105,599 $ 79,960 $ $ 35,938 $ 12,258 $ 15,373 $ 613,560 $

$ $ $

3,101,881 3,101,881 1,432,459

46,063 $ 102,822 $ 77,858 $ 97,689 $ 34,994 $ 11,936 $ 14,968 $ 695,119 $

$ $ $

3,101,881 3,101,881 1,394,800

44,852 $ 100,119 $ 75,811 $ $ 34,074 $ 11,622 $ 14,575 $ 581,723 $

$ $ $

3,101,881 3,101,881 1,358,130

$ $ $

3,101,881 3,101,881 1,322,425

$ $ $

3,101,881 3,101,881 1,287,658

Expressed in 2010 dollars

33

34

35

36

37

38

39

40

41

42

43

44

34 2044

35 2045

36 2046

37 2047

38 2048

39 2049

40 2050

41 2051

42 2052

43 2053

44 2054

45 2055

Scenario E1-E3 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $ $ $ $ $ $

102,438 228,666 173,148 869,000 77,822 26,544 33,288 2,197,618

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 $ 228,666 $ 173,148 $

102,438 228,666 173,148

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

102,438 228,666 173,148 869,000 77,822 26,544 33,288 2,197,618

102,438 228,666 173,148

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $

77,822 26,544 33,288 1,328,618

102,438 228,666 173,148 217,250 77,822 26,544 33,288 1,545,868

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $

152,787 124,787

$ $

148,770 121,507

$ $

144,859 118,312

$ $

141,051 115,202

$ $

137,343 112,173

$ $

133,732 109,224

$ $

130,216 106,353

$ $

126,793 103,557

$ $

123,459 100,834

$ $

120,213 98,183

$ $

117,053 95,602

$ $

113,976 93,089

$ $ $ $ $ $ $ $

41,406 $ 92,429 $ 69,988 $ 351,257 $ 31,456 $ 10,729 $ 13,455 $ 888,295 $

31,722 $ 70,811 $ 53,619 $ $ 24,099 $ 8,220 $ 10,308 $ 411,435 $

30,888 68,950 52,209 23,466 8,004 10,037 400,618

BAH and milcon funding if privatized Gov't contribution BAH E1-E3 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

$ $ $

3,101,881 3,101,881 1,253,805

40,318 $ 89,999 $ 68,148 $ $ 30,629 $ 10,447 $ 13,102 $ 522,919 $

$ $ $

3,101,881 3,101,881 1,220,842

39,258 $ 87,633 $ 66,356 $ $ 29,824 $ 10,173 $ 12,757 $ 509,172 $

$ $ $

3,101,881 3,101,881 1,188,746

38,226 $ 85,329 $ 64,612 $ $ 29,040 $ 9,905 $ 12,422 $ 495,786 $

$ $ $

3,101,881 3,101,881 1,157,494

37,221 $ 83,085 $ 62,913 $ 78,937 $ 28,276 $ 9,645 $ 12,095 $ 561,689 $

$ $ $

3,101,881 3,101,881 1,127,063

36,242 $ 80,901 $ 61,259 $ $ 27,533 $ 9,391 $ 11,777 $ 470,060 $

$ $ $

3,101,881 3,101,881 1,097,432

35,289 $ 78,774 $ 59,648 $ $ 26,809 $ 9,144 $ 11,468 $ 457,702 $

$ $ $

3,101,881 3,101,881 1,068,581

34,362 $ 76,703 $ 58,080 $ $ 26,104 $ 8,904 $ 11,166 $ 445,669 $

$ $ $

3,101,881 3,101,881 1,040,488

33,458 $ 74,687 $ 56,553 $ 283,832 $ 25,418 $ 8,670 $ 10,872 $ 717,784 $

$ $ $

3,101,881 3,101,881 1,013,133

32,579 $ 72,723 $ 55,066 $ $ 24,750 $ 8,442 $ 10,587 $ 422,543 $

$ $ $

3,101,881 3,101,881 986,498

$ $ $

3,101,881 3,101,881 960,562

$ $ $

3,101,881 3,101,881 935,309

Expressed in 2010 dollars

45

46

47

48

49

50

46 2056

47 2057

48 2058

49 2059

50 2060

51 2061

Scenario E1-E3 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $ $ $ $ $ $ $ $ $

Assuming a 55 year facility life, MILCON

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

102,438 $ 228,666 $ 173,148 $ 217,250 77,822 $ 26,544 $ 33,288 $ 1,545,868 $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

102,438 228,666 173,148 869,000 77,822 26,544 33,288 2,197,618

$ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $

102,454 83,679

$ $

99,761 81,479

$ $

97,138 79,337

27,036 $ 60,350 $ 45,698 $ 229,349 $ 20,539 $ 7,006 $ 8,785 $ 580,003 $

26,325 58,764 44,496 19,999 6,821 8,555 341,435

$ $

110,979 90,641

$ $

108,062 88,258

$ $

105,221 85,938

$ $ $ $ $ $ $ $

30,076 67,137 50,837 63,785 22,849 7,793 9,773 453,871

$ $ $ $ $ $ $ $

29,285 65,372 49,500 22,248 7,588 9,516 379,830

$ $ $ $ $ $ $ $

28,516 $ 63,653 $ 48,199 $ $ 21,663 $ 7,389 $ 9,266 $ 369,844 $

BAH and milcon funding if privatized Gov't contribution BAH E1-E3 Total Cost Discounted costs

377,992 308,721

$ $ $

3,101,881 3,101,881 910,720

$ $ $

3,101,881 3,101,881 886,777

$ $ $

3,101,881 3,101,881 863,463

27,766 $ 61,980 $ 46,932 $ $ 21,094 $ 7,195 $ 9,023 $ 360,121 $

$ $ $

3,101,881 3,101,881 840,763

$ $ $

3,101,881 3,101,881 818,659

$ $ $

3,101,881 3,101,881 797,136

Expressed in 2010 dollars

51

52

53

54

55

52 2062

53 2063

54 2064

55 2065

56 2066

Scenario E1-E3 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

102,438 228,666 173,148 217,250 77,822 26,544 33,288 1,545,868

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $ $ $

77,822 26,544 33,288 1,328,618

$ $

94,584 77,251

$ $

92,098 75,220

$ $

89,676 73,242

$ $

87,319 71,317

$ $

85,023 69,442

$ $ $ $ $ $ $ $

25,633 57,219 43,326 19,473 6,642 8,330 332,458

$ $ $ $ $ $ $ $

24,959 55,714 42,187 18,961 6,467 8,111 323,718

$ $ $ $ $ $ $ $

24,303 54,250 41,078 51,541 18,463 6,297 7,897 366,749

$ $ $ $ $ $ $ $

23,664 52,823 39,998 17,977 6,132 7,690 306,920

$ $ $ $ $ $ $ $

23,042 51,435 38,947 17,505 5,971 7,488 298,851

BAH and milcon funding if privatized Gov't contribution BAH E1-E3 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

$ $ $

3,101,881 3,101,881 776,179

$ $ $

3,101,881 3,101,881 755,773

$ $ $

3,101,881 3,101,881 735,904

$ $ $

3,101,881 3,101,881 716,557

$ $ $

3,101,881 3,101,881 697,719

Expressed in 2010 dollars Scenario E1-E3 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms BAH and milcon funding if privatized Gov't contribution BAH E1-E3 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

Expressed in 2010 dollars

1

2

3

4

5

6

7

8

2 2012

3 2013

4 2014

5 2015

6 2016

7 2017

8 2018

9 2019

Scenario E1-E4 Occupancy 0 2010 Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

$ $

Total Cost Discounted costs

$

21,740,000

100%

$ $

$

23,479,200

$

$ $ $ $ $ $ $ 21,740,000 $

$ $

1,739,200 21,740,000

$

21,168,452

100%

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Costs Number of bedrooms BAH and milcon funding if privatized Gov't contribution BAH E1-E4

1,739,200 21,740,000

1 2011

NPV - 55 years $ 1,739,200 $ 42,908,452 $ 10,482,630 $ 8,561,585

$ $ $ $ $ $ $

2,840,868 6,341,460 4,801,803 4,529,238 2,158,192 736,130 85,827,492 $ $3,013,477 $627.81 400

$

23,479,200

$

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

102,438 $ 228,666 $ 173,148 $ 1,348,750 77,822 $ 26,544 $ 26,249 $ 2,670,328 $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

102,438 $ 228,666 $ 173,148 $ 217,250 77,822 $ 26,544 $ 26,249 $ 1,538,829 $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $ $

$ $ $ $ 77,822 $ 26,544 $ 26,249 $ 1,321,579 $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

305,435 $ 249,461 $

297,405 242,903

358,378 $ 292,702 $

348,956 $ 285,007 $

339,782 $ 277,514 $

330,849 $ 270,218 $

322,151 $ 263,114 $

313,682 $ 256,196 $

$ $ $ $ $ $ $ 21,168,452 $

97,123 $ 216,801 $ 164,163 $ 1,278,764 $ 73,784 $ 25,167 $ 24,886 $ 2,531,767 $

94,570 $ 211,101 $ 159,847 $ $ 71,844 $ 24,505 $ 24,232 $ 1,220,062 $

92,083 $ 205,551 $ 155,645 $ $ 69,955 $ 23,861 $ 23,595 $ 1,187,986 $

89,662 $ 200,147 $ 151,553 $ $ 68,116 $ 23,233 $ 22,975 $ 1,156,754 $

87,305 $ 194,885 $ 147,568 $ 185,156 $ 66,325 $ 22,623 $ 22,371 $ 1,311,498 $

85,010 $ 189,761 $ 143,689 $ $ 64,582 $ 22,028 $ 21,783 $ 1,096,731 $

82,775 184,773 139,911 62,884 21,449 21,210 1,067,897

$ $ $ $ $ $ $ $

80,599 179,915 136,233 61,231 20,885 20,652 1,039,822

$

$ $

377,992 308,721

$ $

105%

NPV 55 years $ 85,827,492

$ $

-

$ $

-

$ $

3,094,841 3,094,841 2,934,253

$ $ $

Assuming a 55 year facility life, MILCON is equal to paying 105% of BAH over the 55 years to 95% of the maximum estimated E1-E4 occupants.

3,094,841 3,094,841 2,857,111

$ $ $

3,094,841 3,094,841 2,781,997

$ $ $

3,094,841 3,094,841 2,708,858

$ $ $

3,094,841 3,094,841 2,637,641

$ $ $

3,094,841 3,094,841 2,568,297

$ $ $

3,094,841 3,094,841 2,500,776

$ $ $

3,094,841 3,094,841 2,435,030

Expressed in 2010 dollars

9

10

11

12

13

14

15

16

17

18

19

20

10 2020

11 2021

12 2022

13 2023

14 2024

15 2025

16 2026

17 2027

18 2028

19 2029

20 2030

21 2031

Scenario E1-E4 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $ $ $ $ $ $

102,438 228,666 173,148 869,000 77,822 26,544 26,249 2,190,579

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 $ 228,666 $ 173,148 $

102,438 228,666 173,148

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

102,438 228,666 173,148 869,000 77,822 26,544 26,249 2,190,579

102,438 228,666 173,148

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $

77,822 26,544 26,249 1,321,579

102,438 228,666 173,148 217,250 77,822 26,544 26,249 1,538,829

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $

289,586 236,517

$ $

281,973 230,299

$ $

274,560 224,244

$ $

267,342 218,349

$ $

260,313 212,608

$ $

253,469 207,019

$ $

246,806 201,576

$ $

240,317 196,277

$ $

233,999 191,116

$ $

227,847 186,092

$ $

221,857 181,200

$ $

216,024 176,436

60,125 $ 134,212 $ 101,627 $ $ 45,677 $ 15,580 $ 15,406 $ 775,683 $

58,544 130,684 98,955 44,476 15,170 15,001 755,290

$ $ $ $ $ $ $ $

BAH and milcon funding if privatized Gov't contribution BAH E1-E4 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

78,480 $ 175,185 $ 132,651 $ 665,756 $ 59,621 $ 20,336 $ 20,109 $ 1,678,241 $

$ $ $

3,094,841 3,094,841 2,371,013

76,417 $ 170,579 $ 129,164 $ $ 58,053 $ 19,801 $ 19,581 $ 985,867 $

$ $ $

3,094,841 3,094,841 2,308,679

74,408 $ 166,095 $ 125,768 $ $ 56,527 $ 19,281 $ 19,066 $ 959,948 $

$ $ $

3,094,841 3,094,841 2,247,983

72,451 $ 161,728 $ 122,462 $ $ 55,041 $ 18,774 $ 18,565 $ 934,711 $

$ $ $

3,094,841 3,094,841 2,188,883

70,547 $ 157,476 $ 119,242 $ 149,614 $ 53,594 $ 18,280 $ 18,077 $ 1,059,752 $

$ $ $

3,094,841 3,094,841 2,131,337

68,692 $ 153,336 $ 116,107 $ $ 52,185 $ 17,800 $ 17,601 $ 886,210 $

$ $ $

3,094,841 3,094,841 2,075,304

66,886 $ 149,305 $ 113,055 $ $ 50,813 $ 17,332 $ 17,139 $ 862,911 $

$ $ $

3,094,841 3,094,841 2,020,744

65,128 $ 145,380 $ 110,083 $ $ 49,477 $ 16,876 $ 16,688 $ 840,225 $

$ $ $

3,094,841 3,094,841 1,967,618

63,415 $ 141,558 $ 107,189 $ 537,962 $ 48,176 $ 16,432 $ 16,249 $ 1,356,097 $

$ $ $

3,094,841 3,094,841 1,915,889

61,748 $ 137,836 $ 104,371 $ $ 46,910 $ 16,000 $ 15,822 $ 796,626 $

$ $ $

3,094,841 3,094,841 1,865,520

$ $ $

3,094,841 3,094,841 1,816,475

$ $ $

3,094,841 3,094,841 1,768,720

Expressed in 2010 dollars

21

22

23

24

25

26

27

28

29

30

31

32

22 2032

23 2033

24 2034

25 2035

26 2036

27 2037

28 2038

29 2039

30 2040

31 2041

32 2042

33 2043

Scenario E1-E4 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $ $ $ $ $ $

102,438 228,666 173,148 217,250 77,822 26,544 26,249 1,538,829

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 $ 228,666 $ 173,148 $

102,438 228,666 173,148

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

102,438 228,666 173,148 217,250 77,822 26,544 26,249 1,538,829

102,438 228,666 173,148

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $

77,822 26,544 26,249 1,321,579

102,438 228,666 173,148 869,000 77,822 26,544 26,249 2,190,579

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $

210,345 171,797

$ $

204,815 167,281

$ $

199,430 162,883

$ $

194,187 158,601

$ $

189,082 154,431

$ $

184,111 150,371

$ $

179,271 146,418

$ $

174,558 142,568

$ $

169,969 138,820

$ $

165,500 135,171

$ $

161,149 131,617

$ $

156,913 128,157

$ $ $ $ $ $ $ $

57,005 $ 127,248 $ 96,353 $ 120,895 $ 43,306 $ 14,771 $ 14,607 $ 856,329 $

43,673 $ 97,487 $ 73,818 $ $ 33,178 $ 11,317 $ 11,191 $ 563,429 $

42,524 94,924 71,877 32,306 11,019 10,896 548,616

BAH and milcon funding if privatized Gov't contribution BAH E1-E4 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

$ $ $

3,094,841 3,094,841 1,722,220

55,506 $ 123,903 $ 93,820 $ $ 42,168 $ 14,383 $ 14,223 $ 716,099 $

$ $ $

3,094,841 3,094,841 1,676,943

54,047 $ 120,645 $ 91,354 $ $ 41,059 $ 14,005 $ 13,849 $ 697,272 $

$ $ $

3,094,841 3,094,841 1,632,855

52,626 $ 117,474 $ 88,952 $ $ 39,980 $ 13,637 $ 13,485 $ 678,941 $

$ $ $

3,094,841 3,094,841 1,589,927

51,243 $ 114,385 $ 86,613 $ 434,699 $ 38,929 $ 13,278 $ 13,130 $ 1,095,790 $

$ $ $

3,094,841 3,094,841 1,548,128

49,895 $ 111,378 $ 84,336 $ $ 37,905 $ 12,929 $ 12,785 $ 643,711 $

$ $ $

3,094,841 3,094,841 1,507,427

48,584 $ 108,450 $ 82,119 $ $ 36,909 $ 12,589 $ 12,449 $ 626,788 $

$ $ $

3,094,841 3,094,841 1,467,797

47,306 $ 105,599 $ 79,960 $ $ 35,938 $ 12,258 $ 12,122 $ 610,310 $

$ $ $

3,094,841 3,094,841 1,429,208

46,063 $ 102,822 $ 77,858 $ 97,689 $ 34,994 $ 11,936 $ 11,803 $ 691,954 $

$ $ $

3,094,841 3,094,841 1,391,634

44,852 $ 100,119 $ 75,811 $ $ 34,074 $ 11,622 $ 11,493 $ 578,641 $

$ $ $

3,094,841 3,094,841 1,355,048

$ $ $

3,094,841 3,094,841 1,319,423

$ $ $

3,094,841 3,094,841 1,284,736

Expressed in 2010 dollars

33

34

35

36

37

38

39

40

41

42

43

44

34 2044

35 2045

36 2046

37 2047

38 2048

39 2049

40 2050

41 2051

42 2052

43 2053

44 2054

45 2055

Scenario E1-E4 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $ $ $ $ $ $

102,438 228,666 173,148 869,000 77,822 26,544 26,249 2,190,579

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 $ 228,666 $ 173,148 $

102,438 228,666 173,148

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

102,438 228,666 173,148 869,000 77,822 26,544 26,249 2,190,579

102,438 228,666 173,148

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $

77,822 26,544 26,249 1,321,579

102,438 228,666 173,148 217,250 77,822 26,544 26,249 1,538,829

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $

152,787 124,787

$ $

148,770 121,507

$ $

144,859 118,312

$ $

141,051 115,202

$ $

137,343 112,173

$ $

133,732 109,224

$ $

130,216 106,353

$ $

126,793 103,557

$ $

123,459 100,834

$ $

120,213 98,183

$ $

117,053 95,602

$ $

113,976 93,089

$ $ $ $ $ $ $ $

41,406 $ 92,429 $ 69,988 $ 351,257 $ 31,456 $ 10,729 $ 10,610 $ 885,450 $

31,722 $ 70,811 $ 53,619 $ $ 24,099 $ 8,220 $ 8,128 $ 409,255 $

30,888 68,950 52,209 23,466 8,004 7,915 398,495

BAH and milcon funding if privatized Gov't contribution BAH E1-E4 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

$ $ $

3,094,841 3,094,841 1,250,960

40,318 $ 89,999 $ 68,148 $ $ 30,629 $ 10,447 $ 10,331 $ 520,149 $

$ $ $

3,094,841 3,094,841 1,218,072

39,258 $ 87,633 $ 66,356 $ $ 29,824 $ 10,173 $ 10,059 $ 506,474 $

$ $ $

3,094,841 3,094,841 1,186,048

38,226 $ 85,329 $ 64,612 $ $ 29,040 $ 9,905 $ 9,795 $ 493,159 $

$ $ $

3,094,841 3,094,841 1,154,867

37,221 $ 83,085 $ 62,913 $ 78,937 $ 28,276 $ 9,645 $ 9,537 $ 559,131 $

$ $ $

3,094,841 3,094,841 1,124,505

36,242 $ 80,901 $ 61,259 $ $ 27,533 $ 9,391 $ 9,287 $ 467,569 $

$ $ $

3,094,841 3,094,841 1,094,942

35,289 $ 78,774 $ 59,648 $ $ 26,809 $ 9,144 $ 9,042 $ 455,277 $

$ $ $

3,094,841 3,094,841 1,066,156

34,362 $ 76,703 $ 58,080 $ $ 26,104 $ 8,904 $ 8,805 $ 443,307 $

$ $ $

3,094,841 3,094,841 1,038,126

33,458 $ 74,687 $ 56,553 $ 283,832 $ 25,418 $ 8,670 $ 8,573 $ 715,485 $

$ $ $

3,094,841 3,094,841 1,010,834

32,579 $ 72,723 $ 55,066 $ $ 24,750 $ 8,442 $ 8,348 $ 420,304 $

$ $ $

3,094,841 3,094,841 984,259

$ $ $

3,094,841 3,094,841 958,382

$ $ $

3,094,841 3,094,841 933,186

Expressed in 2010 dollars

45

46

47

48

49

50

46 2056

47 2057

48 2058

49 2059

50 2060

51 2061

Scenario E1-E4 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $ $ $ $ $ $ $ $ $

Assuming a 55 year facility life, MILCON

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

102,438 $ 228,666 $ 173,148 $ 217,250 77,822 $ 26,544 $ 26,249 $ 1,538,829 $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

102,438 228,666 173,148 869,000 77,822 26,544 26,249 2,190,579

$ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $

102,454 83,679

$ $

99,761 81,479

$ $

97,138 79,337

27,036 $ 60,350 $ 45,698 $ 229,349 $ 20,539 $ 7,006 $ 6,928 $ 578,145 $

26,325 58,764 44,496 19,999 6,821 6,745 339,626

$ $

110,979 90,641

$ $

108,062 88,258

$ $

105,221 85,938

$ $ $ $ $ $ $ $

30,076 67,137 50,837 63,785 22,849 7,793 7,707 451,804

$ $ $ $ $ $ $ $

29,285 65,372 49,500 22,248 7,588 7,504 377,818

$ $ $ $ $ $ $ $

28,516 $ 63,653 $ 48,199 $ $ 21,663 $ 7,389 $ 7,307 $ 367,885 $

BAH and milcon funding if privatized Gov't contribution BAH E1-E4 Total Cost Discounted costs

377,992 308,721

$ $ $

3,094,841 3,094,841 908,653

$ $ $

3,094,841 3,094,841 884,764

$ $ $

3,094,841 3,094,841 861,504

27,766 $ 61,980 $ 46,932 $ $ 21,094 $ 7,195 $ 7,115 $ 358,213 $

$ $ $

3,094,841 3,094,841 838,855

$ $ $

3,094,841 3,094,841 816,801

$ $ $

3,094,841 3,094,841 795,327

Expressed in 2010 dollars

51

52

53

54

55

52 2062

53 2063

54 2064

55 2065

56 2066

Scenario E1-E4 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

102,438 228,666 173,148 217,250 77,822 26,544 26,249 1,538,829

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $ $ $

77,822 26,544 26,249 1,321,579

$ $

94,584 77,251

$ $

92,098 75,220

$ $

89,676 73,242

$ $

87,319 71,317

$ $

85,023 69,442

$ $ $ $ $ $ $ $

25,633 57,219 43,326 19,473 6,642 6,568 330,697

$ $ $ $ $ $ $ $

24,959 55,714 42,187 18,961 6,467 6,395 322,003

$ $ $ $ $ $ $ $

24,303 54,250 41,078 51,541 18,463 6,297 6,227 365,079

$ $ $ $ $ $ $ $

23,664 52,823 39,998 17,977 6,132 6,064 305,294

$ $ $ $ $ $ $ $

23,042 51,435 38,947 17,505 5,971 5,904 297,268

BAH and milcon funding if privatized Gov't contribution BAH E1-E4 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

$ $ $

3,094,841 3,094,841 774,418

$ $ $

3,094,841 3,094,841 754,058

$ $ $

3,094,841 3,094,841 734,234

$ $ $

3,094,841 3,094,841 714,931

$ $ $

3,094,841 3,094,841 696,135

Expressed in 2010 dollars Scenario E1-E4 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms BAH and milcon funding if privatized Gov't contribution BAH E1-E4 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

Expressed in 2010 dollars

1

2

3

4

5

6

7

8

2 2012

3 2013

4 2014

5 2015

6 2016

7 2017

8 2018

9 2019

Scenario E4 Occupancy 0 2010 Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

$ $

Total Cost Discounted costs

$

21,740,000

100%

$ $

$

23,479,200

$

$ $ $ $ $ $ $ 21,740,000 $

$ $

1,739,200 21,740,000

$

21,168,452

100%

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Costs Number of bedrooms BAH and milcon funding if privatized Gov't contribution BAH E4

1,739,200 21,740,000

1 2011

NPV - 55 years $ 1,739,200 $ 42,908,452 $ 10,482,630 $ 8,561,585

$ $ $ $ $ $ $

2,840,868 6,341,460 4,801,803 4,529,238 2,158,192 736,130 85,611,720 $ $3,005,901 $626.23 400

$

23,479,200

$

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

102,438 $ 228,666 $ 173,148 $ 1,348,750 77,822 $ 26,544 $ 18,468 $ 2,662,548 $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

102,438 $ 228,666 $ 173,148 $ 217,250 77,822 $ 26,544 $ 18,468 $ 1,531,048 $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $ $

$ $ $ $ 77,822 $ 26,544 $ 18,468 $ 1,313,798 $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

305,435 $ 249,461 $

297,405 242,903

358,378 $ 292,702 $

348,956 $ 285,007 $

339,782 $ 277,514 $

330,849 $ 270,218 $

322,151 $ 263,114 $

313,682 $ 256,196 $

$ $ $ $ $ $ $ 21,168,452 $

97,123 $ 216,801 $ 164,163 $ 1,278,764 $ 73,784 $ 25,167 $ 17,510 $ 2,524,390 $

94,570 $ 211,101 $ 159,847 $ $ 71,844 $ 24,505 $ 17,049 $ 1,212,879 $

92,083 $ 205,551 $ 155,645 $ $ 69,955 $ 23,861 $ 16,601 $ 1,180,992 $

89,662 $ 200,147 $ 151,553 $ $ 68,116 $ 23,233 $ 16,165 $ 1,149,943 $

87,305 $ 194,885 $ 147,568 $ 185,156 $ 66,325 $ 22,623 $ 15,740 $ 1,304,867 $

85,010 $ 189,761 $ 143,689 $ $ 64,582 $ 22,028 $ 15,326 $ 1,090,274 $

82,775 184,773 139,911 62,884 21,449 14,923 1,061,610

$ $ $ $ $ $ $ $

80,599 179,915 136,233 61,231 20,885 14,531 1,033,700

$

$ $

377,992 308,721

$ $

159%

NPV 55 years $ 85,611,720

$ $

-

$ $

-

$ $

3,087,061 3,087,061 2,926,876

$ $ $

3,087,061 3,087,061 2,849,928

$ $ $

3,087,061 3,087,061 2,775,003

$ $ $

3,087,061 3,087,061 2,702,047

$ $ $

3,087,061 3,087,061 2,631,010

$ $ $

3,087,061 3,087,061 2,561,840

$ $ $

3,087,061 3,087,061 2,494,489

Assuming a 55 year facility life, MILCON is equal to paying 159% of BAH over the 55 years to 95% of the maximum E4 occupants. While E4 occupants receive the entire module to themselves, the BAH rate is significantly lower than that of E5s.

$ $ $

3,087,061 3,087,061 2,428,909

Expressed in 2010 dollars

9

10

11

12

13

14

15

16

17

18

19

20

10 2020

11 2021

12 2022

13 2023

14 2024

15 2025

16 2026

17 2027

18 2028

19 2029

20 2030

21 2031

Scenario E4 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $ $ $ $ $ $

102,438 228,666 173,148 869,000 77,822 26,544 18,468 2,182,798

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 $ 228,666 $ 173,148 $

102,438 228,666 173,148

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

102,438 228,666 173,148 869,000 77,822 26,544 18,468 2,182,798

102,438 228,666 173,148

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $

77,822 26,544 18,468 1,313,798

102,438 228,666 173,148 217,250 77,822 26,544 18,468 1,531,048

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $

289,586 236,517

$ $

281,973 230,299

$ $

274,560 224,244

$ $

267,342 218,349

$ $

260,313 212,608

$ $

253,469 207,019

$ $

246,806 201,576

$ $

240,317 196,277

$ $

233,999 191,116

$ $

227,847 186,092

$ $

221,857 181,200

$ $

216,024 176,436

60,125 $ 134,212 $ 101,627 $ $ 45,677 $ 15,580 $ 10,840 $ 771,116 $

58,544 130,684 98,955 44,476 15,170 10,555 750,843

$ $ $ $ $ $ $ $

BAH and milcon funding if privatized Gov't contribution BAH E4 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

78,480 $ 175,185 $ 132,651 $ 665,756 $ 59,621 $ 20,336 $ 14,149 $ 1,672,281 $

$ $ $

3,087,061 3,087,061 2,365,052

76,417 $ 170,579 $ 129,164 $ $ 58,053 $ 19,801 $ 13,777 $ 980,063 $

$ $ $

3,087,061 3,087,061 2,302,875

74,408 $ 166,095 $ 125,768 $ $ 56,527 $ 19,281 $ 13,415 $ 954,297 $

$ $ $

3,087,061 3,087,061 2,242,332

72,451 $ 161,728 $ 122,462 $ $ 55,041 $ 18,774 $ 13,062 $ 929,208 $

$ $ $

3,087,061 3,087,061 2,183,380

70,547 $ 157,476 $ 119,242 $ 149,614 $ 53,594 $ 18,280 $ 12,718 $ 1,054,393 $

$ $ $

3,087,061 3,087,061 2,125,979

68,692 $ 153,336 $ 116,107 $ $ 52,185 $ 17,800 $ 12,384 $ 880,992 $

$ $ $

3,087,061 3,087,061 2,070,087

66,886 $ 149,305 $ 113,055 $ $ 50,813 $ 17,332 $ 12,058 $ 857,831 $

$ $ $

3,087,061 3,087,061 2,015,664

65,128 $ 145,380 $ 110,083 $ $ 49,477 $ 16,876 $ 11,741 $ 835,278 $

$ $ $

3,087,061 3,087,061 1,962,672

63,415 $ 141,558 $ 107,189 $ 537,962 $ 48,176 $ 16,432 $ 11,433 $ 1,351,281 $

$ $ $

3,087,061 3,087,061 1,911,073

61,748 $ 137,836 $ 104,371 $ $ 46,910 $ 16,000 $ 11,132 $ 791,936 $

$ $ $

3,087,061 3,087,061 1,860,830

$ $ $

3,087,061 3,087,061 1,811,909

$ $ $

3,087,061 3,087,061 1,764,273

Expressed in 2010 dollars

21

22

23

24

25

26

27

28

29

30

31

32

22 2032

23 2033

24 2034

25 2035

26 2036

27 2037

28 2038

29 2039

30 2040

31 2041

32 2042

33 2043

Scenario E4 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $ $ $ $ $ $

102,438 228,666 173,148 217,250 77,822 26,544 18,468 1,531,048

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 $ 228,666 $ 173,148 $

102,438 228,666 173,148

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

102,438 228,666 173,148 217,250 77,822 26,544 18,468 1,531,048

102,438 228,666 173,148

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $

77,822 26,544 18,468 1,313,798

102,438 228,666 173,148 869,000 77,822 26,544 18,468 2,182,798

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $

210,345 171,797

$ $

204,815 167,281

$ $

199,430 162,883

$ $

194,187 158,601

$ $

189,082 154,431

$ $

184,111 150,371

$ $

179,271 146,418

$ $

174,558 142,568

$ $

169,969 138,820

$ $

165,500 135,171

$ $

161,149 131,617

$ $

156,913 128,157

$ $ $ $ $ $ $ $

57,005 $ 127,248 $ 96,353 $ 120,895 $ 43,306 $ 14,771 $ 10,277 $ 851,999 $

43,673 $ 97,487 $ 73,818 $ $ 33,178 $ 11,317 $ 7,873 $ 560,112 $

42,524 94,924 71,877 32,306 11,019 7,666 545,386

BAH and milcon funding if privatized Gov't contribution BAH E4 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

$ $ $

3,087,061 3,087,061 1,717,890

55,506 $ 123,903 $ 93,820 $ $ 42,168 $ 14,383 $ 10,007 $ 711,883 $

$ $ $

3,087,061 3,087,061 1,672,727

54,047 $ 120,645 $ 91,354 $ $ 41,059 $ 14,005 $ 9,744 $ 693,167 $

$ $ $

3,087,061 3,087,061 1,628,750

52,626 $ 117,474 $ 88,952 $ $ 39,980 $ 13,637 $ 9,488 $ 674,944 $

$ $ $

3,087,061 3,087,061 1,585,930

51,243 $ 114,385 $ 86,613 $ 434,699 $ 38,929 $ 13,278 $ 9,238 $ 1,091,898 $

$ $ $

3,087,061 3,087,061 1,544,236

49,895 $ 111,378 $ 84,336 $ $ 37,905 $ 12,929 $ 8,995 $ 639,922 $

$ $ $

3,087,061 3,087,061 1,503,638

48,584 $ 108,450 $ 82,119 $ $ 36,909 $ 12,589 $ 8,759 $ 623,098 $

$ $ $

3,087,061 3,087,061 1,464,107

47,306 $ 105,599 $ 79,960 $ $ 35,938 $ 12,258 $ 8,529 $ 606,717 $

$ $ $

3,087,061 3,087,061 1,425,615

46,063 $ 102,822 $ 77,858 $ 97,689 $ 34,994 $ 11,936 $ 8,304 $ 688,455 $

$ $ $

3,087,061 3,087,061 1,388,136

44,852 $ 100,119 $ 75,811 $ $ 34,074 $ 11,622 $ 8,086 $ 575,235 $

$ $ $

3,087,061 3,087,061 1,351,641

$ $ $

3,087,061 3,087,061 1,316,106

$ $ $

3,087,061 3,087,061 1,281,506

Expressed in 2010 dollars

33

34

35

36

37

38

39

40

41

42

43

44

34 2044

35 2045

36 2046

37 2047

38 2048

39 2049

40 2050

41 2051

42 2052

43 2053

44 2054

45 2055

Scenario E4 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $ $ $ $ $ $

102,438 228,666 173,148 869,000 77,822 26,544 18,468 2,182,798

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 $ 228,666 $ 173,148 $

102,438 228,666 173,148

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

102,438 228,666 173,148 869,000 77,822 26,544 18,468 2,182,798

102,438 228,666 173,148

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $

77,822 26,544 18,468 1,313,798

102,438 228,666 173,148 217,250 77,822 26,544 18,468 1,531,048

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $

152,787 124,787

$ $

148,770 121,507

$ $

144,859 118,312

$ $

141,051 115,202

$ $

137,343 112,173

$ $

133,732 109,224

$ $

130,216 106,353

$ $

126,793 103,557

$ $

123,459 100,834

$ $

120,213 98,183

$ $

117,053 95,602

$ $

113,976 93,089

$ $ $ $ $ $ $ $

41,406 $ 92,429 $ 69,988 $ 351,257 $ 31,456 $ 10,729 $ 7,465 $ 882,305 $

31,722 $ 70,811 $ 53,619 $ $ 24,099 $ 8,220 $ 5,719 $ 406,845 $

30,888 68,950 52,209 23,466 8,004 5,569 396,149

BAH and milcon funding if privatized Gov't contribution BAH E4 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

$ $ $

3,087,061 3,087,061 1,247,815

40,318 $ 89,999 $ 68,148 $ $ 30,629 $ 10,447 $ 7,269 $ 517,086 $

$ $ $

3,087,061 3,087,061 1,215,009

39,258 $ 87,633 $ 66,356 $ $ 29,824 $ 10,173 $ 7,078 $ 503,492 $

$ $ $

3,087,061 3,087,061 1,183,067

38,226 $ 85,329 $ 64,612 $ $ 29,040 $ 9,905 $ 6,891 $ 490,255 $

$ $ $

3,087,061 3,087,061 1,151,964

37,221 $ 83,085 $ 62,913 $ 78,937 $ 28,276 $ 9,645 $ 6,710 $ 556,304 $

$ $ $

3,087,061 3,087,061 1,121,678

36,242 $ 80,901 $ 61,259 $ $ 27,533 $ 9,391 $ 6,534 $ 464,816 $

$ $ $

3,087,061 3,087,061 1,092,189

35,289 $ 78,774 $ 59,648 $ $ 26,809 $ 9,144 $ 6,362 $ 452,596 $

$ $ $

3,087,061 3,087,061 1,063,475

34,362 $ 76,703 $ 58,080 $ $ 26,104 $ 8,904 $ 6,195 $ 440,697 $

$ $ $

3,087,061 3,087,061 1,035,516

33,458 $ 74,687 $ 56,553 $ 283,832 $ 25,418 $ 8,670 $ 6,032 $ 712,943 $

$ $ $

3,087,061 3,087,061 1,008,293

32,579 $ 72,723 $ 55,066 $ $ 24,750 $ 8,442 $ 5,873 $ 417,830 $

$ $ $

3,087,061 3,087,061 981,784

$ $ $

3,087,061 3,087,061 955,973

$ $ $

3,087,061 3,087,061 930,840

Expressed in 2010 dollars

45

46

47

48

49

50

46 2056

47 2057

48 2058

49 2059

50 2060

51 2061

Scenario E4 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $ $ $ $ $ $ $ $ $

Assuming a 55 year facility life, MILCON

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

102,438 $ 228,666 $ 173,148 $ 217,250 77,822 $ 26,544 $ 18,468 $ 1,531,048 $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

102,438 228,666 173,148 869,000 77,822 26,544 18,468 2,182,798

$ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $

102,454 83,679

$ $

99,761 81,479

$ $

97,138 79,337

27,036 $ 60,350 $ 45,698 $ 229,349 $ 20,539 $ 7,006 $ 4,874 $ 576,091 $

26,325 58,764 44,496 19,999 6,821 4,746 337,626

$ $

110,979 90,641

$ $

108,062 88,258

$ $

105,221 85,938

$ $ $ $ $ $ $ $

30,076 67,137 50,837 63,785 22,849 7,793 5,422 449,519

$ $ $ $ $ $ $ $

29,285 65,372 49,500 22,248 7,588 5,280 375,593

$ $ $ $ $ $ $ $

28,516 $ 63,653 $ 48,199 $ $ 21,663 $ 7,389 $ 5,141 $ 365,719 $

BAH and milcon funding if privatized Gov't contribution BAH E4 Total Cost Discounted costs

377,992 308,721

$ $ $

3,087,061 3,087,061 906,368

$ $ $

3,087,061 3,087,061 882,540

$ $ $

3,087,061 3,087,061 859,338

27,766 $ 61,980 $ 46,932 $ $ 21,094 $ 7,195 $ 5,006 $ 356,104 $

$ $ $

3,087,061 3,087,061 836,746

$ $ $

3,087,061 3,087,061 814,747

$ $ $

3,087,061 3,087,061 793,328

Expressed in 2010 dollars

51

52

53

54

55

52 2062

53 2063

54 2064

55 2065

56 2066

Scenario E4 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

102,438 228,666 173,148 217,250 77,822 26,544 18,468 1,531,048

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $ $ $

77,822 26,544 18,468 1,313,798

$ $

94,584 77,251

$ $

92,098 75,220

$ $

89,676 73,242

$ $

87,319 71,317

$ $

85,023 69,442

$ $ $ $ $ $ $ $

25,633 57,219 43,326 19,473 6,642 4,621 328,750

$ $ $ $ $ $ $ $

24,959 55,714 42,187 18,961 6,467 4,500 320,107

$ $ $ $ $ $ $ $

24,303 54,250 41,078 51,541 18,463 6,297 4,381 363,233

$ $ $ $ $ $ $ $

23,664 52,823 39,998 17,977 6,132 4,266 303,497

$ $ $ $ $ $ $ $

23,042 51,435 38,947 17,505 5,971 4,154 295,518

BAH and milcon funding if privatized Gov't contribution BAH E4 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

$ $ $

3,087,061 3,087,061 772,471

$ $ $

3,087,061 3,087,061 752,162

$ $ $

3,087,061 3,087,061 732,388

$ $ $

3,087,061 3,087,061 713,133

$ $ $

3,087,061 3,087,061 694,385

Expressed in 2010 dollars Scenario E4 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms BAH and milcon funding if privatized Gov't contribution BAH E4 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

Expressed in 2010 dollars

1

2

3

4

5

6

7

8

2 2012

3 2013

4 2014

5 2015

6 2016

7 2017

8 2018

9 2019

Scenario E5 Occupancy 0 2010 Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

$ $

Total Cost Discounted costs

$

21,740,000

100%

$ $

$

23,479,200

$

$ $ $ $ $ $ $ 21,740,000 $

$ $

1,739,200 21,740,000

$

21,168,452

100%

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Costs Number of bedrooms BAH and milcon funding if privatized Gov't contribution BAH E5

1,739,200 21,740,000

1 2011

NPV - 55 years $ 1,739,200 $ 42,908,452 $ 10,482,630 $ 8,561,585

$ $ $ $ $ $ $

2,840,868 6,341,460 4,801,803 4,529,238 2,158,192 736,130 85,649,658 $ $3,007,233 $626.51 400

$

23,479,200

$

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

102,438 $ 228,666 $ 173,148 $ 1,348,750 77,822 $ 26,544 $ 19,836 $ 2,663,916 $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

102,438 $ 228,666 $ 173,148 $ 217,250 77,822 $ 26,544 $ 19,836 $ 1,532,416 $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $ $

$ $ $ $ 77,822 $ 26,544 $ 19,836 $ 1,315,166 $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

305,435 $ 249,461 $

297,405 242,903

358,378 $ 292,702 $

348,956 $ 285,007 $

339,782 $ 277,514 $

330,849 $ 270,218 $

322,151 $ 263,114 $

313,682 $ 256,196 $

$ $ $ $ $ $ $ 21,168,452 $

97,123 $ 216,801 $ 164,163 $ 1,278,764 $ 73,784 $ 25,167 $ 18,807 $ 2,525,687 $

94,570 $ 211,101 $ 159,847 $ $ 71,844 $ 24,505 $ 18,312 $ 1,214,142 $

92,083 $ 205,551 $ 155,645 $ $ 69,955 $ 23,861 $ 17,831 $ 1,182,222 $

89,662 $ 200,147 $ 151,553 $ $ 68,116 $ 23,233 $ 17,362 $ 1,151,141 $

87,305 $ 194,885 $ 147,568 $ 185,156 $ 66,325 $ 22,623 $ 16,906 $ 1,306,033 $

85,010 $ 189,761 $ 143,689 $ $ 64,582 $ 22,028 $ 16,461 $ 1,091,409 $

82,775 184,773 139,911 62,884 21,449 16,028 1,062,716

$ $ $ $ $ $ $ $

80,599 179,915 136,233 61,231 20,885 15,607 1,034,777

$

$ $

377,992 308,721

$ $

142%

NPV 55 years $ 85,649,658

$ $

-

$ $

-

$ $

3,088,429 3,088,429 2,928,173

Assuming a 55 year facility life, MILCON is equal to paying 104% of BAH over the 55 years to 95% of the maximum E5 occupants.

$ $ $

3,088,429 3,088,429 2,851,191

$ $ $

3,088,429 3,088,429 2,776,232

$ $ $

3,088,429 3,088,429 2,703,245

$ $ $

3,088,429 3,088,429 2,632,176

$ $ $

3,088,429 3,088,429 2,562,976

$ $ $

3,088,429 3,088,429 2,495,595

$ $ $

3,088,429 3,088,429 2,429,985

Expressed in 2010 dollars

9

10

11

12

13

14

15

16

17

18

19

20

10 2020

11 2021

12 2022

13 2023

14 2024

15 2025

16 2026

17 2027

18 2028

19 2029

20 2030

21 2031

Scenario E5 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $ $ $ $ $ $

102,438 228,666 173,148 869,000 77,822 26,544 19,836 2,184,166

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 $ 228,666 $ 173,148 $

102,438 228,666 173,148

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

102,438 228,666 173,148 869,000 77,822 26,544 19,836 2,184,166

102,438 228,666 173,148

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $

77,822 26,544 19,836 1,315,166

102,438 228,666 173,148 217,250 77,822 26,544 19,836 1,532,416

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $

289,586 236,517

$ $

281,973 230,299

$ $

274,560 224,244

$ $

267,342 218,349

$ $

260,313 212,608

$ $

253,469 207,019

$ $

246,806 201,576

$ $

240,317 196,277

$ $

233,999 191,116

$ $

227,847 186,092

$ $

221,857 181,200

$ $

216,024 176,436

60,125 $ 134,212 $ 101,627 $ $ 45,677 $ 15,580 $ 11,642 $ 771,919 $

58,544 130,684 98,955 44,476 15,170 11,336 751,625

$ $ $ $ $ $ $ $

BAH and milcon funding if privatized Gov't contribution BAH E5 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

78,480 $ 175,185 $ 132,651 $ 665,756 $ 59,621 $ 20,336 $ 15,197 $ 1,673,329 $

$ $ $

3,088,429 3,088,429 2,366,100

76,417 $ 170,579 $ 129,164 $ $ 58,053 $ 19,801 $ 14,797 $ 981,083 $

$ $ $

3,088,429 3,088,429 2,303,895

74,408 $ 166,095 $ 125,768 $ $ 56,527 $ 19,281 $ 14,408 $ 955,290 $

$ $ $

3,088,429 3,088,429 2,243,325

72,451 $ 161,728 $ 122,462 $ $ 55,041 $ 18,774 $ 14,029 $ 930,176 $

$ $ $

3,088,429 3,088,429 2,184,348

70,547 $ 157,476 $ 119,242 $ 149,614 $ 53,594 $ 18,280 $ 13,661 $ 1,055,336 $

$ $ $

3,088,429 3,088,429 2,126,921

68,692 $ 153,336 $ 116,107 $ $ 52,185 $ 17,800 $ 13,301 $ 881,910 $

$ $ $

3,088,429 3,088,429 2,071,004

66,886 $ 149,305 $ 113,055 $ $ 50,813 $ 17,332 $ 12,952 $ 858,724 $

$ $ $

3,088,429 3,088,429 2,016,557

65,128 $ 145,380 $ 110,083 $ $ 49,477 $ 16,876 $ 12,611 $ 836,148 $

$ $ $

3,088,429 3,088,429 1,963,541

63,415 $ 141,558 $ 107,189 $ 537,962 $ 48,176 $ 16,432 $ 12,280 $ 1,352,128 $

$ $ $

3,088,429 3,088,429 1,911,920

61,748 $ 137,836 $ 104,371 $ $ 46,910 $ 16,000 $ 11,957 $ 792,761 $

$ $ $

3,088,429 3,088,429 1,861,655

$ $ $

3,088,429 3,088,429 1,812,712

$ $ $

3,088,429 3,088,429 1,765,055

Expressed in 2010 dollars

21

22

23

24

25

26

27

28

29

30

31

32

22 2032

23 2033

24 2034

25 2035

26 2036

27 2037

28 2038

29 2039

30 2040

31 2041

32 2042

33 2043

Scenario E5 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $ $ $ $ $ $

102,438 228,666 173,148 217,250 77,822 26,544 19,836 1,532,416

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 $ 228,666 $ 173,148 $

102,438 228,666 173,148

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

102,438 228,666 173,148 217,250 77,822 26,544 19,836 1,532,416

102,438 228,666 173,148

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $

77,822 26,544 19,836 1,315,166

102,438 228,666 173,148 869,000 77,822 26,544 19,836 2,184,166

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $

210,345 171,797

$ $

204,815 167,281

$ $

199,430 162,883

$ $

194,187 158,601

$ $

189,082 154,431

$ $

184,111 150,371

$ $

179,271 146,418

$ $

174,558 142,568

$ $

169,969 138,820

$ $

165,500 135,171

$ $

161,149 131,617

$ $

156,913 128,157

$ $ $ $ $ $ $ $

57,005 $ 127,248 $ 96,353 $ 120,895 $ 43,306 $ 14,771 $ 11,038 $ 852,760 $

43,673 $ 97,487 $ 73,818 $ $ 33,178 $ 11,317 $ 8,457 $ 560,695 $

42,524 94,924 71,877 32,306 11,019 8,234 545,954

BAH and milcon funding if privatized Gov't contribution BAH E5 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

$ $ $

3,088,429 3,088,429 1,718,652

55,506 $ 123,903 $ 93,820 $ $ 42,168 $ 14,383 $ 10,748 $ 712,624 $

$ $ $

3,088,429 3,088,429 1,673,468

54,047 $ 120,645 $ 91,354 $ $ 41,059 $ 14,005 $ 10,466 $ 693,889 $

$ $ $

3,088,429 3,088,429 1,629,472

52,626 $ 117,474 $ 88,952 $ $ 39,980 $ 13,637 $ 10,190 $ 675,647 $

$ $ $

3,088,429 3,088,429 1,586,633

51,243 $ 114,385 $ 86,613 $ 434,699 $ 38,929 $ 13,278 $ 9,923 $ 1,092,582 $

$ $ $

3,088,429 3,088,429 1,544,920

49,895 $ 111,378 $ 84,336 $ $ 37,905 $ 12,929 $ 9,662 $ 640,588 $

$ $ $

3,088,429 3,088,429 1,504,304

48,584 $ 108,450 $ 82,119 $ $ 36,909 $ 12,589 $ 9,408 $ 623,747 $

$ $ $

3,088,429 3,088,429 1,464,756

47,306 $ 105,599 $ 79,960 $ $ 35,938 $ 12,258 $ 9,160 $ 607,348 $

$ $ $

3,088,429 3,088,429 1,426,247

46,063 $ 102,822 $ 77,858 $ 97,689 $ 34,994 $ 11,936 $ 8,920 $ 689,070 $

$ $ $

3,088,429 3,088,429 1,388,751

44,852 $ 100,119 $ 75,811 $ $ 34,074 $ 11,622 $ 8,685 $ 575,834 $

$ $ $

3,088,429 3,088,429 1,352,240

$ $ $

3,088,429 3,088,429 1,316,690

$ $ $

3,088,429 3,088,429 1,282,074

Expressed in 2010 dollars

33

34

35

36

37

38

39

40

41

42

43

44

34 2044

35 2045

36 2046

37 2047

38 2048

39 2049

40 2050

41 2051

42 2052

43 2053

44 2054

45 2055

Scenario E5 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $ $ $ $ $ $

102,438 228,666 173,148 869,000 77,822 26,544 19,836 2,184,166

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 $ 228,666 $ 173,148 $

102,438 228,666 173,148

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

102,438 228,666 173,148 869,000 77,822 26,544 19,836 2,184,166

102,438 228,666 173,148

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $

77,822 26,544 19,836 1,315,166

102,438 228,666 173,148 217,250 77,822 26,544 19,836 1,532,416

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $

152,787 124,787

$ $

148,770 121,507

$ $

144,859 118,312

$ $

141,051 115,202

$ $

137,343 112,173

$ $

133,732 109,224

$ $

130,216 106,353

$ $

126,793 103,557

$ $

123,459 100,834

$ $

120,213 98,183

$ $

117,053 95,602

$ $

113,976 93,089

$ $ $ $ $ $ $ $

41,406 $ 92,429 $ 69,988 $ 351,257 $ 31,456 $ 10,729 $ 8,018 $ 882,858 $

31,722 $ 70,811 $ 53,619 $ $ 24,099 $ 8,220 $ 6,143 $ 407,269 $

30,888 68,950 52,209 23,466 8,004 5,981 396,562

BAH and milcon funding if privatized Gov't contribution BAH E5 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

$ $ $

3,088,429 3,088,429 1,248,368

40,318 $ 89,999 $ 68,148 $ $ 30,629 $ 10,447 $ 7,807 $ 517,625 $

$ $ $

3,088,429 3,088,429 1,215,548

39,258 $ 87,633 $ 66,356 $ $ 29,824 $ 10,173 $ 7,602 $ 504,016 $

$ $ $

3,088,429 3,088,429 1,183,591

38,226 $ 85,329 $ 64,612 $ $ 29,040 $ 9,905 $ 7,402 $ 490,766 $

$ $ $

3,088,429 3,088,429 1,152,474

37,221 $ 83,085 $ 62,913 $ 78,937 $ 28,276 $ 9,645 $ 7,207 $ 556,801 $

$ $ $

3,088,429 3,088,429 1,122,175

36,242 $ 80,901 $ 61,259 $ $ 27,533 $ 9,391 $ 7,018 $ 465,300 $

$ $ $

3,088,429 3,088,429 1,092,673

35,289 $ 78,774 $ 59,648 $ $ 26,809 $ 9,144 $ 6,833 $ 453,068 $

$ $ $

3,088,429 3,088,429 1,063,947

34,362 $ 76,703 $ 58,080 $ $ 26,104 $ 8,904 $ 6,654 $ 441,156 $

$ $ $

3,088,429 3,088,429 1,035,975

33,458 $ 74,687 $ 56,553 $ 283,832 $ 25,418 $ 8,670 $ 6,479 $ 713,390 $

$ $ $

3,088,429 3,088,429 1,008,739

32,579 $ 72,723 $ 55,066 $ $ 24,750 $ 8,442 $ 6,308 $ 418,265 $

$ $ $

3,088,429 3,088,429 982,219

$ $ $

3,088,429 3,088,429 956,397

$ $ $

3,088,429 3,088,429 931,253

Expressed in 2010 dollars

45

46

47

48

49

50

46 2056

47 2057

48 2058

49 2059

50 2060

51 2061

Scenario E5 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $ $ $ $ $ $ $ $ $

Assuming a 55 year facility life, MILCON

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

102,438 $ 228,666 $ 173,148 $ 217,250 77,822 $ 26,544 $ 19,836 $ 1,532,416 $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

102,438 228,666 173,148 869,000 77,822 26,544 19,836 2,184,166

$ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $

102,454 83,679

$ $

99,761 81,479

$ $

97,138 79,337

27,036 $ 60,350 $ 45,698 $ 229,349 $ 20,539 $ 7,006 $ 5,235 $ 576,453 $

26,325 58,764 44,496 19,999 6,821 5,098 337,978

$ $

110,979 90,641

$ $

108,062 88,258

$ $

105,221 85,938

$ $ $ $ $ $ $ $

30,076 67,137 50,837 63,785 22,849 7,793 5,824 449,921

$ $ $ $ $ $ $ $

29,285 65,372 49,500 22,248 7,588 5,671 375,984

$ $ $ $ $ $ $ $

28,516 $ 63,653 $ 48,199 $ $ 21,663 $ 7,389 $ 5,522 $ 366,100 $

BAH and milcon funding if privatized Gov't contribution BAH E5 Total Cost Discounted costs

377,992 308,721

$ $ $

3,088,429 3,088,429 906,770

$ $ $

3,088,429 3,088,429 882,931

$ $ $

3,088,429 3,088,429 859,719

27,766 $ 61,980 $ 46,932 $ $ 21,094 $ 7,195 $ 5,377 $ 356,475 $

$ $ $

3,088,429 3,088,429 837,116

$ $ $

3,088,429 3,088,429 815,108

$ $ $

3,088,429 3,088,429 793,679

Expressed in 2010 dollars

51

52

53

54

55

52 2062

53 2063

54 2064

55 2065

56 2066

Scenario E5 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $

377,992 308,721

$ $ $

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

102,438 228,666 173,148

$ $ $

102,438 228,666 173,148

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

102,438 228,666 173,148 217,250 77,822 26,544 19,836 1,532,416

$ $ $

$ $ $ $

$ $ $ $ $ $ $ $

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $ $ $

77,822 26,544 19,836 1,315,166

$ $

94,584 77,251

$ $

92,098 75,220

$ $

89,676 73,242

$ $

87,319 71,317

$ $

85,023 69,442

$ $ $ $ $ $ $ $

25,633 57,219 43,326 19,473 6,642 4,964 329,092

$ $ $ $ $ $ $ $

24,959 55,714 42,187 18,961 6,467 4,833 320,440

$ $ $ $ $ $ $ $

24,303 54,250 41,078 51,541 18,463 6,297 4,706 363,557

$ $ $ $ $ $ $ $

23,664 52,823 39,998 17,977 6,132 4,582 303,813

$ $ $ $ $ $ $ $

23,042 51,435 38,947 17,505 5,971 4,462 295,826

BAH and milcon funding if privatized Gov't contribution BAH E5 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

$ $ $

3,088,429 3,088,429 772,813

$ $ $

3,088,429 3,088,429 752,496

$ $ $

3,088,429 3,088,429 732,713

$ $ $

3,088,429 3,088,429 713,449

$ $ $

3,088,429 3,088,429 694,693

Expressed in 2010 dollars Scenario E5 Occupancy

Government built Design Military Construction Sustainment Modernization Modernization and Sustainment for Supporting Facilities Operations Barracks Management Furnishings Fire and Police Washers and Dryers Partial BAH Total Costs

Government built - discounted costs Discounted Design Discounted MILCON Discounted Sustainment Discounted Modernization Discounted Modernization and Sustainment for Supporting Facilities Discounted Operations Discounted Barracks Management Discounted Furnishings Discounted Fire and Police Discounted Washers and Dryers Discounted Partial BAH Total discounted costs Annualized (levelized) Costs Per Bedroom Monthly (levelized) Cos Number of bedrooms BAH and milcon funding if privatized Gov't contribution BAH E5 Total Cost Discounted costs

Assuming a 55 year facility life, MILCON

FY Service Funding Organization 2011 Marines Marine (Active) 2011 Marines Marine (Active)

Funding Source O&M O&M

Inst_or_UIC 'M67001 'M67001

2011 Marines Marine (Active)

FAM HSG

'M67001

Instl_or_UIC_Name MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

Code Code Description 1444 Miscellaneous Operations Support Building 2134 Marine Maintenance Support Facility Miscellaneous Family Housing Support 7143 Facility Cost Per Square Foot: (2011$) Cost Per Square Foot: (2010$)

FAC Type Building Building

FAC UM SF SF

Building

SF

Supported Asset Sustainment Cost ($) 232,721.00 1075639 4.622011 71,956.00 169301 2.352841 10,058.00 3.795905545 3.719987434

25453 2.530622

FY 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011

Service Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines

Funding Organization Marine (Active) Marine (Active) Other Agencies Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active)

Primary Funding Source MCON MCON NAF MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON

Instl_or_UIC_Code 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011

Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines

Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active)

MCON MCON MCON MCON MCON MCON MCON MCON NR EXCESS MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

2011 Marines Marine (Active) 2011 Marines Marine (Active) 2011 Marines Marine (Active)

MCON MCON MCON

'M67001 'M67001 'M67001

2011 Marines Marine (Active)

MCON

'M67001

2011 Marines Marine (Active)

MCON

'M67001

2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011

MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON NAF MCON MCON MCON MCON MCON MCON MCON MCON OTH LEASE NAF MCON MCON MCON MCON

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

2011 Marines Marine (Active)

MCON

'M67001

2011 Marines Marine (Active)

FAM HSG

'M67001

2011 2011 2011 2011 2011 2011 2011

MCON MCON MCON MCON MCON NAF MCON

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines

Marines Marines Marines Marines Marines Marines Marines

Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Other Agencies Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Other Agencies Marine (Active) Marine (Active) Marine (Active) Marine (Active)

Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Other Agencies Marine (Active)

2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011

Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines

Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Other Agencies Marine (Active) Other Agencies Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Other Agencies Other Agencies Marine (Active) Other Agencies Other Agencies Marine (Active) Other Agencies Marine (Active) Other Agencies Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Other Agencies Marine (Active) Other Agencies Marine (Active) Other Agencies Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Other Agencies Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active)

MCON MCON MCON MCON MCON MCON NAF MCON NAF MCON MCON FAM HSG MCON MCON NAF NAF MCON NAF NAF MCON NAF MCON NAF MCON MCON MCON MCON MCON MCON MCON NAF MCON NAF MCON NAF MCON MCON MCON MCON MCON NAF MCON MCON MCON MCON MCON

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011

Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines

Marine (Active) Marine (Active) Marine (Active) Other Agencies Other Agencies Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active)

MCON MCON MCON NAF NAF MCON FAM HSG MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

2011 Marines Marine (Active)

MCON

'M67001

2011 Marines Marine (Active) 2011 Marines Marine (Active) 2011 Marines Marine (Active)

FAM HSG MCON FAM HSG

'M67001 'M67001 'M67001

2011 Marines Marine (Active)

MCON

'M67001

2011 2011 2011 2011 2011 2011 2011 2011 2011

Marines Marines Marines Marines Marines Marines Marines Marines Marines

Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active)

FAM HSG MCON MCON MCON MCON MCON MCON MCON MCON

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

2011 2011 2011 2011 2011 2011 2011 2011 2011 2011

Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines

Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active)

MCON MCON MCON MCON MCON NR EXCESS MCON FAM HSG MCON FAM HSG

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011

Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines

Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active)

MCON OTH MISC MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON MCON FAM HSG MCON MCON MCON

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011

Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines

Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active) Other Agencies Marine (Active) Marine (Active) Marine (Active) Marine (Active) Marine (Active)

MCON MCON FAM HSG MCON MCON MCON MCON MCON FAM HSG MCON NAF MCON MCON FAM HSG MCON MCON

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

2011 2011 2011 2011

Marines Marines Marines Marines

Marine (Active) Marine (Active) Marine (Active) Marine (Active)

MCON MCON MCON MCON

'M67001 'M67001 'M67001 'M67001

InstlMaintUICName MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

Code 1111 1112 1112 1121 1131 1161 1163 1164 1167 1221 1231 1241 1244 1261 1262 1311 1321 1331 1341 1351 1361 1362 1411 1412 1413 1441 1442 1443 1444 1445 1446 1464 1495 1497 1498 1499 1511 1512 1531 1541 1551 1552 1591 1641 1711 1712

Code Description Fixed-Wing Runway, Surfaced Rotary-Wing Landing Area, Surfaced Rotary-Wing Landing Area, Surfaced Taxiway, Surfaced Aircraft Apron, Surfaced Compass Calibration Pad, Surfaced Aircraft Washing Pad, Surfaced Miscellaneous Airfield Pavement, Surfaced Aircraft Rinse Facility Marine Fueling Facility Vehicle Fueling Facility Aircraft Operating Fuel Storage Other Operating Fuel Storage Liquid Fuel Loading/Unloading Facility POL Pump Station Communications Building Communications Facility Aircraft Navigation Building Aircraft Navigation Facility Communications Lines Airfield Pavement Lighting Airfield Lighting Airfield Fire And Rescue Station Aviation Operations Building Air Control Tower Photo/TV Production Building Operations Support Lab Operations Supply Building Miscellaneous Operations Support Building Working Animal Support Building Security Force Building Aircraft Blast Deflector Revetment Explosive Ordnance Disposal Area Security Support Facility Miscellaneous Operations Support Facility Pier Wharf Marine Cargo Staging Area Shore Erosion Prevention Facility Small Craft Berthing Small Craft Building Miscellaneous Waterfront Facility Harbor Marine Improvements General Purpose Instruction Building Applied Instruction Building

FAC Type Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Building Building Structure Building Structure Linear Structure Structure Structure Building Building Building Building Building Building Building Building Building Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Building Structure Structure Building Building

FAC UM SY SY SY SY SY SY SY SY SY GM OL GA GA OL SF SF EA SF EA MI LF EA SF SF SF SF SF SF SF SF SF EA EA EA SF EA SY SY SY LF FB SF EA LF SF SF

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

1718 1721 1723 1725 1731 1732 1733 1734 1734 1741 1742 1743 1745 1750 1751 1753 1755 1756 1757 1758 1761 1763 1765 1766 1771 1772 1773 1775 1776 1781 1782 1783 1790 1793 1794 1795 1796 1798 1799 2111 2112 2113 2116 2118 2132 2133 2134

Indoor Firing Range and Supporting Facility Flight Simulator Facility Gas Training Facility Training Pool and Tank Range Support Building Training Aids Support Building Training Support Structure Observation Tower/Bunker Observation Tower/Bunker Maneuver/Training Land, Light Forces Maneuver/Training Land, Heavy Forces Weapons Impact Area Parade and Drill Field General Purpose Small Arms Range Zero Range Record Fire Range Known Distance Range Sniper Range Pistol Range Machinegun Range Grenade Launcher Range Light Antiarmor Weapon Range Artillery Direct Fire Range Tank Stationary Gunnery Range Armor Vehicle Crew Training Range Armor Vehicle Unit Training Range Fire and Movement Range Infantry Battle Course Urban Combat Training Range Live Hand Grenade Range Engineer Qualification Range Light Demolition and Flame Training Range Miscellaneous Training Facility Aircraft Weapons Range Air Defense Range Fire And Rescue Training Facility Urban Combat Training Area, Non-Fire Infiltration Course, Live Fire Confidence/Obstacle Course Aircraft Maintenance Hangar Aircraft Maintenance Shop Aircraft Corrosion Control Hangar Aircraft Maintenance Shop, Depot Aircraft Engine Test Facility Marine Railway Marine Maintenance Shop Marine Maintenance Support Facility

Building Building Building Structure Building Building Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Building Building Building Building Structure Structure Building Building

SF SF SF EA SF SF SF EA EA AC AC AC AC FP FP FP FP FP FP FP FP FP EA EA LN EA LN EA EA FP FP FP EA EA FP EA EA EA EA SF SF SF SF EA EA SF SF

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

Structure Building Structure

EA SF EA

Building

SF

Building

SF

Building Building Building Building Building Structure Structure Building Structure Building Building Building Structure Building Building Building Structure Building Building Building Building Building Building Building Building Building

SF SF SF SF SF BL GA SF SY SF SF SF SF SF SF SF SY SF SF SF SF SF SF SF SF SF

Structure

EA

MCB CAMP LEJEUNE NC

2135 Landing Craft Wash Facility 2141 Vehicle Maintenance Shop 2145 Vehicle Maintenance Facility Electronic and Communication 2171 Maintenance Shop Installation Support Vehicle Maintenance 2181 Shop Installation Support Equipment 2182 Maintenance Shop 2184 Parachute And Dingy Maintenance Shop 2191 Facility Engineer Maintenance Shop 2281 Miscellaneous Support Production Plant 3111 Aircraft RDT&E Facility 4111 Bulk Liquid Fuel Storage 4121 Bulk Liquid Storage, Other Than Fuel 4211 Ammunition Storage, Depot and Arsenal 4251 Open Ammunition Storage 4411 Covered Storage Building, Depot 4421 Covered Storage Building, Installation 4421 Covered Storage Building, Installation 4422 Covered Storage Shed, Installation 4423 Hazardous Materials Storage, Installation 4424 Controlled Humidity Storage, Installation 4427 Small Arms Storage, Installation 4521 Open Storage, Installation 5400 Dental Facility 5500 Dispensary And Clinic 6100 General Administrative Building 6100 General Administrative Building 6100 General Administrative Building 6101 Small Unit Headquarters Building 6102 Large Unit Headquarters Building 6103 Printing And Reproduction Plant 6104 Automated Data Processing Center Administrative Structure, Other Than 6900 Buildings Miscellaneous Family Housing Support 7143 Facility

Building

SF

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

7210 7213 7218 7220 7234 7235 7240

Building Building Building Building Building Structure Building

SF SF SF SF SF EA SF

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

Enlisted Unaccompanied Personnel Housing Student Barracks Recruit/Trainee Barracks Dining Facility Latrine/Shower Facility Miscellaneous UPH Support Facility Officer Unaccompanied Personnel Housing

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

7250 7251 7311 7312 7313 7331 7331 7332 7332 7333 7340 7340 7341 7342 7342 7343 7344 7344 7345 7346 7346 7347 7347 7348 7351 7361 7371 7372 7384 7385 7387 7388 7388 7411 7411 7412 7413 7415 7416 7417 7417 7421 7431 7441 7442 7444

Emergency Unaccompanied Personnel Housing EUPH Tent Pad Fire Station Facility Prison/Confinement Facility Police Station Exchange Eating Facility Exchange Eating Facility Non-Exchange Eating Facility Non-Exchange Eating Facility Open Mess and Club Facility Thrift Shop Thrift Shop Bus Station Laundry/Dry Cleaning Facility Laundry/Dry Cleaning Facility Clothing Sales Store Postal Facility Postal Facility Exchange Automobile Facility Exchange Sales Facility Exchange Sales Facility Bank and Credit Union Bank and Credit Union Car Wash Facility Education Center Chapel Facility Nursery and Child Care Facility Family Service Center Miscellaneous Personnel Shelter Public Restroom/Shower Exchange Support Facility Exchange Warehouse Exchange Warehouse Hobby And Craft Center Hobby And Craft Center Automobile Craft Center Golf Club House and Sales Bowling Center Library, General Use Recreation Center Recreation Center Indoor Physical Fitness Facility Auditorium and Theater Facility Transient Lodging Recreational Lodging Stable

Building Structure Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Structure Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building

SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

7445 7447 7512 7513 7514 7516 7516 7517 7518 7521 7522 7531 7541 7542 7601 7602 7603 8112

MCB CAMP LEJEUNE NC

8121 Electrical Power Distribution Line, Overhead Linear Structure

LF

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

8121 Electrical Power Distribution Line, Overhead 8122 Exterior Lighting, Pole 8122 Exterior Lighting, Pole Electrical Power Distribution Line, 8123 Underground Electrical Power Distribution Line, 8123 Underground 8131 Electrical Power Substation 8132 Electrical Power Switching Station 8133 Electrical Power Transformers 8211 Heat Source 8221 Heat Distribution Line 8232 Heat Gas Storage 8241 Heat Gas Distribution Line 8261 Refrigeration and Air Conditioning Source Chilled Water and Refrigerant Distribution 8271 Line 8311 Sewage Treatment 8312 Industrial Waste Treatment 8313 Water Separation Facility 8314 Septic Tank and Drain Field 8314 Septic Tank and Drain Field 8316 Sewage Lift Stations 8316 Sewage Lift Stations 8321 Sewer and Industrial Waste Line 8321 Sewer and Industrial Waste Line

Linear Structure Structure Structure

LF EA EA

Linear Structure

LF

Linear Structure Structure Structure Structure Structure Linear Structure Structure Linear Structure Structure

LF KV KV KV MB LF EA LF TR

Linear Structure Structure Structure Structure Structure Structure Structure Structure Linear Structure Linear Structure

LF KG KG KG GA GA EA EA LF LF

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

Boathouse Miscellaneous MWR Support Outdoor Swimming Pool Golf Course Golf Driving Range Outdoor Recreation Area Outdoor Recreation Area Recreational Pier Marina Outdoor Playing Court Athletic Field Pavilion Recreational Camp and Trailer Park Miscellaneous Outdoor Recreation Facility Museum Monument and Memorial Cemetery Stand-By/Emergency Power

Building Building Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Building Structure Structure Structure

SF SF EA EA EA EA EA EA EA EA EA SF EA EA SF EA EA KW

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

8331 8333 8412 8413 8414 8421 8422 8432 8434 8441 8442 8443 8451 8452 8511 8511 8512 8513 8521

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

8522 8524 8524 8525 8526 8601 8611 8711 8711 8712 8712 8721 8910 8910 8921 8923

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

8926 8928 8929 8930

Refuse Collection and Recycling Facility Sanitary Landfill Water Treatment Facility Water Storage, Potable Water Well, Potable Water Distribution Line, Potable Water Pump Facility, Potable Water Distribution Line, Fire Protection Water Pump Facility, Fire Protection Water Source, Non-Potable Water Storage, Non-Potable Reservoir, Water Water Distribution Line, Non-Potable Water Pump Facility, Non-Potable Road, Surfaced Road, Surfaced Road, Unsurfaced Vehicle Bridge Vehicle Parking, Surfaced Vehicle Parking and Staging Area, Unsurfaced Sidewalk and Walkway Sidewalk and Walkway Pedestrian Bridge Miscellaneous Paved Area Railroad Track Railroad Bridge Storm Drainage Storm Drainage Retaining Structure Retaining Structure Boundary Fence and Wall Utility Building Utility Building Installation Gas Production Plant Vehicle Scales Hazardous Waste Storage Or Disposal Facility Loading Platform/Ramp Miscellaneous Utility Facility Installation Gas Distribution Line Cost Per Square Foot: (2011$) Cost Per Square Foot: (2010$)

Structure Structure Structure Structure Structure Linear Structure Structure Linear Structure Structure Structure Structure Structure Linear Structure Structure Linear Structure Linear Structure Linear Structure Structure Structure

EA AC KG GA KG LF KG LF KG KG GA MG LF KG SY SY SY SY SY

Structure Structure Structure Structure Structure Linear Structure Structure Linear Structure Linear Structure Structure Structure Linear Structure Building Building Structure Structure

SY SY SY SY SY MI LF LF LF LF LF LF SF SF EA EA

Structure Structure Structure Linear Structure

EA EA EA LF

FMM Asset FMM Rqmt ($) 388,807.30 1307476 210,799.00 239856 100 139 255,489.00 263389 899,549.00 1277314 1,227.00 1778 6,114.00 8858 23,943.70 34688 1,090.00 5496 450 4142 101 433066 13,000.00 1670 1,597,185.28 109114 7 27405 521 16948 99,290.80 436286 46 40595 7,063.00 32176 12 2178 456.71 1343136 61,572.00 186807 48 6738 9,364.00 46195 15,916.00 73136 4,140.00 87789 44,504.50 148459 1,352.00 4815 9,274.00 17733 232,721.00 368141 24,569.00 56702 6,820.00 25861 2 2614 1 505 4 0 20,188.00 161401 4 1036 1,700.38 77712 99.55 4550 8,500.00 10990 2,805.00 35640 365 19176 10,000.00 7591 8 9150 365 4782 538,330.89 1965160 491,826.70 2062700

25,062.11 157,611.00 2,486.00 5 32,061.00 55,113.20 127,291.00 38 3 104,959.85 42.35 6,240.45 31.4 118 91 48 1,150.00 8 737 8 8 9 1 1 2 1 25 4 6 22 65 50 72 1 8 2 12 2 7 293,768.00 244,591.00 22,306.00 24,299.00 8 1 68,080.65 71,956.00

138887 461350 7173 71379 105752 168539 233465 137503 10855 0 0 0 0 77889 1608 53821 380731 34902 80603 14988 8129 164651 40342 230970 269814 196068 117119 160762 97815 18054 748596 3869856 229438 0 45041 143267 1026197 6676 11394 1679975 1055468 127390 118587 271089 280 164220 146400

1 1,215,730.43 175

179970 4183360 201549

254,450.75

614239

56,922.00

197467

16,292.95 11,892.00 121,936.00 45,223.80 6,376.00 7,667.31 281,420.00 85,771.00 5,626.43 142,080.00 2,503,587.50 1,248.00 223,351.10 78,381.00 82,016.00 231,434.25 388,558.80 19,775.00 19,775.00 1,574,666.12 81 5,371.20 334,822.24 783,356.80 13,152.00 7,210.00

38503 46608 283746 96156 20868 14036 16098 332240 3747 297775 4620931 2286 180700 214859 156081 661524 207032 328067 275315 4829348 244 16176 905994 3021506 22962 33270

299

69161

10,058.00

30572

4,661,242.96 461,407.40 374,038.56 274,744.01 16,364.00 4 211,699.00

14451106 1224935 992293 1859328 53573 405 732753

3.03957

293,108.45 22,795.00 73,797.00 67,024.15 53,389.00 1,050.60 16,136.00 36,803.20 2,750.00 103,699.00 19,213.00 3,101.00 5,307.00 3,026.40 950 18,719.00 35,545.00 1,238.00 24,323.00 2,967.15 372,316.00 229.25 9,425.00 11,640.00 112,020.00 91,399.25 96,526.00 66,011.50 18,509.00 35,485.00 41,429.20 67,651.00 87,350.60 17,356.00 4,060.00 37,676.00 11,985.00 45,123.00 28,664.00 146,475.20 580 319,563.00 42,735.40 55,357.10 38,720.00 27,293.00

602272 2473 331029 307042 222881 5067 77830 177515 13264 593699 59426 9591 12699 9126 2865 49847 76371 2685 67904 7648 960359 570 22829 81629 435836 456985 395672 237806 26245 109551 106050 144294 188699 40432 9458 104702 32637 212602 100702 554240 2164 1095953 134314 222577 68569 19960

24,597.00 82,847.70 6 2 4 48 1 36 3 117 51 140,686.00 2 16 3,100.00 28 2 2,000.00

19095 134091 274864 198773 20364 26497 552 6834 47702 270826 318222 199915 23731 41939 6463 2850 0 9630

1,555,205.67

820715

33,000.00 4,668.00 141

17415 304796 9207

169,088.00

97060

14,420.00 750 181,411.00 337 923.16 569,261.15 3 1,393.00 1,069.00

8278 3145 40688 235 1095145 2718654 5304 565 213897

3,600.00 15,000.00 804.01 8,806.95 31,380.00 1,000.00 118 2 898,443.03 50,181.00

10416 1393907 81632 14323 5782 184 820128 13900 432214 24141

3 23.3 13,602.45 13,141,355.00 36,967.00 1,618,455.78 538.56 6,743.33 3,080.00 1,794.60 23,500.00 26.07 137,010.00 653 3,629,817.05 97,558.00 5,395,632.00 8,357.32 3,731,374.94

14099 360588 468162 553898 25023 533730 633 2674 3619 1769 419 0 54328 767 3034462 81626 1725569 160693 2771837

508,669.22 636,714.11 23,638.00 7,365.44 82,905.29 42.81 1,343.00 891,087.00 2,475.00 657 150 604,569.00 224,277.65 304 1 5

161719 655058 24319 192692 55081 461602 255693 63850 177 2994 684 796582 581720 779 4571 6914

37 36 4 20,072.00

179116 19490 240 7972

3.100268775 3.038263399

FY 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011

InventoryType ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL

Service Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines

InstlMaintUICCode 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

InstlMaintUICName MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

Funding_Organization ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL

2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011

ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL

Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL

2011 ALL

Marines 'M67001

MCB CAMP LEJEUNE NC

ALL

2011 ALL

Marines 'M67001

MCB CAMP LEJEUNE NC

ALL

2011 ALL

Marines 'M67001

MCB CAMP LEJEUNE NC

ALL

2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011

Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL

2011 ALL

Marines 'M67001

MCB CAMP LEJEUNE NC

ALL

2011 ALL

Marines 'M67001

MCB CAMP LEJEUNE NC

ALL

2011 2011 2011 2011 2011 2011 2011

ALL ALL ALL ALL ALL ALL ALL

Marines Marines Marines Marines Marines Marines Marines

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

ALL ALL ALL ALL ALL ALL ALL

2011 2011 2011 2011 2011

ALL ALL ALL ALL ALL

Marines Marines Marines Marines Marines

'M67001 'M67001 'M67001 'M67001 'M67001

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

ALL ALL ALL ALL ALL

ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL

2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011

ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL

Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL

2011 ALL

Marines 'M67001

MCB CAMP LEJEUNE NC

ALL

2011 ALL 2011 ALL

Marines 'M67001 Marines 'M67001

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

ALL ALL

2011 2011 2011 2011 2011 2011 2011 2011 2011

ALL ALL ALL ALL ALL ALL ALL ALL ALL

Marines Marines Marines Marines Marines Marines Marines Marines Marines

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

ALL ALL ALL ALL ALL ALL ALL ALL ALL

2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011

ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL

Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines Marines

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL

2011 2011 2011 2011 2011 2011

ALL ALL ALL ALL ALL ALL

Marines Marines Marines Marines Marines Marines

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

ALL ALL ALL ALL ALL ALL

2011 2011 2011 2011 2011 2011

ALL ALL ALL ALL ALL ALL

Marines Marines Marines Marines Marines Marines

'M67001 'M67001 'M67001 'M67001 'M67001 'M67001

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

ALL ALL ALL ALL ALL ALL

2011 2011 2011 2011

ALL ALL ALL ALL

Marines Marines Marines Marines

'M67001 'M67001 'M67001 'M67001

MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC MCB CAMP LEJEUNE NC

ALL ALL ALL ALL

Funding_Source ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL

FAC 1111 1112 1121 1131 1161 1163 1164 1167 1221 1231 1241 1244 1261 1262 1311 1321 1331 1341 1351 1361 1362 1411 1412 1413 1441 1442 1443 1444 1445 1446 1464 1495 1497 1498 1499 1511 1512 1531 1541 1551 1552 1591 1641 1711 1712 1718

FACTitle Fixed-Wing Runway, Surfaced Rotary-Wing Landing Area, Surfaced Taxiway, Surfaced Aircraft Apron, Surfaced Compass Calibration Pad, Surfaced Aircraft Washing Pad, Surfaced Miscellaneous Airfield Pavement, Surfaced Aircraft Rinse Facility Marine Fueling Facility Vehicle Fueling Facility Aircraft Operating Fuel Storage Other Operating Fuel Storage Liquid Fuel Loading/Unloading Facility POL Pump Station Communications Building Communications Facility Aircraft Navigation Building Aircraft Navigation Facility Communications Lines Airfield Pavement Lighting Airfield Lighting Airfield Fire And Rescue Station Aviation Operations Building Air Control Tower Photo/TV Production Building Operations Support Lab Operations Supply Building Miscellaneous Operations Support Building Working Animal Support Building Security Force Building Aircraft Blast Deflector Revetment Explosive Ordnance Disposal Area Security Support Facility Miscellaneous Operations Support Facility Pier Wharf Marine Cargo Staging Area Shore Erosion Prevention Facility Small Craft Berthing Small Craft Building Miscellaneous Waterfront Facility Harbor Marine Improvements General Purpose Instruction Building Applied Instruction Building Indoor Firing Range and Supporting Facility

FAC_UM SY SY SY SY SY SY SY SY GM OL GA GA OL SF SF EA SF EA MI LF EA SF SF SF SF SF SF SF SF SF EA EA EA SF EA SY SY SY LF FB SF EA LF SF SF SF

FAC_TYPE Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Building Building Structure Building Structure Linear Structure Structure Structure Building Building Building Building Building Building Building Building Building Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Building Structure Structure Building Building Building

ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL

1721 1723 1725 1731 1732 1733 1734 1741 1742 1743 1745 1750 1751 1753 1755 1756 1757 1758 1761 1763 1765 1766 1771 1772 1773 1775 1776 1781 1782 1783 1790 1793 1794 1795 1796 1798 1799 2111 2112 2113 2116 2118 2132 2133 2134 2135 2141

Flight Simulator Facility Gas Training Facility Training Pool and Tank Range Support Building Training Aids Support Building Training Support Structure Observation Tower/Bunker Maneuver/Training Land, Light Forces Maneuver/Training Land, Heavy Forces Weapons Impact Area Parade and Drill Field General Purpose Small Arms Range Zero Range Record Fire Range Known Distance Range Sniper Range Pistol Range Machinegun Range Grenade Launcher Range Light Antiarmor Weapon Range Artillery Direct Fire Range Tank Stationary Gunnery Range Armor Vehicle Crew Training Range Armor Vehicle Unit Training Range Fire and Movement Range Infantry Battle Course Urban Combat Training Range Live Hand Grenade Range Engineer Qualification Range Light Demolition and Flame Training Range Miscellaneous Training Facility Aircraft Weapons Range Air Defense Range Fire And Rescue Training Facility Urban Combat Training Area, Non-Fire Infiltration Course, Live Fire Confidence/Obstacle Course Aircraft Maintenance Hangar Aircraft Maintenance Shop Aircraft Corrosion Control Hangar Aircraft Maintenance Shop, Depot Aircraft Engine Test Facility Marine Railway Marine Maintenance Shop Marine Maintenance Support Facility Landing Craft Wash Facility Vehicle Maintenance Shop

SF SF EA SF SF SF EA AC AC AC AC FP FP FP FP FP FP FP FP FP EA EA LN EA LN EA EA FP FP FP EA EA FP EA EA EA EA SF SF SF SF EA EA SF SF EA SF

Building Building Structure Building Building Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Building Building Building Building Structure Structure Building Building Structure Building

ALL

EA

Structure

SF

Building

SF

Building

SF SF SF SF SF BL GA SF SY SF SF SF SF SF SF SY SF SF SF SF SF SF SF

Building Building Building Building Building Structure Structure Building Structure Building Building Structure Building Building Building Structure Building Building Building Building Building Building Building

EA

Structure

ALL

2145 Vehicle Maintenance Facility Electronic and Communication 2171 Maintenance Shop Installation Support Vehicle Maintenance 2181 Shop Installation Support Equipment 2182 Maintenance Shop 2184 Parachute And Dingy Maintenance Shop 2191 Facility Engineer Maintenance Shop 2281 Miscellaneous Support Production Plant 3111 Aircraft RDT&E Facility 4111 Bulk Liquid Fuel Storage 4121 Bulk Liquid Storage, Other Than Fuel 4211 Ammunition Storage, Depot and Arsenal 4251 Open Ammunition Storage 4411 Covered Storage Building, Depot 4421 Covered Storage Building, Installation 4422 Covered Storage Shed, Installation 4423 Hazardous Materials Storage, Installation 4424 Controlled Humidity Storage, Installation 4427 Small Arms Storage, Installation 4521 Open Storage, Installation 5400 Dental Facility 5500 Dispensary And Clinic 6100 General Administrative Building 6101 Small Unit Headquarters Building 6102 Large Unit Headquarters Building 6103 Printing And Reproduction Plant 6104 Automated Data Processing Center Administrative Structure, Other Than 6900 Buildings Miscellaneous Family Housing Support 7143 Facility

SF

Building

ALL ALL ALL ALL ALL ALL ALL

7210 7213 7218 7220 7234 7235 7240

SF SF SF SF SF EA SF

Building Building Building Building Building Structure Building

ALL ALL ALL ALL ALL

7250 7251 7311 7312 7313

SF SF SF SF SF

Building Structure Building Building Building

ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL

Enlisted Unaccompanied Personnel Housing Student Barracks Recruit/Trainee Barracks Dining Facility Latrine/Shower Facility Miscellaneous UPH Support Facility Officer Unaccompanied Personnel Housing Emergency Unaccompanied Personnel Housing EUPH Tent Pad Fire Station Facility Prison/Confinement Facility Police Station

ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL

7331 7332 7333 7340 7341 7342 7343 7344 7345 7346 7347 7348 7351 7361 7371 7372 7384 7385 7387 7388 7411 7412 7413 7415 7416 7417 7421 7431 7441 7442 7444 7445 7447 7512 7513 7514 7516 7517 7518 7521 7522 7531 7541 7542 7601 7602 7603

Exchange Eating Facility Non-Exchange Eating Facility Open Mess and Club Facility Thrift Shop Bus Station Laundry/Dry Cleaning Facility Clothing Sales Store Postal Facility Exchange Automobile Facility Exchange Sales Facility Bank and Credit Union Car Wash Facility Education Center Chapel Facility Nursery and Child Care Facility Family Service Center Miscellaneous Personnel Shelter Public Restroom/Shower Exchange Support Facility Exchange Warehouse Hobby And Craft Center Automobile Craft Center Golf Club House and Sales Bowling Center Library, General Use Recreation Center Indoor Physical Fitness Facility Auditorium and Theater Facility Transient Lodging Recreational Lodging Stable Boathouse Miscellaneous MWR Support Outdoor Swimming Pool Golf Course Golf Driving Range Outdoor Recreation Area Recreational Pier Marina Outdoor Playing Court Athletic Field Pavilion Recreational Camp and Trailer Park Miscellaneous Outdoor Recreation Facility Museum Monument and Memorial Cemetery

SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF EA EA EA EA EA EA EA EA SF EA EA SF EA EA

Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Structure Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Building Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Structure Building Structure Structure

ALL

8112 Stand-By/Emergency Power

KW

Structure

ALL ALL

8121 Electrical Power Distribution Line, Overhead 8122 Exterior Lighting, Pole Electrical Power Distribution Line, 8123 Underground 8131 Electrical Power Substation 8132 Electrical Power Switching Station 8133 Electrical Power Transformers 8211 Heat Source 8221 Heat Distribution Line 8232 Heat Gas Storage 8241 Heat Gas Distribution Line 8261 Refrigeration and Air Conditioning Source Chilled Water and Refrigerant Distribution 8271 Line 8311 Sewage Treatment 8312 Industrial Waste Treatment 8313 Water Separation Facility 8314 Septic Tank and Drain Field 8316 Sewage Lift Stations 8321 Sewer and Industrial Waste Line 8331 Refuse Collection and Recycling Facility 8333 Sanitary Landfill 8412 Water Treatment Facility 8413 Water Storage, Potable 8414 Water Well, Potable 8421 Water Distribution Line, Potable 8422 Water Pump Facility, Potable 8432 Water Distribution Line, Fire Protection 8434 Water Pump Facility, Fire Protection 8441 Water Source, Non-Potable 8442 Water Storage, Non-Potable 8443 Reservoir, Water 8451 Water Distribution Line, Non-Potable 8452 Water Pump Facility, Non-Potable 8511 Road, Surfaced 8512 Road, Unsurfaced 8513 Vehicle Bridge 8521 Vehicle Parking, Surfaced Vehicle Parking and Staging Area, 8522 Unsurfaced 8524 Sidewalk and Walkway 8525 Pedestrian Bridge 8526 Miscellaneous Paved Area 8601 Railroad Track 8611 Railroad Bridge

LF EA

Linear Structure Structure

LF KV KV KV MB LF EA LF TR

Linear Structure Structure Structure Structure Structure Linear Structure Structure Linear Structure Structure

LF KG KG KG GA EA LF EA AC KG GA KG LF KG LF KG KG GA MG LF KG SY SY SY SY

Linear Structure Structure Structure Structure Structure Structure Linear Structure Structure Structure Structure Structure Structure Linear Structure Structure Linear Structure Structure Structure Structure Structure Linear Structure Structure Linear Structure Linear Structure Structure Structure

SY SY SY SY MI LF

Structure Structure Structure Structure Linear Structure Structure

ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL

ALL ALL ALL ALL ALL ALL

8711 8712 8721 8910 8921 8923

ALL ALL ALL ALL

8926 8928 8929 8930

Storm Drainage Retaining Structure Boundary Fence and Wall Utility Building Installation Gas Production Plant Vehicle Scales Hazardous Waste Storage Or Disposal Facility Loading Platform/Ramp Miscellaneous Utility Facility Installation Gas Distribution Line

LF LF LF SF EA EA

Linear Structure Structure Linear Structure Building Structure Structure

EA EA EA LF

Structure Structure Structure Linear Structure 2011 Dollars 2010 Dollars

USMC Lejeune Factor

Custodial Services 1.06 Refuse Control 200

SupportedAsset FIRE & EMER ($) ENERGY ($) WATER/WASTEW ($) PAVEMT CLEAR ($ 388807.3 0 0 0 24442.88 210899 0 0 0 13258.43 255489 0 0 0 16061.64 899549 0 0 0 56551.31 1227 0 0 0 27.32 6114 0 0 0 136.12 23943.7 0 0 0 1505.25 1090 0 22.1 0 24.27 450 0 5.34 0 0 101 0 1207 0 0 13000 0 146.91 0 0 1597185.28 0 18049.94 0 0 7 0 70.69 0 0 521 0 18.73 0 0 99290.8 0 279399.97 25996.65 0 46 0 34678.94 0 0 7063 0 19874.97 0 0 12 0 9046.68 0 0 456.71 0 0 0 0 61572 0 222882.29 0 0 48 0 12382.66 0 0 9364 0 6041.72 7399.43 0 15916 0 22300.25 12410.74 0 4140 0 5839 1068.4 0 44504.5 0 62768.51 4222.56 0 1352 0 3762.1 301.69 0 9274 0 5535.01 492.85 0 232721 0 138894.99 39563.56 0 24569 0 14663.53 27699.72 0 6820 0 9001.66 1293.2 0 2 0 0 0 0 1 0 0 0 0 4 0 0 0 0 20188 0 26386.69 3648.35 0 4 0 3015.56 0 0 1700.38 0 0 0 38.1 99.55 0 0 0 2.23 8500 0 0 0 1.94 2805 0 0 0 0 365 0 0 0 0 10000 0 13070.45 955.75 0 8 0 0 0 0 365 0 0 0 0 538330.89 0 543681.25 74368.09 0 491826.7 0 496714.9 67943.8 0 25062.11 0 4600.32 261.5 0

157611 2486 5 32061 55113.2 127291 38.45 104959.85 42.35 6240.45 31.4 118 91 48 1150 8 737 8 8 9 1 1 2 1 25 4 6 22 65 50 72 1 8 2 13 2 7 293768 244591 22306 24299 8 1 68080.65 71956 1 1215730.43

0 0 0 0 0 0 0 503842.42 203.29 29956.26 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

136149.67 2510.71 93.25 21004.24 7921.43 47955.73 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1287.9 0 0 0 7796.57 29644.92 2148.47 3994.34 5149.76 0 6483.05 5705.59 753.89 169715.67

31552.65 343.43 3882.55 5793.93 2928.93 6764.61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15611.92 29705.94 1185.42 2951.15 0 0 8268.48 12232.82 0 147652.23

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

175

0

80394.9

0

0

254450.75

0

40893.82

30903.4

0

56922

0

8096.7

6913.26

0

16292.95 11892 121936 45223.8 6376 7667.31 281420 85771 5626.43 142080 2504835.5 223351.1 78381 82016 231434.25 388558.8 19775 19775 1580037.32 334822.24 783356.8 13152 7210

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2732.72 1665.75 23294.93 66788.22 17318.69 11.68 202.62 0 0 10673.1 1616137.48 0 0 349603.52 0 0 27001.8 27001.8 2146598.41 472228.49 1125454.02 14209.6 13537.66

1978.8 1444.3 14809.28 4806.72 1422.79 0 0 0 0 0 0 0 4165.36 4358.64 0 0 4833.67 4833.67 285538.67 60507.87 141565.43 1397.89 4253.95

0 0 0 0 0 0 0 0 1.29 0 0 0 0 0 0 88.64 0 0 0 0 0 0 0

299

0

0

0

0

10058

0

0

961.3

0

4661242.96 461407.4 374038.56 274744.01 16364 4 211699

0 0 0 0 0 0 0

4729650.96 468179.03 363791.06 915528.58 18153.71 0 205899.1

1139362.58 110536.59 89606.2 1185387.81 122724.46 0 51746.24

0 0 0 0 0 0 0

293108.45 22795 73797 67024.15 53389

0 0 0 0 0

285077.93 0 106024.63 91196.88 72644.12

71645.38 0 7053.18 16382.93 9648.27

0 0 0 0 0

17186.6 39553.2 103699 22314 5307 3976.4 18719 36783 24323 375283.15 9654.25 11640 112020 91399.25 96526 66011.5 18509 35485 41429.2 155001.6 21416 37676 11985 45123 28664 147055.2 319563 42735.4 55357.1 38720 27293 24597 82847.7 6 2 4 49 36 3 117 51 140686 2 16 3100 28 2

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

58456.15 134530.82 352707.51 26408.6 5448.46 4706.06 21951.37 41306.7 24971.3 440086.52 8339.72 261.99 113133.35 40080.15 83382.4 93101.69 0 36430.86 8702.59 100008.12 21986.81 37583.33 10353.05 50342.8 27538.06 157425.68 313692.3 45069.88 66036.45 41049.59 0 0 0 17.46 0 0 0 0 0 0 0 0 0 0 2978.23 0 0

74151.88 170652.96 73200.41 2132.67 507.22 39130.83 1789.07 6253.27 2324.67 35867.76 1744.67 21375.45 15475.09 12626.43 13334.68 9119.22 0 8673.74 5031.64 8237.34 2046.84 3600.88 1145.47 6233.55 2739.57 14054.85 30542.3 4084.44 13531.12 9464.53 3314.78 2987.34 7918.19 4659.06 570543.84 63940.46 0 0 55233.75 0 808270.44 0 79231.66 0 527.01 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2000

0

0

0

0

1588205.67 4809

0 0

0 689215.46

0 0

0 0

183508 750 181411 337 923.16 569261.15 3 1393 1069

0 0 0 0 0 0 0 0 0

0 0 0 0 133451.69 0 0 0 87586.06

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

3600 15000 804.01 8806.95 31530 120 948624.03 3 23.3 13602.45 13141355 36967 1618455.78 538.56 6743.33 3080 1794.6 23500 26.07 137010 653 3727375.05 5395632 8357.32 3731374.94

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 908674.33 48705.55 533510 0 3.6 0 105.42 498.08 68119.41 0 0 0 12028.21 0 68788.79 0 0 0 0 14584.12 0 0 0 0

0 0 0 0 0 100731.6 0 1312.86 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 83493.59 1230.78 187.21 83583.19

508669.22 660352.11 7365.44 82905.29 42.81 1343

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

116.03 0 0 18.87 0 0

s 2009$ 09$

893562 807 604569 224581.65 1 5

0 0 0 0 0 0

0 0 0 134037.07 34.44 0

0 0 0 0 0 0

0 0 0 0 0 0

37 36 4 20072

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

1.014675914 0.994382396

0.24443321 0.239544546

0.1091 0.11795892 0.0873 0.09438876

REFUSE ($) LEASES ($) GROUND MAINT ($) PEST CONTROL ($) CUSTODIAL ($) RP & ENG SVC ($) 0 0 268401.52 29106.48 0 109580.14 0 0 62394.82 6368.96 0 56071.57 0 0 44108.16 4781.54 0 72006.14 0 0 0 0 0 251925.5 0 0 211.83 22.96 0 345.81 0 0 1055.54 114.43 0 1723.15 0 0 4133.7 448.12 0 6748.2 0 0 188.18 20.4 0 307.2 0 0 0 0 0 30.59 0 0 0 0 0 3590.69 0 0 58.12 0 0 156.86 0 0 0 0 0 0 0 0 0 0 0 92.25 0 0 9.96 0 0 869.54 7854.87 0 1899.19 3973.22 76245.46 57850.27 0 0 0 0 0 5667.17 558.75 0 135.1 93.92 5423.68 5913.57 0 0 0 0 0 304.92 0 0 24615.47 0 0 104356.01 0 0 0 0 0 78222.26 0 0 0 0 0 345.24 745.05 0 3086.7 377.02 0 6343.57 1266.37 0 5246.47 640.81 12293.68 10313.8 329.4 0 79.18 166.69 3197.78 7730.78 3541.02 0 14670.23 1791.85 34375.75 20422.78 107.57 0 25.86 54.44 1044.3 768.58 92.12 0 177.4 373.4 7163.34 2103.34 18516.55 0 4451.31 3123.3 179756.13 126507.99 1954.85 0 8098.79 989.22 24351.53 6222.63 542.64 0 2248.1 91.52 1072.28 2631.7 0 0 0 0 0 219.77 0 0 0 0 0 52.37 0 0 0 0 0 0 1606.26 0 6654.64 270.97 3174.05 11535.21 9.2 0 0 37.24 65.64 167.96 0 0 0 22.81 0 4466.11 0 0 0 1.34 0 261.47 0 0 0 114.08 0 1127.16 0 0 0 0 0 3743.81 0 0 0 0 0 2058.84 99.34 0 0 134.21 683.4 756 0 0 0 0 0 984.08 0 0 0 0 0 487.16 84639.41 250482.8 42832.49 0 177452.56 21674.45 39132.43 0 162123.17 19802.11 77327.78 228844.58 1994.08 0 8261.34 336.35 3940.39 8415.02

12540.39 197.8 0 2550.96 4385.12 10127.89 306.05 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 49665.96 19461 221.59 1933.37 1034.32 0 5416.86 5725.21 0 96730.15

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

51954.07 47.55 0 613.21 18167.23 2434.71 0 1175068.35 474.13 0 136838.87 285640.04 2429.76 45566.22 477949.78 24678.45 47947.41 12100.68 13163.29 6940.81 0 0 69180.44 0 228792.74 0 0 6500.32 7327336.7 2336103.79 0 0 0 0 0 0 0 5618.98 4678.36 426.65 464.77 0 0 1302.2 1376.32 0 23253.6

6345.8 0 0 1290.84 739.65 1708.36 3676.2 79401 30.17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3942.6 3282.59 299.36 326.1 4192.08 0 913.71 965.7 0 16316.05

24780.49 1529.34 1572.2 5040.81 3766.44 8699 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20076.1 16715.34 13722.31 1660.59 63980.72 0 41882.18 44266.23 0 747898.75

93304.49 812.67 5049.15 10468.94 19638.4 16487.89 16398.15 0 0 0 0 6345.6 131.03 4384.81 31017.91 2843.46 6566.69 1221.06 662.3 13414.07 3286.63 18817.07 19261.07 14170.74 8464.48 11618.96 7069.51 1304.82 53372.89 279691.96 16314.46 0 3255.3 11781.32 80348.56 474.9 810.74 173040.31 113806.99 17761.36 11306.2 44721.84 28.94 24066.24 22025.19 19857.16 544267.95

2829.82

0

0

11469.57

19451.01

31715.01

20245.5

0

4866.93

3414.93

17389.15

112410.74

4529.02

0

1088.75

763.94

3890.04

24642.27

1296.36 946.19 9701.91 7645.76 507.31 0 0 852.07 0 1411.46 24883.72 2218.81 778.56 814.77 2299.14 0 2162.76 2162.76 125716.37 26640.29 62328.12 2223.54 573.67

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

311.64 227.46 2332.29 865.01 121.96 0 0 16895.65 9977.73 2717.61 47910.61 4272.04 1499.08 1568.74 4426.71 48260.17 6518.53 6518.53 520835.05 110369.01 258221.58 4335.36 2376.67

218.66 159.6 1635.51 606.94 85.57 0 0 1151.12 75.5 1906.83 33613.57 2997.5 1051.94 1100.72 3106.01 5214.76 796.19 796.19 63616.03 13480.7 31539.77 529.53 290.29

1113.46 812.7 8333.08 27820.99 3922.42 0 0 5861.55 0 9709.74 171180.26 15263.84 5356.38 5604.97 15816.22 0 19599.96 19599.96 1220437.28 258620.19 605072.95 8090.91 5569.08

5759.5 5708.99 40917.51 21710.6 3624.6 1197.06 1420.67 53553.21 758.57 36404.62 568037.02 21395.33 28875.11 19570.59 144501.64 51525.73 12639.19 11416.9 660867.63 150885.26 369121.74 3110.79 3949.57

0

0

0

0

0

5794.54

800.27

0

3315.46

404.96

687.36

4206.87

0 50463.33 29760.53 415342.57 1302.03 0 16843.96

0 0 0 0 0 0 0

1536507.42 152095.87 123296.11 90565.14 5394.15 0 69783.34

0 18577.34 15059.69 19919.82 658.85 0 0

0 0 0 272312.05 16219.17 0 0

2100556.8 207930.08 149813.85 200618.37 8434.12 43.12 93523.93

0 0 5871.7 5332.81 4247.91

0 0 0 0 0

96618.49 7514.02 24326.05 22093.49 17598.87

0 0 2971.24 2698.55 2149.57

0 0 0 66430.87 41238.22

27447.77 330.37 37381.32 42013.22 23112.79

25981.74 59794.32 156766.33 1775.42 422.25 672.27 1489.39 2926.66 1935.27 29859.59 768.17 926.15 8912.92 7272.22 7680.18 5252.23 0 2823.36 3296.33 1539.84 1703.98 2997.72 953.59 3590.23 2280.67 11700.52 25426.18 3400.26 4404.51 3080.65 4614.3 244.35 6591.83 0 0 0 0 0 0 0 0 11193.7 0 0 246.65 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

5665.3 13038.12 34182.79 7355.47 1749.38 1310.75 6170.43 12124.94 8017.72 123706.39 3182.41 3836.94 36925.68 30128.35 31818.31 21759.68 6101.21 11697.09 13656.49 51093.9 7059.45 12419.31 3950.68 14874.11 9448.65 48474.52 105339.06 14087.07 18247.63 12763.42 522.04 470.47 1584.67 0 0 0 0 0 0 0 511052.16 2690.93 0 0 1021.87 0 0

1246.39 2868.46 7520.41 898.41 71.22 160.1 753.66 1480.97 326.44 15109.77 388.7 0 4510.18 3679.93 3886.38 2657.78 0 1426.1 1668.03 6240.74 862.26 1516.93 482.55 1816.75 1154.07 5889.1 12866.35 1720.64 2228.81 1559.04 1979.33 990.33 3335.65 0 0 0 0 0 0 0 0 5664.42 0 0 124.81 0 0

17034.47 39203.09 102781.07 1524.94 362.68 2446.23 11515.64 22628.34 14963.14 230868.46 7457 0 86525.41 14370.3 95671.58 50987.97 0 35170.89 2831.27 10592.79 13174.79 23177.7 9257.34 27758.98 4506.72 23120.84 21838.91 2920.54 54867.09 38377.34 1865.19 1680.96 5661.79 0 0 0 0 0 0 0 0 0 0 0 2394.47 0 0

8403.14 28889.13 70556.49 7294.47 1629.66 1920.69 6119.26 11259.01 7457.06 122680.4 3753.95 7491.3 56094.64 46837.77 48050.66 31104.96 2981.42 17423.5 13543.25 37444.4 9271.26 13095.67 4800.36 21795.55 13930.14 66779.15 157190.01 16990.56 24455.55 8209.73 3646.13 1844.38 17892.12 24581.7 20152.66 7106.74 1920.85 423.43 8928.69 13902.91 28371.84 24718.74 1427.12 3326.08 1506.54 544.04 0

0

0

0

0

0

2585.41

0 0

0 0

0 0

0 0

0 0

112441.18 92159.21

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

33236.02 428.94 5561.79 37.64 31660.06 340362.61 293.69 334.28 10210.86

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 924050.38 1337626.53 0 231723.94

0 0 0 0 0 0 0 497.97 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

476.94 209318.16 11219.6 2216.47 500.71 19.2 149271.41 1917.66 37615.22 134652.36 82520.55 830.81 185904.34 137.33 774.66 785.39 40.65 147.56 58162.8 15739.3 166.51 248679.53 107623.95 22505.43 470457.57

0 0 0 0 0 0

0 0 0 0 0 0

31589.11 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

10146.17 75208.84 21244.57 10993.86 108131.94 29965.18

0 0 0 0 14.92 0

0 0 0 0 0 0

0 0 0 4295.48 0 0

0 0 0 9042.19 60.46 0

0 0 0 0 0 0

10121.95 1085.64 60518.49 108477.05 828.36 306.45

1840.01 0 0 0

0 0 0 0

0 0 0 0

7456.98 0 0 0

0 0 0 0

23651.14 1134.34 40.48 4816.75

0.329634699 0.323042005

0.040262336 0.03945709

0.450643062 0.441630201

ENG READINS ($) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

2011 Marines

Marine (Active)

'M67 MCB CAMP FAM HSG 001 LEJEUNE NC

Miscellaneous Family Housing 7143 Support Facility

Building

SF

10,058.00

2.53062239

Sustainment of Support Facillity

2011 Marines

Marine (Active)

'M67 MCB CAMP FAM HSG 001 LEJEUNE NC

Miscellaneous Family Housing 7143 Support Facility

Building

SF

Modernization of Support Facillity TOTAL SUPPORT/MODERNIZATION FACTOR: FY2011$:

$5.57

FY2010$:

$5.46

25453

10,058.00

30572 3.03957049

Barracks Management (Data conversion)

2008 2009 2010 2011 0 1 2 3 416.06 416.06 416.06 416.06 416.06 424.3812 432.8688 441.5262

Fire and Police (Data conversion)

BAH Rate

2007 0 187 187

2009 1442.56

2008 2009 2010 1 2 3 187 187 187 190.74 194.5548 198.4459

2010 1472

Suggest Documents