27 SOUTH M AIN STREET, YERINGTON, NEVADA (775) (775) FAX 34 LAKES BLVD., DAYTON, NEVADA (775)

For Office Use Only LYON COUNTY COMMUNITY DEVELOPMENT DEPARTMENT Date 27 S O U T H M A I N S T R E E T , Y E R I N G T O N , N E V A D A 89447 (77...
Author: Matthew Carson
3 downloads 0 Views 250KB Size
For Office Use Only

LYON COUNTY

COMMUNITY DEVELOPMENT DEPARTMENT

Date

27 S O U T H M A I N S T R E E T , Y E R I N G T O N , N E V A D A 89447 (775) 463-6592 ● (775 ) 463 -5305 F A X

Received by

34 L A K E S B L V D . , D A Y T O N , N E V A D A 89403 (775) 246-6135

File Number

D EVELOPMENT A PPLICATION This form must be completed and all requested information incorporated, as prescribed by the application submission requirements for each application type, before the application is deemed complete and accepted for processing by Lyon County.

Application Type (check all that apply) Abandonment Amended Map Appeal of Administrative Decision Appeal of Planning Commission Decision Approval Condition Amendment Boundary Line Adjustment Certificate of Amendment Continuation of Planning Application Development Agreement Development Agreement, Revision Division of Land into Large Parcels, Tentative Map Waiver Division of Land into Large Parcels, Tentative Map Division of Land into Large Parcels, Final Map

Extension of Time Request Hardship Exception Permit Improvement Plan for Land Division Improvement Standards Variance or Waiver Master Plan Map Amendment Master Plan Text Amendment Mobile Home Park/Recreational Vehicle Park Parcel Map Parcel Map, Final Parcel Map Waiver Planned Unit Development, Final

Reimbursement Agreement Reversion to Acreage Site Improvement Plan Special Use Permit Specific Plan Street Name Request Subdivision Map, Tentative Subdivision Map, Final Variance Administrative Wireless Communication Facility Wireless Communication Facility, Modification

Planned Unit Development, Tentative

Zoning Determination

Pre-Application Conference

Zoning Map / Text Change

General Information Assessor’s Parcel number(s)

Applicant Name(s): Community:

Acreage

Same as Owner

Dayton Fernley Other County

Assessor’s Parcel number(s)

Acreage

Other (Insert name(s)): Mark Twain Silver City

Mason Valley Mason Townsite Silver Springs Smith Valley

Mound House Stagecoach

Previous applications filed on this site: Project Name (if applicable):

Project Information Project or Request Description Summary: (Separate detailed Narrative and Justification are required)

Project Area (square feet or acres): Uses proposed (check all that apply):

Number of proposed units: Single Family Multi-Family Residential Residential

Smallest parcel size: Commercial

Industrial

Project Location Project Street Address: Primary Access: Section(s)/Township/Range: north south of Approximately feet east west of Approximately feet If within a Subdivision, Name: Lot: Project Location (with point of reference to primary access, major cross streets or area locator):

Planning Application 2-27-2015

(street name) (street name)

Block:

Page 1 of 9

Lyon County Community Development Department

Development Application

Other Information Current Master Plan designation(s): Proposed Master Plan designation(s): Current Zoning designation(s): Proposed Zoning designation(s): Floodplain designation (from FIRM maps): Road/street surface of frontage/access:

Applicant Information Professional Consultant/Representative

Applicant/Developer Name:

Name:

Address:

Address:

City:

State:

Phone:

Fax:

Cell:

Zip:

City:

State:

Phone:

Contact:

Fax:

Cell:

Email:

Zip:

Contact:

Email:

Property Owner

Other Person(s) to be Contacted

Name:

Name:

Address:

Address:

City:

State:

Phone:

Fax:

Cell:

Zip:

City:

State:

Phone:

Contact:

Fax:

Cell:

Email:

Zip:

Contact:

Email: The receipt of an application at the time of submission does not imply the application complies with all requirements of the Lyon County Code or Lyon County Community Development Department, or that it is deemed complete and will be processed.

Property Tax Status: As per Lyon County Code Title 10, Section 10.12.05, a signature is required from the Lyon County Clerk’s Office showing the taxes are paid current on the subject property. I, Nikki Bryan, hereby certify that all required property taxes are paid current on APN(s): By: Deputy Clerk

Date

Applicant’s Affidavit: (If the applicant is not the property owner, the owner(s) must sign a Property Owner Affidavit) I,

, being duly sworn, depose and say that I am the applicant (Printed name)

of the described project and/or request, I specify that I am an owner* in fee of the described property involved in this application by my checking of this box , and I affirm that all the statements and answers herein contained and the information herewith submitted are in all respects complete, true and correct to the best of my knowledge and belief. I acknowledge that I am aware of the "right to farm" policy of the county and have been provided with a copy of a statement (attached to this application form) containing substantially the disclosure set forth in Chapter 10.15 of the Lyon County Code. I have read and understand the Application Schedule enclosed with this application form. I understand that no assurance or guarantee can be given by the Lyon County Community Development Department staff. I further acknowledge that I will be obligated to pay additional costs for County Engineer review if required. (*A separate Affidavit must be provided by each property owner)

Signature of Applicant Subscribed and sworn to before me this day of

Date (Notary stamp ,

Notary Public in and for said county.

Planning Application 2-27-2015

Page 2 of 9

Lyon County Community Development Department

Development Application

Property Owner’s Affidavit: I,

, being duly sworn, depose and say that I am an owner* in (Printed name)

fee of the described property involved in this application, that I have knowledge of, and agree to, the filing of this application, and that the statements and answers herein contained and the information herewith submitted are in all respects complete, true and correct to the best of my knowledge and belief. I acknowledge that I am aware of the "right to farm" policy of the county and have been provided with a copy of a statement (attached to this application form) containing substantially the disclosure set forth in Chapter 10.15 of the Lyon County Code. I have read and understand the Application Schedule enclosed with this application form. I understand that no assurance or guarantee can be given by the Lyon County Community Development Department staff. I further acknowledge that additional costs may be incurred for County Engineer review if required. (*A separate Affidavit must be provided by each property owner)

Signature of Property Owner

Date

Subscribed and sworn to before me this day of

(Notary stamp ,

Notary Public in and for said county.

Property Owner’s Affidavit: I,

, being duly sworn, depose and say that I am an owner* in (Printed name)

fee of the described property involved in this application, that I have knowledge of, and agree to, the filing of this application, and that the statements and answers herein contained and the information herewith submitted are in all respects complete, true and correct to the best of my knowledge and belief. I acknowledge that I am aware of the "right to farm" policy of the county and have been provided with a copy of a statement (attached to this application form) containing substantially the disclosure set forth in Chapter 10.15 of the Lyon County Code. I have read and understand the Application Schedule enclosed with this application form. I understand that no assurance or guarantee can be given by the Lyon County Community Development Department staff. I further acknowledge that additional costs may be incurred for County Engineer review if required. (*A separate Affidavit must be provided by each property owner)

Signature of Property Owner

Date

Subscribed and sworn to before me this day of

(Notary stamp ,

Notary Public in and for said county.

Property Owner’s Affidavit: I,

, being duly sworn, depose and say that I am an owner* in (Printed name)

fee of the described property involved in this application, that I have knowledge of, and agree to, the filing of this application, and that the statements and answers herein contained and the information herewith submitted are in all respects complete, true and correct to the best of my knowledge and belief. I acknowledge that I am aware of the "right to farm" policy of the county and have been provided with a copy of a statement (attached to this application form) containing substantially the disclosure set forth in Chapter 10.15 of the Lyon County Code. I have read and understand the Application Schedule enclosed with this application form. I understand that no assurance or guarantee can be given by the Lyon County Community Development Department staff. I further acknowledge that additional costs may be incurred for County Engineer review if required. (*A separate Affidavit must be provided by each property owner)

Signature of Property Owner Subscribed and sworn to before me this day of

Date (Notary stamp ,

Notary Public in and for said county.

Planning Application 2-27-2015

Page 3 of 9

Lyon County Community Development Department

Development Application

RIGHT TO FARM DISCLOSURE Pursuant to Chapter 10.15 of the Lyon County Code: As a condition of approval of any subdivision or parcel map of any land in Lyon County, the owners or developers of such land and their heirs, assigns and successors, shall agree to provide notice to any and all subsequent purchasers of the provisions of Nevada Revised Statutes 40.140 and this chapter. Such notice shall include a signed acknowledgment on all land development maps. No public official, board, commission, or agency of the county shall issue a permit, lease, license, certificate, or other entitlement for use of a parcel which is adjacent to or near agricultural land and other land until the owner(s) of the property has signed a written disclosure statement acknowledging that they are aware of the "right to farm" policy of the county and have been provided with a copy of a statement containing substantially the disclosure set forth in this chapter.

Disclosure Statement Lyon County has determined that the highest and best use for agricultural land as defined below is to develop or preserve said lands for the purposes of agricultural operations and it will not consider the inconveniences or discomforts arising from or related to agricultural operations to be a perceived nuisance if such operations are legal, consistent with accepted customs and standards and operated in a non-negligent manner. If property you own or may purchase in the future is located adjacent, near, or close to agricultural lands or within agricultural lands, including agriculture land easements, irrigation ditch easements, drain ditch easements, or agricultural products processing facilities, you may be subject to inconveniences or discomfort arising from agricultural operations. These may include but are not limited to the spraying, cleaning, and maintenance of irrigation water delivery systems as well as traffic, noise, odors, dust, chemicals, smoke, insects, operation of machinery (during any 24-hour period), aircraft operation, and storage and disposal of agriculture by-products, including manure. One or more of the inconveniences described above may occur even in the case of an agricultural operation, which is in conformance with existing laws and regulations and locally accepted customs and standards. If you live near an agricultural production area and/or agriculture products facility, you should be prepared to accept such inconveniences or discomfort as a normal and necessary aspect of living in a County with a strong rural character and a healthy agricultural sector. You are prohibited from interfering with or in any way obstructing agricultural operations, including, for example, tampering with irrigation delivery facilities, obstructing irrigation ditches, and obstructing agricultural land easements. For purposes of this notification: While not presently zoned or designated on the General Plan for primary or substantial agricultural use, the land contains an existing agricultural operation of a type that would be obvious to an uninformed observer after a physical inspection of the property, and that operation began at a time when such use was permissible. "Agricultural Operation" means all operations necessary to conduct agriculture as defined in Section 10.15.02 of the Lyon County Code, as such may be amended from time to time and shall include, but not be limited to, the cultivation and tillage of the soil, lawful use of appropriated water rights for agricultural irrigation purposes as well as any agriculture irrigation water delivery system maintenance and improvements, the burning of agricultural waste, weeds and other debris or other agricultural burning, including ditches and fields, lawful use of housing and transportation of labor for the purpose of crop production, protection of crops and livestock from pests (i.e., insects, diseases, weeds, predators) damaging or which could potentially damage crops or livestock, the proper and lawful use of agricultural chemicals, including but not limited to the ground and aerial (i.e., via aircraft) application of crop protection products and fertilizers, fumigation, or the raising, production, irrigation, pruning, harvesting, or processing of any living organism having value as an agricultural commodity or product, and any commercial practices performed incident to or in conjunction with such operations where the agricultural product is being produced, including preparation for market, delivery to storage, processing and packaging, and distribution to market, or to carriers for transportation to market or processing of an agricultural commodity, and those buildings or related facilities (no matter their zoning) that process, store, package and distribute agriculture products.

Planning Application 2-27-2015

Page 4 of 9

Lyon County Community Development Department

Development Application

2*



Building Elevations

2*



Map

2*



Reduced Map (11” x 17”)

2*



Map on CD (AutoCAD format)



Detailed Description/Narrative

2



Vicinity Map

2



Title Report

2



Property Legal Description/Deed

2



Justification

2



Photographs (min. set of four photos)

2



Street Name Request Form



Project Approval Letter with Conditions



Additional Required Documents/Information





Engineering Review Fees May Be Applicable



2

2

2

2

2

2*

3

3

2

2

2

2*

2

2

6

2*

2*

2*

3

3

6

2*

2*

2*

3

3

2

15

2

2

15

2

2

2

2





20

2

2*

2*

2

2

2*

2*

2



2

1 2

2

2

2

2

2

2

2

1

2

20

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

20

2

2

2

2

2

2

2

2

2

2

2

2

3

2

2

2

2

2

3*

2

2

2

2

2

2

2



2

2





2

2* 



2

2

2

2



2





* 



















 Specific additional information is required (See application submittal instructions)

 









 Additional information is required for Specific Plan & PUD

 Engineering Review Fees - Actual cost of engineering review will be billed in addition to the application fee as required by the nature/technical aspects of application/request.

1. $20 additional fee for each dwelling unit over 50.

2. $2,500 application fee if filed and heard concurrently with PUD.

4. $875 plus $125 fee for each adjacent parcel with same ownership if filed with MPA.

Planning Application 2-27-2015

2

2

2

2*

* If applicable and/or dependent on the type of project.  Additional copies may be required.

2

2

20



2*

2

*



2

2



1 3

Zoning Text Change

2*

Floor Plan

2

$1,750

Reduced Site Plan (11” x 17”)



6

Zoning Map Change



2

$1,7503, 4

2*

2

Wireless Communication Facility, Modification

Site Plan

2

$750



2

Wireless Communication Facility

2

$1,000

2

Variance

2

$750

$500

2

Variance, Administrative

$300

2

$350

Pre-Application Conference

$500

2

Street Name Request

Planning Commission Determination

$2,250

2

$250

Mobile Home Park/Recreational Vehicle Park

$2,250

2

Specific Plan

Master Plan Text Amendment

$850

2

$2,5001, 2

Master Plan Map Amendment

$500

2



Special Use Permit

Hardship Exception Permit

$1,000

2

$850

Extension of Time Request

$2,000

3

Site Improvement Plan

Development Agreement, Revision

50% of Orig. App. Fee

2

$500

Development Agreement

$750

Application Form



Fees and number of copies needed for required information & materials are shown for each application type

Reimbursement Agreement

Approval Condition Amendment

$275



Submittal Requirements

$1,500

Appeal of Decision5

Application Fee

Application Type

Continuance Request

Abandonment or Vacation



$750

D EVELOPMENT A PPLICATION S UBMITTAL R EQUIREMENTS

3. $250 additional fee for each adjacent parcel with same ownership.

5. One set of application materials submitted to County Clerk, and original set & one copy submitted to Community Development Dept.

Page 5 of 9

Lyon County Community Development Department

Development Application

* If applicable and/or dependent on the type of project.

2

2 2

2 2 2 2 2 2

2 2 2

2

2 2 2 2 2 2

2

3 3 3

2* 2* 2*

2 2*

1 2

1

1  

1

1 2 1







2 2

1 1

 

2 2 2 2 2 2* 2* 2* 1 2

3

1 2

20/223 2 2 2 20/223 2 3 3 3 3

12

3 3 3 3

2* 2*

2 2 2 2 2 2

2 15 2 12 15 2



 



 Specific additional information is required (See application submittal instructions)



 

 

Subdivision Map, Final

Subdivision Map, Tentative

Reversion to Acreage 2

2 20/223 2

2 10 2 12

2 2 2 2 2 2 3 3 3 3 2 2 2

2 2

2 2 2* 2* 2* 1 2

1 2*

1 1

 

15 2 3* 3* 3* 3* 2 2 2 2* 2 2 2* 2* 2* 1 2

2 15 2 12 2 2 2 2 2 2

$1,000

2 2

2 20/223 2

$750

2

$1,7501

12

2 6

2 15 2

Planned Unit Development, Final

2

$1,000

2 6

Planned Unit Development, Tentative

2 20 2 12 2 2 2 2 2 2

$2,5001

2 20 2

2 2

Parcel Map Waiver

$750

2

2   12 2 2

$500

$500

Application Form Map Reduced Map (11” x 17”) Original Map Mylar Detailed Description/Narrative Vicinity Map Title Report Property Legal Description/Deed Justification Photographs (min. set of four photos) Grading Plan Drainage Report Traffic Study Soils Report Irrigation Water Conveyance Approval Water Rights Will Serve Letters/Utility Statements Street Name Request Form Map Approval Letter with Conditions Approved Improvement Plans or Proof of Completion Cost Estimate Financial Security Improvement Agreement Recording Fees Traverse Calculations (Wet Stamped) Tentative Map on CD (AutoCAD format) Final Map on CD (AutoCAD format) Additional Required Documents/Information Engineering/Surveying Review Fees

Parcel Map, Final

Improvement Standards Variance or Waiver

$250

                            

$500

Improvement Plan

$500

 Application Fee

Parcel Map

Division of Land into Large Parcels, Final Map

$500



Fees and number of copies needed for required information & materials are shown for each application type

$1,000

Certificate of Amendment $75

Submittal Requirements

Division of Land into Large Parcels, Tentative Map

Boundary Line Adjustment $300

2

Application Type

Division of Land into Large Parcels, Tentative Map Waiver

Amended Map See Note #4

L AND D IVISION A PPLICATION S UBMITTAL R EQUIREMENTS

1 1  

1  

1 



 Same number as required for the original map

 Engineering/Surveying Review Fees - The actual cost of engineering/surveying review will be billed in addition to the application fee. 1. Additional fee of $20 for each dwelling unit over 50 3. If within 3 miles of an incorporated city.

Planning Application 2-27-2015

2. Submit to Community Development Department after Map review is completed &/or prior to setting a hearing by the Board of Commissioners 4. Amended Map Fees: Division of Land Into Large Parcels Map - $500.00; Parcel Map - $750; & Subdivision Map - $1,000 plus $20.00 per dwelling unit over 50

Page 6 of 9

Lyon County Community Development Department

Development Application

PLANNING APPLICATION NOTES ATTENTION: APPLICANTS ARE ENCOURAGED TO SUBMIT PROPOSED APPLICATIONS FOR PREAPPLICATION REVIEW. ALL APPLICATIONS SUBMITTED BETWEEN APPLICATION SUBMITTAL DATES ARE DEEMED TO BE SUBMITTED ON THE NEXT APPLICABLE APPLICATION SUBMITTAL DATE. APPLICATIONS DETERMINED TO BE INCOMPLETE WILL BE RETURNED. P L A NN IN G C OMMIS SI O N

B OA R D

OF

HE ARI N GS :

A BA ND ON MEN T , A PPE AL OF A D MI NI ST RA TI VE D ECI SI O N , D I VISI O N O F L AN D IN T O L AR GE P A R CE LS , M AS T ER P LA N A MEN D ME N T , P AR CE L M AP , P L A NN E D U NI T D E V E L O P ME N T , R E V E R S I O N T O A CR EA GE , S PE CI AL U S E P E R MI T , S PEC IF IC P L A N , S T RE E T N A ME S , T E N T A T I V E S U BD IV I S I O N M AP , V A R IA NCE , W AI VER , Z ONE C HA N GE .

C OMMISS I O NE RS H E AR I N GS :

A DVIS ORY B O A R D M E E T I N GS :

A BA ND ON MEN T , A PPE AL OF P LA NN I N G C OMMIS SI ON D E C I S I O N , D IVISI O N OF L A ND I N T O L AR GE P A R CE LS , F I N AL S U B DIV ISI O N M AP , M AS T ER P LA N A MEN D ME N T , P LA N NE D U N I T D E V E L O P ME N T , S P E C I A L U SE P E R M I T , S PEC I FI C P L A N , T E N T A T I V E S U BD IV I S I O N M AP , V A R IA NCE , Z ON E C H AN GE .

A P P LI C AN TS A RE E N C OU RA G E D T O A T TEN D T HE A DVIS ORY B O A R D MEE TI N G F O R TH EI R AR E A AS SH OW N ON T HE SC H ED UL E . A PP LI CANTS AR E A DV IS E D T O C ON T A CT THE R E L E V A NT A DV IS ORY B O AR D F OR IN F OR MA T I O N RE G AR DI N G A DVI S OR Y B O A R D R E V IE W O F A N APP LI C AT I O N . M O N TH L Y A DV IS ORY B OAR D MEE TI N G DA TE S AR E A S F O LL O W S : D AYT O N – F IRS T W E D NE SD AY M AS ON V A L LEY – L AS T W EDNE SD AY M O U N D H O U S E – F IR ST T UES D AY S I LVE R C I TY – F I RS T T U E S D A Y S I LVE R S P RI N GS – F I RS T M ON DA Y S MI T H V A L L E Y - T H E W E DN E S D AY

F O L L OW I N G T H E F IR S T

T UE SD AY

S T A GE C OA C H – F I RS T W E D N E S DA Y

N O TE S : 1. M AS TE R P L AN A ME ND M EN T A P P L I C A T I ON S U B MIT T AL D E A D LI NE S OC C U R I N APRIL, AUGUST AND DECEMBER ON LY . A P P LI CA T I ONS S UB MI T TED B Y T HE A PR IL DE AD L IN E A RE HE AR D B Y T HE P L A NN IN G C O MMIS SI O N I N J UL Y AN D TH E B OA R D O F C O MMIS S IO NE RS I N A U GU S T ; APP LI C AT I O NS SU B MIT T ED BY T HE A U GU S T D E A D LI NE A RE HE AR D BY T HE P L A NN IN G C O MMISS I O N I N N OV E MBE R A N D T H E B O A R D OF C O M M I S S I O N E RS I N D ECE MBE R ; AN D APP LI C AT I O NS SU B MIT T ED BY T HE D ECE MBE R DE AD LI NE A RE HE AR D BY T HE P LA NN IN G C O MMISS I O N I N M A RC H AN D T HE B O A R D O F C O M MISS I ON ERS IN A P RI L . 2. T HE

T I MI N G O F P U BL IC H E A RIN G S MA Y B E AF FE C T E D BY T HE C O MPL E X I TY O F T HE APP LI C AT I O N , R E V I E W I N G A GE N C I E S ’ C O MMEN TS A ND OT HE R FA C T OR S . LYON COUNTY MAY ALTER THE HEARING SCHEDULE FOR AN INDIVIDUAL APPLICATION WITHIN THE TIME FRAMES SET FORTH IN LYON COUNTY CODE AND NEVADA REVISED STATUTES BASED ON THE SPECIFIC CIRCUMSTANCES AND REQUIREMENTS OF THE APPLICATION.

3. R E V IE W I N G

A GE NC IE S M AY RE Q UE S T T HA T T HE A P P L IC A NT P R OVI DE A DD I TI O NA L IN F OR MA T I O N .

PLE ASE C O N TA C T P L AN N IN G DI VIS I ON S T A F F F O R APP LI C AT I O N HE AR IN G S CH E D U LE IN F OR MA T I ON .

Planning Application 2-27-2015

27 SOUTH MAIN STREET YERINGTON, NEVADA 89447 (775) 463-6592 FAX: (775) 463-5305

Lyon County Planning Division 2015 PLANNING APPLICATION SCHEDULE APPOINTMENTS

ARE RECOMMENDED WHEN SUBMITTING

P RE - AP P LI C ATI O N REVIEW S U B M I T T AL C U T O F F D AT E

A P P L I C AT I O N S U B M I T T AL D AT E BEFORE NOON

BEFORE NOON

INCLUDING FEES

ALL

ALL APPLICATIONS1,2

APPLICATIONS1,2

APPLICATIONS - PLEASE

ADVISORY B O AR D MEETINGS FOR A P P L I C AT I O N REVIEW

A P P O I N T ME N T RECOMMENDED

A P P O I N T ME N T RECOMMENDED

CALL

(775) 463-6592

P L AN N I N G COMMISSION H E AR I N G D AT E 2 , 3

TO MAKE AN APPLICATION SUBMITTAL APPOINTMENT

B O AR D O F COUNTY COMMISSIONERS H E AR I N G D AT E

SECOND TUESDAY OF THE MONTH

FIRST THURSDAY OF THE MONTH

N O V E M B E R 3, 2014

N O V E M B E R 17, 2014

D E C E M B E R 31 – JANUARY 7

J A N U A R Y 13 2 , 3

F E B R U A R Y 10 2

DECEMBER 11

D E C E M B E R 15 1

J A N U A R Y 28 FEBRUARY 4

F E B R U A R Y 10 2 , 3

MARCH 52

D E C E M B E R 29

J A N U A R Y 12

F E B R U A R Y 25 MARCH 4

FEBRUARY 2

F E B R U A R Y 16

M A R C H 25 APRIL 8

A P R I L 14 2 , 3

MAY 72

MARCH 2

M A R C H 16

A P R I L 29 MAY 6

M A Y 12 2 , 3

JUNE 42

M AR C H 30 1

A P R I L 13 1

M A Y 27 – JUNE 3

JUNE 92,3

JULY 22

MAY 4

M A Y 18

J U N E 24 – JULY 8

J U L Y 14 2 , 3

AUGUST 62

ATTENTION:

M A R C H 10 2 , 3

P L AN N I N G COMMISSION H E AR I N G D AT E

B O AR D O F C O U N T Y COMMISSIONERS H E AR I N G D AT E

FOR

FOR

M AS T E R P L A N AM E NDM ENTS & S P E C I F I C P L AN S

M AS T E R P L A N AM E NDM ENTS & S P E C I F I C P L AN S

SECOND TUESDAY OF THE MONTH

FIRST THURSDAY OF THE MONTH

M A R C H 10 1

APRIL 21

J U L Y 14 1

AUGUST 61

APRIL 22

APPLICANTS ARE ENCOURAGED TO SUBMIT PROPOSED APPLICATIONS FOR PRE-APPLICATION REVIEW. ALL APPLICATIONS SUBMITTED BETWEEN APPLICATION SUBMITTAL DATES ARE DEEMED TO BE SUBMITTED ON THE NEXT APPLICABLE APPLICATION SUBMITTAL DATE. APPLICATIONS DETERMINED TO BE INCOMPLETE WILL BE RETURNED.

PLANNING COMMISSION

BOARD NOTES:

OF

HEARINGS:

ABANDONMENT, APPEAL OF ADMINISTRATIVE DECISION, DIVISION OF LAND INTO LARGE PARCELS, MASTER PLAN AMENDMENT, PARCEL MAP, PLANNED UNIT DEVELOPMENT, REVERSION TO ACREAGE, SPECIAL USE PERMIT, SPECIFIC PLAN, STREET NAMES, TENTATIVE SUBDIVISION MAP, VARIANCE, WAIVER, ZONE CHANGE.

COMMISSIONERS HEARINGS:

ABANDONMENT, APPEAL OF PLANNING COMMISSION DECISION, DIVISION OF LAND INTO LARGE PARCELS, FINAL SUBDIVISION MAP, MASTER PLAN AMENDMENT, PLANNED UNIT DEVELOPMENT, SPECIAL USE PERMIT, SPECIFIC PLAN, TENTATIVE SUBDIVISION MAP, VARIANCE, ZONE CHANGE.

1 . M A S T E R P L A N A M E N D M E N T A P P L I C A T I O N S U B M I T T A L D A T E S O C C U R I N APRIL, AUGUST AND DECEMBER O N L Y . A P P L I C A T I O N S S U B M I T T E D B Y T H E A P R I L D A T E A R E H E A R D B Y T H E PLANNING COMMISSION IN JULY AND THE BOARD OF COMMISSIONERS IN AUGUST; APPLICATIONS SUBMITTED BY THE AUGUST DATE ARE HEARD BY THE PLANNING COMMISSION IN NOVEMBER AND THE BOARD OF COMMISSIONERS IN DECEMBER; AND APPLICATIONS SUBMITTED BY THE DECEMBER DATE ARE HEARD BY THE PLANNING COMMISSION IN MARCH AND THE BOARD OF COMMISSIONERS IN APRIL. 2.

APPLICATIONS

FOR THE FOLLOWING ITEMS DO NOT FOLLOW THE ABOVE HEARING SCHEDULE:

APPEAL

AND

REVERSION

TO

ACREAGE.

TIMING OF PUBLIC HEARINGS MAY BE AFFECTED BY THE COMPLEXITY OF THE APPLICATION, REVIEWING AGENCIES’ COMMENTS AND OTHER FACTORS. APPLICATIONS MAY BE SCHEDULED FOR HEARING DATES EARLIER THAN SHOWN IN THE APPLICATION SCHEDULE (EXCEPT MASTER PLAN AMENDMENTS) IF CIRCUMSTANCES WARRANT.

3.

THE

4.

REVIEWING

AGENCIES MAY REQUEST THAT THE APPLICANT PROVIDE ADDITIONAL INFORMATION.

Revised 1/13/2015 Schedule may be corrected or revised as necessary. Please ensure you are using the most current schedule. Lyon County may alter the hearing schedule for an individual application within the time frames set forth in Lyon County Code and Nevada Revised Statutes based on the specific circumstances and requirements of the application.

27 SOUTH MAIN STREET YERINGTON, NEVADA 89447 (775) 463-6592 FAX: (775) 463-5305

Lyon County Planning Division 2015 PLANNING APPLICATION SCHEDULE APPOINTMENTS

ARE RECOMMENDED WHEN SUBMITTING

P RE - AP P LI C ATI O N REVIEW S U B M I T T AL C U T O F F D AT E

A P P L I C AT I O N S U B M I T T AL D AT E BEFORE NOON

BEFORE NOON

INCLUDING FEES

ALL

ALL APPLICATIONS1,2

APPLICATIONS1,2

CALL

(775) 463-6592

TO MAKE AN APPLICATION SUBMITTAL APPOINTMENT

P L AN N I N G COMMISSION H E AR I N G D AT E 2 , 3

B O AR D O F C O U N T Y COMMISSIONERS H E AR I N G D AT E

SECOND TUESDAY OF THE MONTH

FIRST THURSDAY OF THE MONTH

JUNE 1

J U N E 15

J U L Y 29 – AUGUST 5

A U G U S T 11 2 , 3

SEPTEMBER 32

J U N E 29

J U L Y 13

A U G U S T 26 – SEPTEMBER 8

SEPTEMBER 82,3

OCTOBER 12

AUGUST 31

A U G U S T 17 1

S E P T E M B E R 30 – OCTOBER 7

O C T O B E R 13 2 , 3

NOVEMBER 52

A U G U S T 31

S E P T E M B E R 14

O C T O B E R 28 – NOVEMBER 4

N O V E M B E R 10 2 , 3

DECEMBER 32

S E P T E M B E R 28

O C T O B E R 12

N O V E M B E R 25 – DECEMBER 7

DECEMBER 82,3

J A N U A R Y 7, 2016 2

NOVEMBER 2

N O V E M B E R 16

D E C E M B E R 30 – J A N U A R Y 6, 2016

J A N U A R Y 12, 2016 2 , 3

F E B R U A R Y 4, 2016 2

N O V E M B E R 30 1

D E C E M B E R 14 1

J A N U A R Y 27, 2016 – F E B R U A R Y 3, 2016

F E B R U A R Y 9, 2016 2 , 3

M A R C H 3, 2016 2

ATTENTION:

OF

P L AN N I N G COMMISSION H E AR I N G D AT E

B O AR D O F COUNTY COMMISSIONERS H E AR I N G D AT E

FOR

FOR

M AS T E R P L A N AM E NDM ENTS & S P E C I F I C P L AN S

M AS T E R P L A N AM E NDM ENTS & S P E C I F I C P L AN S

SECOND TUESDAY OF THE MONTH

FIRST THURSDAY OF THE MONTH

N O V E M B E R 10 1

DECEMBER 31

M A R C H 8, 2016 1

A P R I L 7, 2016 1

APPLICANTS ARE ENCOURAGED TO SUBMIT PROPOSED APPLICATIONS FOR PRE-APPLICATION REVIEW. ALL APPLICATIONS SUBMITTED BETWEEN APPLICATION SUBMITTAL DATES ARE DEEMED TO BE SUBMITTED ON THE NEXT APPLICABLE APPLICATION SUBMITTAL DATE. APPLICATIONS DETERMINED TO BE INCOMPLETE WILL BE RETURNED.

PLANNING COMMISSION

NOTES:

A D V I S O R Y B O AR D MEETINGS FOR A P P L I C AT I O N REVIEW

A P P O I N T ME N T RECOMMENDED

A P P O I N T ME N T RECOMMENDED

BOARD

APPLICATIONS - PLEASE

HEARINGS:

ABANDONMENT, APPEAL OF ADMINISTRATIVE DECISION, DIVISION OF LAND INTO LARGE PARCELS, MASTER PLAN AMENDMENT, PARCEL MAP, PLANNED UNIT DEVELOPMENT, REVERSION TO ACREAGE, SPECIAL USE PERMIT, SPECIFIC PLAN, STREET NAMES, TENTATIVE SUBDIVISION MAP, VARIANCE, WAIVER, ZONE CHANGE.

COMMISSIONERS HEARINGS:

ABANDONMENT, APPEAL OF PLANNING COMMISSION DECISION, DIVISION OF LAND INTO LARGE PARCELS, FINAL SUBDIVISION MAP, MASTER PLAN AMENDMENT, PLANNED UNIT DEVELOPMENT, SPECIAL USE PERMIT, SPECIFIC PLAN, TENTATIVE SUBDIVISION MAP, VARIANCE, ZONE CHANGE.

1 . M A S T E R P L A N A M E N D M E N T A P P L I C A T I O N S U B M I T T A L D A T E S O C C U R I N APRIL, AUGUST AND DECEMBER O N L Y . A P P L I C A T I O N S S U B M I T T E D B Y T H E A P R I L D A T E A R E H E A R D B Y T H E PLANNING COMMISSION IN JULY AND THE BOARD OF COMMISSIONERS IN AUGUST; APPLICATIONS SUBMITTED BY THE AUGUST DATE ARE HEARD BY THE PLANNING COMMISSION IN NOVEMBER AND THE BOARD OF COMMISSIONERS IN DECEMBER; AND APPLICATIONS SUBMITTED BY THE DECEMBER DATE ARE HEARD BY THE PLANNING COMMISSION IN MARCH AND THE BOARD OF COMMISSIONERS IN APRIL. 2.

APPLICATIONS

FOR THE FOLLOWING ITEMS DO NOT FOLLOW THE ABOVE HEARING SCHEDULE:

APPEAL

AND

REVERSION

TO

ACREAGE.

TIMING OF PUBLIC HEARINGS MAY BE AFFECTED BY THE COMPLEXITY OF THE APPLICATION, REVIEWING AGENCIES’ COMMENTS AND OTHER FACTORS. APPLICATIONS MAY BE SCHEDULED FOR HEARING DATES EARLIER THAN SHOWN IN THE APPLICATION SCHEDULE (EXCEPT MASTER PLAN AMENDMENTS) IF CIRCUMSTANCES WARRANT.

3.

THE

4.

REVIEWING

AGENCIES MAY REQUEST THAT THE APPLICANT PROVIDE ADDITIONAL INFORMATION.

Revised 1/13/2015 Schedule may be corrected or revised as necessary. Please ensure you are using the most current schedule. Lyon County may alter the hearing schedule for an individual application within the time frames set forth in Lyon County Code and Nevada Revised Statutes based on the specific circumstances and requirements of the application.

Suggest Documents