100 PROJECTS FOR A NEW, NEW ORLEANS

NEW DAY. NEW ORLEANS. Committed Projects 100 PROJECTS FOR A NEW, NEW ORLEANS COMMUNITY CENTERS Carrollton Hollygrove Senior Center Location: 3300 Ham...
2 downloads 1 Views 53KB Size
NEW DAY. NEW ORLEANS. Committed Projects

100 PROJECTS FOR A NEW, NEW ORLEANS COMMUNITY CENTERS Carrollton Hollygrove Senior Center Location: 3300 Hamilton St. Project Type: Community Centers Description: Senior Center including health clinic and community center will be repaired/replaced. Projected Cost: $1,465,833.65-1,832,292.06 Phase: Planning Cut Off Center Location: 6600 Belgrade St. Project Type: Community Centers Description: Algiers Community Center ; renovations and repairs to facility interior and grounds improvements. Projected Cost: $455,250.40-569,063 Phase: Bid & Award Gert Town Community Pool Location: 7400 Stroelitz Street Project Type: Community Centers Description: Replacement of former pool facility serving the Hollygrove neighborhoods. Projected Cost: $1,480,928.68-1,851,160.85 Phase: Design Lyons Center Location: 624 Louisiana Ave. Project Type: Community Centers Description: Major renovations of Hurricane Katrina related damage at the NORD operated pool and gymnasium facility located in the Irish Channel. Projected Cost: $2,310,186.4-2,887,733 Phase: Design Rosenwald Center Location: 1120 S Broad St. Project Type: Community Centers Description: Replacement facility to include gym, community center and restore the pool Projected Cost: 54,973,25.6-6,871,657 Phase: Design

Page 1 of 26

NEW DAY. NEW ORLEANS. Committed Projects Sanchez (Copelin-Byrd) Center Location: 1616 Caffin Ave. Project Type: Community Centers Description: New facility to include new pool and pool facility to include shower/lockers/restrooms. Projected Cost: $1,840,000-2,300,000 Phase: Design Sanchez (Copelin-Byrd) Center Location: 1616 Caffin Ave. Project Type: Community Centers Description: Replacement facility to include gym, community center, health clinic, police substation. Projected Cost: $9,973,604-12,467,005 Phase: Design Treme Center Location: 900 N Villere St. Project Type: Community Centers Description: Major renovation of the existing community center including repairs to the pool, gymnasium and enhancements for handicap accessibility to the facility. Projected Cost: $3,911,128.8-4,888,911 Phase: Design HEALTH CLINICS Arthur Monday Center Location: 1111 Newton St. Project Type: Health Clinics Description: Major repair/ renovation of health clinic, community services and meeting rooms. Projected Cost: $4,419,115.2-5,523,894 Phase: Design Desire/Florida Multi-Service Center Location: 2727 Louisa St. Project Type: Health Clinics Description: New construction of shared multipurpose community center. Projected Cost: $9,784,664-12,230,830 Phase: Planning FIRE DEPARTMENT

Page 2 of 26

NEW DAY. NEW ORLEANS. Committed Projects NOFD Engine 10 Morrison Rd. Location: 14069 Morrison Road Project Type: New Orleans Fire Department Description: Renovation of the Morrison Avenue Fire Station No. 10, including equipment bay and living quarters for firemen. Projected Cost: $315,908.8-394,886 Phase: Award NOFD Engine 26 S. Jefferson Davis Pkwy. Location: 436 S Jefferson Davis Pkwy. Project Type: New Orleans Fire Department Description: Repairs to bay equipment and living quarters. Projected Cost: $215,276-269,095 Phase: Award NOFD Engine 31 Alba Rd. Location: 4300 Alba Road Project Type: New Orleans Fire Department Description: Replacement of the Venetian Isle Fire Station No. 31, including 2 equipment bays and living quarters for firemen. Projected Cost: $2,013,763.2-2,517,204 Phase: Contracting NOFD Engine Nos. 22 and 39 Location: N Claiborne Ave & Caffin Ave Project Type: New Orleans Fire Department Description: New combined 2-company, 3-bay fire station complete with living quarters for firemen. Projected Cost: $2,838,003.2-3,547,504 Phase: Contracting POLICE DEPARTMENT NOPD Fifth District Police Station Location: 3900 N Claiborne Project Type: New Orleans Police Department Description: New construction for the replacement of the NOPD 5th District Police station on the original Claiborne Avenue site. Projected Cost: $6,213,451.2-7,766,814 Phase: Design NOPD Police Stables Location: Harrison Avenue & Marconi Dr. Project Type: New Orleans Police Department

Page 3 of 26

NEW DAY. NEW ORLEANS. Committed Projects Description: NOPD's Stables in City Park are scheduled to be repaired to better house the City's Mounted Patrol Horses and K9 dogs. The stables provide space for the NOPD Horses used to patrol Mardi Gras and special events. Projected Cost: $5,168,185.6-6,460,232 Phase: Design NOPD Seventh District Police Station Location: 10101 Dwyer Road Project Type: New Orleans Police Department Description: New elevated 2-story Police Station for the Seventh District NOPD, located on the original Read Blvd. site. Projected Cost: $6,921,556 Phase: Construction OTHER PUBLIC SPACES Milne Boys Home Location: 5420 Franklin Ave. Project Type: Other Public Spaces Description: Hurricane Katrina Renovations of the historic Gentilly Facility with multiple buildings. Projected Cost: $10,156,455.2-12,695,569 Phase: Design St. Roch Market () Location: 2381 St Claude Ave. Project Type: Other Public Spaces Description: Restoration of the historic neighborhood former food and produce market facility along the St. Claude Corridor. Projected Cost: $2,400,000-3,000,000 Phase: Design St. Roch Pool / Park Location: 1800 St. Roch Ave. Project Type: Other Public Spaces Description: Renovation of the NORD operated pool facility and adjacent park facility including services buildings and Community park grounds. Projected Cost: $1,373,204.8-1,716,506 Phase: Design West End Park Location: South Rd Project Type: Other Public Spaces Description: Minimal repairs to park. Projected Cost: 80,118.4-100,148 Phase: Planning

Page 4 of 26

NEW DAY. NEW ORLEANS. Committed Projects PARKS & RECREATION FACILITIES Bartholomew Concessions Building Location: 6514 Congress Dr. Project Type: Parks & Recreation Facilities Description: Part of the Ponchartrain Park community golf course renovation. Repair of 1st tee (Hole 1) concessions building. Projected Cost: 800,000-1,000,000 Phase: Design Behrman Center Gym and Pool Location: 2529 General Meyer Ave. Project Type: Parks & Recreation Facilities Description: Behrman Center Gymnasium and Pool will be repaired paid in part with Community Development Block Grant () funding . Projected Cost: $1,200,000-1,500,000 Phase: Planning Behrman Center Gym and Pool Location: 2529 General Meyer Ave. Project Type: Parks & Recreation Facilities Description: The balance of Katrina repairs to Behrman Center Gymnasium and Pool, paid for using funding. Projected Cost: $1,225,390.4-1,531,738 Phase: Design Behrman Park - Enhancements Location: 2529 General Meyer Ave. Project Type: Parks & Recreation Facilities Description: Behrman Stadium repairs to the football playing surface using funding; replacement includes new artificial turf. Projected Cost: $1,360,000-1,700,000 Phase: Design Behrman Soccer Stadium Phase I Location: 2529 General Meyer Ave. Project Type: Parks & Recreation Facilities Description: Major site preparation and preloading for Soccer Fields Projected Cost: $1,693,440-2,116,800 Phase: Design Behrman Soccer Stadium Phase II Location: 2529 General Meyer Ave. Project Type: Parks & Recreation Facilities Description: Major new Soccer Stadium and Fields Complex Projected Cost: $7,417,699.2-9,272,124

Page 5 of 26

NEW DAY. NEW ORLEANS. Committed Projects Phase: Design Brechtel Memorial Park, Golf Course, Club House, Maintenance and Cart Storage Building Location: 3700 Behrman Place Project Type: Parks & Recreation Facilities Description: Renovations to the 18-hole Golf Course, driving range and Clubhouse at Brechtel Memorial Park. Projected Cost: $6,097,584.8-7,621,981 Phase: Design Comiskey Park & Playground Location: Corner of S. Jeff Davis Pkwy & Baudin Project Type: Parks & Recreation Facilities Description: Renovations of the NORD operated park and associated play equipment. Projected Cost: $400,000-500,000 Phase: Design Di Benedetto Playground Location: 4700 Papania St. Project Type: Parks & Recreation Facilities Description: Playground repairs. Projected Cost: $266,004.8-332,506 Phase: Planning Digby Park Location: 6600 Virgilian St. Project Type: Parks & Recreation Facilities Description: Major, Renovation, Playground Projected Cost: $34,120-42,650 Phase: Design Gernon Brown Gym Location: 1001 Harrison Ave. Project Type: Parks & Recreation Facilities Description: Repairs to an existing NORD gymnasium, including a gym space and multipurpose room. Projected Cost: $1,644,029.6-2,055,037 Phase: Design Harrell Stadium Location: 2300 Leonidas St. Project Type: Parks & Recreation Facilities Description: Hollygrove Community Center, Pool, and Pool House; existing building(s) to receive renovations and repairs; new chlorination system for pool.

Page 6 of 26

NEW DAY. NEW ORLEANS. Committed Projects Projected Cost: $599,493 Phase: Construction Hunter's Field Location: 1600 North Claiborne Ave. Project Type: Parks & Recreation Facilities Description: 7th ward shared community field space adjacent to the Treme neighborhood. Repair of field and minor concession building renovation. Projected Cost: $604,901.6-756,127 Phase: Design Joe Brown Center Location: 5601 Read Blvd. Project Type: Parks & Recreation Facilities Description: Part of the Joe Brown Park renovation. Multipurpose community center. Large interior renovation of facility. Projected Cost: $3,368,286.4-4,210,358 Phase: Design Joe Brown Indoor Pool Location: 5601 Read Blvd. Project Type: Parks & Recreation Facilities Description: Indoor Pool. Existing facility and site to receive major renovations and repairs to interior of bath house. Pool to be repaired and receive new chlorination system. Projected Cost: $1,738,700.8-2,173,376 Phase: Bid & Award Joe Brown Park - Enhancements Location: 5601 Read Blvd. Project Type: Parks & Recreation Facilities Description: Part of the Joe Brown Park renovation in New Orleans East. Major added ground enhancements to the existing facility. Projected Cost: $3,200,000-4,000,000 Phase: Design Joe Brown Park Lighting, Ball Fields, Shelters Location: 5601 Read Blvd. Project Type: Parks & Recreation Facilities Description: Major repairs to baseball fields, park grounds, and shelters. Projected Cost: $9,377,449.6-11,721,812 Phase: Design

Page 7 of 26

NEW DAY. NEW ORLEANS. Committed Projects

Joseph Bartholomew Club House & Maintenance Warehouse Building Location: 6514 Congress Dr. Project Type: Parks & Recreation Facilities Description: Part of the Ponchartrain Park community golf course renovation. Repair of 1st tee (Hole 1) concessions building. Projected Cost: $2,053,191.2-2,566,489 Phase: Design Kingswood Playground Location: 7200 Edgefield Dr. Project Type: Parks & Recreation Facilities Description: Minor Repair of Playground lighting Projected Cost: $62,400-78,000 Phase: Bid & Award Municipal Yacht Harbor Administration Building Repairs Location: 401 N. Roadway St. Project Type: Parks & Recreation Facilities Description: MYH and NOYC shared offices and multi use meeting space located in Bucktown/Lakeview. Medium project - Building will undergo complete renovation to first floor interior and some minor exterior repair work. Projected Cost: $12,938,96-1,617,370 Phase: Bid & Award Municipal Yacht Harbor Boat House Repairs Location: 401 N. Roadway St. Project Type: Parks & Recreation Facilities Description: NO Fire Department Boat House and MYH Boat Slip. Small project - Repair of both structures and renovation of interior living quarters of NOFD boat house. Projected Cost: $2,86,532.8-358,166 Phase: Design Municipal Yacht Harbor Repairs Location: 401 N. Roadway St. Project Type: Parks & Recreation Facilities Description: Includes Piers, Bulkheads, and Pilings. Large project located in Bucktown/Lakeview – Repair of entire harbor facility to restore functionality to all rental boat slips that are currently damaged. Projected Cost: $23,533,228.8-29,416,536 Phase: Design Norwood Thompson Playground Location: 7200 Forshey St. Project Type: Parks & Recreation Facilities

Page 1 of 26

NEW DAY. NEW ORLEANS. Committed Projects Description: Minor renovaions to NORD playground. Projected Cost: $56,000-70,000 Phase: Design Oliver Bush Playground Location: 2500 Caffin St. Project Type: Parks & Recreation Facilities Description: Community basketball, baseball, and tennis recreational area in lower ninth ward community. Projected Cost: $2,701,227.2-3,376,534 Phase: Design Parks & Parkways Gentilly Facility Location: 2829 Gentilly Blvd. Project Type: Parks & Recreation Facilities Description: Renovation of Hurricane Katrina damages to the facilities that house the city's Parks & Parkways Department. Projected Cost: $2,487,644.8-3,109,556 Phase: Design Pontchartrain Park Location: 5721 Press Drive, 6455 Press Drive, 482 Hayne Blvd Project Type: Parks & Recreation Facilities Description: Part of the Ponchartrain Park community golf course renovation. Added ground enhancements to the existing facility. Projected Cost: $400,000-500,000 Phase: Design Pontchartrain Park and Lights Location: 5721 Press Drive, 6455 Press Drive, 482 Hayne Blvd Project Type: Parks & Recreation Facilities Description: Complete renovation of concession bldg.& lights Projected Cost: 2,190,508-2,738,135 Phase: Bid & Award Sam Bonart Playground & Pool Location: 1200 Forstall St. Project Type: Parks & Recreation Facilities Description: Repair of facility to Pre-Katrina function. Repair of concessions, fields and basketball shelter. Projected Cost: $454,448-568,060 Phase: Design Stallings St. Claude Community Center Location: 4300 St Claude Ave. Project Type: Parks & Recreation Facilities

Page 2 of 26

NEW DAY. NEW ORLEANS. Committed Projects Description: New Center will include basketball court, multi-purpose rooms for dance, music and activities. Major renovations to pool and pool building including restrooms/lockers/showers. Projected Cost: $5,118,006.4-6,397,508 Phase: Design Wesley Barrow Stadium Location: 6500 Press Dr. Project Type: Parks & Recreation Facilities Description: Baseball Stadium in Ponchartrain Park community. Major renovation to field and viewing stands. Projected Cost: $3,927,100-4,908,875 Phase: Design Wisner Playground Location: 4877 Laurel St. Project Type: Parks & Recreation Facilities Description: Minor repairs to playground lighting/major repairs future Projected Cost: $164,812.8-206,016 Phase: Design

PUBLIC LIBRARIES Algiers Regional Library Design-Build Location: 3014 Holiday Dr. Project Type: Public Libraries Description: Replacement facility is designed as a wellness branch and provide all the services of the main branch including children's reading room, Wi-Fi hotspot, enterprise area and meeting rooms. Projected Cost: $8,753,818 Phase: Construction Cita Hubbell Library Location: 725 Pelican Ave. Project Type: Public Libraries Description: Major renovation of roof and structure damaged by termites. Projected Cost: $1,038,091.2-1297,614 Phase: Design New Orleans East Regional Library Design-Build Location: 5641 Read Blvd Project Type: Public Libraries Description: Replacement facility is designed as a "Technology/ Innovation Branch" and includes the same services as the main branch including children's reading room, Wi-Fi hotspot, enterprise area and meeting rooms.

Page 3 of 26

NEW DAY. NEW ORLEANS. Committed Projects Projected Cost: $832,2454 Phase: Construction Nora Navra Library Design-Build Location: 1902 St. Bernard Ave. Project Type: Public Libraries Description: Replacement facility will be in a new location and is designed as a "Neighborhood Branch" to include meeting rooms, enterprise space and a basic collection. Projected Cost: $3,251,239 Phase: Construction Norman Mayer Library Design-Build Location: 2098 Foy St. Project Type: Public Libraries Description: Replacement facility is designed as a "Music Branch" and includes a collection of print and non-print materials, enterprise space, children's area and WI-Fi hotspot. Projected Cost: $6,303,352 Phase: Construction Robert E. Smith Library Design-Build Location: 6301 Canal Blvd. Project Type: Public Libraries Description: Replacement facility is designed as a "Community Branch" Library including Wi-Fi hotspot, enterprise space and meeting rooms. Projected Cost: $4,720,411 Phase: Construction ROAD RECONSTRUCTION & RESURFACING Veterans Admin. Medical Ctr Infrastructure Improvements (Canal, S Claiborne, Tulane, & S Rocheblave) Location: Veterans Admin. Medical Ctr Infrastructure Improvements (Canal, S Claiborne, Tulane, & S Rocheblave) Project Type: Road Reconstruction Description: Reconstruction of existing roadway, including the replacement of affected utilities. Projected Cost: $11,994,229 Phase: Construction Gentilly Roadway Improvements Location: Gentilly St. Project Type: Road Resurfacing Description: Improvements to various minor streets, which may include reconstruction and/or milling and overlay.

Page 4 of 26

NEW DAY. NEW ORLEANS. Committed Projects Projected Cost: $361,696-452,120 Phase: Design Michoud Front Door Infrastructure Improvements (Old Gentilly Road from I5-10 - Chef Menteur Highway) Location: Michoud Front Door Infrastructure Improvements (Old Gentilly Road from I5-10 - Chef Menteur Highway) Project Type: Road Resurfacing Description: Various street improvements near the New Orleans Regional Business Park Projected Cost: $5,003,438.4-6,254,298 Phase: Design Napoleon-Freret Roadway Improvements Location: Napoleon @ Freret Project Type: Road Resurfacing Description: Improvements to various minor streets, which may include reconstruction and/or milling and overlay. Projected Cost: $708,240-885,300 Phase: Design Congress Street Roadway Improvements Location: Congress Street Project Type: Roadway Description: Projected Cost: $1,213,264-1,516,580 Phase: Design St. Roch Avenue Roadway Improvements Location: St. Roch Ave Project Type: Roadway Description: Projected Cost: $1,180,800-1,476,000 Phase: Bid & Award STREETSCAPES Alcee Fortier Blvd Streetscape (Chef Menteur Hwy - Michoud Lagoon) Location: Alcee Fortier Blvd Streetscape (Chef Menteur Hwy - Michoud Lagoon) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: $400,000-500,000 Phase: Design

Page 5 of 26

NEW DAY. NEW ORLEANS. Committed Projects Bayou Rd Streetscape (Broad St - Rocheblave St) Location: Bayou Rd Streetscape (Broad St - Rocheblave St) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: $560,000-700,000 Phase: Design Broad and Washington Streetscape (S. Broad (Fourth - Louisiana) Washington (S. White - Dorgenois) Location: Broad and Washington Streetscape (S. Broad (Fourth - Louisiana) Washington (S. White - Dorgenois) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: $160,000-200,000 Phase: Planning Broad St. and Lafitte St Streetscape (Bienville St - Orleans Ave) Location: Broad St. and Lafitte St Streetscape (Bienville St - Orleans Ave) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: 480000-600000 Phase: Design Broadmoor Streetscape (General Pershing from Broad St. to Miro St.) Location: Broadmoor Streetscape (General Pershing from Broad St. to Miro St.) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: 200000-250000 Phase: Design Carrollton Ave (South) Streetscape (Palmetto St - Washington Ave) Location: Carrollton Ave (South) Streetscape (Palmetto St - Washington Ave) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: 400000-500000 Phase: Design

Page 6 of 26

NEW DAY. NEW ORLEANS. Committed Projects

Carrollton Intersection (S. Carrollton Ave. from I-10 - Palm St.) Location: Carrollton Intersection (S. Carrollton Ave. from I-10 - Palm St.) Project Type: Streetscapes Description: Traffic signal and roadway intersection improvements Projected Cost: 1200000-1500000 Phase: Design Claiborne (South) @ Toledano (Napoleon Ave - Martin Luther King Jr.) Location: Claiborne (South) @ Toledano (Napoleon Ave - Martin Luther King Jr.) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: 1600000-2000000 Phase: Design Claiborne Ave (Esplanade Ave- St. Anthony St) Location: Claiborne Ave (Esplanade Ave- St. Anthony St) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: 240000-300000 Phase: Design Freret St Streetscape (Napoleon Ave - Jefferson Ave) Location: Freret St Streetscape (Napoleon Ave - Jefferson Ave) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: 656540.8-820676 Phase: Design General Meyer Ave Streetscape (Hendee St - Odeon Ave) Location: General Meyer Ave Streetscape (Hendee St - Odeon Ave) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: 400000-500000 Phase: Design

Page 7 of 26

NEW DAY. NEW ORLEANS. Committed Projects Gentilly Streetscape (Caton, Gentilly, Elysian Fields) Location: Gentilly Streetscape (Caton, Gentilly, Elysian Fields) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: 560000-700000 Phase: Design Harrison Ave Streetscape (West End Blvd - Orleans Ave) Location: Harrison Ave Streetscape (West End Blvd - Orleans Ave) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: 3200000-4000000 Phase: Design Lower Ninth Ward Streetscape (N. Claiborne - Andry to Lamanche) (St. Claude -Bridge to Egania) Location: Lower Ninth Ward Streetscape (N. Claiborne - Andry to Lamanche) (St. Claude -Bridge to Egania) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: 1520000-1900000 Phase: Design Napoleon, Broad and Fontainebleau Intersection Design Location: Broad Street, Fontainebleau Dr and Napoleon Ave. Project Type: Streetscapes Description: Interim repairs have been completed by volunteers and fire fighters. However, some minor repairs, including architectural and mechanical systems, remain and must be further defined during the AE scoping exercise. Projected Cost: 200000-250000 Phase: Design New Orleans East Streetscape Improvements Read Blvd, Lakeforest Blvd, Crowder Rd Location: Read Blvd, from I-1-Dwyer and Lake Forest Blvd from Bundy to Wright Road Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art.

Page 8 of 26

NEW DAY. NEW ORLEANS. Committed Projects Projected Cost: 2400000-3000000 Phase: Design Oretha Castle Haley Blvd Streetscape (Felicity St. - Martin Luther King Jr) Location: Oretha Castle Haley Blvd Streetscape (Felicity St. - Martin Luther King Jr) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: 240000-300000 Phase: Design Press Drive Streetscape (Chef - Leon C Simon) Location: Press Drive Streetscape (Chef - Leon C Simon) Project Type: Streetscapes Description: Landscaping along Press Drive Projected Cost: 160000-200000 Phase: Design Robert E. Lee Blvd (Perlita Dr - Chatham Dr) and Paris Ave. (Robert E. Lee Aviators) Streetscape Location: Robert E. Lee Blvd (Perlita Dr - Chatham Dr) and Paris Ave. (Robert E. Lee - Aviators) Streetscape Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: 400000-500000 Phase: Design St. Anthony Path Landscape (Mirabeau - Pelopidas) Location: St. Anthony Path Landscape (Mirabeau - Pelopidas) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: 320000-400000 Phase: Design St. Bernard Ave (Claiborne Ave - North Miro St) Location: St. Bernard Ave (Claiborne Ave - North Miro St) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art.

Page 9 of 26

NEW DAY. NEW ORLEANS. Committed Projects Projected Cost: 480000-600000 Phase: Design St. Roch Art Project Location: St. Roch Ave Project Type: Streetscapes Description: Instillation of a interruptive art project consisting of benches that connect the St. Roch Market and St. Roch Park Facilities. Projected Cost: 136000-170000 Phase: Design St. Roch Landscaping Location: St. Roch Ave Project Type: Streetscapes Description: Beautification of neutral grounds that connect the St. Roch Market and St. Roch Park Facilities Projected Cost: 128000-160000 Phase: Design Tulane Ave and Jeff. Davis Pkwy Streetscape (Baudin St, Clark(sou D'hemecourt St)) Location: Tulane Ave and Jeff. Davis Pkwy Streetscape (Baudin St, Clark(sou D'hemecourt St)) Project Type: Streetscapes Description: May include sidewalk or other pedestrian walkway improvements, bikeways, traffic and pedestrian signage or signalization, landscaping, lighting, or public art. Projected Cost: 240000-300000 Phase: Bid & Award City Park Festival and Recreation Complex Location: 1Palm Drive, City Park Project Type: Parks & Recreation Facilities Description: Major 62-acre sports and festival complex. Projected Cost: 3200000-4000000 Phase: Bid & Award Citywide Public Safety and Criminal Justice Location: Citywide Project Type: Public Safety Description: Alternate / Improved Project for systems approach. Projected Cost: 55800969.76-69751212.2 Phase: Various

Page 10 of 26

NEW DAY. NEW ORLEANS. Committed Projects Lafitte Greenway Location: N/A Project Type: Parks & Recreation Facilities Projected Cost: 9600000-12000000 Phase: Bid & Award New Orleans East Community Health Clinic Location: 13085 Chef Menteur hwy Project Type: Parks & Recreation Facilities Description: New community center health clinic. Projected Cost: 960000-1200000 Phase: Design New Orleans East Hospital Land Acquisition & Development Location: 5620 Reed Blvd Project Type: Hospital Description: Major acquisition/renovation of existing Methodist Hospital. Projected Cost: 32000000-40000000 Phase: Design New Orleans Museum of Art Location: 1 Collins Diboll Circle Project Type: Other Public facilities Description: Renovation of NOMA facilities. Projected Cost: $5,940,000 Phase: Design Public Greenspace Tree Replacement - Phase I Location: Citywide Project Type: Other Public Spaces Description: Beautification project Projected Cost: 600000-750000 Phase: Construction Public Greenspace Tree Replacement - Phase II Location: Citywide Project Type: Other Public Spaces Description: Beautification project Projected Cost: 1000000-1250000 Phase: Design Reinventing the Crescent Location: 0 Project Type: Parks & Recreation Facilities

Page 11 of 26

NEW DAY. NEW ORLEANS. Committed Projects Description: Extensive redevelopment of the eastbank riverfront from Jackson Ave. to the Industrial Canal includes recreational, entertainment and exhibit attractions. Projected Cost: 30000000 Phase: Construction Saenger Theatre Renewal Project Location: 801 N Rampart St Project Type: Other Public Spaces Description: Major historic renovation of entertainment venue. Projected Cost: 10400000-13000000 Phase: Design Sanchez Center Land Acquistion Location: 0 Project Type: Community Centers Description: Projected Cost: 800000-1000000 Phase: Implementation Tulane University Community Health Clinic Location: 711 N. Broad Street Project Type: Health Clinics Description: Projected Cost: 1600000-2000000 Phase: Design VA Medical Center Location: 0 Project Type: Hospital Description: Major new construction of VA hospital in hospital complex. Projected Cost: 75000000 Phase: Construction

PROJECTS IN CONSTRUCTION Crowder Boulevard (Dwyer Rd - US 90) Bikeways Location: Crowder Boulevard (Dwyer Rd - US 90) Bikeways Project Type: Bike/Pedestrian Paths & Bridges Description: Install new pavement markings and signage Projected Cost: $ 11405 Phase: Construction

Page 12 of 26

NEW DAY. NEW ORLEANS. Committed Projects Marconi Blvd. (Robert E. Lee - Norfolk Southern Railroad) Bikeways Location: Marconi Blvd. (Robert E. Lee - Norfolk Southern Railroad) Bikeways Project Type: Bike/Pedestrian Paths & Bridges Description: Install new pavement markings and signage Projected Cost: $ 29403 Phase: Construction Press Dr (US 90 - Robert E. Lee Blvd) Bikeways Location: Press Dr (US 90 - Robert E. Lee Blvd) Bikeways Project Type: Bike/Pedestrian Paths & Bridges Description: Install new pavement markings and signage Projected Cost: $ 24235 Phase: Construction Robert E. Lee Blvd (St. Bernard Ave - Paris Ave) Bikeways Location: Robert E. Lee Blvd (St. Bernard Ave - Paris Ave) Bikeways Project Type: Bike/Pedestrian Paths & Bridges Description: Install new pavement markings and signage Projected Cost: $ 15800 Phase: Construction Whitney Ave & L.B. Landry (Mardi Gras Blvd - Patterson Dr) Bikeways Location: Whitney Ave & L.B. Landry (Mardi Gras Blvd - Patterson Dr) Bikeways Project Type: Bike/Pedestrian Paths & Bridges Description: Install new pavement markings and signage Projected Cost: $ 44491 Phase: Construction Harrison Ave Bridge over Bayou St. John (Eastbound) Location: Harrison Ave Bridge over Bayou St. John (Eastbound) Project Type: Bridge Reconstruction Description: Bridge reconstruction Projected Cost: $ 1252437 Phase: Construction Harrison Ave Bridge over Bayou St. John (Westbound) Location: Harrison Ave Bridge over Bayou St. John (Westbound) Project Type: Bridge Reconstruction Description: Bridge reconstruction Projected Cost: $ 1252437 Phase: Construction Park Island Bridge over Bayou St. John Location: Park Island Bridge over Bayou St. John Project Type: Bridge Reconstruction Description: Bridge reconstruction

Page 13 of 26

NEW DAY. NEW ORLEANS. Committed Projects Projected Cost: $ 2469258 Phase: Construction Gallier Hall Renovations Location: 545 Saint Charles Ave. Project Type: Community Centers Description: Major repairs to existing roof and interior. Projected Cost: $ 1321304 Phase: Construction BW Cooper Infrastructure Location: 0 Project Type: DPW Recovery Description: Projected Cost: $ 10000000 Phase: Construction City Park Road repairs Location: City Park Ave Project Type: DPW Recovery Description: Patching repairs of streets and sidewalks damaged by storm waters and debris removal. Projected Cost: $ 339649 Phase: Construction Drain Point Repair Services Location: Navarre Project Type: DPW Recovery Description: Patching repairs of streets and sidewalks damaged by storm waters and debris removal. Projected Cost: $ 4335751 Phase: Construction Filmore Road Repairs Location: Filmore St Project Type: DPW Recovery Description: Patching repairs of streets and sidewalks damaged by storm waters and debris removal. Projected Cost: $ 1798540 Phase: Construction Gentilly Woods Road Repairs Location: Gentilly Woods Project Type: DPW Recovery Description: Patching repairs of streets and sidewalks damaged by storm waters and debris removal.

Page 14 of 26

NEW DAY. NEW ORLEANS. Committed Projects Projected Cost: $ 409274 Phase: Construction Lakeshore - Lake Vista Road Repairs Location: Lakeshore @ Lake Vista Project Type: DPW Recovery Description: Patching repairs of streets and sidewalks damaged by storm waters and debris removal. Projected Cost: $ 439956 Phase: Construction Lower Ninth Ward Road Repairs Location: Lower Ninth Ward Project Type: DPW Recovery Description: Patching repairs of streets and sidewalks damaged by storm waters and debris removal. Projected Cost: $ 4220483 Phase: Construction Marlyville & Fontainbleau Road Repairs Location: Marlyville & Fontainbleau Road Repairs Project Type: DPW Recovery Description: Patching repairs of streets and sidewalks damaged by storm waters and debris removal. Projected Cost: $ 1484699 Phase: Construction School Zone Flashing Beacons Location: Citywide Project Type: DPW Recovery Description: Repair and/or replacement of damaged school zone flashers with new solar-powered flashers Projected Cost: $ 1548439 Phase: Construction West End Road Repairs Location: West End Ave Project Type: DPW Recovery Description: Patching repairs of streets and sidewalks damaged by storm waters and debris removal. Projected Cost: $ 2626076 Phase: Construction City-Wide Fencing (EP) Location: Citywide Project Type: Other Public Spaces

Page 15 of 26

NEW DAY. NEW ORLEANS. Committed Projects Description: Parks, Playgrounds, and other City Owned sites. Replacement and/or repairing of chainlink, barb wire, backstop, and iron fencing at facilities, playgrounds, and fields. Projected Cost: $ 831298 Phase: Construction Mosquito Control Administration Building Design-Build Location: Leon C. Simon Blvd @ Elysian Field Ave. Project Type: Other Public Spaces Description: Replacement and relocation of mosquito and rodent control facility. Projected Cost: $ 5283430 Phase: Construction Brechtel Park (Park Only) Location: 3700 Behrman Place Project Type: Parks & Recreation Facilities Description: Park, Picnic Shelters, and Campgrounds in Algiers. Renovations and repairs to shelters, restrooms, grounds, sidewalks, and bridges. Projected Cost: $ 564164 Phase: Construction Joseph Bartholomew Golf Course (Pontchartrain Park) Location: 6514 Congress Dr. Project Type: Parks & Recreation Facilities Description: Complete renovation of existing golf course Projected Cost: $ 9941791 Phase: Construction Louis Armstrong Park & Old Fire Station (Phase 2) Location: 901 N Rampart St Project Type: Parks & Recreation Facilities Description: eligible repairs. Projected Cost: $ 118800 Phase: Construction

Page 16 of 26

NEW DAY. NEW ORLEANS. Committed Projects Louis Armstrong Park & Old Fire Station (Phase 3) Location: 901 N Rampart St. Project Type: Parks & Recreation Facilities Description: Continue the renovation of the park including the relocation of the Louis Armstrong Statue and the installation of 7 other statues dedicated to cultural contributions. Projected Cost: $ 3360821 Phase: Construction NORD High Mast Lighting Group 1 Location: Citywide Project Type: Parks & Recreation Facilities Description: High Mast Lighting; Replacement or additions of new timber poles, lighting fixtures, electrical boxes, wiring, and bulbs at playgrounds, parks, ball fields, and community areas. Projected Cost: $ 291865 Phase: Construction NORD High Mast Lighting Group 2 Location: Citywide Project Type: Parks & Recreation Facilities Description: High Mast Lighting; Replacement or additions of new timber poles, lighting fixtures, electrical boxes, wiring, and bulbs at playgrounds, parks, ball fields, and community areas. Projected Cost: $ 354508 Phase: Construction NORD High Mast Lighting Group 3 Location: Citywide Project Type: Parks & Recreation Facilities Description: High Mast Lighting; Replacement or additions of new timber poles, lighting fixtures, electrical boxes, wiring, and bulbs at playgrounds, parks, ball fields, and community areas. Projected Cost: $ 497685 Phase: Construction Latter Library (Roof Replacement & Library Renovations) Location: #N/A Project Type: Public Libraries Description: Replace historic claytile roof and termite repairs on main house and carrage house. Projected Cost: $ 2661108 Phase: Construction/Design

Page 1 of 26

NEW DAY. NEW ORLEANS. Committed Projects Rosa Keller (Broadmoor) Library Location: 4300 S Broad St. Project Type: Public Libraries Description: Replacement facility for library and major renovation of historic house to a community center with enterprise zone. Projected Cost: $ 5484965 Phase: Construction Catina (Mouton - Robert E Lee), Louisville (Filmore - Robert E Lee) Location: 0 Project Type: Road Reconstruction Description: Reconstruction of existing roadway, including the replacement of affected utilities. Projected Cost: $ 5985527 Phase: Construction Earhart Blvd Phase I (Hamilton St - Fern St) Location: Earhart Blvd Phase I (Hamilton St - Fern St) Project Type: Road Reconstruction Description: Reconstruction of existing roadway, including the replacement of affected utilities. Projected Cost: $ 14367882 Phase: Construction Fleur de Lis Phase II (Veterans Blvd - Harrison Ave) Location: Fleur de Lis Phase II (Veterans Blvd - Harrison Ave) Project Type: Road Reconstruction Description: Reconstruction of existing roadway, including the replacement of affected utilities. Projected Cost: $ 12714302 Phase: Construction Holy Cross Roadway Improvements - Douglass St., Andry St., N. Peters St. Location: Holy Cross Roadway Improvements - Douglass St., Andry St., N. Peters St. Project Type: Road Reconstruction Description: Improvements to various minor streets, which may include reconstruction and/or milling and overlay. Projected Cost: $ 2500000 Phase: Construction Edgelake Court (Crowder Rd - Hayne Blvd) Location: Edgelake Court (Crowder Rd - Hayne Blvd) Project Type: Road Resurfacing Description: Asphalt pavement, base repair and curb replacement Projected Cost: $ 376596

Page 1 of 26

NEW DAY. NEW ORLEANS. Committed Projects Phase: Construction St. Roch and St. Claude Roadway Improvements (St. Claude Ave. - N. Roman St.) Location: St. Roch and St. Claude Roadway Improvements (St. Claude Ave. - N. Roman St.) Project Type: Road Resurfacing Description: Rehabilitation of roadway by milling existing surface and overlay with new asphalt, including pre-milling patching repairs as well as adjustment of utility manholes, where applicable. Projected Cost: $ 1476000 Phase: Construction West Roadway (Lake Marina Ave - South Roadway) Location: West Roadway (Lake Marina Ave - South Roadway) Project Type: Road Resurfacing Description: Asphalt pavement, base repair and curb replacement Projected Cost: $ 277042 Phase: Construction Claiborne Avenue Streetscape (Cleveland St. - Gravier St.) Location: Claiborne Avenue Streetscape (Cleveland St. - Gravier St.) Project Type: Streetscapes Description: Sidewalk and landscaping improvements Projected Cost: $ 2234859 Phase: Construction

Page 2 of 26