Affordable and Sustainable Housing Solution
covestro.com
Defined By Our Future
2
4/21/2016 Introduction of Covestro
Market-leading, structurally attractive business units Covestro business units
3
4/21/2016 Introduction of Covestro
4
4/21/2016 Introduction of Covestro
World Income Distribution
Asia Underserved communities population
2,858 MiO
Page 5
Mission is to provide access of Covestro high performance material to underserved community
Urbanization
Population Growth
Resources Depletion 6
Current Construction technology taking long time to deliver Buildings and homes are not energy efficient Increase of cost living and house pricing leading to more people cant afford to have home
Slums
Global Warming
Cycle of poverty
Sustainable Housing
A family with seven Children in Jinhua,China living in the house,which is just 20 meters square
Just five kilometres from the presidential palace, in this cul-de-sac in central Jakarta located poor neighbourhood. Photo: Alex Ellinghausen 7
Inclusive Business Activities Technology Solution Indian subcontinents including Bangladesh, Sri Lanka, Nepal
ASEAN regions: Malaysia, Indonesia, Cambodia, Philippines, Vietnam, Brunei
8 4/21/2016 Introduction of Covestro
Housing Solution
Food Security: Solar Dryer
Food Security: Cold storage
Agro Waste board
Collaboration Impact Knowledge transfer to community
Innovation Capacity
Experience Knowledge 13
Expertise
Economic development and social transformation of underserved community. Combat global warming and carbon footprint reduction Together contribute to Millennium Goal 2020
• Government Body and Agency • NGO • Manufacturer • Contractor • Financial Institution • Academic Institution
Integrated Technologies for Sustainable Social & Economic Transformation- Consortium Approach Sustainable Housing
Sustainable Economic Transformation • • • •
Transform Agriculture Into Agribusiness Product Center-Commercialization of product by transforming raw food into end products using solar dryer Providing job employment opportunity for the community Producing commercial product for local and international market
Solar Dryer
10
4/21/2016 Introduction of Covestro
Cold Storage
Covestro & Partner Solutions
11
Energy efficiency house material Use electricity from renewable energy Smart rain water access for crops needs LED lighting for the lighting
4/21/2016 Introduction of Covestro
Solar Dryer
Increases the shelf-life; Changing Food Habit: Used for ready-to-eat food; Hygienic as compared to open sun drying Distribution is better as weight is reduced and increased-shelf life
Cold Storage
PIR Housing
Technologies benefits
Prevents wastage when there is sudden supply of the product Reduces logistics cost as consolidated transportation can be done Distribution can be done extensively as it gives extra time
*Picture was taken at site location IBS Cheras
PIR Technologies For Affordable Housing Solutions …Value for money
covestro.com
PIR As Housing Material The Material
The ring structure creating strong 3D molecules network 13
The Components
The board (skin material) can be sheet metal or oriented strand board(OSB), magnesium board, and fiber cement. Foam: Polyisocyanurate foam. Framing system: steel
PIR Based Housing Technology PIR Composite Panel Technology-For Single Storey House Construction
Integrated PIR Composite Technology-For Multi-Storey House Construction
14
1
2
FACTS
3
PIR HOUSING
4 5 .
15
Modular construction can be used for commercial applications, including office buildings
4/21/2016 Introduction of Covestro
PIR housing designs vary in style and size
Modular homes are permanent structures — “real property
High resistance to fire- do not melt or spreading the flames
PIR is also resistant to mold and PIR suffers little damage from flooding
PIR Housing- Differentiating features Exacerbated by the heat gain of the roof, which constitutes 70% of the total heat gain of the house
Integrated Roofing with PIR insulation helping to prevent heat gains inside the building from conduction and radiation
PIR insulation does more with less. It gives 16
4/21/2016 Introduction of Covestro
more energy saving at less thickness. Less material enables saving in resources
10-12°C* Temperature reduction via the heat insulation *Based on measurement from existing PIR housing application by PU Profile
“Good insulation allows thinner wall thus creating more space inside house ”
Construction Process Foundation The foundation Is integrated using Helix technology
Structure
Roof Integrated roof with insulation eliminates the need of ceilings and providing heat and sound insulation
Finishing
Square Hollow Section Tube has been used for the bottom, upper railings and as well for the vertical beam
Walls The walls are mechanically fasten with power driven screw
17
Clean up
2 3 8
Weeks of constructing basic house Weeks of complete house construction for the exterior and interior finishing
Workers per day
Time & Cost Saving: Description
Composition
Weight Kg/ft²
Exterior PIR Panel (Thickness : 100mm)
8+84+8
2.633kg/ft²
Interior PIR Partition (Thickness : 75mm)
8+59+8
1.6kg/ft²
PS Hybrid (Thickness : 100mm)
10+80+10
4.55kg/ft²
Light Weigh Concrete (Thickness : 100mm)
10+80+10
8.36kg/ft²
• Easy handling and transportation Cement 70 x 90 x 215mm • Brick No&heavy machines needed • It requires fewer man-hours total to construct a home by modular 18
4/21/2016 Introduction of Covestro
8.6 times LIGHTER 14kg/ft² than Brick walls
*Picture was taken at site location Langkawi
“Building Up Multiple Storey with PIR…?”
covestro.com
VARIOUS PROJECTS • • • •
Rajasthan, India Langkawi, Malaysia Native House, Tapah, Malaysia Teluk Bahang, Malaysia
High Rise Housing Solutions Integrated with conventional technology; Reinforced concrete frame with PIR
Rajasthan, India
Rajasthan, India Construction Process Speed Saving Integrated with conventional technology; Reinforced concrete frame with PIR
Rajasthan, India
Langkawi, Malaysia Integrated with conventional technology; Reinforced concrete frame with PIR
Native House,Tapah, Malaysia
25
4/21/2016 Introduction of Covestro
Teluk Bahang, Penang, Malaysia
26
4/21/2016 Introduction of Covestro
Teluk Bahang, Penang, Malaysia
27
4/21/2016 Introduction of Covestro
Sanitation, India •
Model Toilet installed at GCFPL, Ahmedabad in December, 2015
•
Tripartite Cooperation Agreement between CIPL, PACEL and HFH established on December 21, 2015
•
PIR MATERIAL PROJECT, BASED ON ORDERS FROM SWADES AND BHARATI FOUNDATION IS 155.3 TONES FOR FY 2016
•
1.
Swades Order: 5 model units to be installed in Nagaon, Devli and Mangrul Gram Panchayat by February 29, 2016. Next order of 100 units is post installation of 5 units.
2.
Bharati Foundation: locations for 2 model units in Delhi has been finalized in Q1
3.
BAIF (1400 units) where specifications and pricing are being established under a supplier model (shown in the next slide).
Second Stakeholders Meeting (Swachh Bharat Abhiyan) held on February 15, 2016 and established internal alignment on capacity to deliver 400 units/ month from March 2016; and increase to 2100 units/month from June 2016.
Sanitation, India
FIXED TOILETS
MOBILE TOILETS
Be Part of us to MAKE the world a brighter place
covestro.com
Disclaimer : All information and recommendations herein are given to the best of our knowledge and are believed to be accurate. However, your conditions of use and application of our products, technical assistance, information and recommendation (whether verbal, written or by way of production evaluation(s)), are beyond our control. Therefore, it is imperative that you should fully comply with your local legal and regulatory requirements and you test our products, technical assistance, information and recommendation to determine to your own satisfaction whether they are suitable for your intended uses, applications and requirements. This application-specific analysis at least must include testing to determine suitability from a technical as well as health, safety, and environmental standpoint. Such testing has not necessarily been done by Covestro. All information and recommendations are given without warranty or guarantee, and is subject to change without notice. It is expressly understood and agreed that you assume and hereby expressly release Covestro from all liabilities, in tort, contract or otherwise, incurred in connection with the use of our products, information and recommendations. Covestro specifically disclaims any responsibility or liability relating to the use of the information and recommendations and shall under no circumstances whatsoever, be liable for any special, incidental or consequential damages which may arise from such use. Any statement or recommendation not contained herein is unauthorized and shall not bind Bayer.
31
4/21/2016 Introduction of Covestro