16 1d 100%

Project Name 2015 Steam Distribution System Repairs 2016 Campus Asphalt Maintenance 2016 Steam Distribution System Repairs 31 South Court - OU Press R...
Author: Lionel Sullivan
8 downloads 3 Views 927KB Size
Project Name 2015 Steam Distribution System Repairs 2016 Campus Asphalt Maintenance 2016 Steam Distribution System Repairs 31 South Court - OU Press Relocation Accelerator Lab - OIT Room Generator Connection

Assigned To Brody Bauers Garrett Karr Brody Bauers Amelia Walker Chris Long

Proj #

Location

Client

Total Budget

Steve Wood Martin Paulins Steve Wood Gillian Berchowitz Jill Harris

AC - South Green AC - South Green AC - South Green Bush Airport

Christine Sheets Penny Trace Christine Sheets Andy Doll

$32,100.00

AC - College Green AC - College Green

Robin Krivesti Robin Krivesti

$70,000.00 $20,200.00

AC - College Green

Robin Krivesti

AC - College Green

Duane Starkey

$75,000.00

AC - College Green

Robin Krivesti

$99,000.00

AC - College Green AC - College Green AC - Sports Complex

Steve Wood Robin Krivesti Richard Shultz

$2,500,000.00 $2,200,000.00 $300,000.00

AC - West Green AC - West Green AC - West Green AC - West Green AC - West Green AC - North Green AC - North Green AC - Campus Wide AC - Campus Wide AC - Service Center

Dean Dupler Dean Dupler Keely Stockwell Drew Banks Dan Harper Harry Wyatt Steve Wood Steve Wood Steve Wood

AC - Service Center

Steve Wood

EIP Lausche Boiler Replacement- Controls Brody Bauers Integration Auxiliary Food Truck Pad Rob Martin Back South Demolition Ph 1- Cady, Foster, Brough Terry Baxter-Potter

AC - Service Center

Steve Wood

AC - South Green

Mohamed Ali Christine Sheets

Back South Demolition Phase 2 Baker Center 115A Freezer Sprinkler Head Baker Center 339 Door Baker Center 349 Renovation Baker Center West 82 Baker Kitchen Office Carpet Baker Lighting Control Systems Upgrade Bat Exclusion in Washington, Voigt & Martzolff Bentley Annex 202 Wall Film Bentley Annex 362/364 Reconfiguration Bentley Hall Classroom Acoustics Bentley Hall Interior & Furniture Renovation Bentley Hall Roof Upgrades Biochemistry HAZMAT Storage Bldg. Bird Arena Cooling Equipment Upgrades Bird Arena Deferred Maintenance Upgrades Bird Arena Furnace Replacement Bird Arena Ice Rink Piping Replacement Bird Arena Roof Assessment Bob Wren Stadium Crows Nest Bob Wren Stadium Outfield Fence Repair Botanical Research HVAC Upgrades Boyd Dining Hall and Campus market Boyd Garage Lighting Upgrade Boyd Hall Bathroom Upgrades Boyd Hall Bulletin/White Boards Boyd Hall Flat Roof Bromley eLearning HVAC Bromley Hall Phase 8 Bryan Carpet & Tile Replacement Bryan Hall Basement Upgrades Bryan Hall Concrete Drive Repair Bryan Hall Concrete Repair (DUPLICATE of drive repair) BUC Arbor & Pillars Paint & Repair BUC Ballroom Renovation BUC Front Room Coffeehouse Upgrade Building Sanitary and Storm Pump Replacement

AC - South Green AC - College Green

Christine Sheets Douglas Miller

AC - College Green AC - College Green AC - College Green AC - East Green

Eve Wharton Gwyn Scott Dustin Kilgour Brent Buckley Judith Grant

$2,000,000.00 $9,421.00 $250,000.00 $46,875.00 6,000.

AC - College Green AC - College Green AC - College Green

John Gilliom John Gilliom Joe Lalley

$335,000.00 $575,000.00

AC - Sports Complex

Richard Schultz Steve Wood/Christine Sheets

AC - Sports Complex

Steve Wood

AC - Sports Complex

Jason Farmer

AC - South Green AC - West Green

Steve Wood Gwen Scott

$170,000.00 $9,300,000.00

AC - West Green

Brent Buckley

$1,310,000.00

09/14/15

AC - West Green AC - College Green AC - College Green AC - College Green AC - West Green AC - West Green AC - West Green

Gwyn Scott Kim Hayden Christine Sheets Brent Buckley Brent Buckley Christine Sheets Kevin Feil

$573,000.00 $150,000.00

12/09/15

Accessible Pathway Signage 2016 Shawna Bolin ADA Bldg. Entrance Upgrades-Var. Bldgs. Josh Kranyik ADA Int. Signage Upgrades-Var. Bldgs. Josh Kranyik ADA Plumbing Fixture/RR Upgrades-Var. Bldgs Josh Kranyik Adams and Brown RD Door Replacements [email protected] Adams Hall Bike Racks Terry Baxter-Potter Adams Hall Bottle Fill Station Brent Buckley Adams Hall Parking Garage Water Proofing Rob Martin Airport Parking Lot Maintenance Garrett Karr Alden 128 Ceiling Alden 1st & 2nd Floors Remove Service Counters Donivan Noble & Renovate Alden 1st and 3rd FL Service Desk Removal Donivan Noble Alden 251 Lab Reconfiguration Donivan Noble Alden 2nd Floor Lobby Carpet Donivan Noble Alden 409 Lobby and Center Stairwell 1-5 Doors Lynnette Clouse Painting Josh Kranyik Alden Library 233B & C Fire Suppression Study Alden Library 251 Renovation Lynnette Clouse Alden Library 4th and 5th Floor Wall Removal - 2 Donivan Noble PIFS Alden Library Chiller Replacement Brody Bauers Alden Library Roof Gary Alexander Aquatic Center ADA Upgrade Brent Buckley Aquatic Center Lane Lines Aquatic Center Metal Deck Grate Aquatic Center Pool Deck Monitors Donivan Noble Aquatic Center Roof Rob Martin ARC 271 HVAC and Gas Service Robin Faires ARC 2nd and 3rd Floor Lab Relocation/Evaluatio Robin Faires Robin Faires ARC 355 and 359 Lab ARC Cafe Signage Lynnette Clouse ARC CafĂ© Counter Tops Replacement Donivan Noble Athena Backstage Renovation Amelia Walker Athena Theater 2013 Lynnette Clouse Athens Campus Electrical Realignment Tony Breeze Athens Campus Utility Metering Tony Breeze EIP Lausche Boiler Replacement- Commissioning Brody Bauers EIP Lausche Boiler Replacement- Construction

2016-218

UM280983

Rob Martin Josh Kranyik Josh Kranyik Rob Martin Mike West Rob Martin Donivan Noble Chris long Lynnette Clouse Rob Martin Gary Alexander CANCELLED Gary Alexander Brody Bauers Gary Alexander Stephanie Ruth Stephanie Ruth Brent Buckley Brent Buckley

Lynnette Clouse Rob Martin

06/02/16 11/04/15

BOT

01/15/16

Design Start Date Bid Opening NTP (see Constr. End Date ( Duration % Complete 10/28/16 08/12/16 10/03/16

1d 31d 1d

03/16/16 02/01/16

07/01/16 04/04/16

10/28/16 07/01/16 10/03/16

01/04/16

01/22/16

02/29/16

02/29/16

1d

75% 100%

08/24/15

09/11/15

09/01/15

05/20/16

189d

100%

05/23/16

05/23/16

1d

05/16/16

05/16/16

1d

01/08/16

01/08/16

1d

100%

06/30/17 03/21/16 07/01/15

06/30/17 09/05/16 08/03/15

1d 121d 24d

60%

12/01/16

12/01/16

1d

03/14/16

03/14/16

04/22/16

30d

05/04/13

12/01/13

12/01/13

1d

2016-180 2016-299 2016-298 2016-296 2016-240

UM2800946 2016-277 2016-190

na

2016-251 09/05/15 02/15/16

2016-187

2016-273 PL0000809

07/13/16 09/14/15

08/25/16 10/16/15

08/29/16 07/14/15

11/25/16 01/19/16 03/01/15

2016-234 2016-235 2016-176 2016-236

2016-217 2016-231

Brody Bauers

Terry Baxter-Potter Rob Martin [email protected] Lynnette Clouse Josh Kranyik Stephanie Ruth Tony Breeze Terry Baxter-Potter Amelia Walker Amelia Walker Donivan Noble Donivan Noble Rick Swart

$2,000,000.00 $150,000.00 $1,500,000.00 $32,000. $5,500.00

CF&PC

AC - Campus Wide AC - Campus Wide AC - Campus Wide AC - North Green AC - College Green

$400,000.00 $1,570.00 $26,625.00

11/05/15

11/30/15

$256,141.00 $300,000.00 $1,800,000.00

11/10/15

04/25/16

$35,000.00 $1,602,000.00

03/31/16 done

0%

02/08/16

03/11/16

03/01/16 05/01/15

09/29/15

10/16/15

01/06/16

03/31/16 12/01/15

04/19/16 08/15/16

14d 185d

03/23/16 06/06/16

08/12/16 06/24/16

103d 15d

2016-244

2016-222 2016-165 2016-200 2016-226

PL0000812 2016-308 2016-171 2016-256

04/29/15

06/25/15

03/18/16

35%

03/25/16

05/06/16

31d

95% 100%

05/31/16

01/09/15 08/01/16

45d

100% 15%

$450,000.00

2016-268 2016-175

2016-290 PL0000837 2016-287 PL0000846

2016-168

$98,595.00 $389,480.00 $48,500.00

12/02/15 05/03/14

11/01/14

01/01/14

07/31/15

413d

03/10/16

02/03/16

03/22/16

04/01/16

07/29/16

86d

0%

03/10/16

02/03/16

03/23/16

04/01/16 12/15/14

07/29/16 01/19/15

86d 26d

20% 100%

05/02/16 06/02/16

06/10/16 10/05/16

30d 90d

100%

04/21/16

04/20/16

05/01/16

07/21/16

60d

04/13/16

5%

2016-294 2016-302 2016-279 Steve Wood

$225,000.00

03/11/16

Project Name Bush Airport Runway Rehabilitation Campus Elevator Upgrades Campus Energy Performance Contracr Constellation Campus Fire Alarm Upgrades 2015 Campus Pole Banners Campus Refrigerant Monitoring System Upgrades

Assigned To Garrett Karr Brody Bauers Josh Kranyik

PL018780A

Tony Breeze

Location

Client

Total Budget

CF&PC 03/02/15

BOT 05/04/15

Design Start Date Bid Opening NTP (see Constr. End Date ( Duration % Complete

Bush Airport AC - Campus Wide

Andy Doll Brody Bauers Steve Wood

$2,700,000.00 $1,875,000.00 $28,000,000.00

AC - Campus Wide

Steve Wood

$400,000.00

10/01/14

Steve Wood

$175,000.00

05/11/16

12/01/15

AC - Campus Wide

Stephen Wood

$150,000.00

03/31/16

02/15/16

AC - College Green AC - College Green AC - College Green

John Gilliom John Gilliom John Gilliom

$770,000.00 $76,000.00 $620,000.00

AC - Ridges AC - College Green AC - College Green AC - College Green AC - College Green AC - College Green

Terry Swank Wendy Merb-Brown Craig Cornell Craig Cornell Craig Cornell Steve Wood

$14,200.00 $241,000. $50,000.00 $75,000.00

AC - College Green AC - East Green Dublin

Bryan Benchoff Ken Johnson

AC_ South Green

Steve Wood

$2,000,000.00

AC - College Green AC - College Green

Stephen Wood Stephen Wood

$1,302,000.00 $1,500,000.00

AC - College Green

John Day

$3,660,000.00

AC - West Green

Jason Farmer

$57,000.00

AC - West Green

Jason Farmer

$2,850,000.00

AC - West Green AC - West Green AC - West Green AC - West Green

Jasom Farmer Richard Schultz Jason Farmer Dana Espinal

AC - College Green AC - College Green AC - College Green AC - College Green AC - College Green AC - College Green

Evelyn Blake Evelyn Blake Evelyn Blake Ken Cutright Steve Wood

AC - Innovation Center AC - Innovation Center AC - South Green AC - South Green AC - South Green AC - College Green

LuAnne Bowman LuAnne Bowman Christine Sheets Brent Buckley Kevin Feil Steve Wood

AC - College Green AC - College Green

Steve Wood Sheila Schultz

AC - College Green AC - College Green AC - College Green AC - College Green AC - College Green AC - College Green Dublin Dublin Dublin Dublin

Barb Mash Sheila Schultz Joe Lalley Barb Marsh Tony Breeze Joshua Bodnar Brian Thompson Brian Thompson Brian Thompson

AC - East Green AC - East Green AC - East Green

Brent Buckley Christine Sheets Christine Sheets

AC - East Green AC - Service Center AC - Campus Wide AC - Campus Wide AC - Service Center AC - Service Center AC - Service Center AC - Service Center AC - College Green AC - College Green AC - College Green

Steve Wood Brody Bauers Brody Bauers Brody Bauers Brody Bauers Brody Bauers Brody Bauers Brody Bauers Joe Lalley Adam Riehl Steve Wood

06/19/15

05/29/16 03/21/14

08/12/16 07/31/15

56d 356d

100%

05/02/16

08/01/16

66d

0%

04/20/16

05/01/16

07/21/16

60d

04/05/16

05/02/16

05/02/16

0.01d

03/23/16

06/15/15 03/23/16

1d

2016-232 Rob Martin

Campus Wide Back Flow Preventer Chris Long inspection/repair Campus-Wide Building Controls Master Plan Brody Bauers Campus-Wide Steam Dist./Tunnel Imprvmts Central Classroom 207 A/C Units Central Classroom Anatomy Lab Josh Kranyik Central Classroom Anatomy Lab Furniture Josh Kranyik Central Classroom Anthropology Lab Sutie Josh Kranyik Child Development Center ADA Josh Kranyik Child Development Center Carpet Donivan Noble Chubb 060, 140 Reconfigure Amelia Walker Chubb Hall 120F Furniture Stephanie Ruth Chubb Hall 2nd Floor Improvements Stephanie Ruth Chubb Hall Admissions Ground Fl. Renovation Stephanie Ruth Chubb Hall Chiller Replacement Brody Bauers Rick Swart Chubb/Sing Tao Roofs Chubb/Union Tunnel Shoring Brody Bauers Claire Ping Cottage Renovation Stephanie Ruth Cleveland HCOM Facility Program Robin Faires Clippinger 193 A/C Chris long Clippinger Hall roof Mike West Coal Storage building Slab Upgrades College Gr Upgrades - Class Gate Garrett Karr College Green Window Replacement Garrett Karr Compost Site Expansion Rob Martin Computer Service Center Ground, 1st, and 3rd Amelia Walker Floor Renovations Convo - Concrete Ramp Coatings Garrett Karr Mike West Convo Dumpster/Parking Assessment Convo E150/E149 Women's Locker Room Donivan Noble Convo Main Arena Lighting Study Convo Seating Replacement Lynnette Clouse Convo suspended Video/Score Board Dick Planisek Convo Ticket Office E209 Renovation Donivan Noble Convocation Center Concrete Restoration Rob Martin Convocation Center Lobby Displays Lynnette Clouse Convocation Center Residential Renovation Brent Buckley Copeland 2nd & 3rd Floors Offices Carpet Amelia Walker Copeland 2nd Floor Reconfigure Amelia Walker Copeland 4th & 5th Floor Offices Carpet Amelia Walker Copeland Hall 101 Upgrades Amelia Walker Copeland Hall 514 Improvements Amelia Walker Copeland Hall 514 Reconfigure Suite & Hallway Amelia Walker Copeland Hall Chiller Replacement Brody Bauers Copeland Hall HVAC & Controls Upgrades Corrosion Center Fume Hoods Gary Alexander Corrosion Multiphase Office Addition Gary Alexander Crawford Hall Bathroom and Plumbing Upgrades Josh Kranyik Crawford Hall Electrical/Fire System Upgrade Tony Breeze Tony Breeze Crawford Hall Front Porch Roof CSC AHUs 1&2 Replacement Chris Long CSC Chillers 1 & 2 Replacement Tony Breeze CSC Moisture Migration Amelia Walker Cutler 006 Renovation Donivan Noble Cutler 312 Acoustics Donivan Noble Cutler 315 Sound Proofing Donivan Noble Cutler Basement Hallway & Restroom Upgrade Donivan Noble Cutler Hall - 2016 Ext Improvements Garrett Karr Cutler Hall 008 Conversion Donivan Noble Cutler Hall High Voltage Upgrade Tony Breeze Cutler Hall Security & Access Control Upgrades Tony Breeze Dublin - HCOM Anatomy Lab Equipment Robin Faires Dublin - HCOM MEB1 First Floor Entry Robin Faires Dublin MEB1 Cafe Security Access Estimate Robin Faires Dublin MEB2 Parking Lot and Northern Campus Robin Faires Drive Lighting E Green Bldg Based Domestic Hot Water Garrett Karr East Green Landscaping Terry Baxter-Potter East Green Res. Life Office Temporary Relocation Brent Buckley EG Domestic Water Loop Study EIP Boiler Permitting Consultant EIP Energy and Utility Master Plan EIP Gas Line Upgrades Dairy Lane to Lausche EIP Lausche Boiler Replacement EIP Temporary Campus Boilers EIP WGCWP Chiller 2 Upgrade EIP WGCWP Chiller 3 Re-Design Ellis 3rd Floor Water Infiltration Ellis Hall Carpet Safety Hazard Ellis Hall Chiller Replacement

Proj #

Brody Bauers Brody Bauers Brody Bauers Brody Bauers Brody Bauers Brody Bauers Brody Bauers Brody Bauers Rick Swart Donivan Noble Rick Swart

100%

2016-198 2016-307 2016-221

2016-136 2016-252

01/23/15

95%

06/23/16 100% 50%

12/14/15

$850,000.00

11/02/15

$50,000.00 $236,000.00

02/25/16

03/02/16

04/29/16

43d

12/10/15

02/02/16 07/01/14

05/06/16 06/01/15

69d 240d

11/30/13

100% 5% 100%

2016-227 2016-309 PL0000614 PL0000710 2016-033

PL0000862 2016-283

04/12/16 06/30/15 12/09/15

08/27/15 01/21/16

08/27/15 08/03/15

12/17/15 05/05/16

03/04/16 05/20/16

10/03/16 11/18/16

152d 131d

10/27/14

04/29/15

05/26/15

05/31/16

266d

05/23/16

06/15/16

08/12/16

43d

88%

AC - West Green 2016-182 12/31/15

2016-121

2016-237 2016-257 2016-233 2016-185 2016-186

$1,100,000.00

12/06/13

02/10/14

$764,000.00

05/06/14 08/15/13 05/04/15

08/20/14 11/01/13 08/14/15

77d 57d 75d

07/01/16 02/22/16

07/01/16 03/16/16

1d 18d

% 100%

15,000. $80,000.00

02/24/16

$750,000.00

11/02/15

02/11/16

02/18/16

04/29/16

52d

100%

02/16/16

03/07/16 11/21/14

04/08/16 06/02/15 05/06/15 03/16/16

04/06/16 06/03/15 05/15/15 04/11/16

04/29/16 03/15/16 07/31/15 07/22/16

18d 205d 56d 75d

75% 100% 100%

05/15/15

07/13/15

04/15/16

04/29/16

08/15/16

77d

20%

07/01/15

08/28/15

43d

100%

04/14/16 07/01/16

05/19/16 09/16/16

26d 56d

90%

2016-192 PL0000702

PL000804 2016-278

2016-281 2016-243 PL0000865

2016-288

2016-238

PL0000798 PL000740Y

$35,000.00 $1,600,000.00 $960,000.00 $800,000.00 $240,000.00

$235,000.00 $125,500.00 $350,000.00 $150,000.00 $30,000.00

05/17/16

05/17/16

06/30/16

100% 0% 95% 04/01/15 06/01/15

09/10/15

$40,000.00

$100,000.00 $50,000.00 TBD $400,000.00 $1,100,000.00 $4,800,000.00 $15,000,000.00 $3,900,000.00 $3,000,000.00 $200,000.00 $275,000.00

04/29/15

$800,000.00

09/15/15

12/29/17 10/20/16

08/25/16

12/29/17 10/20/16

1d 1d

12/01/17

1d

100% 07/13/16

08/25/16

01/04/16

07/01/16

12/01/17

100% 100%

10/08/15

07/02/15

08/01/15

10/01/15

45d

100%

02/16/16

03/08/16

04/15/16

29d

100%

Project Name

Assigned To

Ellis Hall Interior & Furniture Renovation Ellis Hall Renovation 2016 Emergency Generator Power Quick Connect Emeriti Park Pavilion Electric & Data Facilities Fuel Farm Upgrade Fire Panel Replacement Gen Fund Ph I Fire Panel Replacement Various/Housing Fire Panel Replacement Various/Phase I Fire Panel Replacement Various/Phase II FM Electric Yard Sink Hole Front Four Patio Removal Front Four Windows Replacement Phase 1 Galbreath Chapel Door Galbreath Chapel Paint Gamertsfelder 1st Floor Water Station Gamertsfelder Hall Lobby Renovatons Glidden 4th floor Hallway Paint Glidden Hall 1st Floor Mural Glidden Hall 413 Doors Glidden Hall Classroom Improvements Glidden Hall Rm 400 HVAC Glidden Hall Stair Repair Glidden Patio Paint Gordy Hall 665 Interiors Gordy Patio/Roof Deck Great Western School House Reroof Grosvenor Hall 139A Exhaust Grover Bathroom Upgrade Grover Center E-112 Expansion Grover Ctr Ext Doors Upgrade Grover E118 Reconfigure Grover E306 Sink Haning Basement 017, 018 Renovation Haning Basement Renovations for Academic Technologies Haning Hall 018D HCOM - Cleveland South Pointe Bldg A Expansion

Donivan Noble Rick Swart 2016-201 Tony Breeze Rob Martin 2016-196 Tony Breeze Chris long 2016-247 Chris Long anel Replcmt Gen Chris Long anel Replcmt Gen Chris Long Tony Breeze Terry Baxter-Potter Terry Baxter-Potter Gary Alexander PL0000578 Gary Alexander PL0000578 Josh Kranyik 2016-206 Terry Baxter-Potter 2016-239 Gary Alexander 2016-264 2016-280 Donivan Noble Donivan Noble Chris Long PL000772 PL0000760 Chris long 2016-263 Lynnette Clouse 2016-305 Gary Alexander Robin Faires Donivan Noble Robin Faires [email protected] 2016-248 Stephanie Ruth Stephanie Ruth Stephanie Ruth 2016-259 Donivan Noble

HCOM - Dublin MEB1 Parking Lot Lighting HCOM Dublin Bobcat Way HCOM Dublin Exterior Lighting HCOM Dublin Facilities Assessment HCOM Dublin MEB 2 Rm 100 HCOM Grosvenor Hall 001 Renovation HCOM Grosvenor Hall 4th Floor Carpet & Paint HCOM New Facility Study Health and Physical Education Center Flat Roof Housing Housing Access Control Phase III Housing Bathroom Repairs Housing Furniture Housing-Shower Grout/Caulking Repairs HRTC Reconfigure for Budget Planning Hudson Hall Transformer Hudson Roof, Cupola & Dormers Hwa Wei Lee Library Annex 201/202 Flooring Innovation Center - East Side Exterior Innovation Ctr 211 Clean Room Irvine 127 Conversion Irvine 153 Reconfigure Irvine 1st Fl Corridor Ceiling Paint Irvine 249 Electric Irvine Annex Relocation/Demolition Irvine Hall #100004, 10005 Renovation James Hall Boiler James Hall Kitchen and Study Space James Hall Lobby/Bathroom and Apt Upgrade James Hall Upgrades Heating & Windows Jefferson Jefferson Culinary Project Jennings House Upgrades Kantner Theater Rollup Door Konneker Alum Center Interior and Exterior Upgrades and Repairs Konneker Alumni Basement Carpet Removal Konneker Alumni Ctr. Bldg. Study Konneker RC 046 Wall Repair/Paint Konneker Research Center HVAC & Controls Upgrade Konneker Research Front Door Security Lancaster Brasee Hall Nursing Lab Lasher Hall Roof Upgrades 2015 Lausche Central Plant Energy Metering Lausche CW Pumping Diagnostic Maintenance Lausche HP and Transformer Yard Security Cameras Lausche Perimeter Fence Lausche Perimeter Fence Library Annex Bldg Envelope Improvements

Proj #

Location

Client

Total Budget

AC - College Green AC - College Green AC - Campus Wide

John Gilliom Joe Lalley Steve Wood

$170,000.00 $7,900,000.00 $900,000.00

AC - Service Center

Joe Lalley

$1,500,000.00

AC - South Green AC - College Green AC - Campus Wide AC - Service Center AC - South Green AC - South Green AC - College Green AC - College Green AC - East Green AC - East Green

Stephen Wood Stephen Wood Stephen Wood Steve Wood Christine Sheets Christine Sheets Steve Wood

$400,000.00 $400,000.00 $800,000.00 $1,000,000.00 $425,000.00 $310,000.00 $20,000.00

Brent Buckley Brent Buckley

$6,200.00 $750,000.00

AC - North Green AC - North Green AC - North Green AC - North Green

Chistopher Hayes John Day Christopher Hayes Christopher Hayes

$10,220.00 $294,000.00 $50,000.00

AC - College Green

John Gilliom

$171,150.00

Eastern AC - West Green AC - West Green

Paul Abraham Dean Dupler Tia Barrett Randy Leite

$118,000.00 $185,000.00 $11,000,000.00

AC - West Green AC - West Green AC - College Green AC - College Green

Tia Barrett Tia Barrett Kim Hayden Candi Morris

$23,600.00 $9,000.00 $200,000.00 $1,900.00

Donivan Noble Robin Faires

AC - College Green Dublin

Kim McClain

$4,750.00

Robin Faires Robin Faires Robin Faires

Dublin Dublin Dublin

Brian Thompson Thomas Raabe Brian Thompson

$150,000.00

AC - West Green AC - West Green AC - West Green Eastern AC - South Green

Dean Dupler Dean Dupler Ken Johnson Paul Abraham Christine Sheets Christine Sheets Brent Buckley Lynnette Clouse

Robin Faires Robin Faires Robin Faires Robin Faires Gary Alexander Terry Baxter-Potter Josh Kranyik Donivan Noble Lynnette Clouse Donivan Noble Lynnette Clouse Tony Breeze

CF&PC

BOT

Design Start Date Bid Opening NTP (see Constr. End Date ( Duration % Complete 100% 1% 0% 09/01/15

03/31/16 03/31/16 04/28/16

02/15/16 06/23/16

02/15/16

02/01/16

06/08/16

90%

04/05/16 04/05/16 04/05/16

05/02/16 05/02/16 05/02/16

08/15/16 08/22/16 08/25/16

76d 81d 84d

5% 25% 5%

03/24/16 03/24/16

04/18/16 04/18/16

05/27/16 05/27/16

30d 30d

90%

08/25/16

11/25/14

07/13/15 02/03/16

09/09/15 03/29/16

04/04/16 05/02/16

08/15/16 05/31/16

96d 22d

100% 25% 20%

08/18/14 05/01/16 06/01/15

07/31/16

08/01/16 08/01/15

12/01/16 09/01/15

89d 23d

12/16/15

03/10/16

07/31/17

363d

06/30/16 01/22/16

08/04/16 08/01/15

100%

07/28/14

100%

11/05/15

10/15/15

$80,000.00

03/01/15

$50,000.00

02/01/15 02/01/15

10/15/15

2016-223 2016-254

PL0000752

AC - Campus Wide

$750,000.00 $110,000,000.00 $2,000,000.00

04/01/15

06/25/15

01/01/15 03/14/13

09/09/15 05/07/13

06/29/15

10/01/15

69d

06/18/15 05/07/13

10/21/15 09/16/15

90d 615d

100% 98% 65%

$2,800,000.00

2016-205 2016-261 AC - North Green

Steve Wood

$95,000.00

AC - Columbus Road AC - Service Center AC - Innovation Center AC - West Green

Robin Krivesti Stacy Strauss

$16,000.00 $8,654.00 $10,700.00

95%

2016-301 Donivan Noble Stephanie Ruth Josh Kranyik Robin Faires Josh Kranyik [email protected] Robin Faires Tony Breeze Robin Faires Gary Alexander Gary Alexander Gary Alexander Gary Alexander Terry Baxter-Potter Lynnette Clouse Amelia Walker Stephanie Ruth Lynnette Clouse

2016-155

Dean Dupler Matt White

$3,250.00

AC - West Green AC - West Green

Joe Lalley Dean Dupler

$30,000.00 $50,000.00

AC - West Green

Brent Buckley

AC - East Green AC - East Green

Christine Sheets Lynnette Clouse

$3,125,700.00 $2,000,000.00 $39,100,000.00 $8,000,000.00

AC - College Green AC - College Green

Dan Harper

$46,434.00

AC - East Green AC - College Green

Megan Fowler Bryan Benchoff

$17,665.00 $12,500.00

AC - College Green Lancaster AC - College Green AC - Service Center AC - Service Center AC - Service Center

Lori Abdella James Smith Joe Lalley Steve Wood Steve Wood Steve Wood

$180,000.00 $380,000.00 $250,000.00 $175,000.00 $95,000.00

AC - Service Center

Steve Wood

$100,000.00

AC - Columbus Road

Robin Krivesti

$420,800.00

2016-174 2016-220 2016-224

2016-266 2016-241 PL0000838 2016-269

2016-005 2016-245

Stephanie Ruth Stephanie Ruth

08/06/15 05/10/16

06/10/16

24d

100% 100%

10/01/15

100%

09/14/15

03/10/16

02/11/16

03/17/16

04/01/16

07/29/16

86d

60%

02/24/16

03/10/16

04/22/15

05/01/16

05/01/16 05/01/16

08/04/17 12/15/16

331d 165d

68%

04/04/16 04/15/16

04/06/16 07/01/16

3d 56d

2016-293 2016-194 Donivan Noble Amelia Walker Josh Kranyik Tony Breeze Tony Breeze Brody Bauers

2016-210

Brody Bauers Brody Bauers Rick Swart

2016-295 PL0000829

100% 05/22/15

10/13/15

06/10/16 TBD

06/10/16 06/30/17

1d 300d

09/14/15

03/01/16

06/01/16

12/02/16

133d

50% 0% 90%

Project Name Library Annex HVAC/Controls Life Science 220 Animal Resources Upgrades Life Science 220 Fume Hood Life Sciences Cooling System Upgrades Lightning Arrestors Replacement - OU 4 Lin Hall HVAC Upgrades Lincoln Hall Fire Place Lindley 3rd Floor Renovation - I.R. Lindley Hall 1st Floor Art Installation Lindley Hall Campus and Community Engagement

Assigned To Rick Swart Josh Kranyik Josh Kranyik

Proj # PL0000764

Client

Total Budget

CF&PC

AC - Columbus Road AC - West Green AC - West Green

Robin Krivesti Scott Carpenter Matt White

$650,000.00 $250,000.00 $24,000.00

09/14/15 10/14/16

AC - Ridges AC - Ridges AC - East Green AC - College Green

Joe Lalley Teri Johnson Penny Trace John Day

$150,000.00 $2,700,000.00

AC - College Green

Laura Myers

$58,170.00

AC - College Green AC - College Green

Laura Myers Mary Starcher

$16,672.00 $5,100.00

AC - College Green AC - College Green AC - College Green

Laura Myers

$7,790.00

Mary Starcher

4,200.

AC - College Green AC - South Green AC - South Green

Marty Paulins Brent Buckley Christine Sheets

$501,000.00 $225,000.00 $925,000.00

AC - South Green AC - South Green AC - East Green AC - North Green

Brent Buckley Brent Buckley Renee Middleton Steve Wood

$30,000.00 $40,000.00 $31,870.00 $40,000.00

AC - East Green AC - East Green

Joe Lalley Josh Bodnar

$501,000.00 $400,000.00

08/17/16 05/12/16

AC - East Green AC - East Green

John Day Kelly Pero

$1,500,000.00 $30,000.00

06/30/15

AC - East Green AC - East Green AC - East Green

$1,660,000.00 $1,306,000.00 $150,000.00 $1,100,000.00 $700,000.00 $9,000,000.00

BOT

Design Start Date Bid Opening NTP (see Constr. End Date ( Duration % Complete

10/16/15

03/31/16

05/31/16

11/01/16

111d

15%

2016-197 Tony Breeze Rick Swart Mock, Amber Amelia Walker Dick Planisek Lynnette Clouse

PL0000769

09/14/16

10/16/15

12/01/15

12,000.

03/10/16

12/12/16

198d

90% 50%

02/19/16

02/19/16

1d

100%

2016-209

Lindley Hall Institutional Equity Lindley Hall Misc. College of Education Repairs Lindley Hall Park Lindley Hall Student Accessibility Lindley N175 Electrical Outlets Lindley S119 Carpet Lining Learning Ctr 230, 250 Electric Lot 143 Charging Station Upgrades-2016 Lot 20 Retaining Wall Mackinnon AHU Upgrade Mackinnon Hall Bathrooms & Plumbing Upgrades

Lynnette Clouse Lynnette Clouse

MacKinnon Staff Apartment Renovation Martzolff Catwalk Repair McCracken Hall Renovation McCracken North Field/Parking Lot Lighting Replacement Morton - West Ext Improvements Morton Exterior Door Replacement, Electronic Access, Additional ADA Access Morton Hall 201, 235, 237 Morton Hall 321 Upgrade Morton Hall Building Sign Morton Hall Lobby Water Line Morton Hall Roof Upgrade 2015 North McKinley Drive Extension Old Heating Plant Roof OUC - Bennett Hall Electrical Upgrade Phase I OUC - Bennett Hall Electrical Upgrade Phase II OUC Academic Success Center OUC Black Farm Kitchen, ADA, Restroom & Dining Addition OUC Shoemaker Center Bridge Improvements OUE HPEC Parking Lot Replacement OUE Shannon AHU-2 Replacement OUL Brasee 214 Lab Casework and Modifications

Josh Kranyik Garrett Karr Lynnette Clouse Garrett Karr

2016-188 UM2060141

Garrett Karr Josh Kranyik

2016-102

OUL Brasee Hall Fifth Floor Offices OUL Brasee Hall Raymond Wilkes Gallery for the Visual Arts OUL Brasee Hall Theatre Upgrade OUL Brasee Hall Tutoring Center OUL-Brasee Gym Roof OUL-Herrold Hall Roof PhII OUS Hanging Rock CDC Sanitary Sewer Improvements OUS Horse Park Outdoor Arena OUS Horse Park Stable Electric OUS Resource Commons Study OUS Riffe, Collins, Academic & Dingus HVAC & Energy Project OUSP Science and Art Lab Renovation OUSP Site Upgrades Walking Track, Soccer Field Oxbow Lane at Lot 134 Storm Drain Park Place Curb Clean Up Park Place Electrical Feed Replacement Parking Lot Charging Stations Parks Hall 126 Carpet Parks Hall 4th Floor Carpet and Paint Parks Hall Room 014 Reconfigure Peden Chiller Peden Eden Zone Electric Peden New ADA Seating & Access Peden Stadium 206W Reconfigure Peden Stadium Endzone Concrete Pad Peden Stadium, Section 7 Ping 1st and 2nd Flooring Replacement Ping Center 113, 200, 201 Paint and Flooring Ping Center Chilled Water Connection Ping Center Steam Line Replacement Ping Chiller Replacement Study Ping Interior Paint Walls, Stairwells, Lockers Ping Water Cooler Replacements Porter 2nd Floor Advising & Training Center Renovation Porter Faculty Offices Paint Porter Hall 030/032 Carpet & Paint Porter Hall Cooling System Upgrades Porter Hall HVAC & Controls Upgrades

Location

2016-230 Lynnette Clouse Amelia Walker Amelia Walker Rob Martin Garrett Karr Josh Kranyik Josh Kranyik

Robin Faires Donivan Noble shops Donivan Noble Robin Faires Garrett Karr Rob Martin Rick Swart Rick Swart Rick Swart Rick Swart

2016-189 2016-161 2016-300 2016-204 PL0000855

2015-096

PL0000797 PL0000797

Chillicothe Chillicothe Chillicothe Chillicothe

PL0000697 2016-292 2016-291

Chillicothe Eastern Eastern Lancaster

David Scott Paul Abraham Paul Abraham Gwen Whitehead

$980,000.00 $300,000.00 $450,000.00 $80,000.

Amelia Walker Amelia Walker

Lancaster Lancaster

James Smith James Smith

$185,500.00 $161,000.00

Amelia Walker Amelia Walker Amelia Walker Amelia Walker Stephanie Ruth

Lancaster Lancaster Lancaster Lancaster Southern

James Smith James Smith James Smith James Smith Adam Riehl

122,500. $126,000.00

Southern Southern Southern Southern

Adam Riehl Adam Riehl Adam Riehl Adam Riehl

$50,000.00 $10,130.00 $20,000.00 $1,031,208.00

Southern Southern

Adam Riehl Adam Riehl

$97,440.00 $482,639.00

AC - Sports Complex AC - College Green AC - College Green AC - Campus Wide AC - West Green AC - West Green AC - West Green

Steve Wood Steve Wood Steve Wood Marty Paulins Dean Dupler Dean Dupler

$138,000.00 $18,000.00 $250,000.00 $150,000.00

Stephanie Ruth Stephanie Ruth Stephanie Ruth Stephanie Ruth

2016-275

2016-203 2016-202

2016-213

Stephanie Ruth Stephanie Ruth Tony Breeze Garrett Karr Tony Breeze Tony Breeze Robin Faires Robin Faires Robin Faires Rob Martin Donivan Noble Donivan Noble Rob Martin Donivan Noble Donivan Noble Donivan Noble Brody Bauers Rob Martin Brody Bauers Donivan Noble Josh Kranyik Lynnette Clouse Stephanie Ruth Stephanie Ruth

08/25/16

05/02/16

11/11/16

11/14/16

01/20/17

50d

01/02/14

05/23/16 01/20/15

06/15/16 05/15/15

08/12/16 09/30/16

43d 361d

10/25/16

01/01/17

03/01/18

05/01/18

08/15/18

77d

08/21/15

01/01/15

09/24/15 11/18/15

05/01/16 05/31/16

140d

99%

2016-262 Mohamed Ali Joe Lalley Joe Lalley Steve Wood David Scott David Scott Martin Tuck David Scott

Rick Swart Gary Alexander Gary Alexander Amelia Walker

08/17/16

PL0000614

100% 04/13/16 07/13/16

06/24/16 08/25/16

07/13/16 07/13/16

08/25/16 08/25/16

09/20/15 07/01/16 12/01/15

02/01/15 03/15/17 04/20/16 05/12/16 05/12/16

04/10/17 05/01/16 07/11/16

08/18/17 07/21/16 12/08/16

95d 60d 109d

15%

05/15/14

07/31/15 08/18/17 05/31/17 01/01/16

317d

99%

1d

100%

08/15/15 09/15/16

03/15/16

153d

100%

01/01/16

04/01/14 05/04/16

$465,000.00

$50,000.00

01/26/15

03/13/15

08/01/15

07/18/16

10/24/16

02/21/17

87d

01/14/14

12/17/14

07/01/15

11/30/15

109d

05/10/16

06/01/16

08/23/16

60d

100%

100% 0% 99% 02/01/15

09/15/15

2016-306 2016-284 2016-297 2016-207

2016-274

2016-282 2016-253 2016-193 2016-199

AC - Sports Complex AC - Sports Complex AC - Sports Complex AC - Sports Complex AC - Sports Complex AC - Sports Complex AC - South Green AC - Sports Complex AC - Sports Complex AC - West Green AC - West Green AC - West Green

Jason Farmer $5,000.00 Jason Farmer $8,600.00 Ferguson and Christine S $338,000.00 Christine Sheets $360,000.00 Steve Wood $1,400,000.00 Steve Wood $1,250,000.00 Steve Wood Ferguson and Christine Sheets Steve Wood $90,000.00 Bruce Carlson $85,000.00 Kelly Pero Sarah Racine

$6,525.00 $5,602.00

02/20/15 100%

11/02/15 02/12/15 06/06/16

05/04/14

06/01/14

08/08/14

51d

04/06/15

05/04/15

09/30/15

108d

12/15/14

01/09/15

20d

06/22/16

06/30/16

7d

Project Name

Assigned To

President Street Academic Center Demolition Pruitt Field Track Delamination Residence Halls Access Control Phase IV Residence Halls Electronic Key Banks Residential Housing Concrete Repairs Richland Avenue Safety Lighting COA Richland Bridge Steam System Access Ridges 2, 3, 4 Roof Deck Ridges Bldg 30 Upgrades for CDC Ridges Boiler Plant Study 2016 Ridges Building 19 Room 225 Conversion Ridges Building 21,22 Furniture Ridges Building 37 Outlet Upgrade Ridges Observatory Ridges Stabilization- Masonry, Windows, Doors Ridges Stabilization- Roofing, Waterproofing Ridges Storm Drainage Upgrades RTEC 004 Improvements RTEC 105 Renovation RTEC 221 Bathroom Urinal RTV - Forum Theater Carpet RTVC Chiller Replacement RTVC Fire Alarm Replacements Schoonover Center Plaques/Displays Schoonover Furniture and AV Schoonover Journalism Suite Hallway Spot Lighting

Amelia Walker Brody Bauers Tony Breeze Lynnette Clouse Lynnette Clouse Lynnette Clouse

Schoonover ph II Schoonover/RTV Completion Items III Scott Quad 024 Conversion to Office Space Scott Quad Alley Upgrade Scott Quad Courtyard Landscaping Scott Quad Exterior Painting Scott Quad Shower Floors Replacement Scott Quad Window Replacement Scott Quad/Botanical Research Generator Upgrade

Mike West Mike West Donivan Noble Garrett Karr [email protected] Terry Baxter-Potter Terry Baxter-Potter Terry Baxter-Potter Chris Long

Seigfred 502, 503, 505 Ceiling Lights Seigfred Dumpster Relocation Seigfred Gallery Movable Walls Seigfred Hall 118 Air Compressor Hookups Seigfred Hall 118 Electrical Upgrades Seigfred Roof and Window Replacement Seigfred Sculpture Studio Power Feed Shannon Hall Computer Labs AC Shively Dining Hall Interior Upgrade 2017-18 Shively Rooftop Unit Replacement Shively Truck Turnaround Sidewalks and Stairs Annual Improvements Softball Field Bleachers Sook Academic Center South Green Dr Culvert Repair South Green Mail Room Renovation Sprinkler Valve Replacement - Various Stocker 005, 005A/C Woodworking Lab Stocker 045 Electrical Upgrades Stocker 051 Air Compressor Stocker 125, 125A & B, 126 Stocker 1st Floor Computer Labs, 4th Floor Corridor Renovation Stocker 270-284 Carpet and Paint Stocker 296 &414 Conversions Stocker 2nd Floor Corridors Carpet and Paint Stocker 326 Renovation Stocker 3rd FLoor Carpet, Paint, Signage Stocker Center 050A Egress Stocker Center 292 Wall Removal Stocker Center 412 Upgrades Stocker Center AHU Replacements Stocker Center Sprinkler System Upgrades Stocker Generator/Fire Protection Stocker Hall Flat Roof Repair Sweep Phase B Tiffin Bathroom Upgrades Tiffin Bathroom Ventilations Tiffin Hall Roof Replacement Trisolini House 2nd Floor Carpet True Carpet & Tile Replacement University Garage Door Overhead Door Accelerator

Tony Breeze Garrett Karr Donivan Noble Tony Breeze Tony Breeze Rick Swart Rob Martin Gary Alexander Lynnette Clouse Rob Martin Garrett Karr Tony Breeze

University Service Center 123-127 Renovation University Service Center First Floor Carpet Van Vorhes Improvements W Union Prkg Lot / Happy Cat Demo Washington Hall Domestic Water & Restroom Upgrades Washington Hall Stone Entry Replacement West Green Recreation Upgrades WGCWP Upgrades Project

Tony Breeze Garrett Karr Josh Kranyik Josh Kranyik Mock, Amber Tony Breeze Rob Martin

Rick Swart Donivan Noble Donivan Noble Chris Long Garrett Karr Rick Swart Rick Swart Rick Swart Tony Breeze Amelia Walker

Mike West Garrett Karr Josh Kranyik Rob Martin Donivan Noble Tony Breeze Rob Martin Donivan Noble Donivan Noble

Proj # UM2800954-01 2016-270

Stephanie Ruth Stephanie Ruth Garrett Karr Garrett Karr Terry Baxter-Potter Garrett Karr Shawna Bolin Brody Bauers

AC - College Green AC - Sports Complex

AC - West Green AC - West Green

Client Ken Cutright Jason Farmer Brent Buckley Brent Buckley Dana Espinal Joe Lalley Stephen Wood

Total Budget $1,500,000.00 $8,000.00 $1,000,000.00 $60,000.00 $350,000.00 $100,000.00

CF&PC

BOT

Design Start Date Bid Opening NTP (see Constr. End Date ( Duration % Complete 04/05/16

03/21/16

07/29/16

95d

0% 100%

05/02/16 09/19/16

08/15/16 10/28/16

76d 30d

0%

08/15/16

01/27/16 08/12/16 10/01/14 10/01/14

02/08/16 10/03/16 11/01/14 11/01/14

02/12/16 12/23/16 12/01/14 01/01/15

5d 60d 22d 45d

100%

01/04/16 06/30/16

08/25/16

03/02/16

04/04/16

03/02/16

04/18/16

2016-304 2016-260 2016-195

UM28000980 PL0000851 PL0000749 PL0000744 PL0000852 2016-250 2016-219 2016-272

2016-242 2016-267 2016-216 2016-289 PL0000818

2016-006 2016-156

PL0000833

2016-276 2016-214 PL0000843 2016-249 PL0000692 UM2800950

2016-246

Donivan Noble Donivan Noble Donivan Noble Donivan Noble Donivan Noble Donivan Noble Donivan Noble Donivan Noble Rob Martin Rob Martin Mike West Terry Baxter-Potter Terry Baxter-Potter Terry Baxter-Potter Terry Baxter-Potter Stephanie Ruth Stephanie Ruth Terry Baxter-Potter

Location

2016-215 2016-166

2016-168

PL0000773 PL0000842 2016-225 2016-265 2016-271

AC - Ridges AC - Ridges AC - Ridges AC - Ridges AC - Ridges AC - Ridges AC - Ridges AC - West Green AC - North Green

Michael Finney Michael Finney Gwyn Scott Wayne Chiasson Shawna Bolin Shawna Bolin Steve Wood Luanne Bowman

$2,400.00 $320,000.00 $175,000.00 $125,000.00 $150,000.00 $132,000.00

AC - North Green AC - North Green AC - North Green AC - North Green AC - North Green AC - North Green

Michael Lincoln Steve Wood Joe Lalley Heather Krugman Lynnette Clouse Robert Stewart

$26,000.00 $2,500,000.00 $1,250,000.00 $39,620.00 $2,400,000.00 $6,109.00

AC - North Green AC - North Green AC - College Green AC - College Green

Tom Daniels Mark Krumel Marty Paulins

$41,500.00 $35,000.00

AC - College Green

Brent Buckley

$246,000.00

05/11/16

AC - College Green

Steve Wood

$400,000.00

06/01/15

AC - North Green AC - North Green

Lori Esposito David LaPalombara

TBD $100,000.00

AC - North Green AC - North Green AC - North Green AC - North Green Eastern

Tanner Young Tanner Young Joe Lalley Steve Wood Paul Abraham

TBD TBD $2,600,000.00

AC - East Green AC - East Green AC - Campus Wide

Gwyn Scott Gwyn Scott Jeff Campbell

$200,000.00 $250,000.00 $225,000.00

05/11/16 12/09/15

AC - South Green AC - South Green AC - South Green

Jason Farmer Steve Wood Brent Buckley Steve Wood Luanne Bowman Luanne Bowman Luanna Bowman Luanne Bowman Luanne Bowman

$6,400,000.00 $2,000,000.00 $45,500.00 $90,000.00

07/13/16 04/13/16

AC - West Green AC - West Green AC - West Green AC - West Green AC - West Green AC - West Green AC - West Green AC - West Green AC - West Green AC - West Green AC - West Green AC - West Green AC - South Green AC - East Green AC - East Green AC - East Green AC - North Green AC - South Green AC - West Green

Robert Judd Greg Kremer Luanne Bowman Luanne Bowman Luanne Bowman Luanne Bowman Robert Judd Luanne Bowman Richard Schultz Joe Adams Luanne Bowman Steve Wood Christine Sheets Brent Buckley Brent Buckley Christine Sheets Kathy White Brent Buckley

$176,000.00 $50,000.00 $182,000.00 $59,300.00 $198,000.00

AC - Service Center AC - Service Center AC - East Green AC - Service Center

AC - West Green AC - West Green AC - West Green AC - West Green AC - West Green

100% 100% 75%

50% 07/13/16

08/25/16

08/29/16

11/25/16

06/30/17

06/30/17

1d 90%

02/16/15 02/16/15 08/01/15

10/30/15

03/17/16

03/31/16

08/02/16

89d

01/27/16

02/26/16

08/11/16

120d

40% 100%

05/16/16

05/11/16

06/23/16

07/08/16

04/19/16

06/17/16

12/14/16

129d

05/03/16

07/08/16 05/16/16

09/01/16 07/22/16

40d 50d

100% 100% 15%

$18,000.00 05/24/16 01/01/16

90% 08/25/16 10/28/16

08/15/16

02/08/17

05/08/17

08/25/17

80d

03/11/16

04/20/16

05/01/16

06/09/16

30d

TBD

0% 05/04/16

$21,000.00 $85,000.00

07/15/14

07/22/14

6d

06/01/15

08/21/15

60d

06/01/15 05/09/16 05/09/16

08/21/15 08/12/16 08/12/16

60d 70d 70d

07/15/15 03/01/15 05/07/14 01/01/15 06/06/16

08/21/15 08/21/15 12/31/14 05/22/15 09/01/16

28d 126d 171d 102d 64d

05/01/16

08/01/16

67d

$22,400.00 $36,600.00

05/16/16

06/10/16

20d

Joe Lalley Joe Lalley Marty Paulins Joe Lalley

$99,572.00 $18,511.00 $850,000.00 $240,000.00

06/22/16 08/12/16 12/01/16

8d 70d 50d

AC - East Green

Brent Buckley

$75,000.00

AC - Campus Wide

Steve Wood

$1,000,000.00

04/13/16

$30,900.00 $101,000.00 $500,000.00 $2,700,000.00 $2,700,000.00 $1,100,000.00 $1,900,000.00

10/29/13

08/22/16 05/17/16

12/09/15 12/09/15

08/12/15

10/13/16 06/23/16

01/21/16

10/16/15

08/01/15

02/01/14 12/01/14 03/15/16 03/01/16

09/07/15 05/20/16

03/15/16 09/08/16

06/13/16 05/09/16 09/23/16

06/15/16

07/01/15

07/15/16

09/30/16

56d

06/20/16

08/26/16

12/30/16

12/30/16

1d

80%

100%

Project Name Wilson CG A/C Units Wilson CG Window Coverings Wilson Hall - 2016 Ext Improvements WUSOC 166 Upgrade for Internal Audit Wusoc 213 Conversion to Office Space WUSOC 2nd Floor Corridor Carpet WUSOC OIT 9 Factory Relocation Yamada 009 Upgrades Zanesville Campus Center Roof Zanesville Herrold Hall Nursing

Assigned To Stephanie Ruth Garrett Karr Stephanie Ruth Donivan Noble Stephanie Ruth Lynnette Clouse Robin Faires Robin Faires

Proj # 2016-286 2016-285 2016-255 2016-258 2016-303 2016-181

Location

Client

Total Budget

AC - College Green AC - College Green AC - Service Center AC - Service Center

John Gilliom Joe Lalley Jeff Davis April Koska

$150,000.00 $26,290.50 $16,200.00

AC - Service Center AC - North Green Zanesville Zanesville

Duane Starkey Diane Cahill Jen Cushman Jen Cushman

$76,255.00 $2,500.00 $900,000.00 $1,800,000.00

CF&PC

05/17/16

BOT

Design Start Date Bid Opening NTP (see Constr. End Date ( Duration % Complete

05/17/16

07/01/15

06/30/16

08/30/16 06/08/16

10/14/16 07/15/16

34d 28d

04/11/16

07/11/16

66d

03/01/16

06/10/16 04/29/16

74d