2012 Stormwater Rate Study Preliminary Results City Council Public Works Committee Work Session September 24, 2012
www.fcsgroup.com
1
Agenda • Background – History – Current customer classes and rate design – Key issues
• • • •
Forecast Assumptions Projected Debt Level Projected Rates Summary of Recommendations/Next Steps
2
Background - History • Storm and Surface Water (“stormwater” or SSW) utility formed in 1990 with SDCs only • Monthly rates began in March 2001 • Last rate study in 2004, no increases since 2007
3
What is the Stormwater Utility? • An enterprise fund like water and sewer. • It has physical infrastructure including pipes, ditches, catch basins, manholes and water treatment facilities. • It has employees to maintain, enhance and improve existing facilities and to review and approve new facilities. • It is required to be protective of the environment and to meet standards that maintain health and safety for the public. 4
Public Involvement/Education
-Education -Volunteer Activities
5
Illicit Discharge Program
-Scanning -Mapping -Water Quality Monitoring
6
Construction Site Runoff Control • Review • Permitting • Inspection and Enforcement • Source Control • Monitoring
7
Good Housekeeping for Municipal Operations
-Street Cleaning -Vactor Waste -System Cleaning -Citizen Inquiries -Emergency Response - System Maintenance
8
Capital Program
•WQ Retrofitting •Fish Passage •System Repairs •Replacement •Flood Control
9
Why is a Storm Utility Needed? Flooding
10
Failing Infrastructure Birchwood Culvert Before
11
Birchwood Culvert Failure Baker Creek
12
Fish
13
Water Quality
14
Rate Design Three customer classes: • Small footprint – Less than 1,000 square feet of impervious surface area (ISA) – Flat charge, currently $4.20 – 14% of accounts
• Medium footprint – 1,000-3,000 s.f. ISA – Flat charge, currently $7.00 – 69% of accounts (this class serves as benchmark)
• Large footprint – Over 3,000 s.f. ISA – “Per square foot” charge, currently $.00233/s.f. – 18% of accounts
15
Medium-Footprint Rates by Year $8.00 $7.00 $6.00 $5.00 $4.00 $3.00 $2.00 $1.00 $2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
*Graph Assumes Medium Footprint
Stormwater
16
Credits • Credits at 20%, 50%, and 70% levels • Credits apply to: – Lots with qualified on-site stormwater facilities • Larger credit if there are discharge limits
– Institutions providing public education in environmental science – Lots with partially pervious gravel or approved pervious surface
• In addition, low-income discounts - same thresholds and percentages as water/sewer 17
Key Issues • No change is proposed in customer classes, rate design, or credits – Exception: expansion of low-income discount – Less complicated than the water and sewer rate study
• Primary issue with this rate study is just catching up and keeping up with the costs – The system needs capital investment – Changes in staffing and other operating costs are also proposed – Currently no outstanding stormwater debt, new debt is proposed
18
Forecast Assumptions Policy/Topic
Assumption(s)
Reserve Funding
• Operating reserve policy – 45 days (≈ 12%) of budgeted operating expenses • No rate stabilization reserve at this time
System Reinvestment
• Long-term target: 50% of depreciation, with phase-in (10% in 2013, 15% in 2014, 20% in 2015, 25% in 2016, etc.)
Growth
• SFR: 0.7% – 1.3% per year plus annexations • Non-SFR: 1.3% – 2.3% per year
Inflation
• CPI projections from State economic forecast • ENR index for capital
19
2013 Changes in Operating Budget 2013 Increases in Operating and Maintenance Budget Additional Personnel Costs: • Create new Natural Resources Division • Shift existing positions into Stormwater • Convert Limited-term & Part-time to Full-time Shift Costs of Street Sweeping to Stormwater Reallocation of Overhead Charges Wetland Mitigation Banking Study (2 years only) Other Changes and Inflationary Increases
$
Total O&M Budget Change above 2012 Level
$ 1,030,121
% Change in Operating Budget from 2012
294,872
240,900 139,698 157,233 197,418
21%
20
2012-17 Capital Projects CIP Projection - Inflated Dollars
2012
2013
2014
2015
2016
Watershed Capital Projects Watershed Grants
50,000 -
1,366,800 959,000
780,909 100,000
645,189 -
636,427 -
598,440 -
Capital Projects less Grants
50,000
407,800
680,909
645,189
636,427
598,440
Other SWM Utility Projects Other SWM Grants
787,500 -
2,302,757 728,000
5,918,843 1,200,000
1,935,568 3,102,322 3,203,148 -
Capital Projects less Grants
787,500
1,574,757
4,718,843
1,935,568
Total Capital Expenditures Total Grants
837,500 -
3,669,557 1,687,000
6,699,752 1,300,000
2,580,757 3,738,749 3,801,588 -
Total Capital less Grants
837,500
1,982,557
5,399,752
2,580,757
3,102,322
3,738,749
2017
3,203,148
3,801,588
21
Capital Funding Strategy 1. Grants and watershed surcharge where eligible 2. SDCs/fund balance/interest earnings to the extent available 3. State loans where eligible 4. Revenue bond issues every other year for the remainder Resulting bond issues: 2013: $2.975 million 2015: $3.05 million 2017: $2.93 million
22
Debt Levels Debt Management Indicators Total Outstanding Debt Total Plant-in-Service
2012 -
2013
2014
2015
3,264,378
5,421,697
8,533,292
2016
2017
9,317,684 13,181,465
40,498,493 43,884,299 50,203,820 52,667,012 56,067,400 59,541,472
Debt as % of Total Plant-in-Service
0%
7%
11%
16%
17%
22%
Bonded Debt Service as % of Net Revenues
0%
42%
30%
42%
33%
44%
Debt Service Coverage - Bonds Only
n/a
2.40
3.32
2.37
3.00
2.29
2.34
2.34
1.97
2.19
1.64
Debt Service Coverage including State Loans
n/a
Even after funding capital program, projected debt levels are still moderate. 23
Projected Rates Monthly Rate Schedule Customer Class Small Footprint Medium Footprint ISA > 3,000 square feet
Existing 2012 2013 $ 4.20 $ 5.08 $ 7.00 $ 8.47 $ 0.00233 $ 0.00282
2014 $ 5.39 $ 8.98 $ 0.00299
2015 $ 5.71 $ 9.52 $ 0.00317
Across-the-Board % Increase 21% 6% Average SFR Monthly Impact* $ $ 1.47 $ 0.51 $ Cumulative Impact $ $ 1.47 $ 1.98 $ *Average Single-family Residential (SFR) is assumed to be Medium Footprint.
2016 $ 6.05 $ 10.09 $ 0.00336
6% 0.54 $ 2.52 $
2017 $ 6.42 $ 10.69 $ 0.00356
6% 0.57 $ 3.09 $
6% 0.61 3.69
24
Total Monthly Charge – Water, Sewer, Stormwater Unmetered Single-Family Residence (metered in 2016) Water Bill Watershed Surcharge Total Water Bill Sewer Bill Stormwater Bill (Medium) Total Water/Sewer/Stormwater Bill Change From Prior Year % Change From Prior Year Metered Single-Family Residence (5/8" Meter, Monthly Usage: 6 ccf) Water Bill Watershed Surcharge Total Water Bill Sewer Bill Stormwater Bill (Medium) Total Water/Sewer/Stormwater Bill Change From Prior Year % Change From Prior Year
2012
2013
2014
2015
2016
$29.96 12.00 $41.96 33.23 7.00 $82.19
$32.66 12.30 $44.96 33.97 8.47 $87.40 $5.21 6.3%
$35.27 12.56 $47.83 35.07 8.98 $91.88 $4.48 5.1%
$38.09 12.84 $50.93 37.24 9.52 $97.69 $5.81 6.3%
$41.14 13.23 $54.37 39.47 10.09 $103.93 $6.24 6.4%
2012
2013
2014
2015
2016
2017
2018
$20.79 8.84 $29.63 33.23 7.00 $69.86
$22.58 9.09 $31.67 33.97 8.47 $74.11 $4.25 6.1%
$23.99 9.25 $33.24 35.07 8.98 $77.29 $3.18 4.3%
$25.44 9.43 $34.87 37.24 9.52 $81.63 $4.34 5.6%
$29.67 9.77 $39.44 39.47 10.09 $89.00 $7.37 9.0%
$31.25 10.05 $41.30 41.66 10.69 $93.65 $4.66 5.2%
$33.10 10.34 $43.44 43.16 11.01 $97.61 $3.96 4.2%
25
Total Monthly Charge – Water, Sewer, Stormwater Apartment Building - 29,000 imp. sf (1" Meter, Monthly Usage: 25 ccf) Water Bill Watershed Surcharge Total Water Bill Sewer Bill Stormwater Total Water/Sewer/Stormwater Bill Change From Prior Year % Change From Prior Year Commercial - 29,000 imp. sf (2" Meter, Monthly Usage: 80 ccf) Water Bill Watershed Surcharge Total Water Bill Sewer Bill Stormwater Total Water/Sewer/Stormwater Bill Change From Prior Year % Change From Prior Year
2012
2013
2014
2015
2016
2017
2018
$82.70 21.00 $103.70 92.56 67.57 $263.83
$88.60 21.63 $110.23 103.50 81.76 $295.49 $31.66 12.0%
$93.80 21.98 $115.78 114.29 86.67 $316.74 $21.25 7.2%
$99.26 22.35 $121.61 122.07 91.87 $335.55 $18.81 5.9%
$106.72 23.26 $129.98 131.78 97.38 $359.14 $23.59 7.0%
$113.03 23.92 $136.95 140.26 103.22 $380.43 $21.29 5.9%
$119.57 24.59 $144.16 146.35 106.32 $396.83 $16.40 4.3%
2012
2013
2014
2015
2016
2017
2018
$258.29 56.20 $314.49 309.01 67.57 $691.07
$276.68 57.93 $334.61 328.45 81.76 $744.82 $53.75 7.8%
$293.09 58.83 $351.92 370.59 86.67 $809.18 $64.36 8.6%
$310.34 59.75 $370.09 396.52 91.87 $858.48 $49.30 6.1%
$333.20 62.31 $395.51 430.43 97.38 $923.32 $64.84 7.6%
$352.47 64.07 $416.54 459.26 103.22 $979.02 $55.70 6.0%
$372.57 65.84 $438.41 480.20 106.32 $1,024.93 $45.91 4.7%
26
Stormwater Rate Comparison (Monthly, medium footprint) City Sumas Bellingham (Small) 2012 Blaine Anacortes Bellingham (Small) 2013 Arlington Mount Vernon Lynden Burlington Bellingham (Medium) 2012 Lynnwood Mukilteo Bellingham (Medium) 2013 Ferndale Marysville Kent Renton Stanwood Seattle (< 3,000 sq. ft.) Everett Tacoma Median 2012 (Medium-Footprint)
2012 $ 1.50 4.20 4.37 5.00 5.08 5.82 6.05 6.30 6.30 7.00 7.52 8.32 8.47 10.00 10.40 10.56 11.51 12.25 12.44 12.80 17.82 $ 7.92
Population 1,307 80,885 4,684 15,778 80,885 17,926 31,743 11,951 8,388 80,885 35,836 20,254 80,885 11,415 60,020 92,411 90,927 6,231 608,660 103,019 198,397
27
Combined Utility Rate Comparison (Monthly, billed at 8 CCF, medium footprint, 5/8”x3/4” meter) Jurisdiction City of Seattle Seattle (Summer) City of Seattle (Winter) City of Blaine City of Arlington City of Stanwood Lake Whatcom Water & Sewer District City of Renton City of Kent (Summer) City of Kent (Winter) City of Mount Vernon City of Ferndale City of Tacoma (Summer) City of Lynden City of Tacoma (Winter) Mukilteo WSD City of Nooksack City of Bellingham - Unmetered, Proposed (2013) City of Anacortes City of Marysville City of Bellingham - Unmetered, Existing (2012) City of Everson City of Bellingham - Metered, Proposed (2013) City of Everett City of Sumas City of Bellingham - Metered, Existing (2012) City of Lynnwood Birch Bay Water & Sewer District
Water
Sewer
Stormwater
Total Bill
$50.40 $45.57 $19.75 $46.85 $25.29 $47.67 $36.73 $44.45 $36.91 $39.80 $32.17 $28.73 $34.84 $27.70 $27.35 $30.25 $32.66 $16.87 $25.11 $29.96 $25.56 $25.74 $21.36 $12.06 $23.85 $19.21 $24.90
$85.44 $85.44 $99.00 $68.15 $75.97 $65.66 $62.34 $52.71 $52.71 $52.60 $52.06 $46.41 $45.15 $46.41 $54.14 $45.22 $33.97 $47.49 $38.26 $33.23 $43.00 $33.97 $33.90 $53.93 $33.23 $35.38 $30.20
$12.44 $12.44 $4.37 $5.82 $12.25 n/a $11.51 $10.56 $10.56 $6.05 $10.00 $17.82 $6.45 $17.82 $8.32 n/a $8.47 $5.00 $10.40 $7.00 n/a $8.47 $12.80 $1.50 $7.00 $7.52 n/a
$148.28 $143.45 $123.12 $120.82 $113.51 $113.32 $110.58 $107.72 $100.18 $98.45 $94.22 $92.96 $92.32 $91.93 $89.81 $75.47 $75.10 $74.22 $73.77 $70.19 $68.56 $68.18 $68.06 $67.49 $64.08 $62.11 $55.10
*Excludes watershed surcharges
Tax Included $19.52 $18.77 $11.08 $6.04 $8.00 $0.00 $7.19 $6.46 $6.01 $3.68 $6.12 $6.01 $5.88 $5.93 $0.50 $4.53 $10.84 $4.86 $6.27 $10.09 $4.11 $9.58 $4.08 $5.94 $8.98 $3.73 $0.00
28
Rate Comparisons • After rate increases, Bellingham stormwater rates are in the middle of the comparison group. • After water, sewer, and stormwater rate increases, combined utility bills in Bellingham are in the lower half of the comparison group. That remains true even if watershed surcharge is included.
29
Lake Whatcom Capital Funding
Issue – Level of Capital Funding Desired • 2002 to 2011 average capital expenditure from SSWU 256K/yr. • 30% of Watershed Fund after debt service available for Capital. Thought to be 600K for near future but currently unknown. • Current SSWU rate model assumes 600K/yr revenue from Watershed to offset LW Capital expenditures. • Unknown level of County Capital expenditures and need for work outside City.
30
Historical SSWU Lake Whatcom Capital $900
Inflated Project Costs (in Thousands)
$800 $700 $600 $500 $400 $300 $200 $100 $2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
*Average of $256K per year
LW Project Expenditures
31
Lake Whatcom SSWU Capital Funding Options – • Allow Watershed Fee to replace SSWU capital contribution as in model. • Continue SSWU financing for Lake Whatcom at ½ current level (109K). Cost an additional $0.20/mo/ERU • Continue SSWU financing for Lake Whatcom at current level (217K). Cost an additional $0.41/mo/ERU • Other funding amount as desired. Additional LW Capital from SSWU would cost $0.16/mo/ERU/100K.
32
Lake Whatcom 20 Year Capital Lake Whatcom Projects List
2012
2013
Geotechnical Eval Northshore Property A
Hip Grant Match
100
100
2017
2018
10
10
10
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
200
100
50
375 125
384
Bloedel Donovan Grant City Portion Bloed. Don
100
2016
400
Northshore Rd Grant City Portion NS Rd Grant
2015
550
Northshore Facility A-1 Hip Grant
2014
128
Huntington & Shep.s/o Acad SF/Infilt
400
Northshore Facility A-2 (AHHS)
400
Park Place Alum Fac
100
Brentwood 4 Pond Forest System
50
Facility Prop Acquisition B
450
Facility B
400
North Shore Estates Fac "C"
500
Pre Treatment Facilities (5)
500
Pre Treatment Facilities (5)
500
SB Crk Easements & Imps
400
Mill Wheel Pond Purchase and Imp
500
Roadway SF/infilt/biof Misc
300 200
Home Owner Incentive Cont.
100
100
100
100
100
100
100
100
100
Annual Watershed Program
100
100
100
100
100
100
100
100
100
500
500
500
500
500
500
500
500
500
Total Proposed Expenditures
953
1,359
750
600
560
510
510
600
600
600
600
600
600
600
600
600
600
600
600
600
600
Net Total Appropriations
853
400
650
600
560
510
510
600
600
600
600
600
600
600
600
600
600
600
600
600
600
Add'l WC Projects Needing Funding
Euclid Cedar Hills North Shore Drive/Agate Estates Beaver Ck/Stream Restoration
380 340 220
33
Summary of Recommendations • Adopt proposed stormwater rates, which reflect: – – – –
Updated costs and growth estimates Increased staffing and other operating costs Renewed program of capital investment Moderate debt levels, with gradual transition to rate-funded system reinvestment
34
2012 Stormwater Rate Study Presented by: Gordon Wilson FCS Group (425) 867 – 1802, ext. 224
[email protected]
www.fcsgroup.com
35